Structural steel

sand Blasting
Cutting to required lengths
Drilling of holes for for fixing bolts
Work shop to fitter for assembling
welding
Grinding
Primer
under coat(Anti corrosion)
Top coat

2 coats of ech 75 micron


75 micron

Tests/checks/Inspections
1
2
3
4
5
6
7
8
9
10
11

Dimension tolerance
weight checking
NDT(Non destruction test)
to check welding defects(gaps,blow holes,porasity,penetr
Fitter Inspection
for dimension tolerance as per BSEN 5950
DFT
Dry film thickness
75+2X75+75 microns
Inspection by WSP ON SITE
Site welding
MPI
RING TEST
HAMMER TEST
SHEAR STUDS
BEND TEST
30%
CHECK TOP LEVEL AFTER FIXING BASE PLATE
AFTER FIXING COLUMNS CHECK TOP LEVEL
CHECK VERTICALITY
CHECK ALIGNMENT
CHECK POSITION X,Y w.r.t grid lines

12

gap between baseplate and floor generally 25mm to fill non shrink grout

w holes,porasity,penetrations)