Академический Документы
Профессиональный Документы
Культура Документы
Coal
Boiler
Turbine & Generator
Steam
(through wagons)
Air
Switchyard
(from atmosphere)
Water
Consumers
Sl. Projects
No
Investment
(Rs in Lacs)
Benefit
Payback
(months)
519
9 MW-Hr per
day per unit
36
170
14
Nil
17 MW-Hr
per day per
unit
3 MW-Hr per
day per unit
6 MW-Hr per
day
7
3
NA
Sl.
No
Projects
Investment
(Rs in Lacs)
Benefit
Payback
(months)
30
2 MW-Hr per
day
18
Nil
1 MW-Hr per
day
NA
7
150
Installation of PADO in Unit-1 & 2
Online
immediate
correction of
SHR
deviation
88.37 % PLF
91.16 % PLF
89.08 % PLF
Plant
Capacity
PLF %
(last 3 Years Avg)
SEC %
(last 3 Years
Avg)
Reliance, Dahanu
2 X 250 MW
(without Cooling Tower)
95.04
7.65
(without FGD)
3 X 250 MW
89.54
8.28
JPL, Raigarh
(with Cooling Tower)
4 X 250 MW
92.51
8.31
After Modification
Design
Operating
(50 Hz)
(50 Hz)
1470 RPM
1470 RPM
5350 RPM
113/30
5150 RPM
430 KW
Savings
oApprox 17 MW-Hr per day per unit in full load condition with a payback of 7
months
oReduction of Hydraulic oil temperature by 30C which in turn reduced the
cooling water demand for the pump
v
v
v
v
v
v
v
v
v
v
v
v
v
v
River Hoogli
Sludge
Pit
Holding Pond
Pump House
Turbine
Condenser
CT Blowdown
Station
Services
Canteen
Hot Water
Cold Water
Cooling Water Forebay
CT Make-up
Cooling Water
Pumps
Cooling Tower
Discharge outside Plant
Revised Scheme
Modifications done
Municipal Drain
Raw Water
Treatment Plant
Fish
Pond
DM
Plant
Ammonia Dosing
Water Fogging
Online SPM
Management Programme
Thank You