Compression Facilities.
Inspect Grout and Padding.
Monitor all installations to ensure they meet the Engineering designed spec
.Ensure that all site works meets the designed specification by
implementingQualityControlplansandprocedures(ITP'S/Method Statement) for
efficient and effectivesiteconstruction works
Prepare reports on Anchor bolt torque
Involving in different inspection related activities for the ongoing project within the
areas of company's contract also maintain quality system in respect to ISO and
project spec.
Monitor and Inspection of Mechanical equipment's installation such as Turbine,
Compressors, Diesel Generator, Pumps, Blowers, Vessels, Stacks and Furnace.
Participate actively in Pump Alignments Inspection.
Implementing WPS/PQR, and interpretation of construction drawings, and P&ID
according to project specifications.
Conduct internal Quality Control Audits along with various projects specifications
and follow up closing actions of all corrective actions and actionable observations.
Construction / Equipment Installation & Alignment of Petrochemical Processing Plant
and Compression Facilities.
Inspect Grout and Padding.
Monitor all installations to ensure they meet the Engineering designed spec
.Ensure that all site works meets the designed specification by
implementingQualityControlplansandprocedures(ITPS/Method Statement) for
efficient and effectivesiteconstruction works
Prepare reports on Anchor bolt torque
Involving in different inspection related activities for the ongoing project within the
areas of companys contract also maintain quality system in respect to ISO and
project spec.
Monitor and Inspection of Mechanical equipments installation such as Turbine,
Compressors, Diesel Generator, Pumps, Blowers, Vessels, Stacks and Furnace.
Participate actively in Pump Alignments Inspection.
Implementing WPS/PQR, and interpretation of construction drawings, and P&ID
according to project specifications.
Conduct internal Quality Control Audits along with various projects specifications
and follow up closing actions of all corrective actions and actionable observations.
Inc.
Km 5, New port Authority Expressway, Delta State, Nigeria
POSITION: Mechanical Inspector (Rotating & Static Equipment)
DUARATION: August 2009 to January 2011
PROJECT: Escravos Gas To Liquid Project.
CLIENT: Chevron Nigeria Ltd.
JOB DESCRIPTION.: Construction / Equipment Installation & Alignment of Gas
Processing
Plant and Compression Facilities.
1.Normal erection procedure is that first of all foundation should be ready,for the static equipment
like column,vessel,drum,etc the anchor bolt should be available with foundation.
2.Foundation inspection should be conducted ,anchor bolt inspection to be conducted.
3.chipping and padding
4.padding inspection