Вы находитесь на странице: 1из 133

Standard Detail Contents

HVAC
Page
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Rev.
Typical support for horizontal cold insulated and vapour sealed duct (Sheet 1 of 4)
Typical support for horizontal cold insulated and vapour sealed duct (Sheet 2 of 4)
Typical support for horizontal cold insulated and vapour sealed duct (Sheet 3 of 4)
Typical support for horizontal cold insulated and vapour sealed duct (Sheet 4 of 4)
Typical support for vertical ducts support from intermediate floor slab (Sheet 1 of 2)
Typical support for vertical ducts support from intermediate floor slab (Sheet 2 of 2)
Typical support for vertical ducts (Supports from cantilever Bracket)
Typical access panels (Sheet 1 of 2)
Typical access panels (Sheet 2 of 2)
Typical spring hanger arrangement
Alternative medium duty pipe hanger (Sheet 1 of 2)
Alternative medium duty pipe hanger (Sheet 2 of 2)
Typical arrangement of pipe hangers (Hangers for Un-insulated pipes) (Sheet 1 of 3)
Typical arrangement of pipe hangers (Hangers for hot insulated pipes) (Sheet 2 of 3)
Typical arrangement of pipe hangers (Hangers for cold insulated and vapour sealed pipes) (Sheet 3 of 3)
Drop rod fixing ( Type - A )
Spring Isloated hanger details ( Insulated pipes )
Stem guide and skid details
Detail at bottom of LTHW and CHW riser
Typical arrangement of pipe hangers
Duct roof penetration weathring details
Riser pipe support for chilled water pipe / condenser water pipe / heating water pipe
Anchor for insulated or un-insulated hot pipes
Typical arrangement of pump sets
Pumped system with chemical dosing pot
Chilled water auto dosing system
Expansion tank and air seperator installation
Chemical dosing system for condenser water
Typical detail for service riser housing showing ductwork weathring through upside down roof
Insulated metal duct crossing concrete wall / floor with fire damper
Insulated metal duct crossing concrete wall / floor
Typical duct support where passing below operation room
Linear diffuser schematic
Typical FCU supporting details
Round duct take-off detail
Diffuser mounting detail
Roof mounted smoke exhaust fan ( Direct drive )
Roof mounted centrifugal sidewall exhaust fan
Lab exhaust fan ( Belt drive )
Centrifugal roof mounted exhaust fan ( Belt drive )
Roof mounted exhaust fan
Horizontal ceiling hung fan
Horizontal base mount fan

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

Public Health
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

Typical high level offset arrangement using 45 bend and branch


Typical high level offset arrangement using 2 no. 450 bend
54 copper discharge stack to drainage
Discharge stack / pipe high leve; offset arrangement with long radius access bend
Vertical discharge stack / pipe support bracket
Vertical discharge stack pipework support bracket
100 cast iron SVP
Typical100 cast iron discharge pipework branch connections at highlevel
Deep precast manhole with open channel to BSEN 752-3
100 vent pipe roof connector
Horizontal discharge stack pipework support bracket ( 500mm and over 500mm drop from slab)
Typical manhole detail as sewers for adoption 5th edition ( depth to soffit 3m to 6m )
Typical detail backdrop manhole incorporating precast concrete components
Thrust blocks for underground water pipework (Sheet 1 of 4)
Thrust blocks for underground water pipework (Sheet 2 of 4)
Thrust blocks for underground water pipework (Sheet 3 of 4)
Thrust blocks for underground water pipework (Sheet 4 of 4)
Cored and cast rain water drainage penetrations details (Sheet 1 of 2)
Cored and cast rain water drainage penetrations details (Sheet 2 of 2)
Thrust blocks for underground water pipework
Typical pipework support with additional bracing over 500mm drop
Drain pipe penetration through concrete retaining wall
Drain pipe penetration through base of concrete retaining wall
Typical drain trap arrangements ( Drain on suction side of the fan )
Typical drain trap arrangements ( Drain on discharge side of the fan )
Pipeline air vent details
Horizontal pipeline air vent
Typical arrangement of pipe sleeves thro' walls and floor slabs
Fire stopping of pipe work ( 2 hours non-water and gas tight)
Fire stopping of pipe work ( 4 hours water gas tight)
Typical application with roller stand for pipe installations (Sheet 1 of 2)
Typical application with roller stand (Sheet 1 of 2)
Anchor ( Stanchion )
Service entry seal detail
Supports for sprinkler piping system (Sheet 1 of 3)
Supports for sprinkler piping system (Sheet 2 of 3)
Supports for sprinkler piping system (Sheet 3 of 3)
Supports for ductile iron piping system (Sheet 1 of 2)
Supports for ductile iron piping system (Sheet 2 of 2)
Pipe support detail
Support for cast iron piping system (Sheet 1 of 2)
Support for cast iron piping system (Sheet 2 of 2)
Typical arrangement of pipework expansion
Horizontal pipe support details
Chilled water pipe support details (Sheet 1 of 4)
Chilled water pipe support details (Sheet 2 of 4)
Chilled water pipe support details (Sheet 3 of 4)
Condenser water pipe support details (Sheet 4 of 4)

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

Fire Fighting
92
93
94
95
96
97
98
99
100
101

Typical sprinkler head drop


Inspector test connection for wet pipe sprinkler system
Fire hydrant - wet type
Valve chamber detail
Horizontal pipe anchor detail
Ceiling mounted detector
Dry riser installation
Typical branch line valve installation detail
Typical sprinkler head drop
Typical connection of pendent and upright sprinkler

A
A
A
A
A
A
A
A
A
A

Steam Pipes
102
103
104
105
106
107
108
109
110
111
112
113

Steam to sterilisers ( Central plant arrangement ) (Sheet 1 of 2)


Steam to sterilisers ( Localised plant arrangement ) (Sheet 2 of 2)
Steam pressure reducing valve ( Duplex ) (non prefered HLP details -use only if agreed in advance
with HLP) (Sheet 1 of 2)
Steam pressure reducing valve ( Duplex ) ( Localised plant arrangement ) (Sheet 2 of 2)
Steam pressure reducing valve ( Single )
Steam main air venting
Coil with 2 port control valve ( Heating )
Steam and condensate to DHWS calorifires
Steam and condensate to humidifier
Steam main drain point
Typical timed sampling and sample and hold bioler installation
Detail to remove moister from steam at lab benches

A
A
A
A
A
A
A
A
A
A
A
A

HVAC ( Schedule )
116
117
118
119
120
121
122
123
124
125
126

Rectungular duct construction schedule (Sheet 3 of 8)


Rectungular duct construction schedule (Sheet 4 of 8)
Rectungular duct construction schedule (Sheet 5 of 8)
Rectungular duct construction schedule (Sheet 6 of 8)
Rectungular duct construction schedule (Sheet 7 of 8)
Rectungular duct construction schedule (Sheet 8 of 8)
Schedule of elastomeric pipe insulation for chilled and condenser water pipes and HVAC equipment
Application Schedule for PHD hangers and support
Design of threaded rod / steel anchor / ducting supports for rectangular ducting system
Design of threaded rod / steel anchor / ducting supports for chilled and condenser water piping
schedule - 40 and standard weights.(Sheet 1 of 2)
Design of threaded rod / steel anchor / ducting supports for chilled and condenser water piping
schedule - 40 and standard weights.(Sheet 2 of 2)

A
A
A
A
A
A
A
A
A
A
A

HVAC
(Sheet 1 of 4)

01

HVAC
NTS
HPS

10

15.11.2009

PH

100
A
NTS
HPS

15.11.2009

PH

Fire Fighting
NTS
HPS

101

15.11.2009

PH

102
(Sheet 1 of 2)

NTS
HPS

15.11.2009

PH

103
(Sheet 2 of 2)

NTS
HPS

15.11.2009

PH

104
(Sheet 1 of 2)

NTS
HPS

15.11.2009

PH

105
(Sheet 2 of 2)

NTS
HPS

15.11.2009

PH

Steam Pipes
NTS
HPS

106

15.11.2009

PH

Steam Pipes
NTS
HPS

107

15.11.2009

PH

Steam Pipes
NTS
HPS

108

15.11.2009

PH

109
A
NTS
HPS

15.11.2009

PH

HVAC
(Sheet 1 of 2)

NTS
HPS

11

15.11.2009

PH

110
A
NTS
HPS

15.11.2009

PH

111
A
NTS
HPS

15.11.2009

PH

112
A
NTS
HPS

15.11.2009

PH

113
A
NTS
HPS

15.11.2009

PH

HVAC
( Sheet 1 of 8)

NTS
HPS

114

15.11.2009

PH

HVAC
( Sheet 2 of 8)

NTS
HPS

115

15.11.2009

PH

HVAC
( Sheet 3 of 8)

NTS
HPS

116

15.11.2009

PH

HVAC
( Sheet 4 of 8)

NTS
HPS

117

15.11.2009

PH

HVAC
( Sheet 5 of 8)

NTS
HPS

118

15.11.2009

PH

HVAC
( Sheet 6 of 8)

NTS
HPS

119

15.11.2009

PH

HVAC
(Sheet 2 of 2)

NTS
HPS

12

15.11.2009

PH

HVAC
( Sheet 7 of 8)

NTS
HPS

120

15.11.2009

PH

HVAC
( Sheet 8 of 8)

NTS
HPS

121

15.11.2009

PH

HVAC
NTS
HPS

122

15.11.2009

PH

HVAC
NTS
HPS

123

15.11.2009

PH

124
A
NTS
HPS

15.11.2009

PH

( Sheet 1 of 2)

NTS

125

HPS

15.11.2009

PH

( Sheet 2 of 2)

125

HVAC
(Sheet 1 of 3)

NTS
HPS

13

15.11.2009

PH

HVAC
(Sheet 2 of 3)

NTS
HPS

14

15.11.2009

PH

HVAC
(Sheet 3 of 3)

NTS
HPS

15

15.11.2009

PH

HVAC
NTS
HPS

16

15.11.2009

PH

HVAC
NTS
HPS

17

15.11.2009

PH

HVAC
NTS
HPS

18

15.11.2009

PH

HVAC
NTS
HPS

19

15.11.2009

PH

HVAC
(Sheet 2 of 4)

02

20
A
NTS
HPS

15.11.2009

PH

21
A
NTS
HPS

15.11.2009

PH

22
A
NTS
HPS

15.11.2009

PH

23
A
NTS
HPS

15.11.2009

PH

HVAC
NTS
HPS

24

15.11.2009

PH

HVAC
NTS
HPS

25

15.11.2009

PH

26
A
NTS
HPS

15.11.2009

PH

27
(Sheet 1 of 2)

NTS
HPS

15.11.2009

PH

28
(Sheet 2 of 2)

NTS
HPS

15.11.2009

PH

29
A
NTS
HPS

15.11.2009

PH

03
(Sheet 3 of 4)

NTS
HPS

15.11.2009

PH

30
A
NTS
HPS

15.11.2009

PH

31
A
NTS
HPS

15.11.2009

PH

32
A
NTS
HPS

15.11.2009

PH

33
A
NTS
HPS

15.11.2009

PH

34
A
NTS
HPS

15.11.2009

PH

35
A
NTS
HPS

15.11.2009

PH

36
A
NTS
HPS

15.11.2009

PH

HVAC
NTS
HPS

37

15.11.2009

PH

HVAC
NTS
HPS

38

15.11.2009

PH

39
A
NTS
HPS

15.11.2009

PH

HVAC
(Sheet 4 of 4)

NTS
HPS

04

15.11.2009

PH

HVAC
NTS
HPS

40

15.11.2009

PH

41
A
NTS
HPS

15.11.2009

PH

42
A
NTS
HPS

15.11.2009

PH

43
A
NTS
HPS

15.11.2009

PH

Public Health
NTS
HPS

44

15.11.2009

PH

Public Health
NTS
HPS

15.11.2009

PH

TYPICAL HIGH LEVEL OFFSET ARRANGEMENT

45

Public Health
NTS
HPS

46

15.11.2009

PH

Public Health
NTS
HPS

47

15.11.2009

PH

Public Health
NTS
HPS

48

15.11.2009

PH

Public Health
NTS
HPS

49

15.11.2009

PH

HVAC
(Sheet 1 of 2)

NTS
HPS

05

15.11.2009

PH

Public Health
NTS
HPS

50

15.11.2009

PH

Public Health
NTS
HPS

51

15.11.2009

PH

Public Health
NTS
HPS

SECTION

PLAN
52

15.11.2009

PH

Public Health
NTS
HPS

53

15.11.2009

PH

Public Health
NTS
HPS

54

15.11.2009

PH

Public Health
NTS
HPS

PLAN

55

15.11.2009

PH

Public Health
(Sheet 1 of 4)

NTS
HPS

57

15.11.2009

PH

Public Health
(Sheet 2 of 4)

NTS
HPS

58

15.11.2009

PH

Public Health
(Sheet 3 of 4)

NTS
HPS

59

15.11.2009

PH

HVAC
(Sheet 2 of 2)

NTS
HPS

06

15.11.2009

PH

Public Health
(Sheet 4 of 4)

NTS
HPS

60

15.11.2009

PH

Public Health
(Sheet 1 of 2)

NTS
HPS

61

15.11.2009

PH

Public Health
(Sheet 2 of 2)

NTS
HPS

62

15.11.2009

PH

63
A
NTS
HPS

15.11.2009

PH

64
A
NTS
HPS

15.11.2009

PH

65
A
NTS
HPS

15.11.2009

PH

66
A
NTS
HPS

15.11.2009

PH

67
A
NTS
HPS

15.11.2009

PH

Pipes

68

Pipes

69

HVAC
NTS
HPS

07

15.11.2009

PH

Pipes

70

Pipes

71

Pipes

72

Pipes

73

Pipes
(Sheet 1 of 2)

74

Pipes
(Sheet 2 of 2)

75

Pipes

76

Pipes

77

Pipes
(Sheet 1 of 3)

78

Pipes
(Sheet 2 of 3)

79

HVAC
(Sheet 1 of 2)

NTS
HPS

08

15.11.2009

PH

Pipes
(Sheet 3 of 3)

80

Pipes
(Sheet 1 of 2)

81

Pipes
(Sheet 2 of 2)

82

Pipes

83

Pipes
(Sheet 1 of 2)

84

Pipes
(Sheet 2 of 2)

85

86
A
NTS
HPS

15.11.2009

PH

87
A
NTS
HPS

15.11.2009

PH

88
(Sheet 1 of 4)

NTS
HPS

15.11.2009

PH

89
(Sheet 2 of 4)

NTS
HPS

15.11.2009

PH

HVAC
(Sheet 2 of 2)

NTS
HPS

09

15.11.2009

PH

90
(Sheet 3 of 4)

NTS
HPS

15.11.2009

PH

91
(Sheet 4 of 4)

NTS
HPS

15.11.2009

PH

Fire Fighting
NTS
HPS

92

15.11.2009

PH

Fire Fighting
NTS
HPS

93

15.11.2009

PH

Fire Fighting
NTS
HPS

94

15.11.2009

PH

Fire Fighting
NTS
HPS

95

15.11.2009

PH

Fire Fighting
NTS
HPS

96

15.11.2009

PH

Fire Fighting
NTS
HPS

97

15.11.2009

PH

Fire Fighting
NTS
HPS

98

15.11.2009

PH

Fire Fighting
NTS
HPS

99

15.11.2009

PH

Вам также может понравиться