Академический Документы
Профессиональный Документы
Культура Документы
PROJECT NAME
CONTRACT NO.
: XXXXXXXX
ITEM
: Performance Procedure
DOCUMENT TITLE : Procedure for Clean air flow test of coal pipes
For approval
REV.
DATE
DESCRIPTION
DGN
CHECK
REVW
APPR
NTPC Limited.
(A Government of India Enterprise)
CONTRACTOR
DOOSAN POWER SYSTEMS INDIA PRIVATE LIMITED
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION Co., Ltd. Korea
CATEGORY
Approval
DOOSAN
DOCUMENT NO.
NTPC
REV.
SHEET
BARH STPP
DOC.No.
(3 x 660MW)
XXXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
TABLE OF CONTENS
SL. NO.
DESCRIPTION
1.0
PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSAL
4.0
SERVICE REQUIRED
5.0
SAFETY PRECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDIX
Sheet
1 of 9
BARH STPP
DOC.No.
(3 x 6600MW)
XXXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
2 of 9
BARH STPP
Doc.No.
(3 x 660MW)
XXXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
3 of 9
5.2 The test team members should be aware of the procedure being adopted.
5.3 Other agencies working near the test area should be informed of the activity.
5.4 All compressed air hoses and fitting are in good condition; inspect hoses and fittings daily.
5.5 Wear protective goggles or face shield during measuring.
5.6 Wear protective gloves during measuring.
5.7 Avoid direct contact with hot surfaces.
5.8 Keep the work area clean and neat. Electrical hoses should be laid flat and out of work areas
5.9 Always hold connectors firmly and away from workers face when connecting and disconnecting
5.10 Do not modify the Dirty Air Pitot System in any way. Contact the manufacturer before conducting any
maintenance or repair.
5.11 Proper approach will be available for taking measurement.
6.0 EMERGENCY PROCEDURE
6.1 The test team should be aware of the steps to be taken to stop the running equipment in case of any
emergency / abnormal observations.
6.2 The test team should be aware of actions to be taken in case of injury to any personnel.
6.3 The test team should be aware of operating instructions of portable fire extinguishers.
7.0 STATE OF THE PLANT(To be confirmed by Tyazmash / TKZ)
Pitot tube to be used for clean air flow test is a calibrated one and calibration certificate will be made available
7.1 Open the hot air gates and cold air gates for only the test mill.
7.2 Open hot air damper to nominal 30% and cold air damper to nominal 15% on the test mill. Make final trim
adjustment in this position as advised after inspection of operating condition.
7.3 Provide a flow path for the cold air and hot air from the PA fans to the mills.
7.4 Make sure the mill discharge gates for test mill to be separately are open and the burner shutoff gates are open
at coal burners for the test mill.
7.5 Start mill seal air fans and open seal air dampers to the test mill.
BARH STPP
DOC.No.
(3 x 660MW)
XXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
4 of 9
7.6 Before the test, Boiler will be operated as the following sequence.
(GAH -> IDF -> FD FAN -> SEAL AIR FAN)
7.7 Start one set of ID and FD fans and make certain the furnace pressure control is stable.
7.8 Start one PA fan and adjust the hot air duct pressure to nominal 813 mm wg. Check that the hot air duct to
furnace differential pressure is stable and nominally 825 mm wg.
7.9 Hold the settings for the duration of the clean air flow tests. No adjustments are permitted to the mill PA
dampers while the clean air flow tests are in progress.
7.10 After the clean air flow tests are complete, the PA fan can be stopped and the test mill PA gates closed. The
seal air fans should then be stopped and the ID and FD fans shutdown in the nominal manner.
8.0 Method
8.1 Connect the pitot tube lines to the tube umbilical and to the manometer. Ensure that the high pressure line is
connected to the positive side of the Bluetooth meter and the low pressure line to the negative side of the
Bluetooth meter.
8.2 Connect the pitot tube thermocouple plug to the tube umbilical and to the thermocouple plug on the
Bluetooth meter
8.3 Zero the pressure transducer using the following steps.
8.3.1 Place the tip of the pitot tube in a still area, with no air currents, so there is zero velocity at the probe tip.
8.3.2 Press the Menu/Save button on the Bluetooth meter (this is the center button with a white dot, located
below the text Menu on the screen).
8.3.3 From the menu items, select Zero Pressure and then press the Enter button (the large oval button at
center with arrow).
BARH STPP
DOC.No.
(3 x 660MW)
XXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
4 of 9
BARH STPP
Doc.No.
(3 x 660MW)
XXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
5 of 9
BARH STPP
DOC.No.
(3 x 660MW)
XXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
6 of 9
X 100
------------------------------------------------
Average Velocity
( Min. Velocity Average Velocity )
% Minimum Variation =
X 100
-----------------------------------------------
Average Velocity
8.9 Air flow calculation
Mass Flow rate, kg/s = * A * V,
BARH STPP
DOC.No.
(3 x 660MW)
XXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
7 of 9
DATE
UNIT NO.
PULVERIZER NO.
PULVERIZER LOAD
m2
m
CONTROL ROOM DATA;
START
FINISH
AVERAGE
TIME
ATMOSPHERIC TEMP.
Deg.C
T/H
Deg.C
PULV. PA FLOW
kg/s
Deg.C
HAD POSITION
Precent
CAD POSITION
Percent
PULV. BOWL DP
mmwg
PA. TO FURN. DP
mmwg
FURNACE PR.
mmwg
FIELD DATA;
VENTURI DP(manometer)
mmwg
VENTURI DP(XMTR.-01)
Percent
VENTURI DP(XMTR.-02)
Percent
VENTURI DP(XMTR.-03)
Percent
BARH STPP
Doc.No.
(3 x 660MW)
XXXXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
8 of 9
m2
kg/cm2
PF PIPE NO
#1
TEMP (T)
Deg.C
POSITION
1-1
mmwg
1-2
mmwg
1-3
mmwg
1-4
mmwg
1-5
mmwg
1-6
mmwg
1-7
mmwg
1-8
mmwg
1-9
mmwg
1-10
mmwg
1-11
mmwg
1-12
mmwg
1-13
mmwg
1-14
mmwg
1-15
mmwg
1-16
mmwg
2-1
mmwg
2-2
mmwg
2-3
mmwg
2-4
mmwg
2-5
mmwg
2-6
mmwg
2-7
mmwg
2-8
mmwg
2-9
mmwg
2-10
mmwg
2-11
mmwg
2-12
mmwg
2-13
mmwg
2-14
mmwg
2-15
mmwg
2-16
mmwg
PRESS at
HINGESIDE (PH)
STATIC
PRESS (Ps)
mmwg
#2
P
#3
P
#4
P
mmwg
#5
P
BARH STPP
Doc.No.
(3 x 660MW)
XXXXXXXXXXXXX
Plant Area: BOILER
PROCEDURE FOR CLEAN AIR FLOW TEST OF COAL PIPES
Sheet
9 of 9
DATE
UNIT NO.
PULVERIZER NO.
PULVERIZER LOAD
SUM SQRT P
AVERAGE SQRT P
DENSITY AT TRAVERSE ()
AVERAGE AIR VELOCITY IN PIPE
VOLUMETRIC FLOW RATE
MASS FLOW RATE
PRECENT FLOW DEVIATION
kg/m3
m/s
m3/s
kg/s
percent
kg/s
kg/s
kg/s
mmwg
01
02
03
mmwg
percent
CORNER
PERCENT FLOW DEVIATION
ACTUAL FLOW
T/H
CORRECTION
FACTOR
5
percent