CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm

1. Ap Ty Bridge - Cu pT
The segment piles are marked with form:
CAT:
Cu p T

CAT - H1 - 001

Combination 1: 11.8 + 9.4 + 9.7 = 30.9 m


H1
T1
M
001

Head (t u)
Tip (t cui)
Middle (t thn)
No.:
1

11.8
9.7
9.4

m
m
m
T1

Date

H1

Amount

Acc.
Req.56

4/27/2012

001-002

Total
To
(segment) Previous
56
2
56
0
56
2
Amount

Acc.
Req.56

5/3/2012

This
Period
0
3
0

To
date
2
3
2

H2

Amount

Combination 2: H2 + M + 11.4 = .m

Acc.
Req.56

H2
T2
M

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.56

Total
(segment)
56
56
56

To
Previous
0
0
0

On date

11.4

m
m
m

Amount

Acc.
Req.112

001-002

This
Period
0
0
0

Total
Accumulate

23.6

23.6

18.8

42.4

15/05/2012

001-002

19.4

61.8

17/05/2012

003

9.7

71.5

To
date
0
0
0
Remark
IPC No.02
42.4m

IPC No.03
29.1m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm

2. Muoi Kieu Bridge - Cu Mi Kiu


The segment piles are marked with form:
CMK:
Cu Mi Kiu

CMK - H1 - 001

Combination 1: 11.8 + 8.4 + 9.7 = 29.9 m


H1
T1
M
001

Head (t u)
Tip (t cui)
Middle (t thn)
No.:
1

11.8
9.7
8.4

m
m
m
T1

Date

H1

Amount

Acc.
Req.36

4/27/2012

001-002

15/05/2012

001

Total
To
(segment) Previous
36
34
36
1
36
2
Amount

Acc.
Req.36

This
Period
2
6
0

To
date
36
7
2

H2

Amount

A:
Chuyn 22 t
11.8 t Kenh 2
sang

Acc.
Req.34

M1+2

Amount

Acc.
Req.68

Combination 2: H2 + M + 11.4 = 27.0m


A:
H2
Head (t u)
10.1
m
Chuyn 2 t
T2
Tip (t cui)11.4 t Kenh
11.42
m
M1+2 Middle (t thn)
sang
5.5
m

Total
(segment)
34
34
34

To
Previous
0
6
0

Acc.
Req.34

Acc.
Req.2

On date

T2

Amount

001-002

Amount

This
Period
7
0
0

Total
Accumulate

23.6

IPC No.02
23.6 m

26.5

50.1

IPC No.03
26.5 m

003-016

14

16

165.2

215.3

05/07/2012

017-019

19

001-005

92.4

307.7

06/07/2012

020-023

23

006

58.6

366.3

07/07/2012

024-028

28

59

425.3

08/07/2012

029-030

30

23.6

448.9

12/07/2012

031-034

34

47.2

496.1

18/07/2012

035

35

11.8

507.9

01/09/2012

036

36

11.8

519.7

128.9

648.6

245

893.6

1002.2

1895.8

29

36

001-007

22

29

34

68

68

26

34

IPC No.04
446m

IPC No.05
0m

002-007

Remark

23.6

04/07/2012

19/11/2012

To
date
7
6
0

IPC No.06
23.6 m
IPC No.08
128.9 m

1890

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm

3. Kenh 25 Bridge - Cu Knh 25


The segment piles are marked with form:
CK25:
Cu Knh 25
Supporting slab S1: L=26.0m
C 1: 11.8+10.1+6.3+9.7=37.9 m (Test pile)
: 11.8+4.5+9.7 =26.0 m (Mass pile)
H1
T1
M1
M2
M3

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Middle (t thn)

11.8
9.7
10.1
6.3
4.5

Total
(segment)
m
m
m
m
m

To
Previous
19
2
2
2
0

This
Period
0
17
0
0
0

To
date
19
19
2
2
0

Total
To
(segment) Previous
17
2
17
16

This
Period
15
1

To
date
17
17

H2

Amount

19
19
2
2
17

Total
(segment)

Combination 2: 10.1+4.5+11.4=26.0 m
H2
T2
M3

Head (t u)
Tip (t cui)
Middle (t thn)

m
m
m

17
17
17

To
Previous
0
17
0

11.0
12.0

m
m

Total
(segment)
17
17

To
Previous
0
0

This
Period
0
0

To
date
0
0

M1

Amount

Acc.
Req.2

M2

Amount

Acc.
Req.2

001-002

2
001-002

10.1
11.4
4.5

This
Period
17
0
0

To
date
17
17
0

Supporting slab S2: L=23.0m


Combination 1: 11.6+11.4=23.0m
H4
T2

Date
4/23/2012
4/25/2012
5/3/2012
10/05/2012
11/05/2012
01/06/2012
6/5/2012
6/12/2012
6/13/2012
6/14/2012
6/15/2012
6/16/2012
6/17/2012

Head (t u)
Tip (t cui)

11.6
11.4

m
m

T1

Amount

001

Acc.
Req.19
1

002

H1

Amount

Acc.
Req.19

001-002

003-008
009-016
017-019

6
8
3

Combination 2: 12.0+11.0=23.0m

Acc.
Req.17

M3

Amount

Acc.
Req.34

8
16
19

19/06/2012

H3
T3

Head (t u)
Tip (t cui)

T2

Amount

001-008
009-012
013-018
019-023
024-029
030-031
032-033

8
4
6
5
6
2
2

034

Acc.
Req.34

H4

Amount

Acc.
Req.17

8
12
18
23
29
31
33
33

001-002

34

003-014

12

14

150.6

826.4

015-017

17

34.8

861.2

H3

Amount

Acc.
Req.17

21/06/2012

20/07/2012
24/07/2012
25/07/2012
26/07/2012
27/07/2012
28/07/2012
30/07/2012
31/07/2012
03/08/2012
13/08/2012
14/08/2012
15/08/2012
16/08/2012
01/09/2012

003-005
006

3
1

007-011

5
6
6
11

012
013

1
1

12
13

014-019

19

001
002-008
009-016
017

1
7
8
1

1
8
16
17

001-013
014-023
024-025

13
10
2

026-033
034

8
1

13
23
25
25
25
25
33
34
001-005
006-010
011-015
016-017

5
5
5
2

5
10
15
17

Total
Remark
On date Accumulate
9.7
9.7
23.6
33.3
IPC No.02
9.7
43.0
43 m
20.2
63.2
12.6
75.8
91.2
167.0
45.6
212.6
68.4
281.0
IPC No.03
633.2 m
57
338.0
68.4
406.4
93.6
500.0
117.2
617.2
58.6
675.8

0
58.5
45
19.1
70.7
80.8
39.2
45.7
4.5
48.5
115
124.7
124.7
46
58.2

IPC No.04
185,4m
IPC No.05
0m

919.7
964.7
983.8
1054.5
1135.3
1174.5
1220.2
1224.7
1273.2
1388.2
1512.9
1637.6
1683.6
1741.8

IPC No.06
884.0m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


4. Kenh 6 Bridge - Cu Knh 6
The segment piles are marked with form:
CK6:
Cu Knh 6

CK6- H1 - 001

Combination 1: 11.8 + 8.9 + 9.7 = 30.4 m (Test pile)


11.8+6.0+9.7 = 27.5 m (Mass pile)
H1
Head (t u)
11.8
m
T1
Tip (t cui)
9.7
m
M
Middle (t thn)
8.9
m
M2
Middle (t thn)
6.0
m
001
No.:
1
Acc.
Date
H1
Amount
T1
Req.36

4/25/2012

001-002

Total
To
(segment) Previous
36
36
36
5
2
2
34
0
Amount

Acc.
Req.36

This
Period
0
31
0
34

To
date
36
36
2
34

H2

Amount

Combination 2: 10.1+6.0 + 11.4 = 27.5 m

Acc.
Req.34

M2

Amount

Acc.
Req.68

H2
T2
M2

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.34

10.1
11.4
6.0

m
m
m

Amount

Total
(segment)
34
34
34

To
Previous
0
34
28

Acc.
Req.2

On date

13/05/2012

001-002

15/05/2012

001-002
001-003

This
Period
34
0
6

Total
Accumulate

23.6

23.6

19.4

43.0

17.8

60.8

152.2

213.0

106.2

319.2

20/06/2012

003-012

10

12

21/06/2012

013-021

21

22/06/2012

022-024

24

004

46.8

366.0

26/06/2012

025-027

27

005-012

12

126.6

492.6

27/06/2012

028

28

013-021

21

114.4

607.0

02/07/2012

029-035

35

022-023

23

105.4

712.4

03/07/2012

036

36

024-034

11

34

137.2

849.6

001-011

11

11

66.0

915.6

31/08/2012

003

012-026

15

26

99.7

1015.3

01/09/2012

004-005

027-034

34

67.4

1082.7

12/09/2012

035-042

42

48.0

1130.7

15/09/2012

043-052

10

52

60.0

1190.7

053-062

10

62

60.0

1250.7

29.1

1279.8

23/09/2012
01/11/2012

006-008

05/11/2012

009-019

11

19

001-007

177.4

1457.2

09/11/2012

020-030

11

30

008-028

21

28

318.8

1776.0

15/11/2012

031-036

36

029-034

34

118.8

1894.8

36.0

1930.8

21/11/2012

063-068

68

Remark
IPC No.02
23.6m
IPC No.03
37.2m

IPC No.04
788.8 m

IPC No.05
0m

0.0
30/08/2012

To
date
34
34
34

IPC No.06
233.1 m

IPC No.07
168.0 m

IPC No.08
680.1 m

11.088

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


5. Kenh 5 Bridge - Cu Knh 5
The segment piles are marked with form:
CK5:
Cu Knh 5

CK5 - H1 - 001

Combination 1: 11.8+10.9+9.7 = 32.4m(Test pile)


11.8+6.9+10.8 = 29.5 m (Mass pile)
H1
T1
M
M2
T3
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1

Total
(segment)

11.8
9.7
10.9
6.9
10.8

m
m
m
m
m

36
2
2
34
34

T1

Amount

Date

H1

Amount

Acc.
Req.36

17/04/2012

001-002

To
Previous
19
2
2
32
17

This
Period
17
0
0
2
17

To
date
36
2
2
34
34

Acc.
Req.2

H2

Amount

Acc.
Req.34

M2

Amount

Acc.
Req.68

H2
T2
M2

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.34

10/05/2012

11.2
11.4
6.9

m
m
m

34
34
34

Amount

Acc.
Req.2

001-002

16/05/2012

001-002

Total
(segment)

Combination 2: 11.2+6.9+11.4 = 29.5 m

To
Previous
14
20
0

This
Period
20
14
34

To
date
34
34
34

T3

Amount

Acc.
Req.34

Total
Remark
On date Accumulate

23.6

23.6

21.8

45.4

19.4

64.8

IPC
No.02
23.6m
IPC
No.03
37.2m

IPC
No.04
0m
IPC
No.05
0m
24/08//2012

003-012

10

12

27/08/2012

013-019

19

29/08/2012

001-004

005-008

30/08/2012

001-006

007-015

15

17/09/2012
21/09/2012

009

22/09/2012

010-014

14

001-010

10

10
016-020

20

118.0

182.8

127.4

310.2

113.2

423.4

102.6

526.0

001-012

12

12

129.6

655.6

013-016

16

123.4

779

017

17

123.8

902.8

26/09/2012

011-028

18

28

124.2

1027

02/10/2012

029-032

32

27.6

1054.6

IPC
No.06
461.2 m

IPC
No.07
528.6 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


07/10/2012

033

33

6.9

1061.5

19/10/2012

034

34

6.9

1068.4

22.4

1090.8

21/10/2012
25/10/2012
26/10/2012

020-025

25

27/10/2012

026-034

34

28/10/2012

035-036

36

015-016

16

017

17

30/10/2012

11.2

1102

70.8

1172.8

106.2

1279

114.8

1393.8

33

57

1450.8

34

89.8

1540.6

021-028

28

029-033

034

31/10/2012

018-024

24

04/11/2012

025-028

28

018-019

19

66.4

1607

05/11/2012

029

29

020-023

23

54.4

1661.4

10/11/2012

024-029

29

64.8

1726.2

15/11/2012

030-031

31

21.6

1747.8

032-034

34

18/11/2012

32.4

1780.2

37

20.7

1800.9

038-040

40

20.7

1821.6

041-052

12

52

82.8

1904.4

053-058

58

41.4

1945.8

059-066

66

111.2

2057

067-068

68

13.8

2070.8

19/11/2012

035-037

20/11/2012
21/11/2012
26/11/2012
27/11/2012
30/11/2012

030-034

34

IPC
No.08
1016.2 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


6. Kenh 4 Bridge - Cu Knh 4
The segment piles are marked with form:
CK4:
Cu Knh 4

CK4 - H1 - 001

Combination 1: 11.8+10.9+9.7 = 32.4 m(Test pile)


: 11.8+8.0+9.7 = 29.5 m (Mass pile)
H1
T1
M1
M2
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1

Total
(segment)

11.8
9.7
10.9
8.0

m
m
m
m

36
36
2
34

T1

Amount

Date

H1

Amount

Acc.
Req.36

4/18/2012

001

To
Previous
36
24
2
0

This
Period
0
12
0
34

To
date
36
36
2
34

Acc.
Req.36

H2

Amount

Acc.
Req.34

H2
T2
M2

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.34

4/21/2014
5/2/2012

002

Total
(segment)

Combination 2: 10.1+8.0+11.4 = 29.5 m

To
Previous
33
21
26

This
Period
1
13
8

To
date
34
34
34

M2

Amount

Acc.
Req.68

10.1
11.4
8.0

m
m
m

34
34
34

M1

Amount

Acc.
Req.2

001

22.7

22.7

002

10.9

33.6

11.8

45.4

19.4

64.8
134.8

17/05/2012

001-002

Total
On date Accumulate

25/06/2012

003-006

001-002

70

26/06/2012

007-011

11

003-005

93.2

228

27/06/2012

012-016

16

006-008

93.2

321.2

28/06/2012

017-018

18

009-013

13

80.6

401.8

29/06/2012

019

19

014-017

17

57.4

459.2

10/07/2012

001-007

70.7

529.9

11/07/2012

008-013

13

60.6

590.5

014-017

17

59.8

650.3

12/07/2012

003-004

Remark

IPC No.02
45.4 m

IPC No.03
19.4 m

IPC No.04
585.5 m

IPC No.05
0m
13/07/2012

005-010

10

58.2

708.5

15/07/2012

011

11

9.7

718.2

16/07/2012

012-015

15

38.8

757.0

8.0

726.2

18/07/2012

001

IPC No.06
663.7 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


21/07/2012

016-019

002-005

70.8

797.0

23/07/2012

19

006-007

16.0

813.0

27/07/2012

008-012

12

40.0

853.0

28/07/2012

013-019

19

56.0

909.0

30/07/2012

020-023

23

32.0

941.0

01/08/2012

024-028

28

40.0

981.0

03/08/2012

029-030

30

16.0

997.0

04/08/2012

031-033

33

24.0

1021.0

034

34

05/08/2012

8.0

1029.0

19/08/2012

020

20

11.8

1040.8

20/08/2012

021-022

22

23.6

1064.4

21/08/2012

023-024

24

23.6

1088.0

25/08/2012

025-028

28

47.2

1135.2

27/08/2012

029-032

32

018

18

58.6

1193.8

29/08/2012

033-036

36

019-021

21

81.4

1275.2

08/09/2012

022-030

30

102.6

1377.8

09/09/2012

031-032

32

22.8

1400.6

10/09/2012

033-034

34

22.8

1423.4

20/09/2012

018-020

20

30.3

1453.7

22/09/2012

021-026

26

60.6

1514.3

29/09/2012

027-028

28

20.2

1534.5

02/10/2012

029-033

33

50.5

1585.0

64.5

1649.5

04/10/2012

020-024

24

035-036

08/10/2012

025-034

10

34

97.0

1746.5

12/10/2012

035-036

36

19.4

1765.9

13/10/2012
19/10/2012
12/01/2013

034

34

36

037-050

14

50

112.0

1877.9

051-060

10

60

90.1

1968.0

061-068

68

64.0

2032.0

IPC No.06
663.7 m

IPC No.07
374.3 m

IPC No.08
318.5 m

IPC No.09
64.0 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


7. Kenh 3 Bridge - Cu Knh 3
The segment piles are marked with form:
CK3:
Cu Knh 3

CK3 - H1 - 001

Combination 1: 11.8+10.9+9.7 = 32.4 m(Test pile)


11.8+7.5+9.7 = 29.0m (Mass pile)
H1
Head (t u)
11.8
m
T1
Tip (t cui)
9.7
m
M
Middle (t thn)
10.9
m
M2
Middle (t thn)
7.5
m
001

No.:

Date

H1

Amount

Acc.
Req.36

4/18/2012

001-002

4/24/2014

T1

Total
To
(segment) Previous
36
20
36
24
2
2
34
12

Amount

Acc.
Req.36

001

002

This
Period
2
12
0
22

To
date
22
36
2
34

H2

Amount

Combination 2: 10.1+7.5+11.4 =29.0 m

Acc.
Req.34

M2

Amount

Acc.
Req.68

H2
T2
M2

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.34

10/05/2012
13/05/2012

10.1
11.4
7.5

m
m
m

Amount

Total
(segment)
34
34
34

To
Previous
31
7
26

Acc.
Req.2

On date

This
Period
3
9
8

Total
Accumulate

23.6

23.6

9.7

33.3

001

10.9

44.2

002

20.6

64.8

To
date
34
16
34

Remark

IPC No.02
33.3 m
IPC No.03
31.5 m
IPC No.04
0m
IPC No.05
0m

27/07/2012
28/07/2012

003-006

03/08/2012

007-016

10

16

001-011

11

11

111.1

175.9

012-014

14

69.1

245

97

342

24/08/2012

015-017

17

30.3

372.3

25/08/2012

018

18

10.1

382.4

26/08/2012

019

19

10.1

392.5

020-021

21

20.2

412.7

129

541.7

45

586.7

131

717.7

120.9

838.6

27/08/2012
30/08/2012

003-011

11

001-002

31/08/2012
01/09/2012
05/09/2012

012-016

16
022-030

30

001-006

007-008

009-012

12

003-007

IPC No.06
773.8 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


09/09/2012

017-020

20

031

31

09/09/2012
10/09/2012
11/09/2012

021-024
017-020

24

013-017

17

018-029

12

29

030-037

37

20

008-010

011-016

10

16

86.4

925

124.2

1049.2

THD
K3

98.8

1148

THD

115.6

1263.6

IPC No.07
597.5 m

K3

12/09/2012

038-044

44

52.5

1316.1

K3

15/09/2012

045-048

48

30

1346.1

THD

049-060

12

60

20/09/2012
07/10/2012

025-027

27

08/10/2012
11/10/2012
01/11/2012

032-034

34
061-068

021-022

22
028-036

36

68

90

1436.1

59.4

1495.5

60

1555.5

23.6

1579.1

87.3

1666.4

K3
IPC
No.08
230.3m

TH
K 16

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 300x300mm


8. Kenh 2 Bridge - Cu Knh 2
The segment piles are marked with form:
CK2:
Cu Knh 2

CK2 - H1 - 001

Combination 1: 11.8+10.1+4.8+9.7 = 36.4 m


H1
T1
M1
M2
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date

H1

Amount

4/17/2012
4/18/2012
4/24/2012
11/05/2012
13/05/2012
16/05/2012
17/05/2012
6/8/2012
6/9/2012
6/10/2012
6/11/2012
6/12/2012
6/15/2012
6/16/2012
6/17/2012
6/18/2012

001
002

1
1

11.8
9.7
10.1
4.8
Acc.
Req.36
1
2
2

003-007

008-011

11

012-016
017-021
022-026
027

5
5
5
1

16
21
26
27

m
m
m
m

Total
To
(segment) Previous
36
27
36
2
36
4
36
2

T1

Amount

Acc.
Req.36

001-002

28/06/2012
08/07/2012

028-036

36

11.8
10.1

22 dot

259.6

19.4

This
Period
9
0
0
0

To
date
36
2
4
2

H2

Amount

Combination 2: H2+M1+M2+11.4 = . m

Acc.
Req.35

H2
T2
M1
M2

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)

T2

Amount

Acc.
Req.35

001
002-003
004-008
009-011
012-015

1
2
5
3
4

1
3
8
11
15

016-021
022-027
028-032

6
6
5

21
27
32

033-034

34

11.4

m
m
m
m

Total
(segment)
34
34
34
34

To
Previous
0
32
0
0

This
Period
0
2
0
0

To
date
0
34
0
0

M2

Amount

Acc.
Req.70

001-002

M1

Amount

Acc.
Req.70

001-002
003
004

2
1
1

2
3
4

40.4

9.6

Total
Remark
On date Accumulate
11.8
11.8
IPC No.02
11.8
23.6
43 m
19.4
43
20.2
63.2
10.1
73.3
10.1
83.4
9.6
93
11.4
104.4
81.8
186.2
IPC No.02
57
243.2
709.8 m
81.4
324.6
45.6
370.2
59
429.2
127.4
556.6
127.4
684
68.8
752.8
22.8

775.6

106.2

881.8

IPC No.04
129 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


1. Ap Ty Bridge - Cu pT
The segment piles are marked with form:
CAT:
Cu p T

CAT - H1 - 001
Total
To
(segment) Previous
30
2
30
2
29
3
2
2

Combination 1: 11.8+11.8+4.2+11.2 = 39 m
H1
T1
M1
M2
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date

H1

Amount

11.8
11.2
11.8
4.2
Acc.
Req.30

5/2/2012
15/05/2012

m
m
m
m
T1
001

001-002

Amount
1

Acc.
Req.30

To
date
23
30
20
2

H2

Amount

H2
T2
M1
M2
Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Amount

Acc.
Req.28

m
m
m
m
M1

001-002
002

Total
To
(segment) Previous
28
0
28
0
28
0
28
0

Combination 2: H2+M1+M2+T2=.m

Amount

Acc.
Req.58

M2

This
Period
0
0
0
0

To
date
0
0
0
0

Amount

Acc.
Req.28

17/05/2012

This
Period
21
28
17
0

20/05/2012

001-002

Total
On date Accumulate
11.2

11.2

47.2

58.4

11.2

69.6

8.4

78

Remark
IPC No.02
11.2m

IPC No.03
66.8 m

IPC No.04
0m
IPC No.05
0m

04/08/2012

003

05/11/2012

003-004

15/11/2012

003-012

10

12

19/11/2012

013-020

20

005-024

20

24

11.8

89.8

22.4

112.2

118

230.2

318.4

548.6

IPC No.06
11.8 m

IPC No.08
762,00 m
21/11/2012

30/11/2012

021-023

23

025-029

29

91.4

640

030

30

11.2

651.2

01/12/2012

004-017

14

17

165.2

816.4

02/12/2012

018-020

20

35.4

851.8

09/12/2012

021-023

23

35.4

887.2

IPC No.09
82,60 m

MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

KUNHWA ENGINEERING &


CONSULTING CO., LTD

SSANGYONG ENGINEERING &


CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


15/01/2012

024-027

27

IPC No.09
82,60 m
47.2

934.4

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


2. Muoi Kieu Bridge - Cu Mi Kiu
The segment piles are marked with form:
CMK:
Cu Mi Kiu

CMK - H1 - 001
Total
To
(segment) Previous
30
4
30
2
30
0
30
2

Combination 1: 11.8+11.8+5.7+11.2=40.5m
H1
T1
M1
M2
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date

H1

Amount

11.8
11.2
11.8
5.7
Acc.
Req.30

5/2/2012

m
m
m
m
T1

Amount

Acc.
Req.30

001-002

This
Period
0
19
4
0

To
date
4
21
4
2

H2

Amount

Total
To
(segment) Previous
28
0
28
0
28
0
28
0

Combination 2: H2+M1+M2+T2=.m
H2
T2
M1
M3
Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Amount

Acc.
Req.28

11 m
12.7 m
m
12.5 m
M1

Amount

Acc.
Req.30

M2

This
Period
0
0
0
0

To
date
0
0
0
0

Amount

Acc.
Req.28

M3

Amount

Acc.
Req.28

Total
On date Accumulate
22.4

22.4

15/05/2012

001

11.8

34.2

16/05/2012

002-004

35.4

69.6

11.4

81

20/05/2012

001-002

26/11/2012

003-014

12

14

134.4

215.4

27/11/2012

015-021

21

78.4

293.8

06/12/2012

001

11.8

305.6

07/12/2012

002-004

35.4

341

09/12/2012

005-007

23

30

26

30

30

28

28

28

28

35.4

28

28

1692.6

Remark
IPC No.02
22.4 m

IPC No.03
58.6 m

IPC No.08
260.0 m

376.4 IPC No.09


35,40 m

2069

MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM

SSANGYONG ENGINEERING &


CONSTRUCTION CO.,LTD

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


3. Kenh 25 Bridge - Cu Knh 25
The segment piles are marked with form:
CK25:
Cu Knh 25

CK25 - H1 - 001

C. 1: 11.8+11.8+9.7+11.2 = 44.5 m (Test pile)


: 11.8+11.8+14.4 = 38.0 m (Mass pile)
H1
Head (t u)
11.8 m
T1(Test pile)
Tip (t cui)
11.2 m
M1
Middle (t thn)
11.8 m
M2
Middle (t thn)
9.7 m
T2 (Mass pile) Tip (t cui)
14.4 m
001
No.:
1
Acc.
Date
H1
Amount
T1
Req.30
4/23/2012
4/26/2012
001-002
2
2
001
2/5/2012
002

Total
To
(segment) Previous
30
30
2
2
30
30
2
2
28
22
Amount

Acc.
Req.30

1
1

1
2

09/05/2012
19/06/2012
20/06/2012

003-006
003-007

21/06/2012

007-011

11

This
Period
0
0
0
0
6

To
date
30
2
30
2
28

H2

Amount

Total
To
(segment) Previous
28
10
28
25
28
18

Combination 2: 13.4+13.4+11.2 = 38.0 m


H2
T1
M3

Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)

Amount

Acc.
Req.28

13.4 m
11.2 m
13.4 m

M1

Amount

001-002

Acc.
Req.30
2

This
Period
18
3
10

To
date
28
28
28

M2

Amount

Acc.
Req.2

001-002

M3

Amount

Acc.
Req.28

Total
Remark
On date Accumulate
23.6
23.6
IPC No.02
34.8
58.4
69.6 m
11.2
69.6

19.4

89

44.8

133.8

59

192.8

56

248.8

22/06/2012

008-012

12

59

307.8

24/06/2012

013-017

17

59

366.8

25/06/2012

012-016

16

56

422.8

28/06/2012

017-020

20

44.8

467.6

29/06/2012

021-024

24

44.8

512.4

025-027

27

45.4

557.8

27

59

616.8

07/07/2012

018

18

7/12/2012

019-023

23

IPC No.03
19.4 m

IPC No.04
527.8 m

IPC No.05
0m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


13/07/2012

024-028

28

15/07/2012

029-030

30

028-030

30

92.6

709.4

23.6

733

26/07/2012

003-004

23.6

756.6

27/07/2012

005-008

47.2

803.8

28/07/2012

009-013

13

59

862.8

01/08/2012

014-016

16

35.4

898.2

03/08/2012

017-024

24

94.4

992.6

05/08/2012

025-028

28

47.2

1039.8

07/08/2012

029-030

30

23.6

1063.4

53.6

1117

67

1184

17/08/2012

001-004

18/08/2012

001-005

19/08/2012

006-010

10

67

1251

122.6

1373.6

13

70

1443.6

18

124.6

1568.2

12

43.2

1611.4

14

28.8

1640.2

15

14.4

1654.6

016-018

18

43.2

1697.8

019-021

21

43.2

1741.0

21/08/2012

001-002

005-011

11

22/08/2012

003-005

012-013

24/08/2012

006-009

014-018

25/08/2012

010-012

26/08/2012

013-014

29/08/2012

015

08/09/2012
09/09/2012
10/09/2012

011-013

13

11/09/2012

014-017

17

12/09/2012

018-020

20

15/09/2012

021-025

25

23/09/2012

026-028

28

022

22

019

19

53.6

1794.6

020-022

22

108.2

1902.8

023-026

26

93.8

1996.6

28

93.8

2090.4

40.2

2130.6

027-028

23/10/2012

023-024

24

28.8

2159.4

01/11/2012

025-028

28

57.6

2217.0

IPC No.06
1037.8 m

IPC No.07
476.0 m

IPC No.08
86.4 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


4. Kenh 6 Bridge - Cu Knh 6
The segment piles are marked with form:
CK6:
Cu Knh 6

CK6- H1 - 001

Combination 1: 11.8+11.8+3.7+11.2 = 38.5 m


11.8+7.0+12.7 = 31.5 m
H1
Head (t u)
11.8 m
T1
Tip (t cui)
11.2 m
M1
Middle (t thn)
10.8 m
M2
Middle (t thn)
3.7 m
001
No.:
1
Acc.
Date
H1
Amount
T1
Req.30
5/3/2012

001-002

Total
To
(segment) Previous
30
27
30
15
30
2
2
2
Amount

Acc.
Req.30

This
Period
3
15
28
0

To
date
30
30
30
2

H2

Amount

Combination 2: H2+M1+M2+T2=.m
9.5+10.8+11.2 = 31.5 m
H2
Head (t u)
9.5 m
T2
Tip (t cui)
12.7 m
M3
Middle (t thn)
7m

Acc.
Req.28

T2

Amount

Acc.
Req.28

17/05/2012

001-002

Total
To
(segment) Previous
28
0
28
0
28
0

M1

Amount

Acc.
Req.30

001-002

M2

This
Period
28
28
28

To
date
28
28
28

Amount

Acc.
Req.02

M3

Amount

Acc.
Req.28

Total
On date Accumulate

19/05/2012

001-002

45.2

45.2

22.4

67.6

7.4

75

26/06/2012

003-005

35.4

110.4

06/07/2012

006-010

10

59

169.4

Remark
IPC No.02
47.2 m
IPC No.03
29.8 m

IPC No.04
94.4 m
IPC No.05
0m

14/07/2012

003-009

78.4

247.8

15/07/2012

011-013

13

35.4

283.2

26/07/2012

014-016

16

35.4

318.6

31/07/2012

017-021

21

59

377.6

01/08/2012

022-025

25

80.8

458.4

12/08/2012

026-027

27

23.6

482

33.6

515.6

15/08/2012

010-012

013-015

12

15

IPC No.06
346.2 m

IPC No.07
18/10/2012

016-029

14

29

156.8

672.4

23/10/2012

030

30

11.2

683.6

3 186.5

870.1

27/10/2012

028-030

30

001-003

004-014

11

14

01/11/2012
05/11/2012
21/11/2012

001-008

009-015

15

001-003
004
005-014
003-006

3
1
10

95.9

966.00

14 174.5

1140.50

43.2

1183.70

IPC No.08
1351,40 m

MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

IPC No.08
1351,40 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


26/11/2012
27/11/2012

015-027

13

27

28/11/2012

028

28

30/11/2012

007-019

13

19

020

20

015-025

11

026-028

016-024

24

021-022

22

025-028

28

023-030

30

140.4

1324.10

211.3

1535.40

28 166.4

1701.80

137.2

1839.00

25

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


5. Kenh 5 Bridge - Cu Knh 5
The segment piles are marked with form:
CK5:
Cu Knh 5

CK5 - H1 - 001

Combination 1: 11.8+11.8+11.2 = 34.8 m

Total
(segment)

H1
T1
M1
M2
T3
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
Date

H1

Amount

11.8
11.2
11.8
6.0
13.7
Acc.
Req.30

5/3/2012

m
m
m
m
m

30
2
2
28
28

To
Previous
12
2
2
0
0

This
Period
18
0
0
28
28

To
date
30
2
2
28
28

H2

Amount

M1

Amount

Acc.
Req.2

001

Total
(segment)

Combination 2: H2+M+T2 = .m
H2
T2
M

Acc.
Req.28

Head (t u)
Tip (t cui)
Middle (t thn)

T2

Amount

Acc.
Req.28

9.5 m
11.2 m
10.8 m

Amount

28
28
28

Acc.
Req.30

To
Previous
0
0
0

This
Period
28
28
28

To
date
28
28
28

M2

Amount

Acc.
Req.28

T3

Amount

Acc.
Req.28

Total
On date Accumulate

11.2

23.6

08/05/2012

001-002

23.6

47.2

09/05/2012

003

11.8

59

22.4

81.4

17/05/2012

001-002

02/10/2012

004-006

04/10/2012

007-012

12

002

Remark
IPC No.02
11.8 m

IPC No.03
57.8 m

IPC No.04
0m

IPC No.05
0m

IPC No.06
0m

46.6

128

70.8

198.8

IPC No.07
118.0 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


07/10/2012

013-015

15

001-002

57

255.8

11/10/2012

016-017

17

003-005

56

311.8

006-010

10

54

365.8

011-013

13

13/10/2012
15/10/2012

003-009

001-006

193

558.8

16/10/2012

010-011

11

007-009

63.5

622.3

19/10/2012

012-015

15

010

10

58.5

680.8

016

16

011-014

14

21/10/2012

001-004

001-004

128

808.8

22/10/2012

005-009

005-009

77.5

886.3

25/10/2012

010-014

14

010-013

13

71.5

957.8

23.6

981.4

014

14

987.4

35.4

1022.8

26/10/2012

018-019

19

27/10/2012
30/10/2012

020-022

22

31/10/2012

023-027

27

014-015

15

80.6

1103.4

04/11/2012

028-029

29

016

16

34.4

1137.8

05/11/2012

017-019

19

09/11/2012

020-024

24

015

15

32.4

1170.2

60

1230.2

10/11/2012

015-016

16

27.4

1257.6

14/11/2012

017-021

21

68.5

1326.1

15/11/2012

022-025

25

54.8

1380.9

51.7

1432.6

18/11/2012

015-017

17

19/11/2012

018

18

20/11/2012

019

21/11/2012

020-022

24/11/2012
26/11/2012
30/11/2012

030

30

017

17

19

018-026

26

22

027-030

30

023-024

24

025-028

28

025-027

028

27

28

016-017

17

018

18

026-028

28

56.6

1489.2

110.3

1599.5

019-021

21

91.3

1690.8

022-024

24

69.4

1760.2

025-026

26

50

1810.2

027-028

28

34.6

1844.8

IPC No.08
1646,00 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


6. Kenh 4 Bridge - Cu Knh 4
The segment piles are marked with form:
CK4:
Cu Knh 4

CK4 - H1 - 001

C.1: 11.8+11.8+9.7+11.2 = 44.5 m (Test pile)


Total
To
: 11.8+6.0+14.7 = 32.5 m (Mass pile)
(segment) Previous
H1
Head (t u)
11.8 m
30
30
T1(Test pile)
Tip (t cui)
11.2 m
2
2
M3
Middle (t thn)
6m
28
28
M2
Middle (t thn)
9.7 m
2
2
T2
Tip (t cui)
14.7 m
28
28
001
No.:
1
Acc.
Acc.
Date
H1
Amount
T1
Amount
Req.30
Req.30
08/05/2012
001-002
2
2
09/05/2012
18/05/2012
001-002
2
2
19/05/2012
20/05/2012
02/07/2012
003-006
4
6
06/07/2012
007-011
5
11
07/07/2012
003-006
4
6
11
11/07/2012
007-015
9
15
012-015
4
15

This
Period
0
0
0
0
0

To
date
30
2
28
2
28

H2

Amount

Total
To
(segment) Previous
28
28
28
28
30
25

Combination 2: 9.5+11.8+11.2=32.5 m
H2
T1
M1

Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)

Amount

Acc.
Req.28

9.5 m
11.2 m
11.8 m

M3

Amount

Acc.
Req.28

M2

001
002

This
Period
0
0
5

To
date
28
28
30

Amount

Acc.
Req.2

1
1

M1

Amount

Acc.
Req.30

001-002

1
2

Total
Remark
On date Accumulate
23.60
23.6
47.20
23.6
IPC No.03
69.60
22.4
89 m
79.30
9.7
89.00
9.7
44.8
133.80
56
189.80
IPC No.04
299 m
47.2
237.00
151
388.00
IPC No.05
0m

0
15/07/2012

001-004

58.8

446.80

16/07/2012

005-007

18/07/2012

008-011

44.1

490.90

11

58.8

549.70

20/07/2012
22/07/2012

012-013

13

014-015

15

29.4

579.10

001

35.4

614.50

23/07/2012

002-003

12

626.50

24/07/2012

004-009

36

662.50

25/07/2012

010-013

13

24

686.50

26/04/2012

016

16

014

14

17.8

704.30

27/06/2012

017

17

015

15

30/07/2012

003

17.8

722.10

11.8

733.90

31/07/2012

004-005

23.6

757.50

01/08/2012

006-007

23.6

781.10

03/08/2012

008-009

23.6

804.70

04/08/2012

010-012

12

35.4

840.10

IPC No.06
915.9 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

IPC No.06
915.9 m

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


05/08/2012

013-015

35.4

875.50

38

913.50

10

57

970.50

13

28.5

999.00

35.4

1034.40

70.8

1105.20

06/08/2012

001-004

08/08/2012

005-010

10/08/2012

011-013

15

16/08/2012

018-020

20

18/08/2012

021-026

26

29

016-017

17

47.4

1152.60

30

018-020

20

29.8

1182.40

21/08/2012

021-024

24

24

1206.40

24/08/2012

025-027

27

18

1224.40

28

28

20.7

1245.10

19/08/2012
20/08/2012

027-029
030

25/08/2012

016

16

27/08/2012

017-018

18

29.4

1274.50

29/08/2012

019-020

20

29.4

1303.9

08/09/2012

014-015

15

021-024

24

77.8

1381.7

09/09/2012

016-017

17

025-026

26

48.4

1430.1

027-028

28

48.4

1478.5

65.5

1544

62.1

1606.1

53.2

1659.3

10/09/2012

018-019

19

12/09/2012

016-020

20

020

20

17/09/2012

021-023

23

021-023

23

18/09/2012

024-025

25

024-025

25

016

16

20/09/2012

026

26

026-027

27

017

17

42

1701.3

22/09/2012

027

27

028

28

018

18

32.5

1733.8

29/09/2012

028-030

30

019-020

20

57.2

1791

02/10/2012

012-023

23

35.4

1826.4

04/10/2012

024-025

25

23.6

1850

08/10/2012

026

26

11.8

1861.8

12/10/2012

027-030

30

47.2

1909

IPC No.07
546,1 m

IPC No.08
69 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


7. Kenh 3 Bridge - Cu Knh 3
The segment piles are marked with form:
CK3:
Cu Knh 3

CK3 - H1 - 001

C.1: 11.8+11.8+4.7+11.2 = 39.5 m (Test pile)


11.8+11.8+9.9 = 33.5 m (Mass pile)

Total
To
(segment) Previous

H1
T1(Test pile)
M1
M2
T2(Mass pile)
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1

11.8
11.2
11.8
4.7
9.9

Date

H1

Amount

Acc.
Req.30

10/05/2012

001-004

18/05/2012

m
m
m
m
m

This
Period

To
date

30
2
30
2
28

14
2
0
2
12

16
0
30
0
16

30
2
30
2
28

T1

Amount

Acc.
Req.30

H2

Amount

001-002

Total
To
(segment) Previous

Combination 2: 10.5+11.8+11.2 = 33.5 m


H2
T1
M1

Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)

Amount

Acc.
Req.28

10.5 m
11.2 m
11.8 m

M1

Amount

This
Period

To
date

28
28
28

14
0
6

14
28
22

28
28
28

Acc.
Req.58

M2

Amount

Acc.
Req.2

20/05/2012

001-002

Total
On date Accumulate
47.2

47.2

22.4

69.6

9.4

79.0

IPC No.05
0m

0.0
001-003

29/08/2012

004-012

12

30/08/2012

013-014

14

001

31/08/2012

002-006

01/09/2012

007-012

12

23/09/2012
29/09/2012

005-014

10

14

015-028

08/10/2012
11/10'2012
14/10/2012
27/10/2012

015-028

14

28

01/11/2012

029-030

30

21/11/2012

003-017

15

17

018-030

13

30

14

28
013-018

18

019-027

27

028

28

IPC No.03
79 m
IPC No.04
0m

0.0

27/08/2012

Remark

31.5

110.5

104.4

214.9

21.0

235.9

49.5

285.4

59.4

344.8

001-015

15

15

177.0

521.8

016-036

21

36

512.8

1034.6

037-056

20

56

295.4

1330.0

257.1

1587.1

145.6

1732.7

057

57

177.0

1909.7

058

58

35.4

1945.1

9.9

1955.0

IPC No.06
265.8m

IPC No.07
689.8m

IPC No.08
920.4 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


8. Kenh 2 Bridge - Cu Knh 2
The segment piles are marked with form:
CK2:
Cu Knh 2

CK2 - H1 - 001

Combination 1: 11.8+11.8+7.7+11.2 = 42.5 m


11.8+11.8+13.9 = 37.5 m
H1
Head (t u)
11.8 m
T2
Tip (t cui)
13.9 m
M1
Middle (t thn)
11.8 m
M2(Test Pile) Middle (t thn)
7.7 m
001
No.:
1
Acc.
Date
H1
Amount
T1
Req.30
11/05/2012

001-004

Total
To
(segment) Previous
30
30
28
26
30
21
2
2
Amount

Acc.
Req.30

001-002

22/10/2012

003-008

23/10/2012

009-014

14

25/10/2012

015-016

16

005

H2

Amount

Combination 2: 13.1+13.2+11.2 = 37.5 m


H2
T1
M3

Acc.
Req.28

27/10/2012
28/10/2012

To
date
30
28
30
2

T2

Head (t u)
Tip (t cui)
Middle (t thn)

Amount

Acc.
Req.28

Total
To
(segment) Previous
28
25
30
29
28
8

13.1 m
11.2 m
13.2 m

M1

Amount

Acc.
Req.30

This
Period
3
1
20

To
date
28
30
28

M2

Amount

Acc.
Req.2

001-002

2175

M3

Amount

Acc.
Req.28

19/05/2012

26/10/2012

This
Period
0
2
9
0

001-002
006-009

29/10/2012

010

10

04/11/2012

011-015

15

09/11/2012

016-018

18

001-008

009-012

12

001-003
013

003

13

Total
On date Accumulate
47.2

47.2

37.8

85

67.2

152.2

67.2

219.4

133.6

353

67.4

420.4

65.8

486.2

61.1

547.3

001-004

59

606.3

005-009

131.1

737.4

010

10

47.2

784.6

14/11/2012

004-010

10

011-013

13

127.1

911.7

20/11/2012

011-015

15

014-015

15

004-006

128.7

1040.4

016-019

19

007-008

87.5

1127.9

21/11/2012

014

29/11/2012

019-021

21

30/11/2012

022-027

27

017-018

18

01/12/2012

028-030

30

019

19

016-019

19

02/12/2012

020

20

020-023

03/12/2012

021-023

23

024

04/12/2012

024-029

29

12/5/2012
07/12/2012
5/13/2012

025

14

35.4

1163.3

93.2

1256.5

126.8

1383.3

23

63.6

1446.9

24

46.7

1493.6

67.2

1560.8

25

015-016

16

017-023

23

110.4

1671.2

024-026

26

41.7

1712.9

23.6

1736.5

020-021

21

2117

Remark
IPC No.03
85 m

IPC No.08
1627,9 m

IPC
No.10
23,6 m

MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

KUNHWA ENGINEERING &


CONSULTING CO., LTD

SSANGYONG ENGINEERING &


CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM

IPC
No.10
23,6 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


17/05/2013
18/05/2013
20/05/2013

030

30
026-028

28

027-028

022-026

26

59

1795.5

027-030

30

58.4

1853.9

67.1

1921

28

21/05/2013

009-013

13

66

1987

22/05/2013

014-018

18

66

2053

23/05/2013

019-023

23

66

2119

24/05/2013

024-028

28

66

2185

IPC No.14
448.5m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

DEVELOPMENT AND PROJECT MANAGEMENT OF


INFRASTRUCTURE (CUU LONG CIPM)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


9. Kenh 1 Bridge - Cu Knh 1
The segment piles are marked with form:
CK1:
Cu Knh 1

CK1 - H1 - 001

Combination 1: 11.8+11.8+11.8+11.2 =46.60m (Test pile)


11.8+11.8+6.2+13,7=43.5 m (Actual pile)

Total
(segment)

H1
T1
T2
M1
M
001

Head (t u)
Tip (t cui)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date

H1

Amount

11.8
11.2
13.7
6.2
11.8
Acc.
Req.30

m
m
m
m
m

30
2
28
28
32
T1

Amount

To
Previous
30
2
28
28
32
Acc.
Req.2

This
Period
0
0
0
0

To
date
30
2
28
28
32

H2

Amount

Combination 2: 11+11.8+6.2+14.5=43.5m
(Actual pile)
H2
T3
M1
M

Acc.
Req.28

T2

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)

Amount

Acc.
Req.28

11
14.5
6.2
11.8

M1

m
m
m
m

Amount

Total
(segment)
28
28
28
28

Acc.
Req.56

To
Previous
28
28
13
28

This
Period
0
0
15
0

To
date
28
28
28
28

T3

Amount

Acc.
Req.28

4/26/2012
4/28/2012

001

Acc.
Req.30

001-002

003

Total
On date Accumulate
23.6

23.6

23

46.6

001

11.8

58.4

16/05/2012

002-003

23.6

82

11.2

93.2

93.2

002

Amount

10/05/2012

18/05/2012

17/12/2012

59

152.2

19/12/2012

004-008

004-008

59

211.2

20/12/2012

009-013

13

59

270.2

22/12/2012

014-018

18

59

329.2

24/12/2012

009-013

13

59

388.2

26/12/2012

014-017

17

47.2

435.4

27/12/2012

018-020

20

35.4

470.8

13/01/2013

021-025

25

59

529.8

24/01/2013

026-030

30

59

588.8

4/2/2013

019

19

11.8

600.6

4/4/2013

020-021

21

23.6

624.2

4/5/2013

001

14.5

638.7

4/6/2013

002

14.5

653.2

4/10/2013

003

14.5

667.7

4/11/2013

004

14.5

682.2

Remark

IPC No.02
46.6 m

IPC No.03
46.6 m

IPC
No.09
495.6 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n

B GIAO THNG VN TI

Hnh Lang Ven Bin Pha Nam

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


4/12/2013

11.8

694

4/16/2013

022

22
031

31

11.8

705.8

4/17/2013

032-036

36

59

764.8

4/19/2013

005-006

29

793.8

4/20/2013

007-008

29

822.8
846.4

4/21/2013

037-038

38

23.6

4/22/2013

039-040

40

23.6

870

4/23/2013

041-042

42

23.6

893.6

4/24/2013

043-044

44

23.6

917.2

4/26/2013

045-046

46

23.6

940.8

4/27/2013

047-048

48

23.6

964.4

5/7/2013

049-052

52

47.2

1011.6

5/8/2013

053-056

56

47.2

1058.8

5/9/2013

057-060

60

47.2

1106

5/10/2013

47.2

1153.2

5/11/2013

023-026

26
009

14.5

1167.7

5/12/2013

010

10

14.5

1182.2

5/13/2013

027

27

11.8

1194

5/14/2013

028

28

11.8

1205.8

5/15/2013

029

29

11.8

1217.6

5/16/2013

030

30

5/18/2013

001-004

11.8

1229.4

54.8

1284.2

5/23/2013

001

005-008

65.8

1350

5/24/2013

002

009-012

12

65.8

1415.8

5/26/2013

003-008

66

1481.8

5/28/2013

009-014

14

66

1547.8

5/31/2013
6/1/2013

001-010
011-020

10
10

10
20

62
62

1609.8
1609.8

6/2/2013

021-030

10

30

62

1671.8

6/3/2013

031-040

10

40

62

1733.8

65.8

1799.6

6/5/2013

015

15

013-016

16

IPC
No.10
640,6 m

IPC
No.12
1206,8 m

MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF
INFRASTRUCTURE (CUU LONG CIPM)

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &


CONSULTING CO., LTD

CONSTRUCTION CO.,LTD

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 400 x 400 MM


6/6/2013

011-014

14

58

1857.6

6/7/2013

015-018

18

58

1915.6

019-022

22

6/9/2013
6/10/2013

017-020

20

6/19/2013

021-023

23

6/20/2013

024-027

27

6/21/2013

028

28

6/11/2013

58

1973.6

54.8

2028.4

023-024

24

29

2057.4

025

25

55.6

2113

54.8

2167.8

026-028

28

57.2

2225

6/22/2013

016-018

18

33

2258

6/24/2013

019-023

23

55

2313

6/25/2013

024-028

28

8/12/2013

041

41

61.2

2374.2

042-056

15

56

93

2467.2

IPC
No.12
1206,8 m

IPC14
93m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

B GIAO THNG VN TI

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) -

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &

an Th By- Knh 14 (D n Thnh Phn EDCF)

CONSTRUCTION CO.,LTD

CONSULTING CO., LTD


CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

INFRASTRUCTURE (CUU LONG CIPM)

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 350 x 350 MM


1. Kenh 1 Bridge - Cu Knh 1
The segment piles are marked with form:
CK1:
Cu Knh 1

CK1 - H1 - 001
Total
To
(segme Previou
nt)
s
57
0
2
0
2
0
2
0
55
0
55
0

Combination 1: 11.8+10.1+9.3+9.7=40.9 (Test piles)


Mass piles: 11.8+11.8+14.4 = 38.0 m
H1
T1
M1
M2
M3
T3
001

Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
Date

H1

Amount

16/12/2012

001-002

11.8
9.7
10.1
9.3
11.8
14.4
Acc.

m
m
m
m
m
m

001

Acc.

H2

Amount

Total
(segment)

Combination 2: 13.2+13.5+11.3 =38.0 m


H2
T2
M4

Acc.

Acc.

55
55
55

001

Acc.

M2

Amount

001

To
date
23
27
27

Acc.

Acc.

90.7

35.4

126.1

28/12/2012

001

Total

Req.55

Amount

On date Accumulate

003-005

Req.55

T3

Acc.

27/12/2012

Req.2

Amount

Req.55

23.6

Req.2

M4

Acc.

Amount

This
Period
23
27
27

Req.55

M1

To
Previous
0
0
0

001-002

Req.55

Amount

13.2 m
11.3 m
13.5 m

26/12/2012

Req.2

T2

Head (t u)
Tip (t cui)
Middle (t thn)

Amount

Amount

To
date
29
1
1
1
27
28

M3

Req.57

T1

This
Period
29
1
1
1
27
28

67.1

67.1

006-012

12

82.6

208.7

29/12/2012

001-003

013-016

16

81.1

289.8

09/01/2013

004-008

017-018

18

80.1

369.9

10/01/2013

009-013

13

019-020

20

174.6

544.5

11/01/2013

014-017

17

021-023

23

80.6

625.1

024-025

25

12/01/2013
13/01/2013
14/01/2013

003-005

15/01/2013

006-009

018-020

20

16/01/2013

010-015

15

021-026

26

17/01/2013

016-018

18

027

27

18/01/2013

019-020

19/01/2013

021-024

20/01/2013

025-029

026-027

001-007

008-018

11

18

172.1

797.2

019-024

24

81

878.2

025-027

27

75.9

954.1

81.1

1035.2

27

162.2

1197.4

75.5

1272.9

81.2

1354.1

14

148

1502.1

015-016

16

87.8

1589.9

017-020

20

84

1673.9

021-026

26

86.4

1760.3

027-028

28

81.6

1841.9

002-003

20

004-007

24

008-014

29

21/01/2013

001-002

22/01/2013
23/01/2013

003-006

25/01/2013

007-012

12

79.2

1921.1

26/01/2013

013-018

18

79.2

2000.3

27/01/2013

019-023

23

66

2066.3

024

24

54.1

2120.4

025-027

27

39.6

2160

59

2219

4/2/2012

030

30

4/4/2012
4/5/2012

031-035

002

002

002

35

4/6/2012

028-032

32

59

2278

4/10/2012

033-037

37

59

2337

59

2396

66

2462

4/11/2012
4/12/2012

036-040

40
028-032

32

Remark

IPC
No.09
2066.3 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

B GIAO THNG VN TI

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) -

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &

an Th By- Knh 14 (D n Thnh Phn EDCF)

CONSTRUCTION CO.,LTD

CONSULTING CO., LTD


CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

INFRASTRUCTURE (CUU LONG CIPM)

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 350 x 350 MM


4/16/2012

033-037

37

4/19/2012

029-031

4/20/2012

028-030

31

30

66

2528

43.2

2571.2

40.5

2611.7

45.2

2656.9

45.2

2702.1

51.4

2753.5

35

51.4

2804.9

37

51.4

2856.3

39

51.4

2907.7

4/21/2012

028-031

31

4/22/2012

032-035

35

4/23/2012

036-037

37

032-033

33

4/24/2012

038-039

39

034-035

4/26/2012

040-041

41

036-037

4/27/2012

042-043

43

038-039

5/7/2012

038-041

41

031-034

34

101.2

3008.9

5/8/2012

042-045

45

035-038

38

101.2

3110.1

5/9/2012

041-044

44

039-042

42

101.2

3211.3

5/10/2012

045-048

48

043-046

46

101.2

3312.5

5/11/2012

049-054

54

5/12/2012

044-052

52

5/13/2012
5/14/2012
5/15/2012
5/16/2012

055-058

58

046-048

48

047-054

040-044

44

142.8

3455.3

045-052

52

216.9

3672.2

143.4

3815.6

54

038-051

14

51

049-051

51

220.2

4035.8

052-053

53

052-056

56

132.6

4168.4

054

54

93.4

4261.8

053-054

54

053-056

56

IPC.10
2195,5 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

B GIAO THNG VN TI

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) -

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &

an Th By- Knh 14 (D n Thnh Phn EDCF)

CONSTRUCTION CO.,LTD

CONSULTING CO., LTD


CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

INFRASTRUCTURE (CUU LONG CIPM)

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 350 x 350 MM


2. Nga Bac Bridge - Cu Nga Bac
The segment piles are marked with form:
CNB:
Sn S2 - Cu Ng Bc

CNB - H1 - 001
Total

C.1: 11.8+11.8+7.6+9.7 = 40.9 m (Test pile)


11.8+10.4+13.8 = 36.0 (Mass pile)
H1
Head (t u)
11.8
T1
Tip (t cui)
9.7
M1
Middle (t thn)
11.8
M2
Middle (t thn)
7.6
T3
Tip (t cui)
13.8
M3
Middle (t thn)
10.4
CNB:

Total

No.:

Acc.
H1

Amount

08/5/2012
11/05/2012
15/05/2012
17/05/2012
18/05/2012
21/05/2012
29/05/2012
31/05/2012
01/06/2012
05/06/2012
06/06/2012
09/06/2012
10/06/2012
13/06/2012
17/06/2012
18/06/2012

001-004

Req.58
4

005-007

008-011

11

28/06/2012

012-014
015-019
020-023
024-027
028-030
031-037
038-042

To
Previou
s
29
1
1
1
28
28
To
Previou
s
25
1
1
26
9

This
Period
0
0
0
0
0
0

To
date
29
1
1
1
28
28

This
Period
0
0
0
0

To
date
25
1
1
26
9

H2

Amount

Total
To
(segment) Previous
27
27
27
27
27
27

Combination 2: 12.9+11.8+11.3=36.0m
H2
T2
M1

Head (t u)
Tip (t cui)
Middle (t thn)

12.9 m
11.3 m
11.8 m

Total
To
(segment) Previous
27
5
27
11
27
3

Combination 2: 13.2+13.5+11.3=38.0m
H3
T2
M4

Head (t u)
Tip (t cui)
Middle (t thn)

13.2 m
11.3 m
13.5 m

This
Period
0
0
0

This
Period
0
0
0

To
date
27
27
27

56

To
date
5
11
3

u 11.8
thn 11.8

Cn
29
29

c
25
29

Mi 14.4
u 13.2
thn 13.5
mui 11.3

28
27
27
27

9
5
3
17

T3

Amount

cn li
4
0
19
22
24
10

Date

25/06/2012

m
m
m
m
m

(segme
nt)
29
1
1
29
28

Sn S1 - Cu Ng Bc

C.1: 11.8+11.8+7.6+9.7 = 40.9 m (Test pile)


11.8+11.8+14.4 = 38.0 (Mass pile)
H1
Head (t u)
11.8
T1
Tip (t cui)
9.7
M2
Middle (t thn)
7.6
M1
Middle (t thn)
11.8
T4
Tip (t cui)
14.4
001

m
m
m
m
m
m

(segme
nt)
29
1
1
1
28
28

3
5
4
4
3
7
5

14
19
23
27
30
37
42

T1

001-002

Acc.
Amount

Req.2

Acc.
Req.27

Acc.
T2

Amount

Req.54

Acc.
M1

Amount

001

002-006

007-013

13

Req.57
1

Acc.
M2

Amount

001-002

Req.2

Acc.
M3

Amount

Req.28

Acc.
Req.28

001
002-008
009-015
016-021

1
7
7
6

1
8
15
21

022-026

26

027-033

33

Acc.
M4

Amount

Req.27

Acc.
T4

Amount

Req.28

Acc.
H3

Amount

Req27

Total
Remark
On date Accumulate
47.2
47.2
27.0
74.2
54.8
129.0
59.0
188.0
47.2
235.2
82.6
317.8
35.4
353.2
59.0
412.2
IPC No.03
920.9 m
47.2
459.4
47.2
506.6
35.4
542.0
82.6
624.6
70.3
694.9
79.1
774.0
79.1
853.1
67.8
920.9
56.5

977.4

79.1

1056.5

IPC No.05
0m

0
15/07/2012

001-007

22/07/2012

008-012

23/07/2012

013-015

24/07/2012

016-019

30/07/20012
01/08/2012

034

34

09/08/2012

035

35

IPC No.04
135.6 m

96.6

1153.1

12

69

1222.1

15

41.4

1263.5

19

55.2

1318.7

020-022

22

41.4

1360.1

023-024

24

38.9

1399.0

025-028

28

90.1

1489.1

014-015

15

10/08/2012

016-018

18

35.4

1524.5

17/08/2012

019-024

24

70.8

1595.3

IPC No.06
760.1 m

MINISTRY OF TRANSPORTATION

GMS-SOUTHERN COASTAL CORRIDOR PROJECT - D n


Hnh Lang Ven Bin Pha Nam

B GIAO THNG VN TI

ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) -

CUU LONG CORPORATION FOR INVESTMENT,


DEVELOPMENT AND PROJECT MANAGEMENT OF

SSANGYONG ENGINEERING &

KUNHWA ENGINEERING &

an Th By- Knh 14 (D n Thnh Phn EDCF)

CONSTRUCTION CO.,LTD

CONSULTING CO., LTD

IPC No.06
760.1 m

CONTRACT PACKAGE: VNM 33-Hp ng:VNM33

INFRASTRUCTURE (CUU LONG CIPM)

CAST-IN-PLACE CONCRETE PILE INSPECTION TABLE - PILES 350 x 350 MM


19/08/2012

025-029

29

22/08/2012

030-031

31

23.6

1677.9

28/08/2012

032-037

37

70.8

1748.7

038-039

39

1816.6

31/08/2012

036-038

38

10/09/2012
23/09/2012

001-027

27

27

040

40

041

41

24/09/2012

59

001

67.9

002-007

62.4

1879

360.1

2239.1

008-014

29/09/2012

1654.3

14

72.8

2311.9

11.8

2323.7

02/10/2012

015-023

23

93.6

2417.3

07/10/2012

024-028

28

52

2469.3

136.8

2606.1

02/12/2012

043-048

48

001-005

03/12/2012

042-051

10

51

118

2724.1

04/12/2012

052-057

57

70.8

2794.9

05/12/2012
06/12/2012

049-054

54

07/12/2012
5/15/2013

001-003
039-044

44

001-007

100.8

2895.7

008-009

99.6

2995.3

40.5

3035.8

67.8

3103.6

IPC No.07
600.7 m

IPC No.08
618,5 m

3103.6
3103.6
3103.6
IPC
No.10
67,8 m

B sung bin bn c cc cu Mi Kiu (30x30)


Tn t
Chiu di S lng t Tng
Ngy c
Mi
9.7
29
281.3
u
10.1
5
50.5
Gia
5.5
68
374
Mi
11.4
26
296.4

B sung bin bn c cc cu Mi Kiu (40x40)


Tn t
Chiu di S lng t Tng
Ngy c
Mi
11.2
9
100.8
u
11.8
26
306.8
u
11
28
308
Gia
11.8
23
271.4
Gia
12.5
28
350
Mi
12.7
28
355.6

Вам также может понравиться