4.1.Methodology:
Pressure test Sequence:
Testing is conducted at every floor areas as construction is on
progress, which is then divided into sections.
F-8
F-1
Sheet reference
No.
1.8. Reduce the pressure inside the pipe after pressure test
approval.
1.9. Then install pump for flushing at designated
locations.
1.10. Flush the pipe with clean water until no trace of dirt
and foreign matters are found.
1-11.Drain all the water after flushing approval.
F-
Approved Specification:
Pressure gauges
Pressure gauges
Gate valve
Gate valve
13.3 kg/cm2
2 kg/cm2
13.3 kg/cm2
125 kg/cm2