Академический Документы
Профессиональный Документы
Культура Документы
Welcome To ABB
Technical Sharing Session
ABB Group
June 25, 2013 | Slide 1
Agenda
0900 - 0930 Hrs
Safety briefing
Break Time
Lunch
Refreshment
1700 Hrs
End
ABB Group
June 25, 2013 | Slide 3
Targets were:
IEC 60439-3
IEC 60439-4
IEC 60439-5
IEC 60439-2
For each type of low-voltage assembly two main standards are necessary
to determine all requirements and the corresponding methods of
verification:
1. this basic standard referred to as Part 1 in the specific standards
covering the general rules
2. the specific ASSEMBLY standard hereinafter also referred to as the
relevant ASSEMBLY standard
9.
10.
11.
12.
13.
14.
1.
Scope
2.
Normative references
3.
4.
Application of assemblies
within the IEC 61430 series
Installation5.environment
Assembly design and
verification process
Installation method
6.
Electrical system
Storage and handling
7.
Short-circuit withstand
capability
Operating arrangements
8. and upgrade
Protection of persons
Maintenance
against electric shock
capabilities
Current carrying capability
Part 1
Part 2 to X
General rules
Power
switchgear and
controlgear
assemblies
1.
Scope
1.
Scope
2.
Normative References
2.
Normative References
3.
3.
4.
4.
5.
Interface characteristics
5.
Interface characteristics
6.
Information
6.
Information
7.
Service conditions
7.
Service conditions
8.
Constructional requirements
8.
Constructional requirements
9.
Performance requirements
9.
Performance requirements
10.
Design Verification
10.
Design verification
11.
Routine Verification
11.
Routine Verification
Part 0
Guide for
specifying
assemblies
Part 1
General rules
Part 2
Power switchgear
and controlgear
assemblies
Part 3
Distribution
boards
Part 4
Part 5
Part 6
Assemblies for
construction
sites
Assemblies for
power
distribution
Busbar trunking
systems
61439 -1
61439 - 2
Power Switchgear & Control Assembly -
61439 - 3
61439 - 4
final distribution
Construction site
61439 - 6
61439 - 5
Power distribution
(i.e. public grids)
For Example
1.Electrical System
Provide SLD
Overvoltage category
Rated frequency
4.Installation environment
Resistance to UV radiation
Resistance to corrosion
Altitude
EMC
5.Installation method
The new IEC 61439-1 will be the basis for all the standard of the family 61439
(till now 6 total standard) that shall refer to it.
2009
60439-1 e 60439-x
61439-1 e 61439.2
2014
61439-x
IEC 60439
Type
tested
TTA
Calculation
or extrapolation
PTTA
IEC 61439
ABB Group
25 giugno 2013 | Slide 22
ABB Group
25 giugno 2013 | Slide 23
ABB Group
25 giugno 2013 | Slide 24
Temperature rise
Short-circuit
Dielectric properties
Mechanical operation
Degree protection
Effectiveness protective circuit
Clearances and creepage distances
8
9
10
11
12
13
As IEC
60439
5 Degree protection
6 Effectiveness of the
protective circuit
7 Clearances and
creepage distances
ABB Group
25 giugno 2013 | Slide 25
NEW
Different manufacturer
Problems
- Its difficult to have or find the temperature values on the
components terminals.
- IEC 61439 doesnt give any solution.
ABB Group
25 giugno 2013 | Slide 29
check-list
Icp < 10 kA
NO
Yes
Yes Main device
Ipk limited is:
Ipk < 17 kA
ABB Group
25 giugno 2013 | Slide 31
test ?
NO
test ?
NO!
Yes!
Design verification
10.1
General
catalog
Help
DOC
Electrical Installation Calculation and
Dimensioning
ABB Group
June 25, 2013 | Slide 33
Contents
Introduction
Aim of the application
Target users
Products managed
How it works
Features
Support Tools
ABB Software Desktop
Assistance
How to obtain the software
Starting on a Project
ABB Group
June 25, 2013 | Slide 34
DOC
Introduction
ABB Group
June 25, 2013 | Slide 35
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 36
Target user
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 37
Consultants
Electrical Engineers
Panel builders
Installers
Product managed
Introduction
Aim of the application
Target users
Product managed
Motors
Transformers
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 38
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 39
New Emax
Emax
Product managed
Introduction
Aim of the application
Target users
Product managed
Tmax
Features
Isomax
Support Tools
Tmax XT
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 40
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 41
Tmax
Isomax
Product managed
Introduction
Aim of the application
Target users
Product managed
System PRO M
Features
Support Tools
S800
Smissline
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 42
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 43
RCCBs
System PRO M
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 44
Fuses
OFAX
OFASB
Product managed
Introduction
Aim of the application
Target users
Product managed
Switch Fuses
E930
Features
OESA
Support Tools
OS
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 45
Product managed
Introduction
Aim of the application
Target users
Product managed
Disconnectors
New Emax MS
Features
Emax MS
Support Tools
Tmax D
Isomax D
OT
OETL
E200
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 46
Product managed
Introduction
Aim of the application
Target users
Product managed
Contactors
Features
AF
Support Tools
EN
ESB
E250
E259
E260
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 47
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 48
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 49
Thermal Overload
TAxxDU, ExxDU
UMC-22
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 50
Circuit breaker
Product managed
Introduction
Aim of the application
Target users
Product managed
Circuit breaker
REF542Plus/DK
Features
PR521/DK
Support Tools
PR521/P (50-51)
ASD
Assistance
How to obtain the
software
PR521/P (50-51-51N)
REF542Plus
Starting on a New
Project
REF610
REJ525
PR512/P (50-51)
PR512/P (50-51-50N-51N)
PR512/PD
How it works
ABB Group
June 25, 2013 | Slide 51
Product managed
Introduction
Aim of the application
Target users
Product managed
Disconnectors
SHS2/A
Features
SHS2/I
Support Tools
SHS2/IB
SHS2/IF
SHS2/N-I
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 52
Earth Disconnectors
Product managed
Introduction
Aim of the application
Target users
Product managed
Switch Disconnectors
SHS2/T1
Features
SHS2/T1M
Support Tools
SHS2/T2
SHS2/T2F
SHS2/T2M
SHS2/T2MF
SHS2/N-T1
SHS2/N-T1M
SHS2/N-T2
SHS2/N-T2F
SHS2/N-T2M
SHS2/N-T2MF
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 53
Product managed
Introduction
Aim of the application
Target users
Product managed
Features
Support Tools
How it works
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 54
Motor Fuses
Product managed
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 55
Cables
Sized according to
the ABB
XLPE Cable Systems
Users Guide"
Product managed
Introduction
Aim of the application
Target users
Product managed
Other Products
Motors
M2xxx
M3xxx
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 56
Transformers
RESIBLOC
How
DOC it works
How it Works
ABB Group
June 25, 2013 | Slide 57
Introduction
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 58
How it works
Features
Blank Page
More flexible
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 59
Column Page
By Single Objects
More flexible
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 60
By Macros
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 61
When using the Column layout, Objects are numbered by Page &
Column
All the object in the same feeder have the same number
Use the Add Sheet and Change layout commands to prepare new empty
pages
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 62
This window is shown when starting a new project. Set all the options
carefully to spare time when drawing and calculating the electrical
installation
Main options:
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
Voltage level
ABB Group
June 25, 2013 | Slide 63
A toolbar on the right side of the working area suggests the preferred
way to develop a project with DOC
Introduction
Aim of the application
Target users
Product managed
How it works
Features
MV diagram drawing
LV diagram drawing
Switchboard configuration
Printouts
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 64
The Medium Voltage section of the project can be drawn by the Macros
of the typical units of the Unimix switchboard or by Objects for more
flexibility
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
MV DESIGN
ABB Group
June 25, 2013 | Slide 65
The Medium Voltage section of the project can be drawn by the Macros
of the typical units of the Unimix switchboard or by Objects for more
flexibility
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 66
The Low Voltage section of the project can be drawn by the Macros or
by Objects for more flexibility
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Power Supply
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
I.e.: CB+Cable+Load
I.e.: Fuse+Cable+Load
Switchboard Arrival
Sub-Switchboard
Faster drawing
Pop-up window
Feeders
Motor Coordination
Load-Flow
ASD
Assistance
How to obtain the
software
Cable dimensioning
Starting on a New
Project
Presence of meshes
How it works
Features
Support Tools
ABB Group
June 25, 2013 | Slide 68
Cable dimensioning
Given the power required by the loads and the motors, DOC is
able to size the cables in an iterative process bringing to the
section optimization and the current profile calculation
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
ABB Group
June 25, 2013 | Slide 69
Cable dimensioning
Given the power required by the loads and the motors, DOC is
able to size the cables in an iterative process bringing to the
section optimization and the current profile calculation
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
IEC 60364
Starting on a New
Project
ABB Group
June 25, 2013 | Slide 70
Short Circuit
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 71
Configuration Management
Introduction
Aim of the application
Target users
Product managed
In DOC it is possible to
simulate different
scenarios for the electrical
installation defining the
open/closed position for
the switching and
protecting devices
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 72
How it works
Features
Devices Selection
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 73
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 74
DOC gives the possibility to perform the temperature riseassessment according to IEC 60890 in a early stage of the
installation design
TEMPERATURE
RISE ASSESSMENT
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 75
DOC gives the possibility to perform the temperature riseassessment according to IEC 60890 in a early stage of the
installation design
Features - Curves
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
1E4s
Starting on a New
Project
1E3s
CURVES
10s
-TM1
1s
ABB Group
June 25, 2013 | Slide 76
0.1kA
1kA
10 kA
100kA
Features - Curves
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
1E4s
1E3s
10s
-TM1
1s
ABB Group
June 25, 2013 | Slide 77
0.1kA
1kA
10 kA
100kA
How it works
Features
Layer management (door, panel and plate layer, show hide busbars)
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 78
How it works
Features
Layer management (door, panel and plate layer, show hide busbars)
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 79
How it works
Features
Calculation hypothesis
Support Tools
ASD
Assistance
How to obtain the
software
Cable Protections
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 80
How it works
Features
Calculation hypothesis
Support Tools
ASD
Assistance
How to obtain the
software
Cable Protections
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 81
Support
Tools
DOC
Support Tools
ABB Group
June 25, 2013 | Slide 82
ASD functionalities:
How it works
Features
Support Tools
Registration
Software upgrade
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 83
16 available languages
Italian
English
German
French
Spanish
Portuguese, Danish,
Turkish, Chinese, Polish,
Hungarian, Czech, UA
Russian, RU Russian,
Bulgarian, Finnish
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 84
Registration
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 85
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 86
Assistance
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
On line
ABB Group
June 25, 2013 | Slide 87
software.tools@it.abb.com
Call Center
Starting on a New
Project
The Single Line Diagram
http://www.bol.it.abb.com
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 88
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 89
Introduction
Aim of the application
Target users
Product managed
How it works
Features
Support Tools
ASD
Assistance
How to obtain the
software
Starting on a New
Project
The Single Line Diagram
ABB Group
June 25, 2013 | Slide 90
Transformer size
Cable Length
Etc.
ABB Group
June 25, 2013 | Slide 91
ABB Group
June 25, 2013 | Slide 92
ABB Group
June 25, 2013 | Slide 93
ABB Group
June 25, 2013 | Slide 94
ABB Group
June 25, 2013 | Slide 95