Preparation and consolidation of sub


grade with power road roller of 8 to 12
tonne capacity after excavating earth
to an average of 22.5 cm. depth,
dressing
to
camber
and
consolidating
with
road
roller
including
making
good
the
undulations etc. and re-rolling the
sub grade and disposal of surplus
earth lead upto 50 metres.
sqm 33.90
Laying granular sub-base with stone
aggregate and blinding material, earth
etc. including screening, sorting and
spreading
to
template
and
consolidation with light power roadroller etc. complete. (payment for
stone
aggregate
to
be
made
separately)
136.20
53 mm to 22.4 mm size stone
aggregate.
cum 810.55
946.7

Total {2(a) + 2(b)}


5
3(a 16.4 Laying spreading and compacting stone cum 192.55
aggregate of specified sizes to WMM
).
specifications including spreading in
uniform thickness, hand picking, rolling

SCHEDULE OF RATES

258

3(b
).

16.3.
3

with 3 wheeled road / vibratory roller 810 tonne in stages to proper grade and
camber, applying and
brooming
requisite type of screening/binding
material to fill up interstices of coarse
aggregate watering and compacting to
the required density .
53 mm to 22.4 mm size stone
aggregate.

Total {3(a) + 3(b)}


4.
16.3 Providing and applying prime coat
0
using hot straight run bitumen of
grade 80/ 100 including heating the
bitumen, spraying the bitumen with
mechanically operated spray unit
fitted on bitumen boiler, cleaning
and preparing the existing road surface
as per specifications, on W.B.M. @ 0.75
Kg / sqm.
sqm
5.
16.3 Providing and applying tack coat using
Bitumen Emulsion (Rapid Setting)
1
complying
with
IS
8887-1995,
spraying the bitumen emulsion with
mechanically operated spray unit,
cleaning and preparing the existing
road surface as per specifications, on
W.B.M @ 0.3kg/sqm.
sqm
6.
16.5 Providing
and
laying
Dense cum
4
Bituminous Macadam on prepared
surface with specified graded crushed
stone aggregate for profile corrective
base/ binding
course
including
loading of aggregate with FE loader
and hot mixing of stone aggregate,
filler and bitumen in hot mix plant,
transporting the mixed material by
tippers to paver and laying the mixed
material with paver finisher fitted

810.55
1003.
10

23.90

18.00
5,366
.50

SCHEDULE OF RATES

259

7.

8.

9.

16.5
6

16.7

16.1
2

with electronic sensing device to the


required level and grade and rolling
by road
roller as
per
MORTH
specifications, to achieve the desired
density, but excluding the cost of
primer / tack coat, 80mm average
compacted thickness with bitumen
of 60/70 grade @ 5% (percentage by
weight of total mix) and lime filler @
2%
(percentage
by
weight
of
Aggregate).
Providing
and
laying
Dense
Bituminous concrete on prepared
surface with specified graded stone
aggregate
for
wearing
course
including loading of aggregate with
F.E. loader , and hot mixing of
bitumen
with filler
and
stone
aggregate
in
hot
mix
plant
,
transporting the mixed material by
tippers to paver and laying the
mixed material with mechanical paver
finisher fitted with electronic sensing
device to the required level and
grade and rolling with road rollers,
as
per
MORTH specification,
to
achieve the desired density and
compaction
but excluding cost of
primer/ tack coat. 40 mm compacted
thickness with bitumen of grade 60/ 70
@ 5.5% and lime @3% (percentage
by weight of total mix).
cum
Brick edging in full brick width and half
brick depth including excavation,
refilling and disposal of surplus earth
lead upto 50 metres. With F.P.S. bricks metr
of class designation 75
e
Dry brick pitching half brick thick in sqm
drains including supply of bricks and
preparing the surface complete, With

5,856
.05

52.35
183.5
5

SCHEDULE OF RATES

260

10.

16.6
2

11.

16.2
5

F.P.S. bricks of class designation 75


Providing and applying 2.5mm thick
road marking strips (retro-reflective) of
specified
shade/colour
using
hot
thermoplastic material by fully/semi
automatic
thermoplastic
paint
applicator machine fitted with profile
shoe, glass beads dispenser, propane
tank heater and profile shoe heater,
driven by experienced operator on
road
surface
including
cost
of
material, labour ,T&P, cleaning the
road surface of all dirt, seals, oil,
grease and foreign material etc.
complete as per direction of Engineerin-charge
and
accordance
with
applicable specifications.
sqm 497.30
Surface dressing on new surface with
paving bitumen of grade A-90/S-90 of
approved quality using 2.25 kg of
bitumen per sqm with 1.65 cum of
stone chippings 13.2 mm nominal
size per 100 sqm of road surface
including consolidation with road
roller of 6 to 8 tonne capacity etc.
complete.
sqm 89.40

9.2. Rigid Pavement:-

SCHEDULE OF RATES

261

S.
No
.
1.

2(a

DSR
Code
No.
16.1

16.5

).

2(b
).

16.3.
3

Description

Rate
Unit

(Rs.)

Preparation and consolidation of sub


grade with power road roller of 8 to 12
tonne capacity after excavating earth to
an average of 22.5 cm. depth, dressing
to camber and consolidating with
road roller including making good the
undulations etc. and re-rolling the
33.9
sub grade and disposal of surplus
earth lead upto 50 metres.
sqm
0
Laying granular sub-base with stone
aggregate and blinding material, earth
etc. including screening, sorting and
spreading
to
template
and
consolidation with light power roadroller
etc. complete. (payment
for
136.
stone
aggregate
to
be
made
separately)
20
53 mm to 22.4 mm size stone
810.5
aggregate.
cum
5
946.

Total {2(a) + 2(b)}


3.
16.7 Brick edging in full brick width and half
brick
depth
including
excavation,
refilling and disposal of surplus earth
lead upto 50 metres. With F.P.S. bricks of metr
class designation 75
e
4.
16.1 Dry brick pitching half brick thick in
2
drains including supply of bricks and
preparing the surface complete, With
F.P.S. bricks of class designation 75
sqm
5.
16.6 Providing and applying 2.5mm thick sqm
road marking strips (retro-reflective) of
2
specified
shade/colour
using
hot
thermoplastic material
by fully/semi
automatic
thermoplastic
paint

75

52.3
5
183.
55
497.
30

SCHEDULE OF RATES

262

applicator machine fitted with profile


shoe, glass beads dispenser, propane
tank heater and profile shoe heater,
driven by experienced operator on
road
surface
including
cost
of
material, labour ,T&P, cleaning the
road surface of all dirt, seals, oil,
grease and foreign material etc.
complete as per direction of Engineer-incharge and accordance with applicable
specifications.
S.
N
o.
6.

Description
Dry Lean Cement Concrete
sub-base Construction of
dry lean c/c sub-base over
a prepared sub-grade with
coarse and fine aggregate,
the
size
of
coarse
aggregate not exceeding
25 mm, aggregate cement
ratio not to exceed 15:1,
aggregate gradation after
blending, cement content
not to be less than 150
kg/cum, optimum moisture
content to be determined
during
trial
length
construction
concrete
strength not to be less
than 10 MPa at 7 days,
mixed in a batching plant,
transported to site, laid
with
a
paver
with
electronic
sensor,
compacting
with
8-10
tonne
vibratory
roller,
finishing and curing.

Unit

Quant

Rate

Total

ity

(Rs.)

(Rs.)

SCHEDULE OF RATES

263

Unit = cum
Taking output = 450 cum
(a) Labour
Mate
Skilled Mazdoor
Mazdoor
(b) Machinery
Front end loader 1 cum
bucket capacity
Cement concrete batch
mix plant @ 55 cum per
hour
Paver with electronic
sensor
Vibratory roller 8-10
capacity
Water tanker 6 KL capacity
Tipper

Day
Day
Day

Hour

1.12 138.45
155.06
6.00 138.45
830.70
22.00 135.25 2975.50
Sub Total (a) 3961.26

6.00

750.00

4500.00

11000.

66000.0

Hour

6.00

00
1500.0

Hour

6.00

9000.00

Hour
Hour

8.00
8.00

125.00
100.00

1000.00
800.00
86130.0

t.km

990xL

1.74

Add 10% of cost of


carriage to cover cost of
loading and unloading

8613.00
176043.
Sub Total (b)

(c) Material
Crushed stone coarse
aggregate of 25 mm and
12.5 mm nominal sizes
graded as per table 600-1
@ 0.96 cum/cum of
concrete conforming to
clause 602.2.4.
Coarse sand as per IS:383
@ 0.45 cum/cum of
concrete
Cement @ 150 kg/cum of
concrete
Cost of water

00

283500.
cum

405.00

700.00

00
121800.

cum 203.00
Tonn
e
kL

600.00
4500.0

00
303750.

67.50
0
00
48.00 100.00 4800.00
Sub Total (c) 713850.

SCHEDULE OF RATES

264

(d) Overhead Charges on (a + b +


c) @ 10%
(e) Contractors Profit (a + b + c
+ d) @ 10%
Cost for 450 cum = (a + b + c + d
+ e)

00
89385.4
3
98323.9
7
108156
3.66

Rate per cum = (a + b + c + d + e) /


7.

450
Cement
concrete
pavement Construction of
un-reinforced,
dowel
jointed,
plain
cement
concrete pavement over a
prepared sub-base with 43
grade cement @ 400 kg
per cum, coarse and fine
aggregates conforming to
IS: 383, maximum size by
coarse
aggregate
not
exceeding 25 mm, mixed
in a batching and mixing
plant as per approved mix
design, transported to site,
laid with a fixed form or
slip form paver, spread,
compacted and finished in
a continuous operation
including
provision
of
contractor,
expansion,
construction
and
longitudinal joints, joint
filler,
separation
membrane, sealant primer,
joint sealant, debonding
strip, dowel bar, tie rod,
admixtures as approved,
curing compound, finishing
to lines and grades as per

2403.47

SCHEDULE OF RATES

265

drawing.
Unit = cum
Taking output = 1050 cum
(a) Labour
Mate
Mazdoor skilled
Mazdoor

Day
Day
day

(b) Machinery
Front end loader 1 cum
bucket capacity
Hour
Cement concrete batch
mix plant @ 175 cum per
hour
Hour
Paver
with
electronic
sensor
Hour
Road sweeper @ 1250 sqm
per hour
Hour
Water tanker 6 KL capacity Hour
Transit truck agitator 5 t.km
cum capacity
.
Add 10% of cost of
carriage to cover cost of
loading and unloading
Concrete
joint
cutting
machine
Hour
Texturing machine
Hour
Electric generator 250 KVA Hour

(c) Material
Crushed
stone
coarse
aggregate of 25 mm and
12.5 mm nominal size @
0.90 cum/cum of concrete
conforming
to
clause
602.2.4
Sand as per IS:383 and
conforming
to
clause
602.2.4 @ 0.45 cum/cum

2.00 138.45
276.90
15.00 138.45 2076.75
35.00 135.25 4733.75
Sub Total (a) 7087.40
13500.0
18.00

750.00

11000.

66000.0

6.00

00
1500.0

6.00

9000.00

2.80
36.00
2415x

60.00
100.00

168.00
3600.00
193200.

1.60

00
19320.0
0

12.00
12.00
6.00

100.00
100.00
200.00

1200.00
1200.00
1200.00
308388.

Sub Total (b)

00

661500.
cum
cum

945.00
473.00

700.00
600.00

00
283800.
00

SCHEDULE OF RATES

266

of concrete
Cement 43 grade @ 400 Tonn
kg/cum of concrete
e
414.00
32 mm mild steel dowel Tonn
bars of grade 5240
e
9.45
16 mm deformed steel tie Tonn
bars of grade S 415
e
1.17
Separation membrane of
3675.0
impermeable
plastic
sheeting 125 micron thick
Sqm
0
Pre-moulded joint filler, 25
mm thick for expansion
joint
Sqm
16.33
Joint sealant
kg
kg

Sealant primer
Plastic sheath, 1.25 thick
for dowel bars
Sqm
Curing compound

1863000

0
30500.

.00
288225.

00
31750.

00
37147.5

00

0
551250.

150.00

00

300.00

4899.00
61250.0

875.00
116.67

70.00
65.00

0
7583.55

46.67
1850.0

100.00

4800.00
120250.

65.00

00

Liter
Super
plasticizer
admixture is marked as
per 9103-1999 @ 0.5
percent by weight of
cement
Cost of water

4500.0

2070.0

124200.

kg

60.00

00
21600.0

kL

216.00

100.00

0
402950

Sub Total (c)

5.05
434498.

(d) Overhead Charges on (a + b +


c) @ 10%
(e) Contractors Profit (a + b + c
+ d) @ 10%
Cost for 1050 cum = (a + b + c +
d + e)

05
477947.
85
525742
6.35

Rate per cum = (a + b + c + d + e) /


1050

5007.07

267