Академический Документы
Профессиональный Документы
Культура Документы
Document Type:
LLF CHECKLIST
Revision: 0
Location:
ELECTRICAL
DEPARTMENT
Date:
Document NO
TPCIL-EMP-0
HT SWITCH
GEAR
Revision
0
Description
Reviewed
GM
HOD
By
Team
Date
ELECTRICAL
ELECTRICAL
Approved
RR Pillai
TABLE OF CONTENTS
Description
Page
SAFETY PRECAUTIONS
TOOLS & TACKLES
FREQUENCY OF INSPECTION
REMARKS
3
3
3
5
DATE:
EQUIPMENT/MODULE:
MAKE:
SL NO:
SAFETY PRECAUTIONS:
1. ENSURE THE DEPLOYMENT OF TRAINED /SKILL
WORKFORCE
Page 2 of 5
SL
NO
DESCRIPTION
TAKE PTW BEFORE PROCEDING WITH VISUAL INSPECTION.
ENSURE HT SWITCH BOARD PANEL SURROUNDING SHALL BE
CLEAN i.e. NO DEBRIS SURROUNDNG THE PANEL.
ENSURE ALL THE UN WANTED OPENINGS IN THE PANEL
SHALL BE SEALED PROPERLY INCLUDING THE BOTTOM
GLAND HOLES, FLOOR OPENINGS.
CHECK FOR ANY MOISTURE TRACES ON TOP ROOF THE PANEL
& HUMIDITY.
CHECK THE PANEL DOOR SEALING IS PROPER AND DOOR IS IN
LOCKING POSITION. DOOR LOCKS ARE IN GOOD CONDITION.
1.
2.
3.
4.
5.
6.
7.
8.
9.
REMARKS
WEEKLY
WHENEVER
WORK IS
CARRIED OUT
15DAYS
WHENEVER
WORK IS
CARRIED OUT
WEEKLY
15DAYS
DAILY
WHENEVER
WORK IS
CARRIED OUT
DESCRIPTION
10
11
12
13
14
15
16
REMARKS
WHENEVER
WORK IS
CARRIED OUT
WEEKLY
WEEKLY
DAILY
DAILY
15DAYS
Page 3 of 5
17
18
19
20
21
22
23
24
25
26
27
28
29
WEEKLY
15DAYS
WHENEVER
WORK IS
CARRIED OUT
WHENEVER
WORK IS
CARRIED OUT
15DAYS
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
DAILY
REMARKS:
Page 4 of 5
DATE
PERFORMED BY
CHECKED BY
Page 5 of 5