Вы находитесь на странице: 1из 42

Schedule of works for Construction of Surface drainage for Fulbari 33/11

KV Sub Station under Cooch Behar RE Project. (Estimate based on


PWDSOR effective from10.12.12).
Sl No
1

Description of Items

Quantity

Unit

140.00

Cum

0.00

P-1 , Item2(a)

30.00

Cum

0.00

P-3 , Item3(a)

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

14.00

M3

0.00

P-61 , Item10(ii)(a)

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

40.00

M3

0.00

P-39 , Item7(b)

M2

0.00

P-63 , Item12(a)

M.T.

0.00

P-65 , Item15(a)(i)

Earth work in excavation of foundation trenches


or drains in all sorts of soil but excluding
Laterite or sandstone) including removing
spreading or stacking the spoils within a lead of
75m.as directed. The item includes leveling,
dressing and ramming the bottom bailing out
water as required complete.A) Depth of
excavation not exceeding 1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as
per direction.

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection compl. as per
drawing and direction. (i) Torsteel / mild steel.

Rate

PWD SOR
pgno. &
item no.

Amount

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course where
necessary (ground floor)
(a) with (4:1) Cement mortar(i) 15 mm thick
plaster
Neat cement punning about 1.5mm thick in wall,
dado, window, sills, floor drain etc.
(Rupee Eight Lacs Seventy Seven Thousand
Three Hundred EightyFive) only.

P-319,Item2(i)(C)

M2

0.00

M2

0.00
Total

0.00

Say= Rs

0.00

P-323,
Item-8

Schedule of works for Construction of Switch Yard Fencing(balance) of


Bamanhat 33/11 KV Sub Station under Cooch Behar RE Project.
Sl No
1

Description of Items
Earth work in excavation of foundation trenches or
drains in all sorts of soil but excluding Laterite or
sandstone) including removing spreading or
stacking the spoils within a lead of 75m.as directed.
The item includes leveling, dressing and ramming
the bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.

Quantity

Unit

Rate

Amount

Cum

0.00

Cum

0.00

Cement concrete with 30mm down graded shingles


excluding shuttering in ground floor (1:3:6)
proportion. N.B. Variety.

M3

0.00

Nominal mix (1:1.5:3) cement concrete with graded


stone chips (20mm size) excluding shuttering and
reinforcement if any ground floor.(A) With river
bazree

M3

0.00

Priming one coat on steel or other metal surface


with synthetic enamel/ oil bound primer of
approved quality including smoothening surface,
sand papering etc complete.

M2

0.00

M2

0.00

M2

0.00

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc. Layer
by complete. (Payment to be made on the basis of
measurement of finished quantity of work)(a) With
earth obtained from excavation of foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks of
approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as per
direction.
(b) 25mm to 30mm thick wooden shuttering
without staging in foundation etc.

Reinforcement for reinforced concrete work in all


sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking and
bending to correct shape, placing in proper position
and binding with 16 gauge black annealed wire at
every intersection compl. as per drawing and
direction. (i) Torsteel / mild steel.

M.T.

0.00

Brick work with 1st class bricks in cement mortar.


(a) In foundation and plinth, cement mortar (6:1)

M3

0.00

10

125mm thick work with 1st class bricks in cement


mortar (4:1) in ground floor.

M2

0.00

11

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface including
throating nosing and drip course where necessary
(ground floor)
M2

0.00

M2

0.00

M2

0.00

13

14

(a) with (6:1) cement mortar. (i) 15 mm thick


plaster
Applying decorative cement base paint of approval
quality after preparing the surface incld. scraping
the same thoroughly (plastered or concrete surface)
as per manufacturers specification.In ground floor.
Two coats.
Painting with superior quality aluminium paint
of approved make and brand including
smoothening surface by sand papering etc.on
steel surface.
(a) Two coats.

17

M.S structural works in columns ,beams etc.


With simple rolled strual members (e.g. joists,
angle, channel sections conforming to IS:226,
IS:808 & SP (6)1964 connected to one another
with bracket, gussets, cleats as per design,
direction of Engineer-in charge complete
including cutting to requisite shape and length,
fabrication with neceassry bolting metal arc
welding conforming to IS:816-1956 and
IS:1995 using electrodes of approved make and
brand conforming to IS:814-1957, haulage,
hoisting and erection all complete. The rate
includes the cost of rolled steel section,
consumables such as electrodes, gas and hire
charge of all tools and plants and labour
required for the work including all incidental
chages such as electricity charges, labour
insurance charges etc.ii) For structural works in
roof trusses etc. using joists,channels and
angles of specified section weighing less than
22.5 kg/m.

(Rupee Two Lacs Sixty Six Thousand Eight


Hundred Twenty Two) only.

0.00

MT

Total

0.00

Say= Rs

0.00

PWD
SOR
pgno. &
item no.

P-1 ,
Item-2(a)

P-3 ,
Item-3(a)

P-61 ,
Item10(ii)(a)

P-39 ,
Item-7(b)

P-343 ,
Item-7(b)

P-63 ,
Item12(a)

P-63 ,
Item12(a)

P-65 ,
Item15(a)(i)

Page- 69 /
Sl. No.
22(a)
Page- 73 /
Sl. No. 29

P319,Item
-2(i)(C)

P335,Item
-16(iii)

P343,Item
-8(B)

P145,Item
-1(ii)

Schedule of works for Construction of Cable Trench (Main & Branch) for
Fulbari 33/11 KV Sub Station under Cooch Behar RE Project. (Estimate
based on PWDSOR effective from 07.04.12).
Sl No
1

Description of Items
Earth work in excavation of foundation
trenches or drains in all sorts of soil but
excluding Laterite or sandstone) including
removing spreading or stacking the spoils
within a lead of 75m.as directed. The item
includes leveling, dressing and ramming the
bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.

Quantity

Unit

Rate

Amount

Cum

0.00

Cum

0.00

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

M3

0.00

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground
floor.(A) With river bazree

M3

0.00

M2

0.00

M.T.

0.00

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation
of foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood
planks of approval thickness with required
bracing for concrete slabs, beams, columns,
lintels curved on straightening, fitting, fixing
and striking out completion of works (Upto
roof of ground floor.) (a) 25mm to 30mm thick
wooden shuttering as per direction.

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods,
initial straightening and removal of loose rust
(if necessary) cutting to requisite length,
hooking and bending to correct shape, placing
in proper position and binding with 16 gauge
black annealed wire at every intersection
compl. as per drawing and direction. (i)
Torsteel / mild steel.

M.S. work in brackets made from flats, angles,


tees etc. to sizes, specialy bent, twiated,
fprged, making holes, drilled and fitted to rafter
of trusses with necessary bolts, nuts, washers
or screws etc. (length of straight not less than
230mm).

Qntl.

0.00

M2

0.00

M2

0.00

Plaster (to wall, floor, ceiling etc.) with sand


and cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course
where necessary (ground floor)
(a) with (4:1) Cement mortar(i) 15 mm thick
plaster
Neat cement punning about 1.5mm thick in
wall, dado, window, sills, floor drain etc.
(Rupee Five Lacs Seventy Six Thousand
Fifty) only.

Total

0.00

Say= Rs

0.00

PWD SOR
pgno. &
item no.

P-1 , Item2(a)

P-3 , Item3(a)

P-61 , Item10(ii)(a)

P-39 , Item7(b)

P-63 , Item12(a)

P-65 , Item15(a)(i)

P-167,Item26

P-319,Item2(i)(C)

P-323,
Item-8

Schedule of works for Construction of 1.60MVA Transformer for Fulbari


33/11 KV Sub Station under Cooch Behar RE Project. (Estimate based on
PWDSOR effective from 10.12.12).
Sl No
1

Description of Items

PWD SOR
pgno. &
item no.

Quantity

Unit

Rate

Amount

18.00

Cum

91.61

1648.98

P-1 , Item2(a)

12.00

Cum

59.20

710.40

P-3 , Item3(a)

2.50

Cum

326.91

817.28

Page- 5/ Sl.
No. 4(A)

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

1.00

M3

3535.56

3535.56

P-61 , Item10(ii)(a)

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

8.50

M3

4794.64

40754.44

P-39 , Item7(b)

32.00

M2

275.92

8829.44

P-63 , Item12(a)

Earth work in excavation of foundation trenches


or drains in all sorts of soil but excluding
Laterite or sandstone) including removing
spreading or stacking the spoils within a lead of
75m.as directed. The item includes leveling,
dressing and ramming the bottom bailing out
water as required complete.A) Depth of
excavation not exceeding 1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Filling in foundation or plinth by silver sand


in layers not exceeding150mm as directed
and consolidating the same by thorough
saturation with water, ramming complete
including the cost of supply of sand.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood
planks of approval thickness with required
bracing for concrete slabs, beams, columns,
lintels curved on straightening, fitting, fixing
and striking out completion of works (Upto roof
of ground floor.) (a) 25mm to 30mm thick
wooden shuttering as per direction.

9
10

11

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection compl. as per
drawing and direction. (i) Torsteel / mild steel.

Brick work with 1st class bricks in cement


mortar. (a) In foundation and plinth, cement
mortar (6:1)
Supply fiting fixing of 90 Pound rails including
necessary bolts, MS cleat etc. complete.

0.50

M.T.

59696.00

29848.00

P-65 , Item15(a)(i)

1.00

M3

3917.62

3917.62

Page- 69 / Sl.
No. 22(a)

500.00

Kg.

58.89

29445.00

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course
where necessary (ground floor)

P-319,Item2(i)(C)

(b) with (6:1) Cement mortar(i) 15 mm thick


plaster

15.00

M2

109.21

1638.15

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

15.00

M2

31.16

467.40

Total

121612.27

Say= Rs

121612.00

(Rupee One LacTwenty One Thousand Six


Hundred Twelve) only.

P-323,
Item-8

Schedule of works for Construction of Station Service Transformer for Fulbari


33/11 KV Sub Station under Cooch Behar RE Project. (Estimate based on
PWDSOR effective from 10.12.12).
Sl No
1

Description of Items

PWD SOR
pgno. &
item no.

Quantity

Unit

Rate

Amount

3.00

Cum

91.61

274.83

P-1 , Item2(a)

2.00

Cum

59.20

118.40

P-3 , Item3(a)

0.50

M3

326.91

163.46

Page- 5/ Sl.
No. 4(A)

Cement concrete with 30mm down graded shingles


excluding shuttering in ground floor (1:3:6)
proportion. N.B. Variety.

0.30

M3

3535.56

1060.67

P-61 ,
Item-10(ii)
(a)

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

0.15

M3

4794.64

719.20

P-39 ,
Item-7(b)

1.50

M2

275.92

413.88

P-63 ,
Item-12(a)

Earth work in excavation of foundation trenches or


drains in all sorts of soil but excluding Laterite or
sandstone) including removing spreading or
stacking the spoils within a lead of 75m.as
directed. The item includes leveling, dressing and
ramming the bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc. Layer
by complete. (Payment to be made on the basis of
measurement of finished quantity of work)(a) With
earth obtained from excavation of foundation.

Filling in foundation or plinth by silver sand in


layers not exceeding150mm as directed and
consolidating the same by thorough saturation
with water, ramming complete including the
cost of supply of sand.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as per
direction.

10

Reinforcement for reinforced concrete work in all


sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking and
bending to correct shape, placing in proper
position and binding with 16 gauge black annealed
wire at every intersection compl. as per drawing
and direction. (i) Torsteel / mild steel.

Brick work with 1st class bricks in cement mortar.


(a) In foundation and plinth, cement mortar (6:1)

0.001

M.T.

59696.00

59.70

P-65 ,
Item-15(a)
(i)

4.50

M3

3917.62

17629.29

Page- 69 /
Sl. No. 22(a)

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface including
throating nosing and drip course where necessary
(ground floor)

P319,Item2(i)(C)

(b) with (6:1) Cement mortar(i) 15 mm thick


plaster

9.00

M2

109.21

982.89

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

9.00

M2

31.16

280.44

Total

21702.75

Say= Rs

21703.00

(Rupee Twenty One Thousand Seven Hundred


Three) only.

P-323,
Item-8

Schedule of works for Construction of Current Transformer & Potential


Iransformer and Circuit Breaker for Fulbari 33/11 KV Sub Station under
Cooch Behar RE Project. (Estimate based on PWDSOR effective from
10.12.12).
Sl No
1

Description of Items

Quantity

Unit

Rate

Amount

20.00

Cum

91.61

1832.20

10.00

Cum

59.20

592.00

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

1.00

M3

3535.56

3535.56

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

12.00

M3

4794.64

57535.68

40

M2

275.92

11036.80

0.50

M.T.

59696.00

29848.00

Earth work in excavation of foundation trenches


or drains in all sorts of soil but excluding Laterite
or sandstone) including removing spreading or
stacking the spoils within a lead of 75m.as
directed. The item includes leveling, dressing and
ramming the bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as
per direction.

Reinforcement for reinforced concrete work in all


sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection compl. as per
drawing and direction. (i) Torsteel / mild steel.

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface including
throating nosing and drip course where necessary
(ground floor)
(b) with (6:1) Cement mortar(i) 15 mm thick
plaster

9.00

M2

109.21

982.89

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

9.00

M2

31.16

280.44

Total

105643.57

(Rupee One Lac Five Thousand Six Hundred


Forty Four) only.

Say= Rs 105644.00

PWD SOR
pgno. &
item no.

P-1 , Item2(a)

P-3 , Item3(a)

P-61 , Item10(ii)(a)

P-39 , Item7(b)

P-63 , Item12(a)

P-65 , Item15(a)(i)

P-319,Item2(i)(C)

P-323,
Item-8

Schedule of works for Construction of Concrete Road for Fulbari 33/11 KV


Sub Station under Cooch Behar RE Project. (Estimate based on PWDSOR
effective from 10.12.12).
Sl No
1

Description of Items
Earth work in excavation of foundation trenches
or drains in all sorts of soil but excluding
Laterite or sandstone) including removing
spreading or stacking the spoils within a lead of
75m.as directed. The item includes leveling,
dressing and ramming the bottom bailing out
water as required complete.A) Depth of
excavation not exceeding 1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Quantity

Unit

Rate

Amount

155.00

Cum

91.61

14199.55

10.00

Cum

59.20

592.00

% m.

3098.68

6197.36

Sq.M.

137.91

165492.00

Brick edging (75mm wide) with picked jhama


bricks, laid true to line and level including
cutting necessary trench in soil or in hard
metalled surface, laying the bricks and
repacking the trnch (on both side of the
200.00
edging) with spoils and ramming the same
thoroughly complete as per direction.
(a) Birck on
edge edging (125mm depth)
Supplying and laying brick khoa of ordinary bats
of size (38mm X 63mm) of approved quality in
100mm. layer (loose) filling in gaps with small
1200.00
ones rammed and compact as directed true to
level and grade.
Ordinary cement concrete (mix-1:2:4) with
graded stone chips (20mm nominal size)
excluding shuttering and reinforcement, if any, in
ground floor as per relevant IS code
.(b)River bazree.

60.00

M3

4020.40

241224.00

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

75.00

M3

4794.64

359598.00

10

11

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as
per direction.

60.00

M2

275.92

16555.20

4.50

M.T.

59696.00

268632.00

0.02

Cu.m.

51465.96

1206.23

(a) with (6:1) Cement mortar(i) 15 mm thick


plaster

450.00

M2

109.21

49144.50

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

450.00

M2

31.16

14022.00

Total

1136862.84

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection compl. as per
drawing and direction. (i) Torsteel / mild steel.

Bituminous filler of approved type in expansion


joints of dummy joints including finishing the top
surface as directed.
(The quantam should be corrected upto
three decimals)

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course where
necessary (ground floor)

(Rupee Eleven Lacs Thirty Six Thousand


Eight Hundred Sixty Three) only.

Say= Rs 1136863.00

PWD SOR
pgno. & item
no.

P-1 , Item2(a)

P-3 , Item3(a)

P-395 , Item3(a)

Page
-33
/Sl.
No.5(b)

P-39 , Item7(b)

P-63 , Item12(a)

P-65 , Item15(a)(i)

P-451 , Item9

P-319,Item2(i)(C)

P-323,
Item-8

Schedule of work for Concreting in Switch Yard area & Path way for Fulbari
33/11 KV Sub Station under Cooch Behar RE Project. (Estimate based on
PWDSOR effective from 10.12.12).
Sl No
1

Description of Items
Earth work in excavation of foundation
trenches or drains in all sorts of soil but
excluding Laterite or sandstone) including
removing spreading or stacking the spoils
within a lead of 75m.as directed. The item
includes leveling, dressing and ramming the
bottom bailing out water as required
complete.A) Depth of excavation not
exceeding 1.50 mtr.
Cement concrete with 30mm down graded
shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.
Ordinary cement concrete (mix-1:2:4) with
graded stone chips (20mm nominal size)
excluding shuttering and reinforcement, if any,
in ground floor as per relevant IS code
.(b)River bazree.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m
using approved stout props and thick hard
wood planks of approval thickness with
required bracing for concrete slabs, beams,
columns, lintels curved on straightening,
fitting, fixing and striking out completion of
works (Upto roof of ground floor.) (a) 25mm
to 30mm thick wooden shuttering as per
direction.

Quantity

Unit

Rate

Amount

132.00

Cum

91.61

12092.52

200.00

M3

3535.56

707112.00

20.00

M3

4020.40

80408.00

80.00

M2

275.92

22073.60

Plaster (to wall, floor, ceiling etc.) with sand


and cement mortar including rounding off or
chamfering corners as directed and racking
out joints or roughening of concrete surface
including throating nosing and drip course
where necessary (ground floor)

(b) with (6:1) Cement mortar(i) 15 mm thick


plaster

270.00

M2

109.21

29486.70

Neat cement punning about 1.5mm thick in


wall, dado, window, sills, floor drain etc.

270.00

M2

31.16

8413.20

Supply, Spreding, leveling and dressing


shingles of size
as pe rstandared
specification of the company

130.00

M3

947.00

123110.00

Total

982696.02

(Rupee Nine Lacs Eighty Two Thousand


Six Hundred Ninety Six) only.

Say= Rs 982696.00

PWD SOR
pgno. &
item no.

P-1 , Item2(a)

P-61 , Item10(ii)(a)

Page
-33
/Sl.
No.5(b)

P-63 , Item12(a)

P-319,Item2(i)(C)

P-323,
Item-8

Analysed
rate

Schedule of works for Construction of Cable Trench (Main & Branch) for
Fulbari 33/11 KV Sub Station under Cooch Behar RE Project. (Estimate
based on PWDSOR effective from 07.04.12).
Sl No
1

Description of Items

Quantity

Unit

Rate

Amount

120.00

Cum

91.61

10993.20

65.00

Cum

59.20

3848.00

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

5.00

M3

3535.56

17677.80

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground
floor.(A) With river bazree

65.00

M3

4794.64

311651.60

360.00

M2

275.92

99331.20

1.40

M.T.

59696.00

83574.40

Earth work in excavation of foundation


trenches or drains in all sorts of soil but
excluding Laterite or sandstone) including
removing spreading or stacking the spoils
within a lead of 75m.as directed. The item
includes leveling, dressing and ramming the
bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.
Earth work in filling in foundation trenches or
plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation
of foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood
planks of approval thickness with required
bracing for concrete slabs, beams, columns,
lintels curved on straightening, fitting, fixing
and striking out completion of works (Upto
roof of ground floor.) (a) 25mm to 30mm thick
wooden shuttering as per direction.

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods,
initial straightening and removal of loose rust
(if necessary) cutting to requisite length,
hooking and bending to correct shape, placing
in proper position and binding with 16 gauge
black annealed wire at every intersection
compl. as per drawing and direction. (i)
Torsteel / mild steel.

M.S. work in brackets made from flats, angles,


tees etc. to sizes, specialy bent, twiated,
fprged, making holes, drilled and fitted to rafter
of trusses with necessary bolts, nuts, washers
or screws etc. (length of straight not less than
230mm).

1.00

Qntl.

6862.95

6862.95

300.00

M2

109.21

32763.00

300.00

M2

31.16

9348.00

Total

576050.15

Say= Rs

576050.00

Plaster (to wall, floor, ceiling etc.) with sand


and cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course
where necessary (ground floor)
(a) with (4:1) Cement mortar(i) 15 mm thick
plaster
Neat cement punning about 1.5mm thick in
wall, dado, window, sills, floor drain etc.
(Rupee Five Lacs Seventy Six Thousand
Fifty) only.

PWD SOR
pgno. &
item no.

P-1 , Item2(a)

P-3 , Item3(a)

P-61 , Item10(ii)(a)

P-39 , Item7(b)

P-63 , Item12(a)

P-65 , Item15(a)(i)

P-167,Item26

P-319,Item2(i)(C)

P-323,
Item-8

Schedule of works for Construction of Switch Yard Fencing of Fulbari 33/11 KV


Sub Station under Cooch Behar RE Project. (Estimate based on PWDSOR
effective from 10.12.12).
Sl No
1

Description of Items

Quantity

Unit

Rate

Amount

20.00

Cum

91.61

1832.20

10.00

Cum

59.20

592.00

Cement concrete with 30mm down graded shingles


excluding shuttering in ground floor (1:3:6)
proportion. N.B. Variety.

2.00

M3

3535.56

7071.12

Nominal mix (1:1.5:3) cement concrete with graded


stone chips (20mm size) excluding shuttering and
reinforcement if any ground floor.(A) With river
bazree

3.50

M3

4794.64

16781.24

Priming one coat on steel or other metal surface


with synthetic enamel/ oil bound primer of
approved quality including smoothening surface,
sand papering etc complete.

15.00

M2

23.13

346.95

30.00

M2

257.57

7727.10

15.00

M2

275.92

4138.80

Earth work in excavation of foundation trenches or


drains in all sorts of soil but excluding Laterite or
sandstone) including removing spreading or
stacking the spoils within a lead of 75m.as directed.
The item includes leveling, dressing and ramming
the bottom bailing out water as required
complete.A) Depth of excavation not exceeding
1.50 mtr.
Earth work in filling in foundation trenches or
plinth with good-earth in layers not exceeding
150mm including watering and ramming etc. Layer
by complete. (Payment to be made on the basis of
measurement of finished quantity of work)(a) With
earth obtained from excavation of foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks of
approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as per
direction.
(b) 25mm to 30mm thick wooden shuttering
without staging in foundation etc.

Reinforcement for reinforced concrete work in all


sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking and
bending to correct shape, placing in proper position
and binding with 16 gauge black annealed wire at
every intersection compl. as per drawing and
direction. (i) Torsteel / mild steel.

0.75

M.T.

69334.00

52000.50

Brick work with 1st class bricks in cement mortar.


(a) In foundation and plinth, cement mortar (6:1)

5.00

M3

4597.00

22985.00

10

125mm thick work with 1st class bricks in cement


mortar (4:1) in ground floor.

25.00

M2

627.00

15675.00

11

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface including
throating nosing and drip course where necessary
(ground floor)
90.00

M2

101.43

9128.70

90.00

M2

39.74

3576.60

15.00

M2

40.79

611.85

13

14

(a) with (6:1) cement mortar. (i) 15 mm thick


plaster
Applying decorative cement base paint of approval
quality after preparing the surface incld. scraping
the same thoroughly (plastered or concrete surface)
as per manufacturers specification.In ground floor.
Two coats.
Painting with superior quality aluminium paint
of approved make and brand including
smoothening surface by sand papering etc.on
steel surface.
(a) Two coats.

17

M.S structural works in columns ,beams etc.


With simple rolled strual members (e.g. joists,
angle, channel sections conforming to IS:226,
IS:808 & SP (6)1964 connected to one another
with bracket, gussets, cleats as per design,
direction of Engineer-in charge complete
including cutting to requisite shape and length,
fabrication with neceassry bolting metal arc
welding conforming to IS:816-1956 and
IS:1995 using electrodes of approved make and
brand conforming to IS:814-1957, haulage,
hoisting and erection all complete. The rate
includes the cost of rolled steel section,
consumables such as electrodes, gas and hire
charge of all tools and plants and labour
required for the work including all incidental
chages such as electricity charges, labour
insurance charges etc.ii) For structural works in
roof trusses etc. using joists,channels and
angles of specified section weighing less than
22.5 kg/m.

(Rupee Two Lacs Sixty Six Thousand Eight


Hundred Twenty Two) only.

1.90

MT

65450.02

124355.04

Total

266822.10

Say= Rs

266822.00

PWD
SOR
pgno. &
item no.

P-1 ,
Item-2(a)

P-3 ,
Item-3(a)

P-61 ,
Item10(ii)(a)

P-39 ,
Item-7(b)

P-343 ,
Item-7(b)

P-63 ,
Item12(a)

P-63 ,
Item12(a)

P-65 ,
Item15(a)(i)

Page- 69 /
Sl. No.
22(a)
Page- 73 /
Sl. No. 29

P319,Item
-2(i)(C)

P335,Item
-16(iii)

P343,Item
-8(B)

P145,Item
-1(ii)

Schedule of works for Land Development of Fulbari 33/11 KV Sub Station


under Cooch Behar RE Project. (Estimate based on PWDSOR effective from
10.12.12).
Sl No
1

Description of Items

Quantity

Unit

Rate

Amount

5500.00

Cum

478.70

2632850.00

Earth work in filling in compound,tank,low


land,ditches etc. with good-earth in layers not
exceeding 150mm including breaking clods and
consolidating the same by ramming and dressing
complete. (Payment to be made on the basis of
measurement of finished quantity of work
iii) with carried earth arranged by the contractor
within a radious exceeding 5 km but nit exceeding 10
km including cost of carried earth.

Total =Rs. 26,32,850.00


(Rupee Twenty Six Lacs Thirty Two Thousands Eight Hundred Fifty)
Only.

PWD
SOR
pgno. &
item no.

P-5 ,
Item-3(b)
(iv)

Schedule of works for Construction of Surface drainage for Fulbari 33/11


KV Sub Station under Cooch Behar RE Project. (Estimate based on
PWDSOR effective from10.12.12).
Sl No
1

Description of Items

PWD SOR
pgno. &
item no.

Quantity

Unit

Rate

Amount

200.00

Cum

91.61

18322.00

P-1 , Item2(a)

40.00

Cum

59.20

2368.00

P-3 , Item3(a)

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

25.00

M3

3535.56

88389.00

P-61 , Item10(ii)(a)

Nominal mix (1:1.5:3) cement concrete with


graded stone chips (20mm size) excluding
shuttering and reinforcement if any ground floor.
(A) With river bazree

60.00

M3

4794.64

287678.40

P-39 , Item7(b)

850.00

M2

275.92

234532.00

P-63 , Item12(a)

2.50

M.T.

59696.00

149240.00

P-65 , Item15(a)(i)

Earth work in excavation of foundation trenches


or drains in all sorts of soil but excluding
Laterite or sandstone) including removing
spreading or stacking the spoils within a lead of
75m.as directed. The item includes leveling,
dressing and ramming the bottom bailing out
water as required complete.A) Depth of
excavation not exceeding 1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as
per direction.

Reinforcement for reinforced concrete work in


all sorts of structure including distribution bars,
stirrups, binders etc. incld. supply of rods, initial
straightening and removal of loose rust (if
necessary) cutting to requisite length, hooking
and bending to correct shape, placing in proper
position and binding with 16 gauge black
annealed wire at every intersection compl. as per
drawing and direction. (i) Torsteel / mild steel.

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course where
necessary (ground floor)

P-319,Item2(i)(C)

(a) with (4:1) Cement mortar(i) 15 mm thick


plaster

690.00

M2

109.21

75354.90

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

690.00

M2

31.16

21500.40

Total

877384.70

(Rupee Eight Lacs Seventy Seven Thousand


Three Hundred EightyFive) only.

Say= Rs 877385.00

P-323,
Item-8

Schedule of work for Construction of Cable Terminal Support for Fulbari


33/11 KV Sub Station under Cooch Behar RE Project. (Estimate based on
PWDSOR effective from 10.12.12).
Sl No
1

Description of Items

PWD SOR
pgno. &
item no.

Quantity

Unit

Rate

Amount

2.00

Cum

91.61

183.22

P-1 , Item2(a)

0.50

Cum

59.20

29.60

P-3 , Item3(a)

Cement concrete with 30mm down graded


shingles excluding shuttering in ground floor
(1:3:6) proportion. N.B. Variety.

0.50

M3

3535.56

1767.78

P-61 , Item10(ii)(a)

Ordinary cement concrete (mix-1:2:4) with


graded stone chips (20mm nominal size)
excluding shuttering and reinforcement, if any, in
ground floor as per relevant IS code
.(b)River bazree.

2.00

M3

4020.40

8040.80

7.00

M2

275.92

1931.44

Earth work in excavation of foundation trenches


or drains in all sorts of soil but excluding Laterite
or sandstone) including removing spreading or
stacking the spoils within a lead of 75m.as
directed. The item includes leveling, dressing
and ramming the bottom bailing out water as
required complete.A) Depth of excavation not
exceeding 1.50 mtr.

Earth work in filling in foundation trenches or


plinth with good-earth in layers not exceeding
150mm including watering and ramming etc.
Layer by complete. (Payment to be made on the
basis of measurement of finished quantity of
work)(a) With earth obtained from excavation of
foundation.

Hire and labour charges for shuttering with


centering and necessary staging upto 4 m using
approved stout props and thick hard wood planks
of approval thickness with required bracing for
concrete slabs, beams, columns, lintels curved on
straightening, fitting, fixing and striking out
completion of works (Upto roof of ground floor.)
(a) 25mm to 30mm thick wooden shuttering as
per direction.

Plaster (to wall, floor, ceiling etc.) with sand and


cement mortar including rounding off or
chamfering corners as directed and racking out
joints or roughening of concrete surface
including throating nosing and drip course where
necessary (ground floor)

Page
-33
/Sl.
No.5(b)

P-63 , Item12(a)

P-319,Item2(i)(C)

(a) with (4:1) Cement mortar(i) 15 mm thick


plaster

5.00

M2

109.21

546.05

Neat cement punning about 1.5mm thick in wall,


dado, window, sills, floor drain etc.

5.00

M2

31.16

155.80

Total

12654.69

P-323,
Item-8

(Rupee Twelve Thousand Six Hundred Fifty


Five) only.

Say= Rs 12655.00