Академический Документы
Профессиональный Документы
Культура Документы
PMS
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
PMS No.
Unit / System
BLN
THN
30
2015
Running
Hours
Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
SETIAP 50 SERVICE HOURS
Periksa kebocoran dan kelonggaran bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem pendinginan
PI C
1.1
1.1.1
1.1.2
1.1.3
1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6
C/E
1.3
1.3.1
1.3.2
C/E
1.4
1.4.1
C/E
1.5
1.5.1
1.5.2
428
62
490
C/E
25/Jul/15
25/Jul/15
25/Jul/15
10
10
10
23/May/15
18/May/15
9/May/15
2/May/15
2/May/15
2/May/15
141
151
169
184
184
184
10/Jan/15
5/Jan/15
415
426
2/May/15
184
10/Feb/15
2/May/15
351
184
Interval
Months
PMS No.
Unit / System
Unit / System
Running
Hours
13/Feb/15
13/Feb/15
2/May/15
8/Aug/11
345
345
184
3,001
29/Jun/15
25/Jul/15
64
10
Interval
Months
PI C
1.6
1.6.1
1.6.2
1.6.3
1.6.4
1.7
1.7.1
1.7.2
MARINE GEARBOX
Inspect Oil Level of Gearbox
Clean outside of Gearbox
1.7.3
MARINE GEARBOX
Periksa level minyak pelumas dari Gearbox
Bersihkan bagian luar dari Gearbox
Periksa dan pastikan tidak ada kebocoran dari minyak atau air
dari Gearbox
1.7.4
2/Jul/15
1.7.5
2/Jun/14
1.7.6
2/Jun/14
1.7.7
1.7.8
1.7.9
1.7.10
1.7.11
13/Feb/15
2/Jun/14
8/Aug/11
8/Aug/11
8/Aug/11
1.8
SHAFT PROPELLER
SHAFT PROPELLER
1.8.1
3/Jul/15
1.8.2
3/Jul/15
1.9
1.9.1
Check to make sure no one is near the engines and tools are
not left on or near the engine
1.9.2
1.9.3
1.9.4
C/E
2/Jul/15
58
58
874
874
345
874
3,001
3,001
3,001
C/E
1
0
0
C/E
3/Jul/15
21/Jul/15
1
0
0
21/Jul/15
1
1
0
21/Jul/15
PMS No.
1.9.5
1.9.6
1.9.7
Unit / System
Maintain batteries for electrolyte level, clean batteries if
necessary, check for tight connection
Check the conditional of all Gauges, repair or replace any
broken gauges
Check batteriy charger for proper operaation. Disconnect
charger before starting the engine
Unit / System
PI C
C/E
21/Jul/15
21/Jul/15
21/Jul/15
1.10.1
1.10.2
1.10.3
1.11
1.11.1
CONTROL ENGINE THROTLE (MORSE CONTROL) CONTROL KENDALI MESIN (MORSE CONTROL)
Lubricating All Control Engine Morse machaniscem
Lumasi machanism Kabel Morse Kontrol Engine
1.11.2
13/Feb/15
1.1.3
13/Feb/15
1.12
1.12.1
1.12.2
1.12.3
2/Jul/15
0
0
2/Jul/15
2/Jul/15
0
0
0
13/Feb/15
345
1
1
1
345
C/E
2/May/15
30
2/May/15
30
1.13
1.13.1
TOP OVERHAUL
Top overhaul Main engine portside
TOP OVERHAUL
Top overhaul Main engine portside
C/E
8/Aug/11
490
1.14
1.14.1
GENERAL OVERHAUL
General overhaul Main Engine Portside
GENERAL OVERHAUL
General Overhaul Main Engine Portside
C/E
8/Aug/11
490
C/E
Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.
345
30
1.15.1
C/E
2/May/15
1.15
Interval
Months
1.10
Running
Hours
5/Jul/15
PMS No.
Unit / System
Unit / System
IC
ITEM MAINTENANCEPFOR
July-15
Running
Hours
Interval
Months
21
PERF
PMS MAIN PR
PORTSID
PMS No.
Reason
Chief Engineer
Master
Date :
Date :
Written by :HST
Form
PROPULSION PORTSIDE
LF- E 031
Revision
Page
1 Of 3
July 2015
Symbol
Interval
Hours
50
50
50
18-Aug-15
18-Aug-15
18-Aug-15
250
250
250
250
250
250
20-Sep-15
15-Sep-15
6-Sep-15
30-Aug-15
30-Aug-15
30-Aug-15
500
500
8-Sep-15
3-Sep-15
1000
27-Aug-16
3000
3000
31-Jan-19
22-Apr-19
Jan-15
Feb-15
Mar-15
May-15
May-15
C
C
C
C
C
C
C
C
C
C
C
C
C
C
Jul-15
Aug-15
C
C
C
S
S
S
S
S
S
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
C
C
5000
5000
5000
5000
28-Sep-21
28-Sep-21
15-Dec-21
23-Mar-18
100
100
16-Aug-15
11-Sep-15
19-Aug-15
19-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
20-Aug-15
C
C
S
S
20-Aug-15
20-Aug-15
100
100
1000
28-Sep-15
1000
28-Sep-15
1000
1000
5,000
5,000
10,000
10-Jun-16
28-Sep-15
23-Mar-18
23-Mar-18
5-Nov-24
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jul-15
Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
1-Aug-15
1-Aug-15
1-Aug-15
C
C
C
S
S
S
2000
7-Oct-17
2000
7-Oct-17
2000
7-Oct-17
2000
24-Dec-17
2000
24-Dec-17
2000
24-Dec-17
4000
24-Nov-16
6000
20-Jul-19
4-Aug-15
Jan-15
Feb-15
Mar-15
May-15
May-15
C
C
C
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
PERFORMANCE 100%
MS MAIN PROPULSION
PORTSIDE FOR THIS
MONTH
on
2015
Jan-15
EXCELLENT
Remarks
DEDE MULYANA
Technical Superintendent
Master
Date :
Approved by : VP / DPA
Dec-15
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
PMS No.
Unit / System
BLN
THN
30
2015
Running
Hours
Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
SETIAP 24 SERVICE HOURS
Periksa kebocoran dan kelonggaran bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem pendinginan
PI C
2.1
2.1.1
2.1.2
2.1.3
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
C/E
428
62
490
C/E
20/Jul/15
20/Jul/15
20/Jul/15
21
21
21
23/May/15
18/May/15
9/May/15
2/May/15
2/May/15
2/May/15
141
151
169
184
184
184
Interval
Months
PMS No.
Unit / System
Unit / System
Running
Hours
10/Jan/15
2/May/15
415
184
2/May/15
184
2.3
2.3.1
2.3.2
PC/E
IC
2.4
2.4.1
C/E
2.5
2.5.1
2.5.2
8/Aug/13
10/Feb/15
1,490
351
2.6
2.6.1
2.6.2
2.6.3
2.6.4
8/Aug/11
13/Feb/15
13/Feb/15
2/May/15
3,001
345
345
184
2.7
2.7.1
2.7.2
MARINE GEARBOX
Inspect Oil Level of Gearbox
Clean outside of Gearbox
2/Jul/15
2/Jul/15
58
58
2.7.3
MARINE GEARBOX
Periksa level minyak pelumas dari Gearbox
Bersihkan bagian luar dari Gearbox
Periksa dan pastikan tidak ada kebocoran dari minyak atau air
dari Gearbox
2.7.4
2/Jul/15
2.7.5
2/Jun/14
2.7.6
2/Jun/14
2.7.7
2.7.8
2.7.9
2.7.10
2.7.11
2/Jun/14
2/Jun/14
2/May/15
2/May/15
13/Feb/15
2.8
SHAFT PROPELLER
SHAFT PROPELLER
2.8.1
2/Jul/15
2/Jul/15
2.8.2
Interval
Months
C/E
2/Jul/15
58
58
874
874
874
874
184
184
345
C/E
1
0
0
PMS No.
Unit / System
Unit / System
2.9
2.9.1
Check to make sure no one is near the engines and tools are
not left on or near the engine
2.9.2
2.9.3
2.9.4
2.9.5
2.9.6
2.9.7
Running
Hours
Interval
Months
PC/E
IC
2/Jul/15
21/Jul/15
1
0
0
21/Jul/15
1
1
0
21/Jul/15
21/Jul/15
1
1
0
21/Jul/15
21/Jul/15
0
0
1
1
PMS No.
Unit / System
Unit / System
2.10
2.10.1
2.10.2
2.10.3
2.11
2.11.1
CONTROL ENGINE THROTLE (MORSE CONTROL) CONTROL KENDALI MESIN (MORSE CONTROL)
Lubricating All Control Engine Morse machaniscem
Lumasi machanism Kabel Morse Kontrol Engine
2.11.2
13/Feb/15
13/Feb/15
2.11.3
2.12
2/Jul/15
2/Jul/15
2/Jul/15
0
0
0
13/Feb/15
345
1
1
1
C/E
C/E
2.12.2
2.12.3
2.13
2.13.1
TOP OVERHAUL
Top overhaul Main engine portside
TOP OVERHAUL
Top overhaul Main engine portside
C/E
2.14
2.14.1
GENERAL OVERHAUL
General overhaul Main Engine Portside
GENERAL OVERHAUL
General Overhaul Main Engine Portside
C/E
C/E
2.15.1
Interval
Months
PC/E
IC
2.12.1
2.15
Running
Hours
Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.
345
345
2/May/15
30
2/May/15
30
2/May/15
30
8/Aug/11
490
8/Aug/11
490
9/Jul/15
21
PERF
PMS MAIN PR
PORTSID
PMS No.
Unit / System
Unit / System
IntervalPR
PMS MAIN
Months
PORTSID
Running
Hours
July-15
Summary of Overdue Maintenance
Item Maintenance
PMS No.
Reason
Chief Engineer
Master
Date :
Date :
Written by :HST
Form
OPULSION STARBOARDSIDE
LF- E 031
Revision
Page
1 Of 3
July 2015
Symbol
Interval
Hours
50
50
50
13-Aug-15
13-Aug-15
13-Aug-15
250
250
250
250
250
250
20-Sep-15
15-Sep-15
6-Sep-15
30-Aug-15
30-Aug-15
30-Aug-15
Jan-15
Feb-15
Mar-15
May-15
C
C
C
C
C
C
May-15
C
C
C
C
C
C
Jul-15
Aug-15
C
C
C
S
S
S
S
S
S
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
8-Sep-15
29-Dec-15
1000
27-Aug-16
3000
3000
29-Jul-17
31-Jan-19
5000
5000
5000
5000
23-Mar-18
28-Sep-21
28-Sep-21
15-Dec-21
100
100
19-Aug-15
19-Aug-15
C
C
S
S
19-Aug-15
19-Aug-15
1-Aug-15
1-Aug-15
100
1000
28-Sep-15
1000
28-Sep-15
1000
1000
1000
1000
1000
28-Sep-15
28-Sep-15
27-Aug-16
27-Aug-16
10-Jun-16
Dec-15
Jan-16
Nov-15
Dec-15
500
500
100
Oct-15
C
C
C
C
C
C
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
1-Aug-15
20-Aug-15
C
C
S
S
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
1-Aug-15
1-Aug-15
1-Aug-15
2000
7-Oct-17
2000
7-Oct-17
2000
7-Oct-17
2000
24-Dec-17
2000
24-Dec-17
2000
24-Dec-17
4000
24-Nov-16
6000
20-Jul-19
Aug-15
C
C
C
S
S
S
C
C
C
8-Aug-15
PERFORMANCE 100%
MS MAIN PROPULSION
PORTSIDE FOR THIS
MONTH
Jul-15
EXCELLENT
C
C
C
C
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
on
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
EXCELLENT
Remarks
DEDE MULYANA
Technical Superintendent
Master
Date :
Approved by : VP / DPA
Dec-15
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
PMS No.
Err:509
Unit / System
1.1.2
1.1.3
Unit / System
1154
C/E
Last Maint.
Date
Err:509
C/E
25/Jul/15
C/E
25/Jul/15
C/E
25/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
30/Dec/99
C/E
29/Jun/15
C/E
25/Jul/15
PIC
1.7.1
1.7.2
1.7.3
C/E
2/Jul/15
1.7.4
C/E
2/Jul/15
1.7.5
C/E
2/Jun/14
C/E
2/Jun/14
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
3/Jul/15
Err:509
Err:509
Err:509
Err:509
C/E
C/E
Err:509
Err:509
C/E
3/Jul/15
Err:509
C/E
Err:509
C/E
3/Jul/15
1.1.1
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
1.7.6
Err:509
Err:509
Err:509
Err:509
Err:509
1.8.1
Err:509
Err:509
1.8.2
Err:509
1.9.1
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
Err:509
Periksa untuk memastikan tidak ada
orang yang dekat dengan engine dan
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Running
Hours
Err:509
Interval
Months Hours
Err:509
STATUS
Err:509
Err:509
10
50
18/Aug/15
10
50
18/Aug/15
10
50
18/Aug/15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
30/Dec/99
64
100
16/Aug/15
10
100
11/Sep/15
58
100
19/Aug/15
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2/Aug/15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2/Aug/15
Err:509
Err:509
Err:509
2/Aug/15
OVERDUE
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
PMS No.
#REF!
ITEM
MAINTENANCE
FOR
Unit / System
#REF!
Unit / System
#REF!
PERFORMANCE
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
###
1154
Last Maint.
Date
#REF!
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Running
Hours
#REF!
Interval
Months Hours
#REF!
STATUS
#REF!
Err:504
#REF!
1154
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
PMS No.
Unit / System
BLN
THN
30
2015
Running
Hours
Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
50 JAM KERJA
Periksa volume air pendingin pada header tank
Periksa pelumas dan pendingin dari kebocoran
Periksa volume oli pelumas pada sump tank
PI C
3.1
3.1.1
3.1.2
3.1.3
3.2
3.2.1
3.2.2
C/E
3.3
3.3.1
3.3.2
3.3.3
3.3.4
C/E
EVERY 1 YEARS
SETIAP 1 TAHUN
Ganti baru air pendingin dan tambahkan additive coolant
sebagai pengaman
C/E
ALTERNATOR GENERATOR
Periksa semua sambungan2 dan kabel generator
Test fungsi2 equipment aksesoris generator
C/E
3.4
3.4.1
Replace Coolant
3.5
3.5.1
3.5.2
ALTERNATOR GENERATOR
Inspect all generator connections and cabling
Test function of auxiliaries
Interval
Months
3,960
360
4,320
C/E
30/Jul/15
30/Jul/15
30/Jul/15
0
0
0
20/Jul/15
20/Jul/15
120
120
8/Jul/15
8/Jul/15
8/Jul/15
8/Jul/15
264
264
264
264
30/Jul/15
20/Jul/15
20/Jul/15
120
120
12
PMS No.
3.5.3
Unit / System
Unit / System
PI C
C/E
Check to make sure no one is near the engines and tools are
not left on or near the engine
3.6.2
3.6.3
3.5.4
3.5.5
3.6
3.6.1
3.6.4
3.6.5
3.6.6
20/Jul/15
20/Jun/15
20/May/15
Running
Hours
120
480
852
21/Jul/15
21/Jul/15
Interval
Months
1
0
0
21/Jul/15
1
1
0
21/Jul/15
21/Jul/15
1
1
0
21/Jul/15
PMS No.
Unit / System
3.7
3.7.1
3.7.2
3.7.3
3.8
Unit / System
PC/E
IC
C/E
21/Jul/15
21/Jul/15
21/Jul/15
3.8.1
3.8.2
3.8.3
3.9
3.9.1
TOP OVERHAUL
Top overhaul aux engine portside
TOP OVERHAUL
Top overhaul aux engine portside
C/E
3.10
3.10.1
GENERAL OVERHAUL
General overhaul aux engine Portside
GENERAL OVERHAUL
General Overhaul aux engine Portside
C/E
C/E
3.11
3.11.1
22/Jun/14
22/Jun/14
22/Jun/14
Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.
Running
Hours
0
0
0
Item Maintenance
1
1
1
1,199
1,199
1,199
31/Aug/13
2,077
31/Aug/13
2,077
30/May/15
20
PERF
PMS AUXILLIA
PORTSID
Interval
Months
Reason
PMS No.
Unit / System
Unit / System
Running
Hours
Interval
Months
PI C
Chief Engineer
Master
Date :
Date :
Written by :HST
Form
LF- E 033
Revision
Page
1 Of 3
July 2015
Symbol
Interval
Hours
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
50
50
50
3-Aug-15
3-Aug-15
3-Aug-15
C
C
C
S
S
S
250
250
9-Aug-15
9-Aug-15
C
C
S
S
500
500
500
500
18-Aug-15
18-Aug-15
18-Aug-15
18-Aug-15
C
C
C
C
S
S
S
S
30-Jul-16
250
250
9-Aug-15
9-Aug-15
C
C
S
S
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
250
500
1000
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
9-Aug-15
31-Jul-15
11-Aug-15
Jul-15
C
Aug-15
S
S
S
21-Aug-15
20-Aug-15
C
C
S
S
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
Feb-15
Mar-15
May-15
May-15
20-Aug-15
20-Aug-15
20-Aug-15
2000
24-Apr-16
2000
24-Apr-16
2000
24-Apr-16
4000
6-May-17
6000
9-Mar-19
30-Nov-15
PERFORMANCE 100%
S AUXILLIARY ENGINE
PORTSIDE FOR THIS
MONTH
son
2015
Jan-15
EXCELLENT
Remarks
Jul-15
Aug-15
C
C
C
S
S
S
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
DEDE MULYANA
Technical Superintendent
Master
Date :
Approved by : VP / DPA
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
PMS No.
Unit / System
BLN
THN
30
2015
Running
Hours
Unit / System
4.1
4.1.1
4.1.2
4.1.3
4.2
4.2.1
4.2.2
C/E
4.3
4.3.1
4.3.2
4.3.3
4.3.4
C/E
EVERY 1 YEARS
SETIAP 1 TAHUN
Ganti baru air pendingin dan tambahkan additive coolant
sebagai pengaman
C/E
ALTERNATOR GENERATOR
Periksa semua sambungan2 dan kabel generator
C/E
4.4
4.4.1
Replace Coolant
4.5
4.5.1
ALTERNATOR GENERATOR
Inspect all generator connections and cabling
PI C
Interval
Months
3,960
360
4,320
C/E
28/Jul/15
28/Jul/15
24
24
28/Jul/15
24
20/Jul/15
20/Jul/15
120
120
20/Jul/15
12/Jul/15
12/Jul/15
12/Jul/15
120
216
216
216
30/Jul/15
21/Jul/15
108
12
PMS No.
4.5.2
4.5.3
4.5.4
4.5.5
4.6
4.6.1
4.6.2
4.6.3
4.6.4
4.6.5
4.6.6
Unit / System
Unit / System
PI C
C/E
Check to make sure no one is near the engines and tools are
not left on or near the engine
21/Jul/15
21/Jul/15
21/Jul/15
21/Jul/15
Running
Hours
108
108
108
108
21/Jul/15
21/Jul/15
Interval
Months
1
0
0
21/Jul/15
1
1
0
21/Jul/15
21/Jul/15
1
1
0
21/Jul/15
PMS No.
Unit / System
4.7
4.7.1
4.7.2
4.7.3
4.8
Unit / System
PC/E
IC
C/E
21/Jul/15
21/Jul/15
21/Jul/15
4.8.1
4.8.2
4.8.3
4.9
4.9.1
TOP OVERHAUL
Top overhaul aux engine portside
TOP OVERHAUL
Top overhaul aux engine portside
C/E
4.10
4.10.1
GENERAL OVERHAUL
General overhaul aux engine Portside
GENERAL OVERHAUL
General Overhaul aux engine Portside
C/E
C/E
4.11
4.11.1
22/Jun/15
22/Jun/15
22/Jun/15
Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.
Running
Hours
0
0
0
Item Maintenance
1
1
1
113
113
113
31/Aug/13
2,077
31/Aug/13
2,077
30/May/15
20
PERF
PMS AUXILLIA
PORTSID
Interval
Months
Reason
PMS No.
Unit / System
Unit / System
Running
Hours
Interval
Months
PI C
Chief Engineer
Master
Date :
Date :
Written by :HST
Form
RY ENGINE STARBOARDSIDE
LF- E 033
Revision
Page
1 Of 3
July 2015
Symbol
Interval
Hours
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
50
50
1-Aug-15
1-Aug-15
C
C
S
S
50
1-Aug-15
250
250
9-Aug-15
9-Aug-15
C
C
S
S
500
500
500
500
30-Aug-15
22-Aug-15
22-Aug-15
22-Aug-15
C
C
C
C
S
S
S
S
30-Jul-16
250
10-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
250
250
250
250
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
10-Aug-15
10-Aug-15
Jul-15
C
C
Aug-15
S
S
10-Aug-15
10-Aug-15
C
C
S
S
21-Aug-15
20-Aug-15
C
C
S
S
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
Feb-15
Mar-15
May-15
May-15
20-Aug-15
20-Aug-15
20-Aug-15
2000
24-Apr-17
2000
24-Apr-17
2000
24-Apr-17
4000
6-May-17
6000
9-Mar-19
30-Nov-15
PERFORMANCE 100%
S AUXILLIARY ENGINE
PORTSIDE FOR THIS
MONTH
son
2015
Jan-15
EXCELLENT
Remarks
Jul-15
Aug-15
C
C
C
S
S
S
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
DEDE MULYANA
Technical Superintendent
Master
Date :
Approved by : VP / DPA
PMS No.
3.1.1
3.1.2
Err:509
3.1.3
Err:509
0
Err:509
Err:509
Err:509
Err:509
3.2.1
3.2.2
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.3.1
Err:509
3.3.2
3.3.3
3.3.4
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.5.1
Err:509
3.5.2
Err:509
Err:509
Err:509
3.5.3
3.5.4
Unit / System
PIC
Last Maint.
Date
Running
Hours
C/E
30/Jul/15
C/E
30/Jul/15
C/E
Err:509
C/E
30/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
30/Dec/99
Err:509
Err:509
Err:509
Err:509
20/Jul/15
C/E
20/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
8/Jul/15
Err:509
8/Jul/15
C/E
8/Jul/15
264
C/E
8/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
20/Jul/15
C/E
Err:509
C/E
20/Jul/15
C/E
C/E
C/E
C/E
Unit / System
Form Code
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Periksa semua sambungan2 dan kabel
generator
Err:509
Test fungsi2 equipment aksesoris
Test function of auxiliaries
generator
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Inspect condition of fan
Periksa kondisi fan
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
LF- C 050Revision
Interval
Est. Next Due
Months Hours
50
3-Aug-15
50
3-Aug-15
Err:509
Err:509
Err:509
50
3-Aug-15
Err:509
0
Err:509
Err:509
Err:509
Err:509
120
Err:509
0
Err:509
Err:509
Err:509
Err:509
250
Err:509
30-Dec-99
Err:509
Err:509
Err:509
Err:509
9-Aug-15
120
250
9-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
264
Err:509
264
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
500
Err:509
500
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
18-Aug-15
Err:509
18-Aug-15
500
18-Aug-15
264
500
18-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
120
250
9-Aug-15
Err:509
Err:509
Err:509
120
250
9-Aug-15
Err:509
Err:509
Err:509
20/Jul/15
Err:509
Err:509
Err:509
120
Err:509
Err:509
Err:509
250
Err:509
Err:509
Err:509
9-Aug-15
C/E
20/Jun/15
480
500
31-Jul-15
3.6.1
C/E
21/Jul/15
21-Aug-15
3.6.2
C/E
21/Jul/15
20-Aug-15
3.6.3
C/E
21/Jul/15
20-Aug-15
3.6.4
C/E
21/Jul/15
20-Aug-15
3.6.5
C/E
21/Jul/15
20-Aug-15
C/E
Err:509
Err:509
Err:509
Err:509
C/E
21/Jul/15
20-Aug-15
C/E
Err:509
Err:509
Err:509
Err:509
C/E
21/Jul/15
20-Aug-15
C/E
21/Jul/15
20-Aug-15
C/E
21/Jul/15
20-Aug-15
C/E
30/May/15
30-Nov-15
Err:509
3.6.6
Err:509
3.7.1
3.7.2
3.7.3
3.11.1
Err:509
Check battery charger for proper
operation. Disconnect charger before
starting the engine
Err:509
Err:509
Periksa dan perhatikan suara yang tidak
biasa atau suara getaran
Check and attention to exhaust colour
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Take Lub. oil sample and send ashore for Ambil contoh Lub. Oil dan kirim ke darat
laboratory analysis.
untuk di periksa.
Check and attention to abnormal noise
1154
STATUS
OVERDUE
22
PERFORMANCE
96%
OVERDUE
SCHEDULED
Maintain This Month
ITEM OVERDUE
FOR
July 2015
Form Code
LF- C 050Revision
1154
OVERDUE
EXCELLENT
SCHEDULED
SCHEDULED
Maintain This Month
Chief Engineer
Date :
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Check all exhaust gas piping to ensure no
leak.
Tighten up exhaust Pipe bellow bolts, if
necessary.
Check all securing brackets Exhaust Pipe
and fastener.
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.
Kencangkan baut pegangan Pipa Gas
Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
OVERDUE
23
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Running
Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
22/Jun/14
1,199
2000
24-Apr-16
C/E
22/Jun/14
1,199
2000
24-Apr-16
C/E
22/Jun/14
1,199
2000
24-Apr-16
Interval
Est. Next Due
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Technical Superintendent
Date :
SCHEDULED
STATUS
PMS No.
#REF!
Unit / System
#REF!
Unit / System
#REF!
Last Maint.
Date
#REF!
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Form Code
Running
Hours
#REF!
LF- C 050Revision
Interval
Est. Next Due
Months Hours
#REF!
#REF!
1154
STATUS
Err:504
#REF!
#REF!
PERFORMANCE
OVERDUE
#DIV/0!
#REF!
SCHEDULED
Maintain This Month
ITEM OVERDUE
FOR
#REF!
OVERDUE
#DIV/0!
SCHEDULED
SCHEDULED
Maintain This Month
Unit / System
Unit / System
OVERDUE
0
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Last Maint.
Date
Running
Hours
Interval
#REF!
SCHEDULED
STATUS
Chief Engineer
Date :
Form Code
LF- C 050Revision
Technical Superintendent
Date :
1154
Form
TEST PROGRAM
LF- E 035
Revision
Page
Vessel
Name :
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
1 Of 2
BLN
THN
30
2015
PI C
Running
Hours
Symbol
O
PMS No.
Unit / System
5.1
TEMPERATURE INDICATOR
Remove temperature indicator from the place, cleaning sensor
from sludge and be sure temperature indicator normaly
function
Visual check condition of sensor and temperature casing not
broken
Compared with other thermometers when thermometer
working.
INDIKATOR TEMPERATUR
Lepas indikator temperatur dari tempatnya dan bersihkan
sensor dari jelaga pastikan indikator temperatur berfungsi
dengan baik
check kondisi visual sensor dan casing temperatur tidak ada
yg pecah atau rusak
Bandingkan dengan thermometer lain ketika thermometer
bekerja
PRESSURE SWITCHES
Check cable connections and cable entries to the sensor.
PRESSURE SWITCHES
Periksa kabel koneksi dan kabel yang masuk ke sensor
5.2.2
Periksa bahwa tidak ada kebocoran oli atau air dari sensor
atau koneksi sensor. Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih lanjut.
5.3
5.3.1
5.3.2
5.3.3
GENERAL
Check general condition of Insulation of exhaust pipes
Test Fire pump
Check general condition of Control consoles
GENERAL
Check general condition of Isolasi pipa gas buang
Test fire pump
Check general condition of konsol control
5.1.1
5.1.2
5.1.3
5.2
5.2.1
Unit / System
Interval
Months Hours
15/May/15
14/Jul/15
2/Jul/15
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
15-Aug-15
14-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
C
C
C
S
S
S
1
0
15-Aug-15
1
2/Jul/15
2/Jul/15
2/Jul/15
2/Jul/15
3
2
15/Jul/15
July 2015
TGL
0
0
0
1
1
1
PERFORMANCE 100%
PMS TEST PROGRAM FOR
THIS MONTH
EXCELLENT
PMS No.
Reason
Chief Engineer
Remarks
DEDE MULYANA
Technical Superintendent
Master
Date :
Date :
LF- E 035/DES 2012
Written by :HST
Date :
Approved by : VP / DPA
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Last Maint.
Date
C/E
15/May/15
C/E
15/Jul/15
Err:509
Compared with other thermometers when
thermometer working.
Err:509
Err:509
Err:509
Check cable connections and cable
entries to the sensor.
Err:509
Bandingkan dengan thermometer lain
ketika thermometer bekerja
Err:509
Err:509
Err:509
Periksa kabel koneksi dan kabel yang
masuk ke sensor
C/E
Err:509
C/E
14/Jul/15
C/E
C/E
C/E
Err:509
Err:509
Err:509
C/E
2/Jul/15
C/E
2/Jul/15
Err:509
Err:509
Err:509
Check general condition of Insulation of
exhaust pipes
Err:509
Err:509
Err:509
Err:509
Err:509
Check general condition of Isolasi pipa
gas buang
Err:509
Err:509
C/E
C/E
C/E
Err:509
Err:509
Err:509
C/E
2/Jul/15
C/E
C/E
Err:509
Err:509
C/E
2/Jul/15
Err:509
Err:509
Err:509
Err:509
Check general condition of Control
consoles
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
C/E
2/Jul/15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Unit / System
5.1.1
5.1.2
5.1.3
Err:509
Err:509
Err:509
5.2.1
5.2.2
Err:509
Err:509
Err:509
5.3.1
Err:509
Err:509
5.3.2
Err:509
Err:509
Err:509
Err:509
5.3.3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1154
PIC
PMS No.
Err:509
Unit / System
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Err:509
Err:509
Err:509
Err:509
Err:509
ITEM
MAINTENANCE
FOR
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PERFORMANCE
C/E
C/E
C/E
C/E
C/E
1154
Err:509
Err:509
Err:509
Err:509
Err:509
100%
July 2015
ITEM OVERDUE
FOR
July 2015
EXCELLENT
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
5.2.2
Err:509
Err:509
Err:509
5.3.1
Err:509
Err:509
5.3.2
Err:509
Err:509
Err:509
Err:509
5.3.3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1154
Unit / System
Unit / System
PIC
Last Maint.
Date
C/E
15/Jul/15
Err:509
Compared with other thermometers when
thermometer working.
Check cable connections and cable
entries to the sensor.
Err:509
Bandingkan dengan thermometer lain
ketika thermometer bekerja
Periksa kabel koneksi dan kabel yang
masuk ke sensor
C/E
Err:509
C/E
14/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
Err:509
Err:509
Err:509
Check general condition of Isolasi pipa
gas buang
Err:509
Err:509
Test fire pump
Err:509
Err:509
Err:509
Err:509
C/E
C/E
C/E
Err:509
Err:509
Err:509
C/E
2/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
2/Jul/15
Err:509
Err:509
Err:509
Err:509
C/E
2/Jul/15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Check general condition of Insulation of
exhaust pipes
Err:509
Err:509
Test Fire pump
Err:509
Err:509
Err:509
Err:509
Check general condition of Control
consoles
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Chief Engineer
Date :
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Running
Hours
Interval
Est. Next Due
Months Hours
15-Aug-15
15-Aug-15
Err:509
Err:509
Err:509
14-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
2-Aug-15
STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Maintain This
Month
Maintain This
Month
Maintain This
Month
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Maintain This Month
OVERDUE
SCHEDULED
Maintain This Month
OVERDUE
EXCELLENT
SCHEDULED
Maintain This Month
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Interval
1
SCHEDULED
STATUS
15-Aug-15
SCHEDULED
Err:509
Err:509
Err:509
14-Aug-15
2-Aug-15
2-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Technical Superintendent
Date :
1154
AUXILIARY MACH
Vessel
Name :
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
PMS No.
Unit / System
Unit / System
BLN
THN
30
2015
PI C
Running Hours
22/May/15
6.1
6.1.1
6.1.2
open and close all seachest valve, ensure all valve easy and
buka dan tutup semua valve seachest, pastikan semua valve
ready for operate, add grease at valve stem and change gland mudah dan siap untuk dioperasikan, tambahkan grease pada
packing if necessary
valve stem dan ganti gland packing jika diperlukan
22/May/15
6.1.3
Check and Ensure, zinch anode still , replace new zinch anode Pastikan zinch anode untuk seachest masih ada, ganti jika
if necessary
zinch anode sudah habis
22/May/15
6.2
6.2.1
TGL
C/E
2
2
C/E
28/May/15
PMS No.
Unit / System
Unit / System
PI C
6.2.2
Clean fan, impeller and protective guard ventilation passage. Bersihkan kipas dan rumah pelindung saluran udara. untuk
For motor driven main fire pump
motor penggerak main fire pump
28/May/15
6.2.3
28/May/15
6.2.4
6.2.5
6.2.6
check main fire pump from noize and vibration, check bolt
pondation tightness and bolt rubber coupling between pump
and motor, when pump operated
renew gland packing for main fire pump
28/May/15
Periksa main fire pump dari suara bising dan getaran berlebih,
periksa kekencangan baut pondasi dan baut rubber coupling
antara pompa dan motor
Ganti baru gland packing untuk main fire pump
23
6.2.8
28/Jul/15
6.2.9
open and close all main fire valve, ensure all valve easy and buka dan tutup semua fire valve, pastikan semua valve mudah
ready for operate, add grease at valve stem and change gland dan siap untuk dioperasikan, tambahkan grease pada valve
packing if necessary
stem dan ganti gland packing jika diperlukan
6.3.3
6.3.4
6.3.1
6.3.2
6.3.5
6.3.6
6.3.7
6.3.8
1
2
30/Aug/13
28/May/15
FUEL SYSTEM
Check wire terminal and gland tightness. For motor driven
transfer pump
Clean fan, impeller and protective guard ventilation passage.
For motor driven transfer pump
23/Jun/15
6.2.7
6.3
Running Hours
28/May/15
2
C/E
10/May/15
10/May/15
10/May/15
2
2
2
10/May/15
2
10/Jul/15
10/May/15
10/May/15
10/Jul/15
PMS No.
6.3.9
6.3.10
Unit / System
Unit / System
PI C
open and close all fuel valve, ensure all valve easy and ready buka dan tutup semua fuel valve, pastikan semua valve
for operate, add grease at valve stem and change gland
mudah dan siap untuk dioperasikan, tambahkan grease pada
packing if necessary
valve stem dan ganti gland packing jika diperlukan
10/May/15
10/May/15
Running Hours
PMS No.
6.3.11
6.4
6.4.1
6.4.2
6.4.3
6.4.4
6.5
Unit / System
Unit / System
Check condition of sighting glass at dayli tank and ensure no Periksa kondisi gelas duga dari tanki bahan bakar harian dan
leaking, sighting glass cover are good condition and easy to pastikan tidak ada kebocoran, cover pelindung gelas duga
read
dalam kondisi baik dan mudah terbaca
C/E
C/E
C/E
6.5.2
6.5.3
6.6
6.6.1
6.6.2
6.6.3
6.6.4
6.6.5
6.7.1
6.7.2
Running Hours
6.5.1
10/Jul/15
6.7
PI C
28/May/15
28/May/15
28/May/15
2
2
28/May/15
2
2
30/Jul/15
2/Jun/15
2/Jun/15
1
1
26/Jul/15
26/Jul/15
26/Jul/15
26/Jul/15
0
0
26/Jul/15
Engine room Bilges, should be kept clean and dry, free from
Bilge/got kamar mesin, harus bersih dan kering, bebas dari
corrosion, wastage and oil. Particular care should be taken to
karat, endapan lumpur dan minyak. Dan benda2 yang
prevent the escape of hydrocarbon liquids or vapour into the
menutup saluran/lubang pada dasar sekat harus dibersihkan
engine room.
C/E
28/May/15
2
28/Jul/15
0
PMS No.
Unit / System
Unit / System
PI C
6.7.3
29/Jul/15
6.7.4
29/Jul/15
6.7.5
28/Jul/15
6.7.6
Ensure All Battery have safety box and battery box are good
condition
28/Jul/15
6.7.7
Check and ensure all panel box completed with rubber mate
and good condition
28/Jul/15
6.7.8
6.8
6.8.1
6.8.2
0
0
Check and ensure behind main switch board are free from any Pastikan dan periksa bagian belakang box panel utama bebas
object and dry condition
dari barang2 dan tetesan / ceceran air
NOTE:
CATATAN
Ensure that during hosing down or cleaning operation, no
water is allowed to settle on electrical machinery. The
compartment should look clean and tidy after this
operation. This is one of the criteria that indicates the
performance of the Chief Engineer and his subordinates.
Running Hours
28/Jul/15
C/E
19/May/15
2/May/15
17
PMS No.
Unit / System
Unit / System
PI C
Running Hours
PMS AUXILIAR
0
July-15
PMS No.
Reason
Chief Engineer
Master
Date :
Date :
Written by :HST
Form
MACHINE
LF- E 036
Revision
Page
1 Of 5
July 2015
Symbol
Interval
Months
Hours
3
Jan-15
Feb-15
Mar-15
2015
Jul-15
Aug-15
May-15
May-15
22-Aug-15
22-Aug-15
22-Aug-15
28-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Months
Hours
3
3
4
Jan-15
Feb-15
Mar-15
2015
Jul-15
Aug-15
May-15
May-15
28-Aug-15
28-Aug-15
28-Sep-15
2
3
23-Aug-15
28-Aug-15
36
30-Aug-16
28-Aug-15
S
S
3
3
3
28-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Sep-15
10-Aug-15
36
10-May-18
10-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Months
Hours
Jan-15
Feb-15
Mar-15
2015
Jul-15
Aug-15
May-15
May-15
10-Aug-15
10-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Months
Hours
Jan-15
Feb-15
Mar-15
May-15
May-15
2015
Jul-15
Aug-15
1
10-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
C
C
C
C
S
S
30-Sep-15
3
3
3
2
2
2-Aug-15
2-Aug-15
26-Sep-15
26-Sep-15
2
2
26-Sep-15
26-Sep-15
26-Sep-15
C
S
S
C
C
C
C
C
3
28-Aug-15
1
28-Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Months
Hours
1
Jan-15
Feb-15
Mar-15
May-15
May-15
2015
Jul-15
Aug-15
29-Aug-15
29-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
1
1
1
3
19-Aug-15
2-Aug-15
PERFORMANCE 100%
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
Interval
Months
Hours
ason
Jan-15
Feb-15
Mar-15
May-15
May-15
2015
Jul-15
Aug-15
Oct-15
Dec-15
Jan-16
Nov-15
Dec-15
EXCELLENT
Remarks
DEDE MULYANA
Technical Superintendent
Master
Date :
Approved by : VP / DPA
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
1154
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
28/Jul/15
C/E
28/May/15
Err:509
Err:509
Err:509
C/E
C/E
C/E
Err:509
Err:509
Err:509
C/E
10/May/15
C/E
10/Jul/15
6.3.9
C/E
10/May/15
6.3.11
C/E
10/Jul/15
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
C/E
28/May/15
C/E
28/May/15
C/E
28/May/15
C/E
Err:509
C/E
28/May/15
PMS No.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6.2.8
6.2.9
Err:509
Err:509
Err:509
6.3.6
6.3.8
Err:509
Err:509
Err:509
Err:509
6.4.1
6.4.2
6.4.3
Err:509
6.4.4
6.7.2
Err:509
Err:509
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
check all line main fire system from
leaking
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
periksa seluruh sistem perpipaan
pemadam dari kebocoran
Err:509
Err:509
Err:509
Ganti baru seal dan packing untuk tranfer
renew seal and packing for tranfer pump
pump
periksa seluruh sistem perpipaan sitem
check all line fuel system from leaking
bahan bakar dari kebocoran
Err:509
Err:509
Err:509
Err:509
Check all hoses and piping for
deterioration.
Err:509
Err:509
Err:509
Err:509
Periksa semua selang dan pipa dari
keusangan
PIC
C/E
28/Jul/15
Err:509
Err:509
Err:509
Err:509
C/E
C/E
Err:509
Err:509
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
6.7.3
1154
C/E
29/Jul/15
6.7.4
C/E
29/Jul/15
6.7.5
C/E
28/Jul/15
6.7.6
C/E
28/Jul/15
6.7.7
C/E
28/Jul/15
6.7.8
C/E
28/Jul/15
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Err:509
6.2.6
ITEM
MAINTENANCE
FOR
Err:509
Err:509
Ganti baru gland packing untuk main fire
renew gland packing for main fire pump
pump
17
PERFORMANCE
1154
C/E
Err:509
C/E
28/May/15
100%
July 2015
ITEM OVERDUE
FOR
July 2015
EXCELLENT
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
1154
35
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
PIC
C/E
C/E
C/E
C/E
C/E
Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509
6.2.5
C/E
23/Jun/15
6.2.6
C/E
28/May/15
C/E
28/Jul/15
C/E
C/E
C/E
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
10/Jul/15
C/E
10/May/15
C/E
10/Jul/15
C/E
10/Jul/15
C/E
C/E
Err:509
Err:509
C/E
30/Jul/15
PMS No.
Err:509
Err:509
Err:509
Err:509
Err:509
6.3.5
6.3.6
6.3.8
6.3.11
6.2.8
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6.5.1
Err:509
Err:509
Check all thermometer and gauges are
functioning properly.
Err:509
Err:509
Periksa semua thermometer dan alat2
indicator berfungsi dengan baik.
6.5.2
Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.
C/E
2/Jun/15
6.5.3
C/E
2/Jun/15
C/E
26/Jul/15
C/E
26/Jul/15
C/E
26/Jul/15
C/E
26/Jul/15
6.6.1
6.6.2
6.6.3
6.6.4
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
1154
6.6.5
C/E
26/Jul/15
6.7.2
C/E
28/Jul/15
Err:509
Err:509
Err:509
Err:509
Semua lampu2 di kamar mesin termasuk
covernya dalam kondisi baik dan
berfungsi
C/E
C/E
Err:509
Err:509
C/E
29/Jul/15
Err:509
Err:509
6.7.3
6.7.4
C/E
29/Jul/15
6.7.5
C/E
28/Jul/15
6.7.6
C/E
28/Jul/15
6.7.7
C/E
28/Jul/15
6.7.8
C/E
28/Jul/15
Chief Engineer
Date :
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Running
Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Interval
Est. Next Due
Months Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
28-Aug-15
28-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
28-Aug-15
28-Aug-15
28-Aug-15
Err:509
Err:509
Err:509
28-Aug-15
28-Aug-15
Maintain This
Month
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
29-Aug-15
29-Aug-15
Maintain This
Month
Maintain This
Month
28-Aug-15
Maintain This
Month
28-Aug-15
28-Aug-15
28-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
SCHEDULED
Err:509
Err:509
Err:509
28-Aug-15
OVERDUE
Maintain This Month
OVERDUE
SCHEDULED
Maintain This Month
EXCELLENT
OVERDUE
SCHEDULED
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
Interval
Err:509
Err:509
Err:509
Err:509
Err:509
SCHEDULED
STATUS
23-Aug-15
SCHEDULED
28-Aug-15
28-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
10-Sep-15
10-Aug-15
10-Aug-15
10-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
30-Sep-15
2-Aug-15
SCHEDULED
2-Aug-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
SCHEDULED
1154
PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision
26-Sep-15
28-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
29-Aug-15
SCHEDULED
SCHEDULED
29-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
0
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
Technical Superintendent
Date :
1154
Form
ELECTRIC EQUIPMENT
LF- E 037
Revision
Page
Vessel
Name :
TB TYTYAN KARIMATA 02
Period :
July 2015
Date Last
Overhoul
August 8, 2011
1 Of 3
BLN
THN
30
2015
Symbol
O
PMS No.
7.1
Unit / System
Unit / System
PI C
7.1.1
2/Jul/15
7.1.2
Visually examine all cable connection and bus bar for decoloration.
2/Jul/15
7.1.3
2/Jul/15
7.1.4
2/Jul/15
2/Jul/15
2/Jul/15
3/Jul/15
7.1.5
7.1.6
7.1.7
7.1.8
All instrumentation (meters) should be in good working order Periksa dan pastikan semua alat pengukur instrumens
and recently calibrated. All controls and meters should be
(indikator2) berfungsi dengan baik dan bersih, mudah dibaca
clearly and accurately identified.
dan akurat
7.2
Running
Hours
Interval
Months Hours
0
0
0
0
1
1
1
1
0
3/Jul/15
Mar-15
May-15
May-15
Jul-15
Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
C
C
S
S
2-Aug-15
2-Aug-15
3-Aug-15
3-Aug-15
5-Aug-15
12-Aug-15
12-Aug-15
Oct-15
1
0
5/Jun/15
Periksa tanda perubahan warna dan bau yang tidak biasa dari
tanda tanda overheating dan koneksi yang longgar.
5/Jun/15
5/Jul/15
SEARCH LIGHT
LAMPU SOROT
7.3.1
12/Jul/15
7.3.2
12/Jul/15
7.3.3
Clean reflector.
Bersihkan reflector.
12/Jul/15
FLOODLIGHT/OUTPASS LIGHT
7.4.1
16/Jul/15
7.4.2
16/Jul/15
7.4.3
16/Jun/15
C/E
GENERAL LIGHTING
GENERAL LIGHTING
Nyalakan semua lampu-lampu Periksa dan ganti lampu yang
rusak.
5-Sep-15
5-Sep-15
1
0
C/E
0
0
0
1
1
3
12-Oct-15
C/E
16-Aug-15
16-Aug-15
16-Aug-15
16-Aug-15
16-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
16-Sep-15
C/E
7.5.1
7.5.2
16/Jul/15
7.5.3
16/Jul/15
7.6
7.6.1
20/Jul/15
7.6.2
20/Jul/15
7.6.3
Check all cell vent caps and ensure they are not choked.
20/Jul/15
7.6.4
20/Jul/15
7.6.5
20/Jul/15
AC ALTERNATOR
AC ALTERNATOR
7.7
Feb-15
7.2.2
7.5
Jan-15
7.2.1
7.4
1
0
PAPAN DISTRIBUSI
7.3
C/E
DISTRIBUTION BOARD
7.2.3
July 2015
TGL
16/Jul/15
0
0
0
1
1
1
C/E
C/E
0
0
0
0
0
1
1
1
1
1
Dec-15
Jan-16
Nov-15
Dec-15
PMS No.
7.7.1
7.7.2
7.7.3
7.7.4
7.7.5
Unit / System
Unit / System
PI C
Megger test generator using manufacturer's guidelines. Ensure Megger test generator sesuai manual book. Pastikan solid
solid state devices are isolated from high voltage generated
state devices terisolasi dari listrik tegangan tinggi saat di
during meggar test. Monitor and record insulation resistance megger test. Monitor dan record hasil megger test dan
with a 500 volt mega-ohm meter. The minimum acceptable
pastikan hasil megger test 500 volt mega-ohm meter,
reading is 2 mega-ohms. if result under 2 mega-ohm
minimum insulation resistance 2 mega-ohm. jika dibawah 2
reinsulated alternator
mega-ohm lakukan reinsulation pada generator
Ensure the location of the generator is receiving adequate
ventilation and is as dry as possible.
Verify the operation of the voltmeter and ammeter for each
generator rated at 50 volts or more.
Every 1,000 hours check the bearing(s) for smooth, quiet
operation
Periodically inspect the unit for any buildup of contamination
(dirt, oil, etc.) on the windings
Running
Hours
24/Jun/15
Interval
Months Hours
2015
Jan-15
Feb-15
Mar-15
May-15
May-15
Jul-15
Aug-15
24/Jul/15
24-Aug-15
24/Jul/15
28/Jun/15
24-Aug-15
28/Jun/15
Dec-15
Jan-16
Nov-15
Dec-15
24-Dec-15
Oct-15
S
1
0
1
1
36
28-Jun-18
28-Sep-15
PERFORMANCE 100%
24
PMS ELECTRIC
EQUIPMENT FOR THIS
MONTH
EXCELLENT
PMS No.
Reason
Chief Engineer
Remarks
DEDE MULYANA
Technical Superintendent
Master
Date :
Date :
Written by :HST
Date :
Approved by : VP / DPA
PMS No.
Err:509
Unit / System
Err:509
Unit / System
Err:509
Form Code
LF- C 050Revision
Interval
Est. Next Due
Months Hours
Err:509
Err:509
C/E
Last Maint.
Date
Err:509
Running
Hours
0
C/E
2/Jul/15
2-Aug-15
C/E
2/Jul/15
2-Aug-15
C/E
2/Jul/15
2-Aug-15
PIC
7.1.1
7.1.2
7.1.3
7.1.4
C/E
2/Jul/15
2-Aug-15
7.1.5
C/E
2/Jul/15
2-Aug-15
7.1.6
C/E
2/Jul/15
2-Aug-15
C/E
3/Jul/15
Err:509
3-Aug-15
C/E
C/E
Err:509
Err:509
Err:509
0
Err:509
Err:509
Err:509
Err:509
C/E
3/Jul/15
3-Aug-15
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Periksa dan pastikan lampu bebas
Check and ensure light are free to rotate.
berputar.
Check all water tight gland and cable
Periksa kekedapan airnya dan kabel yang
entry.
masuk harus di seal.
Check and ensure water tightness of all Periksa dan pastikan kekedapan air semua
covers.
penutup.
C/E
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
12/Jul/15
12-Aug-15
C/E
12/Jul/15
12-Aug-15
C/E
16/Jul/15
16-Aug-15
7.4.2
C/E
16/Jul/15
16-Aug-15
7.5.1
Switch on all lightings Check and replace Nyalakan semua lampu-lampu Periksa
blow out bulb.
dan ganti lampu yang rusak.
C/E
16/Jul/15
16-Aug-15
7.5.2
C/E
16/Jul/15
16-Aug-15
7.5.3
C/E
16/Jul/15
16-Aug-15
C/E
20/Jul/15
20-Aug-15
C/E
20/Jul/15
20-Aug-15
C/E
20/Jul/15
Err:509
20-Aug-15
7.2.3
C/E
5/Jul/15
5-Aug-15
7.7.3
Verify the operation of the voltmeter and Periksa dan pastikan ketika generator
ammeter for each generator rated at 50
beroperasi, indikator menunjukan 50
volts or more.
volts atau lebih
C/E
24/Jul/15
Err:509
24-Aug-15
7.1.7
Err:509
Err:509
7.1.8
Err:509
Err:509
Err:509
7.3.1
7.3.2
7.4.1
7.6.1
7.6.2
7.6.3
1154
STATUS
Err:509
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
20
PERFORMANCE
OVERDUE
100%
July 2015
SCHEDULED
Maintain This Month
ITEM OVERDUE
FOR
July 2015
OVERDUE
EXCELLENT
SCHEDULED
Maintain This Month
Maintain This Month
Unit / System
Err:509
Unit / System
Err:509
7.1.2
7.1.3
7.1.4
OVERDUE
23
PIC
C/E
Last Maint.
Date
Err:509
Running
Hours
0
C/E
2/Jul/15
Interval
Err:509
1
SCHEDULED
STATUS
Err:509
2-Aug-15
SCHEDULED
C/E
2/Jul/15
2-Aug-15
C/E
2/Jul/15
2-Aug-15
C/E
2/Jul/15
2-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
Form Code
LF- C 050Revision
2-Aug-15
C/E
7.1.6
C/E
7.1.7
C/E
C/E
3/Jul/15
3-Aug-15
Err:509
Err:509
Err:509
Err:509
C/E
C/E
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
C/E
5/Jul/15
5-Aug-15
C/E
12/Jul/15
12-Aug-15
C/E
12/Jul/15
12-Aug-15
C/E
16/Jul/15
16-Aug-15
C/E
16/Jul/15
16-Aug-15
C/E
16/Jul/15
16-Aug-15
C/E
C/E
16/Jul/15
16/Jul/15
0
0
1
1
16-Aug-15
16-Aug-15
C/E
20/Jul/15
20-Aug-15
C/E
20/Jul/15
20-Aug-15
C/E
20/Jul/15
Err:509
20-Aug-15
C/E
Err:509
Err:509
Err:509
C/E
20/Jul/15
20-Aug-15
C/E
C/E
C/E
C/E
20/Jul/15
Err:509
Err:509
Err:509
0
Err:509
Err:509
Err:509
1
Err:509
Err:509
Err:509
20-Aug-15
Err:509
Err:509
Err:509
C/E
24/Jul/15
24-Aug-15
7.1.5
7.1.8
Err:509
Err:509
7.2.3
7.3.1
7.3.2
7.4.1
7.4.2
7.5.1
7.5.2
7.5.3
7.6.1
7.6.2
7.6.3
Err:509
7.6.4
7.6.5
Err:509
Err:509
Err:509
7.7.2
7.7.3
Err:509
Err:509
Chief Engineer
Date :
2/Jul/15
1154
SCHEDULED
2/Jul/15
2-Aug-15
SCHEDULED
3/Jul/15
Err:509
3-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
C/E
24/Jul/15
Err:509
24-Aug-15
C/E
C/E
Err:509
Err:509
Err:509
1
Err:509
Err:509
Err:509
Err:509
SCHEDULED
Technical Superintendent
Date :
PMS No.
Unit / System
1.1.3
1.2.1
1.2.2
Unit / System
PIC
C/E
25/Jul/15
C/E
25/Jul/15
C/E
25/Jul/15
C/E
23/May/15
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
5/Jan/15
C/E
2/May/15
C/E
10/Feb/15
C/E
2/May/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
C/E
8/Aug/11
C/E
29/Jun/15
1.2.4
1.2.5
1.2.6
1.3.1
1.3.2
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
1.2.3
1.6.4
1.7.1
1.7.2
C/E
25/Jul/15
1.7.3
C/E
2/Jul/15
1.7.4
C/E
2/Jul/15
1.7.5
C/E
2/Jun/14
1.7.6
C/E
2/Jun/14
1.7.7
C/E
13/Feb/15
1.7.8
C/E
2/Jun/14
1.7.9
C/E
8/Aug/11
1.7.10
C/E
8/Aug/11
1.7.2
C/E
25/Jul/15
1.7.11
Overhoul of Gearbox
Overhoul Gearbox
C/E
8/Aug/11
1.4.1
1.5.1
1.5.2
1.6.1
1.6.2
1.6.3
PMS No.
Unit / System
Unit / System
PIC
1.8.1
C/E
3/Jul/15
1.8.2
C/E
3/Jul/15
1.9.1
C/E
3/Jul/15
1.9.2
C/E
21/Jul/15
1.9.3
C/E
21/Jul/15
1.9.4
C/E
21/Jul/15
1.9.5
C/E
21/Jul/15
1.9.6
C/E
21/Jul/15
1.9.7
C/E
21/Jul/15
1.10.1
C/E
2/Jul/15
1.10.2
C/E
2/Jul/15
1.10.3
C/E
2/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
5/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
1.13.1
1.14.1
1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3
1.15.1
1.11.1
1.11.2
1.1.3
1.12.1
PMS No.
Unit / System
Unit / System
1.13.1
1.14.1
1.12.2
1.12.3
2.1.2
2.1.3
2.2.1
2.2.2
PIC
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
5/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
23/May/15
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/13
C/E
10/Feb/15
C/E
8/Aug/11
C/E
13/Feb/15
C/E
13/Feb/15
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
C/E
2/May/15
C/E
2/Jul/15
2.2.4
2.2.5
2.2.6
2.3.1
2.3.2
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
2.2.3
2.6.4
2.7.1
2.7.2
C/E
2/Jul/15
2.7.3
C/E
2/Jul/15
2.7.4
C/E
2/Jul/15
2.7.5
C/E
2/Jun/14
2.7.6
C/E
2/Jun/14
2.7.7
C/E
2/Jun/14
2.7.8
C/E
2/Jun/14
2.7.9
C/E
2/May/15
2.7.10
C/E
2/May/15
2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3
PMS No.
Unit / System
Unit / System
PIC
2.7.11
Overhoul of Gearbox
Overhoul Gearbox
C/E
13/Feb/15
2.8.1
C/E
2/Jul/15
2.8.2
C/E
2/Jul/15
2.9.1
C/E
2/Jul/15
2.9.2
C/E
21/Jul/15
2.9.3
C/E
21/Jul/15
2.9.4
C/E
21/Jul/15
2.9.5
C/E
21/Jul/15
2.9.6
C/E
21/Jul/15
2.9.7
C/E
21/Jul/15
2.10.1
C/E
2/Jul/15
2.10.2
C/E
2/Jul/15
2.10.3
C/E
2/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
2.15.1
C/E
9/Jul/15
C/E
30/Jul/15
3.1.2
C/E
30/Jul/15
C/E
30/Jul/15
2.13.1
2.14.1
2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3
3.1.3
PMS No.
Unit / System
Unit / System
PIC
3.2.1
C/E
20/Jul/15
3.2.2
C/E
20/Jul/15
3.3.1
C/E
8/Jul/15
3.3.2
C/E
8/Jul/15
3.3.3
C/E
8/Jul/15
3.3.4
C/E
8/Jul/15
3.4.1
Replace Coolant
C/E
30/Jul/15
3.5.1
C/E
20/Jul/15
3.5.2
C/E
20/Jul/15
3.5.3
C/E
20/Jul/15
C/E
20/Jun/15
C/E
20/May/15
3.5.4
3.5.5
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator
3.6.1
C/E
21/Jul/15
3.6.2
C/E
21/Jul/15
3.6.3
C/E
21/Jul/15
3.6.4
C/E
21/Jul/15
3.6.5
C/E
21/Jul/15
3.6.6
C/E
21/Jul/15
3.7.1
C/E
21/Jul/15
3.7.2
C/E
21/Jul/15
3.7.3
C/E
21/Jul/15
C/E
22/Jun/14
C/E
22/Jun/14
C/E
22/Jun/14
C/E
31/Aug/13
C/E
31/Aug/13
3.8.1
3.8.2
3.8.3
3.9.1
3.10.1
PMS No.
Unit / System
Unit / System
PIC
3.11.1
C/E
30/May/15
C/E
28/Jul/15
4.1.2
C/E
28/Jul/15
C/E
28/Jul/15
4.1.3
4.2.1
C/E
20/Jul/15
4.2.2
C/E
20/Jul/15
4.3.1
C/E
20/Jul/15
4.3.2
C/E
12/Jul/15
4.3.3
C/E
12/Jul/15
4.3.4
C/E
12/Jul/15
4.4.1
Replace Coolant
C/E
30/Jul/15
4.5.1
C/E
21/Jul/15
4.5.2
C/E
21/Jul/15
4.5.3
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
4.5.4
4.5.5
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator
4.6.1
C/E
21/Jul/15
4.6.2
C/E
21/Jul/15
4.6.3
C/E
21/Jul/15
4.6.4
C/E
21/Jul/15
4.6.5
C/E
21/Jul/15
4.6.6
C/E
21/Jul/15
4.7.1
C/E
21/Jul/15
4.7.2
C/E
21/Jul/15
4.7.3
C/E
21/Jul/15
PMS No.
Unit / System
Unit / System
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.
Kencangkan baut pegangan Pipa Gas
Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul aux engine portside
General Overhaul aux engine Portside
Ambil contoh Lub. Oil dan kirim ke darat
untuk di periksa.
PIC
C/E
22/Jun/15
C/E
22/Jun/15
C/E
22/Jun/15
C/E
C/E
31/Aug/13
31/Aug/13
C/E
30/May/15
5.1.1
C/E
15/May/15
5.1.2
C/E
15/Jul/15
C/E
14/Jul/15
C/E
2/Jul/15
5.2.2
C/E
2/Jul/15
5.3.1
C/E
2/Jul/15
5.3.2
C/E
2/Jul/15
C/E
2/Jul/15
C/E
22/May/15
C/E
22/May/15
5.1.3
5.2.1
6.1.2
6.1.3
C/E
22/May/15
6.2.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump
C/E
28/May/15
C/E
28/May/15
C/E
28/May/15
6.2.4
C/E
28/May/15
6.2.5
C/E
23/Jun/15
6.2.2
6.2.3
PMS No.
Unit / System
Unit / System
PIC
C/E
28/May/15
6.2.6
6.2.7
C/E
30/Aug/13
6.2.8
C/E
28/Jul/15
6.2.9
C/E
28/May/15
6.3.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump
C/E
10/May/15
6.3.2
Clean fan, impeller and protective guard Bersihkan kipas dan rumah pelindung
ventilation passage. For motor driven
saluran udara. untuk motor penggerak
transfer pump
transfer pump
C/E
10/May/15
6.3.3
C/E
10/May/15
6.3.4
C/E
10/May/15
6.3.5
C/E
10/Jul/15
6.3.6
C/E
10/May/15
6.3.7
C/E
10/May/15
6.3.8
C/E
10/Jul/15
6.3.9
C/E
10/May/15
6.3.10
C/E
10/May/15
6.3.11
C/E
10/Jul/15
6.4.1
C/E
28/May/15
PMS No.
Unit / System
Unit / System
C/E
28/May/15
C/E
28/May/15
C/E
28/May/15
C/E
30/Jul/15
6.4.2
6.4.3
6.4.4
6.5.1
6.5.2
Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.
C/E
2/Jun/15
6.5.3
C/E
2/Jun/15
C/E
26/Jul/15
C/E
26/Jul/15
C/E
26/Jul/15
6.6.1
6.6.2
PIC
6.6.3
6.6.4
C/E
26/Jul/15
6.6.5
C/E
26/Jul/15
6.7.1
C/E
28/May/15
6.7.2
C/E
28/Jul/15
6.7.3
C/E
29/Jul/15
6.7.4
C/E
29/Jul/15
6.7.5
C/E
28/Jul/15
6.7.6
C/E
28/Jul/15
6.7.7
C/E
28/Jul/15
6.7.8
C/E
28/Jul/15
PMS No.
Unit / System
Unit / System
PIC
6.8.1
C/E
19/May/15
6.8.2
C/E
2/May/15
7.1.1
C/E
2/Jul/15
7.1.2
C/E
2/Jul/15
7.1.3
C/E
2/Jul/15
7.1.4
C/E
2/Jul/15
7.1.5
C/E
2/Jul/15
7.1.6
C/E
2/Jul/15
7.1.7
C/E
3/Jul/15
7.1.8
C/E
3/Jul/15
7.2.1
C/E
5/Jun/15
7.2.2
C/E
5/Jun/15
7.2.3
C/E
5/Jul/15
7.3.1
C/E
12/Jul/15
7.3.2
C/E
12/Jul/15
7.3.3
Clean reflector.
Bersihkan reflector.
C/E
12/Jul/15
7.4.1
C/E
16/Jul/15
7.4.2
C/E
16/Jul/15
7.4.3
C/E
16/Jun/15
C/E
16/Jul/15
ELECTRIC EQUIPMENT
7.5.1
PMS No.
Unit / System
Unit / System
PIC
7.5.2
C/E
16/Jul/15
7.5.3
C/E
16/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
7.6.5
C/E
20/Jul/15
7.7.1
C/E
24/Jun/15
7.7.2
C/E
24/Jul/15
C/E
24/Jul/15
C/E
28/Jun/15
C/E
28/Jun/15
C/E
25/Jul/15
C/E
25/Jul/15
C/E
25/Jul/15
C/E
23/May/15
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
5/Jan/15
C/E
2/May/15
C/E
10/Feb/15
C/E
2/May/15
C/E
13/Feb/15
7.6.1
7.6.2
7.6.3
7.6.4
7.7.3
7.7.4
1.3.2
1.4.1
1.5.1
1.5.2
1.6.1
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
Inspect/check of engine protection
devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
PMS No.
Unit / System
Unit / System
PIC
C/E
13/Feb/15
C/E
2/May/15
C/E
8/Aug/11
C/E
29/Jun/15
C/E
25/Jul/15
1.6.4
1.7.1
1.7.2
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox
1.7.3
C/E
2/Jul/15
1.7.4
C/E
2/Jul/15
1.7.5
C/E
2/Jun/14
1.7.6
C/E
2/Jun/14
1.7.7
C/E
13/Feb/15
1.7.8
C/E
2/Jun/14
1.7.9
C/E
8/Aug/11
1.7.10
C/E
8/Aug/11
1.7.11
Overhoul of Gearbox
C/E
8/Aug/11
1.8.1
C/E
3/Jul/15
1.8.2
C/E
3/Jul/15
1.9.1
C/E
3/Jul/15
1.9.2
C/E
21/Jul/15
1.9.3
C/E
21/Jul/15
1.9.4
C/E
21/Jul/15
1.9.5
C/E
21/Jul/15
1.9.6
C/E
21/Jul/15
1.9.7
C/E
21/Jul/15
1.10.1
C/E
2/Jul/15
1.10.2
C/E
2/Jul/15
1.10.3
C/E
2/Jul/15
1.6.2
1.6.3
PMS No.
Unit / System
Unit / System
1.13.1
1.14.1
1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3
2.1.3
2.2.1
2.2.2
PIC
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
5/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
23/May/15
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/13
C/E
10/Feb/15
C/E
8/Aug/11
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/Jul/15
C/E
2/Jul/15
2.2.4
2.2.5
2.2.6
2.3.1
2.3.2
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
2.2.3
2.6.4
2.7.1
2.7.2
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox
2.7.3
C/E
2/Jul/15
2.7.4
C/E
2/Jul/15
2.7.5
C/E
2/Jun/14
2.7.6
C/E
2/Jun/14
2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3
PMS No.
Unit / System
Unit / System
PIC
2.7.7
C/E
2/Jun/14
2.7.8
C/E
2/Jun/14
2.7.9
C/E
2/May/15
2.7.10
C/E
2/May/15
2.7.11
Overhoul of Gearbox
C/E
13/Feb/15
2.8.1
C/E
2/Jul/15
2.8.2
C/E
2/Jul/15
2.9.1
C/E
2/Jul/15
2.9.2
C/E
21/Jul/15
2.9.3
C/E
21/Jul/15
2.9.4
C/E
21/Jul/15
2.9.5
C/E
21/Jul/15
2.9.6
C/E
21/Jul/15
2.9.7
C/E
21/Jul/15
2.10.1
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
9/Jul/15
2.13.1
2.14.1
2.10.2
2.10.3
2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3
Take Lub. oil sample and send ashore for Ambil contoh Lub. Oil dan kirim ke darat
laboratory analysis.
untuk di periksa.
AUXILLIARY ENGINE PORTSIDE
2.15.1
PMS No.
Unit / System
Unit / System
C/E
30/Jul/15
C/E
30/Jul/15
C/E
30/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
C/E
8/Jul/15
8/Jul/15
3.3.1
3.3.2
3.3.3
C/E
8/Jul/15
3.3.4
C/E
8/Jul/15
3.4.1
Replace Coolant
C/E
30/Jul/15
3.5.1
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jun/15
C/E
20/May/15
3.1.1
3.1.2
3.1.3
3.2.1
3.2.2
3.5.2
3.5.3
3.5.4
3.5.5
PIC
3.6.1
C/E
21/Jul/15
3.6.2
C/E
21/Jul/15
3.6.3
C/E
21/Jul/15
3.6.4
C/E
21/Jul/15
3.6.5
C/E
21/Jul/15
3.6.6
C/E
21/Jul/15
3.7.1
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
22/Jun/14
C/E
22/Jun/14
C/E
22/Jun/14
C/E
C/E
31/Aug/13
31/Aug/13
3.7.2
3.7.3
3.8.1
3.8.2
3.8.3
3.9.1
3.10.1
PMS No.
Unit / System
Unit / System
PIC
C/E
30/May/15
C/E
28/Jul/15
C/E
28/Jul/15
C/E
28/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
C/E
20/Jul/15
12/Jul/15
4.3.1
4.3.2
4.3.3
C/E
12/Jul/15
4.3.4
C/E
12/Jul/15
4.4.1
Replace Coolant
C/E
30/Jul/15
4.5.1
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
4.1.2
4.1.3
4.2.1
4.2.2
4.5.2
4.5.3
4.5.4
4.5.5
4.6.1
C/E
21/Jul/15
4.6.2
C/E
21/Jul/15
4.6.3
C/E
21/Jul/15
4.6.4
C/E
21/Jul/15
4.6.5
C/E
21/Jul/15
4.6.6
C/E
21/Jul/15
4.7.1
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
22/Jun/15
C/E
22/Jun/15
4.7.2
4.7.3
4.8.1
4.8.2
PMS No.
Unit / System
Unit / System
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul aux engine portside
General Overhaul aux engine Portside
Ambil contoh Lub. Oil dan kirim ke darat
untuk di periksa.
PIC
C/E
22/Jun/15
C/E
C/E
31/Aug/13
31/Aug/13
C/E
30/May/15
5.1.1
C/E
15/May/15
5.1.2
C/E
15/Jul/15
C/E
14/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
22/May/15
C/E
22/May/15
5.1.3
5.2.1
5.2.2
6.1.2
6.1.3
C/E
22/May/15
6.2.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump
C/E
28/May/15
6.2.2
Clean fan, impeller and protective guard Bersihkan kipas dan rumah pelindung
ventilation passage. For motor driven
saluran udara. untuk motor penggerak
main fire pump
main fire pump
C/E
28/May/15
6.2.3
Cleaning housing motor driven main fire Bersihkan sudu-sudu motor penggerak
pump
main fire pump
C/E
28/May/15
6.2.4
C/E
28/May/15
6.2.5
C/E
23/Jun/15
6.2.6
C/E
28/May/15
PMS No.
PIC
6.2.7
C/E
30/Aug/13
6.2.8
C/E
28/Jul/15
6.2.9
C/E
28/May/15
6.3.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump
C/E
10/May/15
C/E
10/May/15
C/E
10/May/15
6.3.4
C/E
10/May/15
6.3.5
C/E
10/Jul/15
6.3.6
C/E
10/May/15
6.3.7
C/E
10/May/15
6.3.8
C/E
10/Jul/15
6.3.9
C/E
10/May/15
6.3.10
C/E
10/May/15
6.3.11
C/E
10/Jul/15
6.4.1
C/E
28/May/15
6.4.2
C/E
28/May/15
6.3.2
6.3.3
Unit / System
Unit / System
PMS No.
6.4.3
6.4.4
6.5.1
Unit / System
Unit / System
PIC
C/E
28/May/15
C/E
28/May/15
C/E
30/Jul/15
6.5.2
Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.
C/E
2/Jun/15
6.5.3
C/E
2/Jun/15
C/E
26/Jul/15
C/E
26/Jul/15
C/E
26/Jul/15
6.6.1
6.6.2
6.6.3
6.6.4
C/E
26/Jul/15
6.6.5
C/E
26/Jul/15
6.7.1
C/E
28/May/15
6.7.2
C/E
28/Jul/15
6.7.3
C/E
29/Jul/15
6.7.4
C/E
29/Jul/15
6.7.5
C/E
28/Jul/15
6.7.6
C/E
28/Jul/15
6.7.7
C/E
28/Jul/15
6.7.8
C/E
28/Jul/15
PMS No.
Unit / System
Unit / System
PIC
6.8.1
C/E
19/May/15
6.8.2
C/E
2/May/15
7.1.1
C/E
2/Jul/15
7.1.2
C/E
2/Jul/15
7.1.3
C/E
2/Jul/15
7.1.4
C/E
2/Jul/15
7.1.5
C/E
2/Jul/15
7.1.6
C/E
2/Jul/15
7.1.7
C/E
3/Jul/15
7.1.8
C/E
3/Jul/15
7.2.1
C/E
5/Jun/15
7.2.2
C/E
5/Jun/15
7.2.3
C/E
5/Jul/15
7.3.1
C/E
12/Jul/15
C/E
12/Jul/15
C/E
12/Jul/15
C/E
16/Jul/15
ELECTRIC EQUIPMENT
7.4.2
C/E
16/Jul/15
7.4.3
C/E
16/Jun/15
C/E
16/Jul/15
C/E
C/E
16/Jul/15
16/Jul/15
7.3.2
7.3.3
7.4.1
7.5.1
7.5.2
7.5.3
PMS No.
Unit / System
Unit / System
PIC
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
7.7.1
C/E
24/Jun/15
7.7.2
C/E
24/Jul/15
C/E
24/Jul/15
C/E
28/Jun/15
C/E
28/Jun/15
7.6.1
7.6.2
7.6.3
7.6.4
7.6.5
7.7.3
7.7.4
7.7.5
COMPLETE MAINTENANCE
FOR
135
PERFORMA
July 2015
MAINTENANCE OVERDUE FOR
July 2015
PMS No.
Unit / System
Unit / System
PIC
PLAN MAINTENANCE
FOR
July 2015
PMS No. Unit / System
MAIN PROPULSION PORTSIDE
Inspect engine for leaks and loose
1.1.1
connections
1.1.2
Check oil level of engine crankcase
1.1.3
1.2.1
1.2.2
Unit / System
148
PIC
C/E
25/Jul/15
C/E
25/Jul/15
C/E
25/Jul/15
C/E
23/May/15
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
5/Jan/15
C/E
2/May/15
C/E
10/Feb/15
C/E
2/May/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
8/Aug/11
C/E
29/Jun/15
C/E
25/Jul/15
1.2.4
1.2.5
1.2.6
1.3.1
1.3.2
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
1.2.3
1.6.4
1.7.1
1.7.2
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox
1.7.3
C/E
2/Jul/15
1.7.4
C/E
2/Jul/15
1.7.5
C/E
2/Jun/14
1.7.6
C/E
2/Jun/14
1.7.7
C/E
13/Feb/15
1.7.8
C/E
2/Jun/14
1.7.9
C/E
8/Aug/11
1.7.10
C/E
8/Aug/11
1.7.11
Overhoul of Gearbox
C/E
8/Aug/11
1.4.1
1.5.1
1.5.2
1.6.1
1.6.2
1.6.3
PMS No.
Unit / System
Unit / System
PIC
1.8.1
C/E
3/Jul/15
1.8.2
C/E
3/Jul/15
1.9.1
C/E
3/Jul/15
1.9.2
C/E
21/Jul/15
1.9.3
C/E
21/Jul/15
1.9.4
C/E
21/Jul/15
1.9.5
C/E
21/Jul/15
1.9.6
C/E
21/Jul/15
1.9.7
C/E
21/Jul/15
1.10.1
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
5/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
23/May/15
1.13.1
1.14.1
1.10.2
1.10.3
1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3
2.1.3
2.2.1
PMS No.
2.2.2
Unit / System
Drain water and sediment of fuel tank
Unit / System
PIC
C/E
18/May/15
C/E
9/May/15
C/E
C/E
C/E
C/E
2/May/15
2/May/15
2/May/15
10/Jan/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/13
C/E
10/Feb/15
C/E
8/Aug/11
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/Jul/15
C/E
2/Jul/15
2.2.4
2.2.5
2.2.6
2.3.1
2.3.2
Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
2.2.3
2.6.4
2.7.1
2.7.2
Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox
2.7.3
C/E
2/Jul/15
2.7.4
C/E
2/Jul/15
2.7.5
C/E
2/Jun/14
2.7.6
C/E
2/Jun/14
2.7.7
C/E
2/Jun/14
2.7.8
C/E
2/Jun/14
2.7.9
C/E
2/May/15
2.7.10
C/E
2/May/15
2.7.11
Overhoul of Gearbox
C/E
13/Feb/15
2.8.1
C/E
2/Jul/15
2.8.2
C/E
2/Jul/15
2.9.1
C/E
2/Jul/15
2.9.2
C/E
21/Jul/15
2.9.3
C/E
21/Jul/15
2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3
PMS No.
Unit / System
Unit / System
PIC
2.9.4
C/E
21/Jul/15
2.9.5
C/E
21/Jul/15
2.9.6
C/E
21/Jul/15
2.9.7
C/E
21/Jul/15
2.10.1
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
13/Feb/15
C/E
2/May/15
C/E
2/May/15
C/E
2/May/15
C/E
8/Aug/11
C/E
8/Aug/11
C/E
9/Jul/15
C/E
30/Jul/15
C/E
30/Jul/15
C/E
30/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
C/E
8/Jul/15
8/Jul/15
2.13.1
2.14.1
2.10.2
2.10.3
2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3
3.3.1
3.3.2
3.3.3
C/E
8/Jul/15
3.3.4
C/E
8/Jul/15
3.4.1
Replace Coolant
C/E
30/Jul/15
3.5.1
C/E
20/Jul/15
3.5.2
C/E
20/Jul/15
3.5.3
C/E
20/Jul/15
3.1.2
3.1.3
3.2.1
3.2.2
PMS No.
3.5.4
3.5.5
Unit / System
Unit / System
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator
PIC
C/E
20/Jun/15
C/E
20/May/15
3.6.1
C/E
21/Jul/15
3.6.2
C/E
21/Jul/15
3.6.3
C/E
21/Jul/15
3.6.4
C/E
21/Jul/15
3.6.5
C/E
21/Jul/15
3.6.6
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
22/Jun/14
C/E
22/Jun/14
C/E
22/Jun/14
C/E
C/E
31/Aug/13
31/Aug/13
C/E
30/May/15
C/E
28/Jul/15
C/E
28/Jul/15
C/E
28/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
C/E
20/Jul/15
12/Jul/15
4.3.3
C/E
12/Jul/15
4.3.4
C/E
12/Jul/15
4.4.1
Replace Coolant
C/E
30/Jul/15
4.5.1
C/E
21/Jul/15
PMS No.
4.5.2
4.5.3
4.5.4
4.5.5
Unit / System
Unit / System
PIC
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
C/E
21/Jul/15
4.6.1
C/E
21/Jul/15
4.6.2
C/E
21/Jul/15
4.6.3
C/E
21/Jul/15
4.6.4
C/E
21/Jul/15
4.6.5
C/E
21/Jul/15
4.6.6
C/E
21/Jul/15
4.7.1
C/E
21/Jul/15
4.7.2
C/E
21/Jul/15
4.7.3
C/E
21/Jul/15
4.8.1
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
C/E
22/Jun/15
C/E
22/Jun/15
C/E
22/Jun/15
C/E
C/E
31/Aug/13
31/Aug/13
C/E
30/May/15
5.1.1
C/E
15/May/15
5.1.2
C/E
15/Jul/15
C/E
15/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
5.1.3
5.2.1
5.2.2
PMS No.
Unit / System
Unit / System
PIC
C/E
2/Jul/15
C/E
2/Jul/15
C/E
2/Jul/15
C/E
22/May/15
C/E
22/May/15
6.1.2
6.1.3
C/E
22/May/15
6.2.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump
C/E
28/May/15
C/E
28/May/15
C/E
28/May/15
6.2.4
C/E
28/May/15
6.2.5
C/E
23/Jun/15
6.2.6
C/E
28/May/15
6.2.7
C/E
30/Aug/13
6.2.8
C/E
28/Jul/15
6.2.9
C/E
28/May/15
6.3.1
Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump
C/E
10/May/15
C/E
10/May/15
C/E
10/May/15
C/E
10/May/15
6.2.2
6.2.3
6.3.2
6.3.3
6.3.4
PMS No.
Unit / System
Unit / System
PIC
6.3.5
C/E
10/Jul/15
6.3.6
C/E
10/May/15
6.3.7
C/E
10/May/15
6.3.8
C/E
10/Jul/15
6.3.9
C/E
10/May/15
6.3.10
C/E
10/May/15
6.3.11
C/E
10/Jul/15
6.4.1
C/E
28/May/15
6.4.2
C/E
28/May/15
6.4.3
C/E
28/May/15
6.4.4
C/E
28/May/15
6.5.1
C/E
30/Jul/15
6.5.2
Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.
C/E
2/Jun/15
6.5.3
C/E
2/Jun/15
C/E
26/Jul/15
C/E
26/Jul/15
C/E
26/Jul/15
6.6.1
6.6.2
6.6.3
6.6.4
C/E
26/Jul/15
6.6.5
C/E
30/Dec/99
PMS No.
Unit / System
Unit / System
PIC
6.7.1
C/E
28/May/15
6.7.2
C/E
28/Jul/15
6.7.3
C/E
29/Jul/15
6.7.4
C/E
29/Jul/15
6.7.5
C/E
28/Jul/15
6.7.6
C/E
28/Jul/15
6.7.7
C/E
28/Jul/15
6.7.8
C/E
28/Jul/15
6.8.1
C/E
19/May/15
6.8.2
C/E
2/May/15
Err:509
C/E
2/Jul/15
Err:509
C/E
2/Jul/15
Err:509
C/E
2/Jul/15
Err:509
C/E
2/Jul/15
Err:509
C/E
2/Jul/15
ELECTRIC EQUIPMENT
Feel the surface of panel for excessive
7.1.1
warmness indicating overheating or loose
connection.
Visually examine all cable connection
7.1.2
and bus bar for de-coloration.
Check for unusual smell which indicate
7.1.3
overheating.
7.1.4
Ensure all covers are tightly secured.
General overview of the physical
7.1.5
condition should be given to the entire
switchboard.
PMS No.
Unit / System
Unit / System
PIC
7.1.6
Err:509
C/E
2/Jul/15
7.1.7
C/E
3/Jul/15
PMS No.
Unit / System
Unit / System
PIC
C/E
3/Jul/15
7.1.8
7.2.1
C/E
5/Jun/15
7.2.2
C/E
5/Jun/15
7.2.3
C/E
5/Jul/15
7.3.1
C/E
12/Jul/15
C/E
12/Jul/15
C/E
12/Jul/15
C/E
16/Jul/15
7.4.2
C/E
16/Jul/15
7.4.3
C/E
16/Jun/15
C/E
16/Jul/15
C/E
C/E
16/Jul/15
16/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
C/E
20/Jul/15
7.7.1
C/E
24/Jun/15
7.7.2
C/E
24/Jul/15
C/E
24/Jul/15
C/E
28/Jun/15
C/E
28/Jun/15
7.3.2
7.3.3
7.4.1
7.5.1
7.5.2
7.5.3
7.6.1
7.6.2
7.6.3
7.6.4
7.6.5
7.7.3
7.7.4
7.7.5
PMS No.
Unit / System
Unit / System
PIC
Chief Engineer
Date :
LF- E 041/DEC 12
Written by : SK
Form Code
LF- E 041
Revision
01/2012
Page
1 of 1
Interval
Months
Hours
STATUS
Maintain This Month
10
50
18/Aug/15
10
50
18/Aug/15
10
50
18/Aug/15
141
250
20/Sep/15
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
426
500
3/Sep/15
184
1,000
27/Aug/16
351
3,000
31/Jan/19
184
3,000
22/Apr/19
345
5,000
28/Sep/21
345
5,000
28/Sep/21
184
5,000
15/Dec/21
3,001
5,000
23/Mar/18
64
100
16/Aug/15
10
100
11/Sep/15
58
100
19/Aug/15
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
345
1,000
10/Jun/16
874
1,000
28/Sep/15
3,001
5,000
23/Mar/18
3,001
5,000
23/Mar/18
10
100
11/Sep/15
3,001
10,000
5/Nov/24
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
STATUS
2/Aug/15
2/Aug/15
2/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
Maintain This
Month
20/Aug/15
1/Aug/15
1/Aug/15
1/Aug/15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
4/Aug/15
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
4/Aug/15
STATUS
Maintain This
Month
Maintain This Month
21
50
13/Aug/15
21
50
13/Aug/15
21
50
13/Aug/15
141
250
20/Sep/15
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
184
500
29/Dec/15
184
1,000
27/Aug/16
1,490
3,000
29/Jul/17
351
3,000
31/Jan/19
3,001
5,000
23/Mar/18
345
5,000
28/Sep/21
345
5,000
28/Sep/21
184
5,000
15/Dec/21
58
100
19/Aug/15
58
100
19/Aug/15
58
100
19/Aug/15
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
184
1,000
27/Aug/16
184
1,000
27/Aug/16
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
345
Interval
Months
Hours
1,000
STATUS
10/Jun/16
1/Aug/15
1/Aug/15
1/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
Maintain This
Month
20/Aug/15
1/Aug/15
1/Aug/15
1/Aug/15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
8/Aug/15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This Month
50
3-Aug-15
50
3-Aug-15
50
3-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
120
250
9-Aug-15
120
250
9-Aug-15
264
500
18-Aug-15
264
500
18-Aug-15
264
500
18-Aug-15
264
500
18-Aug-15
12
30-Jul-16
120
250
9-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
480
500
31-Jul-15
852
1000
11-Aug-15
21-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
2,077
6-May-17
2,077
9-Mar-19
STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
2
Interval
Months
Hours
6
STATUS
30-Nov-15
Maintain This Month
24
50
1-Aug-15
24
50
1-Aug-15
24
50
1-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
120
500
30-Aug-15
216
500
22-Aug-15
216
500
22-Aug-15
216
500
22-Aug-15
12
30-Jul-16
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
21-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
113
2000
24-Apr-17
113
2000
24-Apr-17
113
2000
24-Apr-17
2,077
2,077
0
0
6-May-17
9-Mar-19
30-Nov-15
STATUS
15-Aug-15
15-Aug-15
14-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This Month
22-Aug-15
22-Aug-15
22-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
28-Sep-15
23-Aug-15
Running
Hours
Interval
Months
Hours
28-Aug-15
23
36
30-Aug-16
28-Aug-15
28-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Sep-15
STATUS
Maintain This
Month
Maintain This
Month
2
10-Aug-15
36
10-May-18
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
Maintain This
Month
Maintain This
Month
2
28-Aug-15
Running
Hours
Interval
Months
Hours
28-Aug-15
28-Aug-15
28-Aug-15
30-Sep-15
2-Aug-15
2-Aug-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
28-Aug-15
28-Aug-15
STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
0
29-Aug-15
29-Aug-15
Maintain This
Month
Maintain This
Month
28-Aug-15
Maintain This
Month
28-Aug-15
28-Aug-15
28-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
19-Aug-15
2-Aug-15
STATUS
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
3-Aug-15
3-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
1
5-Sep-15
5-Sep-15
5-Aug-15
12-Aug-15
12-Aug-15
12-Oct-15
16-Aug-15
16-Aug-15
16-Sep-15
16-Aug-15
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Running
Hours
Interval
Months
Hours
STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
16-Aug-15
16-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
24-Dec-15
24-Aug-15
Maintain This
Month
24-Aug-15
Maintain This
Month
36
28-Jun-18
28-Sep-15
OVERDUE
10
50
18/Aug/15
10
50
18/Aug/15
10
50
18/Aug/15
141
250
20/Sep/15
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
426
500
3/Sep/15
184
1,000
27/Aug/16
351
3,000
31/Jan/19
184
3,000
22/Apr/19
345
5,000
28/Sep/21
Running
Hours
Interval
Months
Hours
345
5,000
28/Sep/21
184
5,000
15/Dec/21
3,001
5,000
23/Mar/18
64
100
16/Aug/15
10
100
11/Sep/15
58
100
19/Aug/15
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
345
1,000
10/Jun/16
874
1,000
28/Sep/15
3,001
5,000
23/Mar/18
3,001
5,000
23/Mar/18
3,001
10,000
5/Nov/24
2/Aug/15
2/Aug/15
2/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
1/Aug/15
1/Aug/15
1/Aug/15
STATUS
Running
Hours
Interval
Months
Hours
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
4/Aug/15
STATUS
OVERDUE
21
50
13/Aug/15
21
50
13/Aug/15
21
50
13/Aug/15
141
250
20/Sep/15
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
184
500
29/Dec/15
184
1,000
29/Jul/17
1,490
3,000
29/Jul/17
351
3,000
31/Jan/19
3,001
5,000
23/Mar/18
345
5,000
28/Sep/21
345
5,000
28/Sep/21
184
5,000
15/Dec/21
58
100
19/Aug/15
58
100
19/Aug/15
58
100
19/Aug/15
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
Running
Hours
Interval
Months
Hours
874
1,000
28/Sep/15
874
1,000
28/Sep/15
184
1,000
27/Aug/16
184
1,000
27/Aug/16
345
1,000
10/Jun/16
1/Aug/15
1/Aug/15
1/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
20/Aug/15
1/Aug/15
1/Aug/15
1/Aug/15
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
8/Aug/15
STATUS
OVERDUE
Running
Hours
Interval
Months
Hours
50
3-Aug-15
50
3-Aug-15
50
3-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
264
264
500
500
18-Aug-15
18-Aug-15
264
500
18-Aug-15
264
500
18-Aug-15
12
30-Jul-16
120
250
9-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
480
500
31-Jul-15
852
1000
11-Aug-15
21-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
2,077
2,077
0
0
6-May-17
9-Mar-19
STATUS
Running
Hours
2
Interval
Months
Hours
6
STATUS
30-Nov-15
OVERDUE
24
50
1-Aug-15
24
50
1-Aug-15
24
50
1-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
120
216
500
500
30-Aug-15
22-Aug-15
216
500
22-Aug-15
216
500
22-Aug-15
12
30-Jul-16
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
21-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
113
2000
24-Apr-17
113
2000
24-Apr-17
Running
Hours
Interval
Months
Hours
113
2000
STATUS
24-Apr-17
2,077
2,077
0
0
24-Apr-17
9-Mar-19
30-Nov-15
OVERDUE
15-Aug-15
15-Aug-15
14-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
22-Aug-15
22-Aug-15
22-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
28-Sep-15
23-Aug-15
28-Aug-15
OVERDUE
Running
Hours
Interval
Months
Hours
23
36
30-Aug-16
28-Aug-15
28-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
10-Sep-15
10-Aug-15
36
10-May-18
10-Aug-15
10-Aug-15
10-Aug-15
10-Aug-15
28-Aug-15
28-Aug-15
STATUS
Running
Hours
Interval
Months
Hours
28-Aug-15
28-Aug-15
30-Sep-15
2-Aug-15
2-Aug-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
28-Aug-15
28-Aug-15
29-Aug-15
29-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
28-Aug-15
STATUS
Running
Hours
Interval
Months
Hours
19-Aug-15
2-Aug-15
STATUS
OVERDUE
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
3-Aug-15
3-Aug-15
5-Sep-15
5-Sep-15
5-Aug-15
12-Aug-15
12-Aug-15
12-Oct-15
16-Aug-15
16-Aug-15
16-Sep-15
16-Aug-15
0
0
1
1
16-Aug-15
16-Aug-15
Running
Hours
Interval
Months
Hours
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
24-Dec-15
24-Aug-15
24-Aug-15
36
28-Jun-18
28-Sep-15
STATUS
PERFORMANCE
100%
OVERDUE
SCHEDULED
Maintain This Month
OVERDUE
EXCELLENT
SCHEDULED
Running
Hours
Interval
Months
Hours
STATUS
ITEM
SCHEDULED
Running
Hours
Interval
Months
Hours
STATUS
SCHEDULED
10
50
18/Aug/15
10
50
18/Aug/15
10
50
18/Aug/15
141
250
20/Sep/15
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
426
500
3/Sep/15
184
1,000
27/Aug/16
351
3,000
31/Jan/19
184
3,000
22/Apr/19
345
5,000
28/Sep/21
345
5,000
28/Sep/21
184
5,000
15/Dec/21
3,001
5,000
23/Mar/18
64
100
16/Aug/15
10
100
30/Aug/15
58
100
30/Aug/15
58
100
30/Aug/15
874
1,000
30/Aug/15
874
1,000
30/Aug/15
345
1,000
30/Aug/15
874
1,000
30/Aug/15
3,001
5,000
30/Aug/15
3,001
5,000
30/Aug/15
3,001
10,000
30/Aug/15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
Running
Hours
0
Interval
Months
Hours
1
STATUS
2/Aug/15
SCHEDULED
2/Aug/15
SCHEDULED
2/Aug/15
SCHEDULED
20/Aug/15
20/Aug/15
SCHEDULED
SCHEDULED
0
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
1/Aug/15
1/Aug/15
1/Aug/15
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
4/Aug/15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
21
50
13/Aug/15
21
50
13/Aug/15
21
50
13/Aug/15
141
250
20/Sep/15
SCHEDULED
SCHEDULED
SCHEDULED
Running
Hours
Interval
Months
Hours
151
250
15/Sep/15
169
250
6/Sep/15
184
184
184
415
250
250
250
500
30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15
184
500
29/Dec/15
184
1,000
27/Aug/16
1,490
3,000
29/Jul/17
351
3,000
31/Jan/19
3,001
5,000
23/Mar/18
345
5,000
28/Sep/21
345
5,000
28/Sep/21
184
5,000
15/Dec/21
58
100
19/Aug/15
58
100
19/Aug/15
58
100
19/Aug/15
STATUS
SCHEDULED
SCHEDULED
SCHEDULED
58
100
19/Aug/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
874
1,000
28/Sep/15
184
1,000
27/Aug/16
184
1,000
27/Aug/16
345
1,000
10/Jun/16
SCHEDULED
1/Aug/15
SCHEDULED
1/Aug/15
SCHEDULED
1/Aug/15
SCHEDULED
20/Aug/15
20/Aug/15
SCHEDULED
SCHEDULED
Running
Hours
0
Interval
Months
Hours
1
STATUS
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
20/Aug/15
SCHEDULED
1/Aug/15
1/Aug/15
1/Aug/15
345
2,000
7/Oct/17
345
2,000
7/Oct/17
345
2,000
7/Oct/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
30
2,000
24/Dec/17
490
24/Nov/16
490
20/Jul/19
8/Aug/15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
50
3-Aug-15
50
3-Aug-15
50
3-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
264
264
500
500
18-Aug-15
18-Aug-15
264
500
18-Aug-15
264
500
18-Aug-15
12
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
30-Jul-16
120
250
9-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
Running
Hours
Interval
Months
Hours
480
500
STATUS
31-Jul-15
SCHEDULED
852
1000
11-Aug-15
SCHEDULED
21-Aug-15
SCHEDULED
20-Aug-15
20-Aug-15
SCHEDULED
SCHEDULED
0
20-Aug-15
SCHEDULED
20-Aug-15
SCHEDULED
20-Aug-15
SCHEDULED
20-Aug-15
20-Aug-15
20-Aug-15
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
1,199
2000
24-Apr-16
2,077
2,077
0
0
6-May-17
9-Mar-19
30-Nov-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
24
50
1-Aug-15
24
50
1-Aug-15
24
50
1-Aug-15
120
250
9-Aug-15
120
250
9-Aug-15
120
216
500
500
30-Aug-15
22-Aug-15
216
500
22-Aug-15
216
500
22-Aug-15
0
108
12
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
30-Jul-16
250
10-Aug-15
SCHEDULED
Running
Hours
Interval
Months
Hours
108
250
10-Aug-15
108
250
10-Aug-15
108
250
10-Aug-15
STATUS
SCHEDULED
SCHEDULED
SCHEDULED
108
250
10-Aug-15
SCHEDULED
21-Aug-15
SCHEDULED
20-Aug-15
20-Aug-15
SCHEDULED
SCHEDULED
0
20-Aug-15
SCHEDULED
20-Aug-15
SCHEDULED
20-Aug-15
SCHEDULED
20-Aug-15
20-Aug-15
20-Aug-15
113
2000
24-Apr-17
113
2000
24-Apr-17
113
2000
24-Apr-17
2,077
2,077
0
0
6-May-17
9-Mar-19
30-Nov-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
15-Aug-15
SCHEDULED
15-Aug-15
SCHEDULED
14-Aug-15
2-Aug-15
2-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
Running
Hours
Interval
Months
Hours
2-Aug-15
2-Aug-15
2-Aug-15
STATUS
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
22-Aug-15
22-Aug-15
SCHEDULED
SCHEDULED
2
22-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
28-Aug-15
28-Sep-15
23-Aug-15
SCHEDULED
SCHEDULED
2
28-Aug-15
23
36
30-Aug-16
28-Aug-15
28-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
2
10-Aug-15
SCHEDULED
10-Aug-15
SCHEDULED
10-Aug-15
10-Aug-15
SCHEDULED
SCHEDULED
Running
Hours
Interval
Months
Hours
10-Sep-15
10-Aug-15
36
10-May-18
10-Aug-15
10-Aug-15
STATUS
SCHEDULED
SCHEDULED
SCHEDULED
10-Aug-15
SCHEDULED
10-Aug-15
SCHEDULED
28-Aug-15
28-Aug-15
SCHEDULED
SCHEDULED
2
28-Aug-15
SCHEDULED
28-Aug-15
30-Sep-15
2-Aug-15
SCHEDULED
SCHEDULED
1
2-Aug-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
26-Sep-15
SCHEDULED
Running
Hours
2
Interval
Months
Hours
3
STATUS
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
29-Aug-15
SCHEDULED
29-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
0
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
28-Aug-15
SCHEDULED
19-Aug-15
SCHEDULED
2-Aug-15
SCHEDULED
SCHEDULED
2-Aug-15
SCHEDULED
2-Aug-15
2-Aug-15
2-Aug-15
2-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
Running
Hours
0
Interval
Months
Hours
1
STATUS
2-Aug-15
SCHEDULED
3-Aug-15
SCHEDULED
Running
Hours
Interval
Months
Hours
STATUS
3-Aug-15
SCHEDULED
5-Sep-15
5-Sep-15
5-Aug-15
12-Aug-15
12-Aug-15
12-Oct-15
16-Aug-15
16-Aug-15
16-Sep-15
16-Aug-15
0
0
1
1
16-Aug-15
16-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
20-Aug-15
24-Dec-15
24-Aug-15
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
0
24-Aug-15
SCHEDULED
36
28-Jun-18
28-Sep-15
Dede Mulyana
Running
Hours
Interval
Est. Next Due
Months
Hours
Technical Superintendent
STATUS
Date :
Approved by : VP/DPA
NO
KODE
FORM
NAMA FORM
1 LF- E 000
2 LF- E 001
3
4
5
6
LFLFLFLF-
E
E
E
E
002
002A
003
004
LFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLF-
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
005B
006
007
008
009
011
012
013
015
016
017
018A
018B
019A
019B
020
021
022A
022B
023
024
025
026
027
028
031
031A
031B
032
033
034
035
036
037
039
040A
040B
040C
041
47
48
49
50
51
LFLFLFLFLF-
E
E
E
E
E
041A
042
044
045
046
File PMS Report terdapat beberapa form yang dijadikan satu dalam 1 file
MAIN PROPULSION PORTSIDE
MAIN PROPULSION STARBOARDSIDE
AUXILIARY PORTSIDE
yaitu :
AUXILIARY STARBOARDSIDE
TEST PROGRAM
AUXILIARY MACHINE
ELECTRIC EQUIPMENT
MONTHLY WORK DONE / WORK PLAN REPORT
Buka Form
Isi data
Otomatisasi
Summary of
Overdue
Maintenance
Penyelesaian
Laporan
Khusus untuk Form LF-E 041 (MONTHLY WORK DONE / WORK PLAN REPORT)
Form tersebut merupakan rangkuman seluruh kegiatan maintenance yang dikerjakan dan yang overdue pada bulan ini
dan juga menunjukan maintenance yg akan dikerjakan pada bulan selanjutnya (sehingga Chief Engineer bisa membuat
untuk PMS bulan selanjutnya)
Dalam Form LF-E 041 tidak ada yg diisi, form tersebut sudah berintegrasi dengan form-form PMS yang lain
hanya mengupdate setelah Form2 LF-E 031 s/d LF-E 038 sudah selesai diisi dengan cara :
Klik icon pada kolom J8 (lihat gambar yang dibulati warna merah)
Maka akan muncul "Filter Bar" (lihat gambar dibawah), tanpa merubah tanda centang LANGSUNG KLIK
INTERVAL
Every Day
Every joining new
Engineer
Every bunker
Every bunker
Every bunker
Every Years
Every Departure
& Arrival
Every
Every
Every
work
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Month
Month
Electrical
Every
Every
Every
Every
Every
Every
Every
Month
Month
Month
Month
Month
Month
After Repair
Request
Month
Month
Month
Month
Month
3 Month
Month
Month
Overhoul
Overhoul
3 Month
Overhoul
Overhoul
Overhoul
Overhoul
Overhoul
Overhoul
Month
Month
6 Month
Month
Every Month
Every
Every
Every
Every
pipe
Every
pipe
3 Month
Month
Month
pressure
pressure
LFLFLFLFLFLFLFLF-
E
E
E
E
E
E
E
E
031
032
033
034
035
036
037
041
BACK
BACK
BACK