BSF Consulting Engineers Limited

Version 4.1

DRAINAGE IMPACT ASSESSMENT


for

Proposed Residential Development


Chestfield Farm
The Drove
Chestfield, CT5 3NX
on behalf of

Hollamby Estates (2005) Ltd

BSF Consulting Engineers Limited

Version 4.1

Document Control Sheet

Project Title

Proposed Residential Development


Chestfield Farm, Chestfield

Document Title

Drainage Impact Assessment

Job No.

12206

Revision

4.0

Status

Final

Status

Author

Date

1.0

Draft

P. Lavender

04.03.08

2.0

Final

P. Lavender

3.0

Reissued

4.0
4.1

Issue

Check

Date

Authorised

Date

04.03.08

A. Keeler

04.03.08 A. Keeler

04.03.08

P.Lavender

04.12.09

A.Keeler

04.12.09 A.Keeler

04.12.09

Reissued

P.Lavender

26.07.10

CDP (via
email)

28.07.10

Final

P.Lavender

28.07.10

CDP (via
email)

28.07.10 P. Lavender

28.07.10

Distribution List

Version

Issued to

Purpose

Date

1.0

Internal Check

1st Draft

2.0

Andy Tull CDP Architecture

Final for Planning

04.03.08

3.0

Andy Tull CDP Architecture

Updated

04.12.09

04.03.08

st

4.0

Mike Wicks CDP Architecture

New Scheme 1 Draft 26.07.10

4.1

Mike Wicks CDP Architecture

Final (pdf issue)

Job No. 12206


2010

28.07.10

July

BSF Consulting Engineers Limited

Version 4.1

A Report on a Drainage Impact Assessment for the proposed Residential Development


at Chestfield Farm, Chestfield, by BSF Consulting Engineers Limited

CONTENTS

1.0

Status. 3

2.0

Synopsis 3

3.0

Introduction....4

4.0

Existing Site.. 5

5.0

Foul Water Drainage...


6
Existing discharge
6
Proposed discharged.. 8
Consents9

6.0

Surface Water Drainage. 10


Existing discharge
10
Sustainable Urban Drainage Systems. 11
Surface Water Strategy.. 12
Consents13

7.0

Flood Risk. 14
Flood Risk Assessment Pro Forma.. 15

8.0

Conclusions.. 18

Appendix A

BSF Drawings
12206/A3/100 Site Location Plan
12206/A3/101 Existing Site Drainage
12206/A3/102 Schematic Drainage Proposals
Architects Drawings
Impermeable Area Plan SDS 201202.01

Appendix B
Job No. 12206
2010

Windes Calculations
2

July

BSF Consulting Engineers Limited

Version 4.1

Greenfield Run-off Rate


Outline Surface Water Network Design

Job No. 12206


2010

July

BSF Consulting Engineers Limited

Version 4.1

1.0

STATUS

1.1

This Report is prepared for the sole use of Hollamby Estates (2005) Ltd and
their agents in connection with the proposed forthcoming planning application.
No responsibility can be assumed for the Report if used by others.

1.2

For the purposes of the Contracts (Rights of Third Parties) Act 1999, nothing in
this Report shall confer on any third party any right to enforce or benefit from
any term of this Report

2.0

SYNOPSIS

2.1

This Report is in accordance with the requirements of the Canterbury City


Council Drainage Impact Assessment for Development Proposals Guidance
Notes dated March 2003 and with Planning Policy Statement 25, Development
and Flood Risk.

2.2

The Report details the observations, calculates the probable flows that may be
generated by the development and makes recommendations for the disposal of
the foul and surface water.

Job No. 12206


2010

July

BSF Consulting Engineers Limited

Version 4.1

3.0

INTRODUCTION

3.1

BSF Consulting Engineers were commissioned by CDP Architecture Ltd on


behalf of the Client and requested to update the previously prepared Drainage
Impact Assessment for the proposed development of land at Chestfield Farm,
The Drove, Chestfield.

3.2

A revised application for planning is currently being prepared for submission


and the proposals are shown on the A3 reduced Architects drawings included in
Appendix A. The proposed development is for the construction of 5No
residential units.

3.3

The proposed development will be accessed from The Drove as shown on the
Architects Site Plan included in Appendix A with a total site area of 3,995m
(Red

Line

Boundary)

centred

at

Ordnance

Survey

Grid

Reference

(613896,165820).

Job No. 12206


2010

July

BSF Consulting Engineers Limited

4.0

EXISTING SITE

4.1

A topographical

Version 4.1

and impermeable areas survey has been previously

commissioned by the Client and carried out SDS & Associates. A copy of SDS
drawing 201202.01 is included in Appendix A, and has been used as the base
drawing for the existing site drainage plan 12206/A1/101 also included in
Appendix A.

4.2

From the survey it can be seen that there are a number of existing farm
buildings with associated hard standings and an existing house to be
demolished as part of the development.

4.3

Inspection of the sewer records indicates that there are no public surface water
sewers in close proximity to this site. The public foul water sewer is located in
The Drove with an existing lateral connection from Little Grannery just
downstream of manhole TR13658701.

4.4

A study of the geological survey map, Solid and Drift Edition for Faversham sheet 273, indicates that the site to be underlain by London Clay.

Job No. 12206


2010

July

BSF Consulting Engineers Limited

5.0

Version 4.1

FOUL WATER DRAINAGE


EXISTING DISCHARGE

5.1

The impermeable area survey indicates that there is currently 25m of roof
drainage from the existing house, Little Grannery, which is connected to the
public foul sewer; (Area Shaded Red). Below is a screen print of the
MicroDrainage Windes Simulation results indicating the existing peak discharge
rates to the public foul water sewer from a 2 year return period (sewers for
adoption design criteria).

5.2

To enable the completion of the SUR1 mandatory items of BREAAM Code for
Sustainable Homes, the following existing site discharge rates are quoted.
1 year return

Job No. 12206


2010

0.1 litres/second

708 litres discharge (6hr duration)

30 year return 0.2 litres/second

1,565 litres discharge (6hr duration)

100 year return 0.2 litres/second

2,030 litres discharge (6hr duration)

July

BSF Consulting Engineers Limited

5.2

Version 4.1

No access was gained to the existing property to establish the number of


existing appliances, but it would be fair to assume that there is at least one
bathroom and kitchen to the dwelling. In accordance with BS EN 752: Part 4,
the existing foul water element of the discharge is calculated as follows;

Peak Flow Rates


to BS EN 752: Part 4

kDU

Sanitary
Appliance

No of
Features

DU

DU

Bathroom

WC's
Washbasin
Bath

1
1
1

1.20
0.60
1.30

1.20
0.60
1.30

Kitchen

Sink
W/machine

1
1

1.30
0.80

1.30
0.80

frequency factor (0.5 for domestic use)

Q=kDU(DU)
5.20

Q= 1.14 l/s

5.3

The existing peak discharge via the existing 100mm lateral to the public foul
water sewer is calculated as being 2.04 litres/second (0.9 l/s roof water and
1.14l/s foul flow).

Job No. 12206


2010

July

BSF Consulting Engineers Limited

Version 4.1

PROPOSED DISCHARGE

5.4

The site proposals include for 5N Units.

In accordance with Sewers for

th

Adoption 6 Edition, the design flow from the proposed development is 0.23
litres/second, calculated as follows;

DWF = 5 units @4000l/s per unit


24 hours

5.5

20 m
day

0.23 l/s

In accordance with BS EN 752: Part 4, the predicted peak discharge from the
proposal is as follows;

Peak Flow Rates


to BS EN 752: Part 4
Sanitary
Appliance
Unit 1

Unit 2&3

Unit 4

Unit 4

5.6

WC's
Washbasin
Bath
Showers
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Showers
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Kitchen Sink
Wash Machine

kDU

frequency factor (0.5 for domestic use)

No of
Features

DU

DU

3
3
1
1
1
1
2x3
2x3
2x1
2x1
2x1
2x1
4
4
3
1
1
4
4
3
1
1

1.20
0.30
0.80
0.30
0.80
0.50
1.20
0.30
0.80
0.30
0.80
0.50
1.20
0.30
0.80
0.80
0.50
1.20
0.30
0.80
0.80
0.50

3.60
0.90
0.80
0.30
0.80
0.50

6.90

7.20
1.80
1.60
0.60
1.60
1.00

13.80

4.80
1.20
2.40
0.80
0.50

9.70

4.80
1.20
2.40
0.80
0.50

9.70
40.10

Q=kDU(DU)
Q= 3.16 l/s

The predicted design flow from the proposed residential development is


calculated as being 0.23 litres/second, with a peak discharge of 3.16
litres/second.

Job No. 12206


2010

July

BSF Consulting Engineers Limited

Job No. 12206


2010

Version 4.1

10

July

BSF Consulting Engineers Limited

Version 4.1

CONSENTS

5.7

An outline foul water disposal system design is included within Appendix A as


drawing 12206/A1/102. A Section 106 Water Industry Act application to connect
to the public sewer will need to be made to, and approved, by Southern Water
Services.

5.8

It can be noted from the outline design that the existing private lateral will be
utilised for one of the new properties, and a new manhole connection made for
the remaining properties in order to comply with the requirements of sewers for
adoption; i.e. the connection of more than 3 properties must via a manhole.

Job No. 12206


2010

11

July

BSF Consulting Engineers Limited

6.0

Version 4.1

SURFACE WATER DRAINAGE


EXISTING DISCHARGE

6.1

The impermeable area survey indicates that the existing site has a total
impermeable area of 1,116m.

This comprises of 643m of roof drainage

discharging to soakaways, 117m of roof drainage discharging direct to the


ground, and 356m of concrete hard standing shedding to the ground.

6.2

As mentioned in section 4.0, there are no public surface water sewers in the
vicinity of the site. The underlying geology is London Clay making the use of
soakaways impractical due to the extremely low permeability.

It is therefore

extremely likely that the existing surface water from the impermeable areas
migrate to the existing pond on the site either via a perched water table, or
through saturated topsoil, or via a land-drainage network.

The pond then

discharges to the surrounding open watercourses via a similar system.

The

existing site is therefore considered as a Greenfield development.

6.3

In accordance with the ADAS 345 method, the existing peak flood flow from the
Greenfield site is calculated as Qbar = 2.4 l/s, using the following parameters;
Area = 0.400 hectare (3,995m red line area)
Catchment Length = 83m
Average Slope = 1:160
AAR = 630mm (agro-climatic area 34)
Soil Type = 1.0 (very slow)

6.4

This equates to a Greenfield Run-off rate of 6 litres/hectare.

Job No. 12206


2010

12

July

BSF Consulting Engineers Limited

Version 4.1

SUSTAINABLE URBAN DRAINAGE SYSTEMS

6.5

The following SUDS techniques have been considered, with the preferred
solution following the hierarchy of sustainability as established by the
Environment Agency and included in the Environment Agency publication: SUDS
A Practical Guide1. This hierarchy is shown below as Table 1.

Table 1 - SUDS Hierarchy from the EA publication: SUDS - A Practical Guide

6.6

Taking these techniques in order, the potential application within the proposed
development are considered below:

Job No. 12206


2010

Living roofs the steep pitched roofs are not suitable for water attenuating
green roofs.
Basins and ponds The applicant controls land to the rear of the proposed
development providing ample area for the creation of a new pond with an
overflow to the existing water coarse.
Infiltration systems The underlying geology is London Clay making the
use the use of infiltrations systems in-effective
Permeable surfaces The private drives and access could incorporate
permeable paving.

13

July

BSF Consulting Engineers Limited

Version 4.1

Tanked systems Runoff from site could be attenuated using underground


tanked or stormcell systems although is superseded by a higher ranking
sustainable solution.
PROPOSED DISCHARGE

6.7

The proposed development will generate approximately 1,486m of impermeable


area, comprising of roof drainage, access road, and private drives as indicated on
the proposed site plan.

6.8

The intention is to install a new balancing pond with a permanent wet bottom for
bio-diversity, and attenuate the outflow from the pond to the equivalent
Greenfield Run-off rate from the existing site. It should be noted that whilst this
rate has been calculated to the equivalent of 6litres/hectare, the actual
attenuated rate used has been limited to 4 litres/hectares as required by the
Canterbury City Council Drainage Impact Assessment for Development
Proposals Guidance Notes dated March 2003. The discharge from the pond will
therefore need to be

1,486m x 4 litres/hectare, which equates to 0.60

litres/second.

6.9

Previous experience with Canterbury City Council Drainage Engineers has


confirmed that 0.6 litres/second is the about the lowest controllable discharge
rate, and has been achieved using a 50mm diameter pipe at a gradient of 1in333.
( Table A8 of Tables for Hydraulic Design of Pipes.)

Job No. 12206


2010

14

July

BSF Consulting Engineers Limited

6.10

Version 4.1

A storage estimate with the above parameters indicated a storage pond with a
volume of up to 124m, depending on the efficiency of the flow control device,
would be required.

6.11

A draft network as indicated on the schematic drainage proposal drawing


12206/A1/102 has been prepared and is included as Appendix B to demonstrate
the adequacy of a storage pond of 124m with the outflow controlled to 0.6 l/s.
Please note that a pump has been used for modelling purposes only, as the
Windes software does not include for pipes below 100mm diameter.

CONSENTS

6.12

The ditch that the proposed pond will discharge to is within the riparian ownership
of the Client, and therefore consent is not required any other third party.

6.13

The site does not sit within a source protection zone, and considering the low risk
discharge, it is unlikely that any special protection measures will be required.

Job No. 12206


2010

15

July

BSF Consulting Engineers Limited

Version 4.1

7.0

FLOOD RISK

7.1

An inspection of the Environment Agency web site has identified that this site is
not located in an area at risk of flooding and therefore a separate Flood Risk
Assessment is not required.

Fig1. Extract of Environment Agency Flood Map

Job No. 12206


2010

16

July

BSF Consulting Engineers Limited

7.2

Version 4.1

Flood Risk Assessment Pro Forma


In accordance with Planning Policy Statement 25, Development and Flood Risk,
December 2006 (PPS25) and the accompanying Practice Companion Guide,
February 2007, the following Pro Forma has been prepared;

Flood Risk Assessment Pro Forma


1

Development description and location

1a

What type of development is proposed and where will it be located?

Section 4.0
1b

What is its vulnerability classification?

More Vulnerable (Residential)

1c

Is the proposed development consistent with the Local Development Documents?

Yes
1d

Provide evidence that the Sequential Test and where necessary the Exception Test has been
applied in the selection of this site for this development type.
Zone 1 Low Probability - All uses of land are appropriate in this zone.

Definition of the flood hazard

2a

What sources of flooding could affect the site?

2b

Flooding from rivers or fluvial flooding


Flooding from the sea or tidal flooding
Flooding from land
Flooding from groundwater
Flooding from sewers
Flooding from reservoirs, canals, and other artificial sources

NO
NO
NO
NO
NO
NO

For each identified source, describe how flooding would occur, with reference to any historic
records wherever these are available.
None Known to Client

2c

What are the existing surface water drainage arrangements for the site?

Some roof area to the public foul water sewer, with the balance to an existing pond

Job No. 12206


2010

17

July

BSF Consulting Engineers Limited

Version 4.1

fronting the site, but not in the control of the Client.

Probability

3a

Which flood zone is the site within

Flood Zone 1 Low Probability


3b

If there is a Strategic Flood Risk Assessment (SFRA) covering this site, what does it show?

No
3c

What is the probability of the site flooding taking account of the contents of the SFRA and of any
further site specific assessment?

Low Probability
3d

What are the existing rates of run-off generated by the site?


Qbar = 2.4 l/s,

Climate Change

4a

How is flood risk at the site likely to be affected by climate change?

Attenuation pond designed to cater for 1in100 year storms with 30% allowance for climate
changes in accordance with BREEAM code for sustainable homes SUR1

Detailed Development Proposals

5a

Please provide details of the development layout, referring to the relevant drawings?

Drawing as per Appendix A


5b

Where appropriate, demonstrate how land-uses most sensitive to flood damage have been placed
in areas within the site that are at least risk of flooding.

N/A
6

Flood Risk Management Measures

6a

How will the site be protected from flooding, including the potential impacts of climate change over
the developments lifetime?

As 4a
7

Off Site Impacts

7a

How will you ensure that your proposed development and the measures to protect your site will
not increase flood risk elsewhere?

Job No. 12206


2010

18

July

BSF Consulting Engineers Limited

Version 4.1

Discharge to ground with suitable SUDS Solutions to mimic existing situation


7b

How will you prevent run-off from the development causing an impact elsewhere?

As 4a

Residual Risk

8a

What flooding risks will remain after you have implemented the measures to protect the site from
flooding?
None

8b

How, and by whom, will these risks be managed over the lifetime of the development?

None required

Job No. 12206


2010

19

July

BSF Consulting Engineers Limited

8.0

Version 4.1

CONCLUSIONS

Based upon our observations and investigations, we conclude the following:-

8.1

The foul water design flow from the proposed development is anticipated to be
0.23litres/, which is lower than that currently being discharged to the public foul
sewer.

8.2

The existing Greenfield run-off rate for the development site (3,995m) is
calculated to be 2.4 litres/second (6 litres/hectare) in accordance with ADAS345
methods. The introduction of the SUDS attenuation pond will reduce this run-off
rate for the new impermeable area to an equivalent of 4 litres/hectare (0.6
litres/seconds for 1,486m). The post development run-off rate for the whole site
will therefore be reduced to 2.1 litres/second.

8.3

The foul and surface water disposal solutions are summarised and indicated on
drawing 12206/A1/102 included within Appendix A, with supporting calculations
for the outline network designs included within Appendix B.

8.4

A Section 106 application to connect to the public foul water sewer will need to
be made to and approved by Southern Water Services.

8.5

The ditch that the proposed pond will discharge to within the riparian ownership
of the Client, and therefore consent is not required any other third party.

8.6

In accordance with Planning Policy Statement 25, Development and Flood Risk,
December 2006, a Flood Risk Pro Forma has been prepared and concluded
that the site is not at risk from flooding and that the proposals will not increase
the risk of flooding elsewhere.

Job No. 12206


2010

20

July

BSF Consulting Engineers Limited

Version 4.1

APPENDIX A

BSF Drawings
12206/A3/100 Site Location Plan
12206/A3/101 Existing Site Drainage
12206/A3/102 Schematic Drainage Proposals
Architects Drawings
Impermeable Area Plan SDS 201202.01

Job No. 12206


2010

21

July

Drawing No.

Drain
Drain

166000m

614100m

Drain

614000m

Random

D rain
Pond

Notes

Pond
Drain
613900m

613800m

Drain

Revision

12206/A3/100

24

1.

This drawing is to be read in conjunction with all relevant Engineers, Architects


and Designers drawings.

2.

This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.

3.

All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend

Ottersend

Drain

Planning Boundary
1

Tinkers
Meadow
Orchard End

Drain

a
Tr

Seafield

Tythe
Barn House

ac
Tr

Brookfield
Mead House

d
an

ck

an

th
Pa

Land owned by Applicant

th
Pa

North
Leas Gate

Tythe Barn
Sea
View

South
Tythe Barn

D rain

Alcrest

Kennel Meadow
The Paddock

Cottage

El Sub Sta
Huntsman's
Cottage

165900m
Portways

14.3m

Paddock South

Wedgewood

BM 14.6 6m

Rev

Description

Date

By

Ckd

Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.

The Old Farm House

Westwell

CLIENT

Badgers End

The Manor House

Hollamby Estates (2005) Ltd


Pond

Pond

Mole House

Pond

Ponds

ENGINEERS
BSF CONSULTING

Chestfield Farm

Development
Site

Drain

53/54 St Dunstans Street


Canterbury, Kent CT28BS
tel: 01227 464811
fax: 01227 459051
www.bsfconsultants.co.uk
office@bsfconsultants.co.uk

PROJECT TITLE

Red Roofs

165800m

Little Granary

Proposed Houses at
Chestfield Farm

THE DROVE

7
19
23

11

Takamaka

DRAWING TITLE
Chestfield Farm House

D rain

17

Newstead

Site Location Plan

Drove Cottage

5
6

Pond

SCALE

Harbinger

1:1250
DESIGNED

Minarto

Drain

SE
CLO

Huddleston

GA
CHECKED

DATE

SIZE

27-07-2010
APPROVED

STATUS
13

Reproduced from the Ordnance Survey Plan with the Permission of the
Controller of Her Majesty's Stationery Office, Crown Copyright
Licence No AL51807A0001

DRAWN

A3
DATE

BSF Project No.

Preliminary
DRAWING No.

100
REVISION

12206/A3/100

Drawing No.

Revision.

12206/A1/101
Existing Drainage Plan

scale 1:200

Westwell

Plan reproduced from SDS


drawing 201201.01

Notes
1.

This drawing is to be read in conjunction with all relevant Engineers, Architects


and Designers drawings.

2.

This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.

3.

All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend

Badgers End

Planning Boundary
Land owned by Applicant

T EL/O
H

The Manor House

ELEC/OH

TEL/OH

ELEC/OH

TEL/OH

WATER
GAS

WATER
GAS

GAS

ELEC/OH

ELEC/OH

TEL/OH

TEL/OH

OIL
CATV

ELEC/OH

TEL/OH

ELEC/OH

se
TEL/OH
TEL/OH

ELEC/OH

TEL/OH
ELEC/OH

TEL/OH
ELEC/OH

Rev

Date

Description

By

Ckd

Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.

CLIENT
ELEC/OH

Hollamby Estates (2005) Ltd


ELEC/OH
ELEC/OH

ofs

ELEC/OH
ELEC/OH

CONSULTING
BSF ENGINEERS

53/54 St Dunstans Street


Canterbury, Kent CT28BS
tel: 01227 464811
fax: 01227 459051
www.bsfconsultants.co.uk
office@bsfconsultants.co.uk

PROJECT TITLE

ELEC/OH

Proposed Houses at
Chestfield Farm
DRAWING TITLE

THE DROVE

Existing Drainage Plan

Reproduced from the Ordnance Survey Plan with the Permission of the
Controller of Her Majesty's Stationery Office, Crown Copyright
Licence No AL51807A0001

SCALE

1:200
DESIGNED

DRAWN

DATE

GA
CHECKED

SIZE

27-07-2010
APPROVED

STATUS

A1
DATE

BSF Project No.

PRELIMINARY
DRAWING No.

12206
REVISION

12206/A1/101

Drawing No.

Revision.

12206/A1/102
Proposed Drainage Plan

scale 1:200

The Manor House

Notes
1.

This drawing is to be read in conjunction with all relevant Engineers, Architects


and Designers drawings.

2.

This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.

3.

All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend

RE

RE

Planning Boundary

Existing Pond

Existing Private Foul Water Drain


Existing Private Foul Water Drain
To be Abandoned
MH
Proposed Foul Water Drainage
Existing Pond
Proposed Surface Water Drainage

MH
Section 106 application to connect to the
public sewer required to be made to and
approved by Southern Water Services

225mm

Mole House

MH

Contractor to make allowance for the


private road opening licence under the
New Roads and Streetworks Act.

MH
MH
New pond to create 124m of
storage, pond to remain partially full
creating permanent wet feature.

MH
MH

MH

MH

MH

New foul water mahole to be


constructed in 'The Drove'

MH

MH

RE

MH

MH
MH

RE

RE
Proposed Pond

MH

MH
MH

MH

MH
MH

MH

MH
225mm

MH

MH

MH

MH
New outfall to local
ditch, headwall to be
'JKH General
Purpose Headwall'
or similar approved.

RE

MH MH

MH

Red Roofs

Existing ditch

MH

MH

MH
Outfall to existing ditch
from 50mm pipe = 0.6 l/s

MH

MH
TR13658701
CL=15.649
IL=13.149

Rev

RE

RE

29-07-10

Pond relocated, blue boundary removed.

GA

Date

Description

By

Ckd

Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.

Existing lateral
utilised for Unit ONE

CLIENT

Hollamby Estates (2005) Ltd


Reproduced from the Ordnance Survey Plan with the Permission of the
Controller of Her Majesty's Stationery Office, Crown Copyright
Licence No AL51807A0001

Section Through Pond

Proposed Pond

CONSULTING
BSF ENGINEERS

Existing ditch

scale 1:25
Ditch profile

'JKH GRC 300 series'


spillway headwall or similar
approved
Tel:01638 713795

53/54 St Dunstans Street


Canterbury, Kent CT28BS
tel: 01227 464811
fax: 01227 459051
www.bsfconsultants.co.uk
office@bsfconsultants.co.uk

PROJECT TITLE

Storage area

Headwall anchor installed


as backfilling is completed

JKH General Purpose


Headwall
GRC lightweight recessed
headwall, batter angle not
less than 45
Tel:01638 713795

Proposed Houses at
Chestfield Farm

Outfall ditch

DRAWING TITLE

Schematic Drainage Plan


Invert TBC
500

225mm Incoming pipe

50mm Outfall pipe to ditch


50mm Outfall pipe

DRAWN

SCALE

1:200

DATE

GA

DESIGNED

CHECKED

SIZE

27-07-2010
APPROVED

STATUS

A1
DATE

BSF Project No.

PRELIMINARY
DRAWING No.

12206/A1/102

12206
REVISION

Existing
Landscaping to be
trimed and
retained

Proposed 1800mm
timber fence to
boundary

NORTH

Access to
unit 3 garden
through
carport
Existing
Landscaping around
pond to be retained
and added to

Car port

Existing
Landscaping to be

retained

Proposed
landscaped
green space

ate
to indic y.
d line
D ashe rear boundar
us
previo

Propose
d fence
line

Existing landscaping
retained

Public footpath

ARCHITECTURE

trimed and

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

ARCHITECTURE

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

ARCHITECTURE

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

ARCHITECTURE

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

ARCHITECTURE

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

ARCHITECTURE

CDP Architecture Ltd


22-23 North Lane
Canterbury
Kent
CT2 7EE
Tel 01227 458181
Fax 01227 451543
enquiries@architectscanterbury.com
www.architectscanterbury.com

BSF Consulting Engineers Limited

Version 4.1

APPENDIX B

Windes Calculations
Greenfield Run-off Rate
Outline Surface Water Network Design

Job No. 12206


2010

22