Development of Delhi-Meerut Expressway (Section from Km. 0.

000 to UP Border ) including 8 laning of NH-24 in the state of


Delhi (Design Length 8.716 KM)

SCHEDULE-D
(See clause 2.1)
SPECIFICATIONS AND STANDARDS
1.

Project Highway
The concessionaire shall comply with specifications and standards of the Schedule D for the
construction of Project Highway

D-1

Development of Delhi-Meerut Expressway (Section from Km. 0.000 to UP Border ) including 8 laning of NH-24 in the state of
Delhi (Design Length 8.716 KM)

(Schedule-D)
Specifications and Standards for Highway
1

Manual of Specifications and Standards to Apply


Subject to the provisions of Paragraph 2, Development of the following of the Project Highway
shall conform to the Manual of Specifications and Standards as given below:
Stretch

Design Chainage
From
To

NH-24

0.000

8.716

(Delhi Meerut
Expressway)

0.000

8.716

Manual of Specifications and Standards to be


adopted
Manual of Specifications & Standards for Six Laning
of Highways through Public Private Partnership
(IRC:SP:87-2013)
Manual of Specifications & Standards for
Expressways (IRC:SP:99-2013)

2. Deviations from the Manuals Specified in Para-1 above for Respective Stretches of the
Project Highway
Notwithstanding anything to the contrary contained in the aforesaid Manual, the following
Specifications and Standards shall apply to the above stretches of the Project Highway, and for
purposes of this agreement, the aforesaid Manuals shall be deemed to be amended to the extent
set forth below:

D-2

Development of Delhi-Meerut Expressway (Section from Km. 0.000 to UP Border ) including 8 laning of NH-24 in the state of Delhi (Design Length 8.716 KM)

NH-24
S.
No

Clause
referred
in
Manual

Items

Provisions as
per Manual

Design Chainage

Deviation from the Manual with Remarks

S.no

2.4

Width
of
Carriageway

25.0m

km 0.000 - km 8.716

Chainage

Length
(m)

Start

End

0.000

529.300

529.300

1080.700 551.400

3
4
5
6
7
8
9

1080.700
1250.000
1600.000
1890.000
2210.000
2490.000
3060.000

1250.000
1600.000
1890.000
2210.000
2490.000
3060.000
3279.750

169.300
350.000
290.000
320.000
280.000
570.000
219.750

10

3279.750 3296.250

16.500

11
12
13
14
15
16
17
18
19
20
21

3296.250
3485.000
3808.000
3838.000
4155.000
4628.000
4785.000
4815.000
5089.000
5119.000
5330.000

188.750
323.000
30.000
317.000
473.000
157.000
30.000
274.000
30.000
211.000
460.000

3485.000
3808.000
3838.000
4155.000
4628.000
4785.000
4815.000
5089.000
5119.000
5330.000
5790.000

529.300

TCS

1
Major Bridge
GAD
1
2
3
Flyover GAD
3
16
4
Minor Bridge
GAD
4
3
VUP GAD
3
16
7
VUP GAD
7
VUP GAD
7
4

NH-24
Carriageway
Width (m)
Left

Right

14

14

Refer GAD
14
14
14
14
7+11 7+11
Refer GAD
7+11 7+11
14
14
14
14
Refer GAD
14
14
7+11 7+11
Refer GAD
7+11 7+11
14
14
7+11 7+11
Refer GAD
7+11 7+11
Refer GAD
7+11 7+11
14
14
D-3

Development of Delhi-Meerut Expressway (Section from Km. 0.000 to UP Border ) including 8 laning of NH-24 in the state of Delhi (Design Length 8.716 KM)

S.
No

Clause
referred
in
Manual

Items

Provisions as
per Manual

Design Chainage

Deviation from the Manual with Remarks


22
23
24
25
26
27
28
29
30
31
32
33
34

7.19

5790.000
6060.000
6090.000
6366.000
6700.000
6810.000
7125.000
7385.000
7760.000
7908.650
8191.350
8393.000
8423.000

6060.000
6090.000
6366.000
6700.000
6810.000
7125.000
7385.000
7760.000
7908.650
8191.350
8393.000
8423.000
8716.000

270.000
30.000
276.000
334.000
110.000
315.000
260.000
375.000
148.650
282.700
201.650
30.000
293.000

7
VUP GAD
7
4
3
Flyover GAD
3
4
3
Flyover GAD
7
VUP GAD
7

7+11 7+11
Refer GAD
7+11 7+11
14
14
7+11 7+11
Refer GAD
7+11 7+11
14
14
7+11 7+11
Refer GAD
7+11 7+11
Refer GAD
7+11 7+11

Width of
Structure
(Type of
superstructure)
2x13.4m
Grade
(overall width)
Separated
Independent
structure/Flyover
superstructure
for each
direction of
travel

Km 0.000

Overall width is 12.5m

Major Bridge

Width of
Structure
2x15.2m
(overall width)

Km 0.805

Overall width is 2x20.5 m (2x4-lane with 2m paved shoulder and 2.5 m


Cycle track on either side of existing bridge).

Minor Bridge

Width of
Structure
2x15.2m
(overall width)

7.3

Km 3.288

Overall width is 31(LHS)+21(RHS)m (Provide New 4-lane bridge with


Footpath and Cycle track).

D-4

Development of Delhi-Meerut Expressway (Section from Km. 0.000 to UP Border ) including 8 laning of NH-24 in the state of Delhi (Design Length 8.716 KM)

S.
No

Clause
referred
in
Manual

Items

Provisions as
per Manual

Design Chainage

Km 6.930

2.17

Typical CrossSections

Deviation from the Manual with Remarks

Overall width is 2x17.5m (Provide New bridge on either side of existing


bridge with Footpath and Cycle track).
i) Size & Location of Storm Water Drainage shall be as per the site
requirement and within ROW.
ii) Width of Covered drain shall be as per TCS

D-5

Development of Delhi-Meerut Expressway (Section from Km. 0.000 to UP Border ) including 8 laning of NH-24 in the state of Delhi (Design Length 8.716 KM)

DME
Sl No
1

Clause
2.2.1

Items

Provisions as per IRC:SP:99-2013

Design Speed

120KM/H
A clear zone width of 9-11 m for
design speed of 100 120 Km/hour
for the errant vehicle.crash
barrier should be part of the clear
zone distance

2.17

Clear Zone

6.3.
Figure
6.5(b)

Grade
Separated Width of Carriageway 2x17.5 m
structure/Flyover
(2x 3-lane)

Design Chainage
km 0.000 - km 8.716

Deviations from the Expressway


Guidelines with Remarks
100 KM/H (Built up Section)
No provision of clear zone width in
Km 0.000 to Km 8.716 crash barrier
to be provided at the end of the
paved shoulder

At
these
locations
existing
km- 2.050,km -7.000 structures are retained.
& km-8.047
Overall Carriageway - 2x10.5 m

D-6