CMS UK
Background to Renewables
Energy from Waste
CHP Units
H
How
we prepare b
business
i
plan
l
Projected Input and output
Patrick Grange
Background:
z Cheshire Farmer former
dairy now farming beef and
sheep
z Co-op Director for some 15
years now Deputy Chair of
Co-operative Group
z Director of South Cheshire
Chamber of Commerce
z Founder of Rural Funding
Solutions now part of the
p
CMS UK Group
CMS UK
z
z
z
z
z
z
Renewable Energy
z
z
z
z
z
z
z
z
z
z
z
z
Energy
Water
Rainwater harvesting
Waste Management
Additi
Additional
lC
Carbon
b ffootprint
t i t metrics
ti
Energy Fuels
Miscanthus
Mowing Miscanthus
Baling Miscanthus
10
Baled Miscanthus
11
Woodchip
12
13
14
15
BENEFITS
z
z
z
z
z
The project will greatly improve the viability of the family business in addition to providing
employment in a rural area.
The project is environmentally friendly, meeting all the green energy policies with absolute
minimal pollution the only waste product being a small amount of potash that will be used on
the farm saving on imported fertilizer
fertilizer.
The project complies with the Governments Renewable Energy Scheme.
The project fits in with the current farm business enhancing the use of farm crop production
Miscanthus is one of the few crops still attracting subsidies from DEFRA.
The unit would use the Miscanthus grown on the farm together with any surplus straw. Heat
from the unit would be used for drying and heating the other enterprises. Manure from the
poultry unit would be dried and briquetted then used as fuel for the Gasifier again reducing
any chance of pollution in the area. The project completes the principle of whole farm
production meeting with best practise by reducing dependence on outside sources.
OUTSIDE AGENCIES
z
z
z
z
z
The local authority has been very supportive of the project in granting planning permission.
The project has had to comply with all Health and Safety legislation
legislation.
A licence is needed from the Environment Agency for the spreading of the waste potash on the
farmland.
Need to obtain quote for electrical connection to the Grid.
Energy companies see it as an ideal time to use other businesss capital to update all local
infrastructures. (Power lines, poles etc)
16
z
z
z
z
z
z
z
z
z
z
17
PRICING OF OUTPUT
z
Pricing varies dependant on time of day, time of year and even day of the week.
z
Winter period is October to March inclusive
z
Day
08.00 16.00 and 19.00 20.00
z
Peak 16.00 19.00
z
Night 20.00 08.00
z
Summer period is April to September inclusive
z
Day
08.00 20.00
z
Night 20.00 08.00
z
However Sundays and bank holidays are paid at a lower rate
z
V i
Various
other
th items
it
affect
ff t the
th final
fi l price
i to
t be
b paid
id as the
th above
b
tariffs
t iff equate
t to
t a TWA
(Time weighted average)
CAPITAL REQUIREMENTS
z
Gasification Plant
1,670,000
z
Connection Charge 250,000
z
Site Housing
g etc
74,552
,
z
Briquetting Machine 100,000
z
Push Floor Loading 45,000
z
TOTAL
2,139,552
18
CONCLUSION
z From these figures we were able to produce:z Balance Sheet
z Cash Flow
z Funds Flow
z Profit & Loss
z After allowing for Insurance,
Insurance Maintenance costs
costs, Electricity
Electricity,
Operator costs Interest and fees we calculated that the
enterprise would pay for itself in less than six years.
z This included a fuel input cost estimated at a maximum of
20 00 per tonne
20.00
19
20
Waste to Energy
CIBSE Presentation
Patrick Grange
21