L ONG INTERNATIONAL
Long Internationals
Claims Analysis Process
Our professionals are experts in contract, insurance,
and surety bond-related claims and disputes
including their evaluation, analysis, preparation,
and resolution.
Our claims analysis process is:
Performed in Phases for better definition
and control of scope, time and cost;
Systematic to ensure our analyses are
thorough, our findings are credible, and
our opinions are defensible; and
Tailored to your specific needs regarding
services provided and resources utilized.
Senior-Level Resources
Members of our select group of consultants
typically have 20 or more years of experience
in the construction industry and offer unique
perspectives based on a combination of their
claims consulting skills, technical expertise,
and mud-on-the-boots practical experience
on pipeline projects.
Our professionals diverse experience allows
them to function as:
Your Support Staff
A World of Experience
Phased Approach
Long Internationals standard work plan for
providing engineering and construction claims
analysis and expert testimony services on pipeline
construction projects is to use a phased approach,
as described on pages 2 and 3 of this brochure.
Our task assignments are dependent on the work
already performed by our client, the availability of
project documentation,
the issues in dispute,
and the timing of
required work products
that are defined by the
arbitration/litigation
schedule. Therefore, we
can make any necessary
adjustments to our
typical work tasks
described herein.
Document Database
Development and
Preliminary Analysis
Submittals;
Subcontracts; and
PHASE III:
PHASE IV:
PHASE V:
Detailed Analysis
Report Preparation
Arbitration/Litigation Testimony
Our consultants offer unique perspectives based on a combination of their claims consulting skills,
technical expertise, and mud-on-the-boots practical experience in pipeline projects.
C O M P E N S A B L E D E L AY
16 CDs
90,000
Planned
Start
12 JUL
80,000
18 CDs
Planned
Finish
Actual
Finish
27 JUL
30 AUG
CONTRACTOR
PREMATURE
DEMOBILIZATION OF
CRAFT MANPOWER
60,000
(Linear Feet)
Cumulative Quantity
70,000
II M
MP
PA
AC
CT
T
50,000
Actual Pipeline
Installation
40,000
30,000
CONTRACTOR FAILURE
TO MOBILIZE SUFFICIENT
CRAFT MANPOWER
II M
MP
PA
AC
CT
T
20,000
OWNER FAILURE TO
PROVIDE SUFFICIENT
INSPECTION PERSONNEL
I M PA C T
10,000
0
1
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
July
Number of
Craft Labor
per Day
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
August
2010
No per Day
300
000
250
000
200
000
150
000
100
00
50
0
0
79
82
80
81
83
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
42
44
41
36
30
24
24
71
77
July
7/1/10
7/2/10
7/3/10
7/4/10
7/5/10
7/6/10
7/7/10
7/8/10
7/9/10
7/10/10
7/11/10
77
80
82
82
96
83
43
75
80
45
78
176
81
42
76
95 106
78
44
72
85
74
40
42
August
2010
L ONG I NTERNATIONAL
7/12/10
7/13/10
7/14/10
7/15/10
7/16/10
7/17/10
7/18/10
7/19/10
7/20/10
7/21/10
7/22/10
7/23/10
7/24/10
7/25/10
7/26/10
7/27/10
7/28/10
7/29/10
7/30/10
7/31/10
8/1/10
8/2/10
8/3/10
8/4/10
8/5/10
8/6/10
8/7/10
8/8/10
8/9/10
8/10/10
8/11/10
8/12/10
8/13/10
8/14/10
8/15/10
8/16/10
8/17/10
8/18/10
8/19/10
8/20/10
8/21/10
8/22/10
8/23/10
8/24/10
8/25/10
8/26/10
8/27/10
8/28/10
8/29/10
8/30/10
40
44
42
45
43
42
44
41
36
30
24
24
72
76
78
75
71
77
77
74
78
81
80
83
81
79
82
80
81
83
80
82
82
85
95
106
154
176
238
244
240
238
244
149
132
134
128
120
96
42
8/31/10
Experience Matters...
L ONG INTERNATIONAL
Damage Analyses
Long International employs numerous methods
to analyze, demonstrate or disprove the Contractors
entitlement to recovery of increased costs as a
result of engineering and/or construction labor
productivity loss caused by delays and impacting
events for which the Owner and/or the Contractor
may be responsible. After the Contractors various
types of damages are identified, evaluated for
entitlement, and quantified, Long International
may utilize various methods of presenting such
damages, depending on the contract terms, legal
issues, and availability of data and documentation.
Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com