Вы находитесь на странице: 1из 5

Labor Costing - Crew/Team Component

Activity Description
Concrete Works
Steel Reinforcement
- Fabrication
- Installation
Formworks
CHB Laying # 6
CHB Laying # 4
Steel Trusses

Purlins
Roof Insulation
G.I. Sheet
- Lifting
-Installation
Bended accessories
Plastering
Plain cement / Topping
Ceiling work framing
Ceiling Hardiflex Installation
Plumbing Works
Painting (per coat)
Door Installation
Lockset Installation
Ceiling Molding / Baseboard

Manpower
Eq. Operator
Mason
Laborer

No.
1
1
6

Rate
500.00
450.00
350.00

Amount
500.00
450.00
2,100.00

Steelman
Steelman
Carpenter
Laborer
Mason
Laborer
Mason
Laborer
Lead Welder
Welder
Laborer
Lead Welder
Welder
Laborer
Carpenter

2
2
4
4
1
1
1
1
1
4
2
1
4
2
2

450.00
450.00
450
350
450
350
450
350
500
450
350
500
450
350
450

900.00
900.00
1,800.00
1,400.00
450.00
350.00
450.00
350.00
500.00
1,800.00
700.00
500.00
1,800.00
700.00
900.00

Laborer
Tinsmith
Tinsmith
Mason
Laborer
Mason
Laborer
Carpenter
Laborer
Carpenter
Laborer
Plumber
Laborer
Painters
Carpenter
Carpenter
Carpenter

4
2
2
2
2
2
2
4
2
4
2
1
1
4
2
2
2

350
450
450
450
350
450
350
450
350
450
350
450
350
460
450
450
450

1,400.00
900.00
900.00
900.00
700.00
900.00
700.00
1,800.00
700.00
1,800.00
700.00
450.00
350.00
1,840.00
900.00
900.00
900.00

Total
3,050.00

1,800.00
3,200.00
800.00
800.00
3,000.00

3,000.00
900.00
1,400.00
900.00
900.00
1,600.00
1,600.00
2,500.00
2,500.00
800.00
1,840.00
900.00
900.00
900.00

LABOR COST DERIVATION


Activity Description
Excavation
Backfill
Site Clearing
Concrete Works
Steel Reinforcement
Formworks
CHB #6 laying w/ rebars
CHB #4 laying w/ rebars
Steel Trusses
Steel Purlins
Roof Insulation
G.I. Sheet Roofing
- Lifting
- Insulation
Bended accessories
Plastering works
Painting works (per coat)
Plain cement finish
Ceiling Works
- Framing 2 x 2
- Hardiflex installation
Door installation
Installation of Locksets
Ceiling molding/Baseboard
Cold Water Line
Sanitary Line
Storm Drain

Qty
83
62
192
82
15,112.55
541
257
193
1493
1862
150

Unit
cu.m.
cu.m.
sq.m.
cu.m.
kgs
sq.m.
sq.m.
sq.m.
kgs
kgs
sq.m.

Manpower
10
Laborer
10
Laborer
10
Laborer
1
Team
1
Team
1
Team
1
Team
1
Team
1
Team
1
Team
1
Team

182
182
103
817
1192
201

lm
lm
lm
sq.m.
sq.m.
sq.m.

4
1
1
1
1
1

Laborer
Team
Team
Team
Team
Team

920
63
11
11
281
59
50.64
142.75

bd.ft.
sq.m.
sets
sets
bd.ft.
lm
lm
lm

1
1
1
1
1
1
1
1

Team
Team
Team
Carpenter
Carpenter
Team
Team
Team

Daily Rate
380
380
380
3,050.00
1,800.00
3,200.00
800.00
800.00
3,000.00
3,000.00
900.00

Productivity
Work Hour
0.125 cu.m./hr
8
0.200 cu.m./hr
8
0.200 sq.m./hr
8
0.200 cu.m./hr
8
20.000
kgs/hr
8
1.790 sq.m./hr
8
1.250 sq.m./hr
8
1.500 sq.m./hr
8
10.000
kgs/hr
8
20.000
kgs/hr
8
2.500 sq.m./hr
8

Duration
8.30 cu.m./day
3.88 cu.m./day
12.00 cu.m./day
51.25 cu.m./day
94.45
kgs/day
37.78 sq.m./day
25.70 sq.m./day
16.08 sq.m./day
18.66
kgs/day
11.64
kgs/day
7.50 sq.m./day

Labor Cost
31,540.00
14,725.00
45,600.00
156,312.50
170,016.19
120,893.85
20,560.00
12,866.67
55,987.50
34,912.50
6,750.00

1,400.00
3.700
lm/hr
900.00
1.220
lm/hr
900.00 4.500
lm/hr
1,600.00 1.200 sq.m./hr
1,840.00 13.920 sq.m./hr
1,600.00 1.200 sq.m./hr

8
8
8
8
8
8

1.54
18.65
2.86
85.10
10.70
20.94

sq.m./day
sq.m./day
lm/day
lm/day
lm/day
lm/day

8,608.11
16,782.79
2,575.00
136,166.67
19,695.40
33,500.00

2,500.00
2,500.00
900.00
900.00
900.00
800.00
800.00
800.00

8
8
8
8
8
8
8
8

10.45
1.97
5.50
5.50
6.39
4.85
4.16
11.74

sq.m./day
sq.m./day
set/hr
set/hr
set/hr
set/hr
set/hr
set/hr

26,136.36
4,921.88
4,950.00
4,950.00
5,747.73
3,881.58
3,331.58
9,391.45

11.000 bd.ft./hr
4.000 pcs/hr
0.250
set/hr
0.250
set/hr
5.500 bd.ft./hr
1.520
lm/hr
1.520
lm/hr
1.520
lm/hr

Unit Cost
380.00
237.50
237.50
1,906.25
11.25
223.46
80.00
66.67
37.50
18.75
45.00

Say
380
238
238
1906
11
223
80
67
38
19
45

47.30
92.21
25.00
166.67
16.52
166.67

47
92
25
167
17
167

28.41
78.13
450.00
450.00
20.45
65.79
65.79
65.79

28
78
450
450
20
66
66
66

Вам также может понравиться