SAFETY CRITICAL ELEMENT

PERFORMANCE STANDARD
AG-SCEq-13
Fire Water Pumps

A
Rev

October 2004

Issued for Review

Yudi PP

Date

REMARKS

Prepared

Checked

Approved

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps

1. SCE DECSRIPTION
Installation
SCE ID
SCE Category
SCE Name
Main Function
Boundary

XXX
XXSCEq-13
Safety Critical Equipment
Firewater Pumps
To ensure timely delivery of sufficient fire water to specified end user points
Firewater Pump (with Driver and power supply, P-8402 A/B), Jok and Fire Water Ring main
List of Equipment Tags is available at Separate documents

xxxx-Seq-13 Fire Water Pumps

Page 2 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps

2. FUNCTIONALITY
PS ID
AG-SCEq-13-01

Function
To
ensure
timely
delivery of sufficient
fire water to specified
end user points

Performance Requirements
Firewater pump will Auto start at the following conditions :
a)
b)

Any confirmed fire or confirmed high- high level gas or


manual ESD or ESDV incident on either YYY or XXX
platform.
Low Firewater header Pressure detected by PSLL-8030
and/or PSLL-8031 (start within 15 seconds)

(for 15 seconds ref to MAN-101 XXX Facility Description)

Assurance Strategy

Operation and Maintenance:

Confirm the Firewater pump auto started in the


conditions stated at performance standard during periodic
testing

Perform
Preventive
Maintenance
to
all
components of the pump assembly in accordance with the
manufacturers recommendations or at least as stated at
Table 5-5.1. of NFPA 25.

Record all the conformance and conformance


status using checklist, perform corrective action as
required.
Refer to lattes edition of
standards below for detail
requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems

AG-SCEq-13-02

The firewater pumps can be started manually from

the Main Control Panel the YYY control room

start push buttons adjacent to Firewater pump


and auxiliary generator.
Manual stop can be perform with Stop pushbuttons
adjacent to Firewater pump and auxiliary generator.

AG-SCEq-13-03

xxxx-Seq-13 Fire Water Pumps

Pump running and alarm lights are provided at the main


control panel in the YYY platform control room, as minimum
will indicate :

Pump Running (also available at adjacent of

Operation and Maintenance:

During Periodic running test Confirm the that


pump can be start from CCR and Start/stop pushbutton
adjacent to firewater pump and auxiliary generator.

Record all the conformance and conformance


status using checklist, perform corrective action as
required.
Refer to lattes edition of standards below for detail
requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems
Operation and Maintenance:

During running test confirm that Pump running


and alarm lights status are displayed at YYY platform

Page 3 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps
PS ID

Function

Performance Requirements

Firewater pump and auxiliary generator)


Pump Fault.
Pump failed to start.
Pump not in auto (when pump is not in auto
mode)

control room
Record all the conformance and conformance
status using checklist, perform corrective action as
required.

(Ref W1904-000-00-Pl-X-002 XXX Gas Export Project - Fire


And Safety Philosophy, Point 6.2.29 + MAN-804-XXX
Operating Manual)

Refer to lattes edition of standards below for detail


requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems

Engine Cranking is set to continue for 90 seconds.

Operation and Maintenance:

If the engine do not start at the 90 second racking, the


controller locks of the cracking and send a pump fail to
start signal to F&G system.

Manual start then can be perform which will initiate an


another 90 seconds crank cycle, and can be repeated until
the engine starts or the starting air and the back up
nitrogen is fully exhausted.

AG-SCEq-13-04

Assurance Strategy

(Ref best practice need to conform)


Firewater pump deliver water at a pressure of 150 psig
(10.55 kg/cm2) and flow rate of 2000 USGPM (7.6 m3/min)

Confirm

performance

standard

by

Periodic

testing

Record all the conformance and conformance


status using checklist, perform corrective action as
required.

Refer to lattes edition of standards below for detail


requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems
Operation and Maintenance:

During Periodic running test verify flow-rates


and discharge pressures against criteria.

Record all the conformance and conformance


status using checklist, perform corrective action as
required
Refer to lattes edition of standards below for detail
requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems
AG-SCEq-13-05

Overpressure protection is provided by relief valves in the


discharge lines PSV-975 (pump A) and PSV-976 (pump B),
each set at 200 psig (14.06 kg/cm2).

Operation and Maintenance:

During Periodic running test verify the operation


of PSV against criteria.

Perform PSV Migas Certification program

Record all the conformance and conformance

xxxx-Seq-13 Fire Water Pumps

Page 4 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps
PS ID

Function

Performance Requirements

Assurance Strategy
status using
required

checklist,

perform

corrective

action

as

Refer to lattes edition of standards below for detail


requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems
AG-SCEq-13-06

In auto or manual operating modes no engine shutdowns


except over speed are permitted.

Operation and Maintenance:

During Periodic
of over speed trip against

Record all the


status using checklist,
required

running test verify the operation


criteria.
conformance and conformance
perform corrective action as

Refer to lattes edition of standards below for detail


requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems
AG-SCEq-13-07

Pump system appear to be in operating condition and is


free from physical damage.

Pump House Conditions :


Heat is adequate, not less than 40F (4.4C) [70F
(21C) for pump room with diesel pumps without
engine heaters].
Ventilating louvers are free to operate.

Pump System Conditions


-

xxxx-Seq-13 Fire Water Pumps

Pump suction and discharge and bypass valves


are fully open.
Piping is free of leaks.
Suction line pressure gauge reading is normal.
System line pressure gauge reading is normal.
Suction reservoir is full.

Operation and Maintenance:

Perform Periodic Inspection,


Perform
Preventive
Maintenance
to
all
components of the pump assembly in accordance with the
manufacturers recommendations or at least as stated at
Table 5-5.1. of NFPA 25.

Record all the conformance and conformance


status using checklist, perform corrective action as
required
Refer to lattes edition of standards below for detail
requirement on inspection and maintenance program

NFPA 25 Standard for the Inspection, Testing,


and Maintenance of Water-Based Fire Protection Systems

Diesel Engine System Conditions.

Page 5 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps
PS ID

Function

Performance Requirements
-

AG-SCEq-13-08

Fire
ring
main
To
distribute firewater at
pressures and flows
sufficient for all end
users under normal and
impaired
ring
main
conditions.

xxxx-Seq-13 Fire Water Pumps

Assurance Strategy

Fuel tank is two-thirds full.


Controller selector switch is in AUTO position.
Batteries (2) voltage readings are normal.
Batteries (2) charging current readings are
normal.
Batteries (2) pilot lights are on or battery failure
(2) pilot lights are off.
All alarm pilot lights are off.
Engine running time meter is reading.
Oil level in right angle gear drive is normal.
Crankcase oil level is normal.
Cooling water level is normal.
Electrolyte level in batteries is normal.
Battery terminals are free from corrosion.
Water-jacket heater is operating.

Refer to : Vendor Operation Manual for Normal Setting


Value
Maintain firewater system to ensure pressure and flows are
achieved.

Periodically assess the pressure distribution and inspect


system line for signs of damage and corrosion:

Page 6 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps

3. RELIABILITY/AVAILABILITY
PS ID
XXX-SCEq-1309

Performance Requirements
Fire water pump must be available at all times to deliver 100% demand.

Assurance Strategy
Operation and Maintenance :

Periodic

functional

testing

for

fire

water

pumps

xxxx-Seq-13 Fire Water Pumps

Record all the conformance and conformance


status using checklist, perform corrective action as
required

Page 7 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps

4. SURVIVABILITY
PS ID
XXX-SCEq13-10

Event
Fire, explosion
and
others
major accident
events

Component
All

xxxx-Seq-13 Fire Water Pumps

Performance Requirements
System to survive all major accidental events and remain
functioning until installation evacuated for Evacuation
duration 30 mins

Assurance Strategy
Operation and Maintenance:
Confirm by inspection that measures/enclosures
provided to protect the Fire water pumps and Fire Ring
main remain in good condition

Page 8 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps

5. DEPEDENCY
Related SCE

Performance Requirements

Assurance Tasks

XX-SEq-09 Fire and Gas System

Required to initiate fire pump start

Refer to Performance Standards of related SCE

XXSEq-10 Emergency Shutdown and Blow


down System

Required to initiate fire pump start

Refer to Performance Standards of related SCE

XX-SCA-17- Fire Water Pumps Maintenance


and Inspection

Performance standard for assurance task of Fire water pump

Refer to Performance Standards of related SCE

xxxx-Seq-13 Fire Water Pumps

Page 9 of 10

Safety Critical Element Performance Standard


xxx-SCEq-13 Fire Water Pumps
APPENDIX A
REFERENCE DOCUMENT
1. MAN-804 "Xxx Operating Manual"
2. NFPA 25 Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection
Systems
3. NFPA 20 Standard for the Installation of Stationary Pumps for Fire

AG-Seq-13 Fire Water Pumps

Page 10 of 10