Вы находитесь на странице: 1из 6

Perception

Survey
Thesis 2015-16
Study of Factors Affecting Capital Cost (per km length) of Metro Rail Projects in India
Personal Details
1)
Name
2)
Company
3)
Deisgnation
4)
Experience
Area of
5)
Expertiese/
6)
Address:
7)
8)
9)

Phone (M)
Phone (L)
Email
A. GUIDE WAY
(i) Policy & Planning
Insignificant
Response

Substantial

(i) Design Considerations


Insignificant
Response

Substantial

(iii) Construction Methodology


Insignificant
Response

Substantial

(v) Geotechnical Parameters


Insignificant
Response

Substantial

(vi) City Charactersitics


Insignificant
Response

(B) Station
(i) Policy & Planning
Insignificant
Response

Substantial

Substantial

(i)
Insignificant
Response

Substantial

(ii) Deisgn Considerations


Insignificant
Response

Substantial

(iii) Construction Methdology


Insignificant
Response

Substantial

(iv) Station spacing


Insignificant
Response

Substantial

(v) Geotechnical Conditions


Insignificant

Substantial

Response

(C ) System
(i) Methodology ( Traction, Power, Signalling, Telecomm. FCS)
Insignificant
Substantial
Response

(ii) Local Conditions


Insignificant
Response

Substantial

(iii) Design Considerations


Insignificant
Response

Substantial

(iv) Alignment Length


Insignificant
Response

Substantial

(D) Righw of Way


(i) Policy & Planning - Land Acquisition, Existing improvements, Type
Insignificant
Substantial
Response

(ii) Utility Shifting & improvement


Insignificant
Response

Substantial

(iii) Pavement works, Street improvement & beautification


Insignificant
Substantial
Response

(iv) Road width, ROW type


Insignificant
Response

Substantial

(V) Drainage Facilities


Insignificant
Response

Substantial

(vi) Protection/ strengthing/ monitoring of existing structures


Insignificant
Substantial
Response

(E) Ancillary Works


(i) Alignment Length
Insignificant
Response

(ii) Project Phasing (New/ extension lines)


Insignificant
Response

Substantial

Substantial

(iii) Policy & planning - Retail shops


Insignificant
Response

(F) Vehicle
(i) Alignment length
Insignificant
Response

Substantial

Substantial

(ii) Manufacturing location of Rolling stock


Insignificant
Response

Substantial

(iv) System demand


Insignificant
Response

Substantial

(G) Soft Cost


(i) Policy & planning
Insignificant
Response

(ii) Design Considerations


Insignificant
Response

Substantial

Substantial

(iii) Contract type & conditions


Insignificant
Response

Substantial

(iv) project Phasing ( new/ extension lines)


Insignificant
Response

Substantial

(v) Geotechnical conditions / Topography


Insignificant
Response

Substantial

Signature interviewee

Signature Respondent

Вам также может понравиться