Delhi Metro Rail Corporation Limited


Competency Test
(JE/OHE)
M.M.100

Time :02 Hrs

Important Instructions: 1. Attempt all questions.


2. Figure on right side of the question indicated marks.
3. Answer should be brief and to the point.
4. Good Handwriting is expected.
5. All the name of CBs expected. Also CT and PTs locations.
Q1.
a. What is periodicity of foot plating of complete line, current collection
test,Section Insulator,IOH,POH?
b. Height of Contact wire on main-line.
c. Static and Dyanamic Clearances in ROCS
d. Staggar of contact wire on Tangent and Curved track.
e. Hanger Clamp torque value.

(15)

Q2.
1.
2.
3.
4.
5.
6.

Write short note on (any Five) with diagram


SSP and FP in Line-2.Mention their locations.
What is X-over and why it has been installed?.
Safety equipments in CMV and there use.
The contact wire material ,its x-area and type.
ITL, MET, TEW stands for...
IEC, IS, ISO stands for..

(15)

Q3.

Draw the sectioning diagram of complete section of ROCS L-2 (main line
only)
(20)

Q4.

What are the duties of JE/OHE?

Q5.

What preparations always you kept to attend any breakdown in ROCS.


(10)

Q6.

What is the safe working clearance of 25 Kv OHE,How wil you provide


discharge rod before putting discharge rod what you will check,if the
structure bond is not available ,how will you provide the discharge rod?
(10)

Q7.

What will you do as a JE in case someone getting electric shock in


presence of you?
(10)

Q8.

Write down the type of Power blocks and procedure for obtaining and
cancelling it . (10)

Unstitch

(10)

Come out

DELHI METRO RAIL CORPORATION LTD.


(A Joint Venture of Govt.of India & Govt.of NCT Delhi)

Competency Test
(JE/TPC)
M.M.100

Time :03.00hrs

Important Instructions: 1. Attempt all questions.


2. Figure on right side of the question indicated marks.
3. Answer should be brief and to the point.
4. Good Handwriting is expected.
Q1. Fill in the blanks: (10)
1. The IEC stands for ____________.
2. BIS stands for _____________.
3. The purpose of Buchholz relay ___________.
4. Maximum load current of 33/0.415 KV/2500KVA Cast Resin Transformer
of ASS is _______.
5. SP, SSP, SS, FP, ES, NS stands for _______________________
Q2.Write short note on (any Five)
(15)
1. Traction supply feeding arrangement with OHE in Line-1 with Diagram.
2. Ring Main System (33KV) in Line-1.
3. What are the working clearances in 25Kv system?
4. Safety equipments in ASS and there use.
5. Scheduled Maintenance
6. Energy Conservation.
7. Difference between SSP & SP (by Diagram)
Q3.

Draw Single Line Diagram of KG/RSS and RI/RSS with their protections.

(15)
Q4.

What are the duties of Junior Engineers/TPC ?

Q5.
Q6.

(10)

What is the basic difference among CB, Isolator and interrupter and their
uses ?
(10)
What are the protections available in Auxiliary Main Power Transformer
(66/33 KV)? List down.
(10)

Q7.

In case of any Break Down on Main line list down the steps you should
take.
(10)

Q8.

Write down the safety precautions on while giving power block to a


supervisor. Taking an example
(10)

Q9.

Write down different types of Power-Block. Procedure of obtaining /


canceling Power Block.

(10)