Name of document
Denumire document
No/date
File
number/nu
mar pagini
2
3
4
5
6
7
8
9
II
1
2
3
4
5
6
7
III
Proces verbal de
1/09.05.2016
trasare limite plot 1
Proces verbal de
2/09.05.2016
trasare diafragme si
stalpi plot 1
Proces verbal de
7/09.05.2016
trasare -fundatie
macara K1
Tracing works report Proces verbal de
9/23.05.2016
foundation raft plot 2
trasare limite plot 2
Krane K3 verticality
Proces verbal de
10/30.05.2016
cheking report
verificare verticalitate
macara K3
Tracing works report Proces verbal de
11/23.05.2016
foundation raft plot 2
trasare limite plot 2
Pits measurements
Releveu base ploturi 11/30.05.2016
plots 3, 4 and 5
3, 4, 5
Plots measurements Releveu limita - ploturi 12/30.05.2016
2 and 3
2 si 3
Diaphragm and pillars
Trasare diafragme si
13/31.05.2016
tracing - plot 2
stalpi plot 2
Hidden works reports/Procese verbale de lucrari ascunse
Voltex system
Montaj sistem
1/09.05.2016
mounting on plot 1, on hidroizolator Voltex foundation of krane K2 radier plot 1 si fundatie
macara K2
Foundation raft
Ramare radier etapa 1 2/16.05.2016
reinforcement plot1
plot 1
stage 1
Couples mounting Montaj cuple radier 3/16.05.2016
Foundation raft plot 1
etapa 1 plot 1
stage 1
Starter bars mounting
Montaj mustati etapa 1 4/16.05.2016
- Foundation raft plot 1 plot 1 radier
stage 1
Foundation raft
Cofrare radier etapa 1 5/16.05.2016
formwork - Plot 1
plot 1
stage 1
Cheking of concrete
Verificare aspect beton 6/19.05.2016
appearance after
dupa decofrare
removal of formwork
Voltex system
Montaj sistem
7/24.05.2016
mounting on plot 2 and hidroizolator Voltex pillars sealing
radier plot 2 si sigilare
capete piloti
Voltex system
Montaj sistem
8/24.05.2016
mounting on plot 3 and hidroizolator Voltex pillars sealing
radier plot 3 si sigilare
capete piloti
MEP reports / Procese verbale MEP
Revizuit/Data:
01/30.05.2016
Status
Remarks/
Observatii
Approved/
aprobat
Approved/
aprobat
original
Approved/
aprobat
original
Approved/
aprobat
Approved/
aprobat
original
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
original
Approved/
aprobat
original
Approved/
aprobat
original
Approved/
aprobat
original
Approved/
aprobat
original
Approved/
aprobat
original
Pending/in
lucru
original
Approved/
aprobat
original
pending
original
1
1
1
original
original
original
original
Grounding - plot 1
Montaj sistem
impamantare plot 1
Montaj conducte in
radier plot 1
1/11.05.2016
original
2/13.05.2016
original
IV
B500C Steel
10/03.05.2016
10.2/04.05.2016
13/06.05.2016
14/06.05.2016
15/07.05.2016
Voltex waterproofing
System
16/09.05.2016
B500C concrete
steel+Fortec couples
B500C concrete steel+
Fortec couples and
transition couples
B500C concrete steel
+ Fortec couples
Sika Waterbar
Sistem de
impermeabilizare
Voltex
Otel beton B500C si
cuple Fortec
Otel beton B500C si
cuple Fortec
Otel beton B500C si
cuple Fortec
Sika waterbar
19/12.05.2016
B500C concrete
steel+Fortec couples
B500C concrete
steel+Fortec couples
Sika Waterbar
21/13.05.2016
25/16.05.2016
original
16
Obo Bettterman
grounding
26/17.05.2016
original
17
OBO platbanda si
accesorii pentru
impamantare
Distantieri din beton
pentru armare
Otel beton B500C si
cuple Fortec
Otel beton B500C
27/18.05.2016
original
31/23.05.2016
10
11
12
13
14
15
18
19
20
21
B500C concrete
steel+Fortec couples
Voltex waterproofing
System
22
Voltex waterproofing
System
23
B500C concrete
steel+Fortec couples
Revizuit/Data:
01/30.05.2016
original
Approved/
aprobat
original
11/06.05.2016
original
12/06.05.2016
original
17/11.05.2016
18/12.05.2016
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
original
Approved/
aprobat
Approved/
aprobat
original
Approved/
aprobat
original
20/13.05.2016
22/14.05.2016
28/19.05.2016
original
original
original
original
original
Approved/
aprobat
Approved/
aprobat
original
original
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
Approved/
aprobat
original
34/24.05.2016
Approved/
aprobat
original
35/26.05.2016
Approved/
aprobat
original
29/20.05.2016
33/23.05.2016
original
original
original