Вы находитесь на странице: 1из 2

OBIECTIV: ORHIDEEA TOWERS - Ansamblu de birouri, Spatii comerciale, Servicii Anexe Alimentatie Publica si

Parcaj I 2S +Stehnic+P+1-15e+E tehnic" - Sos Orhideelor 15A Bucuresti


May 2016 DOCUMENTS UNTIL 31.05.2016
No

Name of document

Denumire document

No/date

File
number/nu
mar pagini

Tracing and measurements reports/Rapoarte de trasare si masuratori topo

Tracing works report


foundation raft plot 1
Tracing works report
diaphragm and
columns
Tracing foundation
corners krane K1

2
3
4
5
6
7
8
9
II
1

2
3
4
5
6
7

III

Proces verbal de
1/09.05.2016
trasare limite plot 1
Proces verbal de
2/09.05.2016
trasare diafragme si
stalpi plot 1
Proces verbal de
7/09.05.2016
trasare -fundatie
macara K1
Tracing works report Proces verbal de
9/23.05.2016
foundation raft plot 2
trasare limite plot 2
Krane K3 verticality
Proces verbal de
10/30.05.2016
cheking report
verificare verticalitate
macara K3
Tracing works report Proces verbal de
11/23.05.2016
foundation raft plot 2
trasare limite plot 2
Pits measurements
Releveu base ploturi 11/30.05.2016
plots 3, 4 and 5
3, 4, 5
Plots measurements Releveu limita - ploturi 12/30.05.2016
2 and 3
2 si 3
Diaphragm and pillars
Trasare diafragme si
13/31.05.2016
tracing - plot 2
stalpi plot 2
Hidden works reports/Procese verbale de lucrari ascunse
Voltex system
Montaj sistem
1/09.05.2016
mounting on plot 1, on hidroizolator Voltex foundation of krane K2 radier plot 1 si fundatie
macara K2
Foundation raft
Ramare radier etapa 1 2/16.05.2016
reinforcement plot1
plot 1
stage 1
Couples mounting Montaj cuple radier 3/16.05.2016
Foundation raft plot 1
etapa 1 plot 1
stage 1
Starter bars mounting
Montaj mustati etapa 1 4/16.05.2016
- Foundation raft plot 1 plot 1 radier
stage 1
Foundation raft
Cofrare radier etapa 1 5/16.05.2016
formwork - Plot 1
plot 1
stage 1
Cheking of concrete
Verificare aspect beton 6/19.05.2016
appearance after
dupa decofrare
removal of formwork
Voltex system
Montaj sistem
7/24.05.2016
mounting on plot 2 and hidroizolator Voltex pillars sealing
radier plot 2 si sigilare
capete piloti
Voltex system
Montaj sistem
8/24.05.2016
mounting on plot 3 and hidroizolator Voltex pillars sealing
radier plot 3 si sigilare
capete piloti
MEP reports / Procese verbale MEP

Revizuit/Data:

01/30.05.2016

Status

Remarks/
Observatii

Approved/
aprobat
Approved/
aprobat

original

Approved/
aprobat

original

Approved/
aprobat
Approved/
aprobat

original

Approved/
aprobat
Approved/
aprobat
Approved/
aprobat

original

Approved/
aprobat

original

Approved/
aprobat

original

Approved/
aprobat

original

Approved/
aprobat

original

Approved/
aprobat

original

Pending/in
lucru

original

Approved/
aprobat

original

pending

original

1
1
1

original

original

original
original

Data listarii: 31.05.2016

Grounding - plot 1

Raft sewage system installation of pipes


plot 1
Raft sewage system
checking of
pipes tightness plot 1

Montaj sistem
impamantare plot 1
Montaj conducte in
radier plot 1

1/11.05.2016

original

2/13.05.2016

original

IV

Proces verbal pentru


2/13.05.2016
1
proba de etanseitate a
conductelor interioare
de canalizare plot 1
Grounding - plot 1
Montaj sistem
3/31.05.2016
1
impamantare plot 1
Reports for reception of materials on site/Receptie materiale in santier

B500C Steel

Otel beton B500C

10/03.05.2016

PVC pipes for sewage

10.2/04.05.2016

OBO Accessories for


grounding

B500C concrete steel

Teava PVC pentru


canalizare
OBO platbanda si
accesorii pentru
impamantare
Otel beton B500C

B500C concrete steel

Otel beton B500C

13/06.05.2016

B500C concrete steel

Otel beton B500C

14/06.05.2016

B500C concrete steel

Otel beton B500C

15/07.05.2016

Voltex waterproofing
System

16/09.05.2016

B500C concrete
steel+Fortec couples
B500C concrete steel+
Fortec couples and
transition couples
B500C concrete steel
+ Fortec couples
Sika Waterbar

Sistem de
impermeabilizare
Voltex
Otel beton B500C si
cuple Fortec
Otel beton B500C si
cuple Fortec
Otel beton B500C si
cuple Fortec
Sika waterbar

19/12.05.2016

B500C concrete
steel+Fortec couples
B500C concrete
steel+Fortec couples
Sika Waterbar

Otel beton B500C si


cuple Fortec
Otel beton B500C si
cuple Fortec
Sika Waterbar

21/13.05.2016

25/16.05.2016

original

16

Obo Bettterman
grounding

26/17.05.2016

original

17

Concrete spacers for


reinforcement
B500C concrete
steel+Fortec couples
B500C concrete steel

OBO platbanda si
accesorii pentru
impamantare
Distantieri din beton
pentru armare
Otel beton B500C si
cuple Fortec
Otel beton B500C

27/18.05.2016

original

Otel beton B500C si


cuple Fortec
Sistem de
impermeabilizare
Voltex
Sistem de
impermeabilizare
Voltex
Otel beton B500C si
cuple Fortec

31/23.05.2016

10
11
12
13
14
15

18
19
20
21

B500C concrete
steel+Fortec couples
Voltex waterproofing
System

22

Voltex waterproofing
System

23

B500C concrete
steel+Fortec couples

Revizuit/Data:

01/30.05.2016

original

Approved/
aprobat

original

11/06.05.2016

original

12/06.05.2016

original

17/11.05.2016
18/12.05.2016

Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat

original

Approved/
aprobat
Approved/
aprobat

original

Approved/
aprobat

original

20/13.05.2016

22/14.05.2016

28/19.05.2016

original
original
original

original

original
Approved/
aprobat
Approved/
aprobat

original
original

Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat

original

34/24.05.2016

Approved/
aprobat

original

35/26.05.2016

Approved/
aprobat

original

29/20.05.2016

33/23.05.2016

original
original
original

Data listarii: 31.05.2016