John Hart Generating Station Replacement Project

Monthly Progress Report No. 25 March 2016


TABLE OF CONTENTS
1.0

2.0

3.0

4.0

5.0

EXECUTIVE SUMMARY ..............................................................................................................5


1.1

Design and Procurement........................................................................................................ 6

1.2

Construction ........................................................................................................................... 6

1.3

Environmental Activities ........................................................................................................ 7

1.4

Quality Management ............................................................................................................. 8

1.5

Safety...................................................................................................................................... 8

QUALITY MANAGEMENT ...........................................................................................................9


2.1

Reports, Audits and Meetings ................................................................................................ 9

2.2

Non-Conformity Tracking ..................................................................................................... 10

SAFETY ...................................................................................................................................20
3.1

Meetings .............................................................................................................................. 20

3.2

Audits/Inspections ............................................................................................................... 20

3.3

Background Checks .............................................................................................................. 20

3.4

Safety Statistics .................................................................................................................... 20

SUMMARY OF POTENTIAL PROBLEMS .....................................................................................23


4.1

Potential Problems ............................................................................................................... 23

4.2

Actions Required/Taken ....................................................................................................... 23

4.3

Strategic Issues ..................................................................................................................... 25

NARRATIVE OF MAJOR EVENTS ...............................................................................................26


5.1

Engineering Design ............................................................................................................... 26


5.1.1

Civil....................................................................................................................... 26

5.1.2

Geotechnical ........................................................................................................ 26

5.1.3

Hydrotechnical ..................................................................................................... 27

5.1.4

Mechanical ........................................................................................................... 27

5.1.5

Turbine and Generator (T/G) ............................................................................... 30

5.1.6

Electrical............................................................................................................... 31

5.2

Site Construction .................................................................................................................. 31

5.3

Procurement Activities......................................................................................................... 31

6.0

INTERIM DAM SAFETY RISK MANAGEMENT PLAN (IDSRMP) INFORMATION .............................36

7.0

DESIGN PACKAGES UPDATE.....................................................................................................38

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
8.0

DESIGN DEVELOPMENT CHANGE NOTICE REGISTER .................................................................44

9.0

SUMMARY OF CORRESPONDENCE AND TRANSMITTALS...........................................................45


9.1

Summary of Correspondence .............................................................................................. 45

9.2

Tracking of Submittals .......................................................................................................... 50

9.3

Submittal Schedule .............................................................................................................. 94

10.0 PROJECT SCHEDULE............................................................................................................... 109


11.0 PROJECT PROGRESS CHART ................................................................................................... 165
12.0 CRITICAL PATH ANALYSIS ...................................................................................................... 166
13.0 INVENTORY OF CONSTRUCTION EQUIPMENT......................................................................... 167
14.0 INVENTORY OF CONSTRUCTION MATERIAL............................................................................ 168
15.0 PERMANENT EQUIPMENT DELIVERY DATES ........................................................................... 168
16.0 INVENTORY OF PERMANENT EQUIPMENT ............................................................................. 168
17.0 MONTHLY ENVIRONMENTAL REPORT SUMMARY .................................................................. 169
17.1 Project Work during Reporting Period ............................................................................... 169
17.2 Status of Environmental Permits, Licenses and Approvals (PLAs) ..................................... 170
17.3 Other Environmental Reports ............................................................................................ 172
17.4 Communication with Environmental Authorities .............................................................. 174
18.0 FIRST NATIONS AND COMMUNITY INVOLVEMENT ................................................................. 175
18.1 First Nations Involvement .................................................................................................. 175
18.2 Community involvement and Communications ................................................................ 176
19.0 CLAIMS AND NOTICES ........................................................................................................... 178
19.1 Claims ................................................................................................................................. 178
19.2 Notices ............................................................................................................................... 178
20.0 PHOTOGRAPHS ..................................................................................................................... 179
20.1 Photographs On Site........................................................................................................ 179
20.2 Photographs Off Site ....................................................................................................... 179

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
List of Figures
Figure 10.1
Figure 11.1

Overall Project Schedule


Project Progress Chart

List of tables
Table 1.1:
Table 2.1:
Table 3.1:
Table 5.1:
Table 6.1:
Table 7.1:
Table 8.1:
Table 9.1:
Table 9.2
Table 9.3:
Table 17.1:
Table 17.2:
Table 18.1:
Table 19-1:

Summary of Monthly Reports


Reporting Period Register Open and Closed Non-Conformity Reports (NCRs)
Safety Statistics
SLI Subcontracts List (Active)
IDSRMPs - Status
Design Packages Update
Active Design Development Changes
Reporting Period - Correspondence from BC Hydro to SLI/InPower BC
Reporting Period - Submittals Tracking
Submittals Schedule
Summary of Environmental Plans
Summary of Environmental Work Plans (EWP)
Reporting Period - Summary of First Nations Involvement
Differing Site Condition Notices

List of Appendices
Appendix A ASL JV
Appendix B Alstom

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
- BLANK PAGE -

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
1.0

EXECUTIVE SUMMARY
On 25 February 2014, the British Columbia Hydro and Power Authority (BC Hydro) awarded to
InPower BC General Partnership a contract for the design, construction, financing, testing,
commissioning, maintenance and rehabilitation of the John Hart Generating Station
Replacement Project. Subsequently, InPower BC awarded a contract to SNC-Lavalin Inc. (SLI) to
design and construct as well as decommission certain elements of the John Hart Facility (JHT).
This John Hart Generating Station Replacement Project Monthly Progress Report (JHN MPR) has
been prepared in accordance with the Project Agreement (PA) and covers progress on design
and construction activities, including labour, equipment, materials, planning, scheduling, as well
as environmental and safety summaries. This report is for the reporting period of 26 February to
25 March 2016.
In addition to this report, a number of stand-alone monthly reports are prepared to meet the
requirements of the PA. In some cases, portions of the stand-alone monthly reports have been
incorporated into the JHN MPR to provide a comprehensive overview of the Projects evolution.
The content of the reports is summarized as follows:

Table 1.1:

Summary of Monthly Reports

Report Name
1.

2.

JHN Monthly Progress


Report (MPR)

Safety Report

PA Reference Section Subject Matter

Type

13-3

13.4

Monthly progress report

Provided as per
Schedule 13,
Section 13.4

5-52

4.3.4

Interim Dam Safety Risk Management Plan (IDSRMP)


monitoring information.

Information

5-76

5.5.3

Submittal Schedule updates.

Information

12-36

11.6

Background Check Statistics.

Information

14-1

1.5

Development Changes Register.

Information

12-22

8.1

Statistical Accident and Incident Report.

Information

8-2

2.4 (f)

Summary of Monthly Environmental Reports.

See below

12-22

8.1

Summary of Statistical Accident and Incident Report.

See below

24-6

App. B

Summary Aboriginal Participation Report Form.

See below

12-10

4.12

Notice of Workplace Safety Inspection.

Information

12-22

8.1

Statistical Accident and Incident Report.

Information

3.

Quality Report

9-2

5.9

Quality Management System reports.

Information

4.

Environmental Report

8-2

2.4 (f)

Monthly Environmental Reports

Review

5.

First Nations

24-6

App. B

Aboriginal Participation Report Form: Section 1 to 5 Monthly

Information

24-7

App. B

Aboriginal Participation Report Form: Section 6 Quarterly

Information

13-1

13.1

Monthly Reports for Progress Payments.

Information

13-2

13.2

Monthly Reports for Remittance Payments.

Information

6.

Payment Report

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
1.1

Design and Procurement


During this reporting period, design work focused on the Intake structure, Powerhouse and
Tailrace areas. Development of the Surge Tank DBM, calculations and drawings is progressing.
The Service Tunnel Fan House design has also been advanced. Refer to Section 5.1 for additional
information.
Procurement activities focused on the following:

ME16 Embedded Piping Powerhouse:


The scope comprises the fabrication and supply of embedded piping in the Powerhouse to
support the early phase concreting schedule. The subcontract is awarded to W.S. Nicholls
Western Construction Ltd. Substantial Completion has been achieved.

ME08 Fire Protection System:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of the fire protection and suppression system complete with all ancillaries.
The RFP was issued on 25 November 2015. Bids were returned on 14 January 2016. The
subcontract is awarded to Tyco Integrated Fire and Security Canada Inc.

ME14-02 - Pumps Process:


The scope comprises supply only of process pumps for service water, domestic water,
waste water, oil & dirty water and recirculation pumps. The work is awarded to Canadian
Industrial Pumps Ltd., executed as a change to subcontract ME14-01.

ME06 Compressed Air System:


The scope comprises the design and supply of compressed air system complete with all
ancillaries and instrumentation. Bids were returned on 18 March 2016. A preferred
proponent will be identified in the coming period.

EL09-02 AC Station Service Equipment - MCC:


The scope comprises the design and supply of motor control centers with auxillary
equipment. The RFP was issued on 11 March 2016, with return of bids scheduled by 15
April 2016.

EL10 Battery Banks, Chargers and UPS:


The scope comprises the design and supply of 125 VDC systems- batteries / chargers, 120
AC UPS systems in ancillary/ auxiliary components plus cable terminations. The RFP is being
prepared, for release in the coming period.

Refer to Section 5.3 for additional procurement information.

1.2

Construction
Main Access Tunnel (MAT):
FK/ASLJV are continuing with the installation of canopy pipes and lattice girders advancing
to station 20+330.5.
Probe holes continue to be drilled in the MAT to establish conditions ahead of the tunnel
face.

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Powerhouse Cavern:
Approximately 75% of the Powerhouse has been completed.
FK/ASLJV has blasted 100% of Bench 4, 7 and 8.
Excavation of Bench 5 is scheduled to commence in late March.
The Muck shaft was completed and is currently used to facilitate the Powerhouse
excavation through Draft Tube No.3.
Surge Chamber & Draft Tube Outlets:
The three Draft Tube Outlets were completed this reporting period.
The Surge Chamber bottom heading remains at approximately station 00+068 and will
continue advancing concurrently with the Bypass Outlet tunnels.
Power Tunnel and Unit Inlets:
Power Tunnel excavation remains at stations 00+173m. Further advancement is put on hold
to focus on Bypass and Unit Inlets advancement.
Blasting activities are scheduled to resume in the Power Tunnel late March/early April once
Bypass Inlets are complete.
Excavation of the Unit Inlets is 100% completed.
Excavation of the Bypass Inlets is approximately 90% completed.
Tailrace:
Drilling and blasting of Bench 4 (EL 15m) is complete and Bench 5 blasting activities have
commenced.
Excavation of Tailrace below EL 22.25 is approximately 25% completed.
Grout curtain drilling and grouting of Maintenance gate is completed.
East Abutment:
46 mm diameter DCP rock anchor installation was completed.
Formwork has been stripped and stair tower erected for Intake Maintenance Gate access.
Intake:
Intake Operating Gate excavation is complete at EL 108.25. Installation of rock support
(rock bolts, shotcrete and scaling) is ongoing and scheduled to be completed by late March.
Consult Appendix A for additional information.

1.3

Environmental Activities
Regular environmental maintenance items continue, including check dam clean-out along Surge
Tower Road, vacuuming of the Water Treatment Plant tanks, the main site entrance cattleguard,
and removal of contaminated materials and used fuels.
The annual amphibian and owl surveys were completed this month.
Four red-legged frog egg masses were relocated from the construction-side of the wetland
exclusion fence. The fence was cut in a five locations to allow frog passage to the wetlands
during the breeding period.
The cofferdam east abutment and the cofferdam perimeter plinth were poured this reporting
period with no water quality concerns. All concrete-affected water is captured within the
cofferdam and pumped through the water treatment plant. The overall volume of water within
the cofferdam is very minimal.

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Broom was removed from around the L60/Interpretive Centre and cut at the site entrance.
Turbid water from the surge tank area was noted to reach the stream at the North safety berm
through a previously unknown sump/pipe system within the Penstock corridor. This water did
not reach BC Parks and the discharge location was changed in consultation with the
environmental coordinator to ensure that there would be no possible risk of a discharge to
Parks.
A hydrophone was installed in the River to allow for overpressure monitoring during Tailrace
blasting now that the blasts are level with, and below, the River water level.
An updated short term water use permit approval application was submitted to FLNRO. The
current permit expires on April 1st.
Refer to Section 17.1 for additional details.

1.4

Quality Management
During this reporting period work continued to communicate system, process and procedure.
Refer to Section 2.0 for Quality Management reports, audits and meetings.

1.5

Safety
The meetings, audits and inspections were conducted as scheduled.

Document No.: 616482-3000-30RM-0025

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
2.0

QUALITY MANAGEMENT

2.1

Reports, Audits and Meetings


During this reporting period, the following letters, documents, Audit Advance Notices, and Audit
Reports were developed and/or submitted to BC Hydro:
The following inspection and test plans (ITPs) were submitted for review:

ITP Name

SLI Document Number

1. Kuenz - QCIP I Intake Trashrack

616482-ME19-01-3221-38QA-0043

2.
3.
4.
5.
6.
7.

616482-ME19-01-3221-38QA-0044
616482-ME19-01-3222-38QA-0051
616482-ME19-01-3222-38QA-0052
616482-ME19-01-3222-38QA-0054
616482-ME19-01-3230-38QA-0083

8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.

Kuenz QCIP II Trashrack


Kuenz QCIP I INMG Lifting Beam Steelwork
Kuenz QCIP I INMG Embedded Parts
Kuenz QCIP II Intake Maintenance Gate
Kuenz QCIP I Intake Operating Gate
Kuenz QCIP I INOP Frames and Guide
Assembly
Kuenz QCIP II Intake Operating Gate
Kuenz QCIP I DTMG Assembly/Lifting Beam
Steelwork
Kuenz QCIP I DTMG Embedded Parts
Kuenz QCIP II Draft Tube Maintenance Gate
Kuenz QCIP I TOSL Stop Logs/Lifting Beam
Steelwork
Kuenz QCIP I TOSL Frames and Guides
Assembly
Kuenz QCIP II Tailrace Outlet Stoplogs
Alstom Turbine Runner-Top Half (Crown)
Fabrication Machining
Alstom Turbine Runner-Bottom Half (Band)
Fabrication Machining
Alstom Stator Bars Arrangement
Alstom Upper Shaft Machining
Alstom Thrust Runner Machining
Alstom Thrust Runner Fabrication
Alstom Set of Thrust Collar Fabrication
Alstom Thrust Collar Machining
Alstom Upper Shaft Forging

In addition, the following activities were undertaken:

Document No.: 616482-3000-30RM-0025

616482-ME19-01-3230-38QA-0084
616482-ME19-01-3230-38QA-0085
616482-ME19-01-6630-38QA-0057
616482-ME19-01-6630-38QA-0058
616482-ME19-01-6630-38QA-0060
616482-ME19-01-7400-38QA-0053
616482-ME19-01-7400-38QA-0054
616482-ME19-01-7400-38QA-0056
616482-TG01-A-6910-38QA-0016
616482-TG01-A-6910-38QA-0018
616482-TG01-A-6930-38QA-0006
616482-TG01-A-6930-38QA-0007
616482-TG01-A-6930-38QA-0027
616482-TG01-A-6930-38QA-0028
616482-TG01-A-6930-38QA-0029
616482-TG01-A-6930-38QA-0030
616482-TG01-A-6930-38QA-0034

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
The updated Master Source Surveillance Matrix was uploaded to the SharePoint;
Monthly SLI/BCH Quality meeting was held on 10 March 2016.
The following inspections/witness/hold points took place in March:
TG01 Turbine Draft Tube Elbow Liner Unit #1 Paint Inspection on 01 March;
TG01 Turbine Draft Tube Elbow Liner Unit #1 Final Inspection & Documentation Review
by BC Hydro Representative on March 03;
ME19-01 Trash racks NDE witness points on 04 March;
ME19-01 Intake Maintenance and Operating Gates NDE witness points on 22 March.
The following Shipping releases were issued in February:
SR-016 TG01 Alstom Turbine Draft Tube Elbow Liner Unit #1 issued on 10 March 2016.

2.2

Non-Conformity Tracking
The non-conformities that were open and closed during this reporting period are summarized as
follows:

Document No.: 616482-3000-30RM-0025

10

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
3.0

SAFETY

3.1

Meetings

3.2

Audits/Inspections

3.3

Self Audit conducted for March 2016.


73 Site inspections were conducted between SLCP and ASL JV.
Daily informal inspections carried out as well.
WSBC Inspection - No Orders Written.

Background Checks

3.4

Weekly Project Safety Meetings were held every Tuesdays at 13:00hrs.


Joint Health and Safety Committee:
o March 16, 2016- SLCP
o March 24, 2016 -Frontier Kemper
o March 21, 2016- ASL JV
The Site Coordination Meetings were conducted bi-weekly as scheduled.

No Garda background checks were conducted during this reporting period.

Safety Statistics

33 Project Orientations conducted


36 Visitor Orientations delivered
499 StepBack Cards were developed on the project for this reporting period.
138 Positive Incentive Cards were awarded. 3 weekly winners, 1 monthly winner
90 Behavioral Intervention Program Cards were completed
38 Imminent Dangers / Safety Opportunities were identified and addressed
1 Near Miss
2 First aid
2 Report Only
1 Equipment Damage
1 Property Damage
1 Medical Aid
0 Modified Work Days

TRIF: YTD Man Hours = 183806 and Project to Date =963771


o 2.18 Year to date
(400 000/183 806 = 2.18)
o 1.03 Project to date (1 000 000/963 771 = 1.03)
LTIF: No Lost Time Incidents to date
TRIF Calculation = (Total Number of Recordable(s) x 200 000/Total Man hours
LTIF Calculation = (Total Number of LTI x 200 000) / Total Man hours

Document No.: 616482-3000-30RM-0025

20

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Presented in the following table is an overview of SLCPs Site Safety Statistics Summary
for the John Hart GS Replacement Project for this reporting period. For more
information on trends or comparison to the Provincial construction industry safety
statistics, please refer to the John Hart Safety Reports.

Document No.: 616482-3000-30RM-0025

21

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Table 3.1:

Safety Statistics

Document No.: 616482-3000-30RM-0025

22

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
4.0

SUMMARY OF POTENTIAL PROBLEMS

4.1

Potential Problems
As listed below, some mitigation measures (Phase 1) have been implemented to address the
delays resulting from the geological features encountered during the excavation of the Service
Portal Access and Main Access Tunnel. The measures are currently forecasted to recover 7.4
months of the 13 months unmitigated delay.
Updated Potential Mitigation Measures (Phase 2) are currently under review and are also listed
below. These additional measures are intended to recover the remaining 5.6 months delay. The
Design -Builder will continue to assess the situation and advise if further delays are foreseen.
As part of phase 2 Mitigation Measures, the excavation crews in the powerhouse are working 6
days per week, 24 hours/day, to finish the excavation works by end of April 2016. When power
tunnel excavation resumes, it is anticipated that the excavation crew will work 24 hours per day,
5.5 (2 to 3 saturdays/month) to 6 days per week, in the Power Tunnel.
Encountering the geological feature has required significant alternative L20 tunnel support, resequencing and re-planning of the work with attendant pervasive disruption on the balance of
the Project work. Significant disrupting factors are Service Tunnel traffic congestion and
arrangement of tunnel services, including ventilation, while L20 is not available for access.

4.2

Actions Required/Taken
Mitigation Measures Related to the Main Access Tunnel (L20):
Phase 1 Mitigation Measures
The following is a list of the more significant measures that have been:
Additional Geotechnical investigations:
Additional geotechnical investigations were undertaken to evaluate excavation
alternatives for the Main Access Tunnel. In addition, further exploratory drilling from the
Surge Chamber was undertaken.
Excavation Alternative to Main Access Tunnel (MAT)
The feasibility of a detour towards the draft tube gate change around the geological
feature encountered in L20 was evaluated. A total of seventeen probe holes were drilled.
The information gathered from the probe holes indicated that an alternative MAT
alignment was feasible. Further excavation of the initial alignment was suspended, and
work was initiated along the new MAT alignment. This work continued to progress in
January 2015.

Document No.: 616482-3000-30RM-0025

23

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Modified Underground Excavation Sequence and Schedule:
Activities have been rescheduled to prioritize Adit B, Power Tunnel, Adit D and upstream
portion of the Main Access Tunnel to provide alternative access to the Powerhouse
Service Bay, allowing the Powerhouse excavation to progress without the completion of
the Main Access Tunnel. As a consequence, these tunnels and Adits are now on the critical
path. Amongst other things, this has involved a complete redesign of the tunnel
temporary ventilation system, driving the manifold section of the Power Tunnel in the
reverse direction, putting this section on the critical path, driving the inlet tunnels out of
sequence and potentially putting them on the critical path as well.
Increased working hours per day and per week.
Modified Temporary Cranes:
Ordered the temporary construction cranes with spliced girders in order to deliver the
temporary crane to the Powerhouse via the Service Tunnel (i.e., alternative access route),
without waiting for the permanent crane to be delivered through the Main Access Tunnel.
This will allow the first stage concrete works to continue without waiting for the
completion of the Main Access Tunnel.
Draft Tube Mitigation measures
In order to help minimize the impact of excavation delays in achieving pit free dates, the
Design-Builder has ordered Alstom to install Nelson Studs on the Draft Tubes to shorten
the duration of the reinforcement and concreting work in the unit bays. This has caused
the Design-Builder increased costs.
Postponed Delivery of Main Crane:
The delivery of the main crane has been postponed so as to be delivered through the
Main Access Tunnel once completed. This will protect the integrity of the crane girder (i.e.,
splicing not required). However, this entails additional storage cost at the vendors shop.
Embedding of Draft Tube Elbows postponed to Second Stage Concrete:
The original draft tube elbow liners were to be cast in the First Stage concrete. The elbows
will now be embedded in the Second Stage concrete to allow the first concrete works to
proceed un-interrupted, allowing the Main Access Tunnel to be completed and the draft
tube elbows to be delivered and installed at a later date.
Gate Gallery Critical Path Modification:
Removing the gate gallery excavation from the critical path of the project as it was
supposed to occur before the start of the Power Tunnel excavation from the Adit D
intersection.
Power Tunnel Critical Path Modification:
Removing the concrete lining of the Power Tunnel manifold from the critical path of the
project as it was supposed to occur after the Power Tunnel concrete invert.
Longer drill Slides:
The use of longer drill slides to allow for 5.7 m long rounds in the Power Tunnel has been
be implemented;
Re-design of temporary ventilation:
Further re-design of temporary ventilation works has been done to accommodate a
Document No.: 616482-3000-30RM-0025

24

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
revised construction sequence, with a view to use it for the permanent ventilation system;
Phase 2 Mitigation Measures
The following measures are being considered to further mitigate the effects of excavation
delays:
o
o
o
o

4.3

Further increase working hours per day and per week;


Increasing resources (personnel and equipment) to accelerate underground excavation;
Innovation proposals from FK/ASLJV for the Power Tunnel concrete slab;
Grouting of the Middle Earthfill Dam (MED) is not being considered at this time.

Strategic Issues

Document No.: 616482-3000-30RM-0025

25

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
5.0

NARRATIVE OF MAJOR EVENTS

5.1

Engineering Design
During this reporting period the following activities have been completed or are ongoing:
5.1.1

Civil

The civil design teams activities and progress are reported in Section 5 of Appendix A.
5.1.2

Geotechnical

The geotechnical design work carried out during this reporting period includes the:
Continued mapping and support prescriptions for the:
o Main Access Tunnel (new alignment);
o Surge Chamber;
o Powerhouse Cavern;
o Power Tunnel (non-MED zone);
o Tailrace Outlet Channel;
o Unit Inlet Tunnels;
o Bypass Inlet Tunnels
o Access Passage from Powerhouse to Gate Gallery;
o Draft Tube Tunnel 3;
o Intake Excavation (downstream of the Main Dam);
o Intake Excavation (Upstream of the Main Dam).
Submission of the following documents:
o DBM, calculations and drawings for the excavation of the Intake Shaft (updated);
o DBM, Calculation and drawings for the Surge Shaft;
o DBM, Calculation and drawings for the Surge Tank Excavation;
o DBM and Calculations for the Low Level Outlet / Environmental Flow Release Structure
(LLO/EFRS) House Excavation.
Ongoing development of the:
o DBM, Calculation, and drawings for Power Tunnel in MED zone;
o DBM, Calculation and Drawings for the Gate Gallery;
o DBM, Calculation and drawings of LLO/EFRS Tunnel.
Studies and Investigations:
o Observing the rock surface along the MAT, and ordering the probe holes to investigate the
special feature along the new alignment of the MAT;
o Boring the borehole SLI14-02B and doing Geotechnical Tests to provide geotechnical data
from the rock mass along MED Tunnel.

Document No.: 616482-3000-30RM-0025

26

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
The following activities are planned for next month:
Continue mapping and support prescriptions for the:
o Powerhouse;
o Surge Chamber;
o Draft Tube Tunnels;
o MAT (new alignment);
o Unit Inlet Tunnels;
o Bypass Inlet Tunnels;
o Power Tunnels (non MED zone);
o Intake Trench (downstream of the Main Dam);
o Intake Trench ( Upstream of the Main Dam);
o Access Passage from Powerhouse to Gate Gallery;
o Tailrace Outlet Trench and Channel;
o Surge Tank Excavation;
o Tailrace Tunnel.
Submittal of:
o DBM, Calculation, and drawings for Power Tunnel in MED zone;
o DBM, Calculation (3D Modelling) and Drawings for the Gate Gallery;
o LLO/EFRS Tunnel package to BC Hydro for review;
o Updating the Powerhouse Excavation and Rock Support Drawings;
o Redesign of the Tailrace outlet Trench and Channel based on the as built rock surface;
Answer to the BC Hydro comments and IFC the drawing of the Bypass Outlet Tunnels,
Surge Shaft, Intake Shaft, and LLO/EFRS House Excavation.
5.1.3

Hydrotechnical

During this reporting period the following work was continued:

Carried out 3D numerical simulations to estimate head losses in power tunnel elbow;
Revised all head losses calculations;
Selected design for lower elbow.

During the next reporting period the following work is planned:


Revise tailwater curves downstream EFRS/LLO and update numerical studies report;
Optimize upstream surge tank design;
Refine head losses calculations.
5.1.4

Mechanical

The Mechanical work undertaken during this reporting is summarized as follows:

Document No.: 616482-3000-30RM-0025

27

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
1- General
Coordination of the civil and electrical engineering design groups on the GAs of the Intake,
Powerhouse, Main Access Tunnel and Tailrace to integrate the Hydromechanical equipment,
Turbine and Generator (T/G) equipment, Bypass system, LLO and EFRS system, Balance of
Plant (BOP), Powerhouse crane and HVAC system;
Coordination of the T/G supplier interfaces with the BOP equipment;
Issued BOP packages to procurement and BC Hydro;
Meet with BC Hydro to discuss various technical issues;
Updated GA drawings to include mechanical equipment;
The activities planned for next month include:

Integrate the BC Hydro comments relating to the powerhouse GAs;


Continue the BOP design;
Continue coordination with other disciplines and the integration of Alstoms design into the
layout and BOP;
Follow-up with Alstom and review of the technical documentation;
Follow-up with COH and review of the technical documentation;
Follow-up with Kuenz and review of the technical documentation;
Follow-up with VAG and review of the technical documentation;
Follow-up with Adams and review of the technical documentation;
Follow-up with COH for Gate Gallery Monorail and review of technical documentation;
Continue mechanical BOP systems piping optimization;
Meet with potential elevator vendor to discuss supply scope;
Meet with potential compressed air system vendor to discuss supply scope;
Update HVAC drawings with SNCL internal review comments
Modify Revit 3D model layout for Service Tunnel Fan House as per Civil and KMBR
requirements for reduced footprint
Continue detail design BOP piping. This includes stress analysis of major systems and
support design;
Continue design and layout anti-cavitation dewatering valve system in bypass area;
Provide technical bid evaluation on the following mechanical BOP packages:
o Compressed Air System
o Valves (100 mm to 1000 mm)
Hydromechanical equipment
Followed-up on technical issues and reviewed the technical documentations of Kuenz;
Coordinated with the civil design group for review of Kuenz equipment interface with civil;
Submitted Kuenz revised quality documentation to BC Hydro for information;
Performed witness inspections in Kuenz shops for trashrack, INMG and INOG embedded
parts;
Internal review of Kuenz draft drawings for the Power Tunnel Access Port;
Resubmitted drawings for trashrack, INMG and TOSL to BC Hydro for review.

The activities planned for next month include:

Resubmit drawings as required for DTMG and TOSL packages;

Document No.: 616482-3000-30RM-0025

28

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Continue fabrication of gates and embedded parts;


Arrange inspections as per approved ITPs (QCIP);
Begin coordination of field installation activities for hydromechanical.

3- Powerhouse
Continued on the design and coordination with Civil regarding the layout of access and
maintenance platforms;
Coordination with Bypass System valve supplier;
Coordination with gate gallery monorail supplier;
Review of preliminary design submittals from VAG for Bypass System;
Review of preliminary design submittals by Adams for LLO/EFRS valves;
Work continued on the following packages related to the Balance of Plant (BOP):
o Comments from BCH on drainage system under review
o Send Submersible pump drawings to BCH for review
o Compile calculation package of Dewatering, Drainage, and Oil handling systems to be sent
to BCH for review
o Comments from BC Hydro on the Domestic Water System are under internal review;
o The REVIT modeling of the mechanical BOP systems continued;
o Continued work on the water supply system stress analysis and support design;
o Continued work on the piping general arrangement drawings;
o Continued to populate the mechanical BOP lists;
The activities planned for next month include:

Continue the detailed engineering for the BOP;


Continue modeling with REVIT;
Begin stress model for the exposed dewatering and drainage piping systems;
Begin support design for the exposed dewatering and drainage piping;
Submit Bypass System design package to BC Hydro for review;
Finalize layout of HPUs, accumulators and nitrogen tanks on pump floor for Bypass System;
Submittal of Gate Gallery Monorail crane drawings/documentation to BC Hydro for review;
Submittal of LLO EFRS drawings/ Documentation to BC Hydro for review.
Review buried piping outside of powerhouse adjacent to the service tunnel portal area
Complete modeling of sanitary drainage system of the PH complex building and start
preparing drawings for internal review

4- Turbine/Generator (T/G) supplier


Technical coordination with other disciplines is ongoing;
Bi-Weekly conference calls continued with Alstom to review progress on the design and
other technical issues.
During this reporting period, the main technical coordination issues related to the T/G supplier
concerned the:
Erection and concreting of the main embedded parts;
Equipment layout around the units and on various floors;
Document No.: 616482-3000-30RM-0025

29

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Turbine Inlet Valve (TIV) layout;


Follow-up on the Development Change Requests (DCRs) and RFFI;
Interfaces between Alstom and BOP;
Review of T/G and TIV detailed design submittals.

The activities planned for next month include:


Continue the exchange of technical information and follow-up on action items;
Review the technical documentation submitted by Alstom;
Review final model test report.
5- Turbine/Generator (T/G) supplier
Technical coordination with other disciplines is ongoing;
Weekly conference calls continued with Alstom to review progress on the design and other
technical issues.
Site visit with Alstom to review various technical issues, schedule of construction, lay down
areas, visit of existing powerhouse and brief meeting with BCH representative to review
some potential DCRs.
During this reporting period, the main technical coordination issues related to the T/G supplier
concerned the:
Erection and concreting of the main embedded parts;
Equipment layout around the units and on various floors;
Turbine Inlet Valve (TIV) layout;
Follow-up on the Development Change Requests (DCRs) and RFFI;
Interfaces between Alstom and BOP;
Review of T/G and TIV detailed design submittals.
The activities planned for next month include:
Continue the exchange of technical information and follow-up on action items;
Review the technical documentation submitted by Alstom;
Review final model test report.
5.1.5

Turbine and Generator (T/G)

During this reporting period, work performed under the Turbine Generator Subcontract includes
the following activities:

The final Turbine Model Tests report was submitted;


Detailed design of Generating Equipment including turbine, turbine inlet valve, generator,
instrumentation and electrical auxiliaries, and tools progressed by 4% resulting in 76%
overall progress to date;
Procurement and fabrication of Turbine components including draft tube elbows, draft tube
cones, turbine inlet valves, stay rings, spiral cases, head cover, runner, and bottom ring is in
progress. The second draft tube elbow is received at Site;

Document No.: 616482-3000-30RM-0025

30

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Procurement and fabrication of generator components including stator lamination, stator


frame, stator bars, generator upper shaft, thrust runner and thrust collar is in progress.

The work planned for the next reporting period includes:


Continue the basic and detailed design of the generating equipment;
Continue the fabrication of the turbine inlet valve (TIV), turbine, and generator components.
For additional information, please consult Appendix B.
5.1.6

Electrical

During this reporting period, the following work was performed:


Submitted the following packages for BC Hydro review:
Revised lighting drawings and panel schedules;
General electrical installation specification;
Control system architecture, fiber optic termination and GPS clock overview block diagrams.
Detailed design:
Reviewed and returned to vendor the preliminary submittal of the generator switchgear
drawings.
The following packages are planned to be issued for BC Hydro review in April:
Control and protection system design basis;
125 VDC System specification;
Arc flash calculation;
15 kV cable bus specification;
Power and control cable schedule.
The on-going work to be carried out during the following months is foreseen to include the
continued development of the:
Started preparation of the bypass control system DBM;
Investigated the seismic upgrade of the substation building;
Advanced the switchyard layout for the transformer oil containment;
Reviewed the Vendors submittals for the T/G Package, hydromechanical works and BOP
mechanical packages.
Continue to develop AC, DC schematics and layout drawings for the P&C workSite
Construction

5.2

Site Construction
Consult Appendix A for information on site construction activities.

5.3

Procurement Activities
The following sub-contracting procurement work is ongoing:

Document No.: 616482-3000-30RM-0025

31

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

TG01 Turbine Generator:


The subcontract is awarded to Alstom Renewable Power Canada Ltd. (GE Renewable
Energy).

ME01 Powerhouse Crane:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of the Powerhouse Crane and ancillaries. The subcontract is awarded to
COH Ltd.

ME19-01 Hydro-Mechanical Equipment Intake: The scope comprises the design, supply,
supervision of installation, testing and commissioning of the Intake Operating Gates (INOG)
and Intake Maintenance Gates (INMG) including the trashracks, hydraulic hoist, lifting
beams, gate guides and embedded components, Draft Tube Maintenance Gates and
Tailrace Outlet Stoplogs. The subcontract is awarded to Hans Kuenz GmbH of Austria.

ME23 Bypass System:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of Bypass System comprising the Bypass energy dissipating valves and
Bypass isolation butterfly valves, together with the design of interconnecting pipe spools
and the supply of ancillary equipment. The subcontract is awarded to the Valve and Gate
Group (VAG), in the contracting entity name of Rodney Hunt-Fontaine Ltd.

EL02 Generator Switchgear:


The scope comprises the design and supply of Generator Switchgear panels and ancillary
equipment. All outstanding technical items are resolved and a subcontract price has been
agreed. The subcontract is awarded to Eaton Industries Canada Co.

ME16 Embedded Piping Powerhouse:


The scope comprises the fabrication and supply of embedded piping in the Powerhouse to
support the early phase concreting schedule. The subcontract is awarded to W.S. Nicholls
Western Construction Ltd. Substantial Completion has been achieved.

ME24 LLO / EFRS Mechanical Equipment:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of LLO and EFRS valve system comprising the LLO & EFRS fixed cone valves
and isolation butterfly valves, together with the design of interconnecting pipe spools and
the supply of ancillary equipment. The subcontract is awarded to ADAMS Schweiz AG.

ME10 Water Passage Access Door:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of a water passage access door upstream of the powerhouse. The work is
awarded to Hans Kuenz GmbH, and was executed as a change to subcontract ME19-01.

EL09-01 - AC Station Service Equipment Transformers and Switchgear:


The scope comprises the design and supply of AC Station Transformers and Switchgear and
ancillary equipment. The subcontract is awarded to Schneider Electric Canada Inc.

ME14-01 - Pumps Submersible:


The scope comprises supply only of submersible pumps for dewatering, drainage, sewage
and sump maintenance. The subcontract is awarded to Canadian Industrial Pumps Ltd.

ME03 Elevator:

Document No.: 616482-3000-30RM-0025

32

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
The scope comprises the design, supply and installation of the elevator to the powerhouse
including all ancillaries. The RFP was issued 18 December 2015. Bids were returned on 14
January 2016. Preferred proponents have been selected for interview.

EL06 Power Transformers:


The scope comprises the design, supply, installation, testing and commissioning of 3 Nr.
138/13.8 kV 3 ph Oil Filled Generator Step-Up Transformers. The subcontract is awarded to
Hyundai Heavy Industries.

EL08 Protection and Controls System:


The scope comprises the design, manufacture, factory test, delivery and supply, supervision
of erection/testing and commissioning for Facility protection, control, monitoring and
measurement. The package is being self-performed, with some direct procurement of
software and equipment.

ME08 Fire Protection System:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of the fire protection and suppression system complete with all ancillaries.
The RFP was issued on 25 November 2015. Bids were returned on 14 January 2016. The
subcontract is awarded to Tyco Integrated Fire and Security Canada Inc.

ME11 Sewage Holding Tank:


The scope comprises the supply of sewage holding tank. The package will now be procured
under the CN11 Mechanical Balance of Plant (BoP) RFP.

EL07 138 kV Equipment:


The scope comprises the design and supply of 138kV and 15kV disconnect switches with
support structures and grounding devices. The RFP was issued on 23 February 2016, with
return of bids scheduled by 30 March 2016.

ME19-02 Monorail Crane:


The scope comprises the design, supply, supervision of installation, testing and
commissioning of the Draft Tubes Gates Monorail Crane. The terms and conditions are
agreed and the package will be formally awarded in the coming period.

ME14-02 - Pumps Process:


The scope comprises supply only of process pumps for service water, domestic water,
waste water, oil & dirty water and recirculation pumps. The work is awarded to Canadian
Industrial Pumps Ltd., executed as a change to subcontract ME14-01.

ME06 Compressed Air System:


The scope comprises the design and supply of compressed air system complete with all
ancillaries and instrumentation. Bids were returned on 18 March 2016. A preferred
proponent will be identified in the coming period.

CN02 Electrical Balance of Plant (BoP):


The scope comprises the partial design and supply, installation of domestic and DesignBuilder furnished materials and equipment, and testing and commissioning. Prospective
proponents have been identified and expressions of interest were invited and received
during January 2016. A preliminary bidders list is compiled. Preparation of RFP documents
is in progress.

Document No.: 616482-3000-30RM-0025

33

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

CN11 Mechanical Balance of Plant (BoP):


The scope comprises the partial design and supply, installation of domestic and DesignBuilder furnished materials and equipment, testing and commissioning of the Mechanical
BoP. Prospective proponents have been identified and expressions of interest were invited
and received during January 2016. The bidders list is completed. The RFP is being prepared,
for release in the coming period

ME25 Filters and Strainers:


The scope comprises the design and supply of service and raw water filters and strainers
with all ancillaries and instrumentation. Bids were returned on 24 February 2016. A
Preferred Proponent has been identified. The package will be awarded in the coming
period.

ME26 Valves (greater than 100mm, less than 1000mm):


The scope comprises the design and supply of valves complete with actuators and all
accessories. Bids were returned on 18 March 2016. A preferred proponent will be identified
in the coming period.

EL09-02 AC Station Service Equipment - MCC:


The scope comprises the design and supply of motor control centers with auxillary
equipment. The RFP was issued on 11 March 2016, with return of bids scheduled by 15
April 2016.

EL03 Generator Cable Bus:


The scope comprises the design and supply of 15 kV 3000A 63 kA 3 Ph Cable Bus way from
Generator to GSUT with all fittings and ancillary components. The RFP is being prepared, for
release in the coming period.

EL10 Battery Banks, Chargers and UPS:


The scope comprises the design and supply of 125 VDC systems- batteries / chargers, 120
AC UPS systems in ancillary/ auxiliary components plus cable terminations. The RFP is being
prepared, for release in the coming period.

The general procurement activities are summarized in Table 5.1.

Document No.: 616482-3000-30RM-0025

34

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Table 5.1:
Package
Number
CN10
TG01
EN03-01
EN11-02
EA02
EL02
EN06
ME01
ME19-01
ME23
EN12
ME16
EN22
ME24
ME19-02
ME10
EL09-01
ME14-01
ME03
EN11-03
EL06
EL08
ME08
ME11
EL07
ME14-02
ME06
CN02
CN11
ME25
ME26
EL09-01
EL03
EL10

SLI Subcontracts List (Active)


Package Description

Supplier

Civil Works and Common Services


Turbine / Generator Design, Supply & Installation
Environmental Monitoring & Management (excl. Contaminants)
Independent Checking Team
Physical Hydraulic Model Study
Generator Switchgear
Architectural Services
Powerhouse Crane
Hydro-Mechanical Equipment
Bypass Valve System
Grounding Report
Embedded Piping Powerhouse
HVAC Design
LLO / EFRS Mechanical Equipment
Monorail Crane
Water Passage Access Door
AC Station Service Equipment Transformers and Switchgear
Pumps Submersible
Elevator
Independent Checking - Geotechnical
Power Transformers
Protection and Controls System
Fire Protection System
Sewage Holding Tank
138 kV Equipment
Pumps Process
Compressed Air System
Electrical BoP
Mechanical BoP
Filters and Strainers
Valves (greater than 100mm, less than 1000mm)
AC Station Service Equipment MCC
Generator Cable Bus
Battery Banks, Chargers and UPS

Note Codes:
A
Bid Prep

ASL-JV
Alstom
Hatfield
AECOM Cons. Inc.
Utah State Univ.
Eaton
KMBR
COH
Kuenz
Rodney Hunt-Fontaine
Ground-it
W.S. Nicholls
Hydro East SLI
ADAMS Schweiz AG
TBD
Kuenz
Schneider Electric
CIP
TBD
Derek Martin Inc.
Hyundai
SNC-Lavalin Inc.
Tyco
CN11
TBD
CIP
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD

Manuals/As-Builts Complete

Out for Bids

Materials Purchase In-Progress

Bids Rcvd/Tender Evaluation

Manufacturing / Supply In-Progress

Awarded

Hold Pending Shipment

PO Prep In-Progress

Partial Shipment

Docs/Drawings Rcvd in Period

Full Shipment

Docs/Drawings w/ BCH for Review

Mobilized

Vendor Submissions Reqd (Orig/Revs)

Site Work In-Progress

No Vendor Docs Rcvd

Ongoing As Reqd

Technical Coordination/Dsn Resolution

PO/Sub-Contract Complete

Document No.: 616482-3000-30RM-0025

35

Note
Codes
S
F/L/M
S
Y
Z
F
Y
F/ L/M
F/ L/M
F/ J
Y
Z
F
F
C
D
F
F
C
Y
H
D/J
D
A
B
F
C
A
A
C
C
A
A
A

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
6.0

INTERIM DAM SAFETY RISK MANAGEMENT PLAN (IDSRMP) INFORMATION


Progress on the IDSRMPs submitted to BC Hydro in accordance with the Information Only and
Consent review procedures, is summarized as follows:

Table 6.1
ACTIVITY

1. Geotechnical
Investigations

2. Fiber Optic
Communication
Plan

3. Cofferdam
Construction

4. Main Dam
Alterations

IDSRMPs - Status
AFFECTED
DAMS

Document
Number

Submitted for Submitted for


Information
Consent
Only

Comment

6164820000-40IS0001
6164820000-40IS0002
6164820000-40IS0007

24 March 2014

Work
Completed

616482000-40IS0018

26 June 2014

24 April 2014.
Accepted 02 May
2014.
24 April 2014.
Accepted 02 May
2014.
15 August 2014.
20 Nov. 2014
Resubmitted.
Accepted 26
November 2014.
07 July 2014
Accepted 09 July
2014

Fibre Optic Communication


Cable Relocation and Tree
Clearing
Intake Cofferdam
Construction Activities Prior
to Unwatering

616482CN10-150041IS-0045
616482CN10-122041IS-0130

13 August 2015

24 August 2015

Work
Completed.

19 March 2015

Work
Completed.

Coffer Dam De-watering

616482CN10-601241IS-0303

04 November
2015

02 April 2015
15 April 2015
Accepted 29 June
2015, BCH-INPCO81912-memo0586.doxc
Accepted
02 December 2015

25 May 2015
19 June 2015
23 July 2015
Accepted
28 July 2015

Work in
Progress

01 Sept 2015
30 Sept 2015
Accepted
08 January 2016
01 Feb 2016 for
info to BC Hydro.
19 Feb 2016

Work in
Progress

Scope / Title

Woodstave &
Steel Penstocks

Geotechnical Investigations
- New Powerhouse

Steel Penstocks

Geotechnical Investigations
- Service Portal

Main Dam and


Middle Earthfill
Dam

Geotechnical Investigations
Main Dam Blocks 1-3 and
Middle Earthfill Dam

Fiber Optic
Fibre Optic Communication
communications Cable

Main Dam and


Middle Earth
Dam (MED)

Main Dam
Main Dam

Main Dam
Main Dam

Main Dam

Excavation Upstream of
Dam
Concrete Dam Modification
- Blocks 1, 2 and 3

Excavation under Dam


Block 2 of the Main Dam.
Surface Rock Excavation
Downstream of Main Dam
Surface Rock Excavation
Upstream of Main Dam

Document No.: 616482-3000-30RM-0025

Drafted, informal
circulation

616482CN10-320241IS-0171

616482CN10-320041IS-0243
616482CN10-320041IS-0379

36

24 March 2014

31 July 2015

Work
Completed.
Work
Completed.

Work
Completed.

Work in
Progress

Work in
Progress

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
ACTIVITY

AFFECTED
DAMS

5. Bridges/Crossings Steel Penstocks


over penstocks

Document
Number

Scope / Title

Submitted for Submitted for


Information
Consent
Only

Construction Crossing over


Steel Penstocks

6164820000-40IS0004

25 April 2014.
Accepted

Woodstave
Penstocks

Fiber Optic Communication


Cable Relocation and Tree
Clearing - Intake (Brewster
Lake Road)

6164820000-40IS0006

04 December
2014

Woodstave
Penstocks

Temporary Brewster Lake


Road Bridge over
Woodstave Penstock

616482CN10-122041IS-0069

13 January 2015

Steel Penstocks

Temporary pedestrian
crossing (Station View Trail).

6. Surface
Excavations

Steel Penstocks

7. Decommissioning
of Existing Intake
8. Water
Conveyance
Excavation
9. Power Tunnel
10. Berm

Intake Dam

L20 /L40 Road and Portal


Excavations and L20
Geotechnical
Investigations
1. Removal of Penstocks
2. Plugging of Intake
Construction of water
conveyances.

6164820000-40IS0003
6164820000-40IS0005

Power Tunnel
Woodstave
Penstocks

First Filling Power tunnel


Safety Berm - Woodstave
Penstock Rupture

11. Intake

Instrumentation

Intake Instrumentation
Protection and Cable
Relocation
Intake Earthworks

Penstock

Intake / DS of
Block 1-3, Soil
Nail Wall
Intake & MED
zone

616482CN10-122041IS-0082
616482CN10-122041IS-0117
616482CN10-122041IS-0137
616482CN10-300041IS-0139

Intake Geotechnical
Investigation Phase 2

PCO 16-0575.
Accepted 07
March 2016.
25 April 2014,
25 July 2014
Resubmitted.
Accepted 05
August 2014.
22 December
2014
Accepted 07
January, 2015.

Comment

Work
Completed.

Work
completed.

28 January 2015.
Accepted
06 February 15
BCH-TR-0783
PCO-15-0222
25 April 2014

Work
completed

23 June 2014

08 July 2014.
Accepted 10 July
2014.

Work
Completed.

22 January 2015

Accepted
11 February 2015

Work
Completed.

25 February 2015

02 March 2015
Accepted 12
March 2015
30 April 2015
Accepted
15 May 2015
Accepted
07 April 2015

31 March 2015
31 March 2015

Cancelled.

Work
Completed.
Work
completed.
Work
Completed.

NB: Activities occurring during this reporting period are highlighted in blue text.
For information on construction instrumentation, monitoring data and evaluations related to
the IDSRMPs, please consult the construction monitoring reports.

Document No.: 616482-3000-30RM-0025

37

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
7.0

DESIGN PACKAGES UPDATE


In keeping with the Design Management Plan, the following table summarizes progress:

Table 7.1:

Design Packages Update

Subject Matter
/Title

Percent
Complete

Design Management Plan


Safe Design Plan
Basis of Design Report
Risk Analysis and Register (Threat and Risk Assessment) - including mitigations
and response plans
Reliability Analysis- Specific reliability assessments and mitigations are
prepared for some Packages as noted
Initial Hazard Log - including BC Hydro Requirements in Schedule 5 - 4.4.3C.(d).
Design Criteria for Overall Project
Standard Details
Construction Specifications
Fibre Optic Outage Plans - Annual and Final
Project Site General Arrangements
Facility 3D Revit Model
Site Geology
Facility Surface Drainage and Storm Water Management
Facility Mechanical Layouts (Confined Space and Egress Escape Routes)
Facility Electrical Layouts
Facility Electrical Single Line Diagrams
BCH Microwave Outage Plans - Annual and Final
Security Fencing
Facility Security
25 KV Route Plan (merged to Package 0470 - same progress will be reported for
both packages)
LCC#1 - Civil Works
LCC#2 - Intake
LCC#3 - Tailrace Rock Plug
Access Roads and Parking - General
Access Roads to Intake (L70)
Access to Surge Tank (L60)
Access to Tailrace Outlet and Switchyard (L10)
Main Access Tunnel Portal Parking
Portal Doors and Dampers for Service and Main Tunnel
Main Access (L20) and Service Tunnel (L40) Roads
Reservoir Log Boom - including G.A. and Details of the Boom and Anchors
Intake and LLO General Arrangement
Intake Structure General Arrangements

100%
100%
100%

No. Package
1
2
3
4

0000
0001
0002
0003

0004

6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

0005
0006
0420
0410
0475
0010
0401
0400
0411
0450
0470
0471
0472
0412
0473
0474

22
23
24
25
26
27
28
29
30
31
32
33
34

0401
0402
0403
1000
1200
1300
1400
1112
1111
1110
2000
3000
3200

Document No.: 616482-3000-30RM-0025

38

95%
20%
98%
100%
96%
100%
100%
89%
77%
67%
51%
35%
90%
95%
0%
50%
90%
90%
100%
100%
100%
90%
90%
90%
10%
0%
0%
95%
0%
92%
91%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Subject Matter
/Title

No. Package
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

3201
3202
3200
3230
3200
3200
3210
3100
3220
3230
3240
3300
3000
3221
3222
3230
3231

52
53
54
55
56
57
58
59
60

3300
3300
3010
3020
3030
3400
3410
3420
3400

61
62
63
64
65
66
67

3400
3420
3400
3401
3402
5000
5210

68

5220

69
70

5100
5310

Intake Stability Analysis, focusing on its stability under all Facility Design
Operating Conditions, Generating Unit Operating Conditions and seismic loads.
(Schedule 5- item 5-16-3 (k)
Modifications to Existing Dam, focusing on their stability under all Facility
Design Operating Conditions, Generating Unit Operating Conditions and the
applicable seismic loads; Schedule 5- item 5-16-3 (a)
Intake Hydraulic Model
Intake Operating Gate (INOG) Physical Hydraulic Model
Intake Excavation & Rock Support & Geotechnical Instrumentation
Intake Area Grading, Drainage and Parking
Intake Abutment Structure
Intake Cofferdam Structure
Intake Maintenance Gate Bay Structure and Tunnel
Intake Operating Gate Bay Structure
Intake Shaft Upper Bend Structure
Intake Control House Structure
Intake Miscellaneous Steel
Intake Trash Rack
Intake Maintenance Gate (INMG)
Intake Operating Gate (INOG)
Intake Operating Gate, focusing on its ability to close under full design flow in
accordance with Section 5.3-6.1 [Power Intake Operating Gate] and Section 5.23.2 [Emergency Closing] of Schedule 6 [Design and Construction
Specifications];Schedule 5- item 5-16-3 (c)
Intake Control House Mechanical Equipment
Intake Cable Tray and Conduit
Intake Power and Control Feeder
Intake Single Line Diagrams includes LLO and EFRS
Intake Fire/Security/Communication
LLO / EFRS General Arrangement
LLO / EFRS Tunnel Excavation and Rock Support
LLO / EFRS Structure Excavation and Rock Support
LLO / EFRS Grading, Drainage and Parking (merged to Package 3200-41 - same
progress will be reported for both packages)
LLO / EFRS Structural
LLO / EFRS Mechanical Equipment
Intake Lighting and Receptacle
LLO / EFRS Electrical Grounding
LLO / EFRS Protection and Control
Tunnel General Arrangements
MED Zone - Power Tunnel Excavation & Rock Support & Geotechnical
Instrumentation
Non MED Zone - Power Tunnel Excavation & Rock Support & Geotechnical
Instrumentation
Power Tunnel Intake Shaft & Lower Bend Excavation and Rock Support
Power Tunnel Surge Shaft Excavation and Rock Support

Document No.: 616482-3000-30RM-0025

39

Percent
Complete

100%

95%
95%
100%
84%
97%
96%
92%
91%
23%
45%
18%
82%
100%
100%
100%
50%
94%
90%
25%
90%
90%
42%
82%
87%
97%
7%
91%
90%
90%
5%
90%
33%
90%
85%
76%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Subject Matter
/Title

No. Package
71

5000

72
73
74
75
76
77
78
79
80
81

5100
5320
5230
5411
5412
5420
5430
6002
6000
6001

82
83
84
85
86
87
88
89
90
91

6610
6620
6811
6810
6821
6820
6840
6840
6400
6210

92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112

6220
6230
6610
6310
6100
6400
6000
6000
6822
6822
6812
6812
6511
6513
6580
6320
6520
6011
6531
6536
6535

Water Conveyance Hydraulic Calculations - Including head loss, transient


analysis and conveyance frequency analysis
Power Tunnel Lower Bend Structure
Power Tunnel Surge Tank Structure
Power Tunnel Rock Trap
Power Tunnel Concrete Manifold
Power Tunnel Downstream Access Port and Plug
Power Tunnel Unit Penstock Steel Liners
Power Tunnel Bypass Steel Liners
Midas Model for Powerhouse Seepage
Powerhouse Complex General Arrangements
Powerhouse Complex Excavation & Rock Support & Geotechnical
Instrumentation
Draft Tube Tunnel Excavation and Rock Support
Bypass Outlet Tunnel Excavation and Rock Support
Main Access Tunnel Excavation & Support and Geotechnical Instrumentation
Main Access Tunnel Electrical Services
Service Tunnel Excavation & Support and Geotechnical Instrumentation
Service Tunnel Electrical Services
Construction and Permanent Adits Excavation and Support
Construction Adits Fences and Gates in Adits
Powerhouse Concrete Crane Rail Support Plinth
Powerhouse Concrete Substructure - Service Bay - including Bypass structural
and Office Complex
Powerhouse Concrete Substructure - Unit Bays
Powerhouse Concrete Substructure - Electrical bay
Draft Tube Tunnel Concrete Lining
Powerhouse Access Passages
Powerhouse Office Building
Powerhouse Ceiling
Powerhouse Miscellaneous Steel
Powerhouse Interior Architectural
Service Tunnel Fan House Structural
Service Tunnel Fan House Architectural
Main Access Tunnel Fan House Structural
Main Access Tunnel Fan House Architectural
Powerhouse Crane
Misc. Lifting Devices
Elevator
Service Bay Equipment Door and Water Passage Access Door
HVAC
Cooling Water
Service Water
Domestic Water
Wastewater

Document No.: 616482-3000-30RM-0025

40

Percent
Complete

89%
16%
12%
30%
0%
100%
90%
87%
100%
94%
93%
90%
87%
91%
38%
92%
50%
90%
0%
92%
82%
26%
45%
40%
87%
55%
93%
33%
51%
28%
0%
20%
0%
100%
50%
100%
30%
90%
94%
92%
80%
66%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Subject Matter
/Title

Percent
Complete

Drainage
Dewatering
Oil Handling
Fire Protection
Compressed Air
Mechanical Workshop
Bypass System including General Arrangement; Schedule 5- item 5-16-3 (f)
Bypass System Controls
Powerhouse Single Line Diagrams
AC Station Service System up to 25 kV
DC Service System and UPS
Grounding
Telecommunications
Lighting and Service Outlets
Fire Detection
Control, Protection and Monitoring
Public Warning Systems , including their integration with Facility operation
(including mis-operation), control systems and applicable software code;
Schedule 5- item 5-16-3 (e)
Diesel Generator
Generator Switchgear
15 kV Cable Bus and 600V NSPB
Detailed Schematic and Wiring diagrams for Electrical Services to TG & E/M BOP
Security-CCTV / Alarm / Intrusion / SAC
General Electrical Installation spec
Reliability assessment for the Generation Systems, focusing on the availability
of the Generation Systems for the production of power on demand.
Turbine Model Testing
Turbines
Governors
Generators
Generator Excitation Systems
Generator Terminal Equipment
Turbine Inlet Valves, focusing on their ability to close under full design flow in
accordance with Section 5.2-3.2 [Emergency Closing] of Schedule 6 [Design and
Construction Specifications]; Schedule 5- item 5-16-3
Erection and Commissioning Manuals
Maintenance and Operation Manuals
Tailrace General Arrangements
Tailrace Outlet Public Access Trails
Tailrace 3D Numerical Hydraulic Model of Flow around First Island
Tailrace Outlet Excavation and Rock Support and Retaining Walls
Tailrace Tunnel Excavation & Rock Support and Geotechnical Instrumentation
Tailrace Area Grading, Drainage and Parking
Tailrace Outlet Structure
Tailrace Miscellaneous Steel

82%
88%
74%
99%
97%
90%
100%
65%
95%
83%
62%
90%
83%
85%
90%
20%

No. Package
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129

6534
6012
6533
6550
6532
6540
6700
6700
6501
6060
6070
6564
6570
6563
6562
6080
6083

130
131
132
133
134
135
136

6061
6040
6050
6502
6561
6503
6902

137
138
139
140
141
142
143

6901
6910
6920
6930
6940
6950
6960

144
145
146
147
148
149
150
151
152
153

6903
6904
7000
7010
7400
7400
7200
7400
7400
7400

Document No.: 616482-3000-30RM-0025

41

0%
10%
100%
68%
0%
79%
80%
21%
100%
74%
63%
82%
54%
0%
86%
0%
0%
30%
0%
95%
91%
85%
49%
53%
51%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Subject Matter
/Title

Percent
Complete

Tailrace Stoplogs
Tailrace Pump Station Equipment Layout
Tailrace Pump House
Gate Gallery Excavation and Rock Support & Geotechnical Instrumentation
Gate Gallery Structural Concrete
Gate Gallery Structural Steel
Gate Gallery Mechanical
Gate Gallery Electrical
Surge Chamber Excavation & Rock Support & Geotechnical Instrumentation
Surge Chamber Structure
Surge Chamber Steel Plates
Switchyard and Feeder General Arrangements
Transformer Foundations & Oil Containment Structures
Oil/Water Separator Structures
High Voltage Cable Support Structures
Switchyard Miscelleaneous Steel
138 kV Switchgear and Facilities
25 kV Connection from Powerhouse to BC Hydro Line
Decommissioning of Existing Facilities
Reliability assessment for all civil structures of the Facility (IEC 60812 only)
located upstream of, and including, the Turbine Inlet Valves and the Bypass
System, focusing on their ability to prevent the uncontrolled release of water
following an MDE over the applicable Design Service Life
Brewster Lake Bridge
Laydown Area (Temporary Works)
Surge Tower Road (L30)
L30 Temporary Penstock Construction Crossing
Storm Water Management (merged to Package 3200-41 - same progress will be
reported for both packages)
Intake General Electrical
Power Tunnel Middle Earthfill Dam Zone- Liner
Power Tunnel, focusing on the effects of exfiltration on earthfill dams and other
slopes and structures and on the design, placement and length of linings,
including the methodology and interpretation of hydrojacking test results;
Schedule 5- item 5-16-3 (d)
Manifold GA & Excavation and Rock Support
Power Tunnel Unit - Flow Transmitters and cables
Bypass Outlet Tunnel- Steel Lining
Draft Tube and Bypass Isolating Gates
Access Adit
Main Access Tunnel (Portal & Tunnel)
Electromechanical Equipment - General
Monorail Gate Gallery
Mechanical Auxiliaries & Systems - General and Piping Layout
Raw Water
Cable Tray and Conduit / Duct Bank

100%
87%
69%
31%
8%
13%
0%
0%
90%
0%
0%
80%
3%
46%
0%
0%
52%
50%
0%

No. Package
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
172
173
174

7400
7420
7420
7110
7110
7110
7110
7110
7120
7120
7120
8000
8110
8200
8120
8000
8301
8303
9000
0404

175
176
177
178
179

1220
1700
1130
1132
3000

180
181
182

3000
5211
5000

183
184
185
186
187
188
189
190
191
192
193

5400
5420
6620
6630
6800
6810
6500
6512
6530
6537
6565

Document No.: 616482-3000-30RM-0025

42

50%
90%
100%
90%
100%
97%
90%
15%
25%
90%
0%
85%
100%
60%
70%
53%
71%
55%
95%
90%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Subject Matter
/Title

No. Package
194
195
196
197
198
199

7300
7510
7520
7530
8200
8130

Tailrace Adit & Surge Tunnel Excavation & Rock Support Geotechnical
Instrumentation (merged to Package 6840-same progress will be reported for
both packages)
Rock Plug Design & Construction
Tailrace Channel Excavation D/S of Rock Plug
Rock Plug Removal
Oil/Water Separator
High Voltage DS Structures

Document No.: 616482-3000-30RM-0025

43

Percent
Complete

90%
87%
10%
0%
32%
0%

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
8.0

DESIGN DEVELOPMENT CHANGE NOTICE REGISTER

Table 8.1:

Active Design Development Changes

Item DDCR # & Title

Description

Date Submitted

Remarks / Status

Non metallic piping


DCR-14-0011

SLI requests using non metallic piping for


Buried domestic water system piping

10 Nov 2014

DCR-15-0035

Fire Protection system- Sprinkler

18 August 2015

Technical issues
resolved, awaiting
Representatives
agreement on
commercial aspects.
SLI reviewing

DCR-ALS-0022

24 August 2015

DCR- BCH-0013

DCR-ALS-0024

Schedule 6 Section 4.5-4.1K. Proposed


changes to exciter AC filtering.
Schedule 6 Section 7.8-3 E 1 (c)communication
HPU Valve

DCR-15-0040

Emergency Lighting

04 December 2015

Alstom/SLI reviewing
BCH reply
SLI to provide
estimation
Revised DCRC ready to
be signed.
Sent to BCH

DCR-ALS-0025

Stator RTD Armoured Leads

16 December 2015

Under discussion

DCR-ASLJV-0002 r1

Concrete Curing

18 December 2015

DCR-16-0044

Access Hatch

19 January 2016

10

DCR-16-0045

2016/01/27

11

DCR-16-0047

Underground Powerhouse Water


Ingress
Electrical Equipment enclosure Rating

ASLJV will revise the


DCR
DCRC ready to be
signed
Under discussion

12

DCR ALS-0031

Fire Protection Cable

2016/02/12

13

DCR ALS-0032

Rotor Air Gap Monitoring System

2016/02/17

14

DCR ALS-0033

Shielded Cables

2016/02/22

15

DCR-KNZ-005-rev1

2016/02/23

16

DCR-16-0048

Schedule 6-Section 5.3-4.2 Materials F.


Corrosion Resistance steel
Schdeule 6 appendix 1.3 G - Anti -Sweat

2016/03/03

DCRC ready to be
signed.
Sent to BCH

17

DCR-16-0046

2016/03/10

Sent to BCH

18

DCR-16-0049

Schdeule 6 Section 3.1- 3.4- Designated


Rooms and Areas
Tailrace Deck Loading

2016/03/21

BCH has requested


some changes to DCR.

Document No.: 616482-3000-30RM-0025

44

23 September
2015
24 November 2015

2016/02/10

DCRC ready to be
signed.
Under Discussion
Revised DCR was sent
to BCH on 23 March
Under discussion

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
9.0

SUMMARY OF CORRESPONDENCE AND TRANSMITTALS

9.1

Summary of Correspondence
The correspondence issued during the reporting period is summarized as follows:

Table 9.1:
Transmittal. #
BCH-INP-CO81912-TR-1835

Reporting Period - Correspondence from BC Hydro to SLI/InPower BC


LTR /
MEMO #

Dated

Date
Received

From

To

26-Feb-16

BK

PS

DCRC-160072

26-Feb-16

BCH-INP-CO81912-TR-1836

Review

26-Feb-16

26-Feb-16

BK

BCH-INP-CO81912-TR-1837

Review

26-Feb-16

26-Feb-16

BCH-INP-CO81912-TR-1838

DCRC-160067

26-Feb-16

BCH-INP-CO81912-TR-1839
BCH-INP-CO81912-TR-1840
BCH-INP-CO81912-TR-1841

Review
0769
0059

BCH-INP-CO81912-TR-1842

Doc
Description / Subject
Type

Development Change Record


Confirmation - DCRC-16-0072

PS

DCRC160072
Memo

BK

PS

Memo

26-Feb-16

BK

PS

26-Feb-16
26-Feb-16
26-Feb-16

26-Feb-16
26-Feb-16
26-Feb-16

BK
BK
BK

PS
PS
PS

DCRC160067
Memo
Memo
Letter

Alstom - Supplier's realization, ITP


Turbine Runner Fabrication Machining
Development Change Record
Confirmation DCRC-16-0067

0060

26-Feb-16

26-Feb-16

BK

PS

Letter

BCH-INP-CO81912-TR-1843

Review

29-Feb-16

29-Feb-16

BK

PS

Memo

BCH-INP-CO81912-TR-1844

Review

29-Feb-16

29-Feb-16

BK

PS

Memo

BCH-INP-CO81912-TR-1845
BCH-INP-CO81912-TR-1846

0770
Review

01-Mar-16
01-Mar-16

01-Mar-16
01-Mar-16

BK
BK

PS
PS

Memo
Memo

BCH-INP-CO81912-TR-1847

Review

01-Mar-16

01-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1848

Review

01-Mar-16

01-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1849

Review

01-Mar-16

01-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1850

Review

01-Mar-16

01-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1851

Review

02-Mar-16

02-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1852

Review

02-Mar-16

02-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1853

0771
Review

03-Mar-16

03-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1854

Review

03-Mar-16

03-Mar-16

BK

PS

Memo

Document No.: 616482-3000-30RM-0025

45

Partial - Final Design - Servomotors

Final Design - Bypass Valve System


Valued Items
Appointment of Substitute BC Hydro
Representative
DSC Notice D-002/003 Baseline
Condition Exceedance between
Stations 0+40 and 0+70.
Final Design - Butterfly Valve Walkways
- MBQ94
Final Design - Intake Shaft and Lower
Bend
Revised JHT Canyon lockout schedule
Final Design - Hydromechanical
Equipment Corrosion Protection
Alstom - Supplier's realization,
Inspection and Test Plan - Machining
Construction Monitoring Report 2016-01-04 - 2016-01-31
Hatfield Weekly Environmental
Monitoring Report no. 097 February 7
to February 13, 2016
Blasting Plan for Surface and
Underground Excavations
Partial Final Design - Oil Handling
System
Partial Final Design - Oil Handling
System
Powerhouse Crane
Final Design - Service Water SystemSchematic Diagram

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Transmittal. #
BCH-INP-CO81912-TR-1855

LTR /
MEMO #

Dated

Date
Received

From

To

03-Mar-16

BK

PS

Doc
Description / Subject
Type

Review

03-Mar-16

BCH-INP-CO81912-TR-1856

0772

03-Mar-16

03-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1857

Review

03-Mar-16

03-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1858

Review

03-Mar-16

03-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1859

Review

03-Mar-16

03-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1860
BCH-INP-CO81912-TR-1861

Review
0773

03-Mar-16
03-Mar-16

03-Mar-16
03-Mar-16

BK
BK

PS
PS

Memo
Memo

BCH-INP-CO81912-TR-1862

Review

04-Mar-16

04-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1863

DCRC-160073
DCRC-160074
DCRC-160075

04-Mar-16

04-Mar-16

BK

PS

BCH-INP-CO81912-TR-1864

Review

07-Mar-16

07-Mar-16

BK

PS

BCH-INP-CO81912-TR-1865
BCH-INP-CO81912-TR-1866

Review
0774

07-Mar-16
07-Mar-16

07-Mar-16
07-Mar-16

BK
BK

PS
PS

DCRC160073
DCRC160074
DCRC160075
PCO160575
Memo
Memo

BCH-INP-CO81912-TR-1867

0775

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1868

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1869

0776

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1870

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1871

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1872

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1873

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1874

0777

07-Mar-16

07-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1875

Review

07-Mar-16

07-Mar-16

BK

PS

Memo

Document No.: 616482-3000-30RM-0025

46

Memo

Partial Final Design - Powerhouse


Drainage System - Part 1
Request for change to Prime
Contractor Designated Area
Powerhouse Structure General
Arrangement - Maintenance Shop
Final Design - Powerhouse
Miscellaneous Steel - Part 2
Alstom - Supplier's realization,
Inspection and Test Plan - Stator Bars
Arrangement
38ITP-6000 - Powerhouse Concrete
Construction Traffic and Woodstave
Road
Leave to Commence Construction No.1
(LCC No.1) - Component 6a2 - Tailrace
Tunnel - Excavation Downstream of
Transition
Development Change Record
Confirmations - Schedule 6 Section 5.5
- Large Isolation Valves; Schedule 6
Section 4.2 - Turbine and Servomotor
Locking and Stroke

Surface Rock Excavation Upstream of


Main Dam IDSRMP
Final Design Telecommunications
Final Design - Powerhouse General
Arrangements
Preliminary Innovation Proposals
Final Design - Intake Maintenance Gate
Structure
Direction from Independent Engineer
to Collapse LCC1
Alstom - Supplier's realization,
Inspection and Test Plan
Alstom - Suppliers realization,
Inspection and Test Plan (ITP) - Upper
Shaft - Forging
38ITP-1201 - L70 Road Excavation and
Intake Excavation
Partial Final Design - Embedded
Grounding - Part 2
LLO/EFRS Tailwater - High spill
conditions Disclosed Data
Hatfield Weekly Environmental
Monitoring Report no. 098 (February
14 to February 20, 2016

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Transmittal. #
BCH-INP-CO81912-TR-1876

LTR /
MEMO #

Date
Received

From

To

07-Mar-16

BK

PS

07-Mar-16

07-Mar-16

BK

Dated
07-Mar-16

BCH-INP-CO81912-TR-1878

Review
0384
Review
0384
Review

08-Mar-16

08-Mar-16

BCH-INP-CO81912-TR-1879

Review

08-Mar-16

BCH-INP-CO81912-TR-1880

Review

BCH-INP-CO81912-TR-1881

Doc
Description / Subject
Type
Memo

Final Design - Facility Electrical - Layout

PS

Memo

BK

PS

Memo

08-Mar-16

BK

PS

Memo

08-Mar-16

08-Mar-16

BK

PS

Memo

Review

08-Mar-16

08-Mar-16

BK

PS

Memo

Final Design - Telecommunications Part


2
Final Design - Tailrace Outlet Concrete
Outlines and Reinforcement
Final Design - Tailrace Outlet
Miscellaneous Steel
Field Instruction - ASL-FI-227 - Intake
Investigation - Revised Drilling
Procedure - signed - ASL-FI-232 Orientation of Brow Bolts
Final Design - Security System Part 2

BCH-INP-CO81912-TR-1882

0778

08-Mar-16

08-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1883

0779

08-Mar-16

08-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1884

Review

09-Mar-16

09-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1885

Review

09-Mar-16

09-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1886

Review

09-Mar-16

09-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1887

Review

10-Mar-16

10-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1888

Review

10-Mar-16

10-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1889

Review

10-Mar-16

10-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1890
BCH-INP-CO81912-TR-1891

Review
Review

10-Mar-16
10-Mar-16

10-Mar-16
10-Mar-16

BK
BK

PS
PS

Memo
Memo

BCH-INP-CO81912-TR-1892

0780

10-Mar-16

10-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1893

Review

10-Mar-16

10-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1894

Review

11-Mar-16

11-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1895

Review

11-Mar-16

11-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1896

0781

11-Mar-16

11-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1897

Review

14-Mar-16

14-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1877

Document No.: 616482-3000-30RM-0025

47

LCC1 Component 6a2 Authorization


from IE - Tailrace Tunnel Excavation
Downstream of Transition
Permission to Undertake Investigative
Blasting to EL 128 m at Surge Tank
from IE
Final Design - Electrical Cable Tray Part
2
Final Design - Civil Specifications
(Partial) Final Design Electromechanical Equipment Part 4
Partial Final Design - Intake Embedded
Grounding - Grounding Layout Intake
Deck - Plan - LLO Valve House
Grounding Layout
Final Design - Tailrace Outlet General
Arrangement Part 1 - Partial
Aboriginal Participation Reporting
Form
Alstom - Final Model Test Report
Partial Final Design - AC Station
Services System - Part 4
Power Tunnel Manifold General
Arrangement; Water Conveyance
General Arrangement - Power Tunnel
Manifold - Plan and Details and
Sections and Details - RFFI
Final Design - Collector Ring Field Leads
- MKB29
Final Design - Powerhouse 1st Stage
Concrete Unit Bay 3 -Electrical Bay
Structure
Occupational Health and Safety
Management Program
Transmittal of February 2016 Monthly
Report to Deputy Comptroller of Water
Rights
Final Design - Intake Maintenance Gate
Structure

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Transmittal. #
BCH-INP-CO81912-TR-1898

LTR /
MEMO #

Dated

Date
Received

From

To

14-Mar-16

BK

PS

Doc
Description / Subject
Type

Review

14-Mar-16

BCH-INP-CO81912-TR-1899

Review

14-Mar-16

14-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1900

Review

14-Mar-16

14-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1901

Review

14-Mar-16

14-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1902

0061

14-Mar-16

14-Mar-16

BK

PS

Letter

BCH-INP-CO81912-TR-1903

0782

14-Mar-16

14-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1904

Review

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1905

Review

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1906

Review

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1907

Review

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1908

0783

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1909

Review

15-Mar-16

15-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1910
BCH-INP-CO81912-TR-1911

0784
Review

15-Mar-16
16-Mar-16

15-Mar-16
16-Mar-16

BK
BK

PS
PS

Memo
Memo

BCH-INP-CO81912-TR-1912

Review

16-Mar-16

16-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1913

Review

16-Mar-16

16-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1914

0785

17-Mar-16

17-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1915

Review

17-Mar-16

17-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1916

Review

17-Mar-16

17-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1917

Review

18-Mar-16

18-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1918

DCRC-160078
DCRC-16-

18-Mar-16

18-Mar-16

BK

PS

Memo

18-Mar-16

18-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1919

Document No.: 616482-3000-30RM-0025

48

Memo

Eaton - 15Kv Arc Resistant Switchgear


Inspection and Test Plans
ASLJV - Inspection Test Plan ITP - BR
38ITP-7120 - Surge Chamber
Excavation - 38ITP-7200 - Tailrace
Tunnel
(Partial) Final Design (r03)- Oil Handling
System
ASLJV - Inspection Test Plan ITP - 38ITP6620 - Bypass Outlet Tunnel
DSC Notice D-002/003 Baseline
Condition Exceedance between
Stations 0+40 and 0+70.
Development Change Record
Confirmation DCRC-16-0079
(Partial) Final Design - Miscellaneous
Lifting Device; Specification for
Miscellaneous Handling Equipment
Hatfield - Monthly Environmental
Report No.24 February 2016
ASLJV - Inspection Test Plan ITP - 38ITP6610 - Powerhouse Draft Tube Tunnel
Excavation and Rock Support
Partial Final Design - Facility
Dewatering Filling System - Part 2
Wastewater System - Existing Site
Office Building
Hatfield Weekly Environmental
Monitoring Report no.099 February 21
to February 27, 2016
Drawing Presentation
ASLJV - Inspection Test Plan ITP 38ITP-5100 - Intake Shaft Excavation
and Rock Support
ASLJV - Inspection Test Plan ITP - 38ITP5400 - Power Tunnel Manifold and
Bifurcation Excavation
Partial Final Design - Powerhouse
Drainage and Dewatering System - Part
1
Partial Final Design - Mechanical
Auxiliaries and Systems - Part 10 RFFI
Partial Final Design - Mechanical
Auxiliaries and Systems - Part 10
Alstom - Supplier's realization,
Inspection & Test Plan (ITP)- Turbine
Runner-Top Half (Crown) - Fabrication Machining and Bottom Half (Band) Fabrication Machining
Final Design - Intake Maintenance Gate
Structure.
Development Change Record
Confirmation
Development Change Record

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Transmittal. #

LTR /
MEMO #

Dated

Date
Received

From

To

Doc
Description / Subject
Type

BCH-INP-CO81912-TR-1920

0077
0786

18-Mar-16

18-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1921

Review

21-Mar-16

21-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1922
BCH-INP-CO81912-TR-1923
BCH-INP-CO81912-TR-1924

0788
Review
Review

21-Mar-16
21-Mar-16
21-Mar-16

21-Mar-16
21-Mar-16
21-Mar-16

BK
BK
BK

PS
PS
PS

Memo
Memo
Memo

BCH-INP-CO81912-TR-1925
BCH-INP-CO81912-TR-1926
BCH-INP-CO81912-TR-1927

0790
0789
Review

21-Mar-16
21-Mar-16
21-Mar-16

21-Mar-16
21-Mar-16
21-Mar-16

BK
BK
BK

PS
PS
PS

Memo
Memo
Memo

BCH-INP-CO81912-TR-1928

0791

22-Mar-16

22-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1929

0792

22-Mar-16

22-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1930

0793

22-Mar-16

22-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1931
BCH-INP-CO81912-TR-1932

Review
Review

22-Mar-16
23-Mar-16

22-Mar-16
23-Mar-16

BK
BK

PS
PS

Memo
Memo

BCH-INP-CO81912-TR-1933

0794

23-Mar-16

23-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1934

Review

24-Mar-16

24-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1935

Review

24-Mar-16

24-Mar-16

BK

PS

Memo

BCH-INP-CO81912-TR-1936

Review

24-Mar-16

24-Mar-16

BK

PS

Memo

Document No.: 616482-3000-30RM-0025

49

Confirmation
Risk Work shop - Tunneling Under
Existing Dam
Hatfield Weekly Environmental
Monitoring Report no. 100 February 28
to March 5, 2016
March 16, 2016 Unit Trip Event
Final Design - Tailrace Outlet - Stoplogs
Partial Final Design - HVAC Systems Part 1
Short Term Water Use Application
Final Design - INMG - ME19-01 RFFI
Final Design - Intake Control House
Mechanical Equipment
Flow 3D STL files downstream of
existing concrete dam Disclosed Data
Final Design - Powerhouse General
Arrangements RFFI
Final Design - General Electrical Work
RFFI
Final Design - Electrical 15kV Cable Bus
Final Design - LLO and EFRS Valve
House
Interim Review-Transformers-Drawing
and Specification
Final Design - Support Design for Intake
Tunnel
Hatfield Weekly Environmental
Monitoring Report no. 101 March 6 to
March 12, 2016
Final Design - Surge Shaft - Excavation
and Rock Support (Plan and Sections;
Excavation and Rock Support;
Calculations)

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
9.2

Tracking of Submittals
The tracking of submittals for this reporting period is summarized in the following Table:

Document No.: 616482-3000-30RM-0025

50

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Days to
count down

Reporting Period Submittals Tracking

No.

Document Title

Action

Table 9.2:

Alstom - Final Model Test Report

BR

616482-TG01-A-6901-45E1-0004

01

2016/02/29

BCH I-1531

2016/03/14

2016/03/10

-4

R2

Powerhouse Grounding Layout - Through Layout


Station Sump - Section

BR

616482-6564-47D3-0059

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Typical Grounding Installation Details - Sheet 1 of


2

BR

616482-6564-47D1-0001

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

(Partial) Final Design - Embedded Grounding Part 2

BR

616482-6564-47E4-0002

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Powerhouse Grounding Isometric drawing

BR

616482-6564-47D3-0001

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Powerhouse Grounding Layout - Through Unit


Bay / Unit Centreline - Section

BR

616482-6564-47D3-0052

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Powerhouse Grounding Layout - Transverse View


East Wall - Section

BR

616482-6564-47D3-0061

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Powerhouse Grounding Layout - Through Bypass


Valve Bay - Section

BR

616482-6564-47D3-0060

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

Powerhouse Grounding Layout - Pump Floor Plan

BR

616482-6564-47D3-0040

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

10

Powerhouse Grounding Layout - Longitudinal


View South Wall - Section

BR

616482-6564-47D3-0055

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

11

Typical Grounding Installation Details - Sheet 2 of


2

BR

616482-6564-47D1-0005

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

BR

616482-6564-47D3-0010

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

12

Document No

Powerhouse Grounding Layout - Office Complex

Document No.: 616482-3000-30RM-0025

51

Rev.

Transmittal
Date

Requested
Return Date

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Second / Mezzanine Level Plan

13

Powerhouse Grounding
Plan

Layout - Turbine Floor

14

Powerhouse Grounding
Upstream Valves - Section

BR

616482-6564-47D3-0035

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

BR

616482-6564-47D3-0050

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

15

Powerhouse Grounding Layout - Office Complex


Third Floor Plan, Office Complex Roof &
Powerhouse Plan

BR

616482-6564-47D3-0005

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

16

Powerhouse Grounding Layout - Gate Gallery /


Surge Chamber - Section

BR

616482-6564-47D3-0057

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

17

Powerhouse Grounding Layout - Sump Level /


Draft Tube Invert Plan - Plan

BR

616482-6564-47D3-0045

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

18

Powerhouse Grounding
View North Wall - Section

Layout - Longitudinal
BR

616482-6564-47D3-0056

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

19

Powerhouse Grounding
View North Wall - Section

Layout - Longitudinal
BR

616482-6564-47D3-0058

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

20

Powerhouse Grounding Layout - Generator Floor


Plan

BR

616482-6564-47D3-0030

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

21

Powerhouse Grounding
Main Floor Plan

BR

616482-6564-47D3-0025

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

22

Powerhouse Grounding Layout - Through Bypass


Valves / Unit Centreline - Section

BR

616482-6564-47D3-0051

00

2016/02/26

BCH I-1540

2016/03/11

2016/03/07

-4

R1

23

Powerhouse Structure - Concrete Reinforcement Elec Bay Pump Floor - Pump Floor Plans

BR

616482-CN10-6230-42D8-0021

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

Layout

Through

Layout - Service Bay /

Document No.: 616482-3000-30RM-0025

52

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

24

Design Basis Memorandum - Powerhouse 1st


Stage Concrete Unit Bay 3 / Electrical Bay
Structure

BR

616482-CN10-6230-42E2-0001

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R2

25

Powerhouse Structure - Concrete Outline - Unit


Bay 3 / Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0005

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

26

Calculation - Powerhouse Draft Tube Elbow &


Pump Floor Structural Analysis (Unit Bay
3/Electrical Bay)

BR

616482-CN10-6230-42E3-0002

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R2

27

PH Structure - Concrete Outline - Unit Bay 3 / Elec


Bay Pump Floor-Draft Tube Invt & Pump Fl Fdn
Plans

BR

616482-CN10-6230-42D8-0002

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R2

28

Powerhouse Structure - Concrete Outline - Unit


Bay 3 / Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0007

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

29

Powerhouse Structure - Concrete Reinforcement Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0024

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

30

Powerhouse Structure - Concrete Reinforcement Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0025

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

31

Powerhouse Structure - Concrete Outline - Unit


Bay 3 / Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0004

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

32

Powerhouse Structure - Concrete Reinforcement Elec Bay Pump Floor - Plans

BR

616482-CN10-6230-42D8-0023

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

33

Calculation - Powerhouse 1st Stage Concrete


UnitBay 3 / Electrical bay Structure

BR

616482-CN10-6230-42E3-0001

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R2

BR

616482-CN10-6230-42D8-0020

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

34

Powerhouse Structure - Concrete Reinforcement Elec Bay-Pump Floor - Draft Tube Invert & Pump

Document No.: 616482-3000-30RM-0025

53

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Fl Fdn Plans

35

Powerhouse Structure - Concrete Reinforcement Elec Bay Pump Floor - Sections and Details

BR

616482-CN10-6230-42D8-0022

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

36

Powerhouse Structure - Concrete Outline - Unit


Bay 3 / Elec Bay Pump Floor - Pump Floor Plan

BR

616482-CN10-6230-42D8-0003

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

37

FInal Design - Powerhouse 1st Stage Concrete


Unit Bay 3 / Electrical Bay Structure

BR

616482-6230-42E4-0001

00

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

38

Powerhouse Structure - Concrete Outline and


Reinforcement - Unit Bay 3 / Elec Bay Pump Floor
-General Notes

BR

616482-CN10-6230-42D8-0001

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

39

Powerhouse Structure - Concrete Outline - Unit


Bay 3 / Elec Bay Pump Floor - Sections

BR

616482-CN10-6230-42D8-0006

01

2016/02/26

BCH I-1542

2016/03/11

2016/03/11

R1

40

Tailrace Outlet Structure Concrete Outlines - Wet


Sump Stair & Stoplog Storage - Plan, Section and
Details

BR

616482-CN10-7400-42D8-0005

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

41

Tailrace Outlet Structure Concrete Reinforcement Sections sheet 2

BR

616482-CN10-7400-42D8-0022

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

42

Tailrace Outlet Structure Concrete Outlines and


Reinforcement - General Notes

BR

616482-CN10-7400-42D8-0001

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

43

Tailrace Outlet Structure Concrete Reinforcement Sill Invert and Deck Level - Plans

BR

616482-CN10-7400-42D8-0020

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

44

Final Design - Tailrace Outlet Concrete Outlines


and Reinforcement

BR

616482-7400-42E4-0002

00

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

Document No.: 616482-3000-30RM-0025

54

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

45

Tailrace Outlet Structure Concrete Outlines Sections

BR

616482-CN10-7400-42D8-0003

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

46

Tailrace Outlet Structure Concrete Outline Calculations

BR

616482-CN10-7400-42E3-0001

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R2

47

Tailrace Outlet Structure Concrete Outlines - Sill


Invert and Deck Level - Plans and Section

BR

616482-CN10-7400-42D8-0002

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

48

Tailrace Outlet Structure Concrete Reinforcement Sections sheet 1

BR

616482-CN10-7400-42D8-0021

01

2016/02/26

BCH I-1543

2016/03/11

2016/03/08

-3

R1

49

Powerhouse Structure - General Arrangement Station Sump; Transverse Section

BR

616482-CN10-6000-40D8-0022

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

50

Powerhouse Structure - General Arrangement Sump Floor; Plan

BR

616482-CN10-6000-40D8-0008

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

51

Powerhouse Structure - General Arrangement Bypass-3 Center Line; Transverse Section

BR

616482-CN10-6000-40D8-0023

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

52

Powerhouse Structure - General Arrangement Office Complex Roof / Crane Plinth; Plan

BR

616482-CN10-6000-40D8-0002

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

53

Powerhouse Structure - General Arrangement TIV and Upstream Valves (South Wall)
Longitudinal Section

BR

616482-CN10-6000-40D8-0010

02

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

54

Powerhouse Structure - General Arrangement Generator Floor; Plan

BR

616482-CN10-6000-40D8-0005

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

55

Powerhouse Structure - General Arrangement Center of Units; Longitudinal Section

BR

616482-CN10-6000-40D8-0013

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

BR

616482-CN10-6000-40D8-0003

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

56
Powerhouse Structure - General Arrangement -

Document No.: 616482-3000-30RM-0025

55

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Office Complex 2nd Floor / Mezzanine Level; Plan

57

Powerhouse Structure - General Arrangement Main Floor / Service Bay; Plan

BR

616482-CN10-6000-40D8-0004

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

58

Powerhouse Structure - General Arrangement Unit-1 Center Line; Transverse Section

BR

616482-CN10-6000-40D8-0021

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

59

Powerhouse Structure - General Arrangement Pump Floor; Plan

BR

616482-CN10-6000-40D8-0007

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

60

Powerhouse Structure - General Arrangement East Stairwell; Transverse Section

BR

616482-CN10-6000-40D8-0024

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

61

Powerhouse General Stability Analysis

BR

616482-CN10-6000-40E3-0001

01

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

62

Powerhouse Structure - General Arrangement TIV and Upstream Valves; Longitudinal Section

BR

616482-CN10-6000-40D8-0011

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

63

Powerhouse Structure - General Arrangement Draft Tube Gate Gallery / Surge Chamber;
Longitudinal Section

BR

616482-CN10-6000-40D8-0015

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

64

Powerhouse Structure - General Arrangement Turbine Floor; Plan

BR

616482-CN10-6000-40D8-0006

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

65

Final Design - Powerhouse General Arrangements

BR

616482-6000-40E4-0001

01

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

66

Powerhouse Structure - General Arrangement Site Plan

BR

616482-CN10-6000-40D8-0001

02

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

67

Powerhouse Structure - General Arrangement Downstream Wall (North Wall); Longitudinal


Section

BR

616482-CN10-6000-40D8-0014

03

2016/02/26

BCH I-1544

2016/03/11

2016/03/07

-4

NE

Document No.: 616482-3000-30RM-0025

56

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

68

Powerhouse Structure - General Arrangement Draft Tube Access; Transverse Section

BR

616482-CN10-6000-40D8-0020

03

2016/02/26

BCH I-1544

69

Tailrace Outlet - Tailrace Tunnel Excavation - Plan


and Profile sheet 1

BI

616482-CN10-7200-4GD8-0001

01

2016/02/26

BCH I-1545

2016/03/04

70

Calculations - Tailrace Tunnel - Excavation and


Rock Support

BI

616482-CN10-7200-4GE3-0001

01

2016/02/26

BCH I-1545

2016/03/04

71

Leave to Commence Construction #2 (LCC #2) Component 6a2 - Tailrace Tunnel - Excavation
Downstream of Transition

BI

616482-LCC-40GG-2007

00

2016/02/26

BCH I-1545

2016/03/04

I1

72

Tailrace Outlet - Tailrace Tunnel Excavation - Plan


and Profile sheet 2

BI

616482-CN10-7200-4GD8-0002

01

2016/02/26

BCH I-1545

2016/03/04

73

Tailrace Tunnel Excavation and Rock Support Sections

BI

616482-CN10-7200-4GD8-0003

01

2016/02/26

BCH I-1545

2016/03/04

74

Design Basis Memorandum - Tailrace Tunnel Excavation and Rock Support

BI

616482-CN10-7200-4GE2-0001

01

2016/02/26

BCH I-1545

2016/03/04

75

Hatfield Weekly Environmental Monitoring Report


no. 098 (February 14 to February 20, 2016)

BR

616482-EN03-01-0000-4ERW-0098

01

2016/02/26

BCH I-1546

2016/03/11

2016/03/07

-4

R1

76

Alstom - Supplier's realization, Inspection & Test


Plan (ITP) - Set of Thrust Collar - Fabrication

BR

616482-TG01-A-6930-38QA-0029

02

2016/02/26

BCH I-1547

2016/03/11

2016/03/07

-4

R1

77

Alstom - Supplier's realization, Inspection & Test


Plan (ITP) - Thrust Runner - Fabrication

BR

616482-TG01-A-6930-38QA-0028

01

2016/02/26

BCH I-1547

2016/03/11

2016/03/07

-4

R1

78

Aboriginal Participation Reporting Form - Monthly


(January 26, 2016 February 25, 2016) Report
#28

BI

616482-3M00-30FN-0024

00

2016/02/29

BCH I-1549

Document No.: 616482-3000-30RM-0025

57

2016/03/11

2016/03/07

2016/03/10

-4

NE

I1

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

79

Access Roads Miscellaneous Steel - Road L60 Handrail Details

BI

616482-CN10-1300-41D8-0009

02

2016/02/29

BCH I-1550

2016/03/08

CAD

80

Final Design - L60 Surge Tank Access Road

BI

616482-1300-41E4-0001

02

2016/02/29

BCH I-1550

2016/03/08

CAD

81

Tailrace Outlet Structure Miscellaneous Steel Platform - Wet Sump - Plan, Sections and Detail

BR

616482-CN10-7400-43D8-0022

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R1

82

Tailrace Outlet Structure Miscellaneous Steel Schedule Plan - General Notes and Tables

BR

616482-CN10-7400-43D8-0001

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R2

83

Tailrace Outlet Structure Miscellaneous Steel Grated Doors - Plan, Sections and Details

BR

616482-CN10-7400-43D8-0011

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R1

84

Tailrace Outlet Structure Miscellaneous Steel Concrete


Hatch
Cover
Embedment
and
Arrangement - Plans

BR

616482-CN10-7400-43D8-0020

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R1

85

Tailrace Outlet Structure Miscellaneous Steel Grated Trench Covers - Plan, Section and Details

BR

616482-CN10-7400-43D8-0010

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R2

86

Tailrace Outlet Structure Miscellaneous Steel Concrete Hatch Cover and Embedment - Plans,
Sections and Dtails

BR

616482-CN10-7400-43D8-0021

01

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R1

87

Final Design - Tailrace Outlet Miscellaneous Steel

BR

616482-7400-43E4-0001

00

2016/02/29

BCH I-1551

2016/03/14

2016/03/08

-6

R1

88

BCH - RFFI-0730 - BC Hydro Response to BCH I1317 Request for Further Information

COM

616482-BCH-RFFI-16-0730

00

2016/02/29

BCH I-1552

2016/03/14

89

Quality Management System Monthly Report


(January 2016)

BI

616482-3000-28RM-0023

00

2016/02/29

BCH I-1553

2016/03/15

CAD

BR

616482-TG01-A-6930-38QA-0034

01

2016/02/29

BCH I-1554

90
Alstom - Supplier's realization, Inspection & Test

Document No.: 616482-3000-30RM-0025

58

2016/03/14

2016/03/07

-7

R1

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Plan (ITP) - Upper Shaft - Forging

91

38ITP-1201 - L70 Road Excavation and Intake


Excavation

BR

616482-CN10-0000-38ITP-0132

04

2016/02/29

BCH I-1555

92

Construction Period Security Plan

BI

616482-CN10-0000-67RP-0001

05

2016/02/29

BCH I-1556

2016/03/15

CAD

93

Development Change Record Confirmation Schedule 6 Section 5.5 - Large Isolation Valves

COM

616482-DCRC-16-0073

00

2016/02/29

BCH I-1557

2016/03/04

94

Development Change Record Confirmation Schedule 6 Section 4.2-4.18 - Servomotor Locking


and Stroke

COM

616482-DCRC-16-0075

00

2016/02/29

BCH I-1557

2016/03/04

95

Development Change Record Confirmation Schedule 6 Section 4.2 - Turbine

COM

616482-DCRC-16-0074

00

2016/02/29

BCH I-1557

2016/03/04

96

Technical Specification - Powerhouse Maintenace


Shop Equipment

BR

616482-6540-45E5-0001

00

2016/03/01

BCH I-1558

2016/03/15

2016/03/03

-12

R1

97

Powerhouse Structure General Arrangement Maintenance Shop El. 22-30 - Plan

BR

616482-6540-45D3-0001

00

2016/03/01

BCH I-1558

2016/03/15

2016/03/03

-12

R1

98

Final Design - Powerhouse Maintenance Shop


Equipment

BR

616482-6540-45E4-2001

00

2016/03/01

BCH I-1558

2016/03/15

2016/03/03

-12

R1

99

Powerhouse - Embedded Unistrut Layout


Generator Pit - Exterior Wall Developed View

BR

616482-6565-47D3-0059

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

2016/03/14

2016/03/07

-7

R1

100

Powerhouse - Embedded Conduit and Unistrut


Layout - Pump Floor Plan

BR

616482-6565-47D3-0057

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

101

Powerhouse - Embedded Unistrut in Ceiling


Layout - Generator Floor Ceiling Plan

BR

616482-6565-47D3-0057

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

Document No.: 616482-3000-30RM-0025

59

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

102

Final Design - Electrical Cable Tray Part 2

BR

616482-6565-47E4-0002

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

103

Powerhouse - Embedded Unistrut Sections

BR

616482-6565-47D3-0059

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

104

Powerhouse - Embedded Unistrut in Ceiling


Layout - Turbine Floor Ceiling Plan

BR

616482-6565-47D3-0057

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

105

Powerhouse - Embedded Unistrut in Ceiling


Layout - Main Floor Ceiling @ Electrical Bay

BR

616482-6565-47D3-0057

00

2016/03/01

BCH I-1559

2016/03/15

2016/03/08

-7

R1

106

Field Instruction - ASL-FI-229 - Intake East Wall


Bolting Elev 130 m (signed)

BI

616482-CN10-40FI-0229

02

2016/03/01

BCH I-1560

107

Intake Structure / LLO Valve House Grounding


Layout - Longitudinal Section

BR

616482-3401-47D3-0005

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

108

Intake Structure / LLO Valve House Grounding


Layout - Through Intake Tunnel Section

BR

616482-3401-47D3-0008

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

109

(Partial) Final
Grounding

BR

616482-3401-47E4-0001

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

110

Intake Structure / LLO Valve House Grounding


Isometric Drawing

BR

616482-3401-47D3-0010

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

111

Intake Structure / LLO Valve House Grounding


Layout - Through Operating Gate Slot Section

BR

616482-3401-47D3-0009

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

112

Intake Structure / LLO Valve House Grounding


Layout - Water Passage Invert - Plan

BR

616482-3401-47D3-0003

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

113

Intake Structure / LLO Valve House Grounding


Layout - Through Maintenance Gate Slot Section

BR

616482-3401-47D3-0007

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

Design

Intake

2016/03/08

CAD

Embedded

Document No.: 616482-3000-30RM-0025

60

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Rev.

Transmittal
Date

No.

Document Title

114

Intake Structure / LLO Valve House Grounding


Layout - Upstream of Dam Face Section

BR

616482-3401-47D3-0006

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

115

Intake Structure - Grounding Layout Intake Deck Plan

BR

616482-3401-47D3-0001

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

116

Intake Structure / LLO Valve House Grounding


Layout - Water Passage Invert - Plan

BR

616482-3401-47D3-0004

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

117

Intake Structure / LLO Valve House Grounding


Layout - Link and Operating Gate Access Levels Plan

BR

616482-3401-47D3-0002

00

2016/03/02

BCH I-1562

2016/03/16

2016/03/10

-6

R1

118

Occupational Health and Safety Management


Program

BR

616482-0000-68E0-0001

04

2016/03/02

BCH I-1563

2016/03/16

2016/03/11

-5

R1

119

Field Instruction - ASL-FI-235 - Intake Investigation


- Revised Drilling Procedure (2) (signed)

BI

616482-CN10-40FI-0235

00

2016/03/03

BCH I-1564

2016/03/08

CAD

120

Field Instruction - ASL-FI-234 - EAC Shotcrete


Nozzlemen Certification (signed)

BI

616482-CN10-40FI-0234

00

2016/03/03

BCH I-1564

2016/03/08

CAD

121

Field Instruction - ASL-FI-231 - Second Stage


Grouting for Tailrace

BI

616482-CN10-40FI-0231

00

2016/03/03

BCH I-1564

2016/03/08

CAD

122

Field Instruction - - ASL-FI-236 Prescription for FK0268 M.A.T (signed)

BI

616482-CN10-40FI-0236

00

2016/03/03

BCH I-1564

2016/03/08

CAD

123

Technical Specification for General Mechanical

BI

616482-6500-45E5-0001

01

2016/03/03

BCH I-1565

2016/03/15

CAD

124

(Partial) Final Design


Equipment Part 3

BI

616482-6500-45E4-0003

01

2016/03/03

BCH I-1565

2016/03/15

CAD

125

Powerhouse - Wastewater System - Schematic


Diagram

BI

616482-6535-45D2-0001

01

2016/03/03

BCH I-1566

2016/03/15

CAD

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Revise

Electromechanical

Document No.: 616482-3000-30RM-0025

61

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

126

Technical Specification for Sewage Holding Tank

BI

616482-6535-45E5-0001

01

2016/03/03

BCH I-1566

2016/03/15

CAD

127

Final Design - Wastewater System

BI

616482-6535-45E4-0001

01

2016/03/03

BCH I-1566

2016/03/15

CAD

128

Design Basis Memorandum


Wastewater System

BI

616482-6535-45E2-0001

01

2016/03/03

BCH I-1566

2016/03/15

CAD

129

Hatfield - Monthly Environmental Report No.24


(February 2016)

BR

616482-EN03-01-0000-4ERM-0024

01

2016/03/03

BCH I-1567

2016/03/17

2016/03/15

-2

R2

130

Alstom - Generator - Collector - Collector Shaft

BR

616482-TG01-A-6930-45D3-0255

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

131

Alstom - Generator - Collector - Set of Insulating


Spacers

BR

616482-TG01-A-6930-45D3-0252

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

132

Alstom - Generator - Collector - Set of Rings


Assembling Rods

BR

616482-TG01-A-6930-45D3-0251

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

133

Alstom - Generator - Collector Rings Field Leads Set of Connections Steel Supports

BR

616482-TG01-A-6930-45D3-0245

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

134

Alstom - Generator - Collector Rings Field Leads Set of Connection Bars

BR

616482-TG01-A-6930-45D3-0243

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

135

Alstom - Generator - Collector Rings Field Leads Set of Flexible Connections

BR

616482-TG01-A-6930-45D3-0242

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

136

Alstom - Generator - Collector Rings Field Leads Arrangement

BR

616482-TG01-A-6930-45D3-0240

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

137

Alstom - Collector - Arrangement

BR

616482-TG01-A-6930-45D3-0247

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

BR

616482-TG01-A-6930-45D3-0240

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

Powerhouse

138
Alstom - Generator - Collector Rings Field Leads -

Document No.: 616482-3000-30RM-0025

62

BC Hydro
Response

Actual
Returned
Date

Document Title

Action

TTL No.
Reference for
BC Hydro

Days to
count down

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

139

Final Design - Collector Ring Field Leads (MKB29)

BR

616482-6930-45E4-0029

00

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

140

Alstom - Generator - Collector Rings Field Leads Set of Shaft Connection Bars

BR

616482-TG01-A-6930-45D3-0258

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

141

Alstom - Generator - Collector - Set of Collector


Rings Support

BR

616482-TG01-A-6930-45D3-0253

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

142

Alstom - Generator - Collector - Collector Shaft

BR

616482-TG01-A-6930-45D3-0255

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

143

Alstom - Generator - Collector Rings Assembly

BR

616482-TG01-A-6930-45D3-0248

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

144

Alstom - Generator - Collector Rings Field Leads Set of Insulating Supports and Shims

BR

616482-TG01-A-6930-45D3-0244

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

145

Alstom - Generator - Collector Rings Field Leads Set of Connection Bars

BR

616482-TG01-A-6930-45D3-0243

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

146

Alstom - Generator - Collector - Set of Collector


Rings

BR

616482-TG01-A-6930-45D3-0250

01

2016/03/04

BCH I-1568

2016/03/18

2016/03/10

-8

R1

147

Alstom - Generator - Thrust Bearing - Set of


Locking - Ring and Driving Key

BI

616482-TG01-A-6930-45D3-0607

02

2016/03/04

BCH I-1569

2016/03/15

CAD

148

Alstom - Bottom Ring - Fabrication

BI

616482-TG01-A-6910-45D3-0121

02

2016/03/04

BCH I-1570

2016/03/15

CAD

149

Alstom - Bottom Ring - Machining

BI

616482-TG01-A-6910-45D3-0120

02

2016/03/04

BCH I-1570

2016/03/15

CAD

150

Alstom - Bottom Ring - Machining

BI

616482-TG01-A-6910-45D3-0120

02

2016/03/04

BCH I-1570

2016/03/15

CAD

No.

Document No

Rev.

Transmittal
Date

Requested
Return Date

Arrangement

Document No.: 616482-3000-30RM-0025

63

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

151

Alstom - Bottom Ring - Machining

BI

616482-TG01-A-6910-45D3-0120

02

2016/03/04

BCH I-1570

2016/03/15

CAD

152

Final Design - Bottom Ring (MEF22)

BI

616482-6910-45E4-0020

01

2016/03/04

BCH I-1570

2016/03/15

CAD

153

Final Design - Headcover (MEF21)

BI

616482-6910-45E4-0018

03

2016/03/04

BCH I-1571

2016/03/15

CAD

154

Alstom - Generator - Combined Bearing - Oil


Cooler

BI

616482-TG01-A-6930-45D3-0640

02

2016/03/04

BCH I-1572

2016/03/22

CAD

155

Final Design - Thrust Bearing Cooler (MXE50)

BI

616482-6930-45E4-0028

01

2016/03/04

BCH I-1572

2016/03/22

CAD

156

Alstom - Generator - Stator - Shipping

BI

616482-TG01-A-6930-45D3-0544

02

2016/03/04

BCH I-1573

2016/03/15

CAD

157

Alstom - Generator
Arrangement

BI

616482-TG01-A-6930-45D3-0540

02

2016/03/04

BCH I-1573

2016/03/15

CAD

158

Final Design - Stator Tools (MKB82)

BI

616482-6930-45E4-0027

01

2016/03/04

BCH I-1573

2016/03/15

CAD

159

Alstom - Turbine Runner Top - Half (Crown)


Forging - Procurement

BI

616482-TG01-A-6910-45D3-0186

02

2016/03/04

BCH I-1574

2016/03/15

CAD

160

Alstom - Turbine Runner Bottom - Half (Band)


Forging - Procurement

BI

616482-TG01-A-6910-45D3-0188

02

2016/03/04

BCH I-1574

2016/03/15

CAD

161

(Partial) Final Design - Runner (MEF32) - Part 1

BI

616482-6910-45E4-0015

01

2016/03/04

BCH I-1574

2016/03/15

CAD

162

Alstom - Butterfly Valve - TIV Supporting Feet

BI

616482-TG01-A-6960-45D3-0147

02

2016/03/04

BCH I-1575

2016/03/15

CAD

163

(Partial) Final Design - Butterfly Valve Erection


Tools (MBQ81) - Part 1

BI

616482-6960-45E4-0013

01

2016/03/04

BCH I-1575

2016/03/15

CAD

Stator

Handling

Document No.: 616482-3000-30RM-0025

Rev.

Transmittal
Date

No.

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

64

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

164

Alstom - Butterfly Valve - Plug Machining

BI

616482-TG01-A-6960-45D3-0029

03

2016/03/04

BCH I-1576

2016/03/15

CAD

165

Alstom - Butterfly Valve - Plug Machining

BI

616482-TG01-A-6960-45D3-0029

03

2016/03/04

BCH I-1576

2016/03/15

CAD

166

(Partial) Final Design - Butterfly Valve - Body and


Plug - Part 1

BI

616482-6960-45E4-0002

03

2016/03/04

BCH I-1576

2016/03/15

CAD

167

Alstom - Butterfly Valve - Pressure Test

BI

616482-TG01-A-6960-45D3-0060

02

2016/03/04

BCH I-1577

2016/03/15

CAD

168

Alstom - Butterfly Valve - Pressure Test

BI

616482-TG01-A-6960-45D3-0060

02

2016/03/04

BCH I-1577

2016/03/15

CAD

169

Alstom - Butterfly Valve - Conduit Supports Pressure Test

BI

616482-TG01-A-6960-45D3-0063

01

2016/03/04

BCH I-1577

2016/03/15

CAD

170

Alstom - Butterfly Valve - Pressure Test

BI

616482-TG01-A-6960-45D3-0060

02

2016/03/04

BCH I-1577

2016/03/15

CAD

171

(Partial) Final Design - Butterfly Valve Testing


(MBQ14) - Part 2

BI

616482-6960-45E4-0016

01

2016/03/04

BCH I-1577

2016/03/15

CAD

172

Alstom - Butterfly Valve - Test Beam - Pressure


Test

BI

616482-TG01-A-6960-45D3-0062

01

2016/03/04

BCH I-1577

2016/03/15

CAD

173

Development Change Record Confirmation Schedule 6 Section 1.3G, Corrosion Protection

COM

616482-DCRC-16-0078

00

2016/03/04

BCH I-1578

2016/03/14

174

Specification for Miscellneous Handling Equipment

BR

616482-6513-45E5-0001

00

2016/03/04

BCH I-1580

2016/03/18

2016/03/15

-3

R2

175

(Partial) Final Design - Miscellaneous Lifting


Device

BR

616482-6513-45E4-0001

00

2016/03/04

BCH I-1580

2016/03/18

2016/03/15

-3

R1

176

(Partial) Final Design


Equipment Part 4

BR

616482-6500-45E4-0004

00

2016/03/04

BCH I-1581

2016/03/18

2016/03/09

-9

R1

Electromechanical

Document No.: 616482-3000-30RM-0025

65

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

177

Instrument List

BR

616482-6500-45D1-0002

00

2016/03/04

BCH I-1581

2016/03/18

2016/03/09

-9

R1

178

Mechanical Equipment List

BR

616482-6500-45D1-0001

00

2016/03/04

BCH I-1581

2016/03/18

2016/03/09

-9

R1

179

Powerhouse Piping General Arrangement - Office


Building Roof and Third Floor - Plan

BR

616482-6530-45D3-0006

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

180

Powerhouse Piping General Arrangement - Office


Building Second and Main Floor - Plan

BR

616482-6530-45D3-0007

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

181

Powerhouse
Drainage
Piping
General
Arrangement - Main Floor Secions and Details
sheet 2

BR

616482-6530-45D3-0337

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

182

Powerhouse Piping General Arrangement - Details


and Sections sheet 1

BR

616482-6530-45D3-0020

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R2

183

Powerhouse Piping General Arrangement - Pump


Floor sheet 2 - Plan

BR

616482-6530-45D3-0018

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

184

Powerhouse
Embedded
Piping
General
Arrangement - Draft Tube Access Gallery

BR

616482-6530-45D3-0322

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R3

185

Powerhouse
Drainage
Piping
General
Arrangement - Generator Floor Sections and
Details

BR

616482-6530-45D3-0331

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

186

Powerhouse
Drainage
Piping
Arrangement - Generator Floor Sheet 1

General
BR

616482-6530-45D3-0329

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

187

Powerhouse
Embedded
Piping
Arrangement - Turbine Floor Sheet 2

General
BR

616482-6530-45D3-0327

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

BR

616482-6530-45D3-0330

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

Powerhouse

General

188
Drainage

Piping

Document No.: 616482-3000-30RM-0025

66

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Arrangement - Generator Floor Sheet 2

189

Powerhouse
Drainage
Piping
Arrangement - Main Floor Sheet 2

190

General
BR

616482-6530-45D3-0335

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

Powerhouse Piping General Arrangement - Sump


Floor sheet 3 - Plan and Details

BR

616482-6530-45D3-0022

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

191

Powerhouse Piping General Arrangement - Pump


Floor sheet 3 - Plan

BR

616482-6530-45D3-0019

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

192

Powerhouse Piping General Arrangement - Pump


Floor sheet 1 - Plan

BR

616482-6530-45D3-0017

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

193

Powerhouse Piping General


Turbine Floor sheet 3 - Plan

Arrangement

BR

616482-6530-45D3-0016

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

194

Powerhouse Piping General


Turbine Floor sheet 2 - Plan

Arrangement

BR

616482-6530-45D3-0015

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

195

Powerhouse Piping General


Turbine Floor sheet 1 - Plan

Arrangement

BR

616482-6530-45D3-0014

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

196

Powerhouse Piping General


Generator Floor sheet 3 - Plan

Arrangement

BR

616482-6530-45D3-0013

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

197

Powerhouse Piping General


Generator Floor sheet 2 - Plan

Arrangement

BR

616482-6530-45D3-0012

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

198

Powerhouse Piping General


Generator Floor sheet 1 - Plan

Arrangement

BR

616482-6530-45D3-0011

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

199

Powerhouse Piping General Arrangement - Main


Floor sheet 3 - Plan

BR

616482-6530-45D3-0010

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

Document No.: 616482-3000-30RM-0025

67

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

200

Powerhouse Piping General Arrangement - Main


Floor sheet 2 - Plan

BR

616482-6530-45D3-0009

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

201

Powerhouse Piping General Arrangement - Main


Floor Plan sheet 1 - Plan

BR

616482-6530-45D3-0008

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

202

Service Tunnel General Arrangement - Plan sheet


2

BR

616482-6530-45D3-0005

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

203

Service Tunnel Piping - General Arrangement Plan sheet 1

BR

616482-6530-45D3-0004

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

204

Powerhouse Piping General


Suspended Roof Floor - Plan

BR

616482-6530-45D3-0003

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

205

Gate Gallery Piping - General Arrangement - Plan

BR

616482-6530-45D3-0002

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

206

Valve List

BR

616482-6530-45D1-0002

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R3

207

Piping Line List

BR

616482-6530-45D1-0001

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R3

208

Powerhouse
Drainage
Piping
Arrangement - Main Floor Sheet 3

BR

616482-6530-45D3-0334

00

2016/03/07

BCH I-1582

2016/03/21

2016/03/17

-4

R1

209

Field Instruction - ASL-FI-237 - Revise Drilling


Procedure

BI

616482-CN10-40FI-0237

01

2016/03/07

BCH I-1583

2016/03/15

CAD

210

Final Design - Civil Specifications

BI

616482-0410-42E4-0001

01

2016/03/08

BCH I-1584

2016/03/09

R1

211

Specification for Waterstop and Joint Materials

BI

616482-CN10-0410-42E5-0006

04

2016/03/08

BCH I-1584

2016/03/09

R1

212

ASL-RFI-053 - Approval to Substitute Durajoint


with S ka Waterstop

BI

616482-CN10-40RFI-0053

01

2016/03/08

BCH I-1585

2016/03/15

CAD

Document No.: 616482-3000-30RM-0025

Rev.

Transmittal
Date

No.

Arrangement

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

General

68

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

213

Hatfield Weekly Environmental Monitoring Report


no. 099 (February 21 to February 27, 2016)

BR

616482-EN03-01-0000-4ERW-0099

01

2016/03/08

BCH I-1586

2016/03/22

2016/03/15

-7

R1

214

Specification for 600V Motor Control Centres &


Distribution Panels

BR

616482-6060-47E5-0003

01

2016/03/08

BCH I-1587

2016/03/22

2016/03/10

-12

R1

215

Calculation - Intake Maintenance Gate Bay 3D FE


Structural Analysis of MDE Load Case - Influence
of Boundary Conditions

BR

616482-CN10-3220-42E3-0003

02

2016/03/08

BCH I-1588

2016/03/22

2016/03/18

-4

R1

216

Alstom - Supplier's realization, Inspection&Test


Plan (ITP)- Turbine Runner-Bottom Half (Band) Fabrication - Machining

BR

616482-TG01-A-6910-38QA-0018

03

2016/03/09

BCH I-1589

2016/03/23

2016/03/17

-6

R1

217

Alstom - Supplier's realization,Inspection & Test


Plan (ITP)- Turbine Runner-Top Half (Crown) Fabrication - Machining

BR

616482-TG01-A-6910-38QA-0016

03

2016/03/09

BCH I-1589

2016/03/23

2016/03/17

-6

R1

218

Field Instruction - ASL-FI-218 - Hook Anchors for


East Intake Abutment Block

BI

616482-CN10-40FI-0218

01

2016/03/09

BCH I-1590

2016/03/15

CAD

219

Field Instruction - ASL-FI-238 - L40 Ramp Terex


Shotcrete Storage Area (signed)

BI

616482-CN10-40FI-0238

01

2016/03/09

BCH I-1590

2016/03/15

CAD

220

JHGSRP Monthly Progress Report - February


2016

COM

616482-3000-30RM-0024

00

2016/03/09

BCH I-1591

2016/03/15

CAD

221

Specification for 138 kV Substation Equipments 138 kV & 13.8 kV Outdoor Disconnector Switches

BI

616482-8301-47E5-0001

01

2016/03/09

BCH I-1592

2016/03/15

CAD

222

Final Design -138kV Switchgear and Facilities

BI

616482-8301-47E4-0001

02

2016/03/09

BCH I-1592

2016/03/15

CAD

223

ASLJV - Inspection Test Plan (ITP) - 38ITP-7200 Tailrace Tunnel Excavation & Rock Support

BR

616482-CN10-7200-38ITP-0256

03

2016/03/09

BCH I-1593

69

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

2016/03/23

2016/03/14

-9

R1

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

224

ASLJV - Inspection Test Plan (ITP) - 38ITP-7120 Surge Chamber Excavation

BR

616482-CN10-7120-38ITP-0255

03

2016/03/09

BCH I-1593

2016/03/23

2016/03/14

-9

R1

225

ASLJV - Inspection Test Plan (ITP) - 38ITP-6620 Bypass Outlet Tunnel Excavation & Rock Support

BR

616482-CN10-6620-38ITP-0257

02

2016/03/09

BCH I-1594

2016/03/23

2016/03/14

-9

R1

226

ASLJV - Inspection Test Plan (ITP) - 38ITP-5400 Power Tunnel Manifold & Bifurcation Excavation

BR

616482-CN10-5400-38ITP-0261

02

2016/03/09

BCH I-1595

2016/03/23

2016/03/16

-7

R1

227

ASLJV - Inspection Test Plan (ITP) - 38ITP-6610 Powerhouse Draft Tube Tunnel Excavation & Rock
Support

BR

616482-CN10-6610-38ITP-0262

02

2016/03/09

BCH I-1596

2016/03/23

2016/03/15

-8

R1

228

ASLJV - Inspection Test Plan (ITP) - 38ITP-5100 Intake Shaft Excavation and Rock Support

BR

616482-CN10-5100-38ITP-0422

01

2016/03/09

BCH I-1597

2016/03/23

2016/03/16

-7

R1

229

Final Design - Intake Shaft and Lower Bend

BR

616482-5100-4GE4-0001

02

2016/03/10

BCH I-1598

2016/03/24

2016/03/24

R1

230

Calculation for Intake Shaft Excavation and Rock


Support

BR

616482-CN10-5100-4GE3-0001

03

2016/03/10

BCH I-1598

2016/03/24

2016/03/24

R2

231

Power Tunnel - Intake Shaft and Lower Bend Profile and Sections

BR

616482-CN10-5100-4GD8-0001

03

2016/03/10

BCH I-1598

2016/03/24

2016/03/24

R1

232

Calculations - Surge Shaft - Excavation and Rock


Support

BR

616482-CN10-5310-4GE3-0001

01

2016/03/10

BCH I-1599

2016/03/24

2016/03/24

R2

233

Design Basis Memorandum - Surge Shaft Excavation and Rock Support

BR

616482-CN10-5310-4GE2-0001

01

2016/03/10

BCH I-1599

2016/03/24

2016/03/24

R2

234

Surge Shaft - Excavation and Rock Support - Plan


and Sections

BR

616482-CN10-5310-4GD8-0001

01

2016/03/10

BCH I-1599

2016/03/24

2016/03/24

R1

235

Final Design - Intake Single Line Diagrams


includes LLO and EFRS

BI

616482-3020-47E4-0002

01

2016/03/10

BCH I-1600

70

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

2016/03/15

CAD

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

236

Intake - DP-7 - Main Single Line Diagram

BI

616482-3020-47D2-0001

01

2016/03/10

BCH I-1600

2016/03/15

CAD

237

(Partial) Final Design - Service Tunnel Electrical


Services - Part 2

BI

616482-6820-47E4-0002

01

2016/03/10

BCH I-1601

2016/03/15

CAD

238

Service Tunnel Fan Room - DP-9 - Single Line


Diagram

BI

616482-6820-47D2-0001

01

2016/03/10

BCH I-1601

2016/03/15

CAD

239

(Partial) Final Design - Tailrace Pump House - Part


2

BI

616482-7420-47E4-0002

02

2016/03/10

BCH I-1602

2016/03/15

CAD

240

Tailrace Outlet - MCC8 - Single Line Diagram

BI

616482-7420-47D2-0001

01

2016/03/10

BCH I-1602

2016/03/15

CAD

241

(Partial) Final Design - AC Station Services


System - Part 4

BI

616482-6060-47E4-0004

07

2016/03/10

BCH I-1603

2016/03/15

CAD

242

Powerhouse - AC Station Service - Single Line


Diagram

BI

616482-6060-47D2-0001

03

2016/03/10

BCH I-1603

2016/03/15

CAD

243

Powerhouse - Unit MCC1 - Single Line Diagram

BI

616482-6060-47D2-0005

01

2016/03/10

BCH I-1603

2016/03/15

CAD

244

Powerhouse - Unit MCC4 - Single Line Diagram

BI

616482-6060-47D2-0020

01

2016/03/10

BCH I-1603

2016/03/15

CAD

245

Powerhouse - Unit MCC2 - Single Line Diagram

BI

616482-6060-47D2-0010

01

2016/03/10

BCH I-1603

2016/03/15

CAD

246

Powerhouse - MCC6 -Single Line Diagram

BI

616482-6060-47D2-0030

01

2016/03/10

BCH I-1603

2016/03/15

CAD

247

Powerhouse - Essential Service MCC5 - Single


Line Diagram

BI

616482-6060-47D2-0025

01

2016/03/10

BCH I-1603

2016/03/15

CAD

248

Powerhouse - Unit MCC3 - Single Line Diagram

BI

616482-6060-47D2-0015

01

2016/03/10

BCH I-1603

2016/03/15

CAD

Document No.: 616482-3000-30RM-0025

71

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

249

(Partial) Final Design - Facility Dewatering / Filling


System - Part 2

BR

616482-6012-45E4-0002

02

2016/03/10

BCH I-1604

2016/03/24

2016/03/15

-9

R1

250

Tailrace Diagram

BR

616482-6012-45D2-0002

02

2016/03/10

BCH I-1604

2016/03/24

2016/03/15

-9

R1

251

Powerhouse - Drainage and Dewatering System Schematic Diagram

BR

616482-6012-45D2-0001

02

2016/03/10

BCH I-1604

2016/03/24

2016/03/15

-9

R1

252

Powerhouse - Drainage System - Generator Pit Schematic Diagram

BR

616482-6534-45D2-0010

01

2016/03/10

BCH I-1605

2016/03/24

2016/03/16

-8

R1

253

Powerhouse - Drainage System - Turbine Floor Schematic Diagram

BR

616482-6534-45D2-0005

01

2016/03/10

BCH I-1605

2016/03/24

2016/03/16

-8

R1

254

(Partial) Final Design - Powerhouse Drainage


System - Part 1

BR

616482-6534-45E4-0001

04

2016/03/10

BCH I-1605

2016/03/24

2016/03/16

-8

R1

255

Powerhouse - Drainage and Dewatering System Schematic Diagram

BR

616482-6534-45D2-0001

02

2016/03/10

BCH I-1605

2016/03/24

2016/03/16

-8

R1

256

Powerhouse - Drainage System Pump Floor Schematic Diagram - Sheet 1

BR

616482-6534-45D2-0002

01

2016/03/10

BCH I-1605

2016/03/24

2016/03/16

-8

R2

257

Powerhouse - Oil Handling System - Schematic


Diagram - Sheet 1

BR

616482-6533-45D2-0001

02

2016/03/11

BCH I-1606

2016/03/25

2016/03/14

-11

R1

258

(Partial) Final Design - Oil Handling System

BR

616482-6533-45E4-0001

03

2016/03/11

BCH I-1606

2016/03/25

2016/03/14

-11

R1

259

Powerhouse - Oil Handling System - Schematic


Diagram - Sheet 2

BR

616482-6533-45D2-0002

02

2016/03/11

BCH I-1606

2016/03/25

2016/03/14

-11

R1

260

Support Design for the Intake Tunnel Under the


Dam

BR

616482-CN10-3202-4GE3-0001

03

2016/03/14

BCH I-1607

2016/03/28

2016/03/24

-4

R2

System

Rev.

Transmittal
Date

No.

Dewatering

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Schematic

Document No.: 616482-3000-30RM-0025

72

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

261

Design Basis Memorandum - Main Dam Intake


Tunnel Under Block 2

BR

616482-CN10-3202-4GE2-0001

03

2016/03/14

BCH I-1607

2016/03/28

2016/03/24

-4

R2

262

Intake Structure - Intake Modification to Existing


Dam - Tunnel Under Block 2-Excavation-Primary
Liner: Plan and Section

BR

616482-CN10-3202-4GD8-0001

03

2016/03/14

BCH I-1607

2016/03/28

2016/03/24

-4

R1

263

Final Design - Support Design for Intake Tunnel


Under Dam Block 2

BR

616482-3202-4GE4-0001

02

2016/03/14

BCH I-1607

2016/03/28

2016/03/24

-4

R1

264

(Partial) Final Design - Electromechanical


Equipment - Part 1 - Identification System

BI

616482-6500-45E4-0001

03

2016/03/11

BCH I-1608

2016/03/22

CAD

265

Mechanical Equipment, Piping, Instrumentation


and Valves Identification System

BI

616482-6500-45D2-0003

05

2016/03/11

BCH I-1608

2016/03/22

CAD

266

ASLJV - Inspection Test Plan (ITP) - 38ITP-6810 L20 Main Access Tunnel Excavation

BI

616482-CN10-0000-38ITP-0092

05

2016/03/11

BCH I-1609

2016/03/22

CAD

267

ASLJV - Inspection Test Plan (ITP) - 38ITP-7110 Powerhouse Gate Gallery Excavation & Rock
Support

BI

616482-CN10-7110-38ITP-0263

02

2016/03/11

BCH I-1610

2016/03/22

CAD

268

ASLJV - Inspection Test Plan (ITP) - 38ITP-7400 Tailrace Excavation

BI

616482-CN10-7400-38ITP-0249

03

2016/03/11

BCH I-1611

2016/03/22

CAD

269

Hatfield Weekly Environmental Monitoring Report


no. 100 (February 28 to March 5, 2016)

BR

616482-EN03-01-0000-4ERW-0100

01

2016/03/11

BCH I-1612

270

ASLJV - Inspection Test Plan (ITP) - 38ITP-6000 Powerhouse Concrete

BI

616482-CN10-6000-38ITP-0401

02

2016/03/14

BCH I-1613

2016/03/22

CAD

271

ASLJV - Technical Memo No.011 - Tunnel


Inspections, March 7&8, 2016

BI

616482-CN10-40EN-0011

01

2016/03/14

BCH I-1614

2016/03/22

CAD

73

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

2016/03/25

2016/03/21

-4

R1

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

272

ASLJV - Technical Memo No.010 - Vibration


Exceedance - Intake Blasts IN-55, IN-56 and IN-57

BI

616482-CN10-40EN-0010

01

2016/03/14

BCH I-1614

2016/03/22

CAD

273

ASLJV - Technical Memo No.013 - Vibration


Exceedance - Tailrace Blast TR-55 Sinking Cut

BI

616482-CN10-40EN-0013

01

2016/03/14

BCH I-1614

2016/03/22

CAD

274

Final Design - Surge Shaft Excavation and Rock


Support

BR

616482-3420-4GE4-0001

00

2016/03/14

BCH I-1615

2016/03/28

2016/03/23

-5

R1

275

Calculation - LLO and EFR Valve House Excavation and Rock Support Design

BR

616482-CN10-3420-4GE3-0001

01

2016/03/14

BCH I-1615

2016/03/28

2016/03/23

-5

R1

276

Design Basis Memorandum - LLO and EFR Valve


House - Excavation and Rock Support

BR

616482-CN10-3420-4GE2-0001

01

2016/03/14

BCH I-1615

2016/03/28

2016/03/23

-5

R2

277

Intake - Lower Level Outlet and Eenvironmental


Flow Release System - Valve House Excavation
Plan

BR

616482-CN10-3420-4GD8-0001

01

2016/03/14

BCH I-1615

2016/03/28

2016/03/23

-5

R2

278

Minutes of Meeting - Monthly Construction Period


Joint Committee Meeting (CPJC) February 2016

BI

616482-0000-30MC-0012

00

2016/03/14

BCH I-1616

279

Final Design - Intake Control House Mechanical


Equipment

BR

616482-3300-45E4-0001

02

2016/03/15

BCH I-1617

2016/03/29

2016/03/21

-8

R1

280

Powerhouse - HVAC Systems - LLO/EFRS


Building - Control & Instrumentation Diagram

BR

616482-3300-45D2-0003

01

2016/03/15

BCH I-1617

2016/03/29

2016/03/21

-8

R1

281

Intake - HVAC Systems


Instrumentation Diagram

BR

616482-3300-45D2-0002

01

2016/03/15

BCH I-1617

2016/03/29

2016/03/21

-8

R1

282

Powerhouse - HVAC Systems - Life Safety Schematic Diagram

BR

616482-6520-45D2-0003

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

BR

616482-6520-45D2-0002

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

Control

&

283
Powerhouse - HVAC Systems - Office Building -

Document No.: 616482-3000-30RM-0025

Rev.

Transmittal
Date

No.

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

74

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Schematic Diagram

284

Powerhouse - HVAC Systems - Powerhouse and


Tunnel Ventilation - Schematic Diagram

BR

616482-6520-45D2-0001

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

285

Technical Specification for Powerhouse HVAC


Systems

BR

616482-6520-45E5-0001

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

286

(Partial) Final Design - HVAC Systems - Part 1

BR

616482-6520-45E4-0001

02

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

287

Powerhouse - HVAC Systems - Service Tunnel


Fan House - Sections - Sht. 2 of 2

BR

616482-6520-45D3-0034

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

288

Powerhouse - HVAC Systems - Service Tunnel


Fan House - Sections Sht. 1 of 2

BR

616482-6520-45D3-0033

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

289

Powerhouse - HVAC Systems - Service Tunnel


Fan House - Plan Sht. 2 of 2

BR

616482-6520-45D3-0032

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

290

Powerhouse - HVAC Systems - Service Tunnel


Fan House - Plan - Sht. 1 of 2

BR

616482-6520-45D3-0031

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

291

Powerhouse - HVAC Systems - Gate Gallery


Chamber - Plan & Section

BR

616482-6520-45D3-0030

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

292

Powerhouse - HVAC Systems - Main Access


Tunnel Portal - Plans & Sections

BR

616482-6520-45D3-0027

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

293

Powerhouse - HVAC Systems - Office Building Sections Sht. 2 of 2

BR

616482-6520-45D3-0024

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

294

Powerhouse - HVAC Systems - Office Building Sections Sht. 1 of 2

BR

616482-6520-45D3-0023

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

Document No.: 616482-3000-30RM-0025

75

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

295

Powerhouse - HVAC Systems - Office Building


Main Floor - Plan - El. 22.30

BR

616482-6520-45D3-0022

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

296

Powerhouse - HVAC Systems - Office Building


Floor - Plan El. 26.30

BR

616482-6520-45D3-0021

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

297

Powerhouse - HVAC Systems - Control


Room/Office Level Floor - Plan - El. 30.30

BR

616482-6520-45D3-0020

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

298

Powerhouse - HVAC Systems - Office Building


Roof - Plan - El. 34.45

BR

616482-6520-45D3-0019

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

299

Powerhouse - HVAC Systems - Sump Floor Sections

BR

616482-6520-45D3-0018

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

300

Powerhouse - HVAC Systems - Drywell Sump


Floor & Draft Tube Access - Plan - El. 2.04 & El.
3.90

BR

616482-6520-45D3-0017

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

301

Powerhouse - HVAC Systems - Pump Floor Sections - El. 8.15

BR

616482-6520-45D3-0016

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

302

Powerhouse - HVAC Systems - Pump Floor Service Bay - Plan - El. 8.15

BR

616482-6520-45D3-0015

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

303

Powerhouse - HVAC Systems - Pump Floor - Unit


Bay - Plan - El. 8.15

BR

616482-6520-45D3-0014

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

304

Powerhouse - HVAC Systems - Transfer Fans Section

BR

616482-6520-45D3-0013

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

305

Powerhouse - HVAC Systems - Turbine Floor Service Bay - Plan - El. 13.00

BR

616482-6520-45D3-0012

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

BR

616482-6520-45D3-0011

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

Powerhouse - HVAC Systems - Turbine Floor

Document No.: 616482-3000-30RM-0025

76

Rev.

Transmittal
Date

No.

306

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Unit Bay - Plan - El. 13.00

307

Powerhouse - HVAC Systems - Main & Generator


Floors Cooling Units - Section

BR

616482-6520-45D3-0010

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

308

Powerhouse - HVAC Systems - Generator Floor Service Bay - Plan El. 17.30

BR

616482-6520-45D3-0009

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

309

Powerhouse - HVAC Systems - Generator Floor Unit Bay - Plan El. 17.30

BR

616482-6520-45D3-0008

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

310

Powerhouse - HVAC Systems - Main Floor Sections - El. 22.30

BR

616482-6520-45D3-0007

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

311

Powerhouse - HVAC Systems - Main Floor


Service Bay - Plan El. 22.30

BR

616482-6520-45D3-0006

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

312

Powerhouse - HVAC Systems - Main Floor Unit


Bay - Plan El. 22.30

BR

616482-6520-45D3-0005

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

313

Powerhouse - HVAC Systems - Electrical


Mezzannine - Plan & Section - EL 27.40

BR

616482-6520-45D3-0004

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

314

Powerhouse - HVAC Systems - Suspended


Ceiling - Sections - El. 38.705

BR

616482-6520-45D3-0003

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

315

Powerhouse - HVAC Systems - Suspended


Ceiling - Plan El. 38.705 - Sht. 2 of 2

BR

616482-6520-45D3-0002

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

316

Powerhouse - HVAC Systems - Suspended


Ceiling Unit Bay - Plan El. 38.705

BR

616482-6520-45D3-0001

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

317

Powerhouse - HVAC Systems - Powerhouse


Cooling - Control & Instrumentation Diagram

BR

616482-6520-45D2-0014

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

Document No.: 616482-3000-30RM-0025

77

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

318

Powerhouse - HVAC Systems - Service Tunnel


Fan Room - Control & Instrumentation Diagram

BR

616482-6520-45D2-0013

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

319

Powerhouse - HVAC Systems - Smoke Exhaust Control & Instrumentation Diagram

BR

616482-6520-45D2-0012

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

320

Powerhouse - HVAC Systems - Emergency Exit


Pressurization - Control & Instrumentation
Diagram

BR

616482-6520-45D2-0011

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

321

Powerhouse - HVAC Systems - Powerhouse


Outside Air Control & Instrumentation Diagram

BR

616482-6520-45D2-0010

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

322

Powerhouse - HVAC Systems - Electrical Bay


Cooling
and
Portal
Heating
Control
&
Instrumentation Diagram

BR

616482-6520-45D2-0009

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

323

Powerhouse - HVAC Systems - Transfer Fans Control & Instrumentation Diagram

BR

616482-6520-45D2-0008

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

324

Powerhouse - HVAC Systems - Normal Exhaust


Systems - Control & Instrumentation Diagram

BR

616482-6520-45D2-0007

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

325

Powerhouse - HVAC Systems - Office Building Control & Instrumentation Diagram

BR

616482-6520-45D2-0006

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

326

Powerhouse - HVAC Systems - System


Configuration - Control & Instrumentation Diagram

BR

616482-6520-45D2-0005

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

327

Powerhouse - HVAC Systems - Auxiliary Systems


- Schematic Diagram

BR

616482-6520-45D2-0004

01

2016/03/15

BCH I-1618

2016/03/29

2016/03/21

-8

R1

328

(Partial) Final Design - Mechanical Auxiliaries and


Systems - Part 10

BR

616482-6530-45E4-0010

01

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

78

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

329

Powerhouse - Embedded Piping


Arrangement - Pump Floor Sheet 1

General

330

Powerhouse - Embedded
Arrangement - Generator Pits

General

331

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

BR

616482-6530-45D3-0323

00

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

BR

616482-6530-45D3-0332

00

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

Powerhouse - Embedded Piping General


Arrangement - Generator Pits Sections and Details

BR

616482-6530-45D3-0333

00

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

332

Powerhouse - Embedded Piping


Arrangement - Pump Floor Sheet 2

BR

616482-6530-45D3-0324

00

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

333

Powerhouse Piping - General Arrangement Details and Sections - Sheet 2

BR

616482-6530-45D3-0021

00

2016/03/15

BCH I-1619

2016/03/29

2016/03/17

-12

NE

334

Specification for General Electrical Work

BR

616482-6503-47E5-0001

00

2016/03/15

BCH I-1620

2016/03/29

2016/03/22

-7

NE

335

Final Design - General Electrical Work

BR

616482-6503-47E4-0001

00

2016/03/15

BCH I-1620

2016/03/29

2016/03/22

-7

NE

336

Final Design - Electrical 15kV Cable Bus

BR

616482-6050-47E4-0001

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R3

337

Powerhouse Outdoor - Cable Bus Routing


Between Powerhouse & Switchyard Layout - Aerial
View

BR

616482-6050-47D3-0007

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R3

338

Powerhouse Service Tunnel - 15 kV Cable Bus


Layout - Unit 3 Routing

BR

616482-6050-47D3-0006

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R1

339

Powerhouse Service Tunnel - 15 kV Cable Bus


Layout - Unit 2 Routing

BR

616482-6050-47D3-0005

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R1

340

Powerhouse Outdoor Cable Bus Routing Between


Powerhouse & Switchyard Layout

BR

616482-6050-47D3-0008

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R3

Piping

Document No.: 616482-3000-30RM-0025

General

79

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

341

Powerhouse Service Tunnel - 15 kV Cable Bus


Layout - Unit 1 Routing

BR

616482-6050-47D3-0004

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R1

342

Powerhouse - 15 kV Cable Bus Layout - Sections

BR

616482-6050-47D3-0003

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R1

343

Powerhouse - 15 kV Cable Bus - Layout Electrical Mezzanine Plan - Main & Generator
Floor Plan

BR

616482-6050-47D3-0002

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R1

344

Powerhouse - 15 kV Cable Bus Layout - Isometric


View

BR

616482-6050-47D3-0001

00

2016/03/15

BCH I-1621

2016/03/29

2016/03/22

-7

R2

345

Field Instruction - ASL-FI-240 - Support for Pillar


between Draft Tube 1 and 2

BI

616482-CN10-40FI-0240

01

2016/03/16

BCH I-1623

2016/03/22

CAD

346

Field Instruction - ASL-FI-239 - Support for Pillar


between Bypass Inlet 2 and 3

BI

616482-CN10-40FI-0239

01

2016/03/16

BCH I-1623

2016/03/22

CAD

347

Construction Period Public Safety Management


Plan

BC

616482-0000-68RA-1000

06

2016/03/17

BCH I-1624

348

Alstom - Specification for Thrust Bearing Runner


and Collar Forging

BI

616482-TG01-A-6930-45E5-0041

02

2016/03/17

BCH I-1625

349

Final Design - Thrust Bearing Active Parts


(MXE10)

BI

616482-6930-45E4-0015

02

2016/03/17

BCH I-1625

350

HV Bushing
No.321740

COM

616482-EL06-8100-47E5-0001

01

2016/03/17

BCH I-1626

2016/03/23

NE

351

SDC Bushing 27.5kV, 3000A Model: 150-030-T775-00

COM

616482-EL06-8100-47D3-0051

01

2016/03/17

BCH I-1626

2016/03/23

NE

352

Quality Management System Monthly Report


(February 2016)

BI

616482-3000-28RM-0024

00

2016/03/17

BCH I-1627

2016/03/22

CAD

650-145600

Document No.: 616482-3000-30RM-0025

Rev.

Transmittal
Date

No.

SETFtc

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

2016/04/16

-19

Spec.

80

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

353

Alstom - Operating Ring Locking Device - Detail

BI

616482-TG01-A-6910-45D3-0144

02

2016/03/17

BCH I-1628

354

Alstom - Operating Ring Locking Device Calculation Note

BI

616482-TG01-A-6910-45E9-0133

01

2016/03/17

BCH I-1628

355

Alstom - Operating Ring Locking Device - Detail

BI

616482-TG01-A-6910-45D3-0144

02

2016/03/17

BCH I-1628

356

Alstom - Operating Ring Locking Device Arrangement

BI

616482-TG01-A-6910-45D3-0143

02

2016/03/17

BCH I-1628

357

Alstom - Operating Ring Locking Device Arrangement

BI

616482-TG01-A-6910-45D3-0143

02

2016/03/17

BCH I-1628

358

(Partial) Final Design - Wicket Gate Operating


Mechanism (MEF24) - Part 3

BI

616482-6910-45E4-0028

01

2016/03/17

BCH I-1628

359

Final Design - Powerhouse Office Complex Base


Slab and Elevator Shaft Walls

BI

616482-6100-42E4-0001

02

2016/03/18

BCH I-1629

360

Powerhouse Concrete Reinforcement - Office


Complex / Entrance Bay - Sections and Details

BI

616482-CN10-6100-42D8-0011

03

2016/03/18

BCH I-1629

361

Powerhouse Concrete Outline - Office Complex /


Entrance Bay - Main Floor Plan - Sections and
Details

BI

616482-CN10-6100-42D8-0003

03

2016/03/18

BCH I-1629

362

Powerhouse Concrete Outline - Office Complex /


Entrance Bay - Main Floor Plan

BI

616482-CN10-6100-42D8-0002

03

2016/03/18

BCH I-1629

363

Intake Maintenance Gate Bay


2nd Stage
Concrete - Trashrack and Maintenance Gate Sections and Details

BI

616482-CN10-3220-42D8-0031

02

2016/03/18

BCH I-1631

BI

616482-CN10-3220-42D8-0030

02

2016/03/18

BCH I-1631

364

Intake Maintenance Gate Bay


2nd Stage
Concrete - Trashrack and Maintenance Gate -

Document No.: 616482-3000-30RM-0025

81

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Plan and Details

365

Final Design - Intake Maintenance Gate Structure

BI

616482-3220-42E4-0001

05

2016/03/18

BCH I-1631

366

Kuenz - Quality Control and Inspection Plan QCIP I - TOSL - Stop Logs / Lifting Beam
Steelwork

BI

616482-ME19-01-7400-38QA-0053

03

2016/03/18

BCH I-1632

367

Kuenz - Quality Control and Inspection Plan QCIP I - DTMG - Embedded Parts

BI

616482-ME19-01-6630-38QA-0058

03

2016/03/18

BCH I-1632

368

Kuenz - Quality Control and Inspection Plan QCIP I - DTMG - DTMG Assembly /Lifting Beam
Steelwork

BI

616482-ME19-01-6630-38QA-0057

03

2016/03/18

BCH I-1632

369

Kuenz - Quality Control and Inspection Plan QCIP I - INOG - Frames and Guides Assembly

BI

616482-ME19-01-3230-38QA-0084

03

2016/03/18

BCH I-1632

370

Kuenz - Quality Control and Inspection Plan QCIP I - INOG - Intake Gate Inog

BI

616482-ME19-01-3230-38QA-0083

03

2016/03/18

BCH I-1632

371

Kuenz - Quality Control and Inspection Plan QCIP I - Gate INMG - Intake INMG Embedded
Parts

BI

616482-ME19-01-3222-38QA-0052

03

2016/03/18

BCH I-1632

372

Kuenz - Quality Control and Inspection Plan QCIP I - Gate INMG - Gate /Lifting Beam
Steelwork

BI

616482-ME19-01-3222-38QA-0051

03

2016/03/18

BCH I-1632

373

Kuenz - Quality Control and Inspection Plan QCIP I - Intake Trash Rack

BI

616482-ME19-01-3221-38QA-0043

03

2016/03/18

BCH I-1632

374

Kuenz - Quality Control and Inspection Plan QCIP I - TOSL - Frames and Guides Assembly

BI

616482-ME19-01-7400-38QA-0054

03

2016/03/18

BCH I-1632

Document No.: 616482-3000-30RM-0025

82

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

375

Final Design - Surge Shaft - Excavation and Rock


Support

BR

616482-5310-4GE4-0001

01

2016/03/18

BCH I-1633

2016/04/01

-4

376

Calculations - Surge Tank - Excavation and


Support Design

BR

616482-CN10-5310-4GE3-0002

01

2016/03/18

BCH I-1633

2016/04/01

-4

377

Design Basis
Excavation

BR

616482-CN10-5310-4GE2-0002

01

2016/03/18

BCH I-1633

2016/04/01

-4

378

Water Conveyance Surge Tank - Excavation and


Rock Support - Plan and Sections

BR

616482-CN10-5310-4GD8-0002

01

2016/03/18

BCH I-1633

2016/04/01

-4

379

Hatfield Weekly Environmental Monitoring Report


no. 101 (March 6 to March 12, 2016)

BR

616482-EN03-01-0000-4ERW-0101

01

2016/03/18

BCH I-1634

2016/04/01

2016/03/24

-8

R2

380

Kuenz - Bill of Material - Guides Lower Section


Right Bank

BR

616482-ME19-01-3222-45D3-0033

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

381

Kuenz - Bill of Material - INMG - Guides Middle


Section Right Bank

BR

616482-ME19-01-3222-45D3-0038

03

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

382

Kuenz - Bill of Material - Guides Middle Section


Left Bank

BR

616482-ME19-01-3222-45D3-0037

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

383

Kuenz - Bill of Material - INMG - Lintel Section

BR

616482-ME19-01-3222-45D3-0036

03

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

384

Kuenz - Bill of Material - Guides Upper Section

BR

616482-ME19-01-3222-45D3-0034

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

385

Kuenz - Bill of Material - Guides Lower Section


Left Bank

BR

616482-ME19-01-3222-45D3-0032

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

386

Kuenz - Bill of Material - Sill Section INMG

BR

616482-ME19-01-3222-45D3-0031

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

Surge

Document No.: 616482-3000-30RM-0025

Rev.

Transmittal
Date

No.

Memorandum

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Tank

83

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

387

Kuenz - Bill of Material - Embedded Parts INMG

BR

616482-ME19-01-3222-45D3-0030

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

388

Kuenz - Guidance INMG ASM ZUS FAB. Nr.


22232-40 - Intake INMG - Embedded Parts - Sheet
1 of 2

BR

616482-ME19-01-3222-45D3-0030

04

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

389

Kuenz - Bill of Material - Lifting Beam Steelwork INMG

BR

616482-ME19-01-3222-45D3-0021

01

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

390

Kuenz - Intake - INMG - Lifting Beam Steel Work

BR

616482-ME19-01-3222-45D3-0021

01

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

391

Kuenz - Bill of Material - Lifting Beam Assembly

BR

616482-ME19-01-3222-45D3-0020

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

392

Kuenz - Intake - INMG - Lifting Beam Assembly

BR

616482-ME19-01-3222-45D3-0020

04

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

393

Kuenz - Bill of Material - INMG Element 3


Steelwork

BR

616482-ME19-01-3222-45D3-0016

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

394

Kuenz - Bill of Material - INMG Element 3


Assembly

BR

616482-ME19-01-3222-45D3-0015

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

395

Kuenz - Intake - INMG - INMG Element 3


Assembly

BR

616482-ME19-01-3222-45D3-0015

03

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

396

Kuenz - Bill of Material - INMG Element 2 Steel


Work

BR

616482-ME19-01-3222-45D3-0014

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

397

Kuenz - Bill of Material - INMG Element 2


Assembly

BR

616482-ME19-01-3222-45D3-0013

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

398

Kuenz - Bill of Material - INMG Element 1


Steelwork

BR

616482-ME19-01-3222-45D3-0012

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

Document No.: 616482-3000-30RM-0025

84

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

399

Kuenz - Bill of Material - INMG Element 1


Assembly

BR

616482-ME19-01-3222-45D3-0011

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

400

Kuenz - Bill of Material - Sealing System

BR

616482-ME19-01-3222-45D3-0010

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

401

Kuenz - Bill of Material - INMG Assembly

BR

616482-ME19-01-3222-45D3-0010

02

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

402

Kuenz - Intake - INMG - INMG Assembly- Sheet 2


of 2

BR

616482-ME19-01-3222-45D3-0010

03

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

403

Kuenz - Intake - INMG - INMG Assembly - Sheet 1


of 2

BR

616482-ME19-01-3222-45D3-0010

03

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

404

Kuenz - Guidance INMG ASM ZUS FAB. Nr.


22232-40 - Intake INMG - Embedded Parts - Sheet
2 of 2

BR

616482-ME19-01-3222-45D3-0030

04

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

405

Final Design - INMG (ME19-01)

BR

616482-3222-45E4-0002

01

2016/03/18

BCH I-1635

2016/04/01

2016/03/21

-11

NE

406

Kuenz - Tailrace Outlet - Stoplogs - Blockouts Loads and Block-outs

BR

616482-ME19-01-7400-45D3-0051

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

407

Kuenz - Tailrace Outlet - Stoplogs - Blockouts Loads and Block-outs

BR

616482-ME19-01-7400-45D3-0051

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

408

Kuenz - Bill of Material - Lateral Guide Left Bank


TOSL

BR

616482-ME19-01-7400-45D3-0042

03

2016/03/18

BCH I-1636

2016/04/01

409

Kuenz - Outlet - TOSL - Lateral Guide Right Bank

BR

616482-ME19-01-7400-45D3-0042

03

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

410

Kuenz - Tailrace Outlet - TOSL - Guidance TOSL


Assembly

BR

616482-ME19-01-7400-45D3-0040

03

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

85

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

-4

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

411

Kuenz - Bill of Material - Lifting Beam Steelwork TOSL

BR

616482-ME19-01-7400-45D3-0031

01

2016/03/18

BCH I-1636

2016/04/01

-4

412

Kuenz - Outlet - TOSL - Lifting Beam Steelwork

BR

616482-ME19-01-7400-45D3-0031

01

2016/03/18

BCH I-1636

2016/04/01

-4

413

Kuenz - Outlet - TOSL - Lifting Beam Assembly

BR

616482-ME19-01-7400-45D3-0030

05

2016/03/18

BCH I-1636

2016/04/01

414

Kuenz - Bill of Materials - Upper Stop Log Element


Steelwork

BR

616482-ME19-01-7400-45D3-0015

03

2016/03/18

BCH I-1636

2016/04/01

415

Kuenz - Tailrace Outlet - TOSL - Upper Stop Log


Element Steelwork

BR

616482-ME19-01-7400-45D3-0015

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

416

Kuenz - Bill of Material - Lower Stop Log Element


Steel Work

BR

616482-ME19-01-7400-45D3-0012

03

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

417

Kuenz - Tailrace Outlet - TOSL - Lower Stop Log


Element Steelwork

BR

616482-ME19-01-7400-45D3-0012

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

418

Kuenz - Tailrace Outlet - TOSL - Lower Stop Log


Element Steelwork

BR

616482-ME19-01-7400-45D3-0012

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

419

Kuenz - Tailrace Outlet - Stoplogs - Block outs General Arrangement

BR

616482-ME19-01-7400-45D3-0001

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

420

Kuenz - Tailrace Outlet - Stoplogs - Block outs General Arrangement

BR

616482-ME19-01-7400-45D3-0001

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

421

Kuenz - Tailrace Outlet - TOSL - Storage TOSL

BR

616482-ME19-01-7400-45D3-0045

03

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

422

Final Design - TOSL (ME19-01)

BR

616482-7400-45E4-0002

01

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

BR

616482-ME19-01-7400-45D3-0015

04

2016/03/18

BCH I-1636

2016/04/01

2016/03/21

-11

R1

Kuenz - Tailrace Outlet - TOSL - Upper Stop Log

Document No.: 616482-3000-30RM-0025

86

Rev.

Transmittal
Date

No.

423

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

2016/03/21

-11

R1

-4

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

Element Steelwork

424

ASLJV - Inspection Test Plan (ITP) - 38ITP-5310 Surge Shaft Excavation

BR

616482-CN10-5310-38ITP-0260

02

2016/03/18

BCH I-1637

2016/04/01

-4

425

Kuenz - Quality Control and Inspection Plan QCIP II - Tailrace Outlet Stoplogs

BR

616482-ME19-01-7400-38QA-0056

03

2016/03/18

BCH I-1638

2016/04/01

-4

426

Kuenz - Quality Control and Inspection Plan QCIP II - Draft Tube Maintenance Gate

BR

616482-ME19-01-6630-38QA-0060

03

2016/03/18

BCH I-1638

2016/04/01

-4

427

Kuenz - Quality Control and Inspection Plan QCIP II - Intake Operating Gate

BR

616482-ME19-01-3230-38QA-0085

03

2016/03/18

BCH I-1638

2016/04/01

-4

428

Kuenz - Quality Control and Inspection Plan QCIP II - Intake Maintenance Gate

BR

616482-ME19-01-3222-38QA-0054

03

2016/03/18

BCH I-1638

2016/04/01

-4

429

Kuenz - Quality Control and Inspection Plan QCIP II - Trashrack

BR

616482-ME19-01-3221-38QA-0044

03

2016/03/18

BCH I-1638

2016/04/01

-4

430

Field Instruction - ASL-FI-241


Nozzleman Certification

BI

616482-CN10-40FI-0241

01

2016/03/21

BCH I-1639

431

Field Instruction - ASL-FI-242 - Support for Crane


Pad at Tailrace

BI

616482-CN10-40FI-0242

01

2016/03/21

BCH I-1640

432

Field Instruction - ASL-FI-248 - Additional Work


Point for LLO EFRS Excavation

BI

616482-CN10-40FI-0248

01

2016/03/21

BCH I-1641

433

Field Instruction - ASL-FI-244


Nozzleman Certification

BI

616482-CN10-40FI-0244

01

2016/03/22

BCH I-1642

434

Field Instruction - ASL-FI-243 - PH Survey Prisms

BI

616482-CN10-40FI-0243

01

2016/03/22

BCH I-1642

Document No.: 616482-3000-30RM-0025

Shotcrete

Shotcrete

87

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

435

Technical Specification for Filters and Strainers

BI

616482-6537-45E5-0001

03

2016/03/22

BCH I-1643

436

Final Design - Raw Water System

BI

616482-6537-45E4-0001

03

2016/03/22

BCH I-1643

437

Final Design - Telecommunications Part 4

BR

616482-6570-47E4-0004

00

2016/03/22

BCH I-1644

2016/04/05

-8

438

Design Basis Memorandum


Communication

BR

616482-6570-47E2-0002

00

2016/03/22

BCH I-1644

2016/04/05

-8

439

Final Design - Security System

BR

616482-6561-47E4-0001

01

2016/03/23

BCH I-1645

2016/04/06

-9

440

Design Basis Memorandum - Security System

BR

616482-6561-47E2-0001

01

2016/03/23

BCH I-1645

2016/04/06

-9

441

Powerhouse - Security System - Office Building


and Control Room - Plan Installation Layout

BR

616482-6561-47D3-0005

01

2016/03/23

BCH I-1645

2016/04/06

-9

442

Plant - Security System - Block Diagram

BR

616482-6561-47D2-0001

01

2016/03/23

BCH I-1645

2016/04/06

-9

443

Construction Monitoring Report -2016-02-01 2016-02-29

BI

616482-CN10-0000-41ER-0438

01

2016/03/23

BCH I-1646

444

BCH - RFFI-0785 - BC Hydro Response to BCH I1619 Request for Further Information

COM

616482-BCH-RFFI-16-0785

01

2016/03/24

BCH I-1647

445

ASLJV - Inspection Test Plan (ITP) - 38ITP-5220 Power Tunnel Excavation

BI

616482-CN10-0000-38ITP-0230

04

2016/03/24

BCH I-1648

446

Alstom - Generator - Braking and Jacking Jacks Cylinder Block

BR

616482-TG01-A-6930-45D3-0427

01

2016/03/24

BCH I-1649

2016/04/07

-10

447

Alstom - Generator - Braking and Jacking Jacks Brake Pad

BR

616482-TG01-A-6930-45D3-0426

01

2016/03/24

BCH I-1649

2016/04/07

-10

for

Fibre

Document No.: 616482-3000-30RM-0025

Optic

88

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Requested
Return Date

Actual
Returned
Date

448

Alstom - Generator - Braking and Jacking Jacks Brake Pad Support

BR

616482-TG01-A-6930-45D3-0425

01

2016/03/24

BCH I-1649

2016/04/07

-10

449

Alstom - Generator - Braking and Jacking Jacks Cylinder Block

BR

616482-TG01-A-6930-45D3-0424

01

2016/03/24

BCH I-1649

2016/04/07

-10

450

Alstom - Generator - Braking and Jacking Jacks Arrangement

BR

616482-TG01-A-6930-45D3-0423

01

2016/03/24

BCH I-1649

2016/04/07

-10

451

Final Design - Generator Braking and Jacking


Jacks (MKB55-01)

BR

616482-6930-45E4-0030

00

2016/03/24

BCH I-1649

2016/04/07

-10

452

Alstom - Upper Shaft Coupling Calculation Report

BR

616482-TG01-A-6930-45E3-0005

02

2016/03/24

BCH I-1650

2016/04/07

-10

453

Final Design - Upper Shaft (MKB 21)

BR

616482-6930-45E4-0023

01

2016/03/24

BCH I-1650

2016/04/07

-10

454

Alstom - Stay Ring Finite Element Analysis

BR

616482-TG01-A-6910-45E9-0001

02

2016/03/24

BCH I-1651

2016/04/07

-10

455

(Partial) Final Design - Inlet (MEF10) - Part 1

BR

616482-6910-45E4-0005

01

2016/03/24

BCH I-1651

2016/04/07

-10

456

Alstom - Wicket Gate - Finite Element Analysis

BR

616482-TG01-A-6910-45E9-0030

02

2016/03/24

BCH I-1652

2016/04/07

-10

457

Final Design - Wicket Gate and Operating


Mechanism (MEF24)

BR

616482-6910-45E4-0023

02

2016/03/24

BCH I-1652

2016/04/07

-10

458

(Partial) Final Design - Powerhouse Miscellaneous


Steel - Part 3

BI

616482-6000-43E4-0003

00

2016/03/24

BCH I-1653

459

Powerhouse Miscellaneous Steel - Stairs- West


Stairwell - Plan and Details sheet 2

BI

616482-CN10-6000-43D8-0011

01

2016/03/24

BCH I-1653

460

Powerhouse Miscellaneous Steel - Stairs- West


Stairwell - Plans and Section sheet 1

BI

616482-CN10-6000-43D8-0010

01

2016/03/24

BCH I-1653

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

89

Rev.

Transmittal
Date

No.

Document No.: 616482-3000-30RM-0025

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Requested
Return Date

Actual
Returned
Date

461

Powerhouse Miscellaneous Steel - Unit Bay Pump Floor - Schedule Plan

BI

616482-CN10-6000-43D8-0003

01

2016/03/24

BCH I-1653

462

Powerhouse Miscellaneous Steel - Service Bay Schedule Plan and Tables

BI

616482-CN10-6000-43D8-0002

01

2016/03/24

BCH I-1653

463

Hatfield Weekly Environmental Monitoring Report


no. 102 (March 13 to March 19, 2016)

BR

616482-EN03-01-0000-4ERW-0102

01

2016/03/24

BCH I-1654

2016/04/07

-10

464

Alstom - Foundation Load - Calculation Note

BR

616482-TG01-A-6910-45E3-0001

02

2016/03/24

BCH I-1655

2016/04/07

-10

Final Design - Turbine Foundation (MEF03)

BR

616482-6910-45E4-0013

03

2016/03/24

BCH I-1655

2016/04/07

-10

COM

616482-PCO-16-0584

00

2016/02/29

PCO-16-0584

BC Hydro
Response

TTL No.
Reference for
BC Hydro

Document Title

466

Rev.

Transmittal
Date

No.

65

Document No

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

467

Development Change Record - BCH-013

COM

616482-PCO-16-0585

00

2016/03/01

PCO-16-0585

2016/03/08

CAD

468

Surveillance Data February 21 - 27 2016

COM

616482-PCO-16-0586

00

2016/03/03

PCO-16-0586

2016/03/08

CAD

469

Preliminary Innovation Proposals

COM

616482-PCO-16-0587

00

2016/03/03

PCO-16-0587

2016/03/07

470

Specification for 600V Motor Control Centres

COM

616482-PCO-16-0588

00

2016/03/03

PCO-16-0588

2016/03/15

CAD

COM

616482-PCO-16-0591

00

2016/03/07

PCO-16-0591

471

- periodic update

472

Final Design - Powerhouse General Arrangements

COM

616482-PCO-16-0592

00

2016/03/09

PCO-16-0592

473

Tailrace
Outlet
Reinforcement

COM

616482-PCO-16-0593

00

2016/03/23

PCO-16-0593

Concrete

Outlines

Document No.: 616482-3000-30RM-0025

and

90

Document No

Rev.

Transmittal
Date

TTL No.
Reference for
BC Hydro

Requested
Return Date

Actual
Returned
Date

BC Hydro
Response

Document Title

Days to
count down

No.

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

474

Tailrace Outlet Miscellaneous Steel

COM

616482-PCO-16-0594

00

2016/03/23

PCO-16-0594

475

Surveillance Data February 29 - March 5 2016

COM

616482-PCO-16-0595

00

2016/03/10

PCO-16-0595

2016/03/15

CAD

476

Risk Work shop - Tunneling Under Existing Dam

COM

616482-PCO-16-0596

00

2016/03/10

PCO-16-0596

2016/03/18

477

AC Station Serv. Resp to BCH I-1282 - Review


Memo

COM

616482-PCO-16-0597

00

2016/03/10

PCO-16-0597

2016/03/15

CAD

478

AC Station Serv. Resp to BCH I-1286 - Review


Memo

COM

616482-PCO-16-0598

00

2016/03/10

PCO-16-0598

2016/03/15

CAD

479

AC Station Serv. Resp to BCH I-1284 - Review


Memo

COM

616482-PCO-16-0599

00

2016/03/10

PCO-16-0599

2016/03/15

CAD

480

AC Station Serv. Resp to BCH I-1285 - Review


Memo

COM

616482-PCO-16-0600

00

2016/03/10

PCO-16-0600

2016/03/15

CAD

481

Support Design for Intake Tunnel

COM

616482-PCO-16-0601

00

2016/03/11

PCO-16-0601

482

Short Term Water Use Application

COM

616482-PCO-16-0602

00

2016/03/11

PCO-16-0602

2016/03/21

483

WSBC Inspection Report 201616259028A

COM

616482-PCO-16-0603

00

2016/03/15

PCO-16-0603

2016/03/22

CAD

484

Kuenz Corrosion Protection Instructions

COM

616482-PCO-16-0604

00

2016/03/15

PCO-16-0604

2016/03/22

CAD

485

Response to Trashrack Review Comments

COM

616482-PCO-16-0605

00

2016/03/15

PCO-16-0605

2016/03/22

CAD

486

Tailrace Outlet General Arrangement Part 1

COM

616482-PCO-16-0606

00

2016/03/23

PCO-16-0606

Document No.: 616482-3000-30RM-0025

91

487

Hatfield Monthly Env Report 24 Resp to Rev


Memo

COM

616482-PCO-16-0607

00

2016/03/17

PCO-16-0607

488

WSBC Request for Acceptance AR201400109M7

COM

616482-PCO-16-0608

00

2016/03/18

PCO-16-0608

489

Surveillance Data March 6- March 12 2016

COM

616482-PCO-16-0609

00

2016/03/23

PCO-16-0609

490

F ber Optic Control Link Block Diagram

COM

616482-PCO-16-0610

00

2016/03/23

PCO-16-0610

491

Powerhouse Crane - Guards

COM

616482-PCO-16-0611

00

2016/03/23

PCO-16-0611

492

PCO-16-0612 update

COM

616482-PCO-16-0612

00

2016/03/24

PCO-16-0612

493

Water sprinkler coverage

COM

616482-PCO-16-0613

00

2016/03/24

PCO-16-0613

494

Design of DC Services System and UPS

COM

616482-PCO-16-0614

00

2016/03/24

PCO-16-0614

495

Response to Mechanical Auxiliaries and Systems


Rev Memo

COM

616482-PCO-16-0615

00

2016/03/24

PCO-16-0615

496

Surveillance Data March 13 - March 19 2016

COM

616482-PCO-16-0616

00

2016/03/24

PCO-16-0616

- periodic

92

Requested
Return Date

Actual
Returned
Date

2016/03/22

BC Hydro
Response

Rev.

TTL No.
Reference for
BC Hydro

Document Title

Document No.: 616482-3000-30RM-0025

Document No

Transmittal
Date

No.

Days to
count down

Action

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

CAD

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Legend

BC:
BI:
BR:
C1:
C2:
C3:
NE:
CAD

Sent to BC Hydro for Consent


Sent to BC Hydro for Information
Sent to BC Hydro for Review
Accepted
Conditional Acceptance
Rejected
Not Endorsed
Closed as Discussed

Document No.: 616482-3000-30RM-0025

I1:
I3:
R1:
R2:
R3:
R :
RNC
Rev.:
COM:

Received
Comments
Received
Received with Comments
Comments
Responded (without code)
Review not commenced
Revision
Communication

93

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
10.0 PROJECT SCHEDULE
Due to the Main Access Tunnel excavation delays, both the Powerhouse and Power Tunnel
excavations are facing significant delays.
Figure 10-1 presents the overall schedule.

Document No.: 616482-3000-30RM-0025

109

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
12.0 CRITICAL PATH ANALYSIS
As previously reported, there are two critical paths on the project:

The first path goes through the excavation of the Powerhouse to the
commissioning of the powerhouse units. At this time, after the implementation of
Phase I mitigation measures, the Powerhouse path demonstrates a 4.4 months
delay in completion.
The second critical path of the project is the excavation of the Power Tunnel and
watering-up before commissioning of the units. At this time, after the
implementation of Phase I mitigation measures, the power tunnel path is estimated
to have a 5.6 months delay.

Phase II mitigation measures are being considered to further address the current delays in both
the Powerhouse and Power tunnel critical paths. Refer to Section 4 for additional information.

Document No.: 616482-3000-30RM-0025

166

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
13.0 INVENTORY OF CONSTRUCTION EQUIPMENT
Refer to Section 13 of the ASL-JV Monthly Progress Report presented in Appendix A.

Document No.: 616482-3000-30RM-0025

167

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
14.0 INVENTORY OF CONSTRUCTION MATERIAL
Refer to Appendix for A for additional information.

15.0 PERMANENT EQUIPMENT DELIVERY DATES


Nothing to report.

16.0 INVENTORY OF PERMANENT EQUIPMENT


Nothing to report.

Document No.: 616482-3000-30RM-0025

168

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
17.0 MONTHLY ENVIRONMENTAL REPORT SUMMARY
17.1

Project Work during Reporting Period


Activities occurring this reporting period are summarized as follows:
Annual amphibian and owl surveys were completed this month.
Tailrace rock plug grout curtain holes were pressure tested and grouted without any
concerns. A CO2 bubbler was on site and monitors were present to ensure there were no
turbidity/pH exceedances detected in the River.
Regular environmental maintenance items continue, including check dam clean-out along
Surge Tower Road, vacuuming of the WTP tanks and the main site entrance cattleguard, and
removal of contaminated materials and used fuels by Terrapure.
The cofferdam east abutment and the cofferdam perimeter plinth from P25- P57 were
poured this reporting period with no water quality concerns. All concrete-affected water is
captured within the cofferdam and pumped through the water treatment plant. The overall
volume of water within the cofferdam is very minimal.
The EC inspected the FKASL shop and noted that it is tidy and well organized. FKASL crews are
diligently attending-to and reporting spills.
The asphalt was cut in front of the old Park access at the Intake to direct any overland flow
off the Intake road towards Laydown 5B and away from the Park.
A custom designed spill tray has been placed under the 165 crane in the L70.
The new oil separators in front of the mechanics Quonset huts and the fuel bay were
checked and these are effectively collecting oil.
L60 slopes were covered with topsoil saved from the surge shaft area in preparation for
hydroseed application at the end of March. The L70 drainage was lined with rock and check
dams were installed. The check dams have been constructed with gravel at the core and
coarse blast rock on the outside.
Four red-legged frog egg masses were relocated from the construction-side of the wetland
exclusion fence. The fence was cut in a five locations to allow frog passage to the wetlands
during the breeding period.
BC Hydro noted turbid water from the surge tank area reaching the stream at the North
safety berm through a previously unknown sump/pipe system within the Penstock corridor.
This water did not reach BC Parks and the discharge location was changed in consultation
with the environmental coordinator to ensure that there would be no possible risk of a
discharge to Parks. The new discharge location is to rock within the developed roadbed.
Water flows into the rock, along the stump/grub berm and to vegetation. During heavy rains
the extent of visible pooled water was limited to 15 m x 10 m and did not come close to the
Park boundary. The surge tank has been pumped down and is being maintained.
The environmental coordinator reviewed expectations for refueling within 30 m of a
waterway with the Teamsters. This clarified required best practices at specific sensitive areas
on this site.
Broom was removed from around the L60/Interpretive Centre. BC Parks was on site and
noted the effort.
The water treatment plant fault switch failed for the pre-treat pump controller on 09 March
and the water treatment plant operator, a field engineer and an electrician responded
around midnight to keep the plant operating manually. This was repaired the following day.

Document No.: 616482-3000-30RM-0025

169

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
On 11 March a sinking cut blast at the Tailrace resulted in higher than calculated vibrations.
The high vibrations caused three powerhouse generators to fail and water therefore ceased
to be released through those generators to the River. High flows from the spillway
maintained seasonal water levels and there was no impact to the fish in the River.
Subsequent blasts have been conducted with no concerns and the Bench 5 sinking cut was
hammered out instead of blasted.
An updated short term water use permit approval application was submitted to FLNRO. The
current permit expires on April 1st.
Bluemax and a field engineer reported a L spill at the drill site on March 11th. The majority
of the biodegradable oil (vegetable oil based) from the drill head went into containment and
the remainder was cleaned up by Bluemax. There was no risk of the oil reaching the
Reservoir.
A hydrophone was installed in the River to allow for overpressure monitoring during Tailrace
blasting now that the blasts are level with, and below, the River water level. There have been
no concerns with overpressures recorded to date.
ASL-JV improved the City ditch system this week to reduce the amount of turbid water being
released into Wetland E. A crew and excavator were dedicated to the improvements for an
entire day. Works completed included replacing straw bale/filter cloth check dams, adding
height and bracing existing check dams. Replacing fisheries gravel in front of the check dams,
excavating out the inlet to the Parking lot drainage culvert and adding fisheries gravel below
as a sump, removing coco-matting from along the slope and scattering old straw. The
decommissioned trail system was also improved to allow for greater retention of water
draining from the cattleguard. The crew was given I saved a frog stickers for their efforts at
protecting Wetland E.
Broom was cut at the site entrance and drain rock placed in the ditch adjacent to the mangate.
Water samples were sent to Tervita from the Intake water treatment plant (WTP) to
determine a more effective flocculent to settle out drill cuttings. Intake tanks were cleaned
out by the vac truck to remove residual cuttings from line drilling in the cofferdam.
The ASL-JV EC presented on restoration techniques with a focus on hydrology at a Friday
Lunch and Learn for ASL-JV site supervisors/foremen.
The environmental manager conducted a bird nesting activity survey for two danger trees
along Surge Tower Road that were slated to be removed the flowing day. No activity was
observed.
Bluemax is near to completing investigative drilling/testing next to the reservoir.
Environmental protection and response was exemplary throughout their work near the
drinking water intakes.
EAC began blasting at the Intake Maintenance Gate on March 21st. There were no
environmental concerns.
The BC Parks trail crossing at the L60 continues to be maintained. On March 22nd the area
was scraped and gravel brought in to build up the trail crossing.
Refer to the Monthly Environmental Report for additional details.

17.2

Status of Environmental Permits, Licenses and Approvals (PLAs)


The following activities were carried:

Document No.: 616482-3000-30RM-0025

170

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Leave to Commence Construction (LCC) #1 (with conditions) Civil Works, dated July 8, 2014
was received from the Comptroller of Water Rights. LCC #1 Components will be issued on an
ongoing basis.
Leave to Commence Construction (LCC) #2 (with conditions) Intake Works, dated October
24, 2014 was received from the Comptroller of Water Rights. LCC #2 Components will be
issued on an ongoing basis.
Leave to Commence Construction (LCC) #3 Tailrace works, acceptance dated July 13, 2015
was received from the Comptroller of Water Rights. LCC #3 Components A and B have not yet
been issued.
BC Wildlife Act: permit was approved on May 2, 2014 and is valid through March 31, 2019.
Permit No: NA14-93686.
BC Water Act: Approval for Short-term Water Use File No: A1-1571. Expires: April 1, 2016.
Fisheries Act: Written approval (pers. Com. from Daniel Sneep DFO to Alan Stockwell Project
Environmental Director February 18, 2015) granting approval to clear within the 30 m buffer
of the Campbell River for the L70/Intake structure works. A letter regarding additional
clearing at the L70 was sent to DFO on June 3, 2015 and a response indicating no concerns
with the additional clearing was sent by email from Mr. Daniel Sneep (DFO) to Alan Stockwell
(Hatfield Consultants) on June 16, 2015.
Fisheries Act: The Fisheries and Ocean Canada (DFO) Project Review Document was
submitted to DFO in December 2014. Flow/fish habitat modeling results and the L70/Power
Intake Structure additional information were submitted to DFO on January 26 and February
11, 2015, respectively. On April 9 a Letter of Advice from Mr. Brad Fanos DFO to Mr. Dale
Woodroff InPower confirmed that no formal approval is required from DFO for works
proposed as detailed in the above listed submissions.
Water Act: The Variance to Instream Work Windows document was submitted to FLNRO
during the reporting period. Following their review of the document FLNRO reported on
March 5, 2015 no objections to the proposed variances.
The following activities are being carried out on the acquisition and maintenance of Project
environmental permits, licenses and approvals (PLAs):
A request for a new BC Water Act Approval for Short-term Water use has been submitted to
FLNRO.
Table 17.1:
Plan

Summary of Environmental Plans


Revision

Status

Construction Environmental Management Plan

Rev. 5 Submitted for Review

Amendment 1: Section 6.11.8.4 (Scotch Broom)

Accepted by BC Hydro/IEM

Amendment 2: Section 2.1 (EWPs)

R2- under review (letter dated May 7, 2015)

Amendment 3: Table 14 (Vehicle Spill kits)

Jan 12, 2015

Accepted by BC Hydro/IEM

Amendment 4: Section 2.1.1.3 (Field Instructions)

R2- under review

Amendment 5: Section 6.3 (Blasting- Water Quality)

Accepted by BC Hydro

Amendment 6: Migratory bird window (multiple

Accepted by BC Hydro

Contaminated Soil Baseline Procedure

Accepted by BC Hydro

Environmental Monitoring Plan

Accepted by BC Hydro

Document No.: 616482-3000-30RM-0025

171

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Plan

Revision

Status

Drinking Water Management Plan

Approved by the City of Campbell River and the


Vancouver Island Health Authority

Environmental Quality Management Plan

Accepted by BC Hydro

Red-legged Frog Management Plan

Accepted by BC Hydro

Red-legged Frog Management Plan Addendum 1

Information received

Pacific Sideband Snail Management Plan

Accepted by BC Hydro

Vegetation Resources Monitoring Program

Accepted by BC Hydro

Table 17.2:

Summary of Environmental Work Plans (EWPs)

EWP No.

Environmental Work Plan (EWP) Title

Status

SLI-14-0001

Construction Crossing over Steel


Penstocks
Station View Trail Pedestrian Bridge
Crossing
Soccer Field Laydown Environmental Work
Plan
L40 Portal Construction Environmental
Work Plan
L20 Portal and North Laydown
Construction Environmental Work Plan

Issued for
Construction
Issued for
Construction
Issued for
Construction
Issued for
Construction
Rev 01 Issue for
Construction
Addendum 1 R2
Issued for
Construction
Issued for
Construction
Issued for
Construction
(Rev 1 accepted).
Work is complete.
Issued for
Construction
Issued for
Construction
Issued for
Construction
Issued for
Construction
Issued for
Construction
Issued for
Construction

SLI-14-0002
SLI-14-0003
HCP-EWP2014-001
HCP-EWP2014-002
HCP-EWP2014-005
HCP-EWP2014-004
HCP-EWP2014-006
HCP-EWP2014-003
HCP-EWP2015-007
HCP-EWP2015-008
HCP-EWP2015-011
HCP-EWP2015-009
HCP-EWP2015-010
HCP-EWP2015-012

17.3

Laydown Area 4 Environmental Work Plan


Underground and Portal Water
Management Environmental Work Plan
Underground Spill Response Plan
Geotechnical Investigation Drilling at Intake
Environmental Work Plan
Brewster Bridge and Intake Laydowns
L70 Road Access, Laydown and Power
Intake Structure
Tailrace Access REA 5
Intake In and Near Water Works
L60 and Surge Tank EWP
Tailrace Terrestrial Works

Rev. No.

Date

02

July 25, 2014

03

July 25, 2014

00

August 1, 2014

03

August 28, 2014

01
Addendum 1

September 4, 2014

00

September 26, 2014

02

November 24, 2014

02

November 24, 2014

03

December 12, 2014

01

December 19, 2014

01

March 10, 2015

00

May 6, 2015

02

May 14, 2015

00

June 8, 2015

02

July 30, 2015

Other Environmental Reports


Hatfield Consultants. June 2014. Snail Survey and Salvage: John Hart Generating Station
Replacement Project;
Strategic Natural Resource Consultants. June 5, 2014. John Hart GS Replacement Laydown 4
Clearing Plan Issued for Construction;
Hatfield Consultants. July 2014. Amphibians and Snails Salvage. John Hart Generating Station
Replacement Project;

Document No.: 616482-3000-30RM-0025

172

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Hatfield Consultants. July 2014. Bird Nesting Activity Survey: John Hart Generating Station
Replacement Project;
Strategic Natural Resource Consultants. July 9, 2014. John Hart GS Replacement Laydown L40
Clearing Plan Issued for Construction Rev 2;
Strategic Natural Resource Consultants. July 9, 2014. John Hart GS Replacement Laydown L20
Clearing Plan Issued for Construction Rev 2;
Mainstream Biological Consulting. July 23, 2014. Baseline Water Quality Monitoring JHRP;
Strategic Natural Resource Consultants. August 11, 2014. John Hart GC Replacement Baseline
Vegetation Inventory;
Hatfield Consultants. September 2014. Amphibians and Snails Salvage. John Hart Generating
Station Replacement Project;
Strategic Natural Resource Consultants. September 10, 2014. John Hart GS Replacement
Laydown North Clearing Plan Issued for Construction;
Strategic Natural Resource Consultants. September 10, 2014. John Hart GS Replacement
Laydown L20 Clearing Plan Issued for Construction;
SNC-Lavalin. September 19, 2014. Soil Assessment Proposed Haul Bridge and Trail Bridge at
10 John Hart Road, Campbell River, BC;
Mainstream Biological Consulting. October 2014. JHRP Stream G Fish Sampling Memo;
Mainstream Biological Consulting. October 2014. John Hart Replacement Project BC Parks
Tree Replacement Plan;
NHC. October 2014. DRAFT: John Hart Generating Station Replacement Project Fish Habitat
Modelling Technical Data Report;
Hatfield Consultants. December 2014. Baseline Water Quality for John Hart Reservoir. A
letter from Hatfield Consultants to SNC-Lavalin Inc.;
SNC-Lavalin Inc. December 2014. Results of Surface Soil Characterization. Memorandum from
M. Guest SNC-Lavalin Inc. to P. Morcombe, SNC-Lavalin Inc.;
Strategic Natural Resource Consultants. January 28, 2015. John Hart GC Replacement Intake
Area Clearing Plan and Danger Tree Assessment;
Strategic Natural Resource Consultants. January 28, 2015. John Hart GC Replacement
Diversion Berm and Channel Clearing Plan and Danger Tree Assessment;
Hatfield Consultants. February 2015. Snail Survey and Salvage: Safety Berm and Diversion
Channel. John Hart Generating Station Replacement Project;
Hatfield Consultants. February 2015. Snail Survey and Salvage: L70 Road and Intake
Structure. John Hart Generating Station Replacement Project;
SNC-Lavalin Inc. February 2015. Results of Surface Soil Characterization. Memorandum from
M. Guest SNC-Lavalin Inc. to P. Morcombe, SNC-Lavalin Inc.;
Mainstream Biological Consulting. April 29, 2015. JHRP Silt Curtain Fish Salvage within John
Hart Reservoir. Memorandum from S. Miller, Mainstream Biological Consultants to A.
Ashenhurst, Hatfield Consultants;
Mainstream Biological Consulting. April 29, 2015. JHRP Silt Curtain Fish Salvage within John
Hart Reservoir. Memorandum from S. Miller, Mainstream Biological Consultants to A.
Ashenhurst, Hatfield Consultants;
Mainstream Biological Consulting. April 30, 2015. Dusk Observation of Suspected Bat Colony.
Memorandum from D. Manley, Mainstream Biological Consultants to A. Ashenhurst, Hatfield
Consultants and B. Chow, ASL-JV;

Document No.: 616482-3000-30RM-0025

173

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
Strategic Natural Resource Consultants. June 3, 2015. John Hart GC Replacement L60 and
Surge Tank Construction Clearing Plan and Danger Tree Assessment;
Mainstream Biological Consulting. June 11, 2015. L70 Breeding Bird Survey June 5, 2015.
Memorandum from D. Manley, Mainstream Biological Consultants to V. Masterman, Hatfield
Consultants and B. Clarke, ASL-JV;
Hatfield Consultants. June 2015. Owl Monitoring 2015: John Hart Generating Station
Replacement Project. Prepared for SNC-Lavalin Inc.;
Hatfield Consultants. June 2015. Red-legged Frog Monitoring 2015: John Hart Generating
Station Replacement Project. Prepared for SNC-Lavalin Inc.;
Mainstream Biological Consulting. June 29, 2015. L70 Breeding Bird Survey June 29, 2015.
Memorandum from D. Manley, Mainstream Biological Consultants to A. Ashenhurst, Hatfield
Consultants and B. Clarke, ASL-JV;
Strategic Natural Resource Consultants. July 8, 2015. John Hart GC Replacement Tailrace
Clearing Plan and Danger Tree Assessment;
Mainstream Biological Consulting. July 17, 2015. Penstock Clearing Area Breeding Bird Survey
July 17, 2015. Memorandum from D. Manley, Mainstream Biological Consultants to V.
Masterman, Hatfield Consultants and B. Chow, ASL-JV;
Hatfield Consultants. July 2015. Nest Survey Results June and July 2015. John Hart Generating
Station Replacement Project. Prepared for SNC-Lavalin Inc.;
Hatfield Consultants. July 2015. Amphibian and Snail Salvage. L70 Road and Intake Structure
Additional Clearing. John Hart Generating Station Replacement Project. Prepared for SNCLavalin Inc.;
SNC-Lavalin Inc. August 2015. Results of Surface Soil Characterization Tailrace Outlet, 10
John Hart Road, Campbell River, BC. Memorandum from I Mace, SNC-Lavalin Inc.
Environment & Water to A. Johnsson, SNC-Lavalin; and
Strategic Natural Resource Consultants. August 2015. L60 Surge Tank Clearing Boundary
Addendum Issued for Review. Prepared for AECON SNC-Lavalin Joint Venture.
Hatfield Consultants. September 2015. Snail Survey and Salvage: L60 Road/Surge Tank and
Tailrace Clearing. John Hart Generating Station Replacement Project.
17.4

Communication with Environmental Authorities


EIR 038 was communicated to BC Parks representative Brent Blackmun, DFO representative
Daniel Sneep and the Water Comptrollers Office (through the IEM) by the Project
Environmental Coordinator, Valerie Masterman.
There was ongoing communication this month between Aaron Smeeth and Jordan Wagner of
FLNRO and the Project Environmental Manager, Amber Ashenhurst, regarding re-application of
the Short Term Water Use Approval.
Removal of Danger Trees along Surge Tower Rd. was communicated to BC Parks representative
Brent Blackmun by an ASL-JV field engineer.

Document No.: 616482-3000-30RM-0025

174

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
18.0 FIRST NATIONS AND COMMUNITY INVOLVEMENT
18.1 First Nations Involvement
The notable events that occurred during this reporting period are summarized as follows:
Table 18.1:
Date

Reporting Period -Summary of First Nations Involvement

Organization

Event

K'omoks First Nation,


We Wai Kai First
Nation,
Wei Wai Kum First
Nation

March 15-28 All three Identified First Nations were notified to expect a new First Nation
Responsible Person as the current designate,
, has taken a new job. In accordance
with the Project Agreement, the Project team will work with BC Hydro to identify a new designate.

January 26, 2016 - February 25, 2016

15-Mar16 to 28Mar-16

Please refer to the Monthly Aboriginal Participation Report for additional details.

Document No.: 616482-3000-30RM-0025

175

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
18.2 Community involvement and Communications
Ongoing Communications and Community Relations Activities:
-

BC Hydros monthly public construction report: Collect and draft written content and photos to
be used in monthly public construction report. Coordinate review/edits from the project team.
This months report will be released Mar. 31 and features a profile of Anders Jonsson and
updates about tailrace work and planning.

Weekly media monitoring summary: Report of direct and of interest media clippings shared
with project representatives each Friday. This month there were three updates about the
progress of the project, and eight stories of interest were shared with the project team. Social
media posts are shared if notable. Examples of those are below.

Bi-weekly meetings with BC Hydro Community Relations Manager: Twice-monthly update


meetings with Stephen Watson to review communications work/requirements and upcoming
initiatives. This month, one meeting occurred on site to include an update on current works.

Project Communications Events & Materials:


-

Event Support/Coordination Community Site Event: Work with BC Hydro and project team to
outline initial event plan and determine best approach for planning and execution. The event
date has been set for July 17 (Sunday) and will include stops for the public at both the L20 portal
and the intake area. Will continue to work with community relations at BC Hydro to liaise on the
planning of the event in the coming months.

Video Coordination Tailrace Time Lapse Camera: Operator requirements have been identified
for a time lapse camera to be installed in the powerhouse. Working with ASL-JV to plan for
installation once blasting in the powerhouse is completed, anticipated for May.

Key Messaging Precautionary Spill (Tailrace Work): Provided input/edits and coordinated
review circle for a spill notification proposed by BC Hydro in advance of increased spill from the
reservoir as a precaution to tailrace blasting and potential impacts on generating station.
Changes in blasting plans delayed release of this notice.

Media Coverage Highlights/Social Media Post Examples:


John Hart generating station continues: mycambellrivernow.com, March 1, 2016:
http://www.mycampbellrivernow.com/10389/john-hart-generating-station-continues/

Document No.: 616482-3000-30RM-0025

176

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016

Document No.: 616482-3000-30RM-0025

177

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
19.0 CLAIMS AND NOTICES
19.1 Claims

19.2 Notices

Document No.: 616482-3000-30RM-0025

178

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
20.0 PHOTOGRAPHS
20.1 Photographs On Site
Refer to Appendix A.

20.2 Photographs Off Site


Please refer to Appendix B for photographs relating to the turbine-generator subcontract.

Document No.: 616482-3000-30RM-0025

179

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
19.0 CLAIMS AND NOTICES
19.1 Claims

19.2 Notices

Document No.: 616482-3000-30RM-0025

180

John Hart Generating Station Replacement Project


Monthly Progress Report No. 25 March 2016
20.0 PHOTOGRAPHS
20.1 Photographs On Site
Refer to Appendix A.

20.2 Photographs Off Site


Please refer to Appendix B for photographs relating to the turbine-generator subcontract.

Document No.: 616482-3000-30RM-0025

181

JOHN HART GS REPLACEMENT PROJECT


MONTHLY PROGRESS REPORT

APPENDIX A ASL JV MONTHLY PROGRESS REPORT


MARCH 2016

JOHN HART GENERATING STATION REPLACEMENT PROJECT


Powerhouse-Vertical Muck Shaft

Bypass Inlet Tunnels 1 and 2

Geotechnical Investigation-Core Analysis

MONTHLY PROGRESS REPORT


MARCH 2016

Draft Tube-Fabrication of Ribs

Monthly Progress Report


March 2016

Table of Contents
EXECUTIVE SUMMARY .................................................................................................................................. 5
1.1
Main Access Tunnel ...................................................................................................................... 5
1.2

Service Tunnel and Main Access Tunnel Portals ........................................................................... 5

1.3

Powerhouse Cavern ...................................................................................................................... 5

1.4

Surge Chamber/Draft Tube Outlets .............................................................................................. 6

1.5

Power Tunnel ................................................................................................................................ 6

1.6

Unit and Bypass Inlets ................................................................................................................... 6

1.7

Tailrace .......................................................................................................................................... 6

1.8

Cofferdam ..................................................................................................................................... 6

1.9

East Abutment .............................................................................................................................. 6

1.10

Intake Maintenance Gate ............................................................................................................. 6

1.11

Intake Operating Gate................................................................................................................... 6

1.12

L60/Surge Tank ............................................................................................................................. 6

1.13

Design Change Records ................................................................................................................. 6

SAFETY REPORTING ....................................................................................................................................... 8


2.1
Reporting....................................................................................................................................... 8
2.2

Incident / Injury Review (note: all incidents are reviewed at Toolbox Talks) .............................. 9

ENVIRONMENT ........................................................................................................................................... 10
3.1
Environmental Highlights ............................................................................................................ 10
3.2

Environmental Incidents (Reportable Incidents) ........................................................................ 11

3.3

Status of Environmental Work Plans .......................................................................................... 12

3.4

Status of Permits and Licenses.................................................................................................... 13

QUALITY CONTROL AND ASSURANCE ......................................................................................................... 15


NARRATIVE OF MAJOR EVENTS ON AND OFF SITE ..................................................................................... 16
5.1
Engineering ................................................................................................................................. 16
Achievements this Reporting Period .......................................................................................... 16
5.1.1

General ................................................................................................................................ 16

5.1.2

Intake .................................................................................................................................. 16

5.1.3

Powerhouse ........................................................................................................................ 16

5.1.4

Water Conveyance .............................................................................................................. 17

5.1.5

Gate Gallery ........................................................................................................................ 17

5.1.6

Tailrace ................................................................................................................................ 17

5.1.7

Service Tunnel Fan House ................................................................................................... 17

Upcoming reporting period ........................................................................................................ 17


5.1.8

General Civil Works ............................................................................................................. 17

5.1.9

Intake .................................................................................................................................. 18
Page 2 of 32

Monthly Progress Report


March 2016

5.1.10

Powerhouse ........................................................................................................................ 18

5.1.11

Water Conveyance .............................................................................................................. 18

5.1.12

Tailrace ................................................................................................................................ 18

5.1.13

Service Tunnel Fan House ................................................................................................... 18

5.2

Site Construction......................................................................................................................... 19
Achievements this Reporting Period .......................................................................................... 19

5.2.1

Intake Operating Gate......................................................................................................... 19

5.2.2

Intake Maintenance Gates (IMG)........................................................................................ 19

5.2.3

Surege Tank/L60 ................................................................................................................. 19

5.2.4

Powerhouse ........................................................................................................................ 19

5.2.5

Manifold .............................................................................................................................. 19

5.2.6

Power Tunnel ...................................................................................................................... 19

5.2.7

Tailrace Transition ............................................................................................................... 19

5.2.8

Main Access Tunnel ............................................................................................................ 19

5.2.9

Tailrace Outlet Structure..................................................................................................... 20

Upcoming reporting period ........................................................................................................ 20


5.2.10

Intake Operating Gate......................................................................................................... 20

5.2.11

Intake Maintenance Gates (IMG)........................................................................................ 20

5.2.12

Surge Tank/L60 ................................................................................................................... 20

5.2.13

Powerhouse ........................................................................................................................ 20

5.2.14

Manifold .............................................................................................................................. 20

5.2.15

Power Tunnel ...................................................................................................................... 21

5.2.16

Main Access Tunnel ............................................................................................................ 21

5.2.17

Tailrace Outlet Structure..................................................................................................... 21

AREAS OF CONCERN ................................................................................................................................... 22


SUBCONTRACTORS ..................................................................................................................................... 24
7.1
Subcontracts ............................................................................................................................... 24

8.

7.2

ASLJV and Subcontractor-Aboriginal Participation ..................................................................... 24

7.3

BC Hydro Code of Conduct.......................................................................................................... 24

CRITICAL PATH CIVIL WORKS .............................................................................................................. 25


8.1
Path #1 (Powerhouse Excavation - Powerhouse Concrete - Pit Free) ........................................ 25
8.2

Path #2 (Power Tunnel Excavation) ............................................................................................ 25

8.3

Critical Path Mitigation/Addition Measures ............................................................................... 25

MANPOWER ALLOCATIONS ........................................................................................................................ 27


9.1
Headcount ................................................................................................................................... 27
9.2

Project Labour Hours .................................................................................................................. 28

SIGNIFICANT BREAKDOWNS ....................................................................................................................... 29


INVENTORY OF CONSTRUCTION MATERIAL ............................................................................................... 29
Page 3 of 32

Monthly Progress Report


March 2016

PERMANENT EQUIPMENT DELIVERY DATES ............................................................................................... 29


INVENTORY OF EQUIPMENT ....................................................................................................................... 30

Additional Appendices:
Appendix A - Commodity Projections
Appendix B - Photos

Page 4 of 32

Monthly Progress Report


March 2016

EXECUTIVE SUMMARY
The critical path excavation continues to be significantly impacted due to excavation conditions and the
additional rock support required to be installed in the Power Tunnel and Tailrace Tunnel.
FK/ASLJV continued to advance through the Main Access Tunnel bypass alignment in accordance with
temporary ground support drawings provided by BMO. FK/ASLJV have moved ahead with installation of
canopy tubes and lattice girders in the Main Access Tunnel. Canopy tube system will be ongoing until
probing results indicate solid rock. At this time the cobble feature continues to impede tunneling progress.
With the implementation of weekend work and additional resources, the Unit Inlets, Bypass Inlets and
Powerhouse have advanced efficiently to meet the revised Construction Schedule.
No activity in the Power Tunnel due to access restrictions as a consequence of excavation conditions. The
tunnels will continue opportunistically and will resume full force after completion of the Inlets in early
April.
East Abutment concrete works was completed and blasting activities of the Intake Maintenance Gate
commenced.
Blasting activities continue at the Tailrace with Bench 4 and 5 (EL 14.5m). Rock plug grout curtain was
completed.
The following highlights the work progress during this reporting period.
1.1 Main Access Tunnel
Probe hole drilling continues in the MAT to establish geological and hydrologic conditions ahead of the
tunnel face to confirm required ground support. FK/ASLJV have moved ahead with installation of canopy
pipes and lattice girders advancing to station 20+330.5 (photo 01). FK/ASLJV continue with the installation
of canopy tubes and girders. Additional probing will be prescribed if necessary to confirm rock cover prior
to resuming full 5m rounds.
1.2 Service Tunnel and Main Access Tunnel Portals
The Service Tunnel and Main Access Tunnel portals excavation conditions have affected the design,
construction and project schedule, as outlined in ASL/SNC Letter 169, dated June 8th, 2015.
Additional shotcrete, rock bolts, meshing and other rock support measures are required to stabilize
the rock in these areas. The effect of these measures results in delays to tunnel advancement and has
affected the completion of the Powerhouse.
1.3 Powerhouse Cavern
Approximately 75% of the Powerhouse has been completed. Currently, FK/ASLJV has blasted 100% of
Bench 4, 7 and 8 (photo 02 and photo 03). Bench 5 is scheduled to commence late March and Powerhouse
on schedule for late April completion where ASLJV will commence concrete works.
Muck shaft was completed and currently used to facilitate the Powerhouse excavation through Draft Tube
#3.

Page 5 of 32

Monthly Progress Report


March 2016

1.4 Surge Chamber/Draft Tube Outlets


All three Draft Tube Outlets were completed this reporting period. The Surge Chamber bottom heading
remains at approximately at station 00+068 and will continue advancing concurrently with Bypass Outlet
tunnels opportunistically.
1.5 Power Tunnel
Power Tunnel excavation remains at station 00+173m. Blasting activities are scheduled to resume in the
Power Tunnel late March/early April once Bypass Inlets are complete.
Multiple DSC Notices have been issued over the first portion of Power Tunnel.
1.6 Unit and Bypass Inlets
Excavation of Unit Inlets are 100% complete and Bypass Inlets are approximately 90% complete (photo
04).
1.7 Tailrace
Drilling and blasting of Bench 4 (EL 15m) is complete and Bench 5 blasting activities have commenced.
Excavation of Tailrace below EL 22.25 is approximately 25% complete (photo 05). Grout curtain drilling
and grouting of Maintenance gate is complete.
Blasting at the Tailrace continues to prove difficult near existing Powerhouse Structure. On March 10,
2016 three existing units tripped due to blasting activities. Investigation was performed and Technical
Memo TM No. 13 was issued prior to resuming blasting activities. All other blasts were executed
successfully.
1.8 Cofferdam
Silt curtains continue to successfully maintain low turbidity levels in the John Hart Reservoir.
1.9 East Abutment
East Abutment concrete works and installation of 46mm DCP was completed during this reporting period.
Formwork has been stripped and stair tower erected for Intake Maintenance Gate access (photo 06).
1.10 Intake Maintenance Gate
Emil Anderson Construction commenced drilling and blasting activities of the Intake Maintenance Gate
(photo 07). Initial sinking cut was denoted March 21, 2016. PPV values remain well below threshold limits.
1.11 Intake Operating Gate
Intake Operating Gate excavation is complete at EL 108.25. Installation of rock support (rock bolts,
shotcrete and scaling) is ongoing and scheduled to be completed by late March (photo 08).
Laydown area, east of the soil nail wall has been developed to allow FK/ASLJV to mobilize to site and setup for Intake shaft excavation. FK/ASLJV to mobilize late March.
1.12 L60/Surge Tank
Excavation of the Surge Tank excavation to rock was completed this reporting period (photo 09). Due to
rock elevation and location, Surge Tank Excavation drawings were revised and adjusted to suit the rock
conditions.
1.13 Design Change Records
The following Design Change Records have been submitted for review and consideration, and remain
outstanding:
Page 6 of 32

Monthly Progress Report


March 2016

SAFETY REPORTING
2.1 Reporting
Previously Reported

Current Reporting
Period

1034
193
0
137
0
95
6

37
27
0
0
0
40
0

Previously Reported

Current Reporting
Period

Disciplinary Actions

234
34
71
50
16
4
0
0
0
21
15
13

188
33
71
46
14
3
0
0
0
19
15
13

46
1
0
4
2
1
0
0
0
2
0
0

Site Inspections

526

461

65

500
9709

442
9122

58
587

Training
Health & Safety Orientations
Visitors Orientations
WHMIS training
Hearing Test
First Aid Level 1
Fall Protection
Corporate Audits (SNC/ASLJV)
SAFETY STATISTICS
Safety Opportunities
Incidents (MVA, Equipment & Property Damage)
Unsafe Acts & Conditions
Report Only
F/A
M/A
Modified Work Cases
LTI
Work Safe BC Consultations
Work Safe BC Inspections
Work Safe BC Orders

Behavioural Based Observations


Step Back Cards

Project to Date
1071
220
0
137
0
135
6
Project to Date

NLTI

Reporting Period
10.06

Project To Date
4.78

Target
5.0

TRIF

Reporting Period
3.35

Project To Date
.95

Target
0.25

Page 8 of 32

Monthly Progress Report


March 2016

2.2 Incident / Injury Review (note: all incidents are reviewed at Toolbox Talks)

First Aid Feb 23, 2016 ASLJV A carpenter stated that while positioning a 4x6 into place
he pinched his left ring finger between the 4x6 and a coil rod (gloves on). First Aid cleaned and
bandaged the finger. The worker returned to work.

Report Only Feb 23, 2016 ASLJV A carpenter reported that while walking at the bottom
of the Cofferdam, he slipped and fell. He stated both wrists were sore and that he suffered a
blood blister to his left palm. Ice was applied to the left wrist. The worker returned to work.

First Aid - Mar 2, 2016 FK/ASLJV - A miner stated that while attempting to open a clamp
holding the shortcrete hose, he needed to use a wrench. The clamp opened suddenly and
pinched the workers right thumb (gloves on). First Aid cleaned and then released the pressure
on the thumb, applied a bandage. Worker returned to work.

Report Only - Mar 8, 2016 ASLJV Labourer walking back from L60 stated he tripped on a
rock, fell and landed on his right knee resulting a few minor scrapes. At 9:00am he reported
to First Aid to have it looked at and recorded (no treatment). Worker returned to work.

Report Only - Mar 8, 2016 EAC-The driller helper was lining up drill steel to thread into
another stem when it came loose. The steel dropped and went thru the raingear and
contacted the worker in the chest knocking him to the ground. First Aid was called and the
worker had received a bruise to the upper chest in which ice was applied. The worker returned
to work.

Medical Aid - Mar 14, 2016 FK/ASLJV Powerhouse Employee sustained impact injury
when he struck his left thumb with a hammer while attempting to insert a CT bolt. Four
stitches required to close laceration. Worker has returned to work.

Report Only - Mar 15, 2016 ASLJV Main Site - A teamster was putting a chain on the
sprocket of the dump truck tarp mechanism when the chain pinched his right index finger
(gloves were worn at the time) resulting in a small cut. The teamster wanted it recorded and
reported the incident to First Aid. He washed up and returned to work (no treatment).

Page 9 of 32

Monthly Progress Report


March 2016

ENVIRONMENT
3.1 Environmental Highlights

Tailrace rock plug grout curtain holes were pressure tested and grouted without any concerns.
A CO2 bubbler was on site and monitors were present to ensure there were no turbidity/pH
exceedances detected in the River.

ASLJV placed boulders and fill within the silt curtain in the reservoir in order to extend the drill
pad for EAC drilling. A boulder wall was chosen in order to reduce the area of impact and there
were no concerns with this work. Turbidity levels remained visibly low within the silt curtain.

Regular environmental maintenance items continue, including check dam clean-out along
Surge Tower Road, hydrovac of the water treatment plant tanks and the main site entrance
cattle guard, and removal of contaminated materials and used fuels by Terrapure.

The cofferdam east abutment and the cofferdam perimeter plinth were poured this reporting
period with no water quality concerns. All concrete-affected water is captured within the
cofferdam and pumped through the water treatment plant. The overall volume of water
within the cofferdam is very minimal.

The environmental coordinator (EC) inspected the FKASL shop and noted that it is tidy and
well organized. FKASL crews are diligently attending-to and reporting spills.

The asphalt was cut in front of the old Park access at the Intake to direct any overland flow off
the Intake road towards Laydown 5B and away from the Park.

A custom designed spill tray has been placed under the 165 crane in the L70.

The new oil separators in front of the mechanics Quonset huts and the fuel bay were checked
and these are effectively collecting oil.

L60 slopes were covered with topsoil saved from the surge shaft area in preparation for hydroseed application at the end of March. The L70 drainage was lined with rock and check dams
were installed. The check dams have been constructed with gravel at the core and coarse blast
rock on the outside.

Four red-legged frog egg masses were relocated from the construction-side of the wetland
exclusion fence. The fence was cut in a five locations to allow frog passage to the wetlands
during the breeding period.

BC Hydro noted turbid water from the surge tank area reaching the stream at the North safety
berm through a previously unknown sump/pipe system within the Penstock corridor. This
water did not reach BC Parks and the discharge location was changed in consultation with the
environmental coordinator to ensure that there would be no possible risk of a discharge to
Parks. The new discharge location is to rock within the developed roadbed. Water flows into
the rock, along the stump/grub berm and to vegetation. During heavy rains the extent of
visible pooled water was limited to 15 m x 10 m and did not come close to the Park boundary.
The surge tank has been pumped down and the water level is being maintained.

The EC reviewed expectations for refueling within 30 m of a waterway with the Teamsters.
This clarified required best practices at specific sensitive areas on this site.

Broom was removed from around the L60/Interpretive Centre. BC Parks was on site and noted
the effort.

The water treatment plant fault switch failed for the pre-treat pump controller on March 9th
and the water treatment plant operator, a field engineer and an electrician responded around
midnight to keep the plant operating manually. This was repaired the following day.
Page 10 of 32

Monthly Progress Report


March 2016

NARRATIVE OF MAJOR EVENTS ON AND OFF SITE


5.1 Engineering
Achievements this Reporting Period
5.1.1 General

General Arrangement Site and Parking In Progress

Site Stormwater Management and Drainage In Progress

L20 and L40 Permanent Road Design and Cross Sections In Progress

5.1.2 Intake
The work completed relating to Intake included:

Intake Structures
o
o

Intake Upper Elbow


o

Intake Maintenance Gate and Trashrack 2nd Stage Concrete Issued for Construction
Intake Revit modeling - In Progress
DBM, Calculation and Drawings Continued

Intake Operating Gate Bay


o

DBM, Calculation and Drawings In Progress

o
o
o

DBM and Calculation In Progress


GA Drawings In Progress
Stability Analysis In Progress

LLO

5.1.3 Powerhouse
The work completed relating to the Powerhouse included:

Alstom Turbine and Generator Design Input Review In Progress

Powerhouse GA (Rev. 0) RFFI Required from BC Hydro, Not Yet Endorsed

Powerhouse Stability Analysis RFFI Required from BC Hydro, Not Yet Endorsed

Powerhouse Revit Model review In Progress

Bypass Outlet Steel Liner


o

DBM, calculations and drawings Preparation for IFC in Progress

Bypass Inlet Steel Liner Design Preparation for IFC in Progress

TIV Inlet Steel Liner Design Preparation for IFC in Progress

IBV Foundation Design


o

EDV Foundation Design


o

DBM, Calculation and Drawings In Progress


DBM, Calculation and Drawings In Progress

Unit Bay 1/Unit Bay 2(Up to Pump Floor Level)


o
o

DBM and Calculation Issued for BC Hydro Review


Draft Tube foundation and Pump Floor Concrete Outline Issued for BC Hydro Review
Page 16 of 32

Monthly Progress Report


March 2016

o
o

Office Complex
o

Superstructure DBM and Calculation - In Progress

Unit Bay 3/Electrical Bay (Up to Pump Floor Level)


o
o
o
o
o

Draft Tube foundation and Pump Floor Reinforcement Drawings Issued for BC Hydro
Review
Turbine Floor Drawings and Calculations - Started

DBM Comments Received from BC Hydro


Calculation Comments Received from BC Hydro
Concrete Outline Drawings - Comments Received from BC Hydro
Reinforcement Drawings - Comments Received from BC Hydro
Turbine Floor Drawings and Calculations - Started

Draft Tube Concrete Liner


o
o

DBM and Calculation In Progress


Concrete Outline Drawings In Progress.

5.1.4 Water Conveyance

Surge Tank
o
o

DBM and Calculation Started


GA Drawings In Internal Review.

5.1.5 Gate Gallery

Revit modeling - In Progress

5.1.6 Tailrace
The work completed relating to Tailrace included:

Tailrace Outlet Structure DBM Revision Issued for Information;

Tailrace Calculations Stability Calculation Revision Issued for Information;

Tailrace Outlet Site GA and Structural GA Drawings Awaiting BC Hydro Response to Review
Memo

Tailrace Outlet Concrete Outline Drawings Awaiting BC Hydro Response to Review Memo

Tailrace Outlet Reinforcement Drawings Awaiting BC Hydro Response to Review Memo

5.1.7 Service Tunnel Fan House


The work completed relating to Service Tunnel Fan House included:

Geotech approval given for independent roof structure, HVAC equipment and electrical panel
arrangement being optimized, structure revised (length of building shortened by 6.5m)

Service Tunnel Fan House Revit model In Progress for Trench Option (Approved for Detail
Design)

Service Tunnel Fan House General Arrangement Drawings In Progress

Service Tunnel Fan House Architectural Design Started

Upcoming reporting period


5.1.8 General Civil Works

General Arrangement Site and Parking Continue


Page 17 of 32

Monthly Progress Report


March 2016

Site Stormwater Management and Drainage Issue for Internal Review;

L20 and L40 Permanent Road Design and Cross Sections Issue for Internal Review;

5.1.9 Intake
The planned work relating to the Intake will include:

Operating Gate Bay


o

Intake Upper Elbow


o

DBM, Calculation and Drawings To Be Updated for Hydraulic Profile Change

LLO/EFRS
o

Calculations and Drawings In Progress

General Arrangement Drawings In Progress

LLO/EFRS Miscellaneous Steel - Continue

5.1.10 Powerhouse
The planned work relating to the Powerhouse will include:

Powerhouse GA Drawings Re-issue for Construction

Draft Tube/Gate Gallery Chamber General Arrangement drawings - Continue

Miscellaneous Steel Continues

Revit Modeling for Powerhouse Components Continues

Unit Bay 1/Unit Bay 2


o
o
o
o

Unit Bay 3/Electrical Bay (Up to Turbine Floor Level)


o
o

DBM Issue for Construction for Pump Floor


Calculations Issue for Construction for Pump Floor
Concrete Outline and Reinforcement Drawings - Issue for Construction for Pump Floor
Turbine Floor Drawings and Calculation Continue
Calculations Issue for BC Hydro Review
Concrete Outline and Reinforcement Drawings - Issue for BC Hydro Review

Office Complex
o

Superstructure DBM, Calculation and Drawings - Continues

5.1.11 Water Conveyance

Surge Tank
o
o

DBM and Calculation Continue


GA Drawings Continue

5.1.12 Tailrace
The planned work relating to the Tailrace will include:

Tailrace Outlet Concrete Outline and Reinforcement Drawings Issue for Construction

5.1.13 Service Tunnel Fan House


The planned work relating to the Service Tunnel Fan House will include:

Service Tunnel Fan House Revit model Issue for Internal Review
Page 18 of 32

Monthly Progress Report


March 2016

Service Tunnel Fan House General Arrangement Drawings Issue for Internal Review

DBM and Calculation To Start

5.2 Site Construction


Achievements this Reporting Period
5.2.1 Intake Operating Gate

Completed blasting Intake operating gate structure and vertical shaft area

90% complete mucking structure

Hand/hydro scaled Intake structure

Installed safety fence at EL 116 inside Intake excavation

Completed slab preparation for future stair tower access

Installed rock bolts

Erected wire mesh support frame

5.2.2 Intake Maintenance Gates (IMG)

Installed 46mm DCP anchors in East Abutment

Completed line drilling of IMG

Blasted two shots

5.2.3 Surege Tank/L60

Completed overburden excavation

Prepared for hydro seeding

5.2.4 Powerhouse

Completed Powerhouse Bench 3 excavation and ground support

Completed blasting of Powerhouse Bench 4, 7, 8

Installed 9 (out of 12) DCP anchors in crane plinth

Drilled instrumentation holes for north and south wall in Powerhouse

Installed bulkhead door in Service Tunnel/Powerhouse entrance

Excavated muck pass (vertical shaft)

5.2.5 Manifold

Completed Unit Inlets 1, 2, 3 excavation

Commenced Bypass Unit Inlets 1, 2 and 3 excavation

5.2.6 Power Tunnel

No change

5.2.7 Tailrace Transition

Completed tailrace transition excavation (bottom bench)

5.2.8 Main Access Tunnel

Advanced to 20+330.5 with canopy tube system


Page 19 of 32

Monthly Progress Report


March 2016

5.2.9 Tailrace Outlet Structure

Completed Bench 4 Excavation

Commenced Bench 5 excavation

Drilled 5 holes for tailrace deck TCP anchors

Placed mud slab and leveling plinth along south excavation

Constructed lock block wall complete with handrails

Installed additional bolts under crane pad

Mobilized 125 ton crane

Scaled Bench 4

Removed tights from Bench 3 and 4

Drilled pattern bolting holes for Bench 3 and 4

Installed lighting in excavation

Upcoming reporting period


5.2.10 Intake Operating Gate

Complete tight removal

Complete mucking at Intake structure

Complete rock support (bolts, shotcrete, and slope mesh)

Place mud slab in operating gate

Erect stair tower

Set up trailers for FK/ASLJV

FK/ASLJV mobilize to Intake

5.2.11 Intake Maintenance Gates (IMG)

Mobilize 165 ton crane to IMG

Continue IMG excavation

5.2.12 Surge Tank/L60

Hydro seed exposed slopes

Blast access pad for FK/ASLJV

5.2.13 Powerhouse

Complete Bench 4 ground support

Complete instrumentation installation in north and south wall

Complete Bench 5 excavation

Commence Bench 6

5.2.14 Manifold

Complete bypass Unit 1, 2 and 3 bypass excavation

Blast access pad for FK/ASLJV


Page 20 of 32

Monthly Progress Report


March 2016

5.2.15 Power Tunnel

Resume excavation

5.2.16 Main Access Tunnel

Continue excavation

5.2.17 Tailrace Outlet Structure

Complete excavation of Bench 5

Complete rock support Bench 5 (scale, bolt)

Start Bench 6 excavation

Page 21 of 32

Monthly Progress Report


March 2016

Page 23 of 32

Monthly Progress Report


March 2016

8. CRITICAL PATH CIVIL WORKS


ASLJV schedule has been revised to incorporate the recent alignment change to the Main Access Tunnel.
Please note that although the change will significantly help minimize the effects of poor excavation
conditions, it will not make up for the entire ~6 months of loss time. The change in the alignment
will help reduce the impacts of the excavation conditions and minimize the delay to the pit-free dates.
8.1 Path #1 (Powerhouse Excavation - Powerhouse Concrete - Pit Free)
Due to excavation conditions, access to the Service Bay can no longer be provided through the Main
Access Tunnel. Access has been re-routed through Adit D and the Power Tunnel, through Adit B and the
Service Tunnel.
Main Access Tunnel re-alignment will improve progress in the Main Access Tunnel significantly.
8.2 Path #2 (Power Tunnel Excavation)
Power Tunnel is currently on hold due to access restrictions, and shall resume once Unit and Bypass Inlets
have been excavated. Significant delays remain as poor ground conditions are encountered throughout
the excavation, resulting in additional rock support requirements. Mitigation measures have been
discussed and implemented in order to help accelerate the Power Tunnel excavation.
8.3 Critical Path Mitigation/Addition Measures
The following mitigation options have been considered/implemented to further mitigate the impacts of
the poor Main Access Tunnel ground conditions:

A Powerhouse temporary monorail system has been designed to allow multiple hoisting
options to occur simultaneously in the Powerhouse.

Third Power Tunnel crew non MED/MED

Hot seat changes

6 or 7 day work week for underground operations

Re-assigning existing graveyard shift from the Powerhouse to the Power Tunnel

Longer drill slides to allow for 5.7m long rounds in Power Tunnel

Re-sequence of stage 1 and stage 2 concrete works

Construction of rescue chamber in Power Tunnel

Construction of sump in Power Tunnel

Re-sequencing excavation plan

Re-designing ventilation works to accommodate revised sequence

Increase excavation limits in manifold to facilitate access during excavation

Additional tunneling Construction Manager

Additional tunneling Superintendent

Additional craft manpower

Additional tunneling plant equipment

Additional crews

Additional excavation hot seat changes

Upgrade semi-automatic drills to full automatic

Alter shotcrete mix to attain faster set-time


Page 25 of 32

Monthly Progress Report


March 2016

Innovation Proposals for concrete slab

Innovation Proposal for grouting MED

Page 26 of 32

Monthly Progress Report


March 2016

SIGNIFICANT BREAKDOWNS

Nothing to report.

INVENTORY OF CONSTRUCTION MATERIAL

FK/ASLJV ventilation fans.

FK/ASLJV ventilation ducting.

Acrow bridge components.

PERMANENT EQUIPMENT DELIVERY DATES

Nothing to report.

Page 29 of 32

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 1-Main Access Tunnel 20+330.5

Photo 2-Powerhouse Bench 4-El. 16.88


Page 1 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 3-Powerhouse-Bench 7 Breakthrough to Inlet #1

Photo 4-Inlet Bypass-Drilling Next Round


Page 2 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 5-Tailrace-Bench 6-Hoe Ramming Sinking Cut

Photo 6-Blue Max Drilling East Abutment Anchors


Page 3 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 7-Intake Maintenance Gate-Drilling and Blasting

Photo 8-Intake Operating Gate-Blasting Complete


Page 4 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 9-Surge Tank Excavation

Photo 10-Bypass Inlets 1-3


Page 5 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 11-Intake Operating Gate-Sinking Cut at El. 110.5

Photo 12-Main Access Tunnel Shotcrete Application at 20+330.5


Page 6 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 13-Drill and Install Rock Anchors

Photo 14-Intake Maintenance Gate-Line Drilling


Page 7 of 8

Monthly Progress Report


ASLJV-025-Appendix B-Photos

Photo 15-Tailrace-Drilling Sinking Cut

Photo 16-Tailrace Pad

Page 8 of 8

JOHN HART GS REPLACEMENT PROJECT


MONTHLY PROGRESS REPORT

APPENDIX B ALSTOM/GE MONTHLY PROGRESS REPORT


MARCH 2016

Client: SNC LAVALIN


John Hart Generating Station Replacement
Project
Contract No.616482-TG01

GE RENEWABLE ENERGY CANADA INC.

MONTHLY PROGRESS REPORT


March, 2016

INDEX
1.0

Executive Summary ..........................................................................................................................................1

2.0

Potential Problems ...........................................................................................................................................1

3.0

NOTICES ISSUED ...............................................................................................................................................1

4.0

Narrative of Major Events ................................................................................................................................1

i.

Model test ........................................................................................................................................................1

ii.

Engineering .......................................................................................................................................................2

iii.

Procurement .....................................................................................................................................................5

iv.

Site Work / Construction ..................................................................................................................................6

v.

Other ................................................................................................................................................................6

5.0

PHOTOGRAPHS .................................................................................................................................................7

6.0

SCHEDULE UPDATE .........................................................................................................................................11

7.0

PROGRESS CHARTS .........................................................................................................................................11

8.0

MAN HOURS (ON SITE STAFF FOR THE MONTH INCLUDING A FORECAST FOR THE FOLLOWING MONTH) ..11

9.0

CONSTRUCTION EQUIPMENT ON SITE (INCLUDING A FORECAST OF EQUIPMENT TO BE USED FOR THE

FOLLOWING MONTH) ..................................................................................................................................................12


10.0

CONSTRUCTION MATERIAL ON SITE (INCLUDING COMPARISON TO CURRENT AND FORECAST

CONSUMPSION) ...........................................................................................................................................................12
11.0

PLANNED DELIVERY DATES FOR PERMANENT EQUIPMENT...........................................................................12

12.0

INVENTORY OF PERMANENT EQUIPMENT RECEIVED ON SITE.......................................................................12

13.0

Summary SAFETY REPORT ..............................................................................................................................12

14.0

summary environmental report (for on site work only).................................................................................13

15.0

cash flow statements (comparison of flow to date to planned cash flow) ....................................................13

16.0

list of claims / changes ...................................................................................................................................13

17.0

Subcontracts List ............................................................................................................................................13

18.0

COMMUNITY INVOLVEMENT .........................................................................................................................14

19.0

PERCENTAGE OF DESIGN BUDGET EXPENDED ...............................................................................................15

20.0

QUALITY ASSURANCE / CONTROL ..................................................................................................................15

21.0

BC Hydro Code of conduct..............................................................................................................................15

22.0

OTHER .............................................................................................................................................................15

1.0

EXECUTIVE SUMMARY
Turbine design:
GE submitted the complete design package of instrumentation and protection devices for partial assembly 50
(MEF 58), the last part of TIV erection tools (MBQ 81) and the homology inspection procedure and forms
(MEF32-201 WDC02) part of the runner design package (MEF 32).
Generator design:
GE submitted the part 1 of the design package of Brake and jack System (MKB 55) and the complete design
package of fire protection system (MKB 58).
Procurement:
- Draft tube elbow (SBB): The last draft tube elbow (U1) was delivered to site.
- Runner forgings (Groditz / CNC TVAR) : all 3 bands forging are already completed at Grditz. Crowns are
in rough machining and will be ready in mid April.
- Stator frames (GE Hydro China): The welding of unit 3 and 2 is in progress (see photo 12 ).
- Stator windings (GE Canada) : The prototype bars have been delivered to the external laboratory as
required in the contract.
- TIV (GE Hydro China): the machining of the the fisrt boby has started. The welding of the first plug is
almost completed. The delivery for all the three units is advanced by one month.
- Bottom ring (GE Hydro China): Welding of the bottom ring U3 has started (see photo 11).
- Stay rings (HRPE): welding is completed for 3 units (see photos 7 & 8). It will remains the welding of the
spiral case on the stay ring.
- Draft tube cone (HRPE): Finished cutting. Started the assembly of U3 and U2 (see photo 9).
- Upper pit liner U3 (HRPE): Finished the cutting. Started the assembly (see photo 10).
- Generator shaft (Forgiature Moderna Arese): The forging for all 3 units is done. Next step will be the
sampling and the heat treatment.
- Thrust collar (Forgiature Moderna Arese): The forging for all 3 units is done. Next step will be the sampling
and the heat treatment.

2.0

POTENTIAL PROBLEMS
Nothing to report.

3.0

NOTICES ISSUED
Nothing to report.

4.0

NARRATIVE OF MAJOR EVENTS

i.
-

Model test
The model test is completed and the final report has been submitted.

ii.

Engineering
Turbine:

Transmitted documents:
GE submitted the complete design package of instrumentation and protection devices for partial assembly 50
(MEF 58).
GE submitted the part 3 of the design package of TIV erection tools (MBQ 81). This last part complete the
design package.
GE submitted the homology inspection procedure and forms (MEF32-201 WDC02) part of the runner design
package (MEF 32).
Work done this month:
Working on purchase specification and drawings of instrumentations of the distributor (MEF 28).
Prepared and submitted the homology inspection procedure and forms (MEF32-201 WDC02). Working on
drawings of turbine runner fabrication and machining (MEF32-201 WTW & MEF32-201 FTM).
Drawings of the turbine guide bearing, bearing cover and bearing shell are under final review (MEF 40 & 41).
Prepared and submitted the complete design package of instrumentation and protection devices for partial
assembly 50 (MEF 58).
The design of turbine cabling and junction boxes is in progress (MEF 65).
The design of the piping general arrangement and piping standard supports is in progress (MEF 70).
Start working on air admission piping (MEF 73).
Started the design of guide bearing water piping (MEF74).
Continuing the design of handling devices and tower assembly of the distributor (MEF 82).
Working on distributor shop assembly procedure (MEF 88)
Working on the design of the servomotors position indicator assembly (MBQ 18).
The design of TIV servomotors piping is in progress (MBQ 71).
Prepared and submitted part 3 of the TIV erection tools (MBQ 81). This part include drawings of the conduits
structure and conduits support.
Working on the shop assembly procedure of TIV (MBQ 84)

Package
No.

Table 1: Work Progress to Date


Progress
Progress (to
(during
date)
current
period)
Instrumentation and protection
Title

Summary of work completed this


period.

MEF28

devices for partial assembly 20

10%

60%

MEF32

Runner
Guide bearing, thrust bearing and
seals

10%

70%

Working on drawings and purchase


specification.
Submitted the homology inspection
procedure. Working on drawings of
runner fabrication and machining.

5%

75%

Drawings are under final review.

MEF41

Turbine guide bearing


Instrumentation and protection

5%

75%

Drawings are under final review.

MEF58

devices for partial assembly 50

5%

80%

Design package submitted.

MEF40

MEF65

Turbine
boxes

MEF70

cabling

and

junction
5%

25%

The design is in progress.

Pipes

5%

20%

MEF73

Air admission piping


Guide bearing, thrust bearing and

5%

13%

The design is in progress.


Started the design of the air admission
piping.

MEF74

shaft seal piping

5%

13%

MEF82

Tool for partial assembly 20

15%

60%

MEF88

Standard and common tools


Instrumentation and protection

15%

50%

MBQ18

devices

10%

60%

MBQ71

Oil piping

15%

30%

MBQ81

Erection tools

10%

80%

MBQ84

Workshop tools

10%

30%

Started the design of guide bearing


water piping.
Continuing the design of handling
devices and tower assembly of the
distributor.
Working on distributor shop assembly
procedure.
Working on servomotors position
indicator assembly.
The design of TIV servomotors piping
is in progress.
Design package submitted
Working on the shop
procedure of TIV

Planned work for next month:


- Submitt the design packages related to the turbine guide bearing (MEF 40 & 41)
- Submitt of the last part of the runner design package (MEF 32)
Generator:
Transmitted documents:
GE submitted the part 1 of the design package of Brake and jack System (MKB 55).
GE submitted the complete design package of fire protection system (MKB 58).
Work done this month:
The review of drawings of the lower air deflector is in progress (MKB 15).
Drawings of the generator cover and the collector housing are under internal review (MKB43).
Submitted drawings of braking and jacking jacks cylinder block, PAD support and PAD (MKB 55).
Drawings of oil lift system are in progress (MKB 54)
The design of the brake dust collecting sustem is in progress (MKB 57).
Prepared and submitted the complete design package of fire protection system (MKB 58).
Continuing the design of different generator piping (MKB 71, 73 & 75).
Continuing the design of rotor support and handling tooling (MKB 83)

assembly

Package
No.

Title

Table 2 Work Progress to Date


Progress
Progress (to
(during
date)
current
period)

Summary of work completed this


period.

MKB06

ASSEMBLY AREA

10%

100%

MKB15

STATOR AIR GUIDE

5%

75%

Design package approved


The review of drawings of the lower
air deflector is in progress.

MKB20

ROTOR

10%

90%

Design package submitted

MKB29

COLLECTOR MOVING PARTS

10%

90%

Design package submitted

MKB43

GENERATOR PIT COVERING

40%

70%

Drawings under internal review

HP THRUST INJECTION SYSTEM


MKB54

(HP OIL SYSTEM)

5%

65%

MKB57

CARBON DUST SUCTION

20%

50%

Drawings of oil lift system are in


progress
Design of the brake dust collecting
sustem is in progress

MKB58

FIRE PROTECTION SYSTEM

5%

80%

Design package submitted

10%

60%

Working on the design of the piping

15%

50%

Working on the design of the piping

PIPING FOR PARTIAL ASSEMBLY


MKB71

10
PIPING FOR PARTIAL ASSEMBLY

MKB73

30
PIPING FOR PARTIAL ASSEMBLY

MKB75

50

15%

50%

Working on the design of the piping

MKB82

STATOR TOOLS

10%

90%

MKB83

ROTOR TOOLS

45%

70%

Design package submitted


Continuing the design of rotor support
and handling tooling

Planned work for next month:


- Submitt the complete package of stator air guide (MKB 15).
- Submitt the design of the generator pit covering (MKB 43).
- Submitt the rotor tools design package (MKB 83).
- Continue the design of piping in generator (MKB 71, 73 & 75).
Regulation & Auxiliaries:
Transmitted documents:
No design package was transmitted in February
Work done this month:
The design of main cabinets is in progress (BAA 01)
Starting the design of the distributor servomotor piping (MEU 71).

The design of the instrumentation in generator is in progress (MKB 61)


ABB sent to GE a first batch of drawings. Currently, a review is in rogress (MKC 81 & 82)

Package
No.

BAA01

Table 3 Work Progress to Date


Progress
Progress (to
(during
date)
current
period)

Title

MAIN CABINETS
INSTRUMENTATION

5%

30%

Summary of work completed this


period.

The design of main cabinets is in


progress

AND

MKB61

ELECTRICAL AUXILIARIES

2%

62%

MEU71

OIL PIPES

12%

20%

MKC81

EXCITATION CABINET

10%

40%

MKC82

EXCITATION TRANSFORMER

10%

40%

Design is in progress
Starting the design of the distributor
servomotor piping
A review of drawings received from
ABB is in progress.
A review of drawings received from
ABB is in progress.

Planned work for next month:


Submitt the design packages of the excitation cabinet and transformer (MKC 81 & 82).
Continue the design of the main cabinets (BAA01).

iii. Procurement
-

Draft Tube Elbow (S.B.B) :


o U2: Delivered to site.
o U1: Delivered to site.
Turbine inlet valve U3 (GE Hydro China):
o The TIV body is under machining (photo 1).
o The welding of the plug is almost completed (photo 2)
o Upstream, downstream and removable conduits : Cutting is almost completed.
Turbine inlet valve U2 (GE Hydro China):
o The welding of the body is completed. Waiting for machining (photo 3).
o The welding of the plug is in progress (photo 4)
Turbine inlet valve U1 (GE Hydro China):
o The welding of the body is in progress (photo 5).
o The welding of the plug is in progress (Photo 6)
Stay ring U3 (GE Hydro China/ HRPE): The welding is completed. Grinding is almost completed. Internal
inspection are on-going (photo 7).
Stay ring U2 (GE Hydro China/ HRPE): Welding is completed. Grinding is in progress (see photo 8).
Stay ring U1 (GE Hydro China/ HRPE): Welding is completed. Started grinding.
Draft tube cone (GE Hydro China/ HRPE): Finished cutting. Started the assembly of U3 and U2 (see photo 9).
Upper pit liner U3 (GE Hydro China/ HRPE): Finished the cutting. Started the assembly (see photo 10).
Bottom ring (GE Hydro China): Welding of the bottom ring U3 has started (see photo 11).
Wicket gate (GE Hydro China/ HRPE): The subcontractor is fabricating the mold for the wicket gate castings.

Stator frame (GE Hydro China): The welding of unit 3 and 2 is in progress (see photo 12 ).
Stator winding (GE Canada): The prototype bars have been delivered to the external laboratory as required in
the contract. Resultats of the thermal cycling test are expected to be available by end of May 2016.
Runner forging (CNC TVAR / Grditz): all 3 bands forging are already completed at Grditz. Crowns are in
rough machining and will be ready in mid April. All forgings will be transferred to CNC TVAR in mid April for
machining.
Turbine shaft (GE Hydro China/ HRPE): the subcontractor is preparing to do the forging of the turbine shaft.
Generator shaft (Forgiature Moderna Arese): The forging for all 3 units is done. Next step will be the sampling
and the heat treatment.
Thrust collar (Forgiature Moderna Arese): The forging for all 3 units is done. Next step will be the sampling and
the heat treatment.

Subcontract Package
Draft tube elbow

Draft tube cone


Turbine inlet valve

Stay ring / spiral case

Head cover
Bottom ring
Stator lamination
Stator frame
Stator bars

Table 4 Work Progress to date


subcontractor
Current Status
S.B.B
U3: Delivered to site.
U2: Delivered to site.
U1: Delivered to site.
GE Hydro China /
Finished cutting. Started the assembly of U3 and U2.
HRPE
GE Hydro China
U3: machining is in progress. The welding of the plug is
almost completed
U2: The welding of the body is completed. The welding of
the plug is in progress
U1: The welding of the body and the plug are in progress .
GE Hydro China /
Stay ring U3: The welding is completed. Grinding is almost
HRPE
completed.
Stay ring U2: Welding is completed. Grinding is in progress
Stay ring U1: Welding is completed. Started grinding.
GE Hydro China
Cutting of steel plates is almost completed
GE Hydro China
Welding of the bottom ring U3 has started
th
GE Hydro China
Punching will start on March 30
GE Hydro China
Assembly and welding of U3 and U2 are in progress.
GE Hydro Canada
The prototype bars have been shipped to external
laboratory for the contractual thermal cycling test.

iv. Site Work / Construction


-

No activities at site to report at this time.

v. Other
-

Nothing to report.

5.0

PHOTOGRAPHS

Photo 1 Start of machining of the TIV body U3

Photo 2 Welding of plug U3 almost completed

Photo 3 TIV body U2 waiting for machining

Photo 7 Inspection of stay ring U3

Photo 8 Stay ring U2

Photo 9 2 draft tubes cone assembled

Photo 10 - Upper pit liner U3

Photo 11 Bottom ring U3

10

9.0

10.0

11.0

CONSTRUCTION EQUIPMENT ON SITE (INCLUDING A FORECAST OF EQUIPMENT TO BE USED


FOR THE FOLLOWING MONTH)
No site activities.

CONSTRUCTION MATERIAL ON SITE (INCLUDING COMPARISON TO CURRENT AND FORECAST


CONSUMPSION)
No site activities.

PLANNED DELIVERY DATES FOR PERMANENT EQUIPMENT

Site delivery forecasted dates following the schedule:


Unit 3
-

Draft tube elbow, embedded parts and anchors: 12/01/2016 - Delivered


Spiral case and stay ring assembly: 12/09/2016
Turbine inlet valve: 19/01/2017
Turbine Distributor: 27/04/2017
Stator assembly: 23/03/2017.
Lower bracket and upper bracket: 16/05/2017

Unit 2
-

Draft tube elbow, embedded parts and anchors: 01/03/2016 - Delivered


Spiral case and stay ring assembly: 10/11/2016
Turbine inlet valve: 23/03/2017
Turbine Distributor: 21/06/2017
Stator assembly: 17/05/2017
Lower bracket and upper bracket: 07/07/2017

Unit 1
-

Draft tube elbow, embedded parts and anchors: 24/03/2016 - Delivered


Spiral case and stay ring assembly: 16/01/2017
Turbine inlet valve: 19/05/2017
Turbine Distributor: 02/08/2017
Stator assembly: 28/06/2017
Lower bracket and upper bracket: 22/08/2017

12.0

INVENTORY OF PERMANENT EQUIPMENT RECEIVED ON SITE

Components available at site :


Draft tube elbow U3, U2 and U1
Turbine and TIV anchors

13.0
-

12

SUMMARY SAFETY REPORT


Total Recordable Incident Frequency (TRIF) = 0

Product
Turbine shaft
Runner forging
Runner (rough machining / 2
parts)
Runner (Final ass'y and final
machining)
Spiral case & stay ring
Draft tube cone
Draft tube elbow
Upper pit liner
Stator frame
Stator lamination
Stator winding
Rotor spider
Set of rotor poles
Complete distributor
Guide bearings
Governor control cabinet
Hydraulic cubicule
Main inlet valve
Excitation System
Stator air cooler
Bearings oil coolers
18.0
-

14

COMMUNITY INVOLVEMENT
Nothing to report.

Potential supplier
GE Hydro China
Grditz (Germany)

Status
Confirmed
Confirmed

CNC Tvar (Czech republic)

Confirmed

GE Hydro Canada
GE Hydro China / HRPE
GE Hydro China / HRPE
Acier Profil S.B.B (Qc, Canada)
GE Hydro China / HRPE
GE Hydro China
GE Hydro China
GE Hydro Canada
GE Hydro China
GE Hydro China
GE Hydro China
Getecma (Italy)
GE Controls/Governor
GE Controls/Governor
GE Hydro China
ABB Inc (Canada)
Thermofin (Qc, Canada)
Thermofin (Qc, Canada)

Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed
Confirmed

ANNEX 1
6 MONTHS
SCHEDULE