Вы находитесь на странице: 1из 4

ITEMS OF WORKS

Bills of Materials
DESCRIPTOIN
QUANTI
TY

UNIT

UNIT
COST

AMOUNT

I. EARTHWORKS
Staking Lay-out
Good Lumber
CWN No. 1
CWN No. 3
Nylon String

2416
17.90
17.90
499.03

bd. ft.
kgs.
kgs.
ln. m.

52.00
50.00
50.00
3.00

Gravel Gl

4955.93

cu. m.

450.00

Excess/ Barrow

25812.1
3

cu. m.

60.00

Gravel Bedding
Backfilling
Total

II. CONRETING
WORKS
Foundation
RSB No. 10
RSB No. 12
Tie wire gauge
16
Cement
Sand
Gravel Gl

pcs.
pcs.
kgs.

125.00
200.00
60.00

757
60.92
82.60

bags
cu. m.
cu. m.

185.00
350.00
400.00

2730.92
825.99
96.36
334.18
1548.71
2
1445.48
16481.8
2
1394
154.87
77.44

bd. ft.
pcs.
kgs.
kgs.
pcs.

52.00
300.00
50.00
50.00
125.00

pcs.
kgs.

200.00
60.00

bags
cu. m.
cu. m.

185.00
350.00
400.00

Good Lumber
Form Ply
CWN No. 1
CWN No. 3
RSB No. 10
RSB No. 12
Tie wire gauge
16
Cement
Sand
Gravel

2583.98
624.65
62.3
258.46
1435.16
1435.16
3797.23

bd. ft.
pcs.
kgs.
kgs.
pcs.
pcs.
kgs.

52.00
300.00
50.00
50.00
125.00
200.00
60.00

1152.94
63.33
126.65

bags
cu. m.
cu. m.

185.00
350.00
450.00

Good Lumber
Form Ply
CWN No. 1
CWN No. 3
RSB No. 12
Tie wire gauge
16

1789.65
395.79
550.67
178.96

bd. ft.
pcs.
kgs.
kgs.
pcs.
kgs.

52.00
300.00
50.00
50.00
200.00
60.00

674.56
275.33

Columns
Good Lumber
Form Ply
CWN No. 1
CWN No. 3
RSB No. 10
RSB No. 12
Tie wire gauge
16
Cement
Sand
Gravel Gl
Beams

Slab(flooring)

Cement
Sand
Gravel

2134
42.44

bags
cu. m.
cu. m.

185.00
350.00
450.00

pcs.
kgs.

200.00
60.00

bags
cu. m.
cu. m.

185.00
350.00
450.00

Slab on Fill
RSB No. 12
Tie wire gauge
16
Cement
Sand
Gravel
Total

III. MASONRY
WORKS
Batter Board
Good Lumber
Concrete Nail

2416.02
35.79

bd. ft.
kgs.

52.00
50.00

125632.79
1789.64

RSB No. 10
Tie wire gauge
16
Cement
Sand
CHB No. 4

2337.05
208.22

pcs.
kgs.

125.00
60.00

391483.94
12403.06

809
66.60
36446.7
2

bags
cu. m.
pcs.

185.00
350.00
8.00

46624.30
19978.59

2x4 C-Purlins
2x6 C-Rafters
Welding Rod
Steel Plate
Anchor Bolt
Sag Rod

1806.85
111.85
199.61
68.83
137.66
99.81

pcs.
pcs.
kgs.
pcs.
pcs.
pcs.

200.00
475.00
30.00
40.00
100.00
80.00

sq. m.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

300.00
150.00
90.00
80.00
3.00
75.00
105.00

CHB Laying

Total
IV. ROOFING
Roof Fraiming

Water Proofing
G. I. Corr. Sheet
Ridge Roll
Flashing Sheet
Fascia Board
Tekscrew
G. I. Gutter
Silicon Sealant

499.03
51.62
103.25
258.12

Total
V. DOORS &
WINDOWS
Doors
Panel Door
Roll Up
Hinges
Lockset(Roll Up)
Lockset(Main
Door)

34.92
103.95
34.42

Set
Set
Set
Set
Set

3,200.00
5,300.00
50.00
170.00
350.00

sq. m.
sq. m.

1,000.00
150.00

Windows
Window Frames
Window Glass
Total

17.21
154.57

VI. ELECTRICAL
WORKS

516,242.5587

VII. PLUMBING
WORKS

430,202.1323

VIII. CARPENTRY
WORKS
Ceiling
Ficem Board
Carrying
Channel
Furring Channel
Hunger
Flat Head Screw
Total
TOTAL COST

430.20
963.65

pcs.
pcs.

230.00
100.00

98946.49
96365.28

1032.49
275.33
9692.72

pcs.
pcs.
pcs.

80.00
25.00
4.00

82598.81
6883.23
38570.89
9,000,000.
00

Вам также может понравиться