Civil Report

Purpose: On the demand of Project Manager

Date: 12-08-2016

Context: Civil works remaining, items required and decisions to be made


Pending works.
1) Road work

Dozer for cutting


Loader for earth shifting
Trolley for earth transportation
Roller for compaction

2) Roofing
Corrugated sheets required for roofing of various structures.
3) Plant backfilling
Excavator 320 and 120 required for progress in desired time.
Backfill required behind raw water tank (condition alarming).
1/3 tractor can used for backfill due to hydraulic jack problem, which is
not sufficient for total backfill required.
4) Switch yard area
Excavator 320 required for back fill (excavator 400 cannot work due to
less working space).
Small size roller required for compaction of switch yard area due to less
working space.
Hand roller and plate compactor required for the compaction and
levelling of switch yard earth and gravel surface.
Trench covers are not decided, whether cast on site or purchase from
local market.
Metering room exact location and construction drawings are not
available at site.
Pumps required for main cable trench drainage.
Fences required for switch yard.

5) Engine hall building


False ceiling required for utility block.
Partition walls required for utility block offices and wash room.
Washroom fittings required for utility block and ware house.
Antistatic flooring required for wooden floor at switch gear room.
Antistatic flooring required for stair case phase 1 and phase 2.
Paint required for engine hall floor.
Paint required for railings, gratings and structures.
Lift required for stair case.
HV AC instructions not confirmed.
Doors and windows utility block area.
6) Drainage system
Rain water drain: not decided.
Underground drain system (pipes required).
7) Stone pitching for cooling tower area and raw water tank area
Not decided yet.