Forces acting of the pieri) Dead load from superstructureii) Wight of contained wateriii) Live load reaction with impact-
=
=
=
54.25 t
32.89 "
20.00 "
20.00
4.00 t
The breakinf force will act at 1.2m above the road surface.
R.L. of application = R.L. of road surface + 1.2 m
= 64.15 +
1.20
= 65.35 M
Height above the centre of bearing(
=
Increased reaction - =
=
4.00 /
1.28 t
65.35
1.60 M
5.00
63.75 )
1.60
V) Wind force- Following two cases will be considered for wind forcea) When water level in the drain is at H.F.L.
a) When water level in the drain is zero.
Case (a)-
R.L. of application
=(
=
=
=
60.00 Kg/cm
5.00
0.37
x
t
60.00
x 1.24 )/ 1000
62.91 +
63.53 M
1.24
/ 2
Case (b)-
=( 61.98
= 2.98
= 64.15
= 2.17
59.00 )
M
61.98 )
M
x 1.00
M
Area of the trough on which the wind force will act= 2.17 x 5.00
= 10.85 M
=
75.00 Kg/cm
75.00 )/ 1000
75.00 )/ 1000
2.98 / 2
2.17 / 2
Structural Design of the PierThe pier will be checked for the following conditionsa) When water level is at H.F.L.b) When there is no water in the drain-
Ixx
A = 10.07 x 1.00
+( 0.5
x 3.14
=
10.84 M
=( 10.07 x
+
0.5
= 0.839
=
Iyy
1.00
)+(
/
x
x
0.75
1.00
x
)
1.00
)+
12
)+(
0.5
0.75
12
)x 2
1.00
0.75
12
59.00
3.14
64
0.035
0.025
0.90 M4
=(
1.00
10.07 /
0.5
3.14
=( 85.096 +
0.035
0.5
4.00
12
64
)+( 1.00
x
0.50
x
)
0.003 )
85.13 M4
x( 62.91 -
42.38 M
42.38
Force on pier due water currenta) Forces parrallel to pierNormal scour depth
2.46 M
x( 62.91 - 59.00
Pressure at top-
= Kv2
=
35
=(
=
62.91 3.91 M
59.00 )
= 81.93 Kg/m2
Area
Total pressure
1.00
3.91
M2
=
=
=
3.91 x
160.18 Kg
0.16 t
3.91
81.93 /
3.91
0.27 m2/sec2
80
0.27
21.60 Kg/m2
Length of pier
=
11.32 M
Force on pier=
11.32 x 3.91 x 21.60 /( 1000
= 0.48
t
Height of point of application of resultant pressure from bed=
2.61 M
A) Stresses in pier when water level in the drain is at H.F.L.i)
Vertical load-
a)
b)
c)
d)
ii)
iii)
D.L. of super structurreD.L. of contained waterD.L. of PierIncreased reaction due to breaking forceL.L. with impactBuoyancy force (-)(-)
Total
=
=
=
=
=
=
=
54.25
32.89
119.57
1.28
20.00
6.36
221.63
t
"
"
"
"
"
t
59.00
Moment about XX axisa) Due to water curernet perpendicular to pierMxx = 0.48 x 2.61
= 1.25 tm.
b) Due to breaking forceMxx =
=
4.00 x( 65.35
25.40 tm
=
=
0.37 x( 63.53
1.69 tm
- 59.00 )
+
tm
0.42
14.82
0.14
Max. compression-
20.45
14.82
= 20.45
0.14
<
10
Ixx )
( Myy x 5.66
0.90
= 35.41 t/m2
=
3.54
Kg/m2
Hence Safe
Kg/m2
2.10 x 5.66
Stresses on the pier when there is no waer in the drainVertical loadMoment about XX axisMxx
221.63
26.65 tm
On trough-
=
=
=
=
0.22
0.33
0.81
3.30
x( 60.49
tm
x( 63.07
tm
59.00
59.00
3.62
tm
( Mxx
0.5
Ixx )
( Myy x 5.66
26.65 x
0.5
0.90
Stress =
=
(P / A)
/ Iyy )
221.63 / 10.84
/ 85.13
14.82
0.24
Max. compression-
20.45
14.82
= 20.45
0.24
<
10
3.62 x 5.66
= 35.51 t/m2
=
3.55
Kg/m2
Kg/m2
Hence Safe
No tension will develop in the pier.
Hence nominal reinforcemetn is provided.
Provide 16mm dia torsteel @ 150 c/c both side(vertical)
Provide 12mm dia torsteel @ 200 c/c as binder(Hor)
Executive Engineer
Borolia Division(Irrgn)
Tamulpur
of flow may be
1 cube
0.75 cube
1 cube