Вы находитесь на странице: 1из 32

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

1 of 10

Year: 2015
Code
Hull
H001
H002
H003
H004
H005
H006
H007
H008
H009
H010
H011
H012
H013
H014
H015
H016
H017
H018
H019
H020
H021
H022
H023
H024
H025

Items
Fairleads & Rollers
Greasing of all mechanicall parts
Strip down and overhaul
Windlass (Center )
Checking of gear box oil
Greasing of all mechanical parts
Changing of gear box oil
Renewal of brake lining
Windlass (Stbd)
Checking of gear box oil
Greasing of all mechanical parts
Changing of gear box oil
Renewal of brake lining
Mooring Winch (Port)
Checking of gear box oil
Greasing of all mechanical parts
Changing of gear box oil
Renewal of brake lining
Mooring Winch (Stbd)
Checking of gear box oil
Greasing of all mechanical parts
Changing of gear box oil
Renewal of brake lining
Capstan
Greasing of all mechanical parts
Wire for Mooring / Anchors on Drums and on
Deck
Inspect for wear and tear
Greasing
Mooring Ropes on Drums and on Deck
Inspect for wear and tear
Inspect for wear and tear
Greasing
LF -D 025/DES 2012

Max
Interval
3mths
1 yr
2mths
3mths
1 yr
as reqd

Jan

Feb

Mar

Apr

May

Jun

2mths
3mths
1 yr
as reqd
3mths

Written by :

Sep

Oct

Nov

Dec

19
11

Na

19
11

19
11

11

3mths
1mth
3mths
1mth
2mths
3mths

Aug

11

2mths
3mths
1 yr
as reqd
2mths
3mths
1 yr
as reqd

Jul

Na

14

19

20

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

2 of 10

Year: 2015
Code
Hull
H026
H027
H028
H029
H030
H031
H032
H033
H034
H035
H036
H037
H038
H039
H040
H041
H042
H043
H044
H045
H046
H047
H048
H049
H050
H051
H052
H053

Items
Cargo / Boom Winch (Port)
Wire inspection and greasing
Greasing of all mechanical parts
Checking of gear box oil
Changing of gear box oil
Renewal of brake lining
Cargo / Boom Winch (Stbd)
Wire inspection and greasing
Greasing of all mechanical parts
Checking of gear box oil
Changing of gear box oil
Renewal of brake lining
L/B Winch & Davit (P)
Greasing of all mechanical parts
Fall wire examination & greasing
Changing of gear box oil
Fire wire changed end for end
Changing of fall wire
L/B Winch & Davit (S)
Greasing of all mechanical parts
Fall wire examination & greasing
Changing of gear box oil
Fall wire changed end for end
Changing of fall wire
Cargo Pumps
Inspect and clean filters
Check gear box oil and cooler
Greasing of all mechanical parts & bearings
Changing of gear box oil
Tank Lids & Ports
Greasing of all points
Check condition of all packing
W/T Doors & Hatches
Greasing of all points
Check condition of all packing
LF -D 025/DES 2012

Max
Interval

Jan

Feb

Mar

Apr

May

Jun

Jul

2mths
2mths
2mths
1 yr
as reqd

Na

2mths
2mths
2mths
1 yr
as reqd

Na

3mths
3mths
1 yr
2.5 yrs
5 yrs

Na

3mths
3mths
1 yr
2.5 yrs
5 yrs

Na

1mth
1mth
3mths
1 yr

10
10
10

3mths
3mths

17
17

3mths
3mths

17
17

Written by :

19
19

Aug

Sep

Oct

Nov

Dec

20
20

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

3 of 10

Year: 2015
Code
Hull
H054
H055

H057
H058

H059
H060
H061
H062
H063
H064
H065
H066
H067
H068

Items
Ventilators
Testing & greasing of steering gear room
exhaust fan ( Engine room )

3mths

3mths
Testing & greasing of Pump room exhaust fan
Lifting Appliances
Inspection of wires, Blocks and all mechanical
2mths
parts

Jan

Feb

Mar

Apr

May

Jun

Jul

Greasing and checking of all deck Valves,


Tank lids, Ullage, Sighting and cleaning ports
Checking of all packing and jointing
Greasing and lubricating Stripping Pumps
Checking and greasing of all Vents
Greasing of all pump room Valves, Spindles
and Indicators
Checking & greasing of all Portholes,
Windows & closing appliances
Checking & restoring of all stores
Cleaning of all deck stores rooms
Cleaning of all deck Paint stores
Overhauling of cargo Pump

Aug

Sep

Oct

Nov

Dec

17
17

Na

Greasing of wires, Blocks and all mechanical


3mths
parts
General

Maintenance, Cleaning & Painting


H069
H070
H071
H072
H073
H074
H075
H076

Max
Interval

1mth
1mth
2mths
2mths
3mths
3mths
3mths
3mths
3mths
5yrs
as and
when

17
17

19
19
19
19

26
26

17
11
11
11
11

Monkey Island
Bridge Deck
Boat Deck
Upper Deck
Funnel
Port Superstructure
Stbd Superstructure
Forward Superstructure
LF -D 025/DES 2012

Written by :

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

4 of 10

Year: 2015
Code
Hull
H077
H078
H079
H080
H081
H082
H083
H084
H085
H086
H087
H088
H089
H090
H091
H092
H093
H094
H095
H096
H097
H098
H099
H100

Items

Max
Interval

Aft. Structure
Forecastle Deck
Main Deck Port
Main Deck Stbd
Accomodation Deck Port & Stbd
Poop Deck
Windlass
Winches
Bulwarks and Railings
Mooring Bitts
Cargo Booms and Derricks
Mast and Samson posts
Ventilators
Tank Lids and Ports
Deck Superstructure bulkhead
Deck stores
Bow thruster Room
Pump Room
Pipeline Cargo Oil Tank
Pipeline Pump Room
Shipside - Top side port
Shipside - Top Side Stbd
Shipside - Bootopping Port
Shipside - Bootopping Stbd
LF -D 025/DES 2012

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

20
20

8
7
Na
6
6
8

Na

Na

Na

Na

Na

20
20
20

20

Written by :

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

5 of 10

Year: 2015
Code
Hull

Items

Nav Equipments (Maintenance,


Adjustment and Servicing)
N001 Auto Pilot
N002 Gyro Compass
N003 Magnetic Compass
*N004 Radar No.1
*N005 Radar No.2
N006 SVDR
*N007 G.P.S.
N008 AIS
N009 Echo Sounder
N010 Course Recorder
N011 Speed / Distance Log
Radio Equipment
R001 Main RX & TX
R002 Aux RX & TX
R003 SSB RT
R004 Navtex Receiver
R005 Watch Keeping RX
R006 VHF No.1
R007 VHF.No.2
R008 Auto Alarm RX
R009 INMARSAT
R010 Fascimile RX
R011 Emergency Switchboard
R012 Antenna Wire
R013 Automatic Exchanger
R014 Battery, Check Liquid
LF -D 025/DES 2012

Max
Interval
Per Maker
as reqd

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

1 yr
2mth

2mth
2mth
2mth

N/A
2mth
2mth
2mth
2mth

2mth

2mth
Written by :

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

6 of 10

Year: 2015
Code
Hull

Items

Fire Hydrants
Check spindle / Valve free / Rotating freely &
F001 check for leakage
F002 Greasing / oiling of mechanical parts
Nozzles & Monitors
Check movable parts free & rubber packing in
F003 place & test for leakage
F004 Greasing / oiling of mechanical parts
Fire Hoses
F005 Check for wear and tear and test for leakage
Check coupling packing in place and for
F006 leakage
F007 Greasing / oiling of mechanical parts
F008 Pressure test
Fire Extingushers
F009 Check body for corrosion & leakage
Check securing arrangement and confirm
F010 location
F011 Recharge of CO2 extinguisher
F012 Recharge of Foam extinguisher
F013 Recharge of DP extinguisher
F014 Recharge of Water extinguisher
Fixed Installation
Check cylinders, bottles, tanks for corrosion /
F015 leakage / gauges, etc
F016 Check ventilation system & fans
*F017 Test of Alarms & Detection Systems

F018
F019
F020
F021

Greasing / Oiling and freeing of mechanical


parts such as Valves, ventilators, etc
associated with the system
CO2 servicing, recharging, etc
Halon servicing, recharging,etc
Foam servicing, recharging, etc
LF -D 025/DES 2012

Max
Interval

Jan

Feb

Mar

Apr

May

Jun

1mth
3mths

23
23

20

26

1mth
3mths

23
23

21

26

1mth

23

21

26

1mth
3mths
1 yr

23
23

21

26

1mth

25

21

26

1mth

25

21

26

Jul

Aug

Sep

Oct

Nov

Dec

as per
Maker /
Check
expiry

1mth
1mth
1mth

Na
23

21

27

3mths
Makers
Check
Expiry
Written by :

Na

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

7 of 10

Year: 2015
Code
Hull
F022
F023
F024
F025
F026

F027
F028
F029
F030
F031
F032
F033

Items
BA Sets & F/M Outfit
Check and confirm contain & location
Check operation and observe for leakage of
bottles & face masks, condition of securing
straps, contain of air remaining, pressure
gauges, low level alarm (whistle)
Check operation of Safety Torch
Fireman Suits
BA bottles charging / servicing
* Emergency F/Pump
Operational & Performance test
Check for leakage, level of engine oil, fuel &
water cooling system
General servicing
Fire Line
Test Lines & Check for leakage
Maintenance and Painting
Fire Boxes
Check condition of Boxes
Maintenance and Painting
LF -D 025/DES 2012

Max
Interval

Apr

May

Jun

25

21

27

25
25
25

21
21

27
27

NA

NA

NA

NA

NA

NA

1mth
as reqd

23

21

27

1mth
as reqd

23

21

27

1mth

Jan

Feb

Mar

Jul

Aug

Sep

Oct

Nov

Dec

1mth
1mth
3mths
as reqd

1mth
1mth
as reqd

Written by :

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

8 of 10

Year: 2015
Code
Hull
L001
L002
L003
L004
L005
L006
L007
L008
L009
L010
L011
L012
L013
L014
L015
L016
L017
L018

Items
Lifeboat & Davits (P)
Checking of equipment
Change of Fresh Water
Checking condition of Embarkation Ladder,
Lashing and securing
Greasing of all mechanical parts
Airing of equipment, cleaning and washing
down of Boats
Routine Maintenance of Engine
Maintenance and Painting
Lifeboats & Davits (S)
Checking of equipment
Change of Fresh Water
Checking condition of Embarkation Ladder,
Lashing and securing
Greasing of all mechanical parts
Airing of equipment, cleaning and washing
down of Boats
Routine Maintenance of Engine
Maintenance and Painting
Liferafts
General Inspection of Valise, Cradle &
securing & launching arrangement
Greasing of all mechanical parts
Servicing of Liferafts
Renewal of Hydrostatic Release
LF -D 025/DES 2012

Max
Interval

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

1mth
3mths
3mths
3mths
3mths
3mths
as reqd
1mth
3mths
3mths

Na

3mths
3mths
3mths
as reqd
1mth
3mths
1 yr
2 yrs
Written by :

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

9 of 10

Year: March 2015


Code
Hull
L019
L020
L021
L022
L023
L024
L025
L026
L027
L028
L029
L030
L031
L032
L033
L034
L035
L036
L037
L038
L039

Items
Lifebuoys
Visual Inspection of Buoys & Lines
Inspection & Testing of Ignition Lights
Confirm location of Buoys & check condition
of brackets
Inspection & testing of MOB lights
Renewal of MOB lights + smoke float
Life Jackets
Account for quantity and locations
Testing of Whistle & Lights (Batt.ope)
Renewal of Lights (non Battery)
Pyrotechnics
Visual Inspection & confirm location
Renewal
Line Throwing App.
Visual Inspection & confirm location
Renewal of Rocket Cartridges
EPIRB
Operational Test
Renewal of Hydrostatic Release
Renewal of Battery
Servicing
SART
Operational Test
Renewal of Battery
Servicing
2 Way VHF R/T
Operational Test
Servicing
LF -D 025/DES 2012

Max
Interval

Jan

Feb

Mar

Apr

May

1mth
1mth

25
25

20
20

1mth

25

20

Jun

Jul

Sep

Oct

Nov

Dec

25
25
25

1mth
3 yrs
1mth
1mth
3 yrs

Aug

NA
25
25

20
20

25
25

1mth
1 yr

NA

1mth
3 yrs

NA

1mth
2 yrs
5 yrs
maker/reqd

NA

1mth
5 yrs
maker/reqd
1mth
maker/reqd
Written by :

24

21

30

Approved by : VP/DPA

Retention Period : 1 year

DECK PLANNED MAINTENANCE SCHEDULE

Form Code

MAINTENANCE PLAN
BG. LSBL XVIII

LF - D 025

Revision
Page

10 of 10

Year: 2015
Code
Hull

Items

Max
Interval

Jan

Feb

Mar

Apr

May

Jun

L040
L041

Survival Craft Radio


Operational Test
Servicing

1mth
maker/reqd

Na

Na

Na

L042

Pilot Ladders
Inspect ropes, steps & securing pts.

1mth

19

21

30

M001
M002
M003
M004
M005
M006

Miscellaneous & Additional Items


General visual check
Greasing all mechanical part
Testing of emergency release hook
Shore Load test
Inspect towing bridle,greasing
check emergency release towing smith

monthly
monthly
monthly
monthly
monthly
monthly

M007
M008
M009
M010
M011

Winch Drums ( towing winch )


General visual check
Greasing mechanical pant
Greasing towing wire
check lining pad
shore load test

weekly
monthly
monthly
monthly
yearly

Master : DARYONO

Jul

Aug

Sep

Oct

Nov

Dec

Na
19
19

21
21

30
30

Na

Approved by: ___________________________

C/O: ARLEN

LF -D 025/DES 2012

Written by :

Approved by : VP/DPA

Retention Period : 1 year

PERCENTAGE MONTHLY PMS DECK BG. LSBL XVIII (2015


January
Montly
2-3 Monthly
1-5 Y or as reqd
Percentage

P.1
1
0
0
100%

Point

P.2
2
0
0
100%

P.3
2
0
0
20%

P.4
0
0
0
0%

P.5
0
0
0
0%

P.6
7
0
0
100%

P.7
5
0
0
100%

62%
Category

poor
good
satisfactory

0 - 30 %
31 - 70 %
71 - 100 %
Note: Untuk penilaian NA di item ''1 - 5 y or as reqd'' masih toleransi untuk laporan monthly
kecuali untuk laporan annually

LSBL XVIII (2015)


P.8
0
0
0
0%

uk laporan monthly

P.9
6
0
0
100%

P.10
3
0
0
100%

Fairleads & Rollers

Windlass (Center )

Capstan

Mooring Ropes on Drums and on Deck

Mooring Winch (Port)

Mooring Winch (Stbd)

Cargo Pumps

Tank Lids & Ports

Na

W/T Doors & Hatches

Na

Ventilators

Another sheet

General

Maintenance, Cleaning & Painting

Main Deck Port

Main Deck Stbd

Windlass

Winches

Na

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Another sheet

Вам также может понравиться