Website www.wbsedcl.In
Memo No. PM/RE/CB/WO/T-5D/
_18.08.2016
To
M/s Kar Enterprise,
Ashram Para,
Mohit Nagar,
Jalpaiguri.
Date:
Sub: Formal Order for the work, Internal electrical wiring for
Control room & Switch yard
lighting work for the proposed Fulbari 33/11 Kv sub station
under Cooch Behar RE Project
Ref: 1) Tender Notice No
:
PM/RE/CB/ELEC/TENDER/2016-17/3, Dt-25.07.2016.
2) Your Tender Date
: 08.08.2016
3) Price Bid opened on
: 08.08.2016
4) Approval of the CE(RE) on
: 12.08.2016.
Dear Sir,
With reference to the above, the WBSEDCL is pleased to accept your tender &
place an order with you for execution of the work of Internal electrical wiring for Control
room & Switch yard lighting work for the proposed Fulbari 33/11 Kv sub station under
Cooch Behar RE Project as per offered rate and terms & conditions mentioned hereunder:
Sl.
No
Description of Work
Scope of
Work
Amount
01
As per
enclosed
schedule
Rs 4,10,880.00
(Rs. Four Lakh Ten
Thousand Eight Hundred
Eighty only )
The work shall be executed strictly in accordance with the specification &
instruction of the Controlling Officer/Supervising Officer or their authorized
representative.
TERMS & CONDITIONS:
1
Completion Time: The entire work is to be completed within 30 (Thirty) days
from the date issuance of formal order. The completion time is the essence of the
contract.
02
03
Material: All the materials required for the job have to be supplied by you except WBSEDCL
supplied materials like 05 nos, 9 mt long steel tubular pole, 02 sets 30v,75AH lead acid plate storage
battery with 02 sets fioat cum boost charger (30v,16A,auto/Manual) will be provided by the company
(from Cooch Behar Division store) on the basis of your requisition
04
Guarantee: 10% value of order will be kept deducted to constitute guarantee for
6(six) month
05
Risk & Insurance: WBSEDCL shall no way be held responsible or liable for any
accident, mishap of
any worker during the execution of work, any loss or damage caused to any
equipment of the
Company during execution shall have to be
compensated in full as per direction of the
Controlling/Supervising
PAGE 02/04
Officer. For safe custody of WBSEDCL materials and erected works, insurance
from
any subsidiary of the General Insurance Corporation of India on materials (to be
issued from the WBSEDCL store) and erection value (to be quoted by you) is to be
done by you.
06
Tools & Tackles: All tools & tackles required for the job shall have to be
07
08
will be the Controlling Officer of the work. You are directed to execute the work in
consultation with the Controlling Officer or his authorized representative.
Supervising Officer of the job.
09
Nodal Officer: The Manager (HR&A), RE Head Quarter, WBSEDCL, Bidyut Bhawan, Kol-91.
is the Nodal officer of the work. You shall have to intimate the Nodal Officer about the date of
payment to several classes of labour employed by you and payment is to be done in presence of
the departmental officials at work site on scheduled dates. You shall have to arrange for issuance
of employment card in such form as may be prescribed by the Controlling officer/Nodal Officer
i.r.o several classes of labour employed by you from time to time. You shall have to follow the
labour laws & rules.
10
Supervising Officer: The DE(E)/AE(E), Cooch Behar RE Project will be the
supervising officer of the
work.
11
You shall have to follow all Central Govt. West Bengal Govt. and statutory
Acts and Rules & Regulations.
b. You shall be responsible for compliance of all statutory obligations under
the Contract Labour (R&A) Act, 1970, Minimum Wages Act, 1948.
Payment of Wages Act, 1936, Payment of Bonus Act, 1965 and also be
responsible for payment of contributions (both employers & employees)
under the employees state Insurance Act, 1948(wherein Applicable) and
employees Provident Fund & Miscellaneous Provisions Act, 1952 in
respect of your employees.
c.
The contractor will be solely responsible for any accident that may occur
during the progress of the work and also for injury to person during
execution of the work.
In the event of any such accident, the Contractor will be responsible and
must pay proper
compensation for the same as per Workmens &
Compensation Act, 1923 (Wherein the Employees State Insurance Act,
1948 is not applicable.).
d. No Labour of minor age shall be employed in the work.
e. You shall have to pay statutory minimum wages to the unskilled workers
employed by you in terms of the rule 75 (a) of West Bengal Contract
Labour (R & A) Rules, 1972. You shall have to follow the Notification
issued by the Appropriate Government from time to time in this reg
12
You shall have to submit a programme of work duly supported by Bar Chart
PAGE 03/04
before starting of
execution for approval of the controlling officer.
13
The contractor shall be responsible for true and proper setting out the work and
for the correctness of
position, level, dimension or alignment of any part of the work. The contractor
on being asked to do any
rectification shall have to rectify the effects at his own cost.
14
Payment: First & Final Bill will be allowed after full completion & satisfaction of the
Controlling / Supervising Officer. Payment will be made from the Addl. General
Manager (F&A), REHQ, WBSEDCL after endorsement of necessary certificate from
the controlling officer.
15
Liquidated damage: If the contractor fails to complete the work within the time
prescribed herein, the contractor shall pay to the WBSEDCL a sum amounting to
% (half percent) of the value of work as liquidated damage for such default for
every week or part there of which shall elapse between the time prescribed or
extended time as the case may be and the date of completion of work subject to a
maximum of 10% of the total contract price. The WBSEDCL may without prejudice
to any all other method of recovery deducting the amount of such damages shall
not relieve the contractor from his obligation to complete the work or from any
other of his obligations and liabilities under this contract.
16
ESI & PF Code: you are to furnish the documents towards ESI (for works under
coverage area of ESI) and PF code compliance to the controlling officer.
17
SERVICE Tax: Service tax has not been included in the contract amount. The
service tax will be as per prevailing Act. You shall keep WBSEDCL indemnified in
case any action is taken against WBSEDCL by the competent authority on account
of contravention of any of the provisions of service tax by you. You may be
required to submit documents towards compliance of service Tax Act as per
statute.
18
(A.K.BISWAS)
W.B.S.E.D.C.L
PAGE 04/04
(A.K.BISWAS)
01.
Description of work
Unit
Qty
Rate
Amount
49400.00
49400.00
INTERNAL WIRING
Set
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
14.
S&f 240 volt 4 way TPN Distribution box with 1no 63 Amp
TPN isolator. Having sheet steel enclosure (Legrand Make)
comprising with 12 Nos. 6 Amp. To 32 Amp SP MCB
complete with neutral link, earth bar fixing on wall with
necessary connection having sensitivity 30mA.
S& Laying of 1.1 KV grade 2 core 6 mm, 2 PVC copper
wire from panel board partly recessed in wall and mainly
underground trenches with bricks protection 8 Nos per mtr
with 1 No. 10 SWG G.I wire including mending good the
damages (For SPN BDB and compound light ).
Do do 2 Core 2.5 mm2 & 1 Core 1.5 mm2 PVC copper
wire with casing capping for power plug.
S&F compressing type cable gland for the following size
a 2 Core 6mm2
b 2 Core 4mm2
Fixing the end of the following size of cable with necy.
Cable socket lugs etc. including supplying of cable socket /
lugs etc. by crimping method.
a 2 Core 6mm2
b 2 Core 4mm2
S&F of compound light control panel is sheet enclosure ( 16
SWG CRC steel) comprising with , with 3 Nos. 16 Amp.
MCB 4 Nos. Aluminium bar with 1 No. 16 Amp. Contractor
block (BCH Cat No. NIN and 1 No. time switch (L&T
make Et-100) on wall with earthing attachment.
Distn. Wiring with 2x1.5 mm2 for phase neutral and 1x1.5
mm2 for continuous earth conductor PVC insulated and
unsheathed stranded wire of copper conductor (Finolex
Make) in 1 inch PVC Casing & capping complete with all
accessories PVC pipe embedded in wall for vertical runs
and casing and capping fixed on the ceiling for horizontal
fan to light/fan/call bell points with piano key type switch
fixes in steel metal (16SWG) switch Board with Bakelite
top cover (3 mm thik) in wall including mending good
damages original finished (Av. Run 8mtr.)
Supply &Fixing of fan clamp with required nuts and bolts,
washer etc.
S& F of (48) 1200 mm dia ceiling fan complete with all
accessories (HAVELLS)
Distn. Wiring with 2x1.5 mm2 for phase neutral and 1.5 sq
mm for continuous earth conductor PVC insulated and
unsheathed stranded wire of copper conductor do- do- for
6 Amp .piano key type socket out let with piano key type 5
Amp. Switch Box fixed on sheet metal (16 SWG) switch
Board with Bakelite top cover blushed in wall including
mending good the damages to original finish (Av. Run 1.5
mtr)
Supply and Fixing of industrial type tube light luminaries
for 1x40 watt TL-5 tube light with all accessories including
1 No. 40 W 4-0 long tube light and enameled reflectors of
Philips make
Cat No. TCS 150, TYPE- TCS 150 1xTL5-54W
MIEBP(Single Tube)
-Do- Cat No. TCS 150, TYPE- TCS 150 2xTL5-54W
MIEBP(Twin Tube)
Supply and Fixing ceiling fittings with all accessories
(Crompton make Cat No. T2E211).
S&F of composite flash type 250 V,3 Pin 5/15 Amp. Plug
socket with 15 Amp. Piano key type switch on steel metal
box (16SWG) with Bakelite top cover earthing attachment
3010.00
3010.00
30
125.00
3750.00
80
120.00
9600.00
2
8
85.00
80.00
170.00
640.00
40
8
55.00
45.00
2200.00
360.00
13390.00
13390.00
50
595.00
29750.00
150.00
600.00
2300.00
9200.00
10
595.00
5950.00
12
14
2700.00
3255.00
32400.00
45570.00
6290.00
6290.00
1700.00
15300.00
Set
Mtr
Mtr
Set
Set
Set
Set
Set
Pt.
Set
Set
Pt.
Set
Set
Set
Set
15.
16.
17.
18.
19.
B.
20.
21.
22.
(7x4).
S&F 18 Watt CFL lamp
Earthing the installation by 8 SWG Copper wire as per
direction of E.I.C including supply of 2 dia 10 ft. long G.I
pipe and earth wire.
S & F Electronics fan regulator (Anchor Make Step Type)
S & F of 12 (300 mm) Heavy duty exhaust Fan after
cutting wall and finishing with necessary . Cementing work
including supplying and fixing of 1 No. louver stutter etc.
with necessary connection.
S & F of recess mounting luminary with mirror optics
designed ceiling industrial type tube light luminaries for
4x18 watt tube light with all accessories including and
enameled reflectors of Philips Make Cat No. Aura TBS 088
4XTLD18W EBS CS (Four nos 18 Tube).
COMPOUND LIGHTING
S & F of 250 V 250W Sodium Vapour light fitting complete
set with Ballast, Ignitor, Capacitor including supplying of 1
No. 250W. SON(H-P) lamp (Philips Make) Cat No. SRX
051 1XSON 250W. including Bracket/Header and clamp.
S & F of 250V 250W Metal Halide light fitting complete set
with Ballast, Ignitor, Capacitor including supplying of 1 No.
250W.(Crompton Make)
Cat No.MHSG-1525 1H,including Bracket/Header and
clamp.
S & F of 250 V 70 w post top light fittings complete set
with Ballast Ignitor and Capacitor including supplying of 70
W,SON lamp (Philips Make) Cat. No. SPC 102 ISSON70W(With net cover)
23.
24.
25.
No
10
2
210.00
3300.00
2100.00
6600.00
350.00
1400.00
1800.00
3600.00
4900.00
4900.00
11
7800.00
85800.00
5100.00
20400.00
4800.00
9600.00
11.00
3850.00
650.00
3250.00
1900.00
9500.00
Set
No
Set
Set
Set
Set
Set
Mtr.
350
5
Set
No
26
set
3500.00
7000.00
27
Erection commission of 30 volts 16 AMP auto/manual floatcum Boost charger for charging above battery bank
complete with connectors cable and other accessories
set
3900.00
7800.00
28
S&F of 2x2 way MCB box with 2nos DP 32A DC MCB &
2x6 way MCB box with 12nos DC SPMCB & 2nos 32A DP
changeover fixing on iron structure mounted in the wall for
DC panel.
set
13000.00
13000.00
29
mtr
36
125.00
4500.00
N.B.
TOTAL =RS 4,10,880.00
WBSEDCL supplied materials like 05 nos, 9 mt long steel tubular pole, 02 sets 30v,75AH lead acid plate
storage battery with 02 sets fioat cum boost charger (30v,16A,auto/Manual) will be provided by the company
(from Cooch Behar Division store) on the basis of your requisition
(A.K. BISWAS)
Project Manager , Cooch Behar RE Project