This document is an electrical wiring checklist that contains 15 items to ensure compliance for an electrical wiring project. It includes checks for proper wiring methods, continuity of metal cable trays and raceways, double earthing of equipment, sufficient space for maintenance, adequate free conductor length, proper connections and grounding, exclusive use of raceways for electrical conductors, proper fixing of distribution boards, use of lugs and ferrules for connections, protection of wiring from nails and screws, proper glanding of cables in panels, approved wiring methods in air ducts and plenums, tight cable terminations, and proper laying and dressing of wiring. Compliance for each item is checked off as yes or no.
This document is an electrical wiring checklist that contains 15 items to ensure compliance for an electrical wiring project. It includes checks for proper wiring methods, continuity of metal cable trays and raceways, double earthing of equipment, sufficient space for maintenance, adequate free conductor length, proper connections and grounding, exclusive use of raceways for electrical conductors, proper fixing of distribution boards, use of lugs and ferrules for connections, protection of wiring from nails and screws, proper glanding of cables in panels, approved wiring methods in air ducts and plenums, tight cable terminations, and proper laying and dressing of wiring. Compliance for each item is checked off as yes or no.
This document is an electrical wiring checklist that contains 15 items to ensure compliance for an electrical wiring project. It includes checks for proper wiring methods, continuity of metal cable trays and raceways, double earthing of equipment, sufficient space for maintenance, adequate free conductor length, proper connections and grounding, exclusive use of raceways for electrical conductors, proper fixing of distribution boards, use of lugs and ferrules for connections, protection of wiring from nails and screws, proper glanding of cables in panels, approved wiring methods in air ducts and plenums, tight cable terminations, and proper laying and dressing of wiring. Compliance for each item is checked off as yes or no.
All terminal connections in DB are done with ferrules
and lugs. Check wiring methods for spacing from edges of 11. framing and for protection from nails and screws. In panel/DB- all cables are properly glanded and 12. terminals are connected with lugs & ferrules. Check installations of wiring in ducts, plenums, and 13. other air- handling spaces for proper methods and materials
14. Proper Cable termination with sufficient tightness
Wiring methods are securely fastened in place,
1. supported independently of suspended ceilings, and not used as supports. Continuity and completeness in metal Cable tray / 2. racewaysand enclosures. 3. Double Earthing to Equipment done 4. 5. 6. 7. 8.
Sufficient space is provided for Maintenance and
Cleaning Check for adequate length of free conductors/wires at DB and switch sockets. All electrical connections have been done according to the drawings, and are properly grounded or fixed All terminal connections in switch control are done with ferrules and lugs. Verify that electrical raceways and cable trays are used exclusively for electrical conductors
10.
15.
All wiring /cables are laid in proper way and dressed