27, File name "Audit Reports" & also inculded in Master list
records
Master list of records as soft copy ( few in hard copy) were maintained with Revision number and
revision dates included. Both IMS & QMS procedures found indeed
For Omega Laborataries, third party certification done by NABL has been documented and validity of
certificate was found upto 30/09/2015
Latest ISO procedures for Monthly Review meeting - PR 9940 05-R0 received by site from ISO cell
through hard copy, being documented and distributed to all concerend departements evidence found
Third party documents were all reveiewed by QA/QC department by marking a rubber seal over the
doucment and alos mentioning status of the doucment
Customer Feedback form received for every three months from the General conusultant duly signed b
the Resident Engineer. Till Sep-2014 feedback form available
Analysis of customer feedback are done in every MRM meeting
Standard deviation for the period 26.09.14 to 25.10.14 found to be 4.2 for the M40 grade of concrete
If results are deviating, analysis of properties of Cement, sand and aggregates has to be done. But til
now no such cast found
Cube Report register for Washermen pet Station - Base slab, sample no. 8334, Date of casting
11.09.2014, for pour 8/grid 16-18, 28 day strength found to be 52-59 Mpa for M-40 grade of concrete
found satisfactory
Organisation chart -Rev. AF dated 24/11/2014 and departmental organisation chart - Rev. dated
24/11/2014 along with roles and responsibilites was displayed
NC raised by counsultant from log book UAA-01/NCR/RE/Q4/396 is raised for water stoppage. But NC i
kept open and suitable action is taken when excavation is carried out
QAP plan - ITP for PVC water stopper (water proof membrane) from Omega Laboratory supplier for M/S
Duron Polyvinyls Ltd. Date of testing : 20/09/2014, certificate no. OIAL/2014/09-7464 with reference
taken from IS 15058/2002 found satisfactory
Monitoring for 32 dia Fe 500 bard , Quantity 23.85T, source is from SAIL, MTC and Test report
ML/17265/7/14-15, dated 21.10.2014, cross reference found Ok
Vendor for steel supplier for "SAIL" has been apporved by the client through letter no. GCC-282-CIV1107436 has been evident
Quality manual plan UAA-QP-TTA-220-COU-1100001-B found appoved via letter no. TTA-GC-COU1101010 dated 29/04/2011, evidence found ok
It has been observed that NCR has been raised on same issues say water stopper damage, joints on D
wall etc., should be monitored and suitable corrective and preventive action has to be taken
Master List of documents available in IMS format & RA bills were included in
No.6 and found ok
File codification was found ok, Audit observation file was found with S.No.14 and
found evident
Documented Procedures of sub-contract evaluation PR 9940 02 R5 found as per
procedures
Sub-contract evaluation done by station manager/concerend head once in 6
months. Sub contractor "J.K.Bhola" for labour supply and found satisfactory
List of sub-contractors found updated and available
If sub-contractors is doing some extra works, suitable amendments were made
with revised rates found ok
Sub contract selection made by making comparative statement and by
analysing the rates found for 150T crane. Three suppliers (M/s. Sanghari/ M/s.
Eastern / M/s.express equipment) and m/s. Sanghari were chosen based on
capability and financial, evidence found ok
Conditions for Peace Rate Work (PRW) and Labour Supply has been listed and
approved by Project mananger, if contract worth more than 3 crores, then
project co-ordinator approval is required
Till now there are no sub-contractor appointed by Head office
Diaphram wall construction sub-contract is given to Ipex Infrastructure worth Rs.
4 crore give to sub contract because due to parallel work based on base line
program. Evidence were justified
As per Procedure Manual, Sub-contract planning has to be done