Академический Документы
Профессиональный Документы
Культура Документы
Version 4.1
Version 4.1
Project Title
Document Title
Job No.
12206
Revision
4.0
Status
Final
Status
Author
Date
1.0
Draft
P. Lavender
04.03.08
2.0
Final
P. Lavender
3.0
Reissued
4.0
4.1
Issue
Check
Date
Authorised
Date
04.03.08
A. Keeler
04.03.08 A. Keeler
04.03.08
P.Lavender
04.12.09
A.Keeler
04.12.09 A.Keeler
04.12.09
Reissued
P.Lavender
26.07.10
CDP (via
email)
28.07.10
Final
P.Lavender
28.07.10
CDP (via
email)
28.07.10 P. Lavender
28.07.10
Distribution List
Version
Issued to
Purpose
Date
1.0
Internal Check
1st Draft
2.0
04.03.08
3.0
Updated
04.12.09
04.03.08
st
4.0
4.1
28.07.10
July
Version 4.1
CONTENTS
1.0
Status. 3
2.0
Synopsis 3
3.0
Introduction....4
4.0
Existing Site.. 5
5.0
6.0
7.0
Flood Risk. 14
Flood Risk Assessment Pro Forma.. 15
8.0
Conclusions.. 18
Appendix A
BSF Drawings
12206/A3/100 Site Location Plan
12206/A3/101 Existing Site Drainage
12206/A3/102 Schematic Drainage Proposals
Architects Drawings
Impermeable Area Plan SDS 201202.01
Appendix B
Job No. 12206
2010
Windes Calculations
2
July
Version 4.1
July
Version 4.1
1.0
STATUS
1.1
This Report is prepared for the sole use of Hollamby Estates (2005) Ltd and
their agents in connection with the proposed forthcoming planning application.
No responsibility can be assumed for the Report if used by others.
1.2
For the purposes of the Contracts (Rights of Third Parties) Act 1999, nothing in
this Report shall confer on any third party any right to enforce or benefit from
any term of this Report
2.0
SYNOPSIS
2.1
2.2
The Report details the observations, calculates the probable flows that may be
generated by the development and makes recommendations for the disposal of
the foul and surface water.
July
Version 4.1
3.0
INTRODUCTION
3.1
3.2
3.3
The proposed development will be accessed from The Drove as shown on the
Architects Site Plan included in Appendix A with a total site area of 3,995m
(Red
Line
Boundary)
centred
at
Ordnance
Survey
Grid
Reference
(613896,165820).
July
4.0
EXISTING SITE
4.1
A topographical
Version 4.1
commissioned by the Client and carried out SDS & Associates. A copy of SDS
drawing 201202.01 is included in Appendix A, and has been used as the base
drawing for the existing site drainage plan 12206/A1/101 also included in
Appendix A.
4.2
From the survey it can be seen that there are a number of existing farm
buildings with associated hard standings and an existing house to be
demolished as part of the development.
4.3
Inspection of the sewer records indicates that there are no public surface water
sewers in close proximity to this site. The public foul water sewer is located in
The Drove with an existing lateral connection from Little Grannery just
downstream of manhole TR13658701.
4.4
A study of the geological survey map, Solid and Drift Edition for Faversham sheet 273, indicates that the site to be underlain by London Clay.
July
5.0
Version 4.1
5.1
The impermeable area survey indicates that there is currently 25m of roof
drainage from the existing house, Little Grannery, which is connected to the
public foul sewer; (Area Shaded Red). Below is a screen print of the
MicroDrainage Windes Simulation results indicating the existing peak discharge
rates to the public foul water sewer from a 2 year return period (sewers for
adoption design criteria).
5.2
To enable the completion of the SUR1 mandatory items of BREAAM Code for
Sustainable Homes, the following existing site discharge rates are quoted.
1 year return
0.1 litres/second
July
5.2
Version 4.1
kDU
Sanitary
Appliance
No of
Features
DU
DU
Bathroom
WC's
Washbasin
Bath
1
1
1
1.20
0.60
1.30
1.20
0.60
1.30
Kitchen
Sink
W/machine
1
1
1.30
0.80
1.30
0.80
Q=kDU(DU)
5.20
Q= 1.14 l/s
5.3
The existing peak discharge via the existing 100mm lateral to the public foul
water sewer is calculated as being 2.04 litres/second (0.9 l/s roof water and
1.14l/s foul flow).
July
Version 4.1
PROPOSED DISCHARGE
5.4
th
Adoption 6 Edition, the design flow from the proposed development is 0.23
litres/second, calculated as follows;
5.5
20 m
day
0.23 l/s
In accordance with BS EN 752: Part 4, the predicted peak discharge from the
proposal is as follows;
Unit 2&3
Unit 4
Unit 4
5.6
WC's
Washbasin
Bath
Showers
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Showers
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Kitchen Sink
Wash Machine
WC's
Washbasin
Bath
Kitchen Sink
Wash Machine
kDU
No of
Features
DU
DU
3
3
1
1
1
1
2x3
2x3
2x1
2x1
2x1
2x1
4
4
3
1
1
4
4
3
1
1
1.20
0.30
0.80
0.30
0.80
0.50
1.20
0.30
0.80
0.30
0.80
0.50
1.20
0.30
0.80
0.80
0.50
1.20
0.30
0.80
0.80
0.50
3.60
0.90
0.80
0.30
0.80
0.50
6.90
7.20
1.80
1.60
0.60
1.60
1.00
13.80
4.80
1.20
2.40
0.80
0.50
9.70
4.80
1.20
2.40
0.80
0.50
9.70
40.10
Q=kDU(DU)
Q= 3.16 l/s
July
Version 4.1
10
July
Version 4.1
CONSENTS
5.7
5.8
It can be noted from the outline design that the existing private lateral will be
utilised for one of the new properties, and a new manhole connection made for
the remaining properties in order to comply with the requirements of sewers for
adoption; i.e. the connection of more than 3 properties must via a manhole.
11
July
6.0
Version 4.1
6.1
The impermeable area survey indicates that the existing site has a total
impermeable area of 1,116m.
6.2
As mentioned in section 4.0, there are no public surface water sewers in the
vicinity of the site. The underlying geology is London Clay making the use of
soakaways impractical due to the extremely low permeability.
It is therefore
extremely likely that the existing surface water from the impermeable areas
migrate to the existing pond on the site either via a perched water table, or
through saturated topsoil, or via a land-drainage network.
The
6.3
In accordance with the ADAS 345 method, the existing peak flood flow from the
Greenfield site is calculated as Qbar = 2.4 l/s, using the following parameters;
Area = 0.400 hectare (3,995m red line area)
Catchment Length = 83m
Average Slope = 1:160
AAR = 630mm (agro-climatic area 34)
Soil Type = 1.0 (very slow)
6.4
12
July
Version 4.1
6.5
The following SUDS techniques have been considered, with the preferred
solution following the hierarchy of sustainability as established by the
Environment Agency and included in the Environment Agency publication: SUDS
A Practical Guide1. This hierarchy is shown below as Table 1.
6.6
Taking these techniques in order, the potential application within the proposed
development are considered below:
Living roofs the steep pitched roofs are not suitable for water attenuating
green roofs.
Basins and ponds The applicant controls land to the rear of the proposed
development providing ample area for the creation of a new pond with an
overflow to the existing water coarse.
Infiltration systems The underlying geology is London Clay making the
use the use of infiltrations systems in-effective
Permeable surfaces The private drives and access could incorporate
permeable paving.
13
July
Version 4.1
6.7
6.8
The intention is to install a new balancing pond with a permanent wet bottom for
bio-diversity, and attenuate the outflow from the pond to the equivalent
Greenfield Run-off rate from the existing site. It should be noted that whilst this
rate has been calculated to the equivalent of 6litres/hectare, the actual
attenuated rate used has been limited to 4 litres/hectares as required by the
Canterbury City Council Drainage Impact Assessment for Development
Proposals Guidance Notes dated March 2003. The discharge from the pond will
therefore need to be
litres/second.
6.9
14
July
6.10
Version 4.1
A storage estimate with the above parameters indicated a storage pond with a
volume of up to 124m, depending on the efficiency of the flow control device,
would be required.
6.11
CONSENTS
6.12
The ditch that the proposed pond will discharge to is within the riparian ownership
of the Client, and therefore consent is not required any other third party.
6.13
The site does not sit within a source protection zone, and considering the low risk
discharge, it is unlikely that any special protection measures will be required.
15
July
Version 4.1
7.0
FLOOD RISK
7.1
An inspection of the Environment Agency web site has identified that this site is
not located in an area at risk of flooding and therefore a separate Flood Risk
Assessment is not required.
16
July
7.2
Version 4.1
1a
Section 4.0
1b
1c
Yes
1d
Provide evidence that the Sequential Test and where necessary the Exception Test has been
applied in the selection of this site for this development type.
Zone 1 Low Probability - All uses of land are appropriate in this zone.
2a
2b
NO
NO
NO
NO
NO
NO
For each identified source, describe how flooding would occur, with reference to any historic
records wherever these are available.
None Known to Client
2c
What are the existing surface water drainage arrangements for the site?
Some roof area to the public foul water sewer, with the balance to an existing pond
17
July
Version 4.1
Probability
3a
If there is a Strategic Flood Risk Assessment (SFRA) covering this site, what does it show?
No
3c
What is the probability of the site flooding taking account of the contents of the SFRA and of any
further site specific assessment?
Low Probability
3d
Climate Change
4a
Attenuation pond designed to cater for 1in100 year storms with 30% allowance for climate
changes in accordance with BREEAM code for sustainable homes SUR1
5a
Please provide details of the development layout, referring to the relevant drawings?
Where appropriate, demonstrate how land-uses most sensitive to flood damage have been placed
in areas within the site that are at least risk of flooding.
N/A
6
6a
How will the site be protected from flooding, including the potential impacts of climate change over
the developments lifetime?
As 4a
7
7a
How will you ensure that your proposed development and the measures to protect your site will
not increase flood risk elsewhere?
18
July
Version 4.1
How will you prevent run-off from the development causing an impact elsewhere?
As 4a
Residual Risk
8a
What flooding risks will remain after you have implemented the measures to protect the site from
flooding?
None
8b
How, and by whom, will these risks be managed over the lifetime of the development?
None required
19
July
8.0
Version 4.1
CONCLUSIONS
8.1
The foul water design flow from the proposed development is anticipated to be
0.23litres/, which is lower than that currently being discharged to the public foul
sewer.
8.2
The existing Greenfield run-off rate for the development site (3,995m) is
calculated to be 2.4 litres/second (6 litres/hectare) in accordance with ADAS345
methods. The introduction of the SUDS attenuation pond will reduce this run-off
rate for the new impermeable area to an equivalent of 4 litres/hectare (0.6
litres/seconds for 1,486m). The post development run-off rate for the whole site
will therefore be reduced to 2.1 litres/second.
8.3
The foul and surface water disposal solutions are summarised and indicated on
drawing 12206/A1/102 included within Appendix A, with supporting calculations
for the outline network designs included within Appendix B.
8.4
A Section 106 application to connect to the public foul water sewer will need to
be made to and approved by Southern Water Services.
8.5
The ditch that the proposed pond will discharge to within the riparian ownership
of the Client, and therefore consent is not required any other third party.
8.6
In accordance with Planning Policy Statement 25, Development and Flood Risk,
December 2006, a Flood Risk Pro Forma has been prepared and concluded
that the site is not at risk from flooding and that the proposals will not increase
the risk of flooding elsewhere.
20
July
Version 4.1
APPENDIX A
BSF Drawings
12206/A3/100 Site Location Plan
12206/A3/101 Existing Site Drainage
12206/A3/102 Schematic Drainage Proposals
Architects Drawings
Impermeable Area Plan SDS 201202.01
21
July
Drawing No.
Drain
Drain
166000m
614100m
Drain
614000m
Random
D rain
Pond
Notes
Pond
Drain
613900m
613800m
Drain
Revision
12206/A3/100
24
1.
2.
This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.
3.
All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend
Ottersend
Drain
Planning Boundary
1
Tinkers
Meadow
Orchard End
Drain
a
Tr
Seafield
Tythe
Barn House
ac
Tr
Brookfield
Mead House
d
an
ck
an
th
Pa
th
Pa
North
Leas Gate
Tythe Barn
Sea
View
South
Tythe Barn
D rain
Alcrest
Kennel Meadow
The Paddock
Cottage
El Sub Sta
Huntsman's
Cottage
165900m
Portways
14.3m
Paddock South
Wedgewood
BM 14.6 6m
Rev
Description
Date
By
Ckd
Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.
Westwell
CLIENT
Badgers End
Pond
Mole House
Pond
Ponds
ENGINEERS
BSF CONSULTING
Chestfield Farm
Development
Site
Drain
PROJECT TITLE
Red Roofs
165800m
Little Granary
Proposed Houses at
Chestfield Farm
THE DROVE
7
19
23
11
Takamaka
DRAWING TITLE
Chestfield Farm House
D rain
17
Newstead
Drove Cottage
5
6
Pond
SCALE
Harbinger
1:1250
DESIGNED
Minarto
Drain
SE
CLO
Huddleston
GA
CHECKED
DATE
SIZE
27-07-2010
APPROVED
STATUS
13
Reproduced from the Ordnance Survey Plan with the Permission of the
Controller of Her Majesty's Stationery Office, Crown Copyright
Licence No AL51807A0001
DRAWN
A3
DATE
Preliminary
DRAWING No.
100
REVISION
12206/A3/100
Drawing No.
Revision.
12206/A1/101
Existing Drainage Plan
scale 1:200
Westwell
Notes
1.
2.
This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.
3.
All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend
Badgers End
Planning Boundary
Land owned by Applicant
T EL/O
H
ELEC/OH
TEL/OH
ELEC/OH
TEL/OH
WATER
GAS
WATER
GAS
GAS
ELEC/OH
ELEC/OH
TEL/OH
TEL/OH
OIL
CATV
ELEC/OH
TEL/OH
ELEC/OH
se
TEL/OH
TEL/OH
ELEC/OH
TEL/OH
ELEC/OH
TEL/OH
ELEC/OH
Rev
Date
Description
By
Ckd
Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.
CLIENT
ELEC/OH
ofs
ELEC/OH
ELEC/OH
CONSULTING
BSF ENGINEERS
PROJECT TITLE
ELEC/OH
Proposed Houses at
Chestfield Farm
DRAWING TITLE
THE DROVE
Reproduced from the Ordnance Survey Plan with the Permission of the
Controller of Her Majesty's Stationery Office, Crown Copyright
Licence No AL51807A0001
SCALE
1:200
DESIGNED
DRAWN
DATE
GA
CHECKED
SIZE
27-07-2010
APPROVED
STATUS
A1
DATE
PRELIMINARY
DRAWING No.
12206
REVISION
12206/A1/101
Drawing No.
Revision.
12206/A1/102
Proposed Drainage Plan
scale 1:200
Notes
1.
2.
This drawing must not be scaled. For all dimensions, levels and setting out
information see Architects drawings.
3.
All workmanship and method of construction should comply with all relevant
Codes of Practice, British Standards, the current edition of the Building
Regulations and good building practice.
Legend
RE
RE
Planning Boundary
Existing Pond
MH
Section 106 application to connect to the
public sewer required to be made to and
approved by Southern Water Services
225mm
Mole House
MH
MH
MH
New pond to create 124m of
storage, pond to remain partially full
creating permanent wet feature.
MH
MH
MH
MH
MH
MH
MH
RE
MH
MH
MH
RE
RE
Proposed Pond
MH
MH
MH
MH
MH
MH
MH
MH
225mm
MH
MH
MH
MH
New outfall to local
ditch, headwall to be
'JKH General
Purpose Headwall'
or similar approved.
RE
MH MH
MH
Red Roofs
Existing ditch
MH
MH
MH
Outfall to existing ditch
from 50mm pipe = 0.6 l/s
MH
MH
TR13658701
CL=15.649
IL=13.149
Rev
RE
RE
29-07-10
GA
Date
Description
By
Ckd
Copyright and other intellectual property rights in this document and all related documents,
drawings, etc., including calculations, is invested in BSF Consulting Engineers Limited and cannot
be used or reproduced for any other purpose than that for which they have been created without
the express permission in writing by BSF Consulting Engineers Limited.
Existing lateral
utilised for Unit ONE
CLIENT
Proposed Pond
CONSULTING
BSF ENGINEERS
Existing ditch
scale 1:25
Ditch profile
PROJECT TITLE
Storage area
Proposed Houses at
Chestfield Farm
Outfall ditch
DRAWING TITLE
DRAWN
SCALE
1:200
DATE
GA
DESIGNED
CHECKED
SIZE
27-07-2010
APPROVED
STATUS
A1
DATE
PRELIMINARY
DRAWING No.
12206/A1/102
12206
REVISION
Existing
Landscaping to be
trimed and
retained
Proposed 1800mm
timber fence to
boundary
NORTH
Access to
unit 3 garden
through
carport
Existing
Landscaping around
pond to be retained
and added to
Car port
Existing
Landscaping to be
retained
Proposed
landscaped
green space
ate
to indic y.
d line
D ashe rear boundar
us
previo
Propose
d fence
line
Existing landscaping
retained
Public footpath
ARCHITECTURE
trimed and
ARCHITECTURE
ARCHITECTURE
ARCHITECTURE
ARCHITECTURE
ARCHITECTURE
Version 4.1
APPENDIX B
Windes Calculations
Greenfield Run-off Rate
Outline Surface Water Network Design
22