APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
APPENDIX D
LICITACION
PUBLICA
INTERNACIONAL
2
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
CONTENTS
D.1
PURPOSE...................................................................................................................................................3
D.2
GENERAL PROCEDURES.....................................................................................................................4
D.2.1
D.2.2
D.2.3
D.2.4
D.2.5
D.2.6
D.2.7
D.2.8
D.2.9
D.2.10
D.2.11
D.2.12
D.2.13
D.2.14
D.2.15
D.3
SPECIFIC PROCEDURES....................................................................................................................10
D.3.1
D.3.2
D.3.3
D.3.4
D.3.5
D.3.6
D.3.7
D.4
D.4.1
D.4.2
D.4.3
D.4.4
D.4.5
D.4.6
D.4.7
VESSELS..................................................................................................................................... 12
SHELL AND TUBE HEAT EXCHANGERS..........................................................................................13
ROTATING EQUIPMENT (PUMPS AND COMPRESSORS)......................................................................14
PIPING SYSTEM........................................................................................................................... 14
ELECTRIC POWER DISTRIBUTION AND LIGHTING...........................................................................15
INSTRUMENTATION...................................................................................................................... 16
MECHANICAL AND LOADING EQUIPMENT....................................................................................17
LICITACION
PUBLICA
INTERNACIONAL
3
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
D.1
1600152400
PURPOSE
The checklists of general and specific procedures are intended to define the operations and
tests to be performed by the CONTRACTOR as the construction of the WORK or of part
thereof is being completed.
These lists are intended to show the operations and tests required to demonstrate that the
WORK has been provided and constructed in accordance with the drawings, specifications
and applicable codes and generally with all terms and conditions of the CONTRACT which are
applicable at the considered stage of progress of work.
The performance to the satisfaction of the ENGINEER of the said operations and tests is one
of the conditions for issuance by the ENGINEER of the certificate of MECHANICAL
COMPLETION of the entire WORK and/or of the interim statement of MECHANICAL
COMPLETION of any part of the WORK.
CONTRACTOR will have to finalize detailed check lists which have to be approved by ANCAP.
Such checklists shall cover all the procedures to be developed on the basis outlined in D2
and in D3 hereafter when applicable.
LICITACION
PUBLICA
INTERNACIONAL
4
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
D.2.1 REMOVAL
OF RUST PREVENTIVES
Category
of work
Precom- Commis
miss'g
sioning
ANCAP with
completed.
record
of
work
D.2.2 LUBRICANTS
a/ Provide
lubricants
a list of
b/ Install
lubricants
initial
all
necessary
charge
of
all
X
c/ Maintain
charge.
D.2.3 PACKING
a/
b/
lubrication
after
initial
AND SEALS
Install
mechanical
permanent
packing
accessories when required
seals,
and
X
X
LICITACION
PUBLICA
INTERNACIONAL
5
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
Responsibility of
work
Contrac- ANCAP
tor
D.2.4 REMOVAL
Category
of work
Precom- Commismiss'g
sioning
OF TEMPORARY BRACING
1600152400
AND ALIGNMENT
a/
b/
c/
doweling
a/
b/
Make
hot alignment
required.
D.2.6 TIE-INS
and
any
AT BATTERY LIMITS
X
c/
X
d/
LICITACION
PUBLICA
INTERNACIONAL
6
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
Responsibility of
Category
work
of work
Contra ANCAP Precom Commi
cstor
miss'g sioning
D.2.7 LEAK
AND
PRESSURE TESTS
a/
b/
c/
d/
e/
f/
g/
D.2.8 INSPECTION
a/
b/
D.2.9
a/
DEVICES
LICITACION
PUBLICA
INTERNACIONAL
7
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
b/
Install all safety devices (including pressurerelief valves) after testing and adjustment.
c/
X
X
d/
D.2.10
FLUSHING
CLEANING
a/
b/
AND
CHEMICAL/MECHANICAL
Conduct
all
flushing,
blowing
and
chemical/mechanical cleaning operations
and provide required circulating media and
chemicals. ANCAP designated priorities to
be followed.
Dispose of wastes and cleaning media
according to ANCAPs instructions.
X
c/
X
X
D.2.11 TEMPORARY
BLINDS
a/
b/
Clean
strainers
as
required
during
circulation and remove strainers when
adequately cleaned
c/
d/
blinds
D.2.12 PURGING/INERTING
a/
b/
X
X
X
X
LICITACION
PUBLICA
INTERNACIONAL
8
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
D.2.13
a/
b/
1600152400
HOUSEKEEPING
At completion of construction provide cleanup of the WORK area. Remove excess
materials,
temporary
facilities
and
scaffolding; rough sweep or rake the area;
and pick up trash.
Perform washing or
further clean-up as required.
After completion of construction maintain
adequate
housekeeping
practices,
as
required for safe operation.
Responsibility of
work
Contractor
ANCAP
Category
of work
Precom- Commismiss'g
sioning
D.2.14 SAFETY
During precommissioning activities, CONTRACTOR
shall ensure all safety regulations and practices
imposed by ANCAP are strictly followed.
D.2.15
EQUIPMENT STORAGE
LICITACION
PUBLICA
INTERNACIONAL
9
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
EQUIPMENT
a/
b/
c/
Engines alignment with their drivers, in the hot state, during 4 weeks. (The cold
alignment and one hot alignment verification during the period)
ELECTRIC
POWER
a/
b/
c/
d/
e/
f/
Phase rotation for all electric device and checking of motor rotation direction(at
commissioning stage)
g/
For every high voltage feeder: high voltage test (at commissioning stage)
h/
i/
j/
k/
INSTRUMENTATION
a/
b/
LICITACION
PUBLICA
INTERNACIONAL
10
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
c/
d/
Range setting for all instruments and valves in conformity with specifications
e/
f/
g/
h/
i/
j/
Check inside diameter & and flow direction for calibrated orifices after line
cleaning
k/
D.3.5 WATER
a/
SYSTEMS
d/
Install all required fire fighting chemicals and portable equipment such as
hoses, fire extinguishers and related equipment.
WASTE
DISPOSAL
Inspect facilities for completeness and correctness of installation and make any nonoperating checks to ensure their conformance to specifications.
MISCELLANEOUS
Civil engineering
skirt
Steel structure
Earthwork, roads
Sewer system
Insulation
LICITACION
PUBLICA
INTERNACIONAL
11
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
Painting
1600152400
thickness,
Notes
D.4
1/
All the damaged equipment shall be retested (if required, competent Authorities
shall be present during such tests).
2/
All the equipment, built completely or partially on the site shall be hydraulically
tested (if required, competent Authorities shall be present during such tests).
Based on and in addition to the specific procedures as defined in D3, is presented hereafter
a breakdown of activities into precommissioning and commissioning. For each activity the
involvement of Contractor and ANCAP is indicated.
Responsibility of
Category
work
of work
Contra ANCAP Precom Commi
cstor
miss'g sioning
D.4.1 VESSELS
a/
b/
c/
Close vessel.
D.4.2 SHELL
a/
b/
Proceed
with
pressure
described in D.2.7.f.
tests
tests
after
as
11
LICITACION
PUBLICA
INTERNACIONAL
12
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
Responsibility of
work
Contractor
D.4.3 ROTATING
EQUIPMENT
COMPRESSORS)
(PUMPS
b/
Correct
any
abnormal
effort
equipment due to piping connections
Proceed with cold line-up
d/
e/
D.4.4 PIPING
Precom- Commismiss'g
sioning
AND
a/
c/
ANCAP
Category
of work
on
SYSTEM
a/
b/
c/
d/
e/
f/
12
LICITACION
PUBLICA
INTERNACIONAL
13
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
Responsibility of
work
Contractor
D.4.5 ELECTRIC
ANCAP
Category
of work
Precom- Commismiss'g
sioning
a/
b/
c/
d/
e/
f/
g/
h/
13
LICITACION
PUBLICA
INTERNACIONAL
14
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
Responsibility of
work
Contractor
ANCAP
Category
of work
Precom- Commismiss'g
sioning
D.4.6 INSTRUMENTATION
a/
b/
c/
Check
continuity
of
connections, polarity, etc.
instrument
d/
Check thermocouples
correct connection, etc.
continuity,
e/
f/
g/
h/
i/
j/
for
D.4.7 MECHANICAL
AND
LOADING EQUIPMENT
14
LICITACION
PUBLICA
INTERNACIONAL
15
APPENDIX D CHECKLIST FOR MECHANICAL COMPLETION
1600152400
15