1.
SUMMARY............................................................................................................................. 1
2.
INTRODUCTION .................................................................................................................. 2
3.
3.1
3.2
3.3
3.4
4.
4.1
4.2
5.
METHODOLOGY ................................................................................................................. 6
5.1
5.2
DESCRIPTION ........................................................................................................................ 6
BOUNDARY CONDITIONS .................................................................................................. 9
6.
7.
CONCLUSIONS................................................................................................................... 23
8.
APPENDICES ...................................................................................................................... 23
Page i
FORMA 1
MAY-REP-212-01-COT
1. SUMMARY
The main objective of this report is to determine an appropriate design to modify the existing no-watertight
deck 8250 AB a watertight deck, allowing access to personnel and equipment.
Currently, the deck has openings in several sections where the pipeline passes, electrical cables and crew; also
has a circular cut where it was a cement silo. To be a watertight deck, it will be placed a structural plate of 3/8
thickness with flat bars of 8 x 3/8 as structural reinforcements; to round off the pipeline and electrical cables,
will placed sleeves and putty.
To access from the column to the pump room it will place a hatchway between the frame 22 and 23, with plate
of 5/8 thickness with flat bars of 8" x 5/8" and 8" x 3/8" as structural reinforcements, as well as a hatch will
place between frame 23 and 24.
Page 1 / 23
FORMA 1
MAY-REP-212-01-COT
2. INTRODUCTION
This report verifies the structural safety of deck 8250 above base line (deck 8250 AB) in IOLAIR SemiSubmersible Accommodation Vessel.
This brief analyzes the effects of a flood scenario on pump room or column, whichever is greater.
Is properly justified the deck structure can safely withstand a hydrostatic pressure due to a flooding on pump
room or column.
VESSEL INFORMATION
IMO No.
7816070
Call sign
V7IS9
Port of registry
Laid down
5 January 1980
Launched
6 April 1981
Completed
8 August 1982
6.54 m
6.04 m
MAIN DIMENSIONS
Length
Speed
Breadth
Crew
44
Draught
Tonnage
15,765 GT
4,746 NT
Page 2 / 23
FORMA 1
3.3
MAY-REP-212-01-COT
COLUMN CHARACTERISTICS
Length column
10.40 m
Breadth column
6.55 m
Height column
Exposed
volume
into the
column
6.90 m
Breadth
5.05 m
Height
15.25 m
Page 3 / 23
FORMA 1
3.4
MAY-REP-212-01-COT
The pump room is located inside the pontoon below aft column between frames 21 to 24, its lower deck is 1.50
m above base line and the higher deck is 8.25 m above base line. The general dimensions are as following:
Length
6.90 m
Breadth
8.60 m
Height
6.75 m
Pump room
location
Page 4 / 23
FORMA 1
MAY-REP-212-01-COT
Pump room
Pump room
Page 5 / 23
FORMA 1
MAY-REP-212-01-COT
AISC ASD
AWS D1-1
DNV-OS B101
Metallic Materials
DNV-OS-C301
4.2
REFERENCE DOCUMENTS
sheet 1 of 2 sheets
sheet 2 of 2 sheets
sheet 3 of 4 sheets
sheet 2 of 6 sheets
sheet 3 of 6 sheets
5. METHODOLOGY
5.1
DESCRIPTION
It is intended the pump room is watertight and has no communication with the column. To achieve the
objective, the deck 8250 above base line will be a watertight deck, closing all the existing access openings,
placing steel plate with structural reinforcements and sealing putty with hatch coaming.
Existing access openings are intended to make way for electrical cables, pipelines, silo and access to the pump
room.
FORMA 1
MAY-REP-212-01-COT
FORMA 1
MAY-REP-212-01-COT
New hatch
Page 8 / 23
FORMA 1
5.2
MAY-REP-212-01-COT
BOUNDARY CONDITIONS
It is considered that the pressure that should support the deck will be equal to the pressure exerted by the
volume of water that may contain the pump room considering the height from pontoon deck to the tank top
(6.75 m), or the column considering the height from the pontoon deck to the platform bottom (15.25 m), which
means the following:
Compartment
Insidethepumproom
Insidethecolumn
Exposedvolume(m3)
400.55
531.39
Length(m)
6.90
6.90
Breadth(m)
8.60
5.05
Depth(m)
6.75
15.25
FORMA 1
5.2.1
MAY-REP-212-01-COT
355 MPa, allowable stress respect to y is 309 MPa for ULS condition
315 MPa, allowable stress respect to y is 274 MPa for ULS condition.
5.2.2
Coordinate system
The shell elements in the global YZ-plane have the following local system:
The shell elements in the global XY-plane have the following local system:
5.2.3
Software
GENIE
SESTRA
FEM program
XTRACT
Page 10 / 23
FORMA 1
5.3
MAY-REP-212-01-COT
The physical system being modeled includes material, thicknesses, structural section, mesh and loads.
The GeniE V5.3-10 for Sesam Finite Element Analysis Software is used for modeling and analysis. The
element types used for deck 8250 AB are:
Analysis element
Used for
Plate
Beam
Meshing involves deck plating, longitudinal and transversal stiffeners, hatchway plating and stiffeners, in order
to show the stress of each node of deck 8250 AB.
Page 11 / 23
FORMA 1
5.4
MAY-REP-212-01-COT
All stiffeners and girders are considered as beam elements and deck as plate elements.
The model includes approximately 48 beam elements and 10 plate elements.
Fig. 13 Stiffeners
Page 12 / 23
FORMA 1
5.5
MAY-REP-212-01-COT
LOAD CASE
The deck model is analyzed by a static condition with the following loads:
Structural Self-weight
Page 13 / 23
FORMA 1
5.6
MAY-REP-212-01-COT
MATERIAL
The material selection was based on the design conditions and under the standard DNV-OS B101 Metallic
Materials.
Name
SteelA36
SteelDH
Type
Linearmaterial
Linearmaterial
Yieldstrength
3.09e+008
2.74e+008
Usedfor
Newelements
Existingelements
Table 2. Materials
The material type of deck model is shown below
Page 14 / 23
FORMA 1
MAY-REP-212-01-COT
Page 15 / 23
FORMA 1
MAY-REP-212-01-COT
Page 16 / 23
FORMA 1
MAY-REP-212-01-COT
Page 17 / 23
FORMA 1
MAY-REP-212-01-COT
6. ANALYSIS RESULTS
Stress data presented in this section are used to perform strength check of major plating components in the deck
8250 AB.
Static load combination results are shown below
Element
PI55
Load(N/m2)
153,174
MaximumVonMissesstress
(N/m2)
2.34x10e8
Maximumallowablestress
(N/m2)
3.09x10e8
Status
OK
Page 18 / 23
FORMA 1
MAY-REP-212-01-COT
The area with the maximum strength is at hatchway top; is shown below.
FORMA 1
MAY-REP-212-01-COT
Page 20 / 23
FORMA 1
MAY-REP-212-01-COT
Page 21 / 23
FORMA 1
MAY-REP-212-01-COT
Page 22 / 23
FORMA 1
MAY-REP-212-01-COT
7. CONCLUSIONS
Based on the analyses carried out, and the subsequent modifications to the critical structural details, it is
concluded that the stresses in the deck support structures are acceptable.
The maximum stresses in the module deck structure are found acceptable.
Misalignments of the structure have not been taking into account in any of the analyses.
8. APPENDICES
Appendix A: Drawings
Appendix B: Sleeves and sailing putty characteristics
Page 23 / 23
FORMA 1
MAY-REP-212-01-COT
APPENDIX A: DRAWINGS
FORMA 1
MAY-REP-212-01-COT
FORMA 1
08811105
20-04-13 14:42
Hvik, 2010-09-24
2014-12-31
Petter Langnes
https://exchange.dnv.com/taridocs/TA-CERT/52/08811105.htm
Patrick Aubert
Pgina 1 de 3
08811105
20-04-13 14:42
Head of Section
Rotterdam
Surveyor
Please note that all regular text on this page should be in Arial size 9.
Product description
"RISE and RISE/NOFIRNO Pipe Penetration H-0 / H-120"
composed of a steel sleeve of length 250 mm, welded to steel bulkhead or deck and,
- for RISE penetration (H-0 / H-120), two or more layers of RISE rubber sheets type FRR/EHF wrapped around the pipe
and RISE filler sleeves filling the remaining space between steel sleeve and pipe. The penetration is sealed on both sides
with a layer of 20 mm FIWA sealant.
- for RISE/NOFIRNO penetration (H-0 / H-60), NOFIRNO filler sleeves filling the remaining space between steel sleeve
and pipe. The penetration is sealed on both sides with a layer of 20 mm NOFIRNO sealant.
The sleeve and the pipe are to be insulated as described on the drawings listed below.
Application/Limitation
Approved for use as multi-pipe penetration in steel bulkheads and decks for steel pipes of diameter up to 219 mm OD in
H-0 to H-120 class divisions and for single pipe penetration for steel/stainless steel up to 1016 mm.
Approved for GRP pipes of diameter up to 408 mm OD, in H-0 to H-120 class divisions with RISE/NOFIRNO and up to
222 mm OD with RISE.
Maximum approved steel sleeves/coamings for multi-pipe penetration: Rectangular 1000 x 300 mm or equivalent to 3000
cm2.
The sleeve and ducted pipe of RISE penetrations to be insulated as for H-60 when applied in H-0 partitions.
For RISE/NOFIRNO penetrations for steel/stainless steel and GRP pipes up to 408 mm no insulation is needed for H-0
class. For RISE/NOFIRNO penetrations for steel pipes >408 mm OD the sleeve and ducted pipe to be insulated as for H60.
The installation/insulation of the penetration is to be in accordance with the enclosed approved drawings Nos. R0285E,
R0286E and R287E (RISE) and N0036E, N0037E and N0038E (RISE/NOFIRNO) all dated 14.02.09 for steel and
Stainless steel pipes and Nos. R0288E, R0289E and R0290E (RISE) for GRP pipes. Drawings N0033E Rev.1, N0034E
Rev.1and N0035E rev.1 for steel/stainless steel and GRP pipes up to 408 mm OD (RISE/NOFIRNO) and , N0032E Rev. 2
for steel and GRP pipes up to 408 mm OD in H-0 partitions (RISE/NOFIRNO).
The penetration system is approved for watertight penetrations up to a design pressure of 1.66 bar and for airtight
penetration up to a design pressure of 1.0 bar.
https://exchange.dnv.com/taridocs/TA-CERT/52/08811105.htm
Pgina 2 de 3
08811105
20-04-13 14:42
Assessment report No. IFCA/01204 dated August 2001 from International Fire Consultants Ltd, Buckinghamshire,
England.
Adhesion test No. 11/04.01006/sec dated 16 February 2004 from TNO.
Pressure test report No. 95-41D/42D/43D dated 27 October 1995 and No. 9909-D014 dated 1. September 1999 from
Beele Engineering.
Statement Ref. TQS-RAP-07-335/idl dated 13 February 2008 and test report No. TQS-RAP-07-484/idl dated 26 February
2007, both from TNO, Netherlands.
Statement ref. No. TQS-RAP-09-6211 dated 20 February 2009 from TNO Quality Services B.V, The Netherlands.
Statement ref. IFC Letter Report FSA/10555/01 dated 25 June 2010 from International Fire Consultant Ltd, UK.
Tested according to FTPC Part 3, IMO Resolution A.754 (18) and the hydrocarbon fire
time/temperature curve stipulated by the Norwegian Petroleum Directorate.
Marking of product
The product or packing is to be marked with name of manufacturer, type designation and fire-technical rating.
Notice: This Certificate is subject to terms and conditions overleaf. Any significant change in design or construction may render this Certificate invalid.
If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas
shall pay compensation to such person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the
fee charged for the service in question, provided that the maximum compensation shall never exceed USD 2 million.In this provision "Det Norske Veritas" shall
mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of Det Norske
Veritas.
DET NORSKE VERITAS AS VERITASVEIEN 1, 1322 HVIK, NORWAY TEL: (+47) 67 57 99 00 FAX: (+47) 67 57 99 11
https://exchange.dnv.com/taridocs/TA-CERT/52/08811105.htm
Pgina 3 de 3
<0>
Application
Approved for use as a cable and multi-tube penetration in bulkheads and decks of class A-0 / A-60
This certificate is recognized by Transport Canada
Hvik, 2013-03-01
for Det Norske Veritas AS
Petter Langnes
Head of Section
Patrick Aubert
Surveyor
This Certificate is subject to terms and conditions overleaf. Any significant change in design or construction may render this Certificate invalid.
The validity date relates to the Type Approval Certificate and not to the approval of equipment/systems installed.
If any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Veritas, then Det Norske Veritas shall pay compensation to such
person for his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum
compensation shall never exceed USD 2 million. In this provision "Det Norske Veritas" shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers,
employees, agents and any other acting on behalf of Det Norske Veritas.
DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Hvik, Norway, Tel.: +47 67 57 99 00, Fax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA www.dnv.com
Form No.: TA 1411a Issue: October 2009
Page 1 of 2
Product description
RISE - Multi Cable and Multi-tube Penetrations
composed of a steel/aluminium sleeve (length 200 mm) welded to steel/aluminium bulkhead or deck, RISE Insert Sleeves and
FRR/EHF sheets wrapped around the cables/multi-tubes and filling the remaining space between sleeves and cables/multitubes with RISE filler sleeves.
The penetration is sealed on both sides with a layer of 20 mm FIWA Sealing Putty.
Application/limitation
Approved for watertight penetrations up to a design pressure of 1.66 bar.
Approved for airtight penetrations up to a design pressure of 1.0 bar.
The penetration system is generally not to be used for penetrating boundaries of tanks.
When requested to be used in watertight bulkheads on passenger ships and Special Purpose Ships (SPS), pipe penetration
system has to comply with the requirements given in SOLAS Ch. II-1 Reg. 13.2.3 (2009 issue).
Penetrations passing through watertight bulkheads are subject for separate examination and approval by actual flag
administration.
2
Marking of product
The product or packing is to be marked with name of manufacturer, type designation and fire-technical rating.
DET NORSKE VERITAS AS, Veritasveien 1, NO-1322 Hvik, Norway, Tel.: +47 67 57 99 00, Fax: +47 67 57 99 11, Org.No. NO 945 748 931 MVA www.dnv.com
Form No.: TA 1411a Issue: October 2009
Page 2 of 2