TATA CARA PENGISIAN FORM

PMS

PLAN MAINTENANCE MAIN PROPUL


Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PMS No.

Unit / System

PERIOD OF PMS REPORT


TGL

BLN

THN

30

2015

Last Maint. Date

Running
Hours

Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
SETIAP 50 SERVICE HOURS
Periksa kebocoran dan kelonggaran bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem pendinginan

PI C

1.1
1.1.1
1.1.2
1.1.3

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
EVERY 50 SERVICE HOURS
Inspect engine for leaks and loose connections
Check oil level of engine crankcase
Check coolant level of Cooling System

1.2
1.2.1
1.2.2
1.2.3
1.2.4
1.2.5
1.2.6

EVERY 250 METER HOURS


Clean primary fuel filter
Drain water and sediment of fuel tank
Clean /Replace air filter elements of Air cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries

SETIAP 250 METER HOURS


Bersihkan filter bahan bakar/ganti filter bahan bakar
Menguras air dan kerak di tanki bahan bakar
Bersihkan /ganti elements filter udara air cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery

C/E

1.3
1.3.1
1.3.2

EVERY 500METER HOURS


Check/adjust of clearence Valve
Replace oil and filter of engine crankcase

SETIAP 500 METER HOURS


Periksa/setel celah valve
Ganti oli dan filter oli mesin

C/E

1.4
1.4.1

EVERY 1000 METER HOURS


Inspect/check of engine protection devices

SETIAP 1000 METER HOURS


Periksa perangkat pelindung mesin

C/E

1.5
1.5.1
1.5.2

EVERY 3000 METER HOURS


Drain/clean/Replace coolant Cooling system
Inspect of engine mounts

SETIAP 3000 METER HOURS


Kuras(buang)/bersihkan/ganti coolant sistem pendingin
Periksa mounting mesin

428
62
490

C/E
25/Jul/15
25/Jul/15
25/Jul/15

10
10
10

23/May/15
18/May/15
9/May/15
2/May/15
2/May/15
2/May/15

141
151
169
184
184
184

10/Jan/15
5/Jan/15

415
426

2/May/15

184

10/Feb/15
2/May/15

351
184

Interval
Months

PMS No.

Unit / System

Unit / System

Last Maint. Date

Running
Hours

13/Feb/15
13/Feb/15
2/May/15
8/Aug/11

345
345
184
3,001

29/Jun/15
25/Jul/15

64
10

Interval
Months

PI C
1.6
1.6.1
1.6.2
1.6.3
1.6.4

EVERY 5000 METER HOURS


Inspect/rebuild or exchange of jacket water pump
Inspect/rebuild or exchange of raw/sea water pump
Inspect/rebuild or exchange of starting motor
Clean/inspect/check of turbocharger

SETIAP 5000 METER HOURS


Periksa/bersihkan jaket water pump
Periksa/bersihkan fresh/sea water pump
Periksa/bersihkan atau ganti motor stater
Bersihkan/periksa turbocharger

1.7
1.7.1
1.7.2

MARINE GEARBOX
Inspect Oil Level of Gearbox
Clean outside of Gearbox

1.7.3

Inspect leakage of oil and water of Gearbox

MARINE GEARBOX
Periksa level minyak pelumas dari Gearbox
Bersihkan bagian luar dari Gearbox
Periksa dan pastikan tidak ada kebocoran dari minyak atau air
dari Gearbox

1.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari getaran yang tidak normal

2/Jul/15

1.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas pada suction pipe


dari Gearbox

2/Jun/14

1.7.6

Clean the hydraulic control system of Gearbox

Bersihkan dan service hydraulic control system dari Gearbox

2/Jun/14

1.7.7
1.7.8
1.7.9
1.7.10
1.7.11

Check and renew oil of Gearbox


Renew filter oil
Check the pump of Gearbox
Check and clean the cooler of Gearbox
Overhoul of Gearbox

Ganti baru minyak pelumas dari Gearbox


Ganti baru filter minyak pelumas
Periksa dan service oil pump dari Gearbox
Periksa dan bersihkan oil cooler dari Gearbox
Overhoul Gearbox

13/Feb/15
2/Jun/14
8/Aug/11
8/Aug/11
8/Aug/11

1.8

SHAFT PROPELLER

SHAFT PROPELLER

1.8.1

Check sign of overheating, slackness or creeping in bearing


housing.

Periksa tanda-tanda overheating, gesekan-gesekan yg


menghambat putaran shaft propeller pada bearing housing

3/Jul/15

1.8.2

Check sealing arrangement and ensure no leaks.

Periksa Sealling Arrangement dan pastikan tidak ada


kebocoran pada sistem

3/Jul/15

1.9

MONTHLY BEFORE STARTING ENGINE

BULANAN SEBELUM START ENGINE

1.9.1

Check to make sure no one is near the engines and tools are
not left on or near the engine

Periksa untuk memastikan tidak ada orang yang dekat dengan


engine dan peralatan yang tertinggal atau dekat dengan engine

1.9.2
1.9.3
1.9.4

Maintain proper coolant level

Periksa level air pendingin dengan tepat


Periksa level minyak pelumas di Sumptank/Carter, pastikan
Check oil level on sumptank. Maintain the oil level between
level minyak pelumas antara tanda Maksimal dan minimal
the Maximum and Minimum mark on the dipstick
pada dipstick
Periksa kondisi Fuel System dari kebocoran dan buang/cerat
Check on the Fuel System for leaks and drain water separator
air pada water separator

C/E

2/Jul/15

58
58
874
874
345
874
3,001
3,001
3,001

C/E
1
0
0

C/E
3/Jul/15
21/Jul/15

1
0
0

21/Jul/15

1
1

0
21/Jul/15

PMS No.
1.9.5
1.9.6
1.9.7

Unit / System
Maintain batteries for electrolyte level, clean batteries if
necessary, check for tight connection
Check the conditional of all Gauges, repair or replace any
broken gauges
Check batteriy charger for proper operaation. Disconnect
charger before starting the engine

Unit / System

Last Maint. Date

Periksa kondisi Batterei pastikan air electrolyte tidak


kekurangan, bersihkan batterei dan ikat kembali koneksi2
yang longgar
Periksa kondii semua indikator Gauge, perbaiki atau ganti
baru jika ada gauge yang rusak
Periksa kondisi batterei charger, diskonect charger sebelum
start engine

PI C

BULANAN SAAT ENGINE RUNNING


Periksa dan perhatikan suara yang tidak biasa atau suara
getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari valve overboard

C/E

21/Jul/15
21/Jul/15
21/Jul/15

MONTHLY WHEN ENGINE RUNNING

1.10.1

Check and attention to abnormal noise

1.10.2
1.10.3

Check and attention to exhaust color


Observe sea water discharging volume

1.11
1.11.1

CONTROL ENGINE THROTLE (MORSE CONTROL) CONTROL KENDALI MESIN (MORSE CONTROL)
Lubricating All Control Engine Morse machaniscem
Lumasi machanism Kabel Morse Kontrol Engine

1.11.2

Check mechancal cable Control Engine Morse from damage

Periksa mechanical Kabel Morse Kontrol Engine

13/Feb/15

1.1.3

greasing all Control Engine Morse on mechanical handle

Lumasi grease pada mechanical handle Kabel Morse Kontrol


Engine

13/Feb/15

1.12

EXHAUST GAS PIPING SYSTEM

1.12.1

Check all exhaust gas piping to ensure no leak.

1.12.2

Tighten up exhaust Pipe bellow bolts, if necessary.

1.12.3

2/Jul/15

0
0

2/Jul/15
2/Jul/15

0
0
0

13/Feb/15

345

1
1
1

345

C/E

Kencangkan baut pegangan Pipa Gas Buang, jika perlu.

2/May/15

30

Check all securing brackets Exhaust Pipe and fastener.

Periksa semua braket pengaman Pipa Gas Buang dan


kencangkan.

2/May/15

30

1.13
1.13.1

TOP OVERHAUL
Top overhaul Main engine portside

TOP OVERHAUL
Top overhaul Main engine portside

C/E
8/Aug/11

490

1.14
1.14.1

GENERAL OVERHAUL
General overhaul Main Engine Portside

GENERAL OVERHAUL
General Overhaul Main Engine Portside

C/E
8/Aug/11

490

LUBE OIL SAMPLE

LUBE OIL SAMPLE

C/E

Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.

345

30

1.15.1

C/E

2/May/15

1.15

Interval
Months

1.10

EXHAUST GAS PIPING SYSTEM


Periksa semua pipa gas buang untuk memastikan tidak ada
kebocoran.

Running
Hours

5/Jul/15

PMS No.

Unit / System

Unit / System

Last Maint. Date

IC
ITEM MAINTENANCEPFOR
July-15

Running
Hours

Interval
Months

21

PERF

PMS MAIN PR
PORTSID

ITEM OVERDUE FOR


July-15
Summary of Overdue Maintenance
Item Maintenance

PMS No.

Reason

Chief Engineer

Master

Date :

Date :

LF- C 031/DES 2012

Written by :HST

Form

PROPULSION PORTSIDE

LF- E 031

Revision
Page

1 Of 3

July 2015

PERIOD OF PMS REPORT

Symbol

Interval
Hours

Est. Next Due

50
50
50

18-Aug-15
18-Aug-15
18-Aug-15

250
250
250
250
250
250

20-Sep-15
15-Sep-15
6-Sep-15
30-Aug-15
30-Aug-15
30-Aug-15

500
500

8-Sep-15
3-Sep-15

1000

27-Aug-16

3000
3000

31-Jan-19
22-Apr-19

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

: Overdue Maintenance for This Month


2015

Jan-15

Feb-15

Mar-15

May-15

May-15

C
C
C
C
C
C

C
C
C
C
C
C

C
C

Jul-15

Aug-15

C
C
C

S
S
S

S
S
S

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

C
C

5000
5000
5000
5000

28-Sep-21
28-Sep-21
15-Dec-21
23-Mar-18

100
100

16-Aug-15
11-Sep-15

19-Aug-15

19-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15
20-Aug-15

C
C

S
S

20-Aug-15

20-Aug-15

100
100
1000

28-Sep-15

1000

28-Sep-15

1000
1000
5,000
5,000
10,000

10-Jun-16
28-Sep-15
23-Mar-18
23-Mar-18
5-Nov-24

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jul-15

Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

1-Aug-15
1-Aug-15
1-Aug-15

C
C
C

S
S
S

2000

7-Oct-17

2000

7-Oct-17

2000

7-Oct-17

2000

24-Dec-17

2000

24-Dec-17

2000

24-Dec-17

4000

24-Nov-16

6000

20-Jul-19

4-Aug-15

Jan-15

Feb-15

Mar-15

May-15

May-15

C
C
C

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

PERFORMANCE 100%

MS MAIN PROPULSION
PORTSIDE FOR THIS
MONTH

on

2015
Jan-15

EXCELLENT
Remarks

DEDE MULYANA
Technical Superintendent

Master
Date :

Approved by : VP / DPA

Retention Period : 1 Year

Dec-15

PLAN MAINTENANCE MAIN PROPULSIO


Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PMS No.

Unit / System

PERIOD OF PMS REPORT


TGL

BLN

THN

30

2015

Last Maint. Date

Running
Hours

Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
SETIAP 24 SERVICE HOURS
Periksa kebocoran dan kelonggaran bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem pendinginan

PI C

2.1
2.1.1
2.1.2
2.1.3

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
EVERY 24 SERVICE HOURS
Inspect engine for leaks and loose connections
Check oil level of engine crankcase
Check coolant level of Cooling System

2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6

EVERY 250 METER HOURS


Clean primary fuel filter
Drain water and sediment of fuel tank
Clean /Replace air filter elements of Air cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries

SETIAP 250 METER HOURS


Bersihkan filter bahan bakar/ganti filter bahan bakar
Menguras air dan kerak di tanki bahan bakar
Bersihkan /ganti elements filter udara air cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery

C/E

428
62
490

C/E
20/Jul/15
20/Jul/15
20/Jul/15

21
21
21

23/May/15
18/May/15
9/May/15
2/May/15
2/May/15
2/May/15

141
151
169
184
184
184

Interval
Months

PMS No.

Unit / System

Unit / System

Last Maint. Date

Running
Hours

10/Jan/15
2/May/15

415
184

2/May/15

184

2.3
2.3.1
2.3.2

EVERY 500METER HOURS


Check/adjust of clearence Valve
Replace oil and filter of engine crankcase

SETIAP 500 METER HOURS


Periksa/setel celah valve
Ganti oli dan filter oli mesin

PC/E
IC

2.4
2.4.1

EVERY 1000 METER HOURS


Inspect/check of engine protection devices

SETIAP 1000 METER HOURS


Periksa perangkat pelindung mesin

C/E

2.5
2.5.1
2.5.2

EVERY 3000 METER HOURS


Drain/clean/Replace coolant Cooling system
Inspect of engine mounts

SETIAP 3000 METER HOURS


Kuras(buang)/bersihkan/ganti coolant sistem pendingin
Periksa mounting mesin

8/Aug/13
10/Feb/15

1,490
351

2.6
2.6.1
2.6.2
2.6.3
2.6.4

EVERY 5000 METER HOURS


Inspect/rebuild or exchange of jacket water pump
Inspect/rebuild or exchange of raw/sea water pump
Inspect/rebuild or exchange of starting motor
Clean/inspect/check of turbocharger

SETIAP 5000 METER HOURS


Periksa/bersihkan jaket water pump
Periksa/bersihkan fresh/sea water pump
Periksa/bersihkan atau ganti motor stater
Bersihkan/periksa turbocharger

8/Aug/11
13/Feb/15
13/Feb/15
2/May/15

3,001
345
345
184

2.7
2.7.1
2.7.2

MARINE GEARBOX
Inspect Oil Level of Gearbox
Clean outside of Gearbox

2/Jul/15
2/Jul/15

58
58

2.7.3

Inspect leakage of oil and water of Gearbox

MARINE GEARBOX
Periksa level minyak pelumas dari Gearbox
Bersihkan bagian luar dari Gearbox
Periksa dan pastikan tidak ada kebocoran dari minyak atau air
dari Gearbox

2.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari getaran yang tidak normal

2/Jul/15

2.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas pada suction pipe


dari Gearbox

2/Jun/14

2.7.6

Clean the hydraulic control system of Gearbox

Bersihkan dan service hydraulic control system dari Gearbox

2/Jun/14

2.7.7
2.7.8
2.7.9
2.7.10
2.7.11

Check and renew oil of Gearbox


Renew filter oil
Check the pump of Gearbox
Check and clean the cooler of Gearbox
Overhoul of Gearbox

Ganti baru minyak pelumas dari Gearbox


Ganti baru filter minyak pelumas
Periksa dan service oil pump dari Gearbox
Periksa dan bersihkan oil cooler dari Gearbox
Overhoul Gearbox

2/Jun/14
2/Jun/14
2/May/15
2/May/15
13/Feb/15

2.8

SHAFT PROPELLER

SHAFT PROPELLER

2.8.1

Check sign of overheating, slackness or creeping in bearing


housing.

Periksa tanda-tanda overheating, gesekan-gesekan yg


menghambat putaran shaft propeller pada bearing housing

2/Jul/15

Check sealing arrangement and ensure no leaks.

Periksa Sealling Arrangement dan pastikan tidak ada


kebocoran pada sistem

2/Jul/15

2.8.2

Interval
Months

C/E

2/Jul/15

58
58
874
874
874
874
184
184
345

C/E
1
0
0

PMS No.

Unit / System

Unit / System

2.9

MONTHLY BEFORE STARTING ENGINE

BULANAN SEBELUM START ENGINE

2.9.1

Check to make sure no one is near the engines and tools are
not left on or near the engine

Periksa untuk memastikan tidak ada orang yang dekat dengan


engine dan peralatan yang tertinggal atau dekat dengan engine

2.9.2
2.9.3
2.9.4
2.9.5
2.9.6
2.9.7

Maintain proper coolant level

Periksa level air pendingin dengan tepat


Periksa level minyak pelumas di Sumptank/Carter, pastikan
Check oil level on sumptank. Maintain the oil level between
level minyak pelumas antara tanda Maksimal dan minimal
the Maximum and Minimum mark on the dipstick
pada dipstick
Periksa kondisi Fuel System dari kebocoran dan buang/cerat
Check on the Fuel System for leaks and drain water separator
air pada water separator
Periksa kondisi Batterei pastikan air electrolyte tidak
Maintain batteries for electrolyte level, clean batteries if
kekurangan, bersihkan batterei dan ikat kembali koneksi2
necessary, check for tight connection
yang longgar
Check the conditional of all Gauges, repair or replace any
Periksa kondii semua indikator Gauge, perbaiki atau ganti
broken gauges
baru jika ada gauge yang rusak
Check batteriy charger for proper operaation. Disconnect
Periksa kondisi batterei charger, diskonect charger sebelum
charger before starting the engine
start engine

Last Maint. Date

Running
Hours

Interval
Months

PC/E
IC
2/Jul/15
21/Jul/15

1
0
0

21/Jul/15

1
1

0
21/Jul/15

21/Jul/15

1
1

0
21/Jul/15
21/Jul/15

0
0

1
1

PMS No.

Unit / System

Unit / System

Last Maint. Date

2.10

MONTHLY WHEN ENGINE RUNNING

2.10.1

Check and attention to abnormal noise

2.10.2
2.10.3

Check and attention to exhaust color


Observe sea water discharging volume

2.11
2.11.1

CONTROL ENGINE THROTLE (MORSE CONTROL) CONTROL KENDALI MESIN (MORSE CONTROL)
Lubricating All Control Engine Morse machaniscem
Lumasi machanism Kabel Morse Kontrol Engine

2.11.2

Check mechancal cable Control Engine Morse from damage

Periksa mechanical Kabel Morse Kontrol Engine

13/Feb/15

greasing all Control Engine Morse on mechanical handle

Lumasi grease pada mechanical handle Kabel Morse Kontrol


Engine

13/Feb/15

2.11.3
2.12

EXHAUST GAS PIPING SYSTEM

BULANAN SAAT ENGINE RUNNING


Periksa dan perhatikan suara yang tidak biasa atau suara
getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari valve overboard

2/Jul/15
2/Jul/15
2/Jul/15

0
0
0

13/Feb/15

345

1
1
1

C/E

EXHAUST GAS PIPING SYSTEM


Periksa semua pipa gas buang untuk memastikan tidak ada
kebocoran.
Kencangkan baut pegangan Pipa Gas Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas Buang dan
kencangkan.

C/E

Check all exhaust gas piping to ensure no leak.

2.12.2

Tighten up exhaust Pipe bellow bolts, if necessary.

2.12.3

Check all securing brackets Exhaust Pipe and fastener.

2.13
2.13.1

TOP OVERHAUL
Top overhaul Main engine portside

TOP OVERHAUL
Top overhaul Main engine portside

C/E

2.14
2.14.1

GENERAL OVERHAUL
General overhaul Main Engine Portside

GENERAL OVERHAUL
General Overhaul Main Engine Portside

C/E

LUBE OIL SAMPLE

LUBE OIL SAMPLE

C/E

2.15.1

Interval
Months

PC/E
IC

2.12.1

2.15

Running
Hours

Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.

ITEM MAINTENANCE FOR


July-15

345
345

2/May/15

30

2/May/15

30

2/May/15

30

8/Aug/11

490

8/Aug/11

490

9/Jul/15

21

PERF

PMS MAIN PR
PORTSID

ITEM OVERDUE FOR

PMS No.

Unit / System

Unit / System

Last Maint. Date


PI C

IntervalPR
PMS MAIN
Months
PORTSID

Running
Hours

July-15
Summary of Overdue Maintenance
Item Maintenance

PMS No.

Reason

Chief Engineer

Master

Date :

Date :

LF- C 031/DES 2012

Written by :HST

Form

OPULSION STARBOARDSIDE

LF- E 031

Revision
Page

1 Of 3

July 2015

PERIOD OF PMS REPORT

Symbol

Interval
Hours

Est. Next Due

50
50
50

13-Aug-15
13-Aug-15
13-Aug-15

250
250
250
250
250
250

20-Sep-15
15-Sep-15
6-Sep-15
30-Aug-15
30-Aug-15
30-Aug-15

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

: Overdue Maintenance for This Month


2015

Jan-15

Feb-15

Mar-15

May-15

C
C
C
C
C
C

May-15

C
C
C
C
C
C

Jul-15

Aug-15

C
C
C

S
S
S

S
S
S

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

8-Sep-15
29-Dec-15

1000

27-Aug-16

3000
3000

29-Jul-17
31-Jan-19

5000
5000
5000
5000

23-Mar-18
28-Sep-21
28-Sep-21
15-Dec-21

100
100

19-Aug-15
19-Aug-15

C
C

S
S

19-Aug-15

19-Aug-15

1-Aug-15

1-Aug-15

100
1000

28-Sep-15

1000

28-Sep-15

1000
1000
1000
1000
1000

28-Sep-15
28-Sep-15
27-Aug-16
27-Aug-16
10-Jun-16

Dec-15

Jan-16

Nov-15

Dec-15

500
500

100

Oct-15

C
C

C
C

C
C

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

1-Aug-15
20-Aug-15

C
C

S
S

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

1-Aug-15
1-Aug-15
1-Aug-15

2000

7-Oct-17

2000

7-Oct-17

2000

7-Oct-17

2000

24-Dec-17

2000

24-Dec-17

2000

24-Dec-17

4000

24-Nov-16

6000

20-Jul-19

Aug-15

C
C
C

S
S
S

C
C
C

8-Aug-15

PERFORMANCE 100%

MS MAIN PROPULSION
PORTSIDE FOR THIS
MONTH

Jul-15

EXCELLENT

C
C

C
C

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

on

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

EXCELLENT
Remarks

DEDE MULYANA
Technical Superintendent

Master
Date :

Approved by : VP / DPA

Retention Period : 1 Year

Dec-15

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

PMS No.
Err:509

Unit / System

1.1.2

EVERY 50 SERVICE HOURS


Inspect engine for leaks and loose
connections
Check oil level of engine crankcase

1.1.3

Check coolant level of Cooling System

Unit / System

1154

C/E

Last Maint.
Date
Err:509

C/E

25/Jul/15

C/E

25/Jul/15

C/E

25/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
30/Dec/99

C/E

29/Jun/15

C/E

25/Jul/15

PIC

1.7.1

Inspect Oil Level of Gearbox

1.7.2

Clean outside of Gearbox

SETIAP 50 SERVICE HOURS


Periksa kebocoran dan kelonggaran
bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem
pendinginan
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox

1.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

1.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

1.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

Clean the hydraulic control system of


Gearbox
Err:509
Err:509
Err:509
Err:509
Err:509

Bersihkan dan service hydraulic control


system dari Gearbox
Err:509
Err:509
Err:509
Err:509
Err:509

C/E

2/Jun/14

C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

3/Jul/15

Err:509
Err:509

Err:509
Err:509

C/E
C/E

Err:509
Err:509

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

3/Jul/15

Err:509

C/E

Err:509

C/E

3/Jul/15

1.1.1

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0

1.7.6
Err:509
Err:509
Err:509
Err:509
Err:509
1.8.1
Err:509
Err:509
1.8.2
Err:509
1.9.1

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0

Check to make sure no one is near the


engines and tools are not left on or near

Err:509
Periksa untuk memastikan tidak ada
orang yang dekat dengan engine dan

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Running
Hours
Err:509

Interval
Months Hours
Err:509

Est. Next Due

STATUS

Err:509

Err:509

10

50

18/Aug/15

10

50

18/Aug/15

10

50

18/Aug/15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
0

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
30/Dec/99

64

100

16/Aug/15

10

100

11/Sep/15

58

100

19/Aug/15

58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

2/Aug/15

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

2/Aug/15

Err:509

Err:509

Err:509

2/Aug/15

OVERDUE

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

PMS No.
#REF!

ITEM
MAINTENANCE
FOR

Unit / System
#REF!

Unit / System
#REF!

PERFORMANCE

PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

###

1154

Last Maint.
Date
#REF!

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Running
Hours
#REF!

Interval
Months Hours
#REF!

Est. Next Due

STATUS

#REF!

Err:504

#REF!

Maintain This Month


OVERDUE

1154

PLAN MAINTENANCE AUXILLIARY E


Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PMS No.

Unit / System

PERIOD OF PMS REPORT


TGL

BLN

THN

30

2015

Last Maint. Date

Running
Hours

Unit / System
Last Month Total Running Hours
This Month Running Hours
Current Total Running Hours
50 JAM KERJA
Periksa volume air pendingin pada header tank
Periksa pelumas dan pendingin dari kebocoran
Periksa volume oli pelumas pada sump tank

PI C

3.1
3.1.1
3.1.2
3.1.3

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
50 SERVICE HOURS
Check the amount of coolant in the header tank
Check for oil and coolant leaks
Check the amount of lubricating oil in the sump

3.2
3.2.1
3.2.2

250 SERVICE HOURS


Renew the Engine lubricating oil
Renew the canister of the lubricating oil filter

250 JAM KERJA


Ganti baru oli pelumas Engine
Ganti baru Filter oli pelumas Engine

C/E

3.3
3.3.1
3.3.2
3.3.3
3.3.4

500 SERVICE HOURS


Renew the elements of the fuel filter
Check the Engine mounts
Check all hoses and connections
Check the condition of the crankshaft damper

500 JAM KERJA


Ganti baru filter bahan bakar
Periksa Engine mounts
Periksa semua hose dan sambungan hoses
Periksa kondisi pulley damper

C/E

EVERY 1 YEARS

SETIAP 1 TAHUN
Ganti baru air pendingin dan tambahkan additive coolant
sebagai pengaman

C/E

ALTERNATOR GENERATOR
Periksa semua sambungan2 dan kabel generator
Test fungsi2 equipment aksesoris generator

C/E

3.4
3.4.1

Replace Coolant

3.5
3.5.1
3.5.2

ALTERNATOR GENERATOR
Inspect all generator connections and cabling
Test function of auxiliaries

Interval
Months

3,960
360
4,320

C/E
30/Jul/15
30/Jul/15
30/Jul/15

0
0
0

20/Jul/15
20/Jul/15

120
120

8/Jul/15
8/Jul/15
8/Jul/15
8/Jul/15

264
264
264
264

30/Jul/15

20/Jul/15
20/Jul/15

120
120

12

PMS No.
3.5.3

Unit / System

Unit / System

Last Maint. Date

Inspect condition of fan


Fasten and tightening connecting part of bolt pondation and
inspect from abnormal noise
Test custom connection of auxiliaries

Periksa kondisi fan


Periksa dan kencangkan baut2 pondasi, dan periksa dari
getaran yang tidak normal
Tes koneksi2 equipment aksesoris generator

PI C

MONTHLY BEFORE STARTING ENGINE

BULANAN SEBELUM START ENGINE

C/E

Check to make sure no one is near the engines and tools are
not left on or near the engine

Periksa untuk memastikan tidak ada orang yang dekat dengan


engine dan peralatan yang tertinggal atau dekat dengan engine

3.6.2

Maintain proper coolant level

3.6.3

Check oil level on sumptank. Maintain the oil level between


the Maximum and Minimum mark on the dipstick

Periksa level air pendingin dengan tepat


Periksa level minyak pelumas di Sumptank/Carter, pastikan
level minyak pelumas antara tanda Maksimal dan minimal
pada dipstick

3.5.4
3.5.5
3.6
3.6.1

3.6.4
3.6.5
3.6.6

Periksa kondisi Fuel System dari kebocoran dan buang/cerat


Check on the Fuel System for leaks and drain water separator
air pada water separator
Periksa kondisi Batterei pastikan air electrolyte tidak
Maintain batteries for electrolyte level, clean batteries if
kekurangan, bersihkan batterei dan ikat kembali koneksi2
necessary, check for tight connection
yang longgar
Check battery charger for proper operation. Disconnect
Periksa kondisi batterei charger, diskonect charger sebelum
charger before starting the engine
start engine

20/Jul/15
20/Jun/15
20/May/15

Running
Hours
120
480
852

21/Jul/15
21/Jul/15

Interval
Months

1
0
0

21/Jul/15

1
1

0
21/Jul/15

21/Jul/15

1
1

0
21/Jul/15

PMS No.

Unit / System

3.7

MONTHLY WHEN ENGINE RUNNING

3.7.1

Check and attention to abnormal noise

3.7.2
3.7.3

Check and attention to exhaust colour


Observe sea water discharging volume

3.8

EXHAUST GAS PIPING SYSTEM

Unit / System

Last Maint. Date

BULANAN SAAT ENGINE RUNNING


Periksa dan perhatikan suara yang tidak biasa atau suara
getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari valve overboard

PC/E
IC

EXHAUST GAS PIPING SYSTEM


Periksa semua pipa gas buang untuk memastikan tidak ada
kebocoran.
Kencangkan baut pegangan Pipa Gas Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas Buang dan
kencangkan.

C/E

21/Jul/15
21/Jul/15
21/Jul/15

3.8.1

Check all exhaust gas piping to ensure no leak.

3.8.2

Tighten up exhaust Pipe bellow bolts, if necessary.

3.8.3

Check all securing brackets Exhaust Pipe and fastener.

3.9
3.9.1

TOP OVERHAUL
Top overhaul aux engine portside

TOP OVERHAUL
Top overhaul aux engine portside

C/E

3.10
3.10.1

GENERAL OVERHAUL
General overhaul aux engine Portside

GENERAL OVERHAUL
General Overhaul aux engine Portside

C/E

LUBE OIL SAMPLE

LUBE OIL SAMPLE

C/E

3.11
3.11.1

22/Jun/14
22/Jun/14
22/Jun/14

Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.

ITEM MAINTENANCE FOR


July-15
ITEM OVERDUE FOR
July-15

Running
Hours

0
0
0

Item Maintenance

1
1
1

1,199
1,199
1,199

31/Aug/13

2,077

31/Aug/13

2,077

30/May/15

20

PERF

PMS AUXILLIA
PORTSID

Summary of Overdue Maintenance


PMS No.

Interval
Months

Reason

PMS No.

Unit / System

Unit / System

Last Maint. Date

Running
Hours

Interval
Months

PI C

Chief Engineer

Master

Date :

Date :

LF- E 033/DES 2012

Written by :HST

Form

LIARY ENGINE PORTSIDE

LF- E 033

Revision
Page

1 Of 3

July 2015

PERIOD OF PMS REPORT

Symbol

Interval
Hours

Est. Next Due

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

: Overdue Maintenance for This Month


2015

Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

50
50
50

3-Aug-15
3-Aug-15
3-Aug-15

C
C
C

S
S
S

250
250

9-Aug-15
9-Aug-15

C
C

S
S

500
500
500
500

18-Aug-15
18-Aug-15
18-Aug-15
18-Aug-15

C
C
C
C

S
S
S
S

30-Jul-16

250
250

9-Aug-15
9-Aug-15

C
C

S
S

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours
250
500
1000

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

9-Aug-15
31-Jul-15
11-Aug-15

Jul-15
C

Aug-15
S

S
S

21-Aug-15
20-Aug-15

C
C

S
S

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

Feb-15

Mar-15

May-15

May-15

20-Aug-15
20-Aug-15
20-Aug-15

2000

24-Apr-16

2000

24-Apr-16

2000

24-Apr-16

4000

6-May-17

6000

9-Mar-19

30-Nov-15

PERFORMANCE 100%

S AUXILLIARY ENGINE
PORTSIDE FOR THIS
MONTH

son

2015
Jan-15

EXCELLENT

Remarks

Jul-15

Aug-15

C
C
C

S
S
S

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

DEDE MULYANA
Technical Superintendent

Master
Date :

Approved by : VP / DPA

Retention Period : 1 Year

PLAN MAINTENANCE AUXILLIARY ENGI


Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PMS No.

Unit / System

PERIOD OF PMS REPORT


TGL

BLN

THN

30

2015

Last Maint. Date

Running
Hours

Unit / System

4.1
4.1.1
4.1.2

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
50 SERVICE HOURS
Check the amount of coolant in the header tank
Check for oil and coolant leaks

Last Month Total Running Hours


This Month Running Hours
Current Total Running Hours
50 JAM KERJA
Periksa volume air pendingin pada header tank
Periksa pelumas dan pendingin dari kebocoran

4.1.3

Check the amount of lubricating oil in the sump

Periksa volume oli pelumas pada sump tank

4.2
4.2.1
4.2.2

250 SERVICE HOURS


Renew the Engine lubricating oil
Renew the canister of the lubricating oil filter

250 JAM KERJA


Ganti baru oli pelumas Engine
Ganti baru Filter oli pelumas Engine

C/E

4.3
4.3.1
4.3.2
4.3.3
4.3.4

500 SERVICE HOURS


Renew the elements of the fuel filter
Check the Engine mounts
Check all hoses and connections
Check the condition of the crankshaft damper

500 JAM KERJA


Ganti baru filter bahan bakar
Periksa Engine mounts
Periksa semua hose dan sambungan hoses
Periksa kondisi pulley damper

C/E

EVERY 1 YEARS

SETIAP 1 TAHUN
Ganti baru air pendingin dan tambahkan additive coolant
sebagai pengaman

C/E

ALTERNATOR GENERATOR
Periksa semua sambungan2 dan kabel generator

C/E

4.4
4.4.1

Replace Coolant

4.5
4.5.1

ALTERNATOR GENERATOR
Inspect all generator connections and cabling

PI C

Interval
Months

3,960
360
4,320

C/E
28/Jul/15
28/Jul/15

24
24

28/Jul/15

24

20/Jul/15
20/Jul/15

120
120

20/Jul/15
12/Jul/15
12/Jul/15
12/Jul/15

120
216
216
216

30/Jul/15

21/Jul/15

108

12

PMS No.
4.5.2
4.5.3
4.5.4
4.5.5
4.6
4.6.1
4.6.2
4.6.3
4.6.4
4.6.5
4.6.6

Unit / System

Unit / System

Last Maint. Date

Test function of auxiliaries


Inspect condition of fan
Fasten and tightening connecting part of bolt pondation and
inspect from abnormal noise
Test custom connection of auxiliaries

Test fungsi2 equipment aksesoris generator


Periksa kondisi fan
Periksa dan kencangkan baut2 pondasi, dan periksa dari
getaran yang tidak normal
Tes koneksi2 equipment aksesoris generator

PI C

MONTHLY BEFORE STARTING ENGINE

BULANAN SEBELUM START ENGINE

C/E

Check to make sure no one is near the engines and tools are
not left on or near the engine

Periksa untuk memastikan tidak ada orang yang dekat dengan


engine dan peralatan yang tertinggal atau dekat dengan engine

Maintain proper coolant level

Periksa level air pendingin dengan tepat


Periksa level minyak pelumas di Sumptank/Carter, pastikan
Check oil level on sumptank. Maintain the oil level between
level minyak pelumas antara tanda Maksimal dan minimal
the Maximum and Minimum mark on the dipstick
pada dipstick
Periksa kondisi Fuel System dari kebocoran dan buang/cerat
Check on the Fuel System for leaks and drain water separator
air pada water separator
Periksa kondisi Batterei pastikan air electrolyte tidak
Maintain batteries for electrolyte level, clean batteries if
kekurangan, bersihkan batterei dan ikat kembali koneksi2
necessary, check for tight connection
yang longgar
Check battery charger for proper operation. Disconnect
Periksa kondisi batterei charger, diskonect charger sebelum
charger before starting the engine
start engine

21/Jul/15
21/Jul/15
21/Jul/15
21/Jul/15

Running
Hours
108
108
108
108

21/Jul/15
21/Jul/15

Interval
Months

1
0
0

21/Jul/15

1
1

0
21/Jul/15

21/Jul/15

1
1

0
21/Jul/15

PMS No.

Unit / System

4.7

MONTHLY WHEN ENGINE RUNNING

4.7.1

Check and attention to abnormal noise

4.7.2
4.7.3

Check and attention to exhaust colour


Observe sea water discharging volume

4.8

EXHAUST GAS PIPING SYSTEM

Unit / System

Last Maint. Date

BULANAN SAAT ENGINE RUNNING


Periksa dan perhatikan suara yang tidak biasa atau suara
getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari valve overboard

PC/E
IC

EXHAUST GAS PIPING SYSTEM


Periksa semua pipa gas buang untuk memastikan tidak ada
kebocoran.
Kencangkan baut pegangan Pipa Gas Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas Buang dan
kencangkan.

C/E

21/Jul/15
21/Jul/15
21/Jul/15

4.8.1

Check all exhaust gas piping to ensure no leak.

4.8.2

Tighten up exhaust Pipe bellow bolts, if necessary.

4.8.3

Check all securing brackets Exhaust Pipe and fastener.

4.9
4.9.1

TOP OVERHAUL
Top overhaul aux engine portside

TOP OVERHAUL
Top overhaul aux engine portside

C/E

4.10
4.10.1

GENERAL OVERHAUL
General overhaul aux engine Portside

GENERAL OVERHAUL
General Overhaul aux engine Portside

C/E

LUBE OIL SAMPLE

LUBE OIL SAMPLE

C/E

4.11
4.11.1

22/Jun/15
22/Jun/15
22/Jun/15

Take Lub. oil sample and send ashore for laboratory analysis. Ambil contoh Lub. Oil dan kirim ke darat untuk di periksa.

ITEM MAINTENANCE FOR


July-15
ITEM OVERDUE FOR
July-15

Running
Hours

0
0
0

Item Maintenance

1
1
1

113
113
113

31/Aug/13

2,077

31/Aug/13

2,077

30/May/15

20

PERF

PMS AUXILLIA
PORTSID

Summary of Overdue Maintenance


PMS No.

Interval
Months

Reason

PMS No.

Unit / System

Unit / System

Last Maint. Date

Running
Hours

Interval
Months

PI C

Chief Engineer

Master

Date :

Date :

LF- E 033/DES 2012

Written by :HST

Form

RY ENGINE STARBOARDSIDE

LF- E 033

Revision
Page

1 Of 3

July 2015

PERIOD OF PMS REPORT

Symbol

Interval
Hours

Est. Next Due

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

: Overdue Maintenance for This Month


2015

Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

50
50

1-Aug-15
1-Aug-15

C
C

S
S

50

1-Aug-15

250
250

9-Aug-15
9-Aug-15

C
C

S
S

500
500
500
500

30-Aug-15
22-Aug-15
22-Aug-15
22-Aug-15

C
C
C
C

S
S
S
S

30-Jul-16

250

10-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours
250
250
250
250

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

10-Aug-15
10-Aug-15

Jul-15
C
C

Aug-15
S
S

10-Aug-15
10-Aug-15

C
C

S
S

21-Aug-15
20-Aug-15

C
C

S
S

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

Feb-15

Mar-15

May-15

May-15

20-Aug-15
20-Aug-15
20-Aug-15

2000

24-Apr-17

2000

24-Apr-17

2000

24-Apr-17

4000

6-May-17

6000

9-Mar-19

30-Nov-15

PERFORMANCE 100%

S AUXILLIARY ENGINE
PORTSIDE FOR THIS
MONTH

son

2015
Jan-15

EXCELLENT

Remarks

Jul-15

Aug-15

C
C
C

S
S
S

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

DEDE MULYANA
Technical Superintendent

Master
Date :

Approved by : VP / DPA

Retention Period : 1 Year

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

PMS No.
3.1.1
3.1.2
Err:509
3.1.3
Err:509
0
Err:509
Err:509
Err:509
Err:509
3.2.1
3.2.2
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.3.1
Err:509
3.3.2
3.3.3
3.3.4
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.5.1
Err:509
3.5.2
Err:509
Err:509
Err:509
3.5.3
3.5.4

Unit / System

PIC

Last Maint.
Date

Running
Hours

C/E

30/Jul/15

C/E

30/Jul/15

C/E

Err:509

C/E

30/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
30/Dec/99
Err:509
Err:509
Err:509
Err:509
20/Jul/15

C/E

20/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
8/Jul/15
Err:509
8/Jul/15

Periksa semua hose dan sambungan hoses

C/E

8/Jul/15

264

Periksa kondisi pulley damper

C/E

8/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E

20/Jul/15

C/E

Err:509

C/E

20/Jul/15

C/E
C/E
C/E
C/E

Unit / System

Check the amount of coolant in the


header tank

Periksa volume air pendingin pada header


tank
Periksa pelumas dan pendingin dari
Check for oil and coolant leaks
kebocoran
Err:509
Err:509
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
sump
tank
Err:509
Err:509
0
0
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Renew the Engine lubricating oil
Ganti baru oli pelumas Engine
Renew the canister of the lubricating oil
Ganti baru Filter oli pelumas Engine
filter
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Renew the elements of the fuel filter
Ganti baru filter bahan bakar
Err:509
Err:509
Check the Engine mounts
Periksa Engine mounts
Check all hoses and connections
Check the condition of the crankshaft
damper
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Inspect all generator connections and
cabling
Err:509

Form Code

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Periksa semua sambungan2 dan kabel
generator
Err:509
Test fungsi2 equipment aksesoris
Test function of auxiliaries
generator
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Inspect condition of fan
Periksa kondisi fan
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal

LF- C 050Revision

Interval
Est. Next Due
Months Hours
50

3-Aug-15

50

3-Aug-15

Err:509

Err:509

Err:509

50

3-Aug-15

Err:509
0
Err:509
Err:509
Err:509
Err:509
120

Err:509
0
Err:509
Err:509
Err:509
Err:509
250

Err:509
30-Dec-99
Err:509
Err:509
Err:509
Err:509
9-Aug-15

120

250

9-Aug-15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
264
Err:509
264

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
500
Err:509
500

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
18-Aug-15
Err:509
18-Aug-15

500

18-Aug-15

264

500

18-Aug-15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

120

250

9-Aug-15

Err:509

Err:509

Err:509

120

250

9-Aug-15

Err:509
Err:509
Err:509
20/Jul/15

Err:509
Err:509
Err:509
120

Err:509
Err:509
Err:509
250

Err:509
Err:509
Err:509
9-Aug-15

C/E

20/Jun/15

480

500

31-Jul-15

3.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

21-Aug-15

3.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

20-Aug-15

3.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

20-Aug-15

3.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

20-Aug-15

3.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

C/E

21/Jul/15

20-Aug-15

C/E

Err:509

Err:509

Err:509

Err:509

C/E

21/Jul/15

20-Aug-15

C/E

Err:509

Err:509

Err:509

Err:509

C/E

21/Jul/15

20-Aug-15

C/E

21/Jul/15

20-Aug-15

C/E

21/Jul/15

20-Aug-15

C/E

30/May/15

30-Nov-15

Err:509
3.6.6
Err:509
3.7.1
3.7.2
3.7.3
3.11.1

Err:509
Check battery charger for proper
operation. Disconnect charger before
starting the engine
Err:509

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar
Err:509
Periksa kondisi batterei charger,
diskonect charger sebelum start engine

Err:509
Periksa dan perhatikan suara yang tidak
biasa atau suara getaran
Check and attention to exhaust colour
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Take Lub. oil sample and send ashore for Ambil contoh Lub. Oil dan kirim ke darat
laboratory analysis.
untuk di periksa.
Check and attention to abnormal noise

1154

STATUS

OVERDUE

Maintain This Month


ITEM
MAINTENANCE
FOR
July 2015

22

PERFORMANCE

96%

OVERDUE
SCHEDULED
Maintain This Month

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

ITEM OVERDUE
FOR
July 2015

PMS FOR THIS


MONTH

Form Code

LF- C 050Revision

1154

OVERDUE

EXCELLENT

SCHEDULED
SCHEDULED
Maintain This Month

PLAN MAINTENANCE FOR


July 2015
PMS No.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
3.8.1
3.8.2
3.8.3

Chief Engineer
Date :

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Check all exhaust gas piping to ensure no
leak.
Tighten up exhaust Pipe bellow bolts, if
necessary.
Check all securing brackets Exhaust Pipe
and fastener.

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.
Kencangkan baut pegangan Pipa Gas
Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.

OVERDUE

23
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Running
Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E

22/Jun/14

1,199

2000

24-Apr-16

C/E

22/Jun/14

1,199

2000

24-Apr-16

C/E

22/Jun/14

1,199

2000

24-Apr-16

Interval
Est. Next Due
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Technical Superintendent
Date :

SCHEDULED
STATUS

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

PMS No.
#REF!

Unit / System
#REF!

Unit / System
#REF!

Last Maint.
Date
#REF!

PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Form Code

Running
Hours
#REF!

LF- C 050Revision

Interval
Est. Next Due
Months Hours
#REF!
#REF!

1154

STATUS
Err:504

#REF!

#REF!

Maintain This Month


ITEM
MAINTENANCE
FOR

PERFORMANCE

OVERDUE

#DIV/0!

#REF!

SCHEDULED
Maintain This Month

ITEM OVERDUE
FOR

#REF!

PMS FOR THIS


MONTH

OVERDUE

#DIV/0!

SCHEDULED
SCHEDULED
Maintain This Month

PLAN MAINTENANCE FOR


#REF!
PMS No.

Unit / System

Unit / System

OVERDUE

0
PIC
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Last Maint.
Date

Running
Hours

Interval

#REF!

Est. Next Due

SCHEDULED
STATUS

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

Chief Engineer
Date :

Form Code

LF- C 050Revision

Technical Superintendent
Date :

1154

Form

TEST PROGRAM

LF- E 035

Revision
Page

Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PERIOD OF PMS REPORT

1 Of 2

BLN

THN

30

2015

PI C

Last Maint. Date

Running
Hours

Symbol

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

O
PMS No.

Unit / System

5.1

TEMPERATURE INDICATOR
Remove temperature indicator from the place, cleaning sensor
from sludge and be sure temperature indicator normaly
function
Visual check condition of sensor and temperature casing not
broken
Compared with other thermometers when thermometer
working.

INDIKATOR TEMPERATUR
Lepas indikator temperatur dari tempatnya dan bersihkan
sensor dari jelaga pastikan indikator temperatur berfungsi
dengan baik
check kondisi visual sensor dan casing temperatur tidak ada
yg pecah atau rusak
Bandingkan dengan thermometer lain ketika thermometer
bekerja

PRESSURE SWITCHES
Check cable connections and cable entries to the sensor.

PRESSURE SWITCHES
Periksa kabel koneksi dan kabel yang masuk ke sensor

5.2.2

Check that there is no leakage of oil or water inside the


sensor. If any, clean the sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli atau air dari sensor
atau koneksi sensor. Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih lanjut.

5.3
5.3.1
5.3.2
5.3.3

GENERAL
Check general condition of Insulation of exhaust pipes
Test Fire pump
Check general condition of Control consoles

GENERAL
Check general condition of Isolasi pipa gas buang
Test fire pump
Check general condition of konsol control

5.1.1
5.1.2
5.1.3
5.2
5.2.1

Unit / System

Interval
Months Hours

15/May/15

14/Jul/15

2/Jul/15

ITEM OVERDUE FOR


July-15

Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

15-Aug-15

14-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15
2-Aug-15
2-Aug-15

C
C
C

S
S
S

1
0

ITEM MAINTENANCE FOR


July-15

: Overdue Maintenance for This Month


2015

15-Aug-15
1

2/Jul/15

2/Jul/15
2/Jul/15
2/Jul/15

Est. Next Due

3
2

15/Jul/15

July 2015

PERIOD OF PMS REPORT

TGL

0
0
0

1
1
1

PERFORMANCE 100%
PMS TEST PROGRAM FOR
THIS MONTH

EXCELLENT

Summary of Overdue Maintenance


Item Maintenance

PMS No.

Reason

Chief Engineer

Remarks

DEDE MULYANA
Technical Superintendent

Master

Date :

Date :
LF- E 035/DES 2012

Written by :HST

Date :

Approved by : VP / DPA

Retention Period : 1 Year

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Last Maint.
Date

Lepas indikator temperatur dari


tempatnya dan bersihkan sensor dari
jelaga pastikan indikator temperatur
berfungsi dengan baik

C/E

15/May/15

Visual check condition of sensor and


temperature casing not broken

check kondisi visual sensor dan casing


temperatur tidak ada yg pecah atau rusak

C/E

15/Jul/15

Err:509
Compared with other thermometers when
thermometer working.
Err:509
Err:509
Err:509
Check cable connections and cable
entries to the sensor.

Err:509
Bandingkan dengan thermometer lain
ketika thermometer bekerja
Err:509
Err:509
Err:509
Periksa kabel koneksi dan kabel yang
masuk ke sensor

C/E

Err:509

C/E

14/Jul/15

C/E
C/E
C/E

Err:509
Err:509
Err:509

C/E

2/Jul/15

Check that there is no leakage of oil or


water inside the sensor. If any, clean the
sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli


atau air dari sensor atau koneksi sensor.
Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih
lanjut.

C/E

2/Jul/15

Err:509
Err:509
Err:509
Check general condition of Insulation of
exhaust pipes
Err:509
Err:509

Err:509
Err:509
Err:509
Check general condition of Isolasi pipa
gas buang
Err:509
Err:509

C/E
C/E
C/E

Err:509
Err:509
Err:509

C/E

2/Jul/15

C/E
C/E

Err:509
Err:509

Test Fire pump

Test fire pump

C/E

2/Jul/15

Err:509
Err:509
Err:509
Err:509
Check general condition of Control
consoles
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509

Check general condition of konsol control

C/E

2/Jul/15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Unit / System

5.1.1

Remove temperature indicator from the


place, cleaning sensor from sludge and be
sure temperature indicator normaly
function

5.1.2

5.1.3
Err:509
Err:509
Err:509
5.2.1

5.2.2

Err:509
Err:509
Err:509
5.3.1
Err:509
Err:509
5.3.2
Err:509
Err:509
Err:509
Err:509
5.3.3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

1154

PIC

PMS No.

Err:509

Unit / System

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Err:509
Err:509
Err:509
Err:509
Err:509

ITEM
MAINTENANCE
FOR

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

PERFORMANCE

PMS FOR THIS


MONTH

C/E
C/E
C/E
C/E
C/E

1154

Err:509
Err:509
Err:509
Err:509
Err:509

100%

July 2015

ITEM OVERDUE
FOR
July 2015

EXCELLENT

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

PLAN MAINTENANCE FOR


July 2015
PMS No.
5.1.2
Err:509
5.1.3
5.2.1

5.2.2

Err:509
Err:509
Err:509
5.3.1
Err:509
Err:509
5.3.2
Err:509
Err:509
Err:509
Err:509
5.3.3
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

1154

Unit / System

Unit / System

PIC

Last Maint.
Date

Visual check condition of sensor and


temperature casing not broken

check kondisi visual sensor dan casing


temperatur tidak ada yg pecah atau rusak

C/E

15/Jul/15

Err:509
Compared with other thermometers when
thermometer working.
Check cable connections and cable
entries to the sensor.

Err:509
Bandingkan dengan thermometer lain
ketika thermometer bekerja
Periksa kabel koneksi dan kabel yang
masuk ke sensor

C/E

Err:509

C/E

14/Jul/15

C/E

2/Jul/15

Check that there is no leakage of oil or


water inside the sensor. If any, clean the
sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli


atau air dari sensor atau koneksi sensor.
Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih
lanjut.

C/E

2/Jul/15

Err:509
Err:509
Err:509
Check general condition of Isolasi pipa
gas buang
Err:509
Err:509
Test fire pump
Err:509
Err:509
Err:509
Err:509

C/E
C/E
C/E

Err:509
Err:509
Err:509

C/E

2/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
2/Jul/15
Err:509
Err:509
Err:509
Err:509

Check general condition of konsol control

C/E

2/Jul/15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Check general condition of Insulation of
exhaust pipes
Err:509
Err:509
Test Fire pump
Err:509
Err:509
Err:509
Err:509
Check general condition of Control
consoles
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Chief Engineer
Date :

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Running
Hours

Interval
Est. Next Due
Months Hours

15-Aug-15

15-Aug-15

Err:509

Err:509

Err:509

14-Aug-15

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

2-Aug-15

2-Aug-15

STATUS

Maintain This
Month
Maintain This
Month

Maintain This
Month

Maintain This
Month
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

2-Aug-15

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

2-Aug-15

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

2-Aug-15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Maintain This
Month

Maintain This
Month

Maintain This
Month

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Maintain This Month
OVERDUE
SCHEDULED
Maintain This Month
OVERDUE

EXCELLENT

SCHEDULED
Maintain This Month

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Maintain This Month


OVERDUE
Running
Hours
0

Interval
1

Est. Next Due

SCHEDULED
STATUS

15-Aug-15
SCHEDULED

Err:509

Err:509

Err:509

14-Aug-15

2-Aug-15

2-Aug-15

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

2-Aug-15

Err:509
Err:509
0
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
1
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
2-Aug-15
Err:509
Err:509
Err:509
Err:509

2-Aug-15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

SCHEDULED
SCHEDULED

SCHEDULED

SCHEDULED

SCHEDULED

SCHEDULED

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Technical Superintendent
Date :

1154

AUXILIARY MACH
Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PMS No.

Unit / System

PERIOD OF PMS REPORT

Unit / System

BLN

THN

30

2015

PI C

Last Maint. Date

Running Hours

22/May/15

6.1
6.1.1

SEACHEST AND ACESSORIS


Cleaning filter strainer seachest

6.1.2

open and close all seachest valve, ensure all valve easy and
buka dan tutup semua valve seachest, pastikan semua valve
ready for operate, add grease at valve stem and change gland mudah dan siap untuk dioperasikan, tambahkan grease pada
packing if necessary
valve stem dan ganti gland packing jika diperlukan

22/May/15

6.1.3

Check and Ensure, zinch anode still , replace new zinch anode Pastikan zinch anode untuk seachest masih ada, ganti jika
if necessary
zinch anode sudah habis

22/May/15

6.2
6.2.1

MAIN FIRE SYSTEM


Check wire terminal and gland tightness. For motor driven
main fire pump

SEACHEST DAN PERLENGKAPANNYA


Bersihkan filter strainer seachest

TGL

SISTEM PEMADAM UTAMA


Periksa kabel terminal dan kekencangan untuk motor
penggerak main fire pump

C/E

2
2

C/E
28/May/15

PMS No.

Unit / System

Unit / System

PI C

Last Maint. Date

6.2.2

Clean fan, impeller and protective guard ventilation passage. Bersihkan kipas dan rumah pelindung saluran udara. untuk
For motor driven main fire pump
motor penggerak main fire pump

28/May/15

6.2.3

Cleaning housing motor driven main fire pump

28/May/15

6.2.4

Check starter wire terminal for tightness and contractor for


Periksa terminal kabel starter dari kekencangan, bersihkan
arcing. Vacuum clean starter panel. For motor driven main fire
starter panel motor sistem pemadam utama
system

6.2.5
6.2.6

check main fire pump from noize and vibration, check bolt
pondation tightness and bolt rubber coupling between pump
and motor, when pump operated
renew gland packing for main fire pump

Bersihkan sudu-sudu motor penggerak main fire pump

28/May/15

Periksa main fire pump dari suara bising dan getaran berlebih,
periksa kekencangan baut pondasi dan baut rubber coupling
antara pompa dan motor
Ganti baru gland packing untuk main fire pump

23

6.2.8

check all line main fire system from leaking

28/Jul/15

6.2.9

open and close all main fire valve, ensure all valve easy and buka dan tutup semua fire valve, pastikan semua valve mudah
ready for operate, add grease at valve stem and change gland dan siap untuk dioperasikan, tambahkan grease pada valve
packing if necessary
stem dan ganti gland packing jika diperlukan

periksa seluruh sistem perpipaan pemadam dari kebocoran

6.3.3

Cleaning housing motor driven main transfer pump

Bersihkan sudu-sudu motor penggerak transfer pump

6.3.4

Check starter wire terminal for tightness and contractor for


Periksa terminal kabel starter dari kekencangan, bersihkan
arcing. Vacuum clean starter panel. For motor driven transfer
starter panel motor transfer pump
pump

6.3.1
6.3.2

6.3.5

check main transfer pump from noize and vibration, check


bolt pondation tightness and bolt rubber coupling between
pump and motor, when pump operated

Periksa transfer pump dari suara bising dan getaran berlebih,


periksa kekencangan baut pondasi dan baut rubber coupling
antara pompa dan motor

6.3.6

renew seal and packing for tranfer pump

6.3.7

overhoul tranfer pump, check all construction, gear, renew


bearing, check shaft, check spie between shaft and coupling

6.3.8

check all line fuel system from leaking

Ganti baru seal dan packing untuk tranfer pump


overhoul tranfer pump, periksa semua konstruksi, gear, ganti
baru bearing, periksa shaft dan periksa spie antara shaft dan
coupling
periksa seluruh sistem perpipaan sitem bahan bakar dari
kebocoran

1
2

30/Aug/13

SISTEM BAHAN BAKAR


Periksa kabel terminal dan kekencangan untuk motor
penggerak transfer pump
Bersihkan kipas dan rumah pelindung saluran udara. untuk
motor penggerak transfer pump

28/May/15

overhoul main fire pump, check all construction, impeller,


overhoul main fire pump, periksa semua konstruksi, impeller,
renew ring and spring, check bearing, check shaft, check spie ganti baru packing, ring dan spring, periksa bearing, periksa
between shaft and coupling
shaft dan periksa spie antara shaft dan coupling

FUEL SYSTEM
Check wire terminal and gland tightness. For motor driven
transfer pump
Clean fan, impeller and protective guard ventilation passage.
For motor driven transfer pump

23/Jun/15

6.2.7

6.3

Running Hours

28/May/15
2
C/E
10/May/15
10/May/15
10/May/15

2
2
2

10/May/15
2
10/Jul/15

10/May/15

10/May/15

10/Jul/15

PMS No.
6.3.9

6.3.10

Unit / System

Unit / System

PI C

Last Maint. Date

open and close all fuel valve, ensure all valve easy and ready buka dan tutup semua fuel valve, pastikan semua valve
for operate, add grease at valve stem and change gland
mudah dan siap untuk dioperasikan, tambahkan grease pada
packing if necessary
valve stem dan ganti gland packing jika diperlukan

10/May/15

Bersihkan tanki bahan bakar harian dan periksa kondisi


Clean fuel daily tank and check all construction of dayli tank
konstruksi tanki bahan bakar harian termasuk pipa isi, pipa
including filling pipe, suction pipe, vent pipe, manhole (all
isap, pipa ventilasi, manhole (baut2 lengkap dan tidak ada
bolt are complete and no broken bolt), valves and ensure no
yang patah), valve2 dan pastikan tidak ada kebocoran pada
leaking at dayli tank
tanki bahan bakar harian

10/May/15

Running Hours

PMS No.

6.3.11

6.4
6.4.1
6.4.2
6.4.3
6.4.4

6.5

Unit / System

Unit / System

Check condition of sighting glass at dayli tank and ensure no Periksa kondisi gelas duga dari tanki bahan bakar harian dan
leaking, sighting glass cover are good condition and easy to pastikan tidak ada kebocoran, cover pelindung gelas duga
read
dalam kondisi baik dan mudah terbaca
C/E

THERMOMETER AND GAUGES

C/E

C/E

Check all thermometer and gauges are functioning properly.

6.5.2

Check all gauges are properly secured to the panel.

6.5.3

Replace all defective gauges.

6.6
6.6.1

BATTERY STARTING SYSTEM


Check All battery electrolyte specific gravity.

BATTERY STARTING SYSTEM


Periksa berat jenis electrolyte pada semua battery

6.6.2

Top up All battery with distilled water if necessary.

6.6.3
6.6.4
6.6.5

6.7.1

6.7.2

Running Hours

HYDRAULIC POWER PACK DAN KONTROL


Periksa semua selang dan pipa dari keusangan
Periksa kondisi minyak hydrolik, bersihkan atau ganti
saringan jika perlu.
Periksa semua konrtol valves, pastikan bebas, bersihkan dan
lumasi semua penghubung.
Periksa dari suara yang tidak normal/getaran
PERINGATAN:
Main Breaker dalm posisi OFF pada peralatan yang
akan di kerjakan. Dan beri tanda di panelnya.

6.5.1

Last Maint. Date

10/Jul/15

HYDRAULIC POWER PACK AND CONTROL


Check all hoses and piping for deterioration.
Check hydraulic oil condition, clean or renew oil filter if
necessary.
Check all control valves and ensure they are free, clean and
lubricate all joints.
Check for abnormal noise and vibration.
WARNING:
Main breaker to the assigned equipment to be in "OFF"
position. Tape breaker and display signboard.

THERMOMETER AND GAUGES


Periksa semua thermometer dan alat2 indicator berfungsi
dengan baik.
Periksa semua pengukur sudah terpasang dengan baik pada
panelnya.
Ganti semua alat pengukur yang rusak.

6.7

PI C

28/May/15
28/May/15
28/May/15

2
2

28/May/15

2
2

30/Jul/15

2/Jun/15
2/Jun/15

1
1

26/Jul/15

Tambah air pada semua battery distillateya jika diperlukan

26/Jul/15

Check tightness of all battery terminal.


Ensure all battery cleanliness.

Periksa kekencangan terminal pada semua battery


Pastikan kebersihan pada semua battery

26/Jul/15
26/Jul/15

0
0

Check wire connection all battery to starter.

Periksa kabel penghubung pada semua battery ke starter

26/Jul/15

ENGINE ROOM GENERAL MAINTENANCE

PERAWATAN UMUM KAMAR MESIN


Bulkheads, longitudinal bulkhead, web frames, dan bagian
lain dalam kondisi yang baik , tidak ada korosi yg parah
berlubang atau crack/retak.

Bulkheads, long., web frames, other members in good


condition.No heavy corrosion, wastage, holes or cracks.

Engine room Bilges, should be kept clean and dry, free from
Bilge/got kamar mesin, harus bersih dan kering, bebas dari
corrosion, wastage and oil. Particular care should be taken to
karat, endapan lumpur dan minyak. Dan benda2 yang
prevent the escape of hydrocarbon liquids or vapour into the
menutup saluran/lubang pada dasar sekat harus dibersihkan
engine room.

C/E
28/May/15
2
28/Jul/15
0

PMS No.

Unit / System

Unit / System

PI C

Last Maint. Date

6.7.3

All lights in good order.

Semua lampu2 di kamar mesin termasuk covernya dalam


kondisi baik dan berfungsi

29/Jul/15

6.7.4

Ensure all Vbelt at Main Engine, Aux Engine and other


machinery including rotating equipment are covered and
check condition of cover are good

Pastikan Semua Vanbelt pada Mesin Induk, Mesin Bantu dan


Mesin2 yang lain termasuk equipmen2 yang lain ditutup
pelindung dan periksa kondisi pelindung tersebut dalam
kondisi yang baik

29/Jul/15

6.7.5

Pastikan semua Exhaust pipe ditutup lagging / asbes penahan


Ensure all exhaust pipe covered with asbestos and aluminium
panas dan dilapisi aluminium foil. Periksa asbes dan
foil. Check and ensure are good condition, renew if necessary.
aluminium foil dalam kondisi baik, ganti jika perlu. Dan
And ensure all exhaust pipe closed with spark arrestor and
pastikan saringan pipa exhaust dalam kondisi baik, ganti jika
good condition, renew spark arrestor if necessary
perlu

28/Jul/15

6.7.6

Ensure All Battery have safety box and battery box are good
condition

Pastikan Battery / Accu tertutup cover / ada tempatnya. Dan


Periksa tempat battery dalam kondisi baik

28/Jul/15

6.7.7

Check and ensure all panel box completed with rubber mate
and good condition

Pastikan Semua box panel listrik dilengkapi dengan keset


karet dan periksa kondisi keset dalam keadaan baik

28/Jul/15

6.7.8

6.8
6.8.1

6.8.2

Pastikan bahawa saat penyemprotan atau pembersihan,


jangan sampai air terkena peralatan listrik. Ruangan
harus nampak bersih dan rapih sesuadh itu. Ini adalah
suatu kriteria yang menunjukkan kepribadian KKM dan
anak buahnya

SPARE AND INVENTORY

SUKU CADANG DAN INVENTARIS

0
0

Check and ensure behind main switch board are free from any Pastikan dan periksa bagian belakang box panel utama bebas
object and dry condition
dari barang2 dan tetesan / ceceran air
NOTE:
CATATAN
Ensure that during hosing down or cleaning operation, no
water is allowed to settle on electrical machinery. The
compartment should look clean and tidy after this
operation. This is one of the criteria that indicates the
performance of the Chief Engineer and his subordinates.

Running Hours

28/Jul/15

C/E

Besides the routine checking of spares and updating of


Disamping pemeriksaan rutin pada suku cadang dan
inventory, a thorough check must be carried out to ensure that pencatatan daftar barang, juga di lakukan untuk meyakinkan
spares are properly secured and preserved.
bahwa suku cadang tersebut aman dan bisa digunakan.

19/May/15

The Chief Engineer must be able to produce an up-to-date


Inventory List indicating machinery, part numbers, stock
quantity and position of the stores upon request of the Shore
Auditor.

2/May/15

KKM harus mampu membuat daftar terbaru permesinan,


nomor suku cadang, jumlah yang tersedia dan posisi pada
tempat penyimpanan jika ada permintaan dari auditor.

ITEM MAINTENANCE FOR


July-15

17

PMS No.

Unit / System

Unit / System

PI C

Last Maint. Date

ITEM OVERDUE FOR

Running Hours

PMS AUXILIAR

0
July-15

Summary of Overdue Maintenance


Item Maintenance

PMS No.

Reason

Chief Engineer

Master

Date :

Date :

LF- E 036/DES 2012

Written by :HST

Form

MACHINE

LF- E 036

Revision
Page

1 Of 5

July 2015

PERIOD OF PMS REPORT

Symbol

Interval
Months
Hours
3

Est. Next Due

Jan-15

Feb-15

Mar-15

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

: Overdue Maintenance for This Month

2015
Jul-15
Aug-15

May-15

May-15

22-Aug-15

22-Aug-15

22-Aug-15

28-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Months
Hours
3
3
4

Est. Next Due

Jan-15

Feb-15

Mar-15

2015
Jul-15
Aug-15

May-15

May-15

28-Aug-15

28-Aug-15

28-Sep-15

2
3

23-Aug-15
28-Aug-15

36

30-Aug-16

28-Aug-15

S
S

3
3
3

28-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Sep-15

10-Aug-15

36

10-May-18

10-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Months
Hours

Est. Next Due

Jan-15

Feb-15

Mar-15

2015
Jul-15
Aug-15

May-15

May-15

10-Aug-15

10-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Months
Hours

Est. Next Due

Jan-15

Feb-15

Mar-15

May-15

May-15

2015
Jul-15
Aug-15

1
10-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15
28-Aug-15

C
C

C
C

S
S

30-Sep-15

3
3
3

2
2

2-Aug-15
2-Aug-15

26-Sep-15

26-Sep-15

2
2

26-Sep-15
26-Sep-15

26-Sep-15

C
S
S

C
C
C
C
C

3
28-Aug-15

1
28-Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Months
Hours
1

Est. Next Due

Jan-15

Feb-15

Mar-15

May-15

May-15

2015
Jul-15
Aug-15

29-Aug-15

29-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

1
1
1

3
19-Aug-15

2-Aug-15

PERFORMANCE 100%

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

Interval
Months
Hours

Est. Next Due

UXILIARY MACHINE FOR


THIS MONTH

ason

Jan-15

Feb-15

Mar-15

May-15

May-15

2015
Jul-15
Aug-15

Oct-15

Dec-15

Jan-16

Nov-15

Dec-15

EXCELLENT

Remarks

DEDE MULYANA
Technical Superintendent

Master
Date :

Approved by : VP / DPA

Retention Period : 1 Year

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

1154

C/E
C/E
C/E
C/E
C/E
C/E
C/E
C/E

Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E

28/Jul/15

buka dan tutup semua fire valve, pastikan


open and close all main fire valve, ensure
semua valve mudah dan siap untuk
all valve easy and ready for operate, add
dioperasikan, tambahkan grease pada
grease at valve stem and change gland
valve stem dan ganti gland packing jika
packing if necessary
diperlukan

C/E

28/May/15

Err:509
Err:509
Err:509

C/E
C/E
C/E

Err:509
Err:509
Err:509

C/E

10/May/15

C/E

10/Jul/15

6.3.9

open and close all fuel valve, ensure all


valve easy and ready for operate, add
grease at valve stem and change gland
packing if necessary

buka dan tutup semua fuel valve, pastikan


semua valve mudah dan siap untuk
dioperasikan, tambahkan grease pada
valve stem dan ganti gland packing jika
diperlukan

C/E

10/May/15

6.3.11

Periksa kondisi gelas duga dari tanki


Check condition of sighting glass at dayli
bahan bakar harian dan pastikan tidak ada
tank and ensure no leaking, sighting glass
kebocoran, cover pelindung gelas duga
cover are good condition and easy to read
dalam kondisi baik dan mudah terbaca

C/E

10/Jul/15

C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509

C/E

28/May/15

C/E

28/May/15

C/E

28/May/15

C/E

Err:509

C/E

28/May/15

PMS No.
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
6.2.8

6.2.9

Err:509
Err:509
Err:509
6.3.6
6.3.8

Err:509
Err:509
Err:509
Err:509
6.4.1
6.4.2

6.4.3
Err:509
6.4.4

6.7.2

Err:509
Err:509

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
check all line main fire system from
leaking

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
periksa seluruh sistem perpipaan
pemadam dari kebocoran

Err:509
Err:509
Err:509
Ganti baru seal dan packing untuk tranfer
renew seal and packing for tranfer pump
pump
periksa seluruh sistem perpipaan sitem
check all line fuel system from leaking
bahan bakar dari kebocoran

Err:509
Err:509
Err:509
Err:509
Check all hoses and piping for
deterioration.

Err:509
Err:509
Err:509
Err:509
Periksa semua selang dan pipa dari
keusangan

Check hydraulic oil condition, clean or


renew oil filter if necessary.

Periksa kondisi minyak hydrolik,


bersihkan atau ganti saringan jika perlu.

Periksa semua konrtol valves, pastikan


Check all control valves and ensure they
bebas, bersihkan dan lumasi semua
are free, clean and lubricate all joints.
penghubung.
Err:509
Err:509
Periksa dari suara yang tidak
Check for abnormal noise and vibration.
normal/getaran

PIC

Engine room Bilges, should be kept clean


and dry, free from corrosion, wastage and
oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids
or vapour into the engine room.

Bilge/got kamar mesin, harus bersih dan


kering, bebas dari karat, endapan lumpur
dan minyak. Dan benda2 yang menutup
saluran/lubang pada dasar sekat harus
dibersihkan

C/E

28/Jul/15

Err:509
Err:509

Err:509
Err:509

C/E
C/E

Err:509
Err:509

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

6.7.3

All lights in good order.

Semua lampu2 di kamar mesin termasuk


covernya dalam kondisi baik dan
berfungsi

1154

C/E

29/Jul/15

6.7.4

Pastikan Semua Vanbelt pada Mesin


Ensure all Vbelt at Main Engine, Aux
Induk, Mesin Bantu dan Mesin2 yang lain
Engine and other machinery including
termasuk equipmen2 yang lain ditutup
rotating equipment are covered and check
pelindung dan periksa kondisi pelindung
condition of cover are good
tersebut dalam kondisi yang baik

C/E

29/Jul/15

6.7.5

Ensure all exhaust pipe covered with


asbestos and aluminium foil. Check and
ensure are good condition, renew if
necessary. And ensure all exhaust pipe
closed with spark arrestor and good
condition, renew spark arrestor if
necessary

Pastikan semua Exhaust pipe ditutup


lagging / asbes penahan panas dan
dilapisi aluminium foil. Periksa asbes dan
aluminium foil dalam kondisi baik, ganti
jika perlu. Dan pastikan saringan pipa
exhaust dalam kondisi baik, ganti jika
perlu

C/E

28/Jul/15

6.7.6

Ensure All Battery have safety box and


battery box are good condition

Pastikan Battery / Accu tertutup cover /


ada tempatnya. Dan Periksa tempat
battery dalam kondisi baik

C/E

28/Jul/15

6.7.7

Check and ensure all panel box


completed with rubber mate and good
condition

Pastikan Semua box panel listrik


dilengkapi dengan keset karet dan periksa
kondisi keset dalam keadaan baik

C/E

28/Jul/15

6.7.8

Check and ensure behind main switch


board are free from any object and dry
condition

Pastikan dan periksa bagian belakang box


panel utama bebas dari barang2 dan
tetesan / ceceran air

C/E

28/Jul/15

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Err:509
6.2.6
ITEM
MAINTENANCE
FOR

Err:509

Err:509
Ganti baru gland packing untuk main fire
renew gland packing for main fire pump
pump

17

PERFORMANCE

PMS FOR THIS


MONTH

1154

C/E

Err:509

C/E

28/May/15

100%

July 2015
ITEM OVERDUE
FOR
July 2015

EXCELLENT

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

PLAN MAINTENANCE FOR


July 2015

1154

35

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509

Unit / System
Err:509
Err:509
Err:509
Err:509
Err:509

PIC
C/E
C/E
C/E
C/E
C/E

Last Maint.
Date
Err:509
Err:509
Err:509
Err:509
Err:509

6.2.5

check main fire pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa main fire pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

23/Jun/15

6.2.6

renew gland packing for main fire pump

C/E

28/May/15

C/E

28/Jul/15

C/E
C/E
C/E
C/E
C/E
C/E

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

C/E

10/Jul/15

C/E

10/May/15

C/E

10/Jul/15

C/E

10/Jul/15

C/E
C/E

Err:509
Err:509

C/E

30/Jul/15

PMS No.
Err:509
Err:509
Err:509
Err:509
Err:509

check all line main fire system from


leaking
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Ganti baru gland packing untuk main fire


pump
periksa seluruh sistem perpipaan
pemadam dari kebocoran
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

6.3.5

check main transfer pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa transfer pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

6.3.6

renew seal and packing for tranfer pump

6.3.8

check all line fuel system from leaking

6.3.11

Periksa kondisi gelas duga dari tanki


Check condition of sighting glass at dayli
bahan bakar harian dan pastikan tidak ada
tank and ensure no leaking, sighting glass
kebocoran, cover pelindung gelas duga
cover are good condition and easy to read
dalam kondisi baik dan mudah terbaca

6.2.8
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
6.5.1

Err:509
Err:509
Check all thermometer and gauges are
functioning properly.

Ganti baru seal dan packing untuk tranfer


pump
periksa seluruh sistem perpipaan sitem
bahan bakar dari kebocoran

Err:509
Err:509
Periksa semua thermometer dan alat2
indicator berfungsi dengan baik.

6.5.2

Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.

C/E

2/Jun/15

6.5.3

Replace all defective gauges.

Ganti semua alat pengukur yang rusak.

C/E

2/Jun/15

Check All battery electrolyte specific


gravity.
Top up All battery with distilled water if
necessary.

Periksa berat jenis electrolyte pada semua


battery
Tambah air pada semua battery
distillateya jika diperlukan
Periksa kekencangan terminal pada
semua battery

C/E

26/Jul/15

C/E

26/Jul/15

C/E

26/Jul/15

C/E

26/Jul/15

6.6.1
6.6.2
6.6.3

Check tightness of all battery terminal.

6.6.4

Ensure all battery cleanliness.

Pastikan kebersihan pada semua battery

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

1154

6.6.5

Check wire connection all battery to


starter.

Periksa kabel penghubung pada semua


battery ke starter

C/E

26/Jul/15

6.7.2

Engine room Bilges, should be kept clean


and dry, free from corrosion, wastage and
oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids
or vapour into the engine room.

Bilge/got kamar mesin, harus bersih dan


kering, bebas dari karat, endapan lumpur
dan minyak. Dan benda2 yang menutup
saluran/lubang pada dasar sekat harus
dibersihkan

C/E

28/Jul/15

Err:509
Err:509

Err:509
Err:509
Semua lampu2 di kamar mesin termasuk
covernya dalam kondisi baik dan
berfungsi

C/E
C/E

Err:509
Err:509

C/E

29/Jul/15

Err:509
Err:509
6.7.3

All lights in good order.

6.7.4

Pastikan Semua Vanbelt pada Mesin


Ensure all Vbelt at Main Engine, Aux
Induk, Mesin Bantu dan Mesin2 yang lain
Engine and other machinery including
termasuk equipmen2 yang lain ditutup
rotating equipment are covered and check
pelindung dan periksa kondisi pelindung
condition of cover are good
tersebut dalam kondisi yang baik

C/E

29/Jul/15

6.7.5

Ensure all exhaust pipe covered with


asbestos and aluminium foil. Check and
ensure are good condition, renew if
necessary. And ensure all exhaust pipe
closed with spark arrestor and good
condition, renew spark arrestor if
necessary

Pastikan semua Exhaust pipe ditutup


lagging / asbes penahan panas dan
dilapisi aluminium foil. Periksa asbes dan
aluminium foil dalam kondisi baik, ganti
jika perlu. Dan pastikan saringan pipa
exhaust dalam kondisi baik, ganti jika
perlu

C/E

28/Jul/15

6.7.6

Ensure All Battery have safety box and


battery box are good condition

Pastikan Battery / Accu tertutup cover /


ada tempatnya. Dan Periksa tempat
battery dalam kondisi baik

C/E

28/Jul/15

6.7.7

Check and ensure all panel box


completed with rubber mate and good
condition

Pastikan Semua box panel listrik


dilengkapi dengan keset karet dan periksa
kondisi keset dalam keadaan baik

C/E

28/Jul/15

6.7.8

Check and ensure behind main switch


board are free from any object and dry
condition

Pastikan dan periksa bagian belakang box


panel utama bebas dari barang2 dan
tetesan / ceceran air

C/E

28/Jul/15

Chief Engineer
Date :

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Running
Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Interval
Est. Next Due
Months Hours
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

28-Aug-15

28-Aug-15

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

STATUS

Maintain This
Month

Maintain This
Month

Maintain This
Month
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509

28-Aug-15

28-Aug-15

28-Aug-15

Err:509

Err:509

Err:509

28-Aug-15

28-Aug-15
Maintain This
Month

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

29-Aug-15

29-Aug-15

Maintain This
Month

Maintain This
Month

28-Aug-15
Maintain This
Month

28-Aug-15

28-Aug-15

28-Aug-15

Maintain This
Month

Maintain This
Month
Maintain This
Month

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

SCHEDULED
Err:509

Err:509

Err:509

28-Aug-15
OVERDUE
Maintain This Month
OVERDUE
SCHEDULED
Maintain This Month

EXCELLENT

OVERDUE
SCHEDULED

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

Maintain This Month


OVERDUE
SCHEDULED
Running
Hours
Err:509
Err:509
Err:509
Err:509
Err:509

Interval
Err:509
Err:509
Err:509
Err:509
Err:509

Est. Next Due


Err:509
Err:509
Err:509
Err:509
Err:509

SCHEDULED
STATUS

23-Aug-15
SCHEDULED

28-Aug-15

28-Aug-15

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

10-Sep-15

10-Aug-15

10-Aug-15

10-Aug-15

SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED

SCHEDULED
Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

30-Sep-15

2-Aug-15
SCHEDULED

2-Aug-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

SCHEDULED

1154

PLANT MAINTENANCEMAIN
Form Code
ENGINE PORTSIDE
:
LF- C 050Revision

26-Sep-15

28-Aug-15

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

29-Aug-15

SCHEDULED

SCHEDULED

29-Aug-15
SCHEDULED

28-Aug-15

SCHEDULED
0

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

Technical Superintendent
Date :

1154

Form

ELECTRIC EQUIPMENT

LF- E 037

Revision
Page

Vessel
Name :

TB TYTYAN KARIMATA 02

Period :

July 2015

Date Last
Overhoul

August 8, 2011

PERIOD OF PMS REPORT

1 Of 3

BLN

THN

30

2015

Symbol

: Scheduled Maintenance for Next Month

: Completed Maintenance for This Month

O
PMS No.
7.1

Unit / System

Unit / System

PI C

Last Maint. Date

MAIN SWITCH BOARD

MAIN SWITCH BOARD

7.1.1

Feel the surface of panel for excessive warmness indicating


overheating or loose connection.

Raba permukaan panel untuk memeriksa apakah panas atau


sangat hangat yang menandakan over heating/ kabel terlepas.

2/Jul/15

7.1.2

Visually examine all cable connection and bus bar for decoloration.

Periksa dengan melihat semua hubungan kabel dan bus bar


untuk perubahan dari warna.

2/Jul/15

7.1.3

Check for unusual smell which indicate overheating.

Periksa bau yang tidak biasa yang menandakan overheating.

2/Jul/15

7.1.4

Ensure all covers are tightly secured.


General overview of the physical condition should be given to
the entire switchboard.
Ensure there is a non-conductive mat or non-conducting
grating in each working area in front of and behind each
board.

Pastikan semua penutup tertutup rapat.

2/Jul/15

Pemeriksaan secara general kondisi fisik seluruh switchboard

2/Jul/15

Pastikan disetiap area kerja baik didepan maupun dibelakang


switcboard terdapat rubber mat / alas yg bersifat isolator

2/Jul/15

Pastikan pegangan tangan dan railing pelindung pada


switchboard harus dilengkapi dengan rubber/karet isolator dan
dalam kondisi baik

3/Jul/15

7.1.5
7.1.6

7.1.7

Non-conducting handrails and guard rails should be present


on the board face.

7.1.8

All instrumentation (meters) should be in good working order Periksa dan pastikan semua alat pengukur instrumens
and recently calibrated. All controls and meters should be
(indikator2) berfungsi dengan baik dan bersih, mudah dibaca
clearly and accurately identified.
dan akurat

7.2

Running
Hours

Interval
Months Hours

0
0
0
0

1
1
1
1

0
3/Jul/15

Mar-15

May-15

May-15

Jul-15

Aug-15

2-Aug-15

2-Aug-15

2-Aug-15
2-Aug-15

C
C

S
S

2-Aug-15

2-Aug-15

3-Aug-15

3-Aug-15

5-Aug-15

12-Aug-15

12-Aug-15

Oct-15

1
0

Check and maintain general cleanliness.

Periksa dan rawat secara umum kebersihannya

5/Jun/15

Check for sign of decoloration and unusual smells which


indicate overheating or loose connection.

Periksa tanda perubahan warna dan bau yang tidak biasa dari
tanda tanda overheating dan koneksi yang longgar.

5/Jun/15

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

5/Jul/15

SEARCH LIGHT

LAMPU SOROT

7.3.1

Check and ensure light are free to rotate.

Periksa dan pastikan lampu bebas berputar.

12/Jul/15

7.3.2

Check all water tight gland and cable entry.

Periksa kekedapan airnya dan kabel yang masuk harus di seal.

12/Jul/15

7.3.3

Clean reflector.

Bersihkan reflector.

12/Jul/15

FLOODLIGHT/OUTPASS LIGHT

FLOODLIGHT/ OUTPASS LIGHT

7.4.1

Check and ensure water tightness of all covers.

Periksa dan pastikan kekedapan air semua penutup.

16/Jul/15

7.4.2

Check for loose wire terminal.

Periksa kelonggaran dari terminal kabel.

16/Jul/15

7.4.3

Replace blow out bulb.

Ganti bohlam yang rusak.

16/Jun/15

C/E

GENERAL LIGHTING

GENERAL LIGHTING
Nyalakan semua lampu-lampu Periksa dan ganti lampu yang
rusak.

5-Sep-15

5-Sep-15

1
0

C/E
0
0
0

1
1
3

12-Oct-15

C/E

16-Aug-15

16-Aug-15

16-Aug-15

16-Aug-15

16-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

16-Sep-15

C/E

7.5.1

Switch on all lightings Check and replace blow out bulb.

7.5.2

Clean shades, diffusers if necessary.

Bersihkan kap lampu

16/Jul/15

7.5.3

Check for loose wire terminal.

Periksa kabel terminal yang longgar

16/Jul/15

7.6

BATTERY AND CHARGER

BATREI DAN ALAT PENGISINYA

7.6.1

Check electrolyte level, add distilled water if necessary.

Periksa cairan electrolyte, tambahakn air distilat jika perlu.

20/Jul/15

7.6.2

Clean battery terminals and coat with petroleum jelly.

Bersihkan batrei terminal dan lumuri dengan gemuk.

20/Jul/15

7.6.3

Check all cell vent caps and ensure they are not choked.

Periksa semua tutupnya pastikan tidak tersumbat.

20/Jul/15

7.6.4

Ensure general cleanliness of battery compartment.

Pastikan ruang tempat penyimpanan bersih.

20/Jul/15

7.6.5

Check charging current.

Periksa arus pengisiannya

20/Jul/15

AC ALTERNATOR

AC ALTERNATOR

7.7

Feb-15

7.2.2

7.5

Jan-15

7.2.1

7.4

: Overdue Maintenance for This Month


2015

1
0

PAPAN DISTRIBUSI

7.3

Est. Next Due

C/E

DISTRIBUTION BOARD

7.2.3

July 2015

PERIOD OF PMS REPORT

TGL

16/Jul/15

0
0
0

1
1
1

C/E

C/E

0
0
0
0
0

1
1
1
1
1

Dec-15

Jan-16

Nov-15

Dec-15

PMS No.

7.7.1

7.7.2
7.7.3
7.7.4
7.7.5

Unit / System

Unit / System

PI C

Megger test generator using manufacturer's guidelines. Ensure Megger test generator sesuai manual book. Pastikan solid
solid state devices are isolated from high voltage generated
state devices terisolasi dari listrik tegangan tinggi saat di
during meggar test. Monitor and record insulation resistance megger test. Monitor dan record hasil megger test dan
with a 500 volt mega-ohm meter. The minimum acceptable
pastikan hasil megger test 500 volt mega-ohm meter,
reading is 2 mega-ohms. if result under 2 mega-ohm
minimum insulation resistance 2 mega-ohm. jika dibawah 2
reinsulated alternator
mega-ohm lakukan reinsulation pada generator
Ensure the location of the generator is receiving adequate
ventilation and is as dry as possible.
Verify the operation of the voltmeter and ammeter for each
generator rated at 50 volts or more.
Every 1,000 hours check the bearing(s) for smooth, quiet
operation
Periodically inspect the unit for any buildup of contamination
(dirt, oil, etc.) on the windings

Last Maint. Date

Running
Hours

24/Jun/15

Interval
Months Hours

Est. Next Due

2015
Jan-15

Feb-15

Mar-15

May-15

May-15

Jul-15

Aug-15

24/Jul/15

24-Aug-15

24/Jul/15
28/Jun/15

24-Aug-15

28/Jun/15

ITEM MAINTENANCE FOR


July-15
ITEM OVERDUE FOR
July-15

Dec-15

Jan-16

Nov-15

Dec-15

24-Dec-15

Periksa dan pastikan lokasi generator mendapatkan ventilasi


yang baik, bersih dan kering
Periksa dan pastikan ketika generator beroperasi, indikator
menunjukan 50 volts atau lebih
Periksa kondisi bearing agar operasi generator halus dan tidak
bising
Periksa keseluruhan unit alternator dari kontaminasi (kotoran,
minyak dll)

Oct-15

S
1

0
1
1

36

28-Jun-18

28-Sep-15

PERFORMANCE 100%

24

PMS ELECTRIC
EQUIPMENT FOR THIS
MONTH

EXCELLENT

Summary of Overdue Maintenance


Item Maintenance

PMS No.

Reason

Chief Engineer

Remarks

DEDE MULYANA
Technical Superintendent

Master

Date :

Date :

LF- E 037 /DES 2012

Written by :HST

Date :

Approved by : VP / DPA

Retention Period : 1 Year

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

PMS No.
Err:509

Unit / System
Err:509

Unit / System
Err:509

Form Code

LF- C 050Revision

Interval
Est. Next Due
Months Hours
Err:509
Err:509

C/E

Last Maint.
Date
Err:509

Running
Hours
0

C/E

2/Jul/15

2-Aug-15

C/E

2/Jul/15

2-Aug-15

C/E

2/Jul/15

2-Aug-15

PIC

7.1.1

Feel the surface of panel for excessive


Raba permukaan panel untuk memeriksa
warmness indicating overheating or loose apakah panas atau sangat hangat yang
connection.
menandakan over heating/ kabel terlepas.

7.1.2

Visually examine all cable connection


and bus bar for de-coloration.

7.1.3

Check for unusual smell which indicate


overheating.

Periksa dengan melihat semua hubungan


kabel dan bus bar untuk perubahan dari
warna.
Periksa bau yang tidak biasa yang
menandakan overheating.

7.1.4

Ensure all covers are tightly secured.

Pastikan semua penutup tertutup rapat.

C/E

2/Jul/15

2-Aug-15

7.1.5

General overview of the physical


condition should be given to the entire
switchboard.

Pemeriksaan secara general kondisi fisik


seluruh switchboard

C/E

2/Jul/15

2-Aug-15

7.1.6

Ensure there is a non-conductive mat or


non-conducting grating in each working
area in front of and behind each board.

Pastikan disetiap area kerja baik didepan


maupun dibelakang switcboard terdapat
rubber mat / alas yg bersifat isolator

C/E

2/Jul/15

2-Aug-15

C/E

3/Jul/15

Err:509

3-Aug-15

C/E
C/E

Err:509
Err:509

Err:509
0

Err:509
Err:509

Err:509
Err:509

All instrumentation (meters) should be in


Periksa dan pastikan semua alat pengukur
good working order and recently
instrumens (indikator2) berfungsi dengan
calibrated. All controls and meters should
baik dan bersih, mudah dibaca dan akurat
be clearly and accurately identified.

C/E

3/Jul/15

3-Aug-15

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509
Periksa dan pastikan lampu bebas
Check and ensure light are free to rotate.
berputar.
Check all water tight gland and cable
Periksa kekedapan airnya dan kabel yang
entry.
masuk harus di seal.
Check and ensure water tightness of all Periksa dan pastikan kekedapan air semua
covers.
penutup.

C/E
C/E
C/E

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

Err:509
Err:509
Err:509

C/E

12/Jul/15

12-Aug-15

C/E

12/Jul/15

12-Aug-15

C/E

16/Jul/15

16-Aug-15

7.4.2

Check for loose wire terminal.

C/E

16/Jul/15

16-Aug-15

7.5.1

Switch on all lightings Check and replace Nyalakan semua lampu-lampu Periksa
blow out bulb.
dan ganti lampu yang rusak.

C/E

16/Jul/15

16-Aug-15

7.5.2

Clean shades, diffusers if necessary.

Bersihkan kap lampu

C/E

16/Jul/15

16-Aug-15

7.5.3

Check for loose wire terminal.

Periksa kabel terminal yang longgar

C/E

16/Jul/15

16-Aug-15

Check electrolyte level, add distilled


water if necessary.
Clean battery terminals and coat with
petroleum jelly.
Check all cell vent caps and ensure they
are not choked.

Periksa cairan electrolyte, tambahakn air


distilat jika perlu.
Bersihkan batrei terminal dan lumuri
dengan gemuk.
Periksa semua tutupnya pastikan tidak
tersumbat.

C/E

20/Jul/15

20-Aug-15

C/E

20/Jul/15

20-Aug-15

C/E

20/Jul/15

Err:509

20-Aug-15

7.2.3

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

C/E

5/Jul/15

5-Aug-15

7.7.3

Verify the operation of the voltmeter and Periksa dan pastikan ketika generator
ammeter for each generator rated at 50
beroperasi, indikator menunjukan 50
volts or more.
volts atau lebih

C/E

24/Jul/15

Err:509

24-Aug-15

7.1.7
Err:509
Err:509

7.1.8

Err:509
Err:509
Err:509
7.3.1
7.3.2
7.4.1

7.6.1
7.6.2
7.6.3

Pastikan pegangan tangan dan railing


Non-conducting handrails and guard rails pelindung pada switchboard harus
should be present on the board face.
dilengkapi dengan rubber/karet isolator
dan dalam kondisi baik
Err:509
Err:509
Err:509
Err:509

Periksa kelonggaran dari terminal kabel.

1154

STATUS
Err:509

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month

Maintain This
Month

Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This Month


ITEM
MAINTENANCE
FOR

20

PERFORMANCE

OVERDUE

100%

July 2015

SCHEDULED
Maintain This Month

ITEM OVERDUE
FOR

July 2015

PMS FOR THIS


MONTH

OVERDUE

EXCELLENT

SCHEDULED
Maintain This Month
Maintain This Month

PLAN MAINTENANCE FOR


July 2015
PMS No.
Err:509
7.1.1

Unit / System
Err:509

Unit / System
Err:509

Feel the surface of panel for excessive


Raba permukaan panel untuk memeriksa
warmness indicating overheating or loose apakah panas atau sangat hangat yang
connection.
menandakan over heating/ kabel terlepas.

7.1.2

Visually examine all cable connection


and bus bar for de-coloration.

7.1.3

Check for unusual smell which indicate


overheating.

Periksa dengan melihat semua hubungan


kabel dan bus bar untuk perubahan dari
warna.
Periksa bau yang tidak biasa yang
menandakan overheating.

7.1.4

Ensure all covers are tightly secured.

Pastikan semua penutup tertutup rapat.

OVERDUE

23
PIC
C/E

Last Maint.
Date
Err:509

Running
Hours
0

C/E

2/Jul/15

Interval
Err:509
1

Est. Next Due


Err:509

SCHEDULED
STATUS
Err:509

2-Aug-15
SCHEDULED

C/E

2/Jul/15

2-Aug-15

C/E

2/Jul/15

2-Aug-15

C/E

2/Jul/15

2-Aug-15

SCHEDULED
SCHEDULED
SCHEDULED

PLANT MAINTENANCEMAIN ENGINE PORTSIDE

Form Code

LF- C 050Revision

2-Aug-15

General overview of the physical


condition should be given to the entire
switchboard.

Pemeriksaan secara general kondisi fisik


seluruh switchboard

C/E

7.1.6

Ensure there is a non-conductive mat or


non-conducting grating in each working
area in front of and behind each board.

Pastikan disetiap area kerja baik didepan


maupun dibelakang switcboard terdapat
rubber mat / alas yg bersifat isolator

C/E

7.1.7

Pastikan pegangan tangan dan railing


Non-conducting handrails and guard rails pelindung pada switchboard harus
should be present on the board face.
dilengkapi dengan rubber/karet isolator
dan dalam kondisi baik

C/E

All instrumentation (meters) should be in


Periksa dan pastikan semua alat pengukur
good working order and recently
instrumens (indikator2) berfungsi dengan
calibrated. All controls and meters should
baik dan bersih, mudah dibaca dan akurat
be clearly and accurately identified.

C/E

3/Jul/15

3-Aug-15

Err:509
Err:509

Err:509
Err:509

C/E
C/E

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

Err:509
Err:509

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

C/E

5/Jul/15

5-Aug-15

C/E

12/Jul/15

12-Aug-15

C/E

12/Jul/15

12-Aug-15

C/E

16/Jul/15

16-Aug-15

C/E

16/Jul/15

16-Aug-15

C/E

16/Jul/15

16-Aug-15

C/E
C/E

16/Jul/15
16/Jul/15

0
0

1
1

16-Aug-15
16-Aug-15

C/E

20/Jul/15

20-Aug-15

C/E

20/Jul/15

20-Aug-15

C/E

20/Jul/15

Err:509

20-Aug-15

C/E

Err:509

Err:509

Err:509

C/E

20/Jul/15

20-Aug-15

C/E
C/E
C/E
C/E

20/Jul/15
Err:509
Err:509
Err:509

0
Err:509
Err:509
Err:509

1
Err:509
Err:509
Err:509

20-Aug-15
Err:509
Err:509
Err:509

C/E

24/Jul/15

24-Aug-15

7.1.5

7.1.8

Err:509
Err:509
7.2.3
7.3.1
7.3.2
7.4.1
7.4.2
7.5.1
7.5.2
7.5.3
7.6.1
7.6.2
7.6.3
Err:509
7.6.4
7.6.5
Err:509
Err:509
Err:509
7.7.2

7.7.3
Err:509
Err:509

Chief Engineer
Date :

Periksa dan pastikan lampu bebas


Check and ensure light are free to rotate.
berputar.
Check all water tight gland and cable
Periksa kekedapan airnya dan kabel yang
entry.
masuk harus di seal.
Check and ensure water tightness of all Periksa dan pastikan kekedapan air semua
covers.
penutup.
Check for loose wire terminal.

Periksa kelonggaran dari terminal kabel.

Switch on all lightings Check and replace


blow out bulb.
Clean shades, diffusers if necessary.
Check for loose wire terminal.
Check electrolyte level, add distilled
water if necessary.
Clean battery terminals and coat with
petroleum jelly.
Check all cell vent caps and ensure they
are not choked.
Err:509
Ensure general cleanliness of battery
compartment.
Check charging current.
Err:509
Err:509
Err:509
Ensure the location of the generator is
receiving adequate ventilation and is as
dry as possible.

Nyalakan semua lampu-lampu Periksa


dan ganti lampu yang rusak.
Bersihkan kap lampu
Periksa kabel terminal yang longgar
Periksa cairan electrolyte, tambahakn air
distilat jika perlu.
Bersihkan batrei terminal dan lumuri
dengan gemuk.
Periksa semua tutupnya pastikan tidak
tersumbat.
Err:509
Pastikan ruang tempat penyimpanan
bersih.
Periksa arus pengisiannya
Err:509
Err:509
Err:509
Periksa dan pastikan lokasi generator
mendapatkan ventilasi yang baik, bersih
dan kering

Verify the operation of the voltmeter and


ammeter for each generator rated at 50
volts or more.
Err:509
Err:509

Periksa dan pastikan ketika generator


beroperasi, indikator menunjukan 50
volts atau lebih
Err:509
Err:509

2/Jul/15

1154

SCHEDULED
2/Jul/15

2-Aug-15
SCHEDULED

3/Jul/15

Err:509

3-Aug-15
SCHEDULED

SCHEDULED

SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED

SCHEDULED
C/E

24/Jul/15

Err:509

24-Aug-15

C/E
C/E

Err:509
Err:509

Err:509
1

Err:509
Err:509

Err:509
Err:509

SCHEDULED

Technical Superintendent
Date :

MONTHLY WORK DONE / WORK PLAN REPORT

PMS No.

Unit / System

MAIN PROPULSION PORTSIDE


Inspect engine for leaks and loose
1.1.1
connections
1.1.2

Check oil level of engine crankcase

1.1.3

Check coolant level of Cooling System

1.2.1

Clean primary fuel filter

1.2.2

Drain water and sediment of fuel tank

Unit / System

PIC

Last Maint. Date

Periksa kebocoran dan kelonggaran


bagian mesin

C/E

25/Jul/15

Perika level oli mesin

C/E

25/Jul/15

C/E

25/Jul/15

C/E

23/May/15

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

5/Jan/15

C/E

2/May/15

C/E

10/Feb/15

C/E

2/May/15

Periksa/bersihkan jaket water pump

C/E

13/Feb/15

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

2/May/15

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox

C/E

8/Aug/11

C/E

29/Jun/15

Periksa level coolant pada sistem


pendinginan
Bersihkan filter bahan bakar/ganti filter
bahan bakar
Menguras air dan kerak di tanki bahan
bakar
Bersihkan /ganti elements filter udara air
cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery
Periksa/setel celah valve

1.2.4
1.2.5
1.2.6
1.3.1

Clean /Replace air filter elements of Air


cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries
Check/adjust of clearence Valve

1.3.2

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin

1.2.3

1.6.4

Inspect/check of engine protection


devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
Inspect/rebuild or exchange of raw/sea
water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

1.7.1

Inspect Oil Level of Gearbox

1.7.2

Clean outside of Gearbox

Bersihkan bagian luar dari Gearbox

C/E

25/Jul/15

1.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

1.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

1.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

1.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

1.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

13/Feb/15

1.7.8

Renew filter oil

C/E

2/Jun/14

1.7.9

Check the pump of Gearbox

C/E

8/Aug/11

1.7.10

Check and clean the cooler of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox

C/E

8/Aug/11

1.7.2

Clean outside of Gearbox

Bersihkan bagian luar dari Gearbox

C/E

25/Jul/15

1.7.11

Overhoul of Gearbox

Overhoul Gearbox

C/E

8/Aug/11

1.4.1
1.5.1
1.5.2
1.6.1
1.6.2
1.6.3

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

1.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

3/Jul/15

1.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

3/Jul/15

1.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

3/Jul/15

1.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

1.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

1.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

1.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

1.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

1.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

1.10.1

Check and attention to abnormal noise

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran

C/E

2/Jul/15

1.10.2

Check and attention to exhaust color

Periksa dan perhatikan warna exhaust

C/E

2/Jul/15

1.10.3

Observe sea water discharging volume

C/E

2/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

C/E

8/Aug/11

C/E

5/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

1.13.1

Periksa volume pendingin air laut dari


valve overboard
Lubricating All Control Engine Morse
Lumasi machanism Kabel Morse Kontrol
machaniscem
Engine
Check mechancal cable Control Engine Periksa mechanical Kabel Morse Kontrol
Morse from damage
Engine
greasing all Control Engine Morse on
Lumasi grease pada mechanical handle
mechanical handle
Kabel Morse Kontrol Engine
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul Main engine portside
Top overhaul Main engine portside

1.14.1

General overhaul Main Engine Portside

General Overhaul Main Engine Portside

Take Lub. oil sample and send ashore for


laboratory analysis.
Lubricating All Control Engine Morse
machaniscem
Check mechancal cable Control Engine
Morse from damage
greasing all Control Engine Morse on
mechanical handle
Check all exhaust gas piping to ensure no
leak.

Periksa volume pendingin air laut dari


valve overboard
Lumasi machanism Kabel Morse Kontrol
Engine
Periksa mechanical Kabel Morse Kontrol
Engine
Lumasi grease pada mechanical handle
Kabel Morse Kontrol Engine
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.

1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3

1.15.1
1.11.1
1.11.2
1.1.3
1.12.1

PMS No.

Unit / System

Unit / System

1.13.1

Tighten up exhaust Pipe bellow bolts, if


necessary.
Check all securing brackets Exhaust Pipe
and fastener.
Top overhaul Main engine portside

Kencangkan baut pegangan Pipa Gas


Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul Main engine portside

1.14.1

General overhaul Main Engine Portside

1.12.2
1.12.3

Take Lub. oil sample and send ashore for


laboratory analysis.
MAIN PROPULSION STARBOARDSIDE
Inspect engine for leaks and loose
2.1.1
connections
1.15.1

2.1.2

Check oil level of engine crankcase

2.1.3

Check coolant level of Cooling System

2.2.1

Clean primary fuel filter

2.2.2

Drain water and sediment of fuel tank

PIC

Last Maint. Date

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

General Overhaul Main Engine Portside

C/E

8/Aug/11

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

5/Jul/15

Periksa kebocoran dan kelonggaran


bagian mesin

C/E

20/Jul/15

Perika level oli mesin

C/E

20/Jul/15

C/E

20/Jul/15

C/E

23/May/15

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/13

C/E

10/Feb/15

Periksa/bersihkan jaket water pump

C/E

8/Aug/11

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

13/Feb/15

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox

C/E

2/May/15

C/E

2/Jul/15

Periksa level coolant pada sistem


pendinginan
Bersihkan filter bahan bakar/ganti filter
bahan bakar
Menguras air dan kerak di tanki bahan
bakar
Bersihkan /ganti elements filter udara air
cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery
Periksa/setel celah valve

2.2.4
2.2.5
2.2.6
2.3.1

Clean /Replace air filter elements of Air


cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries
Check/adjust of clearence Valve

2.3.2

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin

2.2.3

2.6.4

Inspect/check of engine protection


devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
Inspect/rebuild or exchange of raw/sea
water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

2.7.1

Inspect Oil Level of Gearbox

2.7.2

Clean outside of Gearbox

Bersihkan bagian luar dari Gearbox

C/E

2/Jul/15

2.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

2.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

2.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

2.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

2.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

2/Jun/14

2.7.8

Renew filter oil

C/E

2/Jun/14

2.7.9

Check the pump of Gearbox

C/E

2/May/15

2.7.10

Check and clean the cooler of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox

C/E

2/May/15

2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

2.7.11

Overhoul of Gearbox

Overhoul Gearbox

C/E

13/Feb/15

2.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

2/Jul/15

2.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

2/Jul/15

2.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

2/Jul/15

2.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

2.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

2.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

2.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

2.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

2.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

2.10.1

Check and attention to abnormal noise

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran

C/E

2/Jul/15

2.10.2

Check and attention to exhaust color

Periksa dan perhatikan warna exhaust

C/E

2/Jul/15

2.10.3

Observe sea water discharging volume

C/E

2/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

General Overhaul Main Engine Portside

C/E

8/Aug/11

2.15.1

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

9/Jul/15

C/E

30/Jul/15

3.1.2

Periksa volume air pendingin pada header


tank
Periksa volume air pendingin pada header
Check for oil and coolant leaks
tank
Check the amount of lubricating oil in the Periksa volume air pendingin pada header
sump
tank

C/E

30/Jul/15

C/E

30/Jul/15

2.13.1

Periksa volume pendingin air laut dari


valve overboard
Lubricating All Control Engine Morse
Lumasi machanism Kabel Morse Kontrol
machaniscem
Engine
Check mechancal cable Control Engine Periksa mechanical Kabel Morse Kontrol
Morse from damage
Engine
greasing all Control Engine Morse on
Lumasi grease pada mechanical handle
mechanical handle
Kabel Morse Kontrol Engine
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul Main engine portside
Top overhaul Main engine portside

2.14.1

General overhaul Main Engine Portside

2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3

Take Lub. oil sample and send ashore for


laboratory analysis.
AUXILLIARY ENGINE PORTSIDE
Check the amount of coolant in the
3.1.1
header tank

3.1.3

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

3.2.1

Renew the Engine lubricating oil

Ganti baru oli pelumas Engine

C/E

20/Jul/15

3.2.2

Renew the canister of the lubricating oil


filter

Ganti baru Filter oli pelumas Engine

C/E

20/Jul/15

3.3.1

Renew the elements of the fuel filter

Ganti baru filter bahan bakar

C/E

8/Jul/15

3.3.2

Check the Engine mounts

Periksa Engine mounts

C/E

8/Jul/15

3.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

8/Jul/15

3.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

8/Jul/15

3.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

3.5.1

Inspect all generator connections and


cabling

C/E

20/Jul/15

3.5.2

Test function of auxiliaries

C/E

20/Jul/15

3.5.3

Inspect condition of fan

C/E

20/Jul/15

C/E

20/Jun/15

C/E

20/May/15

3.5.4
3.5.5

Periksa semua sambungan2 dan kabel


generator
Test fungsi2 equipment aksesoris
generator
Periksa kondisi fan

Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator

3.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

3.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

3.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

3.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

3.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

3.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

3.7.1

Check and attention to abnormal noise

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran

C/E

21/Jul/15

3.7.2

Check and attention to exhaust colour

Periksa dan perhatikan warna exhaust

C/E

21/Jul/15

3.7.3

Observe sea water discharging volume

C/E

21/Jul/15

C/E

22/Jun/14

C/E

22/Jun/14

C/E

22/Jun/14

C/E

31/Aug/13

C/E

31/Aug/13

3.8.1
3.8.2
3.8.3
3.9.1
3.10.1

Periksa volume pendingin air laut dari


valve overboard
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Test fungsi2 equipment aksesoris
Top overhaul aux engine portside
generator
General overhaul aux engine Portside
General Overhaul aux engine Portside

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

3.11.1

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

30/May/15

C/E

28/Jul/15

4.1.2

Periksa volume air pendingin pada header


tank
Periksa pelumas dan pendingin dari
Check for oil and coolant leaks
kebocoran
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
sump
tank

C/E

28/Jul/15

C/E

28/Jul/15

Take Lub. oil sample and send ashore for


laboratory analysis.
AUXILLIARY ENGINE STARBOARDSIDE
Check the amount of coolant in the
4.1.1
header tank

4.1.3
4.2.1

Renew the Engine lubricating oil

Ganti baru oli pelumas Engine

C/E

20/Jul/15

4.2.2

Renew the canister of the lubricating oil


filter

Ganti baru Filter oli pelumas Engine

C/E

20/Jul/15

4.3.1

Renew the elements of the fuel filter

Ganti baru filter bahan bakar

C/E

20/Jul/15

4.3.2

Check the Engine mounts

Periksa Engine mounts

C/E

12/Jul/15

4.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

12/Jul/15

4.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

12/Jul/15

4.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

4.5.1

Inspect all generator connections and


cabling

C/E

21/Jul/15

4.5.2

Test function of auxiliaries

C/E

21/Jul/15

4.5.3

Inspect condition of fan

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

4.5.4
4.5.5

Periksa semua sambungan2 dan kabel


generator
Test fungsi2 equipment aksesoris
generator
Periksa kondisi fan

Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator

4.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

4.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

4.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

4.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

4.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

4.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

4.7.1

Check and attention to abnormal noise

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran

C/E

21/Jul/15

4.7.2

Check and attention to exhaust colour

Periksa dan perhatikan warna exhaust

C/E

21/Jul/15

4.7.3

Observe sea water discharging volume

Periksa volume pendingin air laut dari


valve overboard

C/E

21/Jul/15

PMS No.

Unit / System

Check all exhaust gas piping to ensure no


leak.
Tighten up exhaust Pipe bellow bolts, if
4.8.2
necessary.
Check all securing brackets Exhaust Pipe
4.8.3
and fastener.
4.9.1
Top overhaul aux engine portside
4.10.1 General overhaul aux engine Portside
Take Lub. oil sample and send ashore for
4.11.1
laboratory analysis.
TEST PROGRAM
4.8.1

Unit / System
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.
Kencangkan baut pegangan Pipa Gas
Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul aux engine portside
General Overhaul aux engine Portside
Ambil contoh Lub. Oil dan kirim ke darat
untuk di periksa.

PIC

Last Maint. Date

C/E

22/Jun/15

C/E

22/Jun/15

C/E

22/Jun/15

C/E
C/E

31/Aug/13
31/Aug/13

C/E

30/May/15

5.1.1

Remove temperature indicator from the


place, cleaning sensor from sludge and be
sure temperature indicator normaly
function

Lepas indikator temperatur dari


tempatnya dan bersihkan sensor dari
jelaga pastikan indikator temperatur
berfungsi dengan baik

C/E

15/May/15

5.1.2

Visual check condition of sensor and


temperature casing not broken

check kondisi visual sensor dan casing


temperatur tidak ada yg pecah atau rusak

C/E

15/Jul/15

Compared with other thermometers when


thermometer working.
Check cable connections and cable
entries to the sensor.

Bandingkan dengan thermometer lain


ketika thermometer bekerja
Periksa kabel koneksi dan kabel yang
masuk ke sensor

C/E

14/Jul/15

C/E

2/Jul/15

5.2.2

Check that there is no leakage of oil or


water inside the sensor. If any, clean the
sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli


atau air dari sensor atau koneksi sensor.
Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih
lanjut.

C/E

2/Jul/15

5.3.1

Check general condition of Insulation of Check general condition of Isolasi pipa


exhaust pipes
gas buang

C/E

2/Jul/15

5.3.2

Test Fire pump

Test fire pump

C/E

2/Jul/15

Check general condition of konsol control

C/E

2/Jul/15

Bersihkan filter strainer seachest

C/E

22/May/15

C/E

22/May/15

5.1.3
5.2.1

Check general condition of Control


consoles
AUXILIARY MACHINE
6.1.1
Cleaning filter strainer seachest
5.3.3

6.1.2

buka dan tutup semua valve seachest,


open and close all seachest valve, ensure
pastikan semua valve mudah dan siap
all valve easy and ready for operate, add
untuk dioperasikan, tambahkan grease
grease at valve stem and change gland
pada valve stem dan ganti gland packing
packing if necessary
jika diperlukan

6.1.3

Check and Ensure, zinch anode still ,


replace new zinch anode if necessary

Pastikan zinch anode untuk seachest


masih ada, ganti jika zinch anode sudah
habis

C/E

22/May/15

6.2.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump

C/E

28/May/15

C/E

28/May/15

C/E

28/May/15

6.2.4

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven main fire
motor sistem pemadam utama
system

C/E

28/May/15

6.2.5

check main fire pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

C/E

23/Jun/15

6.2.2
6.2.3

Clean fan, impeller and protective guard


ventilation passage. For motor driven
main fire pump
Cleaning housing motor driven main fire
pump

Bersihkan kipas dan rumah pelindung


saluran udara. untuk motor penggerak
main fire pump
Bersihkan sudu-sudu motor penggerak
main fire pump

Periksa main fire pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

Ganti baru gland packing untuk main fire


pump

C/E

28/May/15

6.2.6

renew gland packing for main fire pump

6.2.7

overhoul main fire pump, periksa semua


overhoul main fire pump, check all
konstruksi, impeller, ganti baru packing,
construction, impeller, renew ring and
ring dan spring, periksa bearing, periksa
spring, check bearing, check shaft, check
shaft dan periksa spie antara shaft dan
spie between shaft and coupling
coupling

C/E

30/Aug/13

6.2.8

check all line main fire system from


leaking

C/E

28/Jul/15

6.2.9

buka dan tutup semua fire valve, pastikan


open and close all main fire valve, ensure
semua valve mudah dan siap untuk
all valve easy and ready for operate, add
dioperasikan, tambahkan grease pada
grease at valve stem and change gland
valve stem dan ganti gland packing jika
packing if necessary
diperlukan

C/E

28/May/15

6.3.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump

C/E

10/May/15

6.3.2

Clean fan, impeller and protective guard Bersihkan kipas dan rumah pelindung
ventilation passage. For motor driven
saluran udara. untuk motor penggerak
transfer pump
transfer pump

C/E

10/May/15

6.3.3

Cleaning housing motor driven main


transfer pump

C/E

10/May/15

6.3.4

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven transfer
motor transfer pump
pump

C/E

10/May/15

6.3.5

check main transfer pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa transfer pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

10/Jul/15

6.3.6

renew seal and packing for tranfer pump

Ganti baru seal dan packing untuk tranfer


pump

C/E

10/May/15

6.3.7

overhoul tranfer pump, check all


construction, gear, renew bearing, check
shaft, check spie between shaft and
coupling

overhoul tranfer pump, periksa semua


konstruksi, gear, ganti baru bearing,
periksa shaft dan periksa spie antara shaft
dan coupling

C/E

10/May/15

6.3.8

check all line fuel system from leaking

periksa seluruh sistem perpipaan sitem


bahan bakar dari kebocoran

C/E

10/Jul/15

6.3.9

open and close all fuel valve, ensure all


valve easy and ready for operate, add
grease at valve stem and change gland
packing if necessary

buka dan tutup semua fuel valve, pastikan


semua valve mudah dan siap untuk
dioperasikan, tambahkan grease pada
valve stem dan ganti gland packing jika
diperlukan

C/E

10/May/15

6.3.10

Clean fuel daily tank and check all


construction of dayli tank including
filling pipe, suction pipe, vent pipe,
manhole (all bolt are complete and no
broken bolt), valves and ensure no
leaking at dayli tank

Bersihkan tanki bahan bakar harian dan


periksa kondisi konstruksi tanki bahan
bakar harian termasuk pipa isi, pipa isap,
pipa ventilasi, manhole (baut2 lengkap
dan tidak ada yang patah), valve2 dan
pastikan tidak ada kebocoran pada tanki
bahan bakar harian

C/E

10/May/15

6.3.11

Periksa kondisi gelas duga dari tanki


Check condition of sighting glass at dayli
bahan bakar harian dan pastikan tidak ada
tank and ensure no leaking, sighting glass
kebocoran, cover pelindung gelas duga
cover are good condition and easy to read
dalam kondisi baik dan mudah terbaca

C/E

10/Jul/15

6.4.1

Check all hoses and piping for


deterioration.

C/E

28/May/15

periksa seluruh sistem perpipaan


pemadam dari kebocoran

Bersihkan sudu-sudu motor penggerak


transfer pump

Periksa semua selang dan pipa dari


keusangan

PMS No.

Unit / System

Unit / System

Last Maint. Date

C/E

28/May/15

C/E

28/May/15

C/E

28/May/15

C/E

30/Jul/15

6.4.2

Check hydraulic oil condition, clean or


renew oil filter if necessary.

6.4.3

Periksa semua konrtol valves, pastikan


Check all control valves and ensure they
bebas, bersihkan dan lumasi semua
are free, clean and lubricate all joints.
penghubung.

6.4.4

Check for abnormal noise and vibration.

6.5.1

Check all thermometer and gauges are


functioning properly.

6.5.2

Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.

C/E

2/Jun/15

6.5.3

Replace all defective gauges.

Ganti semua alat pengukur yang rusak.

C/E

2/Jun/15

Check All battery electrolyte specific


gravity.
Top up All battery with distilled water if
necessary.

Periksa berat jenis electrolyte pada semua


battery
Tambah air pada semua battery
distillateya jika diperlukan
Periksa kekencangan terminal pada
semua battery

C/E

26/Jul/15

C/E

26/Jul/15

C/E

26/Jul/15

6.6.1
6.6.2

Periksa kondisi minyak hydrolik,


bersihkan atau ganti saringan jika perlu.

PIC

Periksa dari suara yang tidak


normal/getaran
Periksa semua thermometer dan alat2
indicator berfungsi dengan baik.

6.6.3

Check tightness of all battery terminal.

6.6.4

Ensure all battery cleanliness.

Pastikan kebersihan pada semua battery

C/E

26/Jul/15

6.6.5

Check wire connection all battery to


starter.

Periksa kabel penghubung pada semua


battery ke starter

C/E

26/Jul/15

6.7.1

Bulkheads, long., web frames, other


members in good condition.No heavy
corrosion, wastage, holes or cracks.

Bulkheads, longitudinal bulkhead, web


frames, dan bagian lain dalam kondisi
yang baik , tidak ada korosi yg parah
berlubang atau crack/retak.

C/E

28/May/15

6.7.2

Engine room Bilges, should be kept clean


and dry, free from corrosion, wastage and
oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids
or vapour into the engine room.

Bilge/got kamar mesin, harus bersih dan


kering, bebas dari karat, endapan lumpur
dan minyak. Dan benda2 yang menutup
saluran/lubang pada dasar sekat harus
dibersihkan

C/E

28/Jul/15

6.7.3

All lights in good order.

Semua lampu2 di kamar mesin termasuk


covernya dalam kondisi baik dan
berfungsi

C/E

29/Jul/15

6.7.4

Pastikan Semua Vanbelt pada Mesin


Ensure all Vbelt at Main Engine, Aux
Induk, Mesin Bantu dan Mesin2 yang lain
Engine and other machinery including
termasuk equipmen2 yang lain ditutup
rotating equipment are covered and check
pelindung dan periksa kondisi pelindung
condition of cover are good
tersebut dalam kondisi yang baik

C/E

29/Jul/15

6.7.5

Ensure all exhaust pipe covered with


asbestos and aluminium foil. Check and
ensure are good condition, renew if
necessary. And ensure all exhaust pipe
closed with spark arrestor and good
condition, renew spark arrestor if
necessary

Pastikan semua Exhaust pipe ditutup


lagging / asbes penahan panas dan
dilapisi aluminium foil. Periksa asbes dan
aluminium foil dalam kondisi baik, ganti
jika perlu. Dan pastikan saringan pipa
exhaust dalam kondisi baik, ganti jika
perlu

C/E

28/Jul/15

6.7.6

Ensure All Battery have safety box and


battery box are good condition

Pastikan Battery / Accu tertutup cover /


ada tempatnya. Dan Periksa tempat
battery dalam kondisi baik

C/E

28/Jul/15

6.7.7

Check and ensure all panel box


completed with rubber mate and good
condition

Pastikan Semua box panel listrik


dilengkapi dengan keset karet dan periksa
kondisi keset dalam keadaan baik

C/E

28/Jul/15

6.7.8

Check and ensure behind main switch


board are free from any object and dry
condition

Pastikan dan periksa bagian belakang box


panel utama bebas dari barang2 dan
tetesan / ceceran air

C/E

28/Jul/15

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

6.8.1

Besides the routine checking of spares


and updating of inventory, a thorough
check must be carried out to ensure that
spares are properly secured and
preserved.

Disamping pemeriksaan rutin pada suku


cadang dan pencatatan daftar barang, juga
di lakukan untuk meyakinkan bahwa suku
cadang tersebut aman dan bisa digunakan.

C/E

19/May/15

6.8.2

The Chief Engineer must be able to


produce an up-to-date Inventory List
indicating machinery, part numbers, stock
quantity and position of the stores upon
request of the Shore Auditor.

KKM harus mampu membuat daftar


terbaru permesinan, nomor suku cadang,
jumlah yang tersedia dan posisi pada
tempat penyimpanan jika ada permintaan
dari auditor.

C/E

2/May/15

7.1.1

Feel the surface of panel for excessive


Raba permukaan panel untuk memeriksa
warmness indicating overheating or loose apakah panas atau sangat hangat yang
connection.
menandakan over heating/ kabel terlepas.

C/E

2/Jul/15

7.1.2

Visually examine all cable connection


and bus bar for de-coloration.

C/E

2/Jul/15

7.1.3

Check for unusual smell which indicate


overheating.

Periksa dengan melihat semua hubungan


kabel dan bus bar untuk perubahan dari
warna.
Periksa bau yang tidak biasa yang
menandakan overheating.

C/E

2/Jul/15

7.1.4

Ensure all covers are tightly secured.

Pastikan semua penutup tertutup rapat.

C/E

2/Jul/15

7.1.5

General overview of the physical


condition should be given to the entire
switchboard.

Pemeriksaan secara general kondisi fisik


seluruh switchboard

C/E

2/Jul/15

7.1.6

Ensure there is a non-conductive mat or


non-conducting grating in each working
area in front of and behind each board.

Pastikan disetiap area kerja baik didepan


maupun dibelakang switcboard terdapat
rubber mat / alas yg bersifat isolator

C/E

2/Jul/15

7.1.7

Pastikan pegangan tangan dan railing


Non-conducting handrails and guard rails pelindung pada switchboard harus
should be present on the board face.
dilengkapi dengan rubber/karet isolator
dan dalam kondisi baik

C/E

3/Jul/15

7.1.8

All instrumentation (meters) should be in


Periksa dan pastikan semua alat pengukur
good working order and recently
instrumens (indikator2) berfungsi dengan
calibrated. All controls and meters should
baik dan bersih, mudah dibaca dan akurat
be clearly and accurately identified.

C/E

3/Jul/15

7.2.1

Check and maintain general cleanliness.

Periksa dan rawat secara umum


kebersihannya

C/E

5/Jun/15

7.2.2

Check for sign of decoloration and


unusual smells which indicate
overheating or loose connection.

Periksa tanda perubahan warna dan bau


yang tidak biasa dari tanda tanda
overheating dan koneksi yang longgar.

C/E

5/Jun/15

7.2.3

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

C/E

5/Jul/15

7.3.1

Check and ensure light are free to rotate.

C/E

12/Jul/15

7.3.2

Check all water tight gland and cable


entry.

Periksa dan pastikan lampu bebas


berputar.
Periksa kekedapan airnya dan kabel yang
masuk harus di seal.

C/E

12/Jul/15

7.3.3

Clean reflector.

Bersihkan reflector.

C/E

12/Jul/15

7.4.1

Check and ensure water tightness of all


covers.

Periksa dan pastikan kekedapan air semua


penutup.

C/E

16/Jul/15

7.4.2

Check for loose wire terminal.

Periksa kelonggaran dari terminal kabel.

C/E

16/Jul/15

7.4.3

Replace blow out bulb.


Ganti bohlam yang rusak.
Switch on all lightings Check and replace Nyalakan semua lampu-lampu Periksa
blow out bulb.
dan ganti lampu yang rusak.

C/E

16/Jun/15

C/E

16/Jul/15

ELECTRIC EQUIPMENT

7.5.1

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

7.5.2

Clean shades, diffusers if necessary.

Bersihkan kap lampu

C/E

16/Jul/15

7.5.3

Check for loose wire terminal.

Periksa kabel terminal yang longgar

C/E

16/Jul/15

Check electrolyte level, add distilled


water if necessary.
Clean battery terminals and coat with
petroleum jelly.
Check all cell vent caps and ensure they
are not choked.
Ensure general cleanliness of battery
compartment.

Periksa cairan electrolyte, tambahakn air


distilat jika perlu.
Bersihkan batrei terminal dan lumuri
dengan gemuk.
Periksa semua tutupnya pastikan tidak
tersumbat.
Pastikan ruang tempat penyimpanan
bersih.

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

7.6.5

Check charging current.

Periksa arus pengisiannya

C/E

20/Jul/15

7.7.1

Megger test generator using


manufacturer's guidelines. Ensure solid
state devices are isolated from high
voltage generated during meggar test.
Monitor and record insulation resistance
with a 500 volt mega-ohm meter. The
minimum acceptable reading is 2 megaohms. if result under 2 mega-ohm
reinsulated alternator

Megger test generator sesuai manual


book. Pastikan solid state devices
terisolasi dari listrik tegangan tinggi saat
di megger test. Monitor dan record hasil
megger test dan pastikan hasil megger
test 500 volt mega-ohm meter, minimum
insulation resistance 2 mega-ohm. jika
dibawah 2 mega-ohm lakukan
reinsulation pada generator

C/E

24/Jun/15

7.7.2

Ensure the location of the generator is


receiving adequate ventilation and is as
dry as possible.

Periksa dan pastikan lokasi generator


mendapatkan ventilasi yang baik, bersih
dan kering

C/E

24/Jul/15

Verify the operation of the voltmeter and


ammeter for each generator rated at 50
volts or more.
Every 1,000 hours check the bearing(s)
for smooth, quiet operation

Periksa dan pastikan ketika generator


beroperasi, indikator menunjukan 50
volts atau lebih
Periksa kondisi bearing agar operasi
generator halus dan tidak bising

C/E

24/Jul/15

C/E

28/Jun/15

C/E

28/Jun/15

C/E

25/Jul/15

C/E

25/Jul/15

C/E

25/Jul/15

C/E

23/May/15

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

5/Jan/15

C/E

2/May/15

C/E

10/Feb/15

C/E

2/May/15

C/E

13/Feb/15

7.6.1
7.6.2
7.6.3
7.6.4

7.7.3
7.7.4

Periodically inspect the unit for any


Periksa keseluruhan unit alternator dari
buildup of contamination (dirt, oil, etc.)
kontaminasi (kotoran, minyak dll)
on the windings
MAIN PROPULSION PORTSIDE
Inspect engine for leaks and loose
Periksa kebocoran dan kelonggaran
1.1.1
connections
bagian mesin
1.1.2
Check oil level of engine crankcase
Perika level oli mesin
Periksa level coolant pada sistem
1.1.3
Check coolant level of Cooling System
pendinginan
Bersihkan filter bahan bakar/ganti filter
1.2.1
Clean primary fuel filter
bahan bakar
Menguras air dan kerak di tanki bahan
1.2.2
Drain water and sediment of fuel tank
bakar
Clean /Replace air filter elements of Air Bersihkan /ganti elements filter udara air
1.2.3
cleaner
cleaner
1.2.4
Check/Adjust/Replace of belts
Periksa/setel/ganti of belts
1.2.5
Inspect/Replace of Hoses and Clamps
Periksa/ganti hose dan clamp
1.2.6
Clean /Check (if required) of batteries
Bersihkan/periksa battery
1.3.1
Check/adjust of clearence Valve
Periksa/setel celah valve
7.7.5

1.3.2
1.4.1
1.5.1
1.5.2
1.6.1

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin
Inspect/check of engine protection
devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin
Periksa/bersihkan jaket water pump

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

2/May/15

C/E

8/Aug/11

C/E

29/Jun/15

C/E

25/Jul/15

1.6.4

Inspect/rebuild or exchange of raw/sea


water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

1.7.1

Inspect Oil Level of Gearbox

1.7.2

Clean outside of Gearbox

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox

1.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

1.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

1.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

1.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

1.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

13/Feb/15

1.7.8

Renew filter oil

C/E

2/Jun/14

1.7.9

Check the pump of Gearbox

C/E

8/Aug/11

1.7.10

Check and clean the cooler of Gearbox

C/E

8/Aug/11

1.7.11

Overhoul of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox
Overhoul Gearbox

C/E

8/Aug/11

1.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

3/Jul/15

1.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

3/Jul/15

1.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

3/Jul/15

1.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

1.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

1.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

1.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

1.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

1.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

1.10.1

Check and attention to abnormal noise

C/E

2/Jul/15

1.10.2

Check and attention to exhaust color

C/E

2/Jul/15

1.10.3

Observe sea water discharging volume

C/E

2/Jul/15

1.6.2
1.6.3

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
valve overboard

PMS No.

Unit / System

Unit / System

1.13.1

Lubricating All Control Engine Morse


machaniscem
Check mechancal cable Control Engine
Morse from damage
greasing all Control Engine Morse on
mechanical handle
Check all exhaust gas piping to ensure no
leak.
Tighten up exhaust Pipe bellow bolts, if
necessary.
Check all securing brackets Exhaust Pipe
and fastener.
Top overhaul Main engine portside

Lumasi machanism Kabel Morse Kontrol


Engine
Periksa mechanical Kabel Morse Kontrol
Engine
Lumasi grease pada mechanical handle
Kabel Morse Kontrol Engine
Periksa semua pipa gas buang untuk
memastikan tidak ada kebocoran.
Kencangkan baut pegangan Pipa Gas
Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul Main engine portside

1.14.1

General overhaul Main Engine Portside

1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3

Take Lub. oil sample and send ashore for


laboratory analysis.
MAIN PROPULSION STARBOARDSIDE
Inspect engine for leaks and loose
2.1.1
connections
2.1.2
Check oil level of engine crankcase
1.15.1

2.1.3

Check coolant level of Cooling System

2.2.1

Clean primary fuel filter

2.2.2

Drain water and sediment of fuel tank

PIC

Last Maint. Date

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

General Overhaul Main Engine Portside

C/E

8/Aug/11

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

5/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

23/May/15

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/13

C/E

10/Feb/15

Periksa/bersihkan jaket water pump

C/E

8/Aug/11

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

13/Feb/15

C/E

2/May/15

C/E

2/Jul/15

C/E

2/Jul/15

Periksa kebocoran dan kelonggaran


bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem
pendinginan
Bersihkan filter bahan bakar/ganti filter
bahan bakar
Menguras air dan kerak di tanki bahan
bakar
Bersihkan /ganti elements filter udara air
cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery
Periksa/setel celah valve

2.2.4
2.2.5
2.2.6
2.3.1

Clean /Replace air filter elements of Air


cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries
Check/adjust of clearence Valve

2.3.2

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin

2.2.3

2.6.4

Inspect/check of engine protection


devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
Inspect/rebuild or exchange of raw/sea
water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

2.7.1

Inspect Oil Level of Gearbox

2.7.2

Clean outside of Gearbox

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox

2.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

2.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

2.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

2.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

2.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

2/Jun/14

2.7.8

Renew filter oil

C/E

2/Jun/14

2.7.9

Check the pump of Gearbox

C/E

2/May/15

2.7.10

Check and clean the cooler of Gearbox

C/E

2/May/15

2.7.11

Overhoul of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox
Overhoul Gearbox

C/E

13/Feb/15

2.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

2/Jul/15

2.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

2/Jul/15

2.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

2/Jul/15

2.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

2.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

2.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

2.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

2.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

2.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

2.10.1

Check and attention to abnormal noise

C/E

2/Jul/15

C/E

2/Jul/15

C/E

2/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

C/E

8/Aug/11

C/E

9/Jul/15

2.13.1

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Check and attention to exhaust color
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Lubricating All Control Engine Morse
Lumasi machanism Kabel Morse Kontrol
machaniscem
Engine
Check mechancal cable Control Engine Periksa mechanical Kabel Morse Kontrol
Morse from damage
Engine
greasing all Control Engine Morse on
Lumasi grease pada mechanical handle
mechanical handle
Kabel Morse Kontrol Engine
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul Main engine portside
Top overhaul Main engine portside

2.14.1

General overhaul Main Engine Portside

2.10.2
2.10.3
2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3

General Overhaul Main Engine Portside

Take Lub. oil sample and send ashore for Ambil contoh Lub. Oil dan kirim ke darat
laboratory analysis.
untuk di periksa.
AUXILLIARY ENGINE PORTSIDE
2.15.1

PMS No.

Unit / System

Unit / System

Last Maint. Date

C/E

30/Jul/15

C/E

30/Jul/15

C/E

30/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E
C/E

8/Jul/15
8/Jul/15

3.3.1
3.3.2

Periksa volume air pendingin pada header


tank
Periksa pelumas dan pendingin dari
Check for oil and coolant leaks
kebocoran
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
sump
tank
Renew the Engine lubricating oil
Ganti baru oli pelumas Engine
Renew the canister of the lubricating oil
Ganti baru Filter oli pelumas Engine
filter
Renew the elements of the fuel filter
Ganti baru filter bahan bakar
Check the Engine mounts
Periksa Engine mounts

3.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

8/Jul/15

3.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

8/Jul/15

3.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

3.5.1

Inspect all generator connections and


cabling

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jun/15

C/E

20/May/15

3.1.1
3.1.2
3.1.3
3.2.1
3.2.2

3.5.2
3.5.3
3.5.4
3.5.5

Check the amount of coolant in the


header tank

PIC

Periksa semua sambungan2 dan kabel


generator
Test fungsi2 equipment aksesoris
Test function of auxiliaries
generator
Inspect condition of fan
Periksa kondisi fan
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator

3.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

3.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

3.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

3.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

3.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

3.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

3.7.1

Check and attention to abnormal noise

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

22/Jun/14

C/E

22/Jun/14

C/E

22/Jun/14

C/E
C/E

31/Aug/13
31/Aug/13

3.7.2
3.7.3
3.8.1
3.8.2
3.8.3
3.9.1
3.10.1

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Check and attention to exhaust colour
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul aux engine portside
Top overhaul aux engine portside
General overhaul aux engine Portside
General Overhaul aux engine Portside

PMS No.

Unit / System

Take Lub. oil sample and send ashore for


laboratory analysis.
AUXILLIARY ENGINE STARBOARDSIDE
Check the amount of coolant in the
4.1.1
header tank
3.11.1

Unit / System

PIC

Last Maint. Date

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

30/May/15

C/E

28/Jul/15

C/E

28/Jul/15

C/E

28/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E
C/E

20/Jul/15
12/Jul/15

4.3.1
4.3.2

Periksa volume air pendingin pada header


tank
Periksa pelumas dan pendingin dari
Check for oil and coolant leaks
kebocoran
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
sump
tank
Renew the Engine lubricating oil
Ganti baru oli pelumas Engine
Renew the canister of the lubricating oil
Ganti baru Filter oli pelumas Engine
filter
Renew the elements of the fuel filter
Ganti baru filter bahan bakar
Check the Engine mounts
Periksa Engine mounts

4.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

12/Jul/15

4.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

12/Jul/15

4.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

4.5.1

Inspect all generator connections and


cabling

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

4.1.2
4.1.3
4.2.1
4.2.2

4.5.2
4.5.3
4.5.4
4.5.5

Periksa semua sambungan2 dan kabel


generator
Test fungsi2 equipment aksesoris
Test function of auxiliaries
generator
Inspect condition of fan
Periksa kondisi fan
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator

4.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

4.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

4.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

4.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

4.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

4.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

4.7.1

Check and attention to abnormal noise

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

22/Jun/15

C/E

22/Jun/15

4.7.2
4.7.3
4.8.1
4.8.2

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Check and attention to exhaust colour
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.

PMS No.

Unit / System

Check all securing brackets Exhaust Pipe


and fastener.
4.9.1
Top overhaul aux engine portside
4.10.1 General overhaul aux engine Portside
Take Lub. oil sample and send ashore for
4.11.1
laboratory analysis.
TEST PROGRAM
4.8.3

Unit / System
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul aux engine portside
General Overhaul aux engine Portside
Ambil contoh Lub. Oil dan kirim ke darat
untuk di periksa.

PIC

Last Maint. Date

C/E

22/Jun/15

C/E
C/E

31/Aug/13
31/Aug/13

C/E

30/May/15

5.1.1

Remove temperature indicator from the


place, cleaning sensor from sludge and be
sure temperature indicator normaly
function

Lepas indikator temperatur dari


tempatnya dan bersihkan sensor dari
jelaga pastikan indikator temperatur
berfungsi dengan baik

C/E

15/May/15

5.1.2

Visual check condition of sensor and


temperature casing not broken

check kondisi visual sensor dan casing


temperatur tidak ada yg pecah atau rusak

C/E

15/Jul/15

Compared with other thermometers when


thermometer working.
Check cable connections and cable
entries to the sensor.

Bandingkan dengan thermometer lain


ketika thermometer bekerja
Periksa kabel koneksi dan kabel yang
masuk ke sensor

C/E

14/Jul/15

C/E

2/Jul/15

Check that there is no leakage of oil or


water inside the sensor. If any, clean the
sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli


atau air dari sensor atau koneksi sensor.
Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih
lanjut.

C/E

2/Jul/15

C/E

2/Jul/15

C/E

2/Jul/15

Check general condition of konsol control

C/E

2/Jul/15

Bersihkan filter strainer seachest

C/E

22/May/15

C/E

22/May/15

5.1.3
5.2.1

5.2.2

Check general condition of Insulation of


exhaust pipes
5.3.2
Test Fire pump
Check general condition of Control
5.3.3
consoles
AUXILIARY MACHINE
6.1.1
Cleaning filter strainer seachest
5.3.1

Check general condition of Isolasi pipa


gas buang
Test fire pump

6.1.2

buka dan tutup semua valve seachest,


open and close all seachest valve, ensure
pastikan semua valve mudah dan siap
all valve easy and ready for operate, add
untuk dioperasikan, tambahkan grease
grease at valve stem and change gland
pada valve stem dan ganti gland packing
packing if necessary
jika diperlukan

6.1.3

Check and Ensure, zinch anode still ,


replace new zinch anode if necessary

Pastikan zinch anode untuk seachest


masih ada, ganti jika zinch anode sudah
habis

C/E

22/May/15

6.2.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump

C/E

28/May/15

6.2.2

Clean fan, impeller and protective guard Bersihkan kipas dan rumah pelindung
ventilation passage. For motor driven
saluran udara. untuk motor penggerak
main fire pump
main fire pump

C/E

28/May/15

6.2.3

Cleaning housing motor driven main fire Bersihkan sudu-sudu motor penggerak
pump
main fire pump

C/E

28/May/15

6.2.4

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven main fire
motor sistem pemadam utama
system

C/E

28/May/15

6.2.5

check main fire pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa main fire pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

23/Jun/15

6.2.6

renew gland packing for main fire pump

Ganti baru gland packing untuk main fire


pump

C/E

28/May/15

PMS No.

PIC

Last Maint. Date

6.2.7

overhoul main fire pump, periksa semua


overhoul main fire pump, check all
konstruksi, impeller, ganti baru packing,
construction, impeller, renew ring and
ring dan spring, periksa bearing, periksa
spring, check bearing, check shaft, check
shaft dan periksa spie antara shaft dan
spie between shaft and coupling
coupling

C/E

30/Aug/13

6.2.8

check all line main fire system from


leaking

C/E

28/Jul/15

6.2.9

buka dan tutup semua fire valve, pastikan


open and close all main fire valve, ensure
semua valve mudah dan siap untuk
all valve easy and ready for operate, add
dioperasikan, tambahkan grease pada
grease at valve stem and change gland
valve stem dan ganti gland packing jika
packing if necessary
diperlukan

C/E

28/May/15

6.3.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump

C/E

10/May/15

C/E

10/May/15

C/E

10/May/15

6.3.4

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven transfer
motor transfer pump
pump

C/E

10/May/15

6.3.5

check main transfer pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa transfer pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

10/Jul/15

6.3.6

renew seal and packing for tranfer pump

Ganti baru seal dan packing untuk tranfer


pump

C/E

10/May/15

6.3.7

overhoul tranfer pump, check all


construction, gear, renew bearing, check
shaft, check spie between shaft and
coupling

overhoul tranfer pump, periksa semua


konstruksi, gear, ganti baru bearing,
periksa shaft dan periksa spie antara shaft
dan coupling

C/E

10/May/15

6.3.8

check all line fuel system from leaking

periksa seluruh sistem perpipaan sitem


bahan bakar dari kebocoran

C/E

10/Jul/15

6.3.9

open and close all fuel valve, ensure all


valve easy and ready for operate, add
grease at valve stem and change gland
packing if necessary

buka dan tutup semua fuel valve, pastikan


semua valve mudah dan siap untuk
dioperasikan, tambahkan grease pada
valve stem dan ganti gland packing jika
diperlukan

C/E

10/May/15

6.3.10

Clean fuel daily tank and check all


construction of dayli tank including
filling pipe, suction pipe, vent pipe,
manhole (all bolt are complete and no
broken bolt), valves and ensure no
leaking at dayli tank

Bersihkan tanki bahan bakar harian dan


periksa kondisi konstruksi tanki bahan
bakar harian termasuk pipa isi, pipa isap,
pipa ventilasi, manhole (baut2 lengkap
dan tidak ada yang patah), valve2 dan
pastikan tidak ada kebocoran pada tanki
bahan bakar harian

C/E

10/May/15

6.3.11

Periksa kondisi gelas duga dari tanki


Check condition of sighting glass at dayli
bahan bakar harian dan pastikan tidak ada
tank and ensure no leaking, sighting glass
kebocoran, cover pelindung gelas duga
cover are good condition and easy to read
dalam kondisi baik dan mudah terbaca

C/E

10/Jul/15

6.4.1

Check all hoses and piping for


deterioration.

Periksa semua selang dan pipa dari


keusangan

C/E

28/May/15

6.4.2

Check hydraulic oil condition, clean or


renew oil filter if necessary.

Periksa kondisi minyak hydrolik,


bersihkan atau ganti saringan jika perlu.

C/E

28/May/15

6.3.2
6.3.3

Unit / System

Clean fan, impeller and protective guard


ventilation passage. For motor driven
transfer pump
Cleaning housing motor driven main
transfer pump

Unit / System

periksa seluruh sistem perpipaan


pemadam dari kebocoran

Bersihkan kipas dan rumah pelindung


saluran udara. untuk motor penggerak
transfer pump
Bersihkan sudu-sudu motor penggerak
transfer pump

PMS No.
6.4.3
6.4.4
6.5.1

Unit / System

Unit / System

Periksa semua konrtol valves, pastikan


Check all control valves and ensure they
bebas, bersihkan dan lumasi semua
are free, clean and lubricate all joints.
penghubung.
Periksa dari suara yang tidak
Check for abnormal noise and vibration.
normal/getaran
Check all thermometer and gauges are
Periksa semua thermometer dan alat2
functioning properly.
indicator berfungsi dengan baik.

PIC

Last Maint. Date

C/E

28/May/15

C/E

28/May/15

C/E

30/Jul/15

6.5.2

Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.

C/E

2/Jun/15

6.5.3

Replace all defective gauges.

Ganti semua alat pengukur yang rusak.

C/E

2/Jun/15

Check All battery electrolyte specific


gravity.
Top up All battery with distilled water if
necessary.

Periksa berat jenis electrolyte pada semua


battery
Tambah air pada semua battery
distillateya jika diperlukan
Periksa kekencangan terminal pada
semua battery

C/E

26/Jul/15

C/E

26/Jul/15

C/E

26/Jul/15

6.6.1
6.6.2
6.6.3

Check tightness of all battery terminal.

6.6.4

Ensure all battery cleanliness.

Pastikan kebersihan pada semua battery

C/E

26/Jul/15

6.6.5

Check wire connection all battery to


starter.

Periksa kabel penghubung pada semua


battery ke starter

C/E

26/Jul/15

6.7.1

Bulkheads, long., web frames, other


members in good condition.No heavy
corrosion, wastage, holes or cracks.

Bulkheads, longitudinal bulkhead, web


frames, dan bagian lain dalam kondisi
yang baik , tidak ada korosi yg parah
berlubang atau crack/retak.

C/E

28/May/15

6.7.2

Engine room Bilges, should be kept clean


and dry, free from corrosion, wastage and
oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids
or vapour into the engine room.

Bilge/got kamar mesin, harus bersih dan


kering, bebas dari karat, endapan lumpur
dan minyak. Dan benda2 yang menutup
saluran/lubang pada dasar sekat harus
dibersihkan

C/E

28/Jul/15

6.7.3

All lights in good order.

Semua lampu2 di kamar mesin termasuk


covernya dalam kondisi baik dan
berfungsi

C/E

29/Jul/15

6.7.4

Pastikan Semua Vanbelt pada Mesin


Ensure all Vbelt at Main Engine, Aux
Induk, Mesin Bantu dan Mesin2 yang lain
Engine and other machinery including
termasuk equipmen2 yang lain ditutup
rotating equipment are covered and check
pelindung dan periksa kondisi pelindung
condition of cover are good
tersebut dalam kondisi yang baik

C/E

29/Jul/15

6.7.5

Ensure all exhaust pipe covered with


asbestos and aluminium foil. Check and
ensure are good condition, renew if
necessary. And ensure all exhaust pipe
closed with spark arrestor and good
condition, renew spark arrestor if
necessary

Pastikan semua Exhaust pipe ditutup


lagging / asbes penahan panas dan
dilapisi aluminium foil. Periksa asbes dan
aluminium foil dalam kondisi baik, ganti
jika perlu. Dan pastikan saringan pipa
exhaust dalam kondisi baik, ganti jika
perlu

C/E

28/Jul/15

6.7.6

Ensure All Battery have safety box and


battery box are good condition

Pastikan Battery / Accu tertutup cover /


ada tempatnya. Dan Periksa tempat
battery dalam kondisi baik

C/E

28/Jul/15

6.7.7

Check and ensure all panel box


completed with rubber mate and good
condition

Pastikan Semua box panel listrik


dilengkapi dengan keset karet dan periksa
kondisi keset dalam keadaan baik

C/E

28/Jul/15

6.7.8

Check and ensure behind main switch


board are free from any object and dry
condition

Pastikan dan periksa bagian belakang box


panel utama bebas dari barang2 dan
tetesan / ceceran air

C/E

28/Jul/15

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

6.8.1

Besides the routine checking of spares


and updating of inventory, a thorough
check must be carried out to ensure that
spares are properly secured and
preserved.

Disamping pemeriksaan rutin pada suku


cadang dan pencatatan daftar barang, juga
di lakukan untuk meyakinkan bahwa suku
cadang tersebut aman dan bisa digunakan.

C/E

19/May/15

6.8.2

The Chief Engineer must be able to


produce an up-to-date Inventory List
indicating machinery, part numbers, stock
quantity and position of the stores upon
request of the Shore Auditor.

KKM harus mampu membuat daftar


terbaru permesinan, nomor suku cadang,
jumlah yang tersedia dan posisi pada
tempat penyimpanan jika ada permintaan
dari auditor.

C/E

2/May/15

7.1.1

Feel the surface of panel for excessive


Raba permukaan panel untuk memeriksa
warmness indicating overheating or loose apakah panas atau sangat hangat yang
connection.
menandakan over heating/ kabel terlepas.

C/E

2/Jul/15

7.1.2

Visually examine all cable connection


and bus bar for de-coloration.

C/E

2/Jul/15

7.1.3

Check for unusual smell which indicate


overheating.

Periksa dengan melihat semua hubungan


kabel dan bus bar untuk perubahan dari
warna.
Periksa bau yang tidak biasa yang
menandakan overheating.

C/E

2/Jul/15

7.1.4

Ensure all covers are tightly secured.

Pastikan semua penutup tertutup rapat.

C/E

2/Jul/15

7.1.5

General overview of the physical


condition should be given to the entire
switchboard.

Pemeriksaan secara general kondisi fisik


seluruh switchboard

C/E

2/Jul/15

7.1.6

Ensure there is a non-conductive mat or


non-conducting grating in each working
area in front of and behind each board.

Pastikan disetiap area kerja baik didepan


maupun dibelakang switcboard terdapat
rubber mat / alas yg bersifat isolator

C/E

2/Jul/15

7.1.7

Pastikan pegangan tangan dan railing


Non-conducting handrails and guard rails pelindung pada switchboard harus
should be present on the board face.
dilengkapi dengan rubber/karet isolator
dan dalam kondisi baik

C/E

3/Jul/15

7.1.8

All instrumentation (meters) should be in


Periksa dan pastikan semua alat pengukur
good working order and recently
instrumens (indikator2) berfungsi dengan
calibrated. All controls and meters should
baik dan bersih, mudah dibaca dan akurat
be clearly and accurately identified.

C/E

3/Jul/15

7.2.1

Check and maintain general cleanliness.

Periksa dan rawat secara umum


kebersihannya

C/E

5/Jun/15

7.2.2

Check for sign of decoloration and


unusual smells which indicate
overheating or loose connection.

Periksa tanda perubahan warna dan bau


yang tidak biasa dari tanda tanda
overheating dan koneksi yang longgar.

C/E

5/Jun/15

7.2.3

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

C/E

5/Jul/15

7.3.1

Check and ensure light are free to rotate.

C/E

12/Jul/15

C/E

12/Jul/15

C/E

12/Jul/15

C/E

16/Jul/15

ELECTRIC EQUIPMENT

Check all water tight gland and cable


entry.
Clean reflector.
Check and ensure water tightness of all
covers.

Periksa dan pastikan lampu bebas


berputar.
Periksa kekedapan airnya dan kabel yang
masuk harus di seal.
Bersihkan reflector.
Periksa dan pastikan kekedapan air semua
penutup.

7.4.2

Check for loose wire terminal.

Periksa kelonggaran dari terminal kabel.

C/E

16/Jul/15

7.4.3

Replace blow out bulb.


Switch on all lightings Check and replace
blow out bulb.
Clean shades, diffusers if necessary.
Check for loose wire terminal.

Ganti bohlam yang rusak.


Nyalakan semua lampu-lampu Periksa
dan ganti lampu yang rusak.
Bersihkan kap lampu
Periksa kabel terminal yang longgar

C/E

16/Jun/15

C/E

16/Jul/15

C/E
C/E

16/Jul/15
16/Jul/15

7.3.2
7.3.3
7.4.1

7.5.1
7.5.2
7.5.3

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

Check electrolyte level, add distilled


water if necessary.
Clean battery terminals and coat with
petroleum jelly.
Check all cell vent caps and ensure they
are not choked.
Ensure general cleanliness of battery
compartment.
Check charging current.

Periksa cairan electrolyte, tambahakn air


distilat jika perlu.
Bersihkan batrei terminal dan lumuri
dengan gemuk.
Periksa semua tutupnya pastikan tidak
tersumbat.
Pastikan ruang tempat penyimpanan
bersih.
Periksa arus pengisiannya

7.7.1

Megger test generator using


manufacturer's guidelines. Ensure solid
state devices are isolated from high
voltage generated during meggar test.
Monitor and record insulation resistance
with a 500 volt mega-ohm meter. The
minimum acceptable reading is 2 megaohms. if result under 2 mega-ohm
reinsulated alternator

Megger test generator sesuai manual


book. Pastikan solid state devices
terisolasi dari listrik tegangan tinggi saat
di megger test. Monitor dan record hasil
megger test dan pastikan hasil megger
test 500 volt mega-ohm meter, minimum
insulation resistance 2 mega-ohm. jika
dibawah 2 mega-ohm lakukan
reinsulation pada generator

C/E

24/Jun/15

7.7.2

Ensure the location of the generator is


receiving adequate ventilation and is as
dry as possible.

Periksa dan pastikan lokasi generator


mendapatkan ventilasi yang baik, bersih
dan kering

C/E

24/Jul/15

Verify the operation of the voltmeter and


ammeter for each generator rated at 50
volts or more.
Every 1,000 hours check the bearing(s)
for smooth, quiet operation
Periodically inspect the unit for any
buildup of contamination (dirt, oil, etc.)
on the windings

Periksa dan pastikan ketika generator


beroperasi, indikator menunjukan 50
volts atau lebih
Periksa kondisi bearing agar operasi
generator halus dan tidak bising

C/E

24/Jul/15

C/E

28/Jun/15

C/E

28/Jun/15

7.6.1
7.6.2
7.6.3
7.6.4
7.6.5

7.7.3
7.7.4
7.7.5

COMPLETE MAINTENANCE
FOR

Periksa keseluruhan unit alternator dari


kontaminasi (kotoran, minyak dll)

135

PERFORMA

July 2015
MAINTENANCE OVERDUE FOR
July 2015

PMS FOR THIS


MONTH

PMS No.

Unit / System

Unit / System

PIC

PLAN MAINTENANCE
FOR
July 2015
PMS No. Unit / System
MAIN PROPULSION PORTSIDE
Inspect engine for leaks and loose
1.1.1
connections
1.1.2
Check oil level of engine crankcase
1.1.3

Check coolant level of Cooling System

1.2.1

Clean primary fuel filter

1.2.2

Drain water and sediment of fuel tank

Unit / System

148
PIC

Last Maint. Date

C/E

25/Jul/15

C/E

25/Jul/15

C/E

25/Jul/15

C/E

23/May/15

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

5/Jan/15

C/E

2/May/15

C/E

10/Feb/15

C/E

2/May/15

Periksa/bersihkan jaket water pump

C/E

13/Feb/15

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

2/May/15

C/E

8/Aug/11

C/E

29/Jun/15

C/E

25/Jul/15

Periksa kebocoran dan kelonggaran


bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem
pendinginan
Bersihkan filter bahan bakar/ganti filter
bahan bakar
Menguras air dan kerak di tanki bahan
bakar
Bersihkan /ganti elements filter udara air
cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery
Periksa/setel celah valve

1.2.4
1.2.5
1.2.6
1.3.1

Clean /Replace air filter elements of Air


cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries
Check/adjust of clearence Valve

1.3.2

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin

1.2.3

Last Maint. Date

1.6.4

Inspect/check of engine protection


devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
Inspect/rebuild or exchange of raw/sea
water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

1.7.1

Inspect Oil Level of Gearbox

1.7.2

Clean outside of Gearbox

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox

1.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

1.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

1.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

1.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

1.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

13/Feb/15

1.7.8

Renew filter oil

C/E

2/Jun/14

1.7.9

Check the pump of Gearbox

C/E

8/Aug/11

1.7.10

Check and clean the cooler of Gearbox

C/E

8/Aug/11

1.7.11

Overhoul of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox
Overhoul Gearbox

C/E

8/Aug/11

1.4.1
1.5.1
1.5.2
1.6.1
1.6.2
1.6.3

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

1.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

3/Jul/15

1.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

3/Jul/15

1.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

3/Jul/15

1.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

1.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

1.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

1.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

1.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

1.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

1.10.1

Check and attention to abnormal noise

C/E

2/Jul/15

C/E

2/Jul/15

C/E

2/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

General Overhaul Main Engine Portside

C/E

8/Aug/11

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

5/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

23/May/15

1.13.1

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Check and attention to exhaust color
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Lubricating All Control Engine Morse
Lumasi machanism Kabel Morse Kontrol
machaniscem
Engine
Check mechancal cable Control Engine Periksa mechanical Kabel Morse Kontrol
Morse from damage
Engine
greasing all Control Engine Morse on
Lumasi grease pada mechanical handle
mechanical handle
Kabel Morse Kontrol Engine
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul Main engine portside
Top overhaul Main engine portside

1.14.1

General overhaul Main Engine Portside

1.10.2
1.10.3
1.11.1
1.11.2
1.1.3
1.12.1
1.12.2
1.12.3

Take Lub. oil sample and send ashore for


laboratory analysis.
MAIN PROPULSION STARBOARDSIDE
Inspect engine for leaks and loose
2.1.1
connections
2.1.2
Check oil level of engine crankcase
1.15.1

2.1.3

Check coolant level of Cooling System

2.2.1

Clean primary fuel filter

Periksa kebocoran dan kelonggaran


bagian mesin
Perika level oli mesin
Periksa level coolant pada sistem
pendinginan
Bersihkan filter bahan bakar/ganti filter
bahan bakar

PMS No.
2.2.2

Unit / System
Drain water and sediment of fuel tank

Unit / System

PIC

Last Maint. Date

C/E

18/May/15

C/E

9/May/15

C/E
C/E
C/E
C/E

2/May/15
2/May/15
2/May/15
10/Jan/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/13

C/E

10/Feb/15

Periksa/bersihkan jaket water pump

C/E

8/Aug/11

Periksa/bersihkan fresh/sea water pump

C/E

13/Feb/15

Periksa/bersihkan atau ganti motor stater

C/E

13/Feb/15

C/E

2/May/15

C/E

2/Jul/15

C/E

2/Jul/15

Menguras air dan kerak di tanki bahan


bakar
Bersihkan /ganti elements filter udara air
cleaner
Periksa/setel/ganti of belts
Periksa/ganti hose dan clamp
Bersihkan/periksa battery
Periksa/setel celah valve

2.2.4
2.2.5
2.2.6
2.3.1

Clean /Replace air filter elements of Air


cleaner
Check/Adjust/Replace of belts
Inspect/Replace of Hoses and Clamps
Clean /Check (if required) of batteries
Check/adjust of clearence Valve

2.3.2

Replace oil and filter of engine crankcase Ganti oli dan filter oli mesin

2.2.3

2.6.4

Inspect/check of engine protection


devices
Drain/clean/Replace coolant Cooling
system
Inspect of engine mounts
Inspect/rebuild or exchange of jacket
water pump
Inspect/rebuild or exchange of raw/sea
water pump
Inspect/rebuild or exchange of starting
motor
Clean/inspect/check of turbocharger

2.7.1

Inspect Oil Level of Gearbox

2.7.2

Clean outside of Gearbox

Bersihkan/periksa turbocharger
Periksa level minyak pelumas dari
Gearbox
Bersihkan bagian luar dari Gearbox

2.7.3

Inspect leakage of oil and water of


Gearbox

Periksa dan pastikan tidak ada kebocoran


dari minyak atau air dari Gearbox

C/E

2/Jul/15

2.7.4

Inspect abnormal noise of Gearbox

Periksa dan pastikan Gearbox dari


getaran yang tidak normal

C/E

2/Jul/15

2.7.5

Clean the filter of Gearbox

Bersihkan Filter element minyak pelumas


pada suction pipe dari Gearbox

C/E

2/Jun/14

2.7.6

Clean the hydraulic control system of


Gearbox

Bersihkan dan service hydraulic control


system dari Gearbox

C/E

2/Jun/14

2.7.7

Check and renew oil of Gearbox

Ganti baru minyak pelumas dari Gearbox

C/E

2/Jun/14

2.7.8

Renew filter oil

C/E

2/Jun/14

2.7.9

Check the pump of Gearbox

C/E

2/May/15

2.7.10

Check and clean the cooler of Gearbox

C/E

2/May/15

2.7.11

Overhoul of Gearbox

Ganti baru filter minyak pelumas


Periksa dan service oil pump dari
Gearbox
Periksa dan bersihkan oil cooler dari
Gearbox
Overhoul Gearbox

C/E

13/Feb/15

2.8.1

Check sign of overheating, slackness or


creeping in bearing housing.

Periksa tanda-tanda overheating, gesekangesekan yg menghambat putaran shaft


propeller pada bearing housing

C/E

2/Jul/15

2.8.2

Check sealing arrangement and ensure no Periksa Sealling Arrangement dan


leaks.
pastikan tidak ada kebocoran pada sistem

C/E

2/Jul/15

2.9.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

2/Jul/15

2.9.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

2.9.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

2.4.1
2.5.1
2.5.2
2.6.1
2.6.2
2.6.3

Periksa perangkat pelindung mesin


Kuras(buang)/bersihkan/ganti coolant
sistem pendingin
Periksa mounting mesin

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

2.9.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

2.9.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

2.9.6

Check the conditional of all Gauges,


repair or replace any broken gauges

Periksa kondii semua indikator Gauge,


perbaiki atau ganti baru jika ada gauge
yang rusak

C/E

21/Jul/15

2.9.7

Check batteriy charger for proper


operaation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

2.10.1

Check and attention to abnormal noise

C/E

2/Jul/15

C/E

2/Jul/15

C/E

2/Jul/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

13/Feb/15

C/E

2/May/15

C/E

2/May/15

C/E

2/May/15

C/E

8/Aug/11

General Overhaul Main Engine Portside

C/E

8/Aug/11

Ambil contoh Lub. Oil dan kirim ke darat


untuk di periksa.

C/E

9/Jul/15

C/E

30/Jul/15

C/E

30/Jul/15

C/E

30/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E
C/E

8/Jul/15
8/Jul/15

2.13.1

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Check and attention to exhaust color
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
Observe sea water discharging volume
valve overboard
Lubricating All Control Engine Morse
Lumasi machanism Kabel Morse Kontrol
machaniscem
Engine
Check mechancal cable Control Engine Periksa mechanical Kabel Morse Kontrol
Morse from damage
Engine
greasing all Control Engine Morse on
Lumasi grease pada mechanical handle
mechanical handle
Kabel Morse Kontrol Engine
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
and fastener.
Buang dan kencangkan.
Top overhaul Main engine portside
Top overhaul Main engine portside

2.14.1

General overhaul Main Engine Portside

2.10.2
2.10.3
2.11.1
2.11.2
2.11.3
2.12.1
2.12.2
2.12.3

Take Lub. oil sample and send ashore for


laboratory analysis.
AUXILLIARY ENGINE PORTSIDE
Check the amount of coolant in the
3.1.1
header tank
2.15.1

3.3.1
3.3.2

Periksa volume air pendingin pada header


tank
Periksa pelumas dan pendingin dari
Check for oil and coolant leaks
kebocoran
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
sump
tank
Renew the Engine lubricating oil
Ganti baru oli pelumas Engine
Renew the canister of the lubricating oil
Ganti baru Filter oli pelumas Engine
filter
Renew the elements of the fuel filter
Ganti baru filter bahan bakar
Check the Engine mounts
Periksa Engine mounts

3.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

8/Jul/15

3.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

8/Jul/15

3.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

3.5.1

Inspect all generator connections and


cabling

C/E

20/Jul/15

3.5.2

Test function of auxiliaries

C/E

20/Jul/15

3.5.3

Inspect condition of fan

C/E

20/Jul/15

3.1.2
3.1.3
3.2.1
3.2.2

Periksa semua sambungan2 dan kabel


generator
Test fungsi2 equipment aksesoris
generator
Periksa kondisi fan

PMS No.
3.5.4
3.5.5

Unit / System

Unit / System

Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator

PIC

Last Maint. Date

C/E

20/Jun/15

C/E

20/May/15

3.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

3.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

3.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

3.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

3.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

3.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

22/Jun/14

C/E

22/Jun/14

C/E

22/Jun/14

C/E
C/E

31/Aug/13
31/Aug/13

C/E

30/May/15

C/E

28/Jul/15

C/E

28/Jul/15

C/E

28/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E
C/E

20/Jul/15
12/Jul/15

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
3.7.2
Check and attention to exhaust colour
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
3.7.3
Observe sea water discharging volume
valve overboard
Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
3.8.1
leak.
memastikan tidak ada kebocoran.
Tighten up exhaust Pipe bellow bolts, if Kencangkan baut pegangan Pipa Gas
3.8.2
necessary.
Buang, jika perlu.
Check all securing brackets Exhaust Pipe Periksa semua braket pengaman Pipa Gas
3.8.3
and fastener.
Buang dan kencangkan.
3.9.1
Top overhaul aux engine portside
Top overhaul aux engine portside
3.10.1 General overhaul aux engine Portside
General Overhaul aux engine Portside
Take Lub. oil sample and send ashore for Ambil contoh Lub. Oil dan kirim ke darat
3.11.1
laboratory analysis.
untuk di periksa.
AUXILLIARY ENGINE STARBOARDSIDE
Check the amount of coolant in the
Periksa volume air pendingin pada header
4.1.1
header tank
tank
Periksa pelumas dan pendingin dari
4.1.2
Check for oil and coolant leaks
kebocoran
Check the amount of lubricating oil in the Periksa volume oli pelumas pada sump
4.1.3
sump
tank
4.2.1
Renew the Engine lubricating oil
Ganti baru oli pelumas Engine
Renew the canister of the lubricating oil
4.2.2
Ganti baru Filter oli pelumas Engine
filter
4.3.1
Renew the elements of the fuel filter
Ganti baru filter bahan bakar
4.3.2
Check the Engine mounts
Periksa Engine mounts
3.7.1

Check and attention to abnormal noise

4.3.3

Check all hoses and connections

Periksa semua hose dan sambungan hoses

C/E

12/Jul/15

4.3.4

Check the condition of the crankshaft


damper

Periksa kondisi pulley damper

C/E

12/Jul/15

4.4.1

Replace Coolant

Ganti baru air pendingin dan tambahkan


additive coolant sebagai pengaman

C/E

30/Jul/15

4.5.1

Inspect all generator connections and


cabling

Periksa semua sambungan2 dan kabel


generator

C/E

21/Jul/15

PMS No.
4.5.2
4.5.3
4.5.4
4.5.5

Unit / System

Unit / System

Test fungsi2 equipment aksesoris


generator
Inspect condition of fan
Periksa kondisi fan
Fasten and tightening connecting part of Periksa dan kencangkan baut2 pondasi,
bolt pondation and inspect from abnormal dan periksa dari getaran yang tidak
noise
normal
Tes koneksi2 equipment aksesoris
Test custom connection of auxiliaries
generator
Test function of auxiliaries

PIC

Last Maint. Date

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

C/E

21/Jul/15

4.6.1

Check to make sure no one is near the


engines and tools are not left on or near
the engine

Periksa untuk memastikan tidak ada


orang yang dekat dengan engine dan
peralatan yang tertinggal atau dekat
dengan engine

C/E

21/Jul/15

4.6.2

Maintain proper coolant level

Periksa level air pendingin dengan tepat

C/E

21/Jul/15

4.6.3

Check oil level on sumptank. Maintain


the oil level between the Maximum and
Minimum mark on the dipstick

Periksa level minyak pelumas di


Sumptank/Carter, pastikan level minyak
pelumas antara tanda Maksimal dan
minimal pada dipstick

C/E

21/Jul/15

4.6.4

Check on the Fuel System for leaks and


drain water separator

Periksa kondisi Fuel System dari


kebocoran dan buang/cerat air pada water
separator

C/E

21/Jul/15

4.6.5

Maintain batteries for electrolyte level,


clean batteries if necessary, check for
tight connection

Periksa kondisi Batterei pastikan air


electrolyte tidak kekurangan, bersihkan
batterei dan ikat kembali koneksi2 yang
longgar

C/E

21/Jul/15

4.6.6

Check battery charger for proper


operation. Disconnect charger before
starting the engine

Periksa kondisi batterei charger,


diskonect charger sebelum start engine

C/E

21/Jul/15

4.7.1

Check and attention to abnormal noise

C/E

21/Jul/15

4.7.2

Check and attention to exhaust colour

C/E

21/Jul/15

4.7.3

Observe sea water discharging volume

C/E

21/Jul/15

4.8.1

Check all exhaust gas piping to ensure no Periksa semua pipa gas buang untuk
leak.
memastikan tidak ada kebocoran.

C/E

22/Jun/15

C/E

22/Jun/15

C/E

22/Jun/15

C/E
C/E

31/Aug/13
31/Aug/13

C/E

30/May/15

Tighten up exhaust Pipe bellow bolts, if


necessary.
Check all securing brackets Exhaust Pipe
4.8.3
and fastener.
4.9.1
Top overhaul aux engine portside
4.10.1 General overhaul aux engine Portside
Take Lub. oil sample and send ashore for
4.11.1
laboratory analysis.
TEST PROGRAM
4.8.2

Periksa dan perhatikan suara yang tidak


biasa atau suara getaran
Periksa dan perhatikan warna exhaust
Periksa volume pendingin air laut dari
valve overboard

Kencangkan baut pegangan Pipa Gas


Buang, jika perlu.
Periksa semua braket pengaman Pipa Gas
Buang dan kencangkan.
Top overhaul aux engine portside
General Overhaul aux engine Portside
Ambil contoh Lub. Oil dan kirim ke darat
untuk di periksa.

5.1.1

Remove temperature indicator from the


place, cleaning sensor from sludge and be
sure temperature indicator normaly
function

Lepas indikator temperatur dari


tempatnya dan bersihkan sensor dari
jelaga pastikan indikator temperatur
berfungsi dengan baik

C/E

15/May/15

5.1.2

Visual check condition of sensor and


temperature casing not broken

check kondisi visual sensor dan casing


temperatur tidak ada yg pecah atau rusak

C/E

15/Jul/15

Compared with other thermometers when


thermometer working.
Check cable connections and cable
entries to the sensor.

Bandingkan dengan thermometer lain


ketika thermometer bekerja
Periksa kabel koneksi dan kabel yang
masuk ke sensor

C/E

15/Jul/15

C/E

2/Jul/15

Check that there is no leakage of oil or


water inside the sensor. If any, clean the
sensor and make repairs to eliminate
further leakage.

Periksa bahwa tidak ada kebocoran oli


atau air dari sensor atau koneksi sensor.
Jika ada , bersihkan sensor dan perbaiki
untuk menghindari kebocoran lebih
lanjut.

C/E

2/Jul/15

5.1.3
5.2.1

5.2.2

PMS No.

Unit / System

Check general condition of Insulation of


exhaust pipes
5.3.2
Test Fire pump
Check general condition of Control
5.3.3
consoles
AUXILIARY MACHINE
6.1.1
Cleaning filter strainer seachest
5.3.1

Unit / System

PIC

Last Maint. Date

C/E

2/Jul/15

C/E

2/Jul/15

Check general condition of konsol control

C/E

2/Jul/15

Bersihkan filter strainer seachest

C/E

22/May/15

C/E

22/May/15

Check general condition of Isolasi pipa


gas buang
Test fire pump

6.1.2

buka dan tutup semua valve seachest,


open and close all seachest valve, ensure
pastikan semua valve mudah dan siap
all valve easy and ready for operate, add
untuk dioperasikan, tambahkan grease
grease at valve stem and change gland
pada valve stem dan ganti gland packing
packing if necessary
jika diperlukan

6.1.3

Check and Ensure, zinch anode still ,


replace new zinch anode if necessary

Pastikan zinch anode untuk seachest


masih ada, ganti jika zinch anode sudah
habis

C/E

22/May/15

6.2.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven main fire pump
untuk motor penggerak main fire pump

C/E

28/May/15

C/E

28/May/15

C/E

28/May/15

6.2.4

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven main fire
motor sistem pemadam utama
system

C/E

28/May/15

6.2.5

check main fire pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa main fire pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

23/Jun/15

6.2.6

renew gland packing for main fire pump

Ganti baru gland packing untuk main fire


pump

C/E

28/May/15

6.2.7

overhoul main fire pump, periksa semua


overhoul main fire pump, check all
konstruksi, impeller, ganti baru packing,
construction, impeller, renew ring and
ring dan spring, periksa bearing, periksa
spring, check bearing, check shaft, check
shaft dan periksa spie antara shaft dan
spie between shaft and coupling
coupling

C/E

30/Aug/13

6.2.8

check all line main fire system from


leaking

C/E

28/Jul/15

6.2.9

buka dan tutup semua fire valve, pastikan


open and close all main fire valve, ensure
semua valve mudah dan siap untuk
all valve easy and ready for operate, add
dioperasikan, tambahkan grease pada
grease at valve stem and change gland
valve stem dan ganti gland packing jika
packing if necessary
diperlukan

C/E

28/May/15

6.3.1

Check wire terminal and gland tightness. Periksa kabel terminal dan kekencangan
For motor driven transfer pump
untuk motor penggerak transfer pump

C/E

10/May/15

C/E

10/May/15

C/E

10/May/15

C/E

10/May/15

6.2.2
6.2.3

6.3.2
6.3.3

6.3.4

Clean fan, impeller and protective guard


ventilation passage. For motor driven
main fire pump
Cleaning housing motor driven main fire
pump

Clean fan, impeller and protective guard


ventilation passage. For motor driven
transfer pump
Cleaning housing motor driven main
transfer pump

Bersihkan kipas dan rumah pelindung


saluran udara. untuk motor penggerak
main fire pump
Bersihkan sudu-sudu motor penggerak
main fire pump

periksa seluruh sistem perpipaan


pemadam dari kebocoran

Bersihkan kipas dan rumah pelindung


saluran udara. untuk motor penggerak
transfer pump
Bersihkan sudu-sudu motor penggerak
transfer pump

Check starter wire terminal for tightness


Periksa terminal kabel starter dari
and contractor for arcing. Vacuum clean
kekencangan, bersihkan starter panel
starter panel. For motor driven transfer
motor transfer pump
pump

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

6.3.5

check main transfer pump from noize and


vibration, check bolt pondation tightness
and bolt rubber coupling between pump
and motor, when pump operated

Periksa transfer pump dari suara bising


dan getaran berlebih, periksa
kekencangan baut pondasi dan baut
rubber coupling antara pompa dan motor

C/E

10/Jul/15

6.3.6

renew seal and packing for tranfer pump

Ganti baru seal dan packing untuk tranfer


pump

C/E

10/May/15

6.3.7

overhoul tranfer pump, check all


construction, gear, renew bearing, check
shaft, check spie between shaft and
coupling

overhoul tranfer pump, periksa semua


konstruksi, gear, ganti baru bearing,
periksa shaft dan periksa spie antara shaft
dan coupling

C/E

10/May/15

6.3.8

check all line fuel system from leaking

periksa seluruh sistem perpipaan sitem


bahan bakar dari kebocoran

C/E

10/Jul/15

6.3.9

open and close all fuel valve, ensure all


valve easy and ready for operate, add
grease at valve stem and change gland
packing if necessary

buka dan tutup semua fuel valve, pastikan


semua valve mudah dan siap untuk
dioperasikan, tambahkan grease pada
valve stem dan ganti gland packing jika
diperlukan

C/E

10/May/15

6.3.10

Clean fuel daily tank and check all


construction of dayli tank including
filling pipe, suction pipe, vent pipe,
manhole (all bolt are complete and no
broken bolt), valves and ensure no
leaking at dayli tank

Bersihkan tanki bahan bakar harian dan


periksa kondisi konstruksi tanki bahan
bakar harian termasuk pipa isi, pipa isap,
pipa ventilasi, manhole (baut2 lengkap
dan tidak ada yang patah), valve2 dan
pastikan tidak ada kebocoran pada tanki
bahan bakar harian

C/E

10/May/15

6.3.11

Periksa kondisi gelas duga dari tanki


Check condition of sighting glass at dayli
bahan bakar harian dan pastikan tidak ada
tank and ensure no leaking, sighting glass
kebocoran, cover pelindung gelas duga
cover are good condition and easy to read
dalam kondisi baik dan mudah terbaca

C/E

10/Jul/15

6.4.1

Check all hoses and piping for


deterioration.

Periksa semua selang dan pipa dari


keusangan

C/E

28/May/15

6.4.2

Check hydraulic oil condition, clean or


renew oil filter if necessary.

Periksa kondisi minyak hydrolik,


bersihkan atau ganti saringan jika perlu.

C/E

28/May/15

6.4.3

Periksa semua konrtol valves, pastikan


Check all control valves and ensure they
bebas, bersihkan dan lumasi semua
are free, clean and lubricate all joints.
penghubung.

C/E

28/May/15

6.4.4

Check for abnormal noise and vibration.

C/E

28/May/15

6.5.1

Check all thermometer and gauges are


functioning properly.

C/E

30/Jul/15

6.5.2

Check all gauges are properly secured to Periksa semua pengukur sudah terpasang
the panel.
dengan baik pada panelnya.

C/E

2/Jun/15

6.5.3

Replace all defective gauges.

Ganti semua alat pengukur yang rusak.

C/E

2/Jun/15

Check All battery electrolyte specific


gravity.
Top up All battery with distilled water if
necessary.

Periksa berat jenis electrolyte pada semua


battery
Tambah air pada semua battery
distillateya jika diperlukan
Periksa kekencangan terminal pada
semua battery

C/E

26/Jul/15

C/E

26/Jul/15

C/E

26/Jul/15

6.6.1
6.6.2

Periksa dari suara yang tidak


normal/getaran
Periksa semua thermometer dan alat2
indicator berfungsi dengan baik.

6.6.3

Check tightness of all battery terminal.

6.6.4

Ensure all battery cleanliness.

Pastikan kebersihan pada semua battery

C/E

26/Jul/15

6.6.5

Check wire connection all battery to


starter.

Periksa kabel penghubung pada semua


battery ke starter

C/E

30/Dec/99

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

6.7.1

Bulkheads, long., web frames, other


members in good condition.No heavy
corrosion, wastage, holes or cracks.

Bulkheads, longitudinal bulkhead, web


frames, dan bagian lain dalam kondisi
yang baik , tidak ada korosi yg parah
berlubang atau crack/retak.

C/E

28/May/15

6.7.2

Engine room Bilges, should be kept clean


and dry, free from corrosion, wastage and
oil. Particular care should be taken to
prevent the escape of hydrocarbon liquids
or vapour into the engine room.

Bilge/got kamar mesin, harus bersih dan


kering, bebas dari karat, endapan lumpur
dan minyak. Dan benda2 yang menutup
saluran/lubang pada dasar sekat harus
dibersihkan

C/E

28/Jul/15

6.7.3

All lights in good order.

Semua lampu2 di kamar mesin termasuk


covernya dalam kondisi baik dan
berfungsi

C/E

29/Jul/15

6.7.4

Pastikan Semua Vanbelt pada Mesin


Ensure all Vbelt at Main Engine, Aux
Induk, Mesin Bantu dan Mesin2 yang lain
Engine and other machinery including
termasuk equipmen2 yang lain ditutup
rotating equipment are covered and check
pelindung dan periksa kondisi pelindung
condition of cover are good
tersebut dalam kondisi yang baik

C/E

29/Jul/15

6.7.5

Ensure all exhaust pipe covered with


asbestos and aluminium foil. Check and
ensure are good condition, renew if
necessary. And ensure all exhaust pipe
closed with spark arrestor and good
condition, renew spark arrestor if
necessary

Pastikan semua Exhaust pipe ditutup


lagging / asbes penahan panas dan
dilapisi aluminium foil. Periksa asbes dan
aluminium foil dalam kondisi baik, ganti
jika perlu. Dan pastikan saringan pipa
exhaust dalam kondisi baik, ganti jika
perlu

C/E

28/Jul/15

6.7.6

Ensure All Battery have safety box and


battery box are good condition

Pastikan Battery / Accu tertutup cover /


ada tempatnya. Dan Periksa tempat
battery dalam kondisi baik

C/E

28/Jul/15

6.7.7

Check and ensure all panel box


completed with rubber mate and good
condition

Pastikan Semua box panel listrik


dilengkapi dengan keset karet dan periksa
kondisi keset dalam keadaan baik

C/E

28/Jul/15

6.7.8

Check and ensure behind main switch


board are free from any object and dry
condition

Pastikan dan periksa bagian belakang box


panel utama bebas dari barang2 dan
tetesan / ceceran air

C/E

28/Jul/15

6.8.1

Besides the routine checking of spares


and updating of inventory, a thorough
check must be carried out to ensure that
spares are properly secured and
preserved.

Disamping pemeriksaan rutin pada suku


cadang dan pencatatan daftar barang, juga
di lakukan untuk meyakinkan bahwa suku
cadang tersebut aman dan bisa digunakan.

C/E

19/May/15

6.8.2

The Chief Engineer must be able to


produce an up-to-date Inventory List
indicating machinery, part numbers, stock
quantity and position of the stores upon
request of the Shore Auditor.

KKM harus mampu membuat daftar


terbaru permesinan, nomor suku cadang,
jumlah yang tersedia dan posisi pada
tempat penyimpanan jika ada permintaan
dari auditor.

C/E

2/May/15

Err:509

C/E

2/Jul/15

Err:509

C/E

2/Jul/15

Err:509

C/E

2/Jul/15

Err:509

C/E

2/Jul/15

Err:509

C/E

2/Jul/15

ELECTRIC EQUIPMENT
Feel the surface of panel for excessive
7.1.1
warmness indicating overheating or loose
connection.
Visually examine all cable connection
7.1.2
and bus bar for de-coloration.
Check for unusual smell which indicate
7.1.3
overheating.
7.1.4
Ensure all covers are tightly secured.
General overview of the physical
7.1.5
condition should be given to the entire
switchboard.

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

7.1.6

Ensure there is a non-conductive mat or


non-conducting grating in each working
area in front of and behind each board.

Err:509

C/E

2/Jul/15

7.1.7

Non-conducting handrails and guard rails


Err:509
should be present on the board face.

C/E

3/Jul/15

PMS No.

Unit / System

Unit / System

PIC

Last Maint. Date

C/E

3/Jul/15

7.1.8

All instrumentation (meters) should be in


good working order and recently
Err:509
calibrated. All controls and meters should
be clearly and accurately identified.

7.2.1

Check and maintain general cleanliness.

Periksa dan rawat secara umum


kebersihannya

C/E

5/Jun/15

7.2.2

Check for sign of decoloration and


unusual smells which indicate
overheating or loose connection.

Periksa tanda perubahan warna dan bau


yang tidak biasa dari tanda tanda
overheating dan koneksi yang longgar.

C/E

5/Jun/15

7.2.3

Ensure all covers are tightly secured.

Pastikan semua penutup terutup rapat.

C/E

5/Jul/15

7.3.1

Check and ensure light are free to rotate.

C/E

12/Jul/15

C/E

12/Jul/15

C/E

12/Jul/15

C/E

16/Jul/15

Check all water tight gland and cable


entry.
Clean reflector.
Check and ensure water tightness of all
covers.

Periksa dan pastikan lampu bebas


berputar.
Periksa kekedapan airnya dan kabel yang
masuk harus di seal.
Bersihkan reflector.
Periksa dan pastikan kekedapan air semua
penutup.

7.4.2

Check for loose wire terminal.

Periksa kelonggaran dari terminal kabel.

C/E

16/Jul/15

7.4.3

Replace blow out bulb.


Switch on all lightings Check and replace
blow out bulb.
Clean shades, diffusers if necessary.
Check for loose wire terminal.
Check electrolyte level, add distilled
water if necessary.
Clean battery terminals and coat with
petroleum jelly.
Check all cell vent caps and ensure they
are not choked.
Ensure general cleanliness of battery
compartment.
Check charging current.

Ganti bohlam yang rusak.


Nyalakan semua lampu-lampu Periksa
dan ganti lampu yang rusak.
Bersihkan kap lampu
Periksa kabel terminal yang longgar
Periksa cairan electrolyte, tambahakn air
distilat jika perlu.
Bersihkan batrei terminal dan lumuri
dengan gemuk.
Periksa semua tutupnya pastikan tidak
tersumbat.
Pastikan ruang tempat penyimpanan
bersih.
Periksa arus pengisiannya

C/E

16/Jun/15

C/E

16/Jul/15

C/E
C/E

16/Jul/15
16/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

C/E

20/Jul/15

7.7.1

Megger test generator using


manufacturer's guidelines. Ensure solid
state devices are isolated from high
voltage generated during meggar test.
Monitor and record insulation resistance
with a 500 volt mega-ohm meter. The
minimum acceptable reading is 2 megaohms. if result under 2 mega-ohm
reinsulated alternator

Megger test generator sesuai manual


book. Pastikan solid state devices
terisolasi dari listrik tegangan tinggi saat
di megger test. Monitor dan record hasil
megger test dan pastikan hasil megger
test 500 volt mega-ohm meter, minimum
insulation resistance 2 mega-ohm. jika
dibawah 2 mega-ohm lakukan
reinsulation pada generator

C/E

24/Jun/15

7.7.2

Ensure the location of the generator is


receiving adequate ventilation and is as
dry as possible.

Periksa dan pastikan lokasi generator


mendapatkan ventilasi yang baik, bersih
dan kering

C/E

24/Jul/15

Verify the operation of the voltmeter and


ammeter for each generator rated at 50
volts or more.
Every 1,000 hours check the bearing(s)
for smooth, quiet operation

Periksa dan pastikan ketika generator


beroperasi, indikator menunjukan 50
volts atau lebih
Periksa kondisi bearing agar operasi
generator halus dan tidak bising

C/E

24/Jul/15

C/E

28/Jun/15

C/E

28/Jun/15

7.3.2
7.3.3
7.4.1

7.5.1
7.5.2
7.5.3
7.6.1
7.6.2
7.6.3
7.6.4
7.6.5

7.7.3
7.7.4
7.7.5

Periodically inspect the unit for any


Periksa keseluruhan unit alternator dari
buildup of contamination (dirt, oil, etc.)
kontaminasi (kotoran, minyak dll)
on the windings

PMS No.

Unit / System

Unit / System

PIC

Chief Engineer
Date :

LF- E 041/DEC 12

Written by : SK

Last Maint. Date

E / WORK PLAN REPORT


Running
Hours

Form Code

LF- E 041

Revision

01/2012

Page

1 of 1

Interval
Months
Hours

Est. Next Due

STATUS
Maintain This Month

10

50

18/Aug/15

10

50

18/Aug/15

10

50

18/Aug/15

141

250

20/Sep/15

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

426

500

3/Sep/15

184

1,000

27/Aug/16

351

3,000

31/Jan/19

184

3,000

22/Apr/19

345

5,000

28/Sep/21

345

5,000

28/Sep/21

184

5,000

15/Dec/21

3,001

5,000

23/Mar/18

64

100

16/Aug/15

10

100

11/Sep/15

58

100

19/Aug/15

58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

345

1,000

10/Jun/16

874

1,000

28/Sep/15

3,001

5,000

23/Mar/18

3,001

5,000

23/Mar/18

10

100

11/Sep/15

3,001

10,000

5/Nov/24

Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

STATUS

2/Aug/15

2/Aug/15

2/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

Maintain This
Month

20/Aug/15

1/Aug/15

1/Aug/15

1/Aug/15

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

4/Aug/15

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month

Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

4/Aug/15

STATUS

Maintain This
Month
Maintain This Month

21

50

13/Aug/15

21

50

13/Aug/15

21

50

13/Aug/15

141

250

20/Sep/15

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

184

500

29/Dec/15

184

1,000

27/Aug/16

1,490

3,000

29/Jul/17

351

3,000

31/Jan/19

3,001

5,000

23/Mar/18

345

5,000

28/Sep/21

345

5,000

28/Sep/21

184

5,000

15/Dec/21

58

100

19/Aug/15

58

100

19/Aug/15

58

100

19/Aug/15

58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

184

1,000

27/Aug/16

184

1,000

27/Aug/16

Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Running
Hours
345

Interval
Months
Hours
1,000

Est. Next Due

STATUS

10/Jun/16

1/Aug/15

1/Aug/15

1/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

Maintain This
Month

20/Aug/15

1/Aug/15

1/Aug/15

1/Aug/15

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

8/Aug/15

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month

Maintain This
Month
Maintain This Month

50

3-Aug-15

50

3-Aug-15

50

3-Aug-15

Maintain This
Month
Maintain This
Month
Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

120

250

9-Aug-15

120

250

9-Aug-15

264

500

18-Aug-15

264

500

18-Aug-15

264

500

18-Aug-15

264

500

18-Aug-15

12

30-Jul-16

120

250

9-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

480

500

31-Jul-15

852

1000

11-Aug-15

21-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

2,077

6-May-17

2,077

9-Mar-19

STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Running
Hours
2

Interval
Months
Hours
6

Est. Next Due

STATUS

30-Nov-15
Maintain This Month

24

50

1-Aug-15

24

50

1-Aug-15

24

50

1-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

120

500

30-Aug-15

216

500

22-Aug-15

216

500

22-Aug-15

216

500

22-Aug-15

12

30-Jul-16

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

21-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

113

2000

24-Apr-17

113

2000

24-Apr-17

113

2000

24-Apr-17

2,077
2,077

0
0

6-May-17
9-Mar-19

30-Nov-15

STATUS

Maintain This Month

15-Aug-15

15-Aug-15

14-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This Month

22-Aug-15

22-Aug-15

22-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

28-Sep-15

23-Aug-15

Running
Hours

Interval
Months
Hours

Est. Next Due

28-Aug-15

23

36

30-Aug-16

28-Aug-15

28-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Sep-15

STATUS

Maintain This
Month

Maintain This
Month
2

10-Aug-15

36

10-May-18

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

Maintain This
Month

Maintain This
Month
2

28-Aug-15

Running
Hours

Interval
Months
Hours

Est. Next Due

28-Aug-15

28-Aug-15

28-Aug-15

30-Sep-15

2-Aug-15

2-Aug-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

28-Aug-15

28-Aug-15

STATUS

Maintain This
Month

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month
0

29-Aug-15

29-Aug-15

Maintain This
Month

Maintain This
Month

28-Aug-15
Maintain This
Month

28-Aug-15

28-Aug-15

28-Aug-15

Maintain This
Month

Maintain This
Month
Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

19-Aug-15

2-Aug-15

STATUS

Maintain This Month

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

3-Aug-15

3-Aug-15

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Maintain This
Month

Maintain This
Month

Maintain This
Month
1

5-Sep-15

5-Sep-15

5-Aug-15

12-Aug-15

12-Aug-15

12-Oct-15

16-Aug-15

16-Aug-15

16-Sep-15

16-Aug-15

Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

Running
Hours

Interval
Months
Hours

Est. Next Due

STATUS
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month
Maintain This
Month

16-Aug-15

16-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

24-Dec-15

24-Aug-15

Maintain This
Month

24-Aug-15

Maintain This
Month

36

28-Jun-18

28-Sep-15
OVERDUE

10

50

18/Aug/15

10

50

18/Aug/15

10

50

18/Aug/15

141

250

20/Sep/15

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

426

500

3/Sep/15

184

1,000

27/Aug/16

351

3,000

31/Jan/19

184

3,000

22/Apr/19

345

5,000

28/Sep/21

Running
Hours

Interval
Months
Hours

Est. Next Due

345

5,000

28/Sep/21

184

5,000

15/Dec/21

3,001

5,000

23/Mar/18

64

100

16/Aug/15

10

100

11/Sep/15

58

100

19/Aug/15

58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

345

1,000

10/Jun/16

874

1,000

28/Sep/15

3,001

5,000

23/Mar/18

3,001

5,000

23/Mar/18

3,001

10,000

5/Nov/24

2/Aug/15

2/Aug/15

2/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

1/Aug/15

1/Aug/15

1/Aug/15

STATUS

Running
Hours

Interval
Months
Hours

Est. Next Due

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

4/Aug/15

STATUS

OVERDUE

21

50

13/Aug/15

21

50

13/Aug/15

21

50

13/Aug/15

141

250

20/Sep/15

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

184

500

29/Dec/15

184

1,000

29/Jul/17

1,490

3,000

29/Jul/17

351

3,000

31/Jan/19

3,001

5,000

23/Mar/18

345

5,000

28/Sep/21

345

5,000

28/Sep/21

184

5,000

15/Dec/21

58

100

19/Aug/15

58

100

19/Aug/15

58

100

19/Aug/15

58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

Running
Hours

Interval
Months
Hours

Est. Next Due

874

1,000

28/Sep/15

874

1,000

28/Sep/15

184

1,000

27/Aug/16

184

1,000

27/Aug/16

345

1,000

10/Jun/16

1/Aug/15

1/Aug/15

1/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

20/Aug/15

1/Aug/15

1/Aug/15

1/Aug/15

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

8/Aug/15

STATUS

OVERDUE

Running
Hours

Interval
Months
Hours

Est. Next Due

50

3-Aug-15

50

3-Aug-15

50

3-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

264
264

500
500

18-Aug-15
18-Aug-15

264

500

18-Aug-15

264

500

18-Aug-15

12

30-Jul-16

120

250

9-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

480

500

31-Jul-15

852

1000

11-Aug-15

21-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

2,077
2,077

0
0

6-May-17
9-Mar-19

STATUS

Running
Hours
2

Interval
Months
Hours
6

Est. Next Due

STATUS

30-Nov-15
OVERDUE

24

50

1-Aug-15

24

50

1-Aug-15

24

50

1-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

120
216

500
500

30-Aug-15
22-Aug-15

216

500

22-Aug-15

216

500

22-Aug-15

12

30-Jul-16

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

21-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

113

2000

24-Apr-17

113

2000

24-Apr-17

Running
Hours

Interval
Months
Hours

113

2000

Est. Next Due

STATUS

24-Apr-17

2,077
2,077

0
0

24-Apr-17
9-Mar-19

30-Nov-15
OVERDUE

15-Aug-15

15-Aug-15

14-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

22-Aug-15

22-Aug-15

22-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

28-Sep-15

23-Aug-15

28-Aug-15

OVERDUE

Running
Hours

Interval
Months
Hours

Est. Next Due

23

36

30-Aug-16

28-Aug-15

28-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

10-Sep-15

10-Aug-15

36

10-May-18

10-Aug-15

10-Aug-15

10-Aug-15

10-Aug-15

28-Aug-15

28-Aug-15

STATUS

Running
Hours

Interval
Months
Hours

Est. Next Due

28-Aug-15

28-Aug-15

30-Sep-15

2-Aug-15

2-Aug-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

28-Aug-15

28-Aug-15

29-Aug-15

29-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

28-Aug-15

STATUS

Running
Hours

Interval
Months
Hours

Est. Next Due

19-Aug-15

2-Aug-15

STATUS

OVERDUE

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

3-Aug-15

3-Aug-15

5-Sep-15

5-Sep-15

5-Aug-15

12-Aug-15

12-Aug-15

12-Oct-15

16-Aug-15

16-Aug-15

16-Sep-15

16-Aug-15

0
0

1
1

16-Aug-15
16-Aug-15

Running
Hours

Interval
Months
Hours

Est. Next Due

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

24-Dec-15

24-Aug-15

24-Aug-15

36

28-Jun-18

28-Sep-15

STATUS

Maintain This Month

PERFORMANCE

100%

OVERDUE

SCHEDULED
Maintain This Month

PMS FOR THIS


MONTH

OVERDUE

EXCELLENT

SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

STATUS

Maintain This Month


OVERDUE

ITEM

SCHEDULED
Running
Hours

Interval
Months
Hours

Est. Next Due

STATUS
SCHEDULED

10

50

18/Aug/15

10

50

18/Aug/15

10

50

18/Aug/15

141

250

20/Sep/15

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

426

500

3/Sep/15

184

1,000

27/Aug/16

351

3,000

31/Jan/19

184

3,000

22/Apr/19

345

5,000

28/Sep/21

345

5,000

28/Sep/21

184

5,000

15/Dec/21

3,001

5,000

23/Mar/18

64

100

16/Aug/15

10

100

30/Aug/15

58

100

30/Aug/15

58

100

30/Aug/15

874

1,000

30/Aug/15

874

1,000

30/Aug/15

345

1,000

30/Aug/15

874

1,000

30/Aug/15

3,001

5,000

30/Aug/15

3,001

5,000

30/Aug/15

3,001

10,000

30/Aug/15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED

Running
Hours
0

Interval
Months
Hours
1

Est. Next Due

STATUS

2/Aug/15
SCHEDULED

2/Aug/15
SCHEDULED

2/Aug/15
SCHEDULED

20/Aug/15

20/Aug/15

SCHEDULED

SCHEDULED
0

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

1/Aug/15

1/Aug/15

1/Aug/15

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

4/Aug/15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED

21

50

13/Aug/15

21

50

13/Aug/15

21

50

13/Aug/15

141

250

20/Sep/15

SCHEDULED
SCHEDULED
SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

151

250

15/Sep/15

169

250

6/Sep/15

184
184
184
415

250
250
250
500

30/Aug/15
30/Aug/15
30/Aug/15
8/Sep/15

184

500

29/Dec/15

184

1,000

27/Aug/16

1,490

3,000

29/Jul/17

351

3,000

31/Jan/19

3,001

5,000

23/Mar/18

345

5,000

28/Sep/21

345

5,000

28/Sep/21

184

5,000

15/Dec/21

58

100

19/Aug/15

58

100

19/Aug/15

58

100

19/Aug/15

STATUS

SCHEDULED
SCHEDULED

SCHEDULED
58

100

19/Aug/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

874

1,000

28/Sep/15

184

1,000

27/Aug/16

184

1,000

27/Aug/16

345

1,000

10/Jun/16

SCHEDULED

1/Aug/15
SCHEDULED

1/Aug/15
SCHEDULED

1/Aug/15
SCHEDULED

20/Aug/15

20/Aug/15

SCHEDULED

SCHEDULED

Running
Hours
0

Interval
Months
Hours
1

Est. Next Due

STATUS

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

20/Aug/15
SCHEDULED

1/Aug/15

1/Aug/15

1/Aug/15

345

2,000

7/Oct/17

345

2,000

7/Oct/17

345

2,000

7/Oct/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

30

2,000

24/Dec/17

490

24/Nov/16

490

20/Jul/19

8/Aug/15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED

50

3-Aug-15

50

3-Aug-15

50

3-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

264
264

500
500

18-Aug-15
18-Aug-15

264

500

18-Aug-15

264

500

18-Aug-15

12

SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED

30-Jul-16

120

250

9-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

SCHEDULED
SCHEDULED
SCHEDULED

Running
Hours

Interval
Months
Hours

480

500

Est. Next Due

STATUS

31-Jul-15
SCHEDULED

852

1000

11-Aug-15

SCHEDULED

21-Aug-15
SCHEDULED

20-Aug-15

20-Aug-15

SCHEDULED

SCHEDULED
0

20-Aug-15
SCHEDULED

20-Aug-15
SCHEDULED

20-Aug-15
SCHEDULED

20-Aug-15

20-Aug-15

20-Aug-15

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

1,199

2000

24-Apr-16

2,077
2,077

0
0

6-May-17
9-Mar-19

30-Nov-15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED

24

50

1-Aug-15

24

50

1-Aug-15

24

50

1-Aug-15

120

250

9-Aug-15

120

250

9-Aug-15

120
216

500
500

30-Aug-15
22-Aug-15

216

500

22-Aug-15

216

500

22-Aug-15

0
108

12

SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED

30-Jul-16
250

10-Aug-15

SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

108

250

10-Aug-15

108

250

10-Aug-15

108

250

10-Aug-15

STATUS
SCHEDULED
SCHEDULED

SCHEDULED
108

250

10-Aug-15

SCHEDULED

21-Aug-15
SCHEDULED

20-Aug-15

20-Aug-15

SCHEDULED

SCHEDULED
0

20-Aug-15
SCHEDULED

20-Aug-15
SCHEDULED

20-Aug-15
SCHEDULED

20-Aug-15

20-Aug-15

20-Aug-15

113

2000

24-Apr-17

113

2000

24-Apr-17

113

2000

24-Apr-17

2,077
2,077

0
0

6-May-17
9-Mar-19

30-Nov-15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED

15-Aug-15
SCHEDULED

15-Aug-15
SCHEDULED

14-Aug-15

2-Aug-15

2-Aug-15

SCHEDULED
SCHEDULED

SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

2-Aug-15

2-Aug-15

2-Aug-15

STATUS
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED

22-Aug-15

22-Aug-15

SCHEDULED

SCHEDULED
2

22-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

28-Aug-15

28-Sep-15

23-Aug-15

SCHEDULED

SCHEDULED
2

28-Aug-15

23

36

30-Aug-16

28-Aug-15

28-Aug-15

SCHEDULED

SCHEDULED

SCHEDULED
2

10-Aug-15
SCHEDULED

10-Aug-15
SCHEDULED

10-Aug-15

10-Aug-15

SCHEDULED

SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

10-Sep-15

10-Aug-15

36

10-May-18

10-Aug-15

10-Aug-15

STATUS

SCHEDULED

SCHEDULED

SCHEDULED

10-Aug-15

SCHEDULED

10-Aug-15
SCHEDULED

28-Aug-15

28-Aug-15

SCHEDULED

SCHEDULED
2

28-Aug-15
SCHEDULED

28-Aug-15

30-Sep-15

2-Aug-15

SCHEDULED

SCHEDULED
1

2-Aug-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

26-Sep-15

SCHEDULED

Running
Hours
2

Interval
Months
Hours
3

Est. Next Due

STATUS

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

29-Aug-15
SCHEDULED

29-Aug-15
SCHEDULED

28-Aug-15

SCHEDULED
0

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

28-Aug-15
SCHEDULED

19-Aug-15
SCHEDULED

2-Aug-15
SCHEDULED
SCHEDULED

2-Aug-15
SCHEDULED

2-Aug-15

2-Aug-15

2-Aug-15

2-Aug-15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED

Running
Hours
0

Interval
Months
Hours
1

Est. Next Due

STATUS

2-Aug-15
SCHEDULED

3-Aug-15
SCHEDULED

Running
Hours

Interval
Months
Hours

Est. Next Due

STATUS

3-Aug-15
SCHEDULED

5-Sep-15

5-Sep-15

5-Aug-15

12-Aug-15

12-Aug-15

12-Oct-15

16-Aug-15

16-Aug-15

16-Sep-15

16-Aug-15

0
0

1
1

16-Aug-15
16-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

20-Aug-15

24-Dec-15

24-Aug-15

SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED

SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED
SCHEDULED

SCHEDULED
0

24-Aug-15
SCHEDULED

36

28-Jun-18

28-Sep-15

Dede Mulyana

Running
Hours

Interval
Est. Next Due
Months
Hours
Technical Superintendent

STATUS

Date :

Approved by : VP/DPA

Retention Period : 1 year

FORM UNTUK DEPARTEMEN ENGINE TOTAL ADA 51 FORM


YAITU :

NO

KODE
FORM

NAMA FORM

1 LF- E 000

CHIEF ENGINEERS STANDING ORDERS

2 LF- E 001

FAMILIARISATION & OPERATION CHECKLIST

3
4
5
6

BUNKER SAFETY CHECKLIST

LFLFLFLF-

E
E
E
E

002
002A
003
004

BUNKER SAFETY CHECKLIST - REPETITIVE


BUNKERING PLAN
ENGINE MAINTENANCE FORM

7 LF- E 005A DEPARTURE AND FULLAWAY ON CHECKLIST


8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

LFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLF-

E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E

005B
006
007
008
009
011
012
013
015
016
017
018A
018B
019A
019B
020
021
022A
022B
023
024
025
026
027
028
031
031A
031B
032
033
034
035
036
037
039
040A
040B
040C
041

PREPARATION FOR END OF PASSAGE AND FINISHED WITH ENGINE CHECKLIST


ENGINE ROOM CRITICAL TESTS
CRITICAL EQUIPMENT & SPARE PARTS INVENTORY
ELECTRICAL ISOLATION PERMIT NEW
SPARES REQUISITION FORM
INVENTORY SPARE PARTS
RUNNING HOUR OF GENERATOR
RUNNING HOUR MAIN ENGINE
MAIN ENGINE PERFORMANCE REPORT
MONTHLY FUEL.LUB OIL CONSUMPTION REPORT
STUFFING BOX RINGS CLEARENCE RECORDS
AUX ENGINE PERFORMANCE REPORT
CARGO PUMP ENGINE PERFORMANCE REPORT
MAIN ENGINE PISTON CONDITION RECORD
AUXILIARY ENGINE CYLINDER LINER AND PISTON CONDITION RECORD
TEST RECORD OF STAND BY ARRANGEMENT
MAIN ENGINE CYLINDER LINER CALIBRATION RECORD
MAIN ENGINE BEARING CLEARENCES
AUXILIARY ENGINE BEARING CLEARENCES
AUXILIARY ENGINE CONNECTING ROD INSPECTION
CROSSHEAD CLEARENCE RECORD
CRANKSHAFT DEFLECTION
SEWAGE TREATMENT RECORD
RECORD L.O STERN TUBE OF MAIN ENGINE
ELECTRICAL MOTOR INSULATION RESISTANCE REPORT
MAIN PROPULSION PORTSIDE
TAPPET CLEARANCE AND ROCKER GEAR
INJECTOR TESTER CHECKLIST
MAIN PROPULSION STARBOARDSIDE
AUXILIARY PORTSIDE
AUXILIARY STARBOARDSIDE
TEST PROGRAM
AUXILIARY MACHINE
ELECTRIC EQUIPMENT
MAINTENANCE REPAIR REPORT
HANDING / TAKING OVER WATCH IN PORT
HANDING / TAKING OVER WATCH AT ANCHOR
HANDING / TAKING OVER WATCH AT SEA
MONTHLY WORK DONE / WORK PLAN REPORT

47
48
49
50
51

LFLFLFLFLF-

E
E
E
E
E

041A
042
044
045
046

SAFETY INSPECTION REPORT (SHIP)


LIFTING APPLIANCES MAINTENANCE RECORD
MONTHLY ENGINE ABSTRACT
PRESSURE VESSEL/PIPELINE WORK PERMIT
PIPELINE PRESSURE (HYDROSTATIC) TEST RECORD

File PMS Report terdapat beberapa form yang dijadikan satu dalam 1 file
MAIN PROPULSION PORTSIDE
MAIN PROPULSION STARBOARDSIDE
AUXILIARY PORTSIDE
yaitu :

AUXILIARY STARBOARDSIDE
TEST PROGRAM
AUXILIARY MACHINE
ELECTRIC EQUIPMENT
MONTHLY WORK DONE / WORK PLAN REPORT

Cara pengisian form PMS adalah sebagai berikut


klik form LF-E 031 (MAIN PROPULSION PORTSIDE)
1

Buka Form

Isi data

Otomatisasi

Summary of
Overdue
Maintenance

Penyelesaian
Laporan

PADA CELL YANG BERWARNA HIJAU SAJA, data tersebut adalah :


Nama Kapal
Tanggal, Bulan & Tahun periode pelaksanaan PMS
Total Jam Kerja bulan sebelumnya
Jam kerja yang di capai pada bulan ini
Tanggal Maintenance terakhir (day/month/year)
Setelah data-data pada cell yang berwarna hijau sudah diisi
Secara otomatis, tanggal pada next maintenance akan berubah sesuai interval maintenancenya
Kode C (Complete Maintenance) dan S (Scheduled Maintenance) akan berubah, sesuai data
pada last maintenance dan next maintenance
Di bagian bawah terdapat hasil pengerjaan performance dari PMS Main Propulsion Portside bulan ini
hasil performance sesuai jumlah item PMS yang dikerjakan dan item PMS yg tidak dikerjakan
pada bulan ini (overdue dan bertanda merah)
Range hasil performane adalah 90% ke atas adalah "EXELLENCE", 75% sampai 90% "GOOD",
50% sampai 75% "LESS" dan dibawah 50% "POOR"
Pada tabel Summary of Overdue Maintenance, adalah tabel yg diisi untuk memberi penjelasan
jika ada item PMS yang jatuh tempo bulan ini (Overdue dan berwarna merah) yang tidak dikerjakan bula
dan beserta alasannya
Contoh :
PMS No. 1.3.2 , Ganti baru saringan pelumas governoor tidak dikerjakan karena
tidak ada spare filter di atas kapal
Setelah data-data pada cell yang berwarna hijau sudah diisi
Jika ada item PMS yang overdue sudah di isi pada tabel Summary of Overdue Maintenance
Jika tidak ada kosongi tabel Summary of Overdue Maintenance
Setelah itu print form LF-E 031
Setelah di Print, klik icon "back" yang ada dibawah form, untuk kembali ke menu awal

ULANGI CARA DI ATAS UNTUK FORM-FORM YANG LAINNYA


DAN KERJAKAN SECARA BERURUTAN DARI FORM LF-E 031 SAMPAI LF-E 041

Khusus untuk Form LF-E 041 (MONTHLY WORK DONE / WORK PLAN REPORT)
Form tersebut merupakan rangkuman seluruh kegiatan maintenance yang dikerjakan dan yang overdue pada bulan ini
dan juga menunjukan maintenance yg akan dikerjakan pada bulan selanjutnya (sehingga Chief Engineer bisa membuat
untuk PMS bulan selanjutnya)
Dalam Form LF-E 041 tidak ada yg diisi, form tersebut sudah berintegrasi dengan form-form PMS yang lain
hanya mengupdate setelah Form2 LF-E 031 s/d LF-E 038 sudah selesai diisi dengan cara :
Klik icon pada kolom J8 (lihat gambar yang dibulati warna merah)

Maka akan muncul "Filter Bar" (lihat gambar dibawah), tanpa merubah tanda centang LANGSUNG KLIK

Selanjutnya Form LF-E 037 bisa langsung di Print


Note :
Pada Form LF-E 041, terdapat hasil pengerjaan performance dari keseluruhan PMS bulan ini
hasil performance sesuai jumlah item PMS yang dikerjakan dan item PMS yg tidak dikerjakan
pada bulan ini (overdue dan bertanda merah)
Range hasil performane adalah 90% ke atas adalah "EXELLENCE", 75% sampai 90% "GOOD",
50% sampai 75% "LESS" dan dibawah 50% "POOR"

INTERVAL

Every Day
Every joining new
Engineer
Every bunker
Every bunker
Every bunker
Every Years
Every Departure
& Arrival
Every
Every
Every
work
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every
Every

Month
Month
Electrical

Every
Every
Every
Every
Every
Every
Every

Month
Month
Month
Month
Month
Month
After Repair

Request
Month
Month
Month
Month
Month
3 Month
Month
Month
Overhoul
Overhoul
3 Month
Overhoul
Overhoul
Overhoul
Overhoul
Overhoul
Overhoul
Month
Month
6 Month
Month

Every Month

Every
Every
Every
Every
pipe
Every
pipe

3 Month
Month
Month
pressure
pressure

eberapa form yang dijadikan satu dalam 1 file

LFLFLFLFLFLFLFLF-

E
E
E
E
E
E
E
E

031
032
033
034
035
036
037
041

orm PMS adalah sebagai berikut

Format dalam ANGKA

Format dalam ANGKA

maintenance akan berubah sesuai interval maintenancenya


n S (Scheduled Maintenance) akan berubah, sesuai data

erjaan performance dari PMS Main Propulsion Portside bulan ini


m PMS yang dikerjakan dan item PMS yg tidak dikerjakan

% ke atas adalah "EXELLENCE", 75% sampai 90% "GOOD",

enance, adalah tabel yg diisi untuk memberi penjelasan


ulan ini (Overdue dan berwarna merah) yang tidak dikerjakan bulan ini

BACK
BACK

1 (MONTHLY WORK DONE / WORK PLAN REPORT)


maintenance yang dikerjakan dan yang overdue pada bulan ini
pada bulan selanjutnya (sehingga Chief Engineer bisa membuat plan

J8 (lihat gambar yang dibulati warna merah)

ar dibawah), tanpa merubah tanda centang LANGSUNG KLIK "OK"

Form LF-E 037 bisa langsung di Print

BACK