Вы находитесь на странице: 1из 1

1.

2.
3.
4.
ng
5.

SS:
SS:
SS:
SS:
FAT

Integrating design into Project Execution, common repository


Accelerating Closure - Supply of small items
Reduce dependencies on Vendors - develop/train KEC personnel
QHSE - make QA responsible for the ensuring specs have been followed duri

Вам также может понравиться