Академический Документы
Профессиональный Документы
Культура Документы
1. Ap Ty Bridge - Cu pT
The segment piles are marked with form:
CAT:
Cu p T
CAT - H1 - 001
Head (t u)
Tip (t cui)
Middle (t thn)
No.:
1
11.8
9.7
9.4
m
m
m
T1
Date
H1
Amount
Acc.
Req.56
4/27/2012
001-002
Total
To
(segment) Previous
56
2
56
0
56
2
Amount
Acc.
Req.56
5/3/2012
This
Period
0
3
0
To
date
2
3
2
H2
Amount
Combination 2: H2 + M + 11.4 = .m
Acc.
Req.56
H2
T2
M
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.56
Total
(segment)
56
56
56
To
Previous
0
0
0
On date
11.4
m
m
m
Amount
Acc.
Req.112
001-002
This
Period
0
0
0
Total
Accumulate
23.6
23.6
18.8
42.4
15/05/2012
001-002
19.4
61.8
17/05/2012
003
9.7
71.5
To
date
0
0
0
Remark
IPC No.02
42.4m
IPC No.03
29.1m
CMK - H1 - 001
Head (t u)
Tip (t cui)
Middle (t thn)
No.:
1
11.8
9.7
8.4
m
m
m
T1
Date
H1
Amount
Acc.
Req.36
4/27/2012
001-002
15/05/2012
001
Total
To
(segment) Previous
36
34
36
1
36
2
Amount
Acc.
Req.36
This
Period
2
6
0
To
date
36
7
2
H2
Amount
A:
Chuyn 22 t
11.8 t Kenh 2
sang
Acc.
Req.34
M1+2
Amount
Acc.
Req.68
Total
(segment)
34
34
34
To
Previous
0
6
0
Acc.
Req.34
Acc.
Req.2
On date
T2
Amount
001-002
Amount
This
Period
7
0
0
Total
Accumulate
23.6
IPC No.02
23.6 m
26.5
50.1
IPC No.03
26.5 m
003-016
14
16
165.2
215.3
05/07/2012
017-019
19
001-005
92.4
307.7
06/07/2012
020-023
23
006
58.6
366.3
07/07/2012
024-028
28
59
425.3
08/07/2012
029-030
30
23.6
448.9
12/07/2012
031-034
34
47.2
496.1
18/07/2012
035
35
11.8
507.9
01/09/2012
036
36
11.8
519.7
128.9
648.6
245
893.6
1002.2
1895.8
29
36
001-007
22
29
34
68
68
26
34
IPC No.04
446m
IPC No.05
0m
002-007
Remark
23.6
04/07/2012
19/11/2012
To
date
7
6
0
IPC No.06
23.6 m
IPC No.08
128.9 m
1890
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Middle (t thn)
11.8
9.7
10.1
6.3
4.5
Total
(segment)
m
m
m
m
m
To
Previous
19
2
2
2
0
This
Period
0
17
0
0
0
To
date
19
19
2
2
0
Total
To
(segment) Previous
17
2
17
16
This
Period
15
1
To
date
17
17
H2
Amount
19
19
2
2
17
Total
(segment)
Combination 2: 10.1+4.5+11.4=26.0 m
H2
T2
M3
Head (t u)
Tip (t cui)
Middle (t thn)
m
m
m
17
17
17
To
Previous
0
17
0
11.0
12.0
m
m
Total
(segment)
17
17
To
Previous
0
0
This
Period
0
0
To
date
0
0
M1
Amount
Acc.
Req.2
M2
Amount
Acc.
Req.2
001-002
2
001-002
10.1
11.4
4.5
This
Period
17
0
0
To
date
17
17
0
Date
4/23/2012
4/25/2012
5/3/2012
10/05/2012
11/05/2012
01/06/2012
6/5/2012
6/12/2012
6/13/2012
6/14/2012
6/15/2012
6/16/2012
6/17/2012
Head (t u)
Tip (t cui)
11.6
11.4
m
m
T1
Amount
001
Acc.
Req.19
1
002
H1
Amount
Acc.
Req.19
001-002
003-008
009-016
017-019
6
8
3
Combination 2: 12.0+11.0=23.0m
Acc.
Req.17
M3
Amount
Acc.
Req.34
8
16
19
19/06/2012
H3
T3
Head (t u)
Tip (t cui)
T2
Amount
001-008
009-012
013-018
019-023
024-029
030-031
032-033
8
4
6
5
6
2
2
034
Acc.
Req.34
H4
Amount
Acc.
Req.17
8
12
18
23
29
31
33
33
001-002
34
003-014
12
14
150.6
826.4
015-017
17
34.8
861.2
H3
Amount
Acc.
Req.17
21/06/2012
20/07/2012
24/07/2012
25/07/2012
26/07/2012
27/07/2012
28/07/2012
30/07/2012
31/07/2012
03/08/2012
13/08/2012
14/08/2012
15/08/2012
16/08/2012
01/09/2012
003-005
006
3
1
007-011
5
6
6
11
012
013
1
1
12
13
014-019
19
001
002-008
009-016
017
1
7
8
1
1
8
16
17
001-013
014-023
024-025
13
10
2
026-033
034
8
1
13
23
25
25
25
25
33
34
001-005
006-010
011-015
016-017
5
5
5
2
5
10
15
17
Total
Remark
On date Accumulate
9.7
9.7
23.6
33.3
IPC No.02
9.7
43.0
43 m
20.2
63.2
12.6
75.8
91.2
167.0
45.6
212.6
68.4
281.0
IPC No.03
633.2 m
57
338.0
68.4
406.4
93.6
500.0
117.2
617.2
58.6
675.8
0
58.5
45
19.1
70.7
80.8
39.2
45.7
4.5
48.5
115
124.7
124.7
46
58.2
IPC No.04
185,4m
IPC No.05
0m
919.7
964.7
983.8
1054.5
1135.3
1174.5
1220.2
1224.7
1273.2
1388.2
1512.9
1637.6
1683.6
1741.8
IPC No.06
884.0m
CK6- H1 - 001
4/25/2012
001-002
Total
To
(segment) Previous
36
36
36
5
2
2
34
0
Amount
Acc.
Req.36
This
Period
0
31
0
34
To
date
36
36
2
34
H2
Amount
Acc.
Req.34
M2
Amount
Acc.
Req.68
H2
T2
M2
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.34
10.1
11.4
6.0
m
m
m
Amount
Total
(segment)
34
34
34
To
Previous
0
34
28
Acc.
Req.2
On date
13/05/2012
001-002
15/05/2012
001-002
001-003
This
Period
34
0
6
Total
Accumulate
23.6
23.6
19.4
43.0
17.8
60.8
152.2
213.0
106.2
319.2
20/06/2012
003-012
10
12
21/06/2012
013-021
21
22/06/2012
022-024
24
004
46.8
366.0
26/06/2012
025-027
27
005-012
12
126.6
492.6
27/06/2012
028
28
013-021
21
114.4
607.0
02/07/2012
029-035
35
022-023
23
105.4
712.4
03/07/2012
036
36
024-034
11
34
137.2
849.6
001-011
11
11
66.0
915.6
31/08/2012
003
012-026
15
26
99.7
1015.3
01/09/2012
004-005
027-034
34
67.4
1082.7
12/09/2012
035-042
42
48.0
1130.7
15/09/2012
043-052
10
52
60.0
1190.7
053-062
10
62
60.0
1250.7
29.1
1279.8
23/09/2012
01/11/2012
006-008
05/11/2012
009-019
11
19
001-007
177.4
1457.2
09/11/2012
020-030
11
30
008-028
21
28
318.8
1776.0
15/11/2012
031-036
36
029-034
34
118.8
1894.8
36.0
1930.8
21/11/2012
063-068
68
Remark
IPC No.02
23.6m
IPC No.03
37.2m
IPC No.04
788.8 m
IPC No.05
0m
0.0
30/08/2012
To
date
34
34
34
IPC No.06
233.1 m
IPC No.07
168.0 m
IPC No.08
680.1 m
11.088
CK5 - H1 - 001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
Total
(segment)
11.8
9.7
10.9
6.9
10.8
m
m
m
m
m
36
2
2
34
34
T1
Amount
Date
H1
Amount
Acc.
Req.36
17/04/2012
001-002
To
Previous
19
2
2
32
17
This
Period
17
0
0
2
17
To
date
36
2
2
34
34
Acc.
Req.2
H2
Amount
Acc.
Req.34
M2
Amount
Acc.
Req.68
H2
T2
M2
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.34
10/05/2012
11.2
11.4
6.9
m
m
m
34
34
34
Amount
Acc.
Req.2
001-002
16/05/2012
001-002
Total
(segment)
To
Previous
14
20
0
This
Period
20
14
34
To
date
34
34
34
T3
Amount
Acc.
Req.34
Total
Remark
On date Accumulate
23.6
23.6
21.8
45.4
19.4
64.8
IPC
No.02
23.6m
IPC
No.03
37.2m
IPC
No.04
0m
IPC
No.05
0m
24/08//2012
003-012
10
12
27/08/2012
013-019
19
29/08/2012
001-004
005-008
30/08/2012
001-006
007-015
15
17/09/2012
21/09/2012
009
22/09/2012
010-014
14
001-010
10
10
016-020
20
118.0
182.8
127.4
310.2
113.2
423.4
102.6
526.0
001-012
12
12
129.6
655.6
013-016
16
123.4
779
017
17
123.8
902.8
26/09/2012
011-028
18
28
124.2
1027
02/10/2012
029-032
32
27.6
1054.6
IPC
No.06
461.2 m
IPC
No.07
528.6 m
033
33
6.9
1061.5
19/10/2012
034
34
6.9
1068.4
22.4
1090.8
21/10/2012
25/10/2012
26/10/2012
020-025
25
27/10/2012
026-034
34
28/10/2012
035-036
36
015-016
16
017
17
30/10/2012
11.2
1102
70.8
1172.8
106.2
1279
114.8
1393.8
33
57
1450.8
34
89.8
1540.6
021-028
28
029-033
034
31/10/2012
018-024
24
04/11/2012
025-028
28
018-019
19
66.4
1607
05/11/2012
029
29
020-023
23
54.4
1661.4
10/11/2012
024-029
29
64.8
1726.2
15/11/2012
030-031
31
21.6
1747.8
032-034
34
18/11/2012
32.4
1780.2
37
20.7
1800.9
038-040
40
20.7
1821.6
041-052
12
52
82.8
1904.4
053-058
58
41.4
1945.8
059-066
66
111.2
2057
067-068
68
13.8
2070.8
19/11/2012
035-037
20/11/2012
21/11/2012
26/11/2012
27/11/2012
30/11/2012
030-034
34
IPC
No.08
1016.2 m
CK4 - H1 - 001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Total
(segment)
11.8
9.7
10.9
8.0
m
m
m
m
36
36
2
34
T1
Amount
Date
H1
Amount
Acc.
Req.36
4/18/2012
001
To
Previous
36
24
2
0
This
Period
0
12
0
34
To
date
36
36
2
34
Acc.
Req.36
H2
Amount
Acc.
Req.34
H2
T2
M2
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.34
4/21/2014
5/2/2012
002
Total
(segment)
To
Previous
33
21
26
This
Period
1
13
8
To
date
34
34
34
M2
Amount
Acc.
Req.68
10.1
11.4
8.0
m
m
m
34
34
34
M1
Amount
Acc.
Req.2
001
22.7
22.7
002
10.9
33.6
11.8
45.4
19.4
64.8
134.8
17/05/2012
001-002
Total
On date Accumulate
25/06/2012
003-006
001-002
70
26/06/2012
007-011
11
003-005
93.2
228
27/06/2012
012-016
16
006-008
93.2
321.2
28/06/2012
017-018
18
009-013
13
80.6
401.8
29/06/2012
019
19
014-017
17
57.4
459.2
10/07/2012
001-007
70.7
529.9
11/07/2012
008-013
13
60.6
590.5
014-017
17
59.8
650.3
12/07/2012
003-004
Remark
IPC No.02
45.4 m
IPC No.03
19.4 m
IPC No.04
585.5 m
IPC No.05
0m
13/07/2012
005-010
10
58.2
708.5
15/07/2012
011
11
9.7
718.2
16/07/2012
012-015
15
38.8
757.0
8.0
726.2
18/07/2012
001
IPC No.06
663.7 m
016-019
002-005
70.8
797.0
23/07/2012
19
006-007
16.0
813.0
27/07/2012
008-012
12
40.0
853.0
28/07/2012
013-019
19
56.0
909.0
30/07/2012
020-023
23
32.0
941.0
01/08/2012
024-028
28
40.0
981.0
03/08/2012
029-030
30
16.0
997.0
04/08/2012
031-033
33
24.0
1021.0
034
34
05/08/2012
8.0
1029.0
19/08/2012
020
20
11.8
1040.8
20/08/2012
021-022
22
23.6
1064.4
21/08/2012
023-024
24
23.6
1088.0
25/08/2012
025-028
28
47.2
1135.2
27/08/2012
029-032
32
018
18
58.6
1193.8
29/08/2012
033-036
36
019-021
21
81.4
1275.2
08/09/2012
022-030
30
102.6
1377.8
09/09/2012
031-032
32
22.8
1400.6
10/09/2012
033-034
34
22.8
1423.4
20/09/2012
018-020
20
30.3
1453.7
22/09/2012
021-026
26
60.6
1514.3
29/09/2012
027-028
28
20.2
1534.5
02/10/2012
029-033
33
50.5
1585.0
64.5
1649.5
04/10/2012
020-024
24
035-036
08/10/2012
025-034
10
34
97.0
1746.5
12/10/2012
035-036
36
19.4
1765.9
13/10/2012
19/10/2012
12/01/2013
034
34
36
037-050
14
50
112.0
1877.9
051-060
10
60
90.1
1968.0
061-068
68
64.0
2032.0
IPC No.06
663.7 m
IPC No.07
374.3 m
IPC No.08
318.5 m
IPC No.09
64.0 m
CK3 - H1 - 001
No.:
Date
H1
Amount
Acc.
Req.36
4/18/2012
001-002
4/24/2014
T1
Total
To
(segment) Previous
36
20
36
24
2
2
34
12
Amount
Acc.
Req.36
001
002
This
Period
2
12
0
22
To
date
22
36
2
34
H2
Amount
Acc.
Req.34
M2
Amount
Acc.
Req.68
H2
T2
M2
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.34
10/05/2012
13/05/2012
10.1
11.4
7.5
m
m
m
Amount
Total
(segment)
34
34
34
To
Previous
31
7
26
Acc.
Req.2
On date
This
Period
3
9
8
Total
Accumulate
23.6
23.6
9.7
33.3
001
10.9
44.2
002
20.6
64.8
To
date
34
16
34
Remark
IPC No.02
33.3 m
IPC No.03
31.5 m
IPC No.04
0m
IPC No.05
0m
27/07/2012
28/07/2012
003-006
03/08/2012
007-016
10
16
001-011
11
11
111.1
175.9
012-014
14
69.1
245
97
342
24/08/2012
015-017
17
30.3
372.3
25/08/2012
018
18
10.1
382.4
26/08/2012
019
19
10.1
392.5
020-021
21
20.2
412.7
129
541.7
45
586.7
131
717.7
120.9
838.6
27/08/2012
30/08/2012
003-011
11
001-002
31/08/2012
01/09/2012
05/09/2012
012-016
16
022-030
30
001-006
007-008
009-012
12
003-007
IPC No.06
773.8 m
017-020
20
031
31
09/09/2012
10/09/2012
11/09/2012
021-024
017-020
24
013-017
17
018-029
12
29
030-037
37
20
008-010
011-016
10
16
86.4
925
124.2
1049.2
THD
K3
98.8
1148
THD
115.6
1263.6
IPC No.07
597.5 m
K3
12/09/2012
038-044
44
52.5
1316.1
K3
15/09/2012
045-048
48
30
1346.1
THD
049-060
12
60
20/09/2012
07/10/2012
025-027
27
08/10/2012
11/10/2012
01/11/2012
032-034
34
061-068
021-022
22
028-036
36
68
90
1436.1
59.4
1495.5
60
1555.5
23.6
1579.1
87.3
1666.4
K3
IPC
No.08
230.3m
TH
K 16
CK2 - H1 - 001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date
H1
Amount
4/17/2012
4/18/2012
4/24/2012
11/05/2012
13/05/2012
16/05/2012
17/05/2012
6/8/2012
6/9/2012
6/10/2012
6/11/2012
6/12/2012
6/15/2012
6/16/2012
6/17/2012
6/18/2012
001
002
1
1
11.8
9.7
10.1
4.8
Acc.
Req.36
1
2
2
003-007
008-011
11
012-016
017-021
022-026
027
5
5
5
1
16
21
26
27
m
m
m
m
Total
To
(segment) Previous
36
27
36
2
36
4
36
2
T1
Amount
Acc.
Req.36
001-002
28/06/2012
08/07/2012
028-036
36
11.8
10.1
22 dot
259.6
19.4
This
Period
9
0
0
0
To
date
36
2
4
2
H2
Amount
Combination 2: H2+M1+M2+11.4 = . m
Acc.
Req.35
H2
T2
M1
M2
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
T2
Amount
Acc.
Req.35
001
002-003
004-008
009-011
012-015
1
2
5
3
4
1
3
8
11
15
016-021
022-027
028-032
6
6
5
21
27
32
033-034
34
11.4
m
m
m
m
Total
(segment)
34
34
34
34
To
Previous
0
32
0
0
This
Period
0
2
0
0
To
date
0
34
0
0
M2
Amount
Acc.
Req.70
001-002
M1
Amount
Acc.
Req.70
001-002
003
004
2
1
1
2
3
4
40.4
9.6
Total
Remark
On date Accumulate
11.8
11.8
IPC No.02
11.8
23.6
43 m
19.4
43
20.2
63.2
10.1
73.3
10.1
83.4
9.6
93
11.4
104.4
81.8
186.2
IPC No.02
57
243.2
709.8 m
81.4
324.6
45.6
370.2
59
429.2
127.4
556.6
127.4
684
68.8
752.8
22.8
775.6
106.2
881.8
IPC No.04
129 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CAT - H1 - 001
Total
To
(segment) Previous
30
2
30
2
29
3
2
2
Combination 1: 11.8+11.8+4.2+11.2 = 39 m
H1
T1
M1
M2
001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date
H1
Amount
11.8
11.2
11.8
4.2
Acc.
Req.30
5/2/2012
15/05/2012
m
m
m
m
T1
001
001-002
Amount
1
Acc.
Req.30
To
date
23
30
20
2
H2
Amount
H2
T2
M1
M2
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Amount
Acc.
Req.28
m
m
m
m
M1
001-002
002
Total
To
(segment) Previous
28
0
28
0
28
0
28
0
Combination 2: H2+M1+M2+T2=.m
Amount
Acc.
Req.58
M2
This
Period
0
0
0
0
To
date
0
0
0
0
Amount
Acc.
Req.28
17/05/2012
This
Period
21
28
17
0
20/05/2012
001-002
Total
On date Accumulate
11.2
11.2
47.2
58.4
11.2
69.6
8.4
78
Remark
IPC No.02
11.2m
IPC No.03
66.8 m
IPC No.04
0m
IPC No.05
0m
04/08/2012
003
05/11/2012
003-004
15/11/2012
003-012
10
12
19/11/2012
013-020
20
005-024
20
24
11.8
89.8
22.4
112.2
118
230.2
318.4
548.6
IPC No.06
11.8 m
IPC No.08
762,00 m
21/11/2012
30/11/2012
021-023
23
025-029
29
91.4
640
030
30
11.2
651.2
01/12/2012
004-017
14
17
165.2
816.4
02/12/2012
018-020
20
35.4
851.8
09/12/2012
021-023
23
35.4
887.2
IPC No.09
82,60 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
024-027
27
IPC No.09
82,60 m
47.2
934.4
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CMK - H1 - 001
Total
To
(segment) Previous
30
4
30
2
30
0
30
2
Combination 1: 11.8+11.8+5.7+11.2=40.5m
H1
T1
M1
M2
001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date
H1
Amount
11.8
11.2
11.8
5.7
Acc.
Req.30
5/2/2012
m
m
m
m
T1
Amount
Acc.
Req.30
001-002
This
Period
0
19
4
0
To
date
4
21
4
2
H2
Amount
Total
To
(segment) Previous
28
0
28
0
28
0
28
0
Combination 2: H2+M1+M2+T2=.m
H2
T2
M1
M3
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Amount
Acc.
Req.28
11 m
12.7 m
m
12.5 m
M1
Amount
Acc.
Req.30
M2
This
Period
0
0
0
0
To
date
0
0
0
0
Amount
Acc.
Req.28
M3
Amount
Acc.
Req.28
Total
On date Accumulate
22.4
22.4
15/05/2012
001
11.8
34.2
16/05/2012
002-004
35.4
69.6
11.4
81
20/05/2012
001-002
26/11/2012
003-014
12
14
134.4
215.4
27/11/2012
015-021
21
78.4
293.8
06/12/2012
001
11.8
305.6
07/12/2012
002-004
35.4
341
09/12/2012
005-007
23
30
26
30
30
28
28
28
28
35.4
28
28
1692.6
Remark
IPC No.02
22.4 m
IPC No.03
58.6 m
IPC No.08
260.0 m
2069
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK25 - H1 - 001
Total
To
(segment) Previous
30
30
2
2
30
30
2
2
28
22
Amount
Acc.
Req.30
1
1
1
2
09/05/2012
19/06/2012
20/06/2012
003-006
003-007
21/06/2012
007-011
11
This
Period
0
0
0
0
6
To
date
30
2
30
2
28
H2
Amount
Total
To
(segment) Previous
28
10
28
25
28
18
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Amount
Acc.
Req.28
13.4 m
11.2 m
13.4 m
M1
Amount
001-002
Acc.
Req.30
2
This
Period
18
3
10
To
date
28
28
28
M2
Amount
Acc.
Req.2
001-002
M3
Amount
Acc.
Req.28
Total
Remark
On date Accumulate
23.6
23.6
IPC No.02
34.8
58.4
69.6 m
11.2
69.6
19.4
89
44.8
133.8
59
192.8
56
248.8
22/06/2012
008-012
12
59
307.8
24/06/2012
013-017
17
59
366.8
25/06/2012
012-016
16
56
422.8
28/06/2012
017-020
20
44.8
467.6
29/06/2012
021-024
24
44.8
512.4
025-027
27
45.4
557.8
27
59
616.8
07/07/2012
018
18
7/12/2012
019-023
23
IPC No.03
19.4 m
IPC No.04
527.8 m
IPC No.05
0m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
024-028
28
15/07/2012
029-030
30
028-030
30
92.6
709.4
23.6
733
26/07/2012
003-004
23.6
756.6
27/07/2012
005-008
47.2
803.8
28/07/2012
009-013
13
59
862.8
01/08/2012
014-016
16
35.4
898.2
03/08/2012
017-024
24
94.4
992.6
05/08/2012
025-028
28
47.2
1039.8
07/08/2012
029-030
30
23.6
1063.4
53.6
1117
67
1184
17/08/2012
001-004
18/08/2012
001-005
19/08/2012
006-010
10
67
1251
122.6
1373.6
13
70
1443.6
18
124.6
1568.2
12
43.2
1611.4
14
28.8
1640.2
15
14.4
1654.6
016-018
18
43.2
1697.8
019-021
21
43.2
1741.0
21/08/2012
001-002
005-011
11
22/08/2012
003-005
012-013
24/08/2012
006-009
014-018
25/08/2012
010-012
26/08/2012
013-014
29/08/2012
015
08/09/2012
09/09/2012
10/09/2012
011-013
13
11/09/2012
014-017
17
12/09/2012
018-020
20
15/09/2012
021-025
25
23/09/2012
026-028
28
022
22
019
19
53.6
1794.6
020-022
22
108.2
1902.8
023-026
26
93.8
1996.6
28
93.8
2090.4
40.2
2130.6
027-028
23/10/2012
023-024
24
28.8
2159.4
01/11/2012
025-028
28
57.6
2217.0
IPC No.06
1037.8 m
IPC No.07
476.0 m
IPC No.08
86.4 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK6- H1 - 001
001-002
Total
To
(segment) Previous
30
27
30
15
30
2
2
2
Amount
Acc.
Req.30
This
Period
3
15
28
0
To
date
30
30
30
2
H2
Amount
Combination 2: H2+M1+M2+T2=.m
9.5+10.8+11.2 = 31.5 m
H2
Head (t u)
9.5 m
T2
Tip (t cui)
12.7 m
M3
Middle (t thn)
7m
Acc.
Req.28
T2
Amount
Acc.
Req.28
17/05/2012
001-002
Total
To
(segment) Previous
28
0
28
0
28
0
M1
Amount
Acc.
Req.30
001-002
M2
This
Period
28
28
28
To
date
28
28
28
Amount
Acc.
Req.02
M3
Amount
Acc.
Req.28
Total
On date Accumulate
19/05/2012
001-002
45.2
45.2
22.4
67.6
7.4
75
26/06/2012
003-005
35.4
110.4
06/07/2012
006-010
10
59
169.4
Remark
IPC No.02
47.2 m
IPC No.03
29.8 m
IPC No.04
94.4 m
IPC No.05
0m
14/07/2012
003-009
78.4
247.8
15/07/2012
011-013
13
35.4
283.2
26/07/2012
014-016
16
35.4
318.6
31/07/2012
017-021
21
59
377.6
01/08/2012
022-025
25
80.8
458.4
12/08/2012
026-027
27
23.6
482
33.6
515.6
15/08/2012
010-012
013-015
12
15
IPC No.06
346.2 m
IPC No.07
18/10/2012
016-029
14
29
156.8
672.4
23/10/2012
030
30
11.2
683.6
3 186.5
870.1
27/10/2012
028-030
30
001-003
004-014
11
14
01/11/2012
05/11/2012
21/11/2012
001-008
009-015
15
001-003
004
005-014
003-006
3
1
10
95.9
966.00
14 174.5
1140.50
43.2
1183.70
IPC No.08
1351,40 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
IPC No.08
1351,40 m
015-027
13
27
28/11/2012
028
28
30/11/2012
007-019
13
19
020
20
015-025
11
026-028
016-024
24
021-022
22
025-028
28
023-030
30
140.4
1324.10
211.3
1535.40
28 166.4
1701.80
137.2
1839.00
25
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK5 - H1 - 001
Total
(segment)
H1
T1
M1
M2
T3
001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
Date
H1
Amount
11.8
11.2
11.8
6.0
13.7
Acc.
Req.30
5/3/2012
m
m
m
m
m
30
2
2
28
28
To
Previous
12
2
2
0
0
This
Period
18
0
0
28
28
To
date
30
2
2
28
28
H2
Amount
M1
Amount
Acc.
Req.2
001
Total
(segment)
Combination 2: H2+M+T2 = .m
H2
T2
M
Acc.
Req.28
Head (t u)
Tip (t cui)
Middle (t thn)
T2
Amount
Acc.
Req.28
9.5 m
11.2 m
10.8 m
Amount
28
28
28
Acc.
Req.30
To
Previous
0
0
0
This
Period
28
28
28
To
date
28
28
28
M2
Amount
Acc.
Req.28
T3
Amount
Acc.
Req.28
Total
On date Accumulate
11.2
23.6
08/05/2012
001-002
23.6
47.2
09/05/2012
003
11.8
59
22.4
81.4
17/05/2012
001-002
02/10/2012
004-006
04/10/2012
007-012
12
002
Remark
IPC No.02
11.8 m
IPC No.03
57.8 m
IPC No.04
0m
IPC No.05
0m
IPC No.06
0m
46.6
128
70.8
198.8
IPC No.07
118.0 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
013-015
15
001-002
57
255.8
11/10/2012
016-017
17
003-005
56
311.8
006-010
10
54
365.8
011-013
13
13/10/2012
15/10/2012
003-009
001-006
193
558.8
16/10/2012
010-011
11
007-009
63.5
622.3
19/10/2012
012-015
15
010
10
58.5
680.8
016
16
011-014
14
21/10/2012
001-004
001-004
128
808.8
22/10/2012
005-009
005-009
77.5
886.3
25/10/2012
010-014
14
010-013
13
71.5
957.8
23.6
981.4
014
14
987.4
35.4
1022.8
26/10/2012
018-019
19
27/10/2012
30/10/2012
020-022
22
31/10/2012
023-027
27
014-015
15
80.6
1103.4
04/11/2012
028-029
29
016
16
34.4
1137.8
05/11/2012
017-019
19
09/11/2012
020-024
24
015
15
32.4
1170.2
60
1230.2
10/11/2012
015-016
16
27.4
1257.6
14/11/2012
017-021
21
68.5
1326.1
15/11/2012
022-025
25
54.8
1380.9
51.7
1432.6
18/11/2012
015-017
17
19/11/2012
018
18
20/11/2012
019
21/11/2012
020-022
24/11/2012
26/11/2012
30/11/2012
030
30
017
17
19
018-026
26
22
027-030
30
023-024
24
025-028
28
025-027
028
27
28
016-017
17
018
18
026-028
28
56.6
1489.2
110.3
1599.5
019-021
21
91.3
1690.8
022-024
24
69.4
1760.2
025-026
26
50
1810.2
027-028
28
34.6
1844.8
IPC No.08
1646,00 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK4 - H1 - 001
This
Period
0
0
0
0
0
To
date
30
2
28
2
28
H2
Amount
Total
To
(segment) Previous
28
28
28
28
30
25
Combination 2: 9.5+11.8+11.2=32.5 m
H2
T1
M1
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Amount
Acc.
Req.28
9.5 m
11.2 m
11.8 m
M3
Amount
Acc.
Req.28
M2
001
002
This
Period
0
0
5
To
date
28
28
30
Amount
Acc.
Req.2
1
1
M1
Amount
Acc.
Req.30
001-002
1
2
Total
Remark
On date Accumulate
23.60
23.6
47.20
23.6
IPC No.03
69.60
22.4
89 m
79.30
9.7
89.00
9.7
44.8
133.80
56
189.80
IPC No.04
299 m
47.2
237.00
151
388.00
IPC No.05
0m
0
15/07/2012
001-004
58.8
446.80
16/07/2012
005-007
18/07/2012
008-011
44.1
490.90
11
58.8
549.70
20/07/2012
22/07/2012
012-013
13
014-015
15
29.4
579.10
001
35.4
614.50
23/07/2012
002-003
12
626.50
24/07/2012
004-009
36
662.50
25/07/2012
010-013
13
24
686.50
26/04/2012
016
16
014
14
17.8
704.30
27/06/2012
017
17
015
15
30/07/2012
003
17.8
722.10
11.8
733.90
31/07/2012
004-005
23.6
757.50
01/08/2012
006-007
23.6
781.10
03/08/2012
008-009
23.6
804.70
04/08/2012
010-012
12
35.4
840.10
IPC No.06
915.9 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
IPC No.06
915.9 m
013-015
35.4
875.50
38
913.50
10
57
970.50
13
28.5
999.00
35.4
1034.40
70.8
1105.20
06/08/2012
001-004
08/08/2012
005-010
10/08/2012
011-013
15
16/08/2012
018-020
20
18/08/2012
021-026
26
29
016-017
17
47.4
1152.60
30
018-020
20
29.8
1182.40
21/08/2012
021-024
24
24
1206.40
24/08/2012
025-027
27
18
1224.40
28
28
20.7
1245.10
19/08/2012
20/08/2012
027-029
030
25/08/2012
016
16
27/08/2012
017-018
18
29.4
1274.50
29/08/2012
019-020
20
29.4
1303.9
08/09/2012
014-015
15
021-024
24
77.8
1381.7
09/09/2012
016-017
17
025-026
26
48.4
1430.1
027-028
28
48.4
1478.5
65.5
1544
62.1
1606.1
53.2
1659.3
10/09/2012
018-019
19
12/09/2012
016-020
20
020
20
17/09/2012
021-023
23
021-023
23
18/09/2012
024-025
25
024-025
25
016
16
20/09/2012
026
26
026-027
27
017
17
42
1701.3
22/09/2012
027
27
028
28
018
18
32.5
1733.8
29/09/2012
028-030
30
019-020
20
57.2
1791
02/10/2012
012-023
23
35.4
1826.4
04/10/2012
024-025
25
23.6
1850
08/10/2012
026
26
11.8
1861.8
12/10/2012
027-030
30
47.2
1909
IPC No.07
546,1 m
IPC No.08
69 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK3 - H1 - 001
Total
To
(segment) Previous
H1
T1(Test pile)
M1
M2
T2(Mass pile)
001
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
11.8
11.2
11.8
4.7
9.9
Date
H1
Amount
Acc.
Req.30
10/05/2012
001-004
18/05/2012
m
m
m
m
m
This
Period
To
date
30
2
30
2
28
14
2
0
2
12
16
0
30
0
16
30
2
30
2
28
T1
Amount
Acc.
Req.30
H2
Amount
001-002
Total
To
(segment) Previous
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Amount
Acc.
Req.28
10.5 m
11.2 m
11.8 m
M1
Amount
This
Period
To
date
28
28
28
14
0
6
14
28
22
28
28
28
Acc.
Req.58
M2
Amount
Acc.
Req.2
20/05/2012
001-002
Total
On date Accumulate
47.2
47.2
22.4
69.6
9.4
79.0
IPC No.05
0m
0.0
001-003
29/08/2012
004-012
12
30/08/2012
013-014
14
001
31/08/2012
002-006
01/09/2012
007-012
12
23/09/2012
29/09/2012
005-014
10
14
015-028
08/10/2012
11/10'2012
14/10/2012
27/10/2012
015-028
14
28
01/11/2012
029-030
30
21/11/2012
003-017
15
17
018-030
13
30
14
28
013-018
18
019-027
27
028
28
IPC No.03
79 m
IPC No.04
0m
0.0
27/08/2012
Remark
31.5
110.5
104.4
214.9
21.0
235.9
49.5
285.4
59.4
344.8
001-015
15
15
177.0
521.8
016-036
21
36
512.8
1034.6
037-056
20
56
295.4
1330.0
257.1
1587.1
145.6
1732.7
057
57
177.0
1909.7
058
58
35.4
1945.1
9.9
1955.0
IPC No.06
265.8m
IPC No.07
689.8m
IPC No.08
920.4 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK2 - H1 - 001
001-004
Total
To
(segment) Previous
30
30
28
26
30
21
2
2
Amount
Acc.
Req.30
001-002
22/10/2012
003-008
23/10/2012
009-014
14
25/10/2012
015-016
16
005
H2
Amount
Acc.
Req.28
27/10/2012
28/10/2012
To
date
30
28
30
2
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Amount
Acc.
Req.28
Total
To
(segment) Previous
28
25
30
29
28
8
13.1 m
11.2 m
13.2 m
M1
Amount
Acc.
Req.30
This
Period
3
1
20
To
date
28
30
28
M2
Amount
Acc.
Req.2
001-002
2175
M3
Amount
Acc.
Req.28
19/05/2012
26/10/2012
This
Period
0
2
9
0
001-002
006-009
29/10/2012
010
10
04/11/2012
011-015
15
09/11/2012
016-018
18
001-008
009-012
12
001-003
013
003
13
Total
On date Accumulate
47.2
47.2
37.8
85
67.2
152.2
67.2
219.4
133.6
353
67.4
420.4
65.8
486.2
61.1
547.3
001-004
59
606.3
005-009
131.1
737.4
010
10
47.2
784.6
14/11/2012
004-010
10
011-013
13
127.1
911.7
20/11/2012
011-015
15
014-015
15
004-006
128.7
1040.4
016-019
19
007-008
87.5
1127.9
21/11/2012
014
29/11/2012
019-021
21
30/11/2012
022-027
27
017-018
18
01/12/2012
028-030
30
019
19
016-019
19
02/12/2012
020
20
020-023
03/12/2012
021-023
23
024
04/12/2012
024-029
29
12/5/2012
07/12/2012
5/13/2012
025
14
35.4
1163.3
93.2
1256.5
126.8
1383.3
23
63.6
1446.9
24
46.7
1493.6
67.2
1560.8
25
015-016
16
017-023
23
110.4
1671.2
024-026
26
41.7
1712.9
23.6
1736.5
020-021
21
2117
Remark
IPC No.03
85 m
IPC No.08
1627,9 m
IPC
No.10
23,6 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
IPC
No.10
23,6 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
030
30
026-028
28
027-028
022-026
26
59
1795.5
027-030
30
58.4
1853.9
67.1
1921
28
21/05/2013
009-013
13
66
1987
22/05/2013
014-018
18
66
2053
23/05/2013
019-023
23
66
2119
24/05/2013
024-028
28
66
2185
IPC No.14
448.5m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
CK1 - H1 - 001
Total
(segment)
H1
T1
T2
M1
M
001
Head (t u)
Tip (t cui)
Tip (t cui)
Middle (t thn)
Middle (t thn)
No.:
1
Date
H1
Amount
11.8
11.2
13.7
6.2
11.8
Acc.
Req.30
m
m
m
m
m
30
2
28
28
32
T1
Amount
To
Previous
30
2
28
28
32
Acc.
Req.2
This
Period
0
0
0
0
To
date
30
2
28
28
32
H2
Amount
Combination 2: 11+11.8+6.2+14.5=43.5m
(Actual pile)
H2
T3
M1
M
Acc.
Req.28
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Amount
Acc.
Req.28
11
14.5
6.2
11.8
M1
m
m
m
m
Amount
Total
(segment)
28
28
28
28
Acc.
Req.56
To
Previous
28
28
13
28
This
Period
0
0
15
0
To
date
28
28
28
28
T3
Amount
Acc.
Req.28
4/26/2012
4/28/2012
001
Acc.
Req.30
001-002
003
Total
On date Accumulate
23.6
23.6
23
46.6
001
11.8
58.4
16/05/2012
002-003
23.6
82
11.2
93.2
93.2
002
Amount
10/05/2012
18/05/2012
17/12/2012
59
152.2
19/12/2012
004-008
004-008
59
211.2
20/12/2012
009-013
13
59
270.2
22/12/2012
014-018
18
59
329.2
24/12/2012
009-013
13
59
388.2
26/12/2012
014-017
17
47.2
435.4
27/12/2012
018-020
20
35.4
470.8
13/01/2013
021-025
25
59
529.8
24/01/2013
026-030
30
59
588.8
4/2/2013
019
19
11.8
600.6
4/4/2013
020-021
21
23.6
624.2
4/5/2013
001
14.5
638.7
4/6/2013
002
14.5
653.2
4/10/2013
003
14.5
667.7
4/11/2013
004
14.5
682.2
Remark
IPC No.02
46.6 m
IPC No.03
46.6 m
IPC
No.09
495.6 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
11.8
694
4/16/2013
022
22
031
31
11.8
705.8
4/17/2013
032-036
36
59
764.8
4/19/2013
005-006
29
793.8
4/20/2013
007-008
29
822.8
846.4
4/21/2013
037-038
38
23.6
4/22/2013
039-040
40
23.6
870
4/23/2013
041-042
42
23.6
893.6
4/24/2013
043-044
44
23.6
917.2
4/26/2013
045-046
46
23.6
940.8
4/27/2013
047-048
48
23.6
964.4
5/7/2013
049-052
52
47.2
1011.6
5/8/2013
053-056
56
47.2
1058.8
5/9/2013
057-060
60
47.2
1106
5/10/2013
47.2
1153.2
5/11/2013
023-026
26
009
14.5
1167.7
5/12/2013
010
10
14.5
1182.2
5/13/2013
027
27
11.8
1194
5/14/2013
028
28
11.8
1205.8
5/15/2013
029
29
11.8
1217.6
5/16/2013
030
30
5/18/2013
001-004
11.8
1229.4
54.8
1284.2
5/23/2013
001
005-008
65.8
1350
5/24/2013
002
009-012
12
65.8
1415.8
5/26/2013
003-008
66
1481.8
5/28/2013
009-014
14
66
1547.8
5/31/2013
6/1/2013
001-010
011-020
10
10
10
20
62
62
1609.8
1609.8
6/2/2013
021-030
10
30
62
1671.8
6/3/2013
031-040
10
40
62
1733.8
65.8
1799.6
6/5/2013
015
15
013-016
16
IPC
No.10
640,6 m
IPC
No.12
1206,8 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
ROAD: THU BAY-KENH 14 BRIDGE (EDCF COMPONENTS) an Th By- Knh 14 (D n Thnh Phn EDCF)
CONSTRUCTION CO.,LTD
011-014
14
58
1857.6
6/7/2013
015-018
18
58
1915.6
019-022
22
6/9/2013
6/10/2013
017-020
20
6/19/2013
021-023
23
6/20/2013
024-027
27
6/21/2013
028
28
6/11/2013
58
1973.6
54.8
2028.4
023-024
24
29
2057.4
025
25
55.6
2113
54.8
2167.8
026-028
28
57.2
2225
6/22/2013
016-018
18
33
2258
6/24/2013
019-023
23
55
2313
6/25/2013
024-028
28
8/12/2013
041
41
61.2
2374.2
042-056
15
56
93
2467.2
IPC
No.12
1206,8 m
IPC14
93m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
CONSTRUCTION CO.,LTD
CK1 - H1 - 001
Total
To
(segme Previou
nt)
s
57
0
2
0
2
0
2
0
55
0
55
0
Head (t u)
Tip (t cui)
Middle (t thn)
Middle (t thn)
Middle (t thn)
Tip (t cui)
No.:
1
Date
H1
Amount
16/12/2012
001-002
11.8
9.7
10.1
9.3
11.8
14.4
Acc.
m
m
m
m
m
m
001
Acc.
H2
Amount
Total
(segment)
Acc.
Acc.
55
55
55
001
Acc.
M2
Amount
001
To
date
23
27
27
Acc.
Acc.
90.7
35.4
126.1
28/12/2012
001
Total
Req.55
Amount
On date Accumulate
003-005
Req.55
T3
Acc.
27/12/2012
Req.2
Amount
Req.55
23.6
Req.2
M4
Acc.
Amount
This
Period
23
27
27
Req.55
M1
To
Previous
0
0
0
001-002
Req.55
Amount
13.2 m
11.3 m
13.5 m
26/12/2012
Req.2
T2
Head (t u)
Tip (t cui)
Middle (t thn)
Amount
Amount
To
date
29
1
1
1
27
28
M3
Req.57
T1
This
Period
29
1
1
1
27
28
67.1
67.1
006-012
12
82.6
208.7
29/12/2012
001-003
013-016
16
81.1
289.8
09/01/2013
004-008
017-018
18
80.1
369.9
10/01/2013
009-013
13
019-020
20
174.6
544.5
11/01/2013
014-017
17
021-023
23
80.6
625.1
024-025
25
12/01/2013
13/01/2013
14/01/2013
003-005
15/01/2013
006-009
018-020
20
16/01/2013
010-015
15
021-026
26
17/01/2013
016-018
18
027
27
18/01/2013
019-020
19/01/2013
021-024
20/01/2013
025-029
026-027
001-007
008-018
11
18
172.1
797.2
019-024
24
81
878.2
025-027
27
75.9
954.1
81.1
1035.2
27
162.2
1197.4
75.5
1272.9
81.2
1354.1
14
148
1502.1
015-016
16
87.8
1589.9
017-020
20
84
1673.9
021-026
26
86.4
1760.3
027-028
28
81.6
1841.9
002-003
20
004-007
24
008-014
29
21/01/2013
001-002
22/01/2013
23/01/2013
003-006
25/01/2013
007-012
12
79.2
1921.1
26/01/2013
013-018
18
79.2
2000.3
27/01/2013
019-023
23
66
2066.3
024
24
54.1
2120.4
025-027
27
39.6
2160
59
2219
4/2/2012
030
30
4/4/2012
4/5/2012
031-035
002
002
002
35
4/6/2012
028-032
32
59
2278
4/10/2012
033-037
37
59
2337
59
2396
66
2462
4/11/2012
4/12/2012
036-040
40
028-032
32
Remark
IPC
No.09
2066.3 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
CONSTRUCTION CO.,LTD
033-037
37
4/19/2012
029-031
4/20/2012
028-030
31
30
66
2528
43.2
2571.2
40.5
2611.7
45.2
2656.9
45.2
2702.1
51.4
2753.5
35
51.4
2804.9
37
51.4
2856.3
39
51.4
2907.7
4/21/2012
028-031
31
4/22/2012
032-035
35
4/23/2012
036-037
37
032-033
33
4/24/2012
038-039
39
034-035
4/26/2012
040-041
41
036-037
4/27/2012
042-043
43
038-039
5/7/2012
038-041
41
031-034
34
101.2
3008.9
5/8/2012
042-045
45
035-038
38
101.2
3110.1
5/9/2012
041-044
44
039-042
42
101.2
3211.3
5/10/2012
045-048
48
043-046
46
101.2
3312.5
5/11/2012
049-054
54
5/12/2012
044-052
52
5/13/2012
5/14/2012
5/15/2012
5/16/2012
055-058
58
046-048
48
047-054
040-044
44
142.8
3455.3
045-052
52
216.9
3672.2
143.4
3815.6
54
038-051
14
51
049-051
51
220.2
4035.8
052-053
53
052-056
56
132.6
4168.4
054
54
93.4
4261.8
053-054
54
053-056
56
IPC.10
2195,5 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
CONSTRUCTION CO.,LTD
CNB - H1 - 001
Total
Total
No.:
Acc.
H1
Amount
08/5/2012
11/05/2012
15/05/2012
17/05/2012
18/05/2012
21/05/2012
29/05/2012
31/05/2012
01/06/2012
05/06/2012
06/06/2012
09/06/2012
10/06/2012
13/06/2012
17/06/2012
18/06/2012
001-004
Req.58
4
005-007
008-011
11
28/06/2012
012-014
015-019
020-023
024-027
028-030
031-037
038-042
To
Previou
s
29
1
1
1
28
28
To
Previou
s
25
1
1
26
9
This
Period
0
0
0
0
0
0
To
date
29
1
1
1
28
28
This
Period
0
0
0
0
To
date
25
1
1
26
9
H2
Amount
Total
To
(segment) Previous
27
27
27
27
27
27
Combination 2: 12.9+11.8+11.3=36.0m
H2
T2
M1
Head (t u)
Tip (t cui)
Middle (t thn)
12.9 m
11.3 m
11.8 m
Total
To
(segment) Previous
27
5
27
11
27
3
Combination 2: 13.2+13.5+11.3=38.0m
H3
T2
M4
Head (t u)
Tip (t cui)
Middle (t thn)
13.2 m
11.3 m
13.5 m
This
Period
0
0
0
This
Period
0
0
0
To
date
27
27
27
56
To
date
5
11
3
u 11.8
thn 11.8
Cn
29
29
c
25
29
Mi 14.4
u 13.2
thn 13.5
mui 11.3
28
27
27
27
9
5
3
17
T3
Amount
cn li
4
0
19
22
24
10
Date
25/06/2012
m
m
m
m
m
(segme
nt)
29
1
1
29
28
Sn S1 - Cu Ng Bc
m
m
m
m
m
m
(segme
nt)
29
1
1
1
28
28
3
5
4
4
3
7
5
14
19
23
27
30
37
42
T1
001-002
Acc.
Amount
Req.2
Acc.
Req.27
Acc.
T2
Amount
Req.54
Acc.
M1
Amount
001
002-006
007-013
13
Req.57
1
Acc.
M2
Amount
001-002
Req.2
Acc.
M3
Amount
Req.28
Acc.
Req.28
001
002-008
009-015
016-021
1
7
7
6
1
8
15
21
022-026
26
027-033
33
Acc.
M4
Amount
Req.27
Acc.
T4
Amount
Req.28
Acc.
H3
Amount
Req27
Total
Remark
On date Accumulate
47.2
47.2
27.0
74.2
54.8
129.0
59.0
188.0
47.2
235.2
82.6
317.8
35.4
353.2
59.0
412.2
IPC No.03
920.9 m
47.2
459.4
47.2
506.6
35.4
542.0
82.6
624.6
70.3
694.9
79.1
774.0
79.1
853.1
67.8
920.9
56.5
977.4
79.1
1056.5
IPC No.05
0m
0
15/07/2012
001-007
22/07/2012
008-012
23/07/2012
013-015
24/07/2012
016-019
30/07/20012
01/08/2012
034
34
09/08/2012
035
35
IPC No.04
135.6 m
96.6
1153.1
12
69
1222.1
15
41.4
1263.5
19
55.2
1318.7
020-022
22
41.4
1360.1
023-024
24
38.9
1399.0
025-028
28
90.1
1489.1
014-015
15
10/08/2012
016-018
18
35.4
1524.5
17/08/2012
019-024
24
70.8
1595.3
IPC No.06
760.1 m
MINISTRY OF TRANSPORTATION
B GIAO THNG VN TI
CONSTRUCTION CO.,LTD
IPC No.06
760.1 m
025-029
29
22/08/2012
030-031
31
23.6
1677.9
28/08/2012
032-037
37
70.8
1748.7
038-039
39
1816.6
31/08/2012
036-038
38
10/09/2012
23/09/2012
001-027
27
27
040
40
041
41
24/09/2012
59
001
67.9
002-007
62.4
1879
360.1
2239.1
008-014
29/09/2012
1654.3
14
72.8
2311.9
11.8
2323.7
02/10/2012
015-023
23
93.6
2417.3
07/10/2012
024-028
28
52
2469.3
136.8
2606.1
02/12/2012
043-048
48
001-005
03/12/2012
042-051
10
51
118
2724.1
04/12/2012
052-057
57
70.8
2794.9
05/12/2012
06/12/2012
049-054
54
07/12/2012
5/15/2013
001-003
039-044
44
001-007
100.8
2895.7
008-009
99.6
2995.3
40.5
3035.8
67.8
3103.6
IPC No.07
600.7 m
IPC No.08
618,5 m
3103.6
3103.6
3103.6
IPC
No.10
67,8 m