1.0
PROJECT BACKGROUND
1.1
Project Title
______________________________________________________________
______________________________________________________________
______________________________________________________________
1.2
Project Location
a. Area Coordinates (at least four angle points)
Longitude
Latitude
: ___________________________________
d. HSD/ HSM
: ___________________________________
1.3
Mukim
: ___________________________________
g. District
: ___________________________________
h. State
: ___________________________________
1.4
Project Proponent
a. Company Name : _____________________________________________
b. Address
: _____________________________________________
_____________________________________________
_____________________________________________
_____________________________________________
1.5
e. Designation
:_____________________________________________
f.
: _____________________________________________
Telephone
g. E-mail
: _____________________________________________
h. Fax
: _____________________________________________
EIA Consultant
a.
b. Address
: _____________________________________________
_____________________________________________
_____________________________________________
_____________________________________________
c. EIA Team
Leader
: _____________________________________________
: _____________________________________________
f.
Fax
: ____________________________________
g. E-mail
:____________________________________
1.6
Preliminary Site
Tapak, PAT)
Assessment
(Penilaian
Awal
Tick and
page
number
1.7
Tick and
page
number
of
2.0
GUIDELINES, GUIDANCE
OTHER REFERENCES
DOCUMENTS
2.1
3.0
EIA CONSULTANT
3.1
3.2
3.3
page
number
Tick and
page
number
4.0
EIA REPORT
4.1
Tick and
page
number
4.2
4.3
Introduction
a. Statement of Need.
Tick and
page
number
4.4
Tick and
page
number
Tick and
page
number
4.5
a.
Site Description:
(i)
(ii)
b.
Process Description
(i)
Organic
chemicals
not
including
petrochemicals
(e.g.
oleo
chemicals,
cellulose and sugar based chemicals).
Explosives.
Synthetic fibers.
Pesticides.
Fertilizers.
Tick and
page
number
cosmetic,
____________________________________
(ii)
number
Alkylation
Amination
Carbonylation
Condensation
Dehydrogenation
Esterification
Hydrogenation
Hydrolysis
Oxidation
Polymerization
Sulphonation
Distillation
Extraction
Salvation
Mixing
c.
Tick and
page
number
Project Description
(i)
Technology options.
(ii)
(iii)
(solid
wastes,
Process area.
Pollution control equipment/areas such as
effluent treatment plant and air pollution
control system.
Bund and drainage system separating the
storage, handling and washing areas.
Lined storm water retention pond as
mitigation measures in the event of overflow
from the contaminated area.
Storage area for raw materials.
Storage area for chemicals, to be covered
and designed with separate drainage
systems.
Storage area for scheduled wastes (residues)
to be covered and designed with separate
drainage systems.
Storage area for products.
Tick and
page
number
10
4.7
Tick and
page
number
Air Quality:
Number of air quality monitoring stations:
________________________________
Parameters:
________________________________
________________________________
Map showing locations of air quality
monitoring stations.
(ii)
Water Quality:
Number of water quality monitoring
stations:
________________________________
Parameters:
________________________________
________________________________
Map showing locations of water quality
monitoring stations.
(iii)
Soil Quality:
Number of soil quality monitoring
stations:
________________________________
Parameters:
________________________________
________________________________
Map showing locations of soil quality
monitoring stations.
Refer
to
Contaminated
Land
Management and Control Guidelines by
the Department of Environment.
11
(iv)
Groundwater Quality:
Number of groundwater quality
monitoring stations:
________________________________
Parameters:
________________________________
________________________________
Map showing locations of groundwater
quality monitoring stations.
Refer
to
Contaminated
Land
Management and Control Guidelines by
the Department of Environment.
(v)
Noise Quality:
Number of noise quality monitoring
stations:
________________________________
Parameters:
________________________________
________________________________
Map showing locations of noise quality
monitoring stations.
4.8
(i)
(ii)
Commercial area
(iii)
(iv)
All raw data used as input for EIA study are provided in Tick and
the EIA main report or in Appendices (hardcopy) and page
number
accompanied with softcopy (CD).
12
4.9
4.10
4.11
Tick and
page
number
Landuse
(ii)
Topography
(iii)
Noise/Vibration
(xiv) Biological
(xv) Socio economic
(xvi) Transportation & Traffic
(xvii) Aesthetic and Cultural/ Heritage
(xviii) Other impacts (specify)
____________________________________
____________________________________
____________________________________
____________________________________
4.12
Landuse
(ii)
Topography
(iii)
Tick and
page
number
Noise/Vibration
(xi) Biomass
(xii) Waste Management
14
(xiii) Sewerage
(xiv) Biological
(xv) Socio economic
(xvi) Transportation and Traffic
(xvii) Aesthetic and Cultural/ Heritage
(xviii) Other mitigation measures (specify)
____________________________________
____________________________________
____________________________________
____________________________________
b. Cover all stages of development:(i)
(ii)
Building Construction
(iii)
Final Stabilization
number
4.14
4.15
Tick and
page
number
Residual Impacts
a.
Identification
significance.
of
residual
impacts
and
b.
their
number
4.16
Tick and
page
number
4.17
Conclusion
Tick and
page
number
Tick and
page
number
5.0
DECLARATION OF SELF-ASSESSMENT
5.1
__________________________
Name
__________________________
MyKad /
Passport No. :
__________________________
Designation :
__________________________
Date
__________________________
Official Stamp:
17
6.0
6.1
6.2
6.3
18
6.4
6.5
19
1. Maklumat Am
a. Tarikh dan masa permohonan EIA diterima di pejabat Jabatan Alam Sekitar
________________________________________________________________
b. Tarikh piagam bermula: _____________________________________________
c. Tarikh piagam tamat: _______________________________________________
2. Syor oleh Pegawai Pemproses
a. Berdasarkan kepada maklumat yang telah dikemukakan oleh Jururunding EIA,
______________________________________________ seperti di atas, dan
semakan terhadap maklumat yang dikemukakan tersebut, adalah disyorkan bahawa
laporan
EIA
bagi
cadangan
projek
bertajuk
___________________________________________________________________
___________________________________________________________________
_____________________________________________________________
________________________________________________________________
(i) Laporan EIA bagi cadangan projek di atas diluluskan dengan syaratsyarat kelulusan kerana telah memenuhi kehendak Seksyen 34A(2), Akta
Kualiti Alam Sekeliling, 1974; atau
(ii) Laporan EIA bagi cadangan projek di atas tidak diluluskan kerana tidak
memenuhi kehendak Seksyen 34A(2), Akta Kualiti Alam Sekeliling, 1974.
Lampirkan butiran kegagalan laporan EIA berkenaan.
Ulasan Pegawai Pemproses:
________________________________________________________________
________________________________________________________________
________________________________________________________________
b. Nama Pegawai Pemproses : ______________________________________
Jawatan : _____________________________________________________
Tandatangan : _________________________________________________
Tarikh : _______________________________________________________