Вы находитесь на странице: 1из 14

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS

PUENTE: ABEJAL Y ACCESOS


CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA


Item

Descripcin

Und.

Metrado

01
TRABAJOS PRELIMINARES
glb
01.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
1.00
m2
01.02
TRAZO Y REPLANTEO
10,436.27
ha
01.03
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
1.04
mes
01.04
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
6.00
km
01.05
ACCESO A CANTERAS, DMES, PLANTAS Y FUENTE DE AGUA
0.70
m3
01.06
REMOCION DE CARPETA ASFALTICA EXISTENTES
345.80
m3
01.07
DEMOLICION DE CUNETAS EXISTENTES
48.26
m3
01.08
ELIMINACION DE MATERIAL EXCEDENTE
394.06
02
PUENTE
02.01
CAISSON
m3
02.01.01
EXCAVACION MANUAL PARA ESTRUCTURAS (CAISSON)
697.23
m2
02.01.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
916.92
kg
02.01.03
ACERO DE REFUERZO fy=4,200 kg/cm2
11,555.10
m3
02.01.04
CONCRETO FC = 210 KG/CM2
337.70
m3
02.01.05
CONCRETO FC=175 KG/CM2 Tapon de caissons
142.86
kg
02.01.06
BORDE METALICO DE CAISSON
2,639.11
02.02
MURO DE APOYO
m3
02.02.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
567.40
m2
02.02.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
318.00
kg
02.02.03
ACERO DE REFUERZO fy=4,200 kg/cm2
8,287.92
m3
02.02.04
CONCRETO FC = 210 KG/CM2
124.31
m3
02.02.05
RELLENO CON MATERIAL PROPIO
565.62
02.03
ESTRIBO ALAS
m3
02.03.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
853.99
m2
02.03.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
296.33
m2
02.03.03
ENCOFRADO Y DESENCOFRADO CARA VISTA
86.40
kg
02.03.04
ACERO DE REFUERZO fy=4,200 kg/cm2
4,835.52
m3
02.03.05
CONCRETO FC = 210 KG/CM2
47.42
m3
02.03.06
CONCRETO FC = 320 KG/CM2
72.78
m
02.03.07
BARRA HELICOIDAL A615 G75
198.00
und
02.03.08
ELEMENTOS DE FIJACION PARA BARRA HELICOIDAL
24.00
02.03.09
MORTERO a/c 5/1 PARA PROTECCION DE BARRAS HELICOIDAL m3
0.55
m3
02.03.10
RELLENO CON MATERIAL PROPIO
1,039.42
02.03.11
RELLENO SIN COMPACTAR CON MATERIAL SELECCIONADO (Estrm3
271.22
02.04
LOSA, VEREDAS, BRIDAS, VIGAS DIAFRAGMA
m
02.04.01
FALSO PUENTE
50.00
m2
02.04.02
ENCOFRADO Y DESENCOFRADO LOSA
1,241.22
kg
02.04.03
ACERO DE REFUERZO fy=4,200 kg/cm2
25,270.83
T-M 192,094.32
02.04.04
ACERO POSTENSADO
m3
02.04.05
CONCRETO FC = 320 KG/CM2
318.61
02.05
ESTRUCTURA METALICA
02.05.01
FABRICACION DE ESTRUCTURAS METALICAS(ACERO A-709 M G ton
37.65
ton
02.05.02
ACERO ASTM A-53 GRADO B
17.27
m2
02.05.03
ARENADO Y PINTURA DE ESTRUCTURA METALICA
511.71
ton
02.05.04
TRANSPORTE DE ESTRUCTURAS METALICAS
54.92
ton
02.05.05
MONTAJE Y COLOCACION DE ESTRUCTURA METALICA
54.92
02.06
LOSA DE APROXIMACIN
m3
02.06.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
47.10
m2
02.06.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
66.53
kg
02.06.03
ACERO DE REFUERZO fy=4,200 kg/cm2
5,465.52
m3
02.06.04
CONCRETO FC = 280 KG/CM2
70.02
02.07
PARAPETOS DE CONCRETO NEW JERSEY
m2
02.07.01
ENCOFRADO Y DESENCOFRADO CARA VISTA
236.16
kg
02.07.02
ACERO DE REFUERZO fy=4,200 kg/cm2
4,746.60
m3
02.07.03
CONCRETO FC = 210 KG/CM2
25.75
m
02.07.04
JUNTA EN PARAPETO NEW JERSEY
42.24
02.08
VARIOS
und
02.08.01
PRUEBA DE CARGA VEHICULAR
1.00
m
02.08.02
BARANDA METALICA
129.08
m2
02.08.03
MARCAS EN EL PAVIMENTO
23.48
und
02.08.04
APOYO DE NEOPRENE
6.00
und
02.08.05
DISPOSITIVOS SISMICOS EN APOYOS
4.00
m
02.08.06
JUNTA EN LOSA DE APROXIMACION
31.40
m
02.08.07
JUNTA DE DILATACION EN DURMIENTE
31.40
und
02.08.08
TUBO DE DRENAJE D=4", L=0.60m
32.00
l
02.08.09
EMULSION ASFALTICA
271.15
m2
02.08.10
RIEGO DE LIGA
602.55
m3
02.08.11
CARPETA ASFALTICA EN CALIENTE
30.13

Precio (S/.)

92,729.02
2.51
3,510.58
7,126.18
5,092.31
9.50
68.30
21.96

82.95
66.74
4.69
361.44
328.39
9.63
4.71
82.27
4.69
361.44
25.07
4.71
66.74
82.27
4.69
361.44
427.54
61.91
18.67
350.00
25.07
46.25
315.90
82.27
4.69
5.84
427.54
13,152.00
14,268.30
198.65
915.35
8,715.23
4.71
82.27
4.69
405.51
82.27
4.69
361.44
4.52
9,976.06
505.00
10.80
2,292.50
954.80
96.91
234.29
22.44
3.14
0.91
701.60

Parcial (S/.)
184,131.58
92,729.02
26,195.04
3,651.00
42,757.08
3,564.62
3,285.10
3,296.16
8,653.56
3,751,954.24
367,610.61
57,835.23
61,195.24
54,193.42
122,058.29
46,913.80
25,414.63
126,815.35
2,672.45
26,161.86
38,870.34
44,930.61
14,180.09
153,342.86
4,022.29
19,777.06
7,108.13
22,678.59
17,139.48
31,116.36
12,258.18
448.08
192.50
26,058.26
12,543.93
1,494,479.71
15,795.00
102,115.17
118,520.19
1,121,830.83
136,218.52
1,372,148.98
495,172.80
246,413.54
101,651.19
50,271.02
478,640.43
59,722.36
221.84
5,473.42
25,633.29
28,393.81
51,188.43
19,428.88
22,261.55
9,307.08
190.92
126,645.94
9,976.06
65,185.40
253.58
13,755.00
3,819.20
3,042.97
7,356.71
718.08
851.41
548.32
21,139.21

Agosto (Inicio:20.08.16)

Sep.16

Oct'16

METRADO

MONTO (S/.)

0.07
4,174.51
1.04
0.40
0.70
-

6,491.03
10,478.02
3,651.00
2,850.47
3,564.62
-

139.45
2,639.11

11,567.38
25,414.63

567.40
-

2,672.45
-

853.99
-

4,022.29
-

Nov'16

MONTO (S/.)

METRADO

MONTO (S/.)

0.17
6,261.76
1.00
-

15,541.18
15,717.02
7,126.18
-

0.17
1.04
-

15,763.93
7,411.23
-

0.17
1.01
-

557.78
702.97
11,555.10
159.96
20.41
-

46,267.85
46,916.22
54,193.42
57,815.94
6,702.44
-

213.95
177.74
122.45
-

14,279.02
64,242.35
40,211.36
26,161.86
38,870.34
44,930.61
10,634.94

METRADO

318.00
8,287.92
124.31
424.21

METRADO

Dic.'16

MONTO (S/.)
15,763.93
7,197.44
-

METRADO

0.17
1.04
-

Ene.'17

MONTO (S/.)
15,763.93
7,411.23
-

Feb.'17 (Fin:15.02.17)

MONTO (S/.)

METRADO

MONTO (S/.)

0.17

15,763.93

1.04

7,411.23

345.80
48.26
394.06

3,285.10
3,296.16
8,653.56

0.08
0.47
-

7,641.07
3,349.30
-

METRADO

141.41

3,545.15

296.33
86.40
4,835.52
47.42
72.78
198.00
19.20
0.44
-

19,777.06
7,108.13
22,678.59
17,139.48
31,116.36
12,258.18
358.46
154.00
-

4.80
0.11
1,039.42
271.22

89.62
38.50
26,058.26
12,543.93

50.00
815.66
15,162.50
-

15,795.00
67,104.35
71,112.13
-

425.56
10,108.33
82,326.14
318.61

35,010.82
47,408.07
480,784.66
136,218.52

109,768.18
-

641,046.17
-

15.81
7.25
209.34
-

207,933.12
103,445.18
41,585.39
-

302.37
54.92
2.62

60,065.80
50,271.02
22,833.90

52.30

455,806.53

47.10
66.53
5,465.52
70.02

221.84
5,473.42
25,633.29
28,393.81

157.44
4,746.60
-

12,952.59
22,261.55

78.72
25.75
42.24

6,476.29
9,307.08
190.92

39.72
31.40
31.40
271.15
602.55
-

20,058.60

1.00
89.36
23.48
30.13

9,976.06
45,126.80
253.58
21,139.21

21.84
10.02
-

287,239.68
142,968.37
-

6.00
4.00
32.00
-

13,755.00
3,819.20
718.08
-

3,042.97
7,356.71
851.41
548.32

Total Partida

92,729.02
26,195.04
3,651.00
42,757.08
3,564.62
3,285.10
3,296.16
8,653.56
57,835.23
61,195.24
54,193.42
122,058.29
46,913.80
25,414.63
2,672.45
26,161.86
38,870.34
44,930.61
14,180.09
4,022.29
19,777.06
7,108.13
22,678.59
17,139.48
31,116.36
12,258.18
448.08
192.50
26,058.26
12,543.93
15,795.00
102,115.17
118,520.19
1,121,830.83
136,218.52
495,172.80
246,413.54
101,651.19
50,271.02
478,640.43
221.84
5,473.42
25,633.29
28,393.81
19,428.88
22,261.55
9,307.08
190.92
9,976.06
65,185.40
253.58
13,755.00
3,819.20
3,042.97
7,356.71
718.08
851.41
548.32
21,139.21

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS
PUENTE: ABEJAL Y ACCESOS
CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA


Item

Descripcin

03
ACCESOS
03.01
MOVIMIENTO DE TIERRAS
03.01.01
EXCAVACION EN EXPLANACIONES EN MATERIAL SUELTO
03.01.02
CONFORMACION DE TERRAPLEN
03.02
OBRAS DE ARTE Y DRENAJE
03.02.01
CUNETAS TRIANGULAR REVESTIDA DE CONCRETO
03.02.02
ZANJA DE DRENAJE REVESTIDA
03.02.03
TAPA DE CONCRETO PARA CUNETA (L=6.00m)
03.03
PAVIMENTOS
03.03.01
SUB-BASE GRANULAR e=0.20 m
03.03.02
BASE GRANULAR E=0.20 m
03.03.03
EMULSION ASFALTICA
03.03.04
IMPRIMACION ASFALTICA
03.03.05
CARPETA ASFALTICA EN CALIENTE
03.04
SEALIZACION Y SEGURIDAD VIAL
03.04.01
SEALES PREVENTIVAS (0.75m X 0.75m)
03.04.02
SEALES REGLAMENTARIAS (1.20m x 0.80m)
03.04.03
SEALES INFORMATIVAS
03.04.04
POSTE SOPORTE DE SEALES
03.04.05
ESTRUCTURAS DE SOPORTE PARA SEALES INFORMATIVAS
03.04.06
MARCAS EN EL PAVIMENTO
03.04.07
TACHAS RETROREFLECTIVAS
03.04.08
BARRERA DE SEGURIDAD
04
DEFENSA RIBEREA
04.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
04.02
GAVION TIPO CAJA 1.0x1.0x5.0M
04.03
GAVION TIPO CAJA 1.0x1.5x5.0M
GAVION TIPO COLCHON 5.0x2.0x0.30M
04.05
GEOTEXTIL NO TEJIDO CLASE 1
04.06
CAMA DE ARENA E=0.10 m
05
IMPACTO AMBIENTAL
05.01
PLAN DE SEGUIMIENTO Y CONTROL
05.01.01
MONITOREO CALIDAD DEL AIRE
05.01.02
MONITOREO DE RUIDO AMBIENTAL
05.01.03
MONITOREO DE CALIDAD DEL AGUA
05.02
PROGRAMA DE PREVENCIN DE IMPACTOS AMBIENTALES
05.02.01
SEAL AMBIENTAL PERMANENTE
05.02.02
ESTRUCTURA DE SOPORTE P/SEAL AMBIENTAL PERMANENT
05.03
PROGRAMA DE ABANDONO DE OBRA
05.03.01
RETIRO Y ALMACENAMIENTO DE TOP SOIL
05.03.02
ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME
REFORESTACION DEL DEPOSITO DE MATERIAL EXCEDENTE,
05.03.03
AREAS AUXILIARES Y MARGENES DE LA QDA. EL ABEJAL
05.03.04
REACONDICIONAMIENTO DE CANTERA
05.03.05
REACONDICIONAMIENTO DE PLANTA CHANCADORA
05.03.06
REACONDICIONAMIENTO DE CAMPAMENTO Y PATIO DE MAQUI
GASTOS GENERALES
UTILIDAD
PARCIAL
IGV
TOTAL_PRESUPUESTO INC IGV
PORCENTAJE DE AVANCE MENSUAL
TOTAL_PRESUPUESTO INC IGV ACUMULADO
PORCENTAJE DE AVANCE MENSUAL ACUMULADO

Und.

Metrado

Precio (S/.)

Parcial (S/.)

Agosto (Inicio:20.08.16)
METRADO

m3
m3

1,680.70
4,363.70

4.71
14.48

m
m
und

369.30
40.00
1.00

135.90
299.29
1,682.83

m2
m2
l
m2
m3

1,322.90
1,504.68
2,133.90
4,742.01
280.00

60.85
67.64
3.14
0.84
701.60

und
und
m2
und
und
m2
und
m

2.00
2.00
3.45
4.00
4.00
200.52
56.00
420.00

401.20
550.20
473.50
283.37
1,809.81
10.80
15.57
316.44

m3
m3
m3
m2
m2
m2

2,307.94
1,170.00
825.00
1,489.50
3,492.03
1,721.15

4.71
150.39
141.18
83.91
5.06
4.98

pto
pto
pto

12.00
12.00
4.00

1,184.40
151.20
709.84

m2
und

4.20
2.00

503.95
1,809.81

m2
m3

156.00
579.69

0.55
3.19

672,202.99
71,102.48
7,916.10
63,186.38
63,842.30
50,187.87
11,971.60
1,682.83
389,406.77
80,498.47
101,776.56
6,700.45
3,983.29
196,448.00
147,851.44
802.40
1,100.40
1,633.58
1,133.48
7,239.24
2,165.62
871.92
132,904.80
454,525.15
10,870.40
175,956.30
116,473.50
124,983.95
17,669.67
8,571.33
32,727.87
18,866.56
14,212.80
1,814.40
2,839.36
5,736.21
2,116.59
3,619.62
8,125.10
85.80
1,849.21

ha
m2
m2
m2

1.00

2,572.09

2,572.09

500.00
1,500.00
600.00

1.41
1.41
1.33

705.00
2,115.00
798.00
5,095,541.83
1,253,004.52
509,554.18
6,858,100.53
1,234,458.10
8,092,558.63

24.59021164%
10%
18%

MONTO (S/.)

Sep.16
METRADO

Oct'16

MONTO (S/.)

METRADO

Nov'16

MONTO (S/.)

METRADO

Dic.'16

MONTO (S/.)

METRADO

Ene.'17

MONTO (S/.)

METRADO

Feb.'17 (Fin:15.02.17)

MONTO (S/.)

METRADO

2,572.09

1,680.70
4,363.70

7,916.10
63,186.38

369.30
20.00
-

50,187.87
5,985.80

20.00
1.00

5,985.80
1,682.83

1,322.90
1,504.68
2,133.90
4,742.01
140.00

80,498.47
101,776.56
6,700.45
3,983.29
98,224.00

140.00

98,224.00

190.91

60,411.56

2.00
2.00
3.45
4.00
4.00
200.52
56.00
229.09

802.40
1,100.40
1,633.58
1,133.48
7,239.24
2,165.62
871.92
72,493.24

2,307.94
936.00
426.72
1,191.60
3,352.35
1,721.15

10,870.40
140,765.04
60,244.33
99,987.16
16,962.89
8,571.33

234.00
398.28
297.90
139.68
-

35,191.26
56,229.17
24,996.79
706.78
-

2.10
2.10
0.70

2,487.24
317.52
496.89

0.83
0.83
0.27

983.05
125.50
191.66

4.20
2.00

2,116.59
3,619.62

156.00
-

959.36
122.47
191.66
85.80
72,071.18
17,722.46
7,207.12
97,000.76
17,460.14
114,460.90
1.41%
114,460.90
1.41%

2.03
2.03
0.68

2,404.33
306.94
482.69

2.10
2.10
0.70

2,487.24
317.52
496.89

2.03
2.03
0.68

2,404.33
306.94
482.69

2.10
2.10
0.70

2,487.24
317.52
496.89

579.69

1,849.21

1.00

2,572.09

253,474.21
62,329.84
25,347.42
341,151.47
61,407.26
402,558.73
4.97%
517,019.63
6.39%

696,015.34
171,151.65
69,601.53
936,768.52
168,618.33
1,105,386.85
13.66%
1,622,406.48
20.05%

647,265.91
159,164.06
64,726.59
871,156.56
156,808.18
1,027,964.74
12.70%
2,650,371.22
32.75%

916,092.19
225,269.01
91,609.22
1,232,970.42
221,934.68
1,454,905.10
17.98%
4,105,276.32
50.73%

2,086,051.77
512,964.55
208,605.18
2,807,621.50
505,371.87
3,312,993.37
40.94%
7,418,269.69
91.67%

500.00
1,500.00
600.00

Total Partida
7,916.10
63,186.38
50,187.87
11,971.60
1,682.83
80,498.47
101,776.56
6,700.45
3,983.29
196,448.00
802.40
1,100.40
1,633.58
1,133.48
7,239.24
2,165.62
871.92
132,904.80
10,870.40
175,956.30
116,473.50
124,983.95
17,669.67
8,571.33
14,212.80
1,814.40
2,839.36
2,116.59
3,619.62
85.80
1,849.21

0.81
0.81
0.27

MONTO (S/.)

705.00
2,115.00
798.00
424,571.24
104,402.97
42,457.12
571,431.33
102,857.64
674,288.94
8.33%
8,092,558.63
100.00%

705.00
2,115.00
798.00

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS
PUENTE: ABEJAL Y ACCESOS
CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAM
Item

Descripcin

Und.

01
TRABAJOS PRELIMINARES
glb
01.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
m2
01.02
TRAZO Y REPLANTEO
ha
01.03
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
mes
01.04
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
01.05
ACCESO A CANTERAS, DMES, PLANTAS Y FUENTE DE AGUA km
m3
01.06
REMOCION DE CARPETA ASFALTICA EXISTENTES
m3
01.07
DEMOLICION DE CUNETAS EXISTENTES
m3
01.08
ELIMINACION DE MATERIAL EXCEDENTE
02
PUENTE
02.01
CAISSON
m3
02.01.01
EXCAVACION MANUAL PARA ESTRUCTURAS (CAISSON)
m2
02.01.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
kg
02.01.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.01.04
CONCRETO FC = 210 KG/CM2
m3
02.01.05
CONCRETO FC=175 KG/CM2 Tapon de caissons
kg
02.01.06
BORDE METALICO DE CAISSON
02.02
MURO DE APOYO
02.02.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.02.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.02.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.02.04
CONCRETO FC = 210 KG/CM2
m3
02.02.05
RELLENO CON MATERIAL PROPIO
02.03
ESTRIBO ALAS
02.03.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.03.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
m2
02.03.03
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.03.04
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.03.05
CONCRETO FC = 210 KG/CM2
m3
02.03.06
CONCRETO FC = 320 KG/CM2
m
02.03.07
BARRA HELICOIDAL A615 G75
und
02.03.08
ELEMENTOS DE FIJACION PARA BARRA HELICOIDAL
02.03.09
MORTERO a/c 5/1 PARA PROTECCION DE BARRAS HELIC m3
m3
02.03.10
RELLENO CON MATERIAL PROPIO
02.03.11
RELLENO SIN COMPACTAR CON MATERIAL SELECCIONADOm3
02.04
LOSA, VEREDAS, BRIDAS, VIGAS DIAFRAGMA
m
02.04.01
FALSO PUENTE
m2
02.04.02
ENCOFRADO Y DESENCOFRADO LOSA
kg
02.04.03
ACERO DE REFUERZO fy=4,200 kg/cm2
T-M
02.04.04
ACERO POSTENSADO
m3
02.04.05
CONCRETO FC = 320 KG/CM2
02.05
ESTRUCTURA METALICA

Metrado

Precio (S/.)

1.00 92,729.02
10,436.27
2.51
1.04
3,510.58
6.00
7,126.18
0.70
5,092.31
345.80
9.50
48.26
68.30
394.06
21.96

697.23
916.92
11,555.10
337.70
142.86
2,639.11

82.95
66.74
4.69
361.44
328.39
9.63

567.40
318.00
8,287.92
124.31
565.62

4.71
82.27
4.69
361.44
25.07

853.99
296.33
86.40
4,835.52
47.42
72.78
198.00
24.00
0.55
1,039.42
271.22

4.71
66.74
82.27
4.69
361.44
427.54
61.91
18.67
350.00
25.07
46.25

50.00
1,241.22
25,270.83
192,094.32
318.61

315.90
82.27
4.69
5.84
427.54

Parcial (S/.)
184,131.58
92,729.02
26,195.04
3,651.00
42,757.08
3,564.62
3,285.10
3,296.16
8,653.56
3,751,954.24
367,610.61
57,835.23
61,195.24
54,193.42
122,058.29
46,913.80
25,414.63
126,815.35
2,672.45
26,161.86
38,870.34
44,930.61
14,180.09
153,342.86
4,022.29
19,777.06
7,108.13
22,678.59
17,139.48
31,116.36
12,258.18
448.08
192.50
26,058.26
12,543.93
1,494,479.71
15,795.00
102,115.17
118,520.19
1,121,830.83
136,218.52
1,372,148.98

MES 1
METRADO

MES 2

MONTO (S/.)

METRADO

MES 3

MONTO (S/.)

METRADO

0.50
10436.27
1.04
1.00
0.70
0.00
0.00
0.00

46,364.51
26195.04
3651.00
7,126.18
3564.62
0.00
0.00
0.00

0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
7,126.18
0.00
0.00
0.00
0.00

0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00

517.94
366.77
6470.86
0.00
0.00
2639.11

42963.31
24478.10
30348.32
0.00
0.00
25414.63

179.29
550.15
5084.24
337.70
142.86
0.00

14871.92
36717.14
23845.10
122058.29
46913.80
0.00

0.00
0.00
0.00
0.00
0.00
0.00

567.40
0.00
0.00
0.00
0.00

2672.45
0.00
0.00
0.00
0.00

0.00
95.40
6215.94
0.00
0.00

0.00
7848.56
29152.75
0.00
0.00

0.00
222.60
2071.98
124.31
565.62

853.99
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

4022.29
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
296.33
86.40
4835.52
47.42
72.78
16.50
1.60
0.04
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

40.48
413.74
5054.17
0.00
0.00

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS
PUENTE: ABEJAL Y ACCESOS
CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAM
Item

Descripcin

Und.

02.05.01
FABRICACION DE ESTRUCTURAS METALICAS(ACERO A-709ton
ton
02.05.02
ACERO ASTM A-53 GRADO B
m2
02.05.03
ARENADO Y PINTURA DE ESTRUCTURA METALICA
ton
02.05.04
TRANSPORTE DE ESTRUCTURAS METALICAS
ton
02.05.05
MONTAJE Y COLOCACION DE ESTRUCTURA METALICA
02.06
LOSA DE APROXIMACIN
02.06.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.06.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.06.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.06.04
CONCRETO FC = 280 KG/CM2
02.07
PARAPETOS DE CONCRETO NEW JERSEY
m2
02.07.01
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.07.02
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.07.03
CONCRETO FC = 210 KG/CM2
m
02.07.04
JUNTA EN PARAPETO NEW JERSEY
02.08
VARIOS
und
02.08.01
PRUEBA DE CARGA VEHICULAR
m
02.08.02
BARANDA METALICA
m2
02.08.03
MARCAS EN EL PAVIMENTO
und
02.08.04
APOYO DE NEOPRENE
und
02.08.05
DISPOSITIVOS SISMICOS EN APOYOS
m
02.08.06
JUNTA EN LOSA DE APROXIMACION
m
02.08.07
JUNTA DE DILATACION EN DURMIENTE
und
02.08.08
TUBO DE DRENAJE D=4", L=0.60m
l
02.08.09
EMULSION ASFALTICA
m2
02.08.10
RIEGO DE LIGA
m3
02.08.11
CARPETA ASFALTICA EN CALIENTE

Metrado

Precio (S/.)

37.65 13,152.00
17.27 14,268.30
511.71
198.65
54.92
915.35
54.92
8,715.23
47.10
66.53
5,465.52
70.02

4.71
82.27
4.69
405.51

236.16
4,746.60
25.75
42.24

82.27
4.69
361.44
4.52

1.00
129.08
23.48
6.00
4.00
31.40
31.40
32.00
271.15
602.55
30.13

9,976.06
505.00
10.80
2,292.50
954.80
96.91
234.29
22.44
3.14
0.91
701.60

Parcial (S/.)
495,172.80
246,413.54
101,651.19
50,271.02
478,640.43
59,722.36
221.84
5,473.42
25,633.29
28,393.81
51,188.43
19,428.88
22,261.55
9,307.08
190.92
126,645.94
9,976.06
65,185.40
253.58
13,755.00
3,819.20
3,042.97
7,356.71
718.08
851.41
548.32
21,139.21

MES 1
METRADO

MES 2

MONTO (S/.)

METRADO

MES 3

MONTO (S/.)

METRADO

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

12.80
5.87
0.00
0.00
0.00

168358.75
83780.60
0.00
0.00
0.00

23.34
10.71
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS
PUENTE: ABEJAL Y ACCESOS
CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAM
Item

Descripcin

Und.

03
ACCESOS
03.01
MOVIMIENTO DE TIERRAS
03.01.01
EXCAVACION EN EXPLANACIONES EN MATERIAL SUELTO m3
m3
03.01.02
CONFORMACION DE TERRAPLEN
03.02
OBRAS DE ARTE Y DRENAJE
m
03.02.01
CUNETAS TRIANGULAR REVESTIDA DE CONCRETO
m
03.02.02
ZANJA DE DRENAJE REVESTIDA
und
03.02.03
TAPA DE CONCRETO PARA CUNETA (L=6.00m)
03.03
PAVIMENTOS
m2
03.03.01
SUB-BASE GRANULAR e=0.20 m
m2
03.03.02
BASE GRANULAR E=0.20 m
l
03.03.03
EMULSION ASFALTICA
m2
03.03.04
IMPRIMACION ASFALTICA
m3
03.03.05
CARPETA ASFALTICA EN CALIENTE
03.04
SEALIZACION Y SEGURIDAD VIAL
und
03.04.01
SEALES PREVENTIVAS (0.75m X 0.75m)
und
03.04.02
SEALES REGLAMENTARIAS (1.20m x 0.80m)
m2
03.04.03
SEALES INFORMATIVAS
und
03.04.04
POSTE SOPORTE DE SEALES
03.04.05
ESTRUCTURAS DE SOPORTE PARA SEALES INFORMATI und
m2
03.04.06
MARCAS EN EL PAVIMENTO
und
03.04.07
TACHAS RETROREFLECTIVAS
m
03.04.08
BARRERA DE SEGURIDAD
04
DEFENSA RIBEREA
04.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m3
04.02
GAVION TIPO CAJA 1.0x1.0x5.0M
m3
04.03
GAVION TIPO CAJA 1.0x1.5x5.0M
m2
GAVION TIPO COLCHON 5.0x2.0x0.30M
m2
04.05
GEOTEXTIL NO TEJIDO CLASE 1
m2
04.06
CAMA DE ARENA E=0.10 m
05
IMPACTO AMBIENTAL
05.01
PLAN DE SEGUIMIENTO Y CONTROL
pto
05.01.01
MONITOREO CALIDAD DEL AIRE
pto
05.01.02
MONITOREO DE RUIDO AMBIENTAL
pto
05.01.03
MONITOREO DE CALIDAD DEL AGUA
05.02
PROGRAMA DE PREVENCIN DE IMPACTOS AMBIENTALES
m2
05.02.01
SEAL AMBIENTAL PERMANENTE
05.02.02
ESTRUCTURA DE SOPORTE P/SEAL AMBIENTAL PERMA und
05.03
PROGRAMA DE ABANDONO DE OBRA
m2
05.03.01
RETIRO Y ALMACENAMIENTO DE TOP SOIL
05.03.02
ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME m3
05.03.03
REFORESTACION DEL DEPOSITO DE MATERIAL EXCEDEN ha

Metrado

Precio (S/.)

1,680.70
4,363.70

4.71
14.48

369.30
40.00
1.00

135.90
299.29
1,682.83

1,322.90
1,504.68
2,133.90
4,742.01
280.00

60.85
67.64
3.14
0.84
701.60

2.00
2.00
3.45
4.00
4.00
200.52
56.00
420.00

401.20
550.20
473.50
283.37
1,809.81
10.80
15.57
316.44

2,307.94
1,170.00
825.00
1,489.50
3,492.03
1,721.15

4.71
150.39
141.18
83.91
5.06
4.98

12.00
12.00
4.00

1,184.40
151.20
709.84

4.20
2.00

503.95
1,809.81

156.00
579.69
1.00

0.55
3.19
2,572.09

Parcial (S/.)
672,202.99
71,102.48
7,916.10
63,186.38
63,842.30
50,187.87
11,971.60
1,682.83
389,406.77
80,498.47
101,776.56
6,700.45
3,983.29
196,448.00
147,851.44
802.40
1,100.40
1,633.58
1,133.48
7,239.24
2,165.62
871.92
132,904.80
454,525.15
10,870.40
175,956.30
116,473.50
124,983.95
17,669.67
8,571.33
32,727.87
18,866.56
14,212.80
1,814.40
2,839.36
5,736.21
2,116.59
3,619.62
8,125.10
85.80
1,849.21
2,572.09

MES 1
METRADO

MES 2

MONTO (S/.)

METRADO

MES 3

MONTO (S/.)

METRADO

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

4.00
4.00
2.00

4,737.60
604.80
1,419.68

0.00
0.00
0.00

4.00
4.00
1.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

156.00
0.00
0.00

85.80
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

OBRA: CONSTRUCCION DE LOS PUENTES: HROES DEL CENEPA Y ACCESOS; EL ABEJAL Y ACCESOS Y PONTON 1217 Y ACCESOS
PUENTE: ABEJAL Y ACCESOS
CONTRATISTA: CONSORCIO PUENTES DEL NORTE

CRONOGRAM
Item
05.03.04
05.03.05
05.03.06

Descripcin
REACONDICIONAMIENTO DE CANTERA
REACONDICIONAMIENTO DE PLANTA CHANCADORA
REACONDICIONAMIENTO DE CAMPAMENTO Y PATIO DE

GASTOS GENERALES
UTILIDAD
PARCIAL
IGV
TOTAL_PRESUPUESTO INC IGV
PORCENTAJE DE AVANCE MENSUAL
TOTAL_PRESUPUESTO INC IGV ACUMULADO
PORCENTAJE DE AVANCE MENSUAL ACUMULADO

Und.
m2
m2
m2

Metrado
500.00
1,500.00
600.00

Precio (S/.)
1.41
1.41
1.33

24.59021164%
10%
18%

Parcial (S/.)
705.00
2,115.00
798.00
5,095,541.83
1,253,004.52
509,554.18
6,858,100.53
1,234,458.10
8,092,558.63

MES 1
METRADO

0.00
0.00
0.00

MONTO (S/.)
0.00
0.00
0.00
223,648.33
54,995.60
22,364.83
301,008.76
54,181.58
355,190.34
4.39%
355,190.34
4.39%

MES 2
METRADO

0.00
0.00
0.00

MONTO (S/.)
0.00
0.00
0.00
540,673.09
132,952.66
54,067.31
727,693.06
130,984.75
858,677.81
10.61%
1,213,868.14
15.00%

MES 3
METRADO

0.00
0.00
0.00

CRONOGRAMA VALORIZADO DE OBRA


MES 3

MES 4

MONTO (S/.)

METRADO

MES 5

MONTO (S/.)

METRADO

MES 6

MONTO (S/.)

METRADO

MONTO (S/.)

0.00
0.00
0.00
7,126.18
0.00
0.00
0.00
0.00

0.00
0.00
0.00
1.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
7,126.18
0.00
0.00
0.00
0.00

0.00
0.00
0.00
1.00
0.00
345.80
48.26
394.06

0.00
0.00
0.00
7,126.18
0.00
3285.10
3296.16
8653.56

0.50
0.00
0.00
1.00
0.00
0.00
0.00
0.00

46,364.51
0.00
0.00
7,126.18
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
18313.30
9717.59
44930.61
14180.09

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

19777.06
7108.13
22678.59
17139.48
31116.36
1021.52
29.87
12.83
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
181.50
22.40
0.51
1039.42
271.22

0.00
0.00
0.00
0.00
0.00
0.00
11236.67
418.21
179.67
26058.26
12543.93

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

12786.43
34038.39
23704.04
0.00
0.00

9.52
827.48
20216.66
16465.23
106.20

3008.57
0.00
68076.78
0.00
94816.15
0.00
96156.93 170140.68
45406.17
212.41

0.00
0.00
0.00
993621.59
90812.35

0.00
0.00
0.00
5488.41
0.00

0.00
0.00
0.00
32052.31
0.00

CRONOGRAMA VALORIZADO DE OBRA


MES 3

MES 4

MONTO (S/.)

METRADO

MES 5

MONTO (S/.)

METRADO

MES 6

MONTO (S/.)

METRADO

MONTO (S/.)

307007.14
152776.39
0.00
0.00
0.00

1.51
0.69
511.71
20.59
0.00

19806.91
9856.54
101651.19
18851.63

0.00
0.00
0.00
34.33
52.30

0.00
0.00
0.00
31419.39
455848.03

0.00
0.00
0.00
0.00
2.62

0.00
0.00
0.00
0.00
22792.40

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

47.10
66.53
5465.52
11.67

221.84
5473.42
25633.29
4732.30

0.00
0.00
0.00
58.35

0.00
0.00
0.00
23661.51

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

236.16
4746.60
25.75
42.24

19428.88
22261.55
9307.08
190.92

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
6.00
4.00
0.00
0.00
32.00
0.00
0.00
0.00

0.00
0.00
0.00
13755.00
3819.20
0.00
0.00
718.08
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.00
129.08
23.48
0.00
0.00
31.40
31.40
0.00
271.15
602.55
30.13

9976.06
65185.40
253.58
0.00
0.00
3042.97
7356.71
0.00
851.41
548.32
21139.21

CRONOGRAMA VALORIZADO DE OBRA


MES 3

MES 4

MONTO (S/.)

METRADO

MES 5

MONTO (S/.)

METRADO

MES 6

MONTO (S/.)

METRADO

MONTO (S/.)

0.00
0.00

0.00
0.00

0.00
0.00

1680.70
4363.70

7916.10
63186.38

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

369.30
40.00
1.00

50187.87
11971.60
1682.83

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

1322.90
1074.77
0.00
0.00
0.00

80498.47
72697.54
0.00
0.00
0.00

0.00
429.91
2133.90
4742.01
280.00

0.00
29079.02
6700.45
3983.29
196448.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.00
2.00
3.45
4.00
4.00
200.52
56.00
420.00

802.40
1100.40
1633.58
1133.48
7239.24
2165.62
871.92
132904.80

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

2307.94
468.00
99.00
476.64
1676.17
1721.15

10870.40
70382.52
13976.82
39994.86
8481.44
8571.33

0.00
702.00
726.00
1012.86
1815.86
0.00

0.00
105573.78
102496.68
84989.09
9188.23
0.00

4,737.60
604.80
709.84

0.00
0.00
0.00

0.00
0.00
0.00

4.00
4.00
1.00

4,737.60
604.80
709.84

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

4.20
2.00

2116.59
3619.62

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
579.69
1.00

0.00
1849.21
2572.09

0.00
0.00
0.00

0.00
0.00
0.00

CRONOGRAMA VALORIZADO DE OBRA


MES 3
MONTO (S/.)
0.00
0.00
0.00
729,516.24
179,389.59
72,951.62
981,857.45
176,734.34
1,158,591.79
14.32%
2,372,459.94
29.32%

MES 4
METRADO

0.00
0.00
0.00

MONTO (S/.)
0.00
0.00
0.00
533,486.07
131,185.35
53,348.61
718,020.03
129,243.61
847,263.64
10.46%
3,219,723.57
39.78%

MES 5
METRADO

0.00
0.00
0.00

MONTO (S/.)
0.00
0.00
0.00
2,011,120.37
494,538.76
201,112.04
2,706,771.16
487,218.81
3,193,989.97
39.47%
6,413,713.54
79.25%

MES 6
METRADO

500.00
1500.00
600.00

MONTO (S/.)
705.00
2115.00
798.00
1,057,097.73
259,942.57
105,709.77
1,422,750.07
256,095.01
1,678,845.08
20.75%
8,092,558.63
100.00%

Item

Descripcin

Und.

01
TRABAJOS PRELIMINARES
glb
01.01
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
m2
01.02
TRAZO Y REPLANTEO
ha
01.03
DESBROCE Y LIMPIEZA EN ZONAS NO BOSCOSAS
mes
01.04
MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL
01.05
ACCESO A CANTERAS, DMES, PLANTAS Y FUENTE DE AGUA km
m3
01.06
REMOCION DE CARPETA ASFALTICA EXISTENTES
m3
01.07
DEMOLICION DE CUNETAS EXISTENTES
m3
01.08
ELIMINACION DE MATERIAL EXCEDENTE
02
PUENTE
02.01
CAISSON
m3
02.01.01
EXCAVACION MANUAL PARA ESTRUCTURAS (CAISSON)
m2
02.01.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
kg
02.01.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.01.04
CONCRETO FC = 210 KG/CM2
m3
02.01.05
CONCRETO FC=175 KG/CM2 Tapon de caissons
kg
02.01.06
BORDE METALICO DE CAISSON
02.02
MURO DE APOYO
02.02.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.02.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.02.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.02.04
CONCRETO FC = 210 KG/CM2
m3
02.02.05
RELLENO CON MATERIAL PROPIO
02.03
ESTRIBO ALAS
02.03.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.03.02
ENCOFRADO Y DESENCOFRADO CARA NO VISTA
m2
02.03.03
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.03.04
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.03.05
CONCRETO FC = 210 KG/CM2
m3
02.03.06
CONCRETO FC = 320 KG/CM2
m
02.03.07
BARRA HELICOIDAL A615 G75
und
02.03.08
ELEMENTOS DE FIJACION PARA BARRA HELICOIDAL
02.03.09
MORTERO a/c 5/1 PARA PROTECCION DE BARRAS HELIC m3
m3
02.03.10
RELLENO CON MATERIAL PROPIO
02.03.11
RELLENO SIN COMPACTAR CON MATERIAL SELECCIONADOm3
02.04
LOSA, VEREDAS, BRIDAS, VIGAS DIAFRAGMA
m
02.04.01
FALSO PUENTE
m2
02.04.02
ENCOFRADO Y DESENCOFRADO LOSA
kg
02.04.03
ACERO DE REFUERZO fy=4,200 kg/cm2
T-M
02.04.04
ACERO POSTENSADO
m3
02.04.05
CONCRETO FC = 320 KG/CM2
02.05
ESTRUCTURA METALICA
02.05.01
FABRICACION DE ESTRUCTURAS METALICAS(ACERO A-709ton
ton
02.05.02
ACERO ASTM A-53 GRADO B
m2
02.05.03
ARENADO Y PINTURA DE ESTRUCTURA METALICA
ton
02.05.04
TRANSPORTE DE ESTRUCTURAS METALICAS
ton
02.05.05
MONTAJE Y COLOCACION DE ESTRUCTURA METALICA
02.06
LOSA DE APROXIMACIN
02.06.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO m3
m2
02.06.02
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.06.03
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.06.04
CONCRETO FC = 280 KG/CM2
02.07
PARAPETOS DE CONCRETO NEW JERSEY
m2
02.07.01
ENCOFRADO Y DESENCOFRADO CARA VISTA
kg
02.07.02
ACERO DE REFUERZO fy=4,200 kg/cm2
m3
02.07.03
CONCRETO FC = 210 KG/CM2
m
02.07.04
JUNTA EN PARAPETO NEW JERSEY
02.08
VARIOS
und
02.08.01
PRUEBA DE CARGA VEHICULAR
m
02.08.02
BARANDA METALICA
m2
02.08.03
MARCAS EN EL PAVIMENTO
und
02.08.04
APOYO DE NEOPRENE
und
02.08.05
DISPOSITIVOS SISMICOS EN APOYOS
m
02.08.06
JUNTA EN LOSA DE APROXIMACION
m
02.08.07
JUNTA DE DILATACION EN DURMIENTE
und
02.08.08
TUBO DE DRENAJE D=4", L=0.60m
l
02.08.09
EMULSION ASFALTICA
m2
02.08.10
RIEGO DE LIGA
m3
02.08.11
CARPETA ASFALTICA EN CALIENTE
03
ACCESOS

AGOSTO-2016

Metrado
PLAZOS
1.00
10,436.27
1.04
6.00
0.70
345.80
48.26
394.06

20.00
30.00
2.00
179.00
1.00
1.00
1.00
3.00

697.23
916.92
11,555.10
337.70
142.86
2,639.11

35.00
30.00
25.00
19.00
7.00
2.00

567.40
318.00
8,287.92
124.31
565.62

2.00
10.00
12.00
7.00
4.00

853.99
296.33
86.40
4,835.52
47.42
72.78
198.00
24.00
0.55
1,039.42
271.22

2.00
8.00
7.00
10.00
4.00
3.00
12.00
15.00
15.00
6.00
6.00

50.00
1,241.22
25,270.83
192,094.32
318.61

21.00
35.00
30.00
35.00
18.00

37.65
17.27
511.71
54.92
54.92

50.00
50.00
22.00
16.00
21.00

47.10
66.53
5,465.52
70.02

1.00
6.00
11.00
6.00

236.16
4,746.60
25.75
42.24

6.00
7.00
2.00
2.00

1.00
129.08
23.48
6.00
4.00
31.40
31.40
32.00
271.15
602.55
30.13

1.00
13.00
1.00
2.00
1.00
4.00
3.00
1.00
1.00
1.00
1.00

20 21 22 23 24 25 26 27 28 29 30 31

SETIEMBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

OCTUBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

NOVIENBRE-2016
1

9 10 11 12 13 14 15 16

Item

Descripcin

03.01
MOVIMIENTO DE TIERRAS
03.01.01
EXCAVACION EN EXPLANACIONES EN MATERIAL SUELTO
03.01.02
CONFORMACION DE TERRAPLEN
03.02
OBRAS DE ARTE Y DRENAJE
03.02.01
CUNETAS TRIANGULAR REVESTIDA DE CONCRETO
03.02.02
ZANJA DE DRENAJE REVESTIDA
03.02.03
TAPA DE CONCRETO PARA CUNETA (L=6.00m)
03.03
PAVIMENTOS
03.03.01
SUB-BASE GRANULAR e=0.20 m
03.03.02
BASE GRANULAR E=0.20 m
03.03.03
EMULSION ASFALTICA
03.03.04
IMPRIMACION ASFALTICA
03.03.05
CARPETA ASFALTICA EN CALIENTE
03.04
SEALIZACION Y SEGURIDAD VIAL
03.04.01
SEALES PREVENTIVAS (0.75m X 0.75m)
03.04.02
SEALES REGLAMENTARIAS (1.20m x 0.80m)
03.04.03
SEALES INFORMATIVAS
03.04.04
POSTE SOPORTE DE SEALES
03.04.05
ESTRUCTURAS DE SOPORTE PARA SEALES INFORMATI
03.04.06
MARCAS EN EL PAVIMENTO
03.04.07
TACHAS RETROREFLECTIVAS
03.04.08
BARRERA DE SEGURIDAD
04
DEFENSA RIBEREA
04.01
EXCAVACION PARA ESTRUCTURAS EN MATERIAL SUELTO
04.02
GAVION TIPO CAJA 1.0x1.0x5.0M
04.03
GAVION TIPO CAJA 1.0x1.5x5.0M
GAVION TIPO COLCHON 5.0x2.0x0.30M
04.05
GEOTEXTIL NO TEJIDO CLASE 1
04.06
CAMA DE ARENA E=0.10 m
05
IMPACTO AMBIENTAL
05.01
PLAN DE SEGUIMIENTO Y CONTROL
05.01.01
MONITOREO CALIDAD DEL AIRE
05.01.02
MONITOREO DE RUIDO AMBIENTAL
05.01.03
MONITOREO DE CALIDAD DEL AGUA
05.02
PROGRAMA DE PREVENCIN DE IMPACTOS AMBIENTALES
05.02.01
SEAL AMBIENTAL PERMANENTE
05.02.02
ESTRUCTURA DE SOPORTE P/SEAL AMBIENTAL PERMA
05.03
PROGRAMA DE ABANDONO DE OBRA
05.03.01
RETIRO Y ALMACENAMIENTO DE TOP SOIL
05.03.02
ACONDICIONAMIENTO DE MATERIAL EXCEDENTE EN DME
05.03.03
REFORESTACION DEL DEPOSITO DE MATERIAL EXCEDEN
05.03.04
REACONDICIONAMIENTO DE CANTERA
05.03.05
REACONDICIONAMIENTO DE PLANTA CHANCADORA
05.03.06
REACONDICIONAMIENTO DE CAMPAMENTO Y PATIO DE
GASTOS GENERALES
UTILIDAD
PARCIAL
IGV
TOTAL_PRESUPUESTO INC IGV
PORCENTAJE DE AVANCE MENSUAL
TOTAL_PRESUPUESTO INC IGV ACUMULADO
PORCENTAJE DE AVANCE MENSUAL ACUMULADO

Und.

AGOSTO-2016

Metrado
PLAZOS

m3
m3

1,680.70
4,363.70

3.00
6.00

m
m
und

369.30
40.00
1.00

8.00
2.00
1.00

m2
m2
l
m2
m3

1,322.90
1,504.68
2,133.90
4,742.01
280.00

5.00
7.00
2.00
2.00
2.00

und
und
m2
und
und
m2
und
m

2.00
2.00
3.45
4.00
4.00
200.52
56.00
420.00

1.00
1.00
1.00
2.00
4.00
2.00
1.00
11.00

m3
m3
m3
m2
m2
m2

2,307.94
1,170.00
825.00
1,489.50
3,492.03
1,721.15

pto
pto
pto

12.00
12.00
4.00

m2
und

4.20
2.00

m2
m3
ha
m2
m2
m2

156.00
579.69
1.00
500.00
1,500.00
600.00

20 21 22 23 24 25 26 27 28 29 30 31

SETIEMBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

OCTUBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

NOVIENBRE-2016
1

9 10 11 12 13 14 15 16

NOVIENBRE-2016
17 18 19 20 21 22 23 24 25 26 27 28 29 30

DICIEMBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

ENERO-2017
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

FEBRERO-2017
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

NOVIENBRE-2016
17 18 19 20 21 22 23 24 25 26 27 28 29 30

DICIEMBRE-2016
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

ENERO-2017
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

FEBRERO-2017
1

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Вам также может понравиться