CLASE 5
ESTRUCTURAS HIDRAULICAS DE
TRANSPORTE DE AGUA III
POZO NORIA
Fuente: CHILERIEGO
PDF created with pdfFactory Pro trial version www.pdffactory.com
MOLINOS DE VIENTO
PDF created with pdfFactory Pro trial version www.pdffactory.com
BOMBA DE
ACCIONAMIENTO MANUAL
ENERGIA EOLICA
PDF created with pdfFactory Pro trial version www.pdffactory.com
BOMBA DE ALTA
BOMBA PARA DRAGADO
PDF created with pdfFactory Pro trial version www.pdffactory.com
PRESION BOOSTER
ESTACION DE RE-BOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
POZO ARTESIANO
BOMBA DE
REBOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
RESERVORIO 2
RESERVORIO 1
ESTACIONES DE REBOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
ESTACIONES DE REBOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
ESTACIONES DE REBOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
RESERVORIO 4
RESERVORIO 3
RESERVORIO 2
RESERVORIO 1
ESTACIONES DE REBOMBEO
PDF created with pdfFactory Pro trial version www.pdffactory.com
DIAMETRO ECONOMICO
En ciertas ocasiones al desarrollar alternativas de
costos, se deviene en un plan de ingeniera
(SISTEMA) que contiene dos variables (BOMBA,
TUBERIA) y elementos dependientes de una
variable (D), ver Fig. 1. Tal es el caso de una
estacin de bombeo y una lnea de tubera a ser
diseada para una descarga dada, la cual contiene
la variable y elementos dependientes de la
capacidad de la bomba y del tamao de la lnea de
tubera, ver Fig. 2. Si el uno es ms grande, el otro
puede ser ms pequeo y viceversa, desde un
punto de vista econmico es un interesante
problema determinar la combinacin que resulte en
el menor costo.
Dz
Bomba
COSTO
SISTEMA
TUBERIA
BOMBA
FIG. 1
Q
L
D
foC
FIG. 2
C:
costo total del sistema
CTubera : costo/unidad de dimetro/unidad de longitud
CBomba : costo/unidad de potencia en HP instalado
C = C1 DL + C2 Pot
luego
donde
C = CTuberia + C Bomba
D:
dimetro de la tubera (m)
L:
longitud de la tubera (m)
Pot:
potencia de la bomba en HP
C1 y C2: factores de conversin de unidades y ajuste
El sistema tiene que tener suficiente potencia para vencer el desnivel y la resistencia
desplazarse el fluido:
C = C1DL + C2
Q
( z + h f )
76
Dz:
hf:
f:
Q:
g:
h:
coeficiente de Darcy
caudal bombeado (m3/s)
peso especfico del fluido (kgf/m3)
eficiencia de la bomba
K
8 fLQ
Q
(z + 2 5 )
76
gD
2
C = C1 DL + C2
dC
Q
8 fLQ 2 1
= C1L + C2
(5 2
)
dD
76
g D6
Despejando el dimetro:
d 2C
> 0 Existe un costo mnimo.
dD 2
dC
Q
bfLQ 2 1
= 0 C1L + C2
( 5 2
)=0
g D6
dD
76
5*8 C2
D =
fQ3
2
76 g C1
6
D = 6 K1
C2
f Q
C1
D=K Q
donde
K = 1.0 a 1.5
K = 1.2 (recomendable)
(m/s)
0.75
2.26
0.80
1.99
0.85
1.76
0.90
1.57
1.00
1.27
1.10
1.05
1.20
0.88
1.30
0.75
1.40
0.65
D = 4 K Q
donde
REGLA DE ADAMS
C = CTuberia + CBomba
C4
D5
C3 y C4 son coeficientes de conversin y de ajuste
C = C3 D 2 +
C
dC
= 2C3 D 5 46
dD
D
d 2C
> 0 existe un costo mnimo
dD 2
dC
C
= 0 2C3 D 5 46 = 0
dD
D
C
2C3 D 2 5 45 = 0
D
2CTuberia 5CBomba = 0
CBomba =
2
CTuberia
5
n
n
n
n
n
n
n
n
Di
Dimetro Econ
Econmico de Tuber
Tubera de Impulsi
Impulsin.
El di
dimetro econ
econmico se calcula usando un procedimiento num
numrico en el cual se tiene
en cuenta los costos de instalaci
instalacin y explotaci
explotacin en funci
funcin del material, llquido
transportado y r
rgimen de escurrimiento.
La expresi
expresin final para el c
clculo del di
dimetro econ
econmico es:
donde:
D
a
ka
V
f
1
-------------6 + ( 1)
Di
Dimetro econ
econmico
Ajuste entre costo y di
dimetro
Tasa de amortizaci
amortizacin
Rugosidad absoluta de la tuber
tubera
Viscosidad cinem
cinemtica del llquido
Velocidad media
Coeficiente de fricci
friccin f de Darcy
0.25
= ------------------------------------------------------------------------1
-------------6 + ( 1)
2
ka
2.51 *
fa log --------- + ---------------3.7*D
V*D*f
ESTACION DE BOMBEO
1. SELECCIN DEL DIAMETRO ECONOMICO
2. ACCESORIOS
3. ALTURA TOTAL
4. CAVITACION
5. SELECCIN DE LA BOMBA - MOTOR
6. COSTOS DE BOMBEO
Bomba
Dz = 95.37 m
Q
L
D
C
TUBERIA
BOMBA
L = 606 m
h = 0.70
C = 140 p0.5/s
Costo: F 6: $ 16.05/ml
Costo:
F 8: $ 27.41/ml
F10: $ 47.06/ml
1,370 $/kw
46 %
Tarifa Elctrica:
30 kw-h al mes: $ 1.29
ms de 30 kw-h: $ 0.027
Horas de funcionamiento: 12 hr por da
Solucin
Por la Ec. de Marquardt:
donde:
D = 4 K Q
=
12
= 0.5
24
De los datos:
De la tabla de Ritcher:
K = 1.2
luego:
10
10
m/s
2.00
1.12
0.72
0/00
23.15
5.71
1.93
14.03
3.46
1.17
0.
0.
0.
14.03
3.46
1.17
109.40
98.83
96.54
HP
Kw
KwKw-h
74.61
55.66
667.92
67.40
50.28
603.36
65.84
49.12
589.44
DESCRIPCION
1. VELOCIDAD: V=Q/A
2. PENDIENTE:
S=Q1.85/(0.000426CD2.63)1.85
7. POTENCIA CONSUMIDA
7.1 En HP (g
(gQhB/76h
/76h)
7.2 En kw (1 kw = 0.746 HP)
7.3 Diaria: trabajando 12 h
8. COSTO ANUAL DE ENERGIA CE
PDF created with pdfFactory Pro trial version www.pdffactory.com
6,588.19 5,951.93
5,814.77
10
10
9,726.30
16,610.46
28,518.36
76,254.20
68,883.60
67,294.40
85,980.50
85,494.06
95,812.76
39,551.03
39,327.27
44,073.87
171.96
170.99
191.63
46,311.80
44,650.19
50,080.27
DESCRIPCION
1.
VELOCIDAD: V
2.
PENDIENTE: S
3.
4Q
V=
D2
S=
1.85
( 0.0004264CD )
2.63 1.85
h f = SL
4. PERDIDA DE CARGA LOCAL: hL
D
L (m)
L/D
OBSERVACION
606
4,040
606
3,030
10
606
2,424
5.
hB = h + z
donde:
z = 95.37 m
$ 1.29
$ 0.027
TUBERIA DE 8
Consumo de la potencia mensual: 30x603.36 = 18,100.60 kw-h
1.29
$ 487.91
$ 489.00
$ 5,931.93
16.31
9.
10.
COSTO DE LA TUBERIA: CT
$ 9,726.30
$ 16,610.46
$ 28,518.36
COSTO DE LA BOMBA: CB
1,370 $/kw x Pot en kw
11.
C= CT + CB
i
AM =
C
n
1 (1 + i )
0.46
AM =
C = 0.46C
15
1 (1 + 0.46)
PDF created with pdfFactory Pro trial version www.pdffactory.com
i
DE =
C
n
1 + (1 + i )
0.46
DE =
C = 0.002C
15
1 + (1 + 0.46)
6. COSTOS DE BOMBEO
EQUIPAMIENTO DE POZOS TUBULARES CON BOMBAS SUMERGIBLES
COSTO EN DOLARES
DESCRIPCION
Unidad
Cantidad
P. U.
Motores elctricos 60 HP
15,500
15,500
6,000
6,000
Conductores elctricos
ml
50
50
2,500
Codo de descarga
250
250
ml
50
150
7,500
Sub-total
Instalacin, transporte al sitio,
otros
Gastos Generales y Utilidad
Total
PDF created with pdfFactory Pro trial version www.pdffactory.com
P. Parcial
31,750
gbl
2,500
2,500
25%
8,563
42,813
DIAMETRO ECONOMICO
VELOCIDAD MEDIA MAS ECONOMICA EN TUBERIAS
(m/s) segn RICHTER
Tuberas de succin en bombas
centrifugas, de acuerdo con la carga de
0.5 a 1.0
succin, longitud, temperatura del agua
(menos de 70C)
Tuberas de descarga en bombas
1.5 a 2.0
1.0 a 2.0
0.5 a 0.7
1.5 a 3.0
2.0 a 4.0
3.6 a 8.0
1.0 a 3.0
FLYPS 2.0
HERRAMIENTA
PARA EL DISEO
DE ESTACIONES
DE BOMBEO
CISTERNA - Planta
ESTACION DE REBOMBEO
PLANTEAMIENTO TCNICO
1.1 ESTUDIOS PRELIMINARES
Antes de realizar el clculo de las dimensiones y parmetros del
diseo de la lnea de impulsin y de la seleccin del sistema de
bombeo se debe realizar actividades de recoleccin de informacin.
Una inspeccin visual de la zona y reconocimiento de las
instalaciones con el propsito de determinar que parte de estas estn
aun en buenas condiciones para seguir operando y cuales necesitan
ser reemplazadas por otras que brinden mayor tiempo de operacin
planteado por la demanda futura de la poblacin y con una garanta
de funcionamiento a bajo costo de mantenimiento.
La inspeccin visual tambin permite determinar si la fuente de
energa con que se dispone actualmente para el funcionamiento del
equipo de bombeo se encuentra en condiciones de operatividad o
requerir realizar un cambio en el sistema que abarate los costos de
inversin, es decir si se cuenta con suministro de energa elctrica
con fcil acceso o si se deber contar con grupos electrgenos que
trabajen con combustibles lquidos.
Diseo de una nueva lnea de impulsin y seleccin del equipo de bombeo para la extraccin de agua
subterrnea planes de expansin de mnimo costo de agua potable y alcantarillado EPS Chimbote.
Choy Bejar, Vctor David
PDF created with pdfFactory Pro trial version www.pdffactory.com
ESTUDIOS PRELIMINARES
ESTUDIOS DE CAMPO
COTA
LLEGADA
RESERVO
RIO
(m.s.n.m)
COTA
POZO
(m.s.n.
m)
NIVEL
BOMBE
O
(m.s.n.
m)
DIMET
RO
POZO
(mm)
PROFU
NDIDAD
POZO(
m)
NIVELESTTIC
O
(m)
NIVELDINMI
CO
(m)
CAUD
AL
BOMB
EO
(l/s)
HORAS
BOMBE
O
62.12
15.79
1.79
300
40
14
35
18
Cuadro N 05.
Dficit de almacenamiento
a) Material de la tubera
El material de la tubera es escogido por factores econmicos, as como de
disponibilidad de accesorios, y caractersticas de resistencia, ante esfuerzos que
se producirn en momento de su operacin.
PVC para dimetros hasta 250 mm, clase 10 o clase 15 (Normas ISO 4422).
FFD para dimetros de 300 mm a mayores, clase k-9 (Normas ISO 2531).
b) Dimetro de la tubera
Los criterios de eleccin del dimetro se basan en un anlisis tcnico - econmico.
Caudal de bombeo.
Longitud de la lnea de impulsin.
Coeficiente de rugosidad de Hazen Williams.
Niveles de succin y descarga.
Tasa de descuento (12% establecida por el BID)
Coeficientes de la funcin costos para equipo (a, k)
Precio Equipo Instalado=k x (potencia instalada de la bomba)a.
Costos de energa en kW/hora.
Horas de funcionamiento de la bomba.
c) Coeficientes de rugosidad - C
Empleado para calculo de la perdida de carga por friccin con la formula de HAZEN
- WILLIAM y que depende del tipo de tubera a utilizar.
Tubos de PVC :
Nuevo C = 135
Antiguo C = 110
Tubos de FFD :
Nuevo C = 130
Antiguo C = 100
e) Pendientes mnimas
El diseo de las lneas de impulsin se ha realizado considerando la operacin
del sistema, de tal manera que facilite la acumulacin de aire en las partes
altas pronunciadas, en donde se instalarn elementos que aseguren la evacuacin
de ste.
Se recomienda pendientes mnimas de:
2 a 3 mm/m en las partes ascendentes.
4 a 6 mm/m en las partes descendentes.
Estando sujeto esto a la configuracin de la topografa.