ACCOMPLISHMENT

Project Name:
Location:

REPORT

SHSHR INFORMATION CENTER


Brgy. Nato, Anini-y, Antique

ITEM

Week 1 (June)
6
7
8
9
Planned Actual Planned Actual Planned Actual Planned

Installation of Metal Furring and Hanger


Installation of Hardiflex
Installation of Cross Bracing on Rafter Truss
Fabrication of Fascia Frame
Installation of Fascia Frame
Rough Finish of Parapet Wall
Installation of Roof and Accessories
Removing of Scaffolding for Ceiling Works
Installation of Tiles
Installation of Electrical Fixtures
Installation of Electrical Wirings & Accessories
Installation of Plumbing Fittings & Accessories
Installation of Windows
Demobilization

Accomplishment (June 6-12,2016):


1. Ceiling Works - 86%
2. Finishing of Parapet Wall - 90%
3. Roofing Framing - 100%
4. Electrical Works - 25.41%

Unfinished Work for the week:


1. Installation of Hardiflex is not done due to light-heavy rains.
2. Plumbing works is not done due to needed materials not on site.
3. Edges of the parapet wall needs to be rectified.
Concerns:
1. Follow-up materials for Tileworks, Windows, Plumbing Works, Electrical Works and Roofing to meet the said deadline.

EPORT

ek 1 (June)
9
10
11
Actual Planned Actual Planned Actual

Week 2 (J
12

13
14
15
Planned Actual Planned Actual Planned

Accomplishment (June 13-19,2016):

said deadline.

Unfinished Work for the week:

Concerns:

Week 2 (June)
15
16
17
18
Actual Planned Actual Planned Actual Planned Actual

19

Week 3 (June)
20
21
22
23
24
25
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

25
Actual

26

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SHSHR INFORMATION CENTER


Brgy. Nato, Anini-y, Antique

ITEM

Week 2 (June)
13
14
15
16
Planned Actual Planned Actual Planned Actual Planned

Installation of Metal Furring and Hanger


Installation of Hardiflex
Installation of Cross Bracing on Rafter Truss
Fabrication of Fascia Frame
Installation of Fascia Frame
Rough Finish of Parapet Wall
Installation of Roof and Accessories
Removing of Scaffolding for Ceiling Works
Installation of Tiles
Installation of Electrical Fixtures
Installation of Electrical Wirings & Accessories
Installation of Plumbing Fittings & Accessories
Installation of Windows
Demobilization

Accomplishment (June 13-19,2016):


1. Ceiling Works - 90%
2. Tile Works - 50%
3. Roofing Accessories (Hardi Sanipa) - 75%
3. Roofing Accessories (Air Vent) - 100%

Concerns:
1. Pay the balance for windows at jasper glass and it is ready for pick-up to be deliver on respective site.
2. Roofing is needed to install electrical and plumbing fixtures.

EPORT

ek 2 (June)
16
17
18
Actual Planned Actual Planned Actual

19

Week 3 (June)
20
21
22
23
24
25
Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

25
Actual

26

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SHSHR INFORMATION CENTER


Brgy. Nato, Anini-y, Antique

ITEM

Week 3 (June)
20
21
22
23
Planned Actual Planned Actual Planned Actual Planned

Installation of Metal Furring and Hanger


Installation of Hardiflex
Installation of Cross Bracing on Rafter Truss
Fabrication of Fascia Frame
Installation of Fascia Frame
Rough Finish of Parapet Wall
Installation of Roof and Accessories
Removing of Scaffolding for Ceiling Works
Installation of Tiles
Installation of Electrical Fixtures
Installation of Electrical Wirings & Accessories
Installation of Plumbing Fittings & Accessories
Installation of Windows
Demobilization

Accomplishment (June 20-26,2016):


1. Ceiling Works - 90%
2. Tile Works - 90%
3. Roofing Accessories (Hardi Sanipa) - 100%
4. Plumbing Accessories - 50%

5. Electrical Accessories - 20%


Concerns:
1. Roofing is needed to install electrical fixtures and ceiling outside.
2. Windows must be on site this week together with the roofing to accomplish 100% of the contract.

EPORT

ek 3 (June)
23
24
25
Actual Planned Actual Planned Actual

26

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SHSHR INFORMATION CENTER


Brgy. Nato, Anini-y, Antique

27

ITEM

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned

Installation of Metal Furring and Hanger


Installation of Hardiflex
Installation of Cross Bracing on Rafter Truss
Fabrication of Fascia Frame
Installation of Fascia Frame
Rough Finish of Parapet Wall
Installation of Roof and Accessories
Removing of Scaffolding for Ceiling Works
Installation of Tiles
Installation of Electrical Fixtures
Installation of Electrical Wirings & Accessories
Installation of Plumbing Fittings & Accessories
Installation of Windows
Demobilization

Accomplishment (June 27-July 3,2016):


1. Ceiling Works - 90%
2. Tile Works - 95%
3. Roofing Accessories (End Flashing) - 90%
4. Plumbing Accessories - 90%

5. Electrical Accessories - 90%


Concerns:
1. Installation of end flashing is not finish due to lack of material needed.
2. Windows must be on site this week accomplish 100% of the contract.

EPORT

4 (June-July)
30

Actual Planned Actual Planned Actual

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

ITEM

Week 1 (June)
9

Planned Actual Planned Actual Planned Actual Planned

Fabrication of G.I Pipe Truss *


#3*
#4*
#5*
#6*
Fabrication of Fascia Frame
Installation of PVC Door
Installation of G.I Pipe Truss
Installation of Rafter Truss
Installation of Fascia Frame
Painting of Roof Framing Materials
Painting of Column (Main Bldg.)
Painting of Beam (Main Bldg.)
Painting of Kitchen Area
Installation of Wood Joist
Installation of Marine Plywood
Leveling and Compaction of Flooring
Fabrication of Steel Door
Installation of Steel Door
Installation of Steel Partitions

Accomplishment (June 6-12,2016):


1. G.I Pipe Truss - 66.67%
Unfinished Work for the week:
1. Painting of C-Purlins and Re-touch painting of materials for roof framing due to unsufficient metal primer paint.
Concerns:
1. Materials for painting of roof framing needed to be on site to avoid rusting of materials.
2. Plain bars must be delivered to site to be cut and ready to install to avoid delay.
3. Black lens, Mask and Leather gloves are needed for the protection of our welder.

EPORT

ek 1 (June)
9

10

11

Actual Planned Actual Planned Actual

12

13

14

15

Week 2 (June)
16

17

18

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

18
Actual

19

20

21

22

Week 3 (June)
23

24

25

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

25
Actual

26

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

3
Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

ITEM

13

14

15

Week 2 (June)
16

Planned Actual Planned Actual Planned Actual Planned

Fabrication of G.I Pipe Truss *


#3*
#4*
#5*
#6*
Fabrication of Fascia Frame
Installation of PVC Door
Installation of G.I Pipe Truss
Installation of Rafter Truss
Installation of Fascia Frame
Painting of Roof Framing Materials
Painting of Column (Main Bldg.)
Painting of Beam (Main Bldg.)
Painting of Kitchen Area
Installation of Wood Joist
Installation of Marine Plywood
Leveling and Compaction of Flooring
Fabrication of Steel Door
Installation of Steel Door
Installation of Steel Partitions

Accomplishment (June 13-19,2016):


1. G.I Pipe Truss - 75%
Unfinished Work for the week:
1. Painting of roof framing materials due to unsufficient metal primer paint.
2. Fascia Frame is to be finish after G.I pipe truss is done.
Concerns:
1.Kindly double check the materials to be delivered on site.
2. We are in need of welding holder that could sustain the heat due to non-stop full welding.
3. Please instruct drivers to cooperate and observe time to avoid delays.
4. Need to evaluate the status of the base for flooring if its okay to ask for FDT.

EPORT

ek 2 (June)
16

17

18

Actual Planned Actual Planned Actual

19

20

21

22

Week 3 (June)
23

24

25

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

25
Actual

26

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

3
Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

T
Project Name:
Location:

SHSHR INFORMATION CENTER


Brgy. Nato, Anini-y, Antique

ITEM

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned

Installation of Hardiflex
Installation of Roof and Accessories
Tile Works
Installation of Electrical Fixtures
Installation of Electrical Wirings & Accessories
Installation of Plumbing Fittings & Accessories
Installation of Windows
Demobilization

ek 5 (July)
7

Actual Planned Actual Planned Actual

10

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

ITEM

20

21

22

Week 3 (June)
23

Planned Actual Planned Actual Planned Actual Planned

Fabrication of G.I Pipe Truss *


#3*
#4*
#5*
#6*
Fabrication of Fascia Frame
Installation of PVC Door
Installation of G.I Pipe Truss
Installation of Rafter Truss
Installation of Fascia Frame
Painting of Roof Framing Materials
Painting of Column (Main Bldg.)
Painting of Beam (Main Bldg.)
Painting of Kitchen Area
Installation of Wood Joist
Installation of Marine Plywood
Leveling and Compaction of Flooring
Fabrication of Steel Door
Installation of Steel Door
Installation of Steel Partitions

Accomplishment (June 20-26,2016):


1. PVC Door - 90%
2. G.I Pipe Truss - 100%
3. Wood Joist - 100%
Concerns:
1. Schedule FDT after installation of G.I Pipe Truss
2. Schedule delivery of roofing for kitchen and main building to meet the said deadline.

EPORT

ek 3 (June)
23

24

25

Actual Planned Actual Planned Actual

26

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

3
Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

ACCOMPLISHMENT

REPORT

Project Name: CONCRETING OF BRGY. ROAD


Location: Brgy. Igpalge, Anini-y, Antique

ITEM

13

14

15

Week 2 (June)
16

Planned Actual Planned Actual Planned Actual Planned

Excavation
Installation of RCPC
Head Wingwall
Head Wall
Item 201 *
*Stockpiling
*Grader
*Road Roller
*Water Truck
FDT
ITEM 311 **
**Forms
**Pouring
**Curing
**Asphalt Sealant
**Shouldering
Final Inspection
Demobilization

Accomplishment (June 13-19,2016):


1. Installation of RCPC - 63.64%

2. Wingwall (Lay-out & Excavation) - 10%


Concerns:
1. Fullswing Stockpile of item 201 on site
2. Deliver the remaining boulders and fine sand for wingwall
3. Hauling Stockpile of item 201 at casay batching plant
4. Deliver the remaining rcpc

EPORT

ek 2 (June)
16

17

18

Actual Planned Actual Planned Actual

19

20

21

22

Week 3 (June)
23

24

25

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

25
Actual

26

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

3
Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

ACCOMPLISHMENT
Project Name:
Location:

REPORT

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

ITEM

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned

Fabrication of G.I Pipe Truss *


#6*
Fabrication of Steel Girt/Center Girt
Installation of G.I Pipe Truss
Installation of C-Purlins
Installation of Fascia Frame
Painting of Roof Framing Materials
Painting of Column (Main Bldg.)
Painting of Beam (Main Bldg.)
Painting of Kitchen Area
Installation of Marine Plywood
Leveling and Compaction of Flooring
Installation of Tiles
Fabrication of Steel Door
Installation of Steel Door
Fabrication of Steel Partitions
Installation of Steel Partitions

Accomplishment (June 27-July 3,2016):


1. G.I Pipe Truss - 100%
2. Steel Partition - 90%

3. C-Purlins - 24.32%
4. Painting Skimcoat - 75 %
Concerns:
1. Painting of Roof Framing materials in not finish due to lack of paint
2. Materials for steel door and electrical fittings, fixtures and accessories must be on site

EPORT

4 (June-July)
30

Actual Planned Actual Planned Actual

T
Project Name:
Location:

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

25

ITEM

26

27

Week 8 (July)
28

29

PlannedActualPlannedActualPlannedActualPlannedActualPlanned

Full Weld of Steel Girt/Center Girt


Re-Touch Painting of Roof Framing
Painting of Column (Main Bldg.)
Painting of Beam (Main Bldg.)
Painting of Kitchen Area
Installation of Marine Plywood
Leveling and Compaction of Flooring
Installation of Steel Door
Painting of Steel Partitions and Steel Door
Installation of Gutter
Installation of Roofing
Installation of Metal Furring
Installation of Rib Span Cladding for Ceiling
Installation of Plumbing Fixtures

29

30

ActualPlannedActual

31

T
Project Name:
Location:

SAN ROQUE EVACUATION CENTER


Brgy. San Roque, Anini-y, Antique

ITEM

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned

Fabrication of Steel Girt/Center Girt


Installation of C-Purlins
Painting of Roof Framing Materials
Painting of Column (Main Bldg.) *skimcoat
Painting of Beam (Main Bldg.) *skimcoat
Painting of Kitchen Area *skimcoat
Installation of Marine Plywood
Leveling and Compaction of Flooring
Installation of Tiles
Fabrication of Steel Door
Installation of Steel Door
Installation of Electrical Fixtures and Wirings

ek 5 (July)
7

Actual Planned Actual Planned Actual

10

ACCOMPLISHMENT

REPORT

Project Name: CONCRETING OF BRGY. ROAD


Location: Brgy. Igpalge, Anini-y, Antique

ITEM

20

21

22

Week 3 (June)
23

Planned Actual Planned Actual Planned Actual Planned

Excavation
Installation of RCPC
Head Wingwall
Head Wall
Item 201 *
*Stockpiling
*Grader
*Road Roller
*Water Truck
FDT
ITEM 311 **
**Forms
**Pouring
**Curing
**Asphalt Sealant
**Shouldering
Final Inspection
Demobilization

Accomplishment (June 20-26,2016):


1. RCPC - 90.91%

2. Excavation - 100%
3. Head Wingwall - 50%
Concerns:
1. Fullswing all materials on site on a sunny day to avoid delays.
2. Instruct drivers to cooperate to meet the said deadline.
3. Dumptrucks and loader is needed to rehauling item 201 at batching plant to accomplish it in just one day.
4. Less activity for this week because of light-heavy rains that causes unpassable road.

EPORT

ek 3 (June)
23

24

25

Actual Planned Actual Planned Actual

26

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

3
Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

ACCOMPLISHMENT

REPORT

Project Name: CONCRETING OF BRGY. ROAD


Location: Brgy. Igpalge, Anini-y, Antique

ITEM

27

28

Week 4 (June-July)
29
30

Planned Actual Planned Actual Planned Actual Planned

Excavation
Installation of RCPC
Head Wingwall
Head Wall
Item 201 *
*Stockpiling
*Grader
*Road Roller
*Water Truck
FDT
ITEM 311 **
**Forms
**Pouring
**Curing
**Asphalt Sealant
**Shouldering
Final Inspection
Demobilization

Accomplishment (June 27-July 3,2016):


1. RCPC - 100%

2. Head Wingwall - 70%


3. Head wall - 40%
4. Item 201 (stockpile panambak) - 30%
Concerns:
1. Fullswing Re-hauling of item 201
2. Canter truck needs its own labor for re-hauling

EPORT

4 (June-July)
30

Actual Planned Actual Planned Actual

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned

10
Actual

Project Name: CONCRETING OF BRGY. ROAD


Location: Brgy. Igpalge, Anini-y, Antique

ITEM

Week 5 (July)
7

Planned Actual Planned Actual Planned Actual Planned

Head Wingwall
Head Wall
Item 201 *
*Stockpiling
*Grader
*Road Roller
*Water Truck
FDT
ITEM 311 **
**Forms
**Pouring
**Curing
**Asphalt Sealant
**Shouldering
Final Inspection
Demobilization

ek 5 (July)
7

Actual Planned Actual Planned Actual

10

Project Name: CONCRETING OF BRGY. ROAD


Location: Brgy. Igpalge, Anini-y, Antique

ITEM

25

26

27

Week 8 (July)
28

Planned Actual Planned Actual Planned Actual Planned

Stockpiling
ITEM 311 **
**Forms
**Pouring
**Curing (Watering)
**Asphalt Sealant
**Shouldering
Final Inspection
Demobilization

ek 8 (July)
28

29

30

Actual Planned Actual Planned Actual

31