SUBJECT: TOPOGRAPHIC AND HYDROGRAPHIC SURVEY OF

Pampanga Delta Bridge, Masantol, Pampanga

1. Comments on Survey Plan


1.1
Pls. indicate Survey Notes consist of Stations, Northing, Easting,
Distance and Azimuth
1.2
Pls. indicate SURVEY WAIVER _ with name of the Geodetic
Engineer
1.3
Pls. indicate Stationing every 20 meter or as required in the TOR
in both River and Road
1.4
Pls. indicate the NORTHING Sign/Direction in the Plan
1.5
Pls. indicate stationing from Abutment to Abutment of the bridge
proper
1.6
TOR calls for nine (9) bore holes including two (2) for abutments
but plan only indicate four (4) boreholes location
1.7
Pls. indicate elevations in existing bridge and proposed
Pampanga Delta Bridge
1.8
Pls. indicate ground control for Horizontal, Global Positioning
System (GPS), and vertical
1.9
Pls. indicate direction of flow, observed flood level and ordinary
water level recorded based from information gathered in the locality.
2. Comments on Cross-Section Survey and Longitudinal Profile of
the Road and River
(please see Item 3)
2.1
2.2

3. Pls. prepare/submit the GENERAL Requirements in Preparing the Drawings

Title Sheet

Location Plan

Plans and Profile

Title of the Project


Location plan showing the adjoining towns,
Municipalities/Barangays
Vicinity Map
General Notes for survey works, including survey accuracy used
Legend and Symbols
Index Map
Technical description of all controlling points

Project area plotted in grid coordinates system


North arrow direction
Indicate all topographic/physical features within the limits of
survey area (100 to 500 meters beyond both banks)
Indicate Right-of-way/Easement Limits
Contour lines with elevation in meters
Technical description of old and new established ground controls
Name and location of natural and man-made features (rivers,
bridges, etc.) box culverts, reinforced concrete pipes, other
waterways properly plotted with correct direction of water flow
indicating the waterline elevation.
Land use classification such as rice field, coconut trees, etc.
Reference points
Date and time of survey
At least two (2) BMs established located one (1) each at both
approaches
Waiver drafted in every sheet of plans
Name with signature, License number, signature and seal of the
Geodetic Engineer
Names of signatories/approving officials in every sheet of plans.

Cross-sections

Cross sections shall be plotted by coordinates


Stationing for every cross section as indicated in the plans
Width of the cross section shall be the width of the river plus one
hundred (100) to five hundred (500) meters beyond both banks

Indicate actual channel configuration such as drainage canals,


drainage structures, bridges and other hydraulic structures and
waterways
Indicate actual river configuration such as river bed.
Indicate properties affected within the ROW/Easement limits
(houses, fences, trees, etc.)

Survey Report to include the following:

Certification from the National Mapping and Resource Information


Authority (NAMRIA), DENR of horizontal and vertical reference points
Instrument calibration
Location/sketch/pictures of established ground controls
Survey returns/computations.

4. Please see sample drawings you got from our office prepared by
PertConsult