Академический Документы
Профессиональный Документы
Культура Документы
AGREEMENT
For the Work
CONTENTS
ITEMS
PART I
Preliminary
EPC Agreement
1
Definitions and Interpretation
1.1
Definitions
1.2
Interpretation
1.3
Measurements and arithmetic conventions
1.4
Priority of agreements and errors/discrepancies
1.5
Joint and several liability
PAGE NO.
10-11
12-15
PART II
Scope of the Project
17
18-20
21-22
23-24
Disclaimer
6.1
Disclaimer
25
PART III
Construction and Operation & Maintenance
7
Performance Security
7.1
Performance Security
7.2
Extension of Performance Security
27-28
2
7.3
7.4
7.5
10
33-38
11
39-42
32
12
Completion Certificate
12.1 Tests on completion
12.2 Provisional Certificate
12.3 Completion of remaining Works
12.4 Completion Certificate
12.5 Rescheduling of Tests
43-45
13
Change of Scope
13.1 Change of Scope
13.2 Procedure for Change of Scope
13.3 Payment for Change of Scope
13.4 Restrictions on Change of Scope
13.5 Power of the Authority to undertake works
46-48
14
49-51
15
16
52
53
17
Defects Liability
17.1 Defects Liability Period
17.2 Remedying Defects
17.3 Cost of remedying Defects
17.4 Contractors failure to rectify Defects
17.5 Contractor to search cause
17.6 Extension of Defects Liability Period
54-55
18
Authoritys Engineer
18.1 Appointment of the Authoritys Engineer
18.2 Duties and authority of the Authoritys Engineer
18.3 Delegation by the Authoritys Engineer
18.4 Instructions of the Authoritys Engineer
18.5 Determination by the Authoritys Engineer
56-57
18.6
18.7
PART IV
Financial Covenants
19
20
Payments
19.1 Contract Price
19.2 Advance Payment
19.3 Procedure for estimating the payment for the Works
19.4 Stage Payment Statement for Works
19.5 Stage Payment for Works
19.6 Monthly Operation & Maintenance Statement of the Water Supply
Project
19.7 Payment for Operation & Maintenance of the Water Supply Project
19.8 Payment of Damages
19.9 Time of payment and interest
19.10. Price adjustment for the Works
19.11 Restrictions on price adjustment
19.12. Price adjustment for Maintenance of Water Supply Project
19.13 Final Payment Statement
19.14 Discharge
19.15 Final Payment Certificate
19.16 Final payment statement for Operation & Maintenance
19.17 Change in law
19.18 Correction of Interim Payment Certificates
19.19 Authoritys claims
19.20 Bonus for early completion
Insurance
20.1 Insurance for Works and Operation & Maintenance
20.2 Notice to the Authority
20.3 Evidence of Insurance Cover
20.4 Remedy for failure to insure
20.5 Waiver of subrogation
20.6 Contractors waiver
20.7 Cross liabilities
20.8 Accident or injury to workmen
20.9 Insurance against accident to workmen
20.10 Application of insurance proceeds
20.11 Compliance with policy conditions
59-67
Force Majeure
21.1 Force Majeure
21.2 Non-Political Event
21.3 Indirect Political Event
21.4 Political Event
72-75
68-70
Part V
Force Majeure and Termination
21
21.5
21.6
21.7
21.8
21.9
21.10
22
23
Termination
23.1 Termination for Contractor Default
23.2 Termination for Authority Default
23.3 Termination for Authoritys convenience
23.4 Requirements after Termination
23.5 Valuation of Unpaid Works
23.6 Termination Payment
23.7 Other rights and obligations of the Parties
23.8 Survival of rights
PART VI
Other Provisions
24
Assignment and Charges
24.1
Restrictions on assignment and charges
24.2
Hypothecation of Materials or Plant
76
77-81
83
25
84-86
26
Dispute Resolution
26.1 Dispute Resolution
26.2 Conciliation
26.3 Arbitration
26.4 Adjudication by Regulatory Authority, Tribunal or Commission
87-88
27
Miscellaneous
27.1 Governing law and jurisdiction
27.2 Waiver of immunity
27.3 Delayed payments
27.4 Waiver
89-92
93-99
101-131
132-234
235
236-305
306-331
F
G
H
I
J
L
M
N
O
P
332
333-341
342-356
357-358
359
360
361-362
363-365
366-370
371
372
373
Part I
Preliminary
BETWEEN
[THE EXECUTIVE ENGINEER, P.H. DIVISION, SAMBALPUR and having
its office at Sambalpur, representative of the Engineer-in-Chief, PH , Odisha, the
Authority which expression shall, unless repugnant to the context or meaning
thereof, include its administrators, successors and assigns of One Part;
AND
WHEREAS:
(A)
(B)
(C)
(D)
(E)
The Government of Odisha] had entrusted to the Authority for Composite Water
Supply project to Baripada, Greater Sambalpur, Rourkela, Jharsuguda
under
UIDSSMT/AMRUT
.
The Authority had resolved to Composite Water Supply project to Baripada,
Greater Sambalpur, Rourkela, Jharsuguda
under UIDSSMT/AMRUT on
Engineering, Procurement, Construction (EPC) basis in accordance with the
terms and conditions to be set forth in an agreement to be entered into.
The Authority had accordingly invited proposals by its [Request for Qualification vide
Tender ID No. CEPH-05/2016-17 Dt.01.07.2016] (the Request for Qualification or
RFQ) for short listing of bidders for EPC of the above referred Water Supply Project
and had shortlisted certain bidders including, inter alia, the selected bidder.
The Authority had prescribed the technical and commercial terms and conditions, and
invited bids (the Request for Proposals or RFP) from the bidders shortlisted
pursuant to the RFQ for undertaking the Project.
4 &5
After evaluation of the bids received, the Authority had accepted the bid of the selected
bidder and issued its Letter of Acceptance No. .. dated .. (hereinafter called the
LOA) to the selected bidder for the work Development of Water Supply Infrastructure
in Baripada, Sambalpur, Rourkela & Jharsuguda under UIDSSMT/AMRUT
contract price specified hereinafter, requiring the selected bidder to inter alia:
1
2
3
4
5
at the
Serially numbered footnotes in this Agreement are for guidance of the Authority and should be omitted from the draft
Agreement forming part of Bid Documents. Footnotes marked $ shall be retained in the draft Agreement.
All provisions enclosed in curly parenthesis shall be retained in the Bid Documents and shall be modified as required after
the selected bidder has been identified.
Refers to the single entity or the lead member of the consortium/joint venture, which is the selected bidder under the RFP.
All asterisks in this Model Agreement should be substituted by project-specific particulars in the draft Agreement forming
part of Bid Documents.
All project-specific provisions in this Model EPC Agreement have been enclosed in square parenthesis and may be modified,
as necessary, before issuing the draft Agreement forming part of Bid Documents.
10
(i)
(F)
deliver to the Authority a legal opinion from the legal counsel of the selected
bidder with respect to the authority of the selected bidder to enter into this
Agreement and the enforceability of the provisions thereof, within 10 (ten) days
of the date of issue of LOA; and
(ii)
execute this Agreement within 15 (fifteen) days of the date of issue of LOA.
The Contractor has fulfilled the requirements specified in Recital (E) above;
NOW THEREFORE in consideration of the foregoing and the respective covenants and
agreements set forth in this Agreement, the sufficiency and adequacy of which is hereby
acknowledged, the Authority hereby covenants to pay the Contractor, in consideration of
the obligations specified herein, the Contract Price or such other sum as may become
payable under the provisions of the Agreement at the times and in the manner specified
by the Agreement and intending to be legally bound hereby, the Parties agree as follows:
11
ARTICLE 1
1.1
1.2
1.2.1
Definitions
The words and expressions beginning with capital letters and defined in this Agreement
(including those in Article 28) shall, unless the context otherwise requires, have the
meaning ascribed thereto herein, and the words and expressions defined in the Schedules
and used therein shall have the meaning ascribed thereto in the Schedules.
Interpretation
In this Agreement, unless the context otherwise requires,
(a)
references to any legislation or any provision thereof shall include amendment or
re-enactment or consolidation of such legislation or any provision thereof so far
as such amendment or re-enactment or consolidation applies or is capable of
applying to any transaction entered into hereunder;
(b)
references to laws of Odisha/ India or Indian law or regulation having the force of
law shall include the laws, acts, ordinances, rules, regulations, bye laws or
notifications which have the force of law in the territory of India and as from time
to time may be amended, modified, supplemented, extended or re-enacted;
(c)
references to a person and words denoting a natural person shall be construed
as a reference to any individual, firm, company, corporation, society, trust,
government, state or agency of a state or any association or partnership (whether
or not having separate legal personality) of two or more of the above and shall
include successors and assigns;
(d)
the table of contents, headings or sub-headings in this Agreement are for
convenience of reference only and shall not be used in, and shall not affect, the
construction or interpretation of this Agreement;
(e)
the words include and including are to be construed without limitation and
shall be deemed to be followed by without limitation or but not limited to
whether or not they are followed by such phrases;
(f)
references to construction or building include, unless the context otherwise
requires, survey and investigation, design, developing, engineering, procurement,
supply of plant, materials, equipment, labour, delivery, transportation,
installation, processing, fabrication, testing, and commissioning of the Water
Supply Project, including operation & maintenance and removing of defects, if
any, and other activities incidental to the construction and construct or build
shall be construed accordingly;
(g)
references to development include, unless the context otherwise requires,
construction, renovation, refurbishing, augmentation, up-gradation and other
activities incidental thereto during the Construction Period, and develop shall
be construed accordingly;
(h)
any reference to any period of time shall mean a reference to that according to
Indian standard time;
(i)
any reference to day shall mean a reference to a calendar day;
(j)
references to a business day shall be construed as a reference to a day (other
than a Sunday) on which banks in [Odisha] are generally open for business;
(k)
any reference to month shall mean a reference to a calendar month as per the
Gregorian calendar;
12
(l)
1.2.2
references to any date, period or Project Milestone shall mean and include such
date, period or Project Milestone as may be extended pursuant to this Agreement;
(m)
any reference to any period commencing from a specified day or date and till
or until a specified day or date shall include both such days or dates; provided
that if the last day of any period computed under this Agreement is not a business
day, then the period shall run until the end of the next business day;
(n)
the words importing singular shall include plural and vice versa;
(o)
references to any gender shall include the other and the neutral gender;
(p)
lakh means a hundred thousand (100,000) and crore means ten million
(10,000,000);
(q)
indebtedness shall be construed so as to include any obligation (whether
incurred as principal or surety) for the payment or repayment of money, whether
present or future, actual or contingent;
(r)
references to the winding-up, dissolution, insolvency, or reorganisation
of a company or corporation shall be construed so as to include any equivalent or
analogous proceedings under the law of the jurisdiction in which such company
or corporation is incorporated or any jurisdiction in which such company or
corporation carries on business including the seeking of liquidation, winding-up,
reorganisation, dissolution, arrangement, protection or relief of debtors;
(s)
save and except as otherwise provided in this Agreement, any reference, at any
time, to any agreement, deed, instrument, licence or document of any description
shall be construed as reference to that agreement, deed, instrument, licence or
other document as amended, varied, supplemented, modified or suspended at the
time of such reference; provided that this Clause shall not operate so as to
increase liabilities or obligations of the Authority hereunder or pursuant hereto in
any manner whatsoever;
(t)
any agreement, consent, approval, authorisation, notice, communication,
information or report required under or pursuant to this Agreement from or by
any Party or the Authoritys Engineer shall be valid and effective only if it is in
writing under the hand of a duly authorised representative of such Party or the
Authoritys Engineer, as the case may be, in this behalf and not otherwise;
(u)
the Schedules and Recitals to this Agreement form an integral part of this
Agreement and will be in full force and effect as though they were expressly set
out in the body of this Agreement;
(v)
references to Recitals, Articles, Clauses, Sub-clauses or Schedules in this
Agreement shall, except where the context otherwise requires, mean references to
Recitals, Articles, Clauses, Sub-clauses and Schedules of or to this Agreement,
and references to a Paragraph shall, subject to any contrary indication, be
construed as a reference to a Paragraph of this Agreement or of the Schedule in
which such reference appears;
(w)
the damages payable by either Party to the other of them, as set forth in this
Agreement, whether on per diem basis or otherwise, are mutually agreed genuine
pre-estimated loss and damage likely to be suffered and incurred by the Party
entitled to receive the same and are not by way of penalty (the Damages); and
(x)
time shall be of the essence in the performance of the Parties respective
obligations. If any time period specified herein is extended for the reasons
specified in the Agreement, such extended time shall also be of the essence.
Unless expressly provided otherwise in this Agreement, any Documentation required to
13
1.2.3
1.2.4
1.3
1.4
1.4.1
1.4.2
1.5
1.5.1
1.5.2
be provided or furnished by the Contractor to the Authority shall be provided free of cost
and in three copies, and if the Authority is required to return any such Documentation
with its comments and/or approval, it shall be entitled to retain two copies thereof.
The rule of construction, if any, that a contract should be interpreted against the parties
responsible for the drafting and preparation thereof, shall not apply.
Any word or expression used in this Agreement shall, unless otherwise defined or
construed in this Agreement, bear its ordinary English meaning and, for these purposes,
the General Clauses Act, 1897 shall not apply.
Measurements and arithmetic conventions
All measurements and calculations shall be in the metric system and calculations done to
2 (two) decimal places, with the third digit of 5 (five) or above being rounded up and
below 5 (five) being rounded down.
Priority of agreements and errors/discrepancies
This Agreement, and all other agreements and documents forming part of or referred to
in this Agreement are to be taken as mutually explanatory and, unless otherwise
expressly provided elsewhere in this Agreement, the priority of this Agreement and other
documents and agreements forming part hereof or referred to herein shall, in the event of
any conflict between them, be in the following order:
(a)
this Agreement; and
(b)
all other agreements and documents forming part hereof or referred to herein; i.e.
this Agreement at (a) above shall prevail over the agreements and documents at
(b).
Subject to the provisions of Clause 1.4.1, in case of ambiguities or discrepancies within
this Agreement, the following shall apply:
(a)
between two or more Clauses of this Agreement, the provisions of a specific
Clause relevant to the issue under consideration shall prevail over those in other
Clauses;
(b)
between the Clauses of this Agreement and the Schedules, the Clauses shall
prevail and between Schedules and Annexes, the Schedules shall prevail;
(c)
between any two Schedules, the Schedule relevant to the issue shall prevail;
(d)
between the written description on the Drawings and the Specifications and
Standards, the latter shall prevail;
(e)
between the dimension scaled from the Drawing and its specific written
dimension, the latter shall prevail; and
(f)
between any value written in numerals and that in words, the latter shall prevail.
Joint and several liability
If the Contractor has formed a Consortium of two or more persons for implementing the
Project:
(a)
these persons shall, without prejudice to the provisions of this Agreement, be
deemed to be jointly and severally liable to the Authority for the performance of
the Agreement; and
(b)
the Contractor shall ensure that no change in the composition of the Consortium
is effected without the prior consent of the Authority.
Without prejudice to the joint and several liability of all the members of the Consortium,
the Lead Member shall represent all the members of the Consortium and shall at all times
be liable and responsible for discharging the functions and obligations of the Contractor.
The Contractor shall ensure that each member of the Consortium shall be bound by any
decision, communication, notice, action or inaction of the Lead Member on any matter
14
related to this Agreement and the Authority shall be entitled to rely upon any such action,
decision or communication of the Lead Member. The Authority shall have the right to
release payments solely to the Lead Member and shall not in any manner be responsible
or liable for the inter se allocation of payments among members of the Consortium.}$
This Clause 1.5 may be omitted if the Contractor is not a Consortium. Even if the Contractor is a Consortium, the
Authority may, at its discretion, delete this provision.
$
15
Part II
Scope of Project
16
ARTICLE 2
2.1
provisions of this Agreement and in conformity with the requirements set forth in
Schedule-E; and
17
ARTICLE 3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.5
3.1.6
3.1.7
18
(h)
3.2.4
3.3
3.4
3.4.1
3.4.2
3.4.3
3.5
3.6
3.7
3.8
therewith.
It is expressly agreed that the Contractor shall, at all times, be responsible and liable for
all its obligations under this Agreement notwithstanding anything contained in the
agreements with its Sub-contractors or any other agreement that may be entered into by
the Contractor, and no default under any such agreement shall excuse the Contractor
from its obligations or liability hereunder.
Deleted
Contractors personnel
The Contractor shall ensure that the personnel engaged by it or by its Sub-contractors in
the performance of its obligations under this Agreement are at all times appropriately
qualified, skilled and experienced in their respective functions in conformity with Good
Industry Practice.
The Authoritys Engineer may, for reasons to be specified in writing, direct the
Contractor to remove any member of the Contractors or Sub-contractors personnel.
Provided that any such direction issued by the Authoritys Engineer shall specify the
reasons for the removal of such person.
The Contractor shall on receiving such a direction from the Authoritys Engineer order
for the removal of such person or persons with immediate effect. It shall be the duty of
the Contractor to ensure that such persons are evicted from the Site within 10 (ten) days
of any such direction being issued in pursuance of Clause 3.4.2. The Contractor shall
further ensure that such persons have no further connection with the Works or Operation
& Maintenance under this Agreement. The Contractor shall then appoint (or cause to be
appointed) a replacement.
Advertisement on Water Supply Project
The Water Supply Project or any part thereof shall not be used in any manner to advertise
any commercial product or services.
Contractor's care of the Works
The Contractor shall bear full risk in and take full responsibility for the care of the
Works, and of the Materials, goods and equipment for incorporation therein, from the
Appointed Date until the date of Provisional Certificate (with respect to the Works
completed prior to the issuance of the Provisional Certificate) and/or Completion
Certificate (with respect to the Works referred to in the Punch List), save and except to
the extent that any such loss or damage shall have arisen from any default or neglect of
the Authority.
Electricity, water and other services
The Contractor shall be responsible for procuring of all power, water and other services
that it may require.
Unforeseeable difficulties
Except as otherwise stated in the Agreement:
(a)
the Contractor accepts complete responsibility for having foreseen all difficulties
and costs of successfully completing the Works;
(b)
the Contract Price shall not be adjusted to take account of any unforeseen
difficulties or costs; and
(c)
the Scheduled Completion Date shall not be adjusted to take account of any
unforeseen difficulties or costs.
20
ARTICLE 4
4.1
4.1.1
4.1.2
4.1.3
4.1.4
4.1.5
4.1.6
Clause (b) may be omitted if the Project does not include a major structure.
Clause 4.1.3(c) may be suitably modified in the event that all the environmental clearances for the Water Supply
Project have been received or are not required. It should be clearly stated that all the environmental clearances for
the Water Supply Project have been received; or such environmental clearances for the Water Supply Project are not
required.
21
6
4.2
4.3
Clause 4.3 may be suitably modified in the event that all the environmental clearances for the Water Supply
Project have been received or are not required. It should be clearly stated that all the environmental clearances for
the Water Supply Project have been received; or such environmental clearances for the Water Supply Project are not
required.
6
22
5.1
ARTICLE 5
REPRESENTATIONS AND WARRANTIES
23
5.2
5.3
any person by way of fees, commission or otherwise for securing the contract or
entering into this Agreement or for influencing or attempting to influence any
officer or employee of the Authority in connection therewith;
(l)
all information provided by the {selected bidder/ members of the Consortium} in
response to the Request for Qualification and Request for Proposals or otherwise,
is to the best of its knowledge and belief, true and accurate in all material
respects; and
(m)
nothing contained in this Agreement shall create any contractual relationship or
obligation between the Authority and any Sub-contractors, designers, consultants
or agents of the Contractor.
Representations and warranties of the Authority
The Authority represents and warrants to the Contractor that:
(a)
it has full power and authority to execute, deliver and perform its obligations
under this Agreement and to carry out the transactions contemplated herein and
that it has taken all actions necessary to execute this Agreement, exercise its
rights and perform its obligations, under this Agreement;
(b)
It has taken all necessary actions under the Applicable Laws to authorise the
execution, delivery and performance of this Agreement;
(c)
It has the financial standing and capacity to perform its obligations under this
Agreement;
(d)
This Agreement constitutes a legal, valid and binding obligation enforceable
against it in accordance with the terms hereof;
(e)
it has no knowledge of any violation or default with respect to any order, writ,
injunction or any decree of any court or any legally binding order of any
Government Instrumentality which may result in any material adverse effect on
the Authoritys ability to perform its obligations under this Agreement;
(f)
It has complied with Applicable Laws in all material respects;
(g)
It has good and valid right to the Site and has the power and authority to grant the
clearance in respect thereof to the Contractor; and
(h)
It has procured land / road and environment clearances such that the Contractor
can commence construction forthwith on 90% (ninety per cent) of the total
land/site requirement for the Water Supply Project.
Disclosure
In the event that any occurrence or circumstance comes to the attention of either Party
that renders any of its aforesaid representations or warranties untrue or incorrect, such
Party shall immediately notify the other Party of the same. Such notification shall not
have the effect of remedying any breach of the representation or warranty that has been
found to be untrue or incorrect nor shall it adversely affect or waive any obligation of
either Party under this Agreement.
24
ARTICLE 6
6.1
6.1.1
6.1.2
6.1.3
6.1.4
6.1.5
6.1.6
DISCLAIMER
Disclaimer
The Contractor acknowledges that prior to the execution of this Agreement, the
Contractor has, after a complete and careful examination, made an independent
evaluation of the Request for Qualification, Request for Proposal, Scope of the Project,
Specifications and Standards of design, construction and Operation & Maintenance, Site,
local conditions, physical qualities of ground, subsoil and geology, source of water
supply, suitability and availability of access routes to the Site and all information
provided by the Authority or obtained, procured or gathered otherwise, and has
determined to its satisfaction the accuracy or otherwise thereof and the nature and extent
of difficulties, risks and hazards as are likely to arise or may be faced by it in the course
of performance of its obligations hereunder. Save as provided in Clause 4.1.2 and Clause
5.2, the Authority makes no representation whatsoever, express, implicit or otherwise,
regarding the accuracy, adequacy, correctness, reliability and/or completeness of any
assessment, assumptions, statement or information provided by it and the Contractor
confirms that it shall have no claim whatsoever against the Authority in this regard.
The Contractor acknowledges and hereby accepts to have satisfied itself as to the
correctness and sufficiency of the Contract Price.
The Contractor acknowledges and hereby accepts the risk of inadequacy, mistake or error
in or relating to any of the matters set forth in Clause 6.1.1 above and hereby
acknowledges and agrees that the Authority shall not be liable for the same in any
manner whatsoever to the Contractor, or any person claiming through or under any of
them, and shall not lead to any adjustment of Contract Price or Scheduled Completion
Date.
The Parties agree that any mistake or error in or relating to any of the matters set forth in
Clause 6.1.1 above shall not vitiate this Agreement, or render it voidable.
In the event that either Party becomes aware of any mistake or error relating to any of the
matters set forth in Clause 6.1.1 above, that Party shall immediately notify the other
Party, specifying the mistake or error.
Except as otherwise provided in this Agreement, all risks relating to the Project shall be
borne by the Contractor; and the Authority shall not be liable in any manner for such
risks or the consequences thereof.
25
Part III
Construction and
Operation & Maintenance
26
ARTICLE 7
7.1
7.1.1
7.1.2
7.1.3
7.2
7.3
7.3.1
7.3.2
PERFORMANCE SECURITY
Performance Security
The Contractor shall, for the performance of its obligations hereunder during the
Construction Period, provide to the Authority, within 10 (ten) days of the date of this
Agreement, an irrevocable and unconditional guarantee from a Nationalised Bank,
counter guaranteed by its branch at Bhubaneswar in the form set forth in Schedule-G (the
Performance Security) for an amount equal to 7.5% (seven and half percent) of the
Contract Price. The Performance Security shall be valid until 60 (sixty) days after the
Defects Liability Period. Until such time the Performance Security is provided by the
Contractor pursuant hereto and the same comes into effect, the Bid Security shall remain
in force and effect, and upon such provision of the Performance Security, the Authority
shall release the Bid Security to the Contractor. For the avoidance of doubt, the parties
expressly agree that the Contractor shall provide, no later than 30 (thirty) days prior to
the expiry of the Performance Security for the defects Liability Period specified in
Clause 17.1.1.
Notwithstanding anything to the contrary contained in this Agreement, the Parties agree
that in the event of failure of the Contractor to provide the Performance Security in
accordance with the provisions of Clause 7.1.1 and within the time specified therein or
such extended period as may be provided by the Authority, in accordance with the
provisions of Clause 7.1.3, the Authority may encash the Bid Security and appropriate
the proceeds thereof as Damages, and thereupon all rights, privileges, claims and
entitlements of the Contractor under or arising out of this Agreement shall be deemed to
have been waived by, and to have ceased with the concurrence of the Contractor, and this
Agreement shall be deemed to have been terminated by mutual agreement of the Parties.
In the event the Contractor fails to provide the Performance Security within 10 (ten) days
of this Agreement, it may seek extension of time for a period not exceeding 20 (twenty)
days on payment of Damages for such extended period in a sum calculated at the rate of
0.05% (zero point zero five per cent) of the Contract Price for each day until the
Performance Security is provided.
Extension of Performance Security
The Contractor may initially provide the Performance Security for a period of 3 (three)
years; provided that it shall procure the extension of the validity of the Performance
Security, as necessary, at least 2 (two) months prior to the date of expiry thereof. Upon
the Contractor providing an extended Performance Security, the previous Performance
Security shall be deemed to be released and the Authority shall return the same to the
Contractor within a period of 7 (seven) business days from the date of submission of the
extended Performance Security.
Appropriation of Performance Security
Upon occurrence of a Contractors Default, the Authority shall, without prejudice to its
other rights and remedies hereunder or in law, be entitled to encash and appropriate the
relevant amounts from the Performance Security as Damages for such Contractors
Default.
Upon such encashment and appropriation from the Performance Security, the Contractor
shall, within 30 (thirty) days thereof, replenish, in case of partial appropriation, to its
original level the Performance Security, and in case of appropriation of the entire
Performance Security provide a fresh Performance Security, as the case may be, and the
27
7.4
7.5
7.5.1
7.5.2
7.5.3
7.5.4
7.5.5
Contractor shall, within the time so granted, replenish or furnish fresh Performance
Security as aforesaid failing which the Authority shall be entitled to terminate the
Agreement in accordance with Article 23. Upon replenishment or furnishing of a fresh
Performance Security, as the case may be, as aforesaid, the Contractor shall be entitled to
an additional Cure Period of 30 (thirty) days for remedying the Contractors Default, and
in the event of the Contractor not curing its default within such Cure Period, the
Authority shall be entitled to encash and appropriate such Performance Security as
Damages, and to terminate this Agreement in accordance with Article 23.
Release of Performance Security
The Authority shall return the Performance Security to the Contractor within 60 (sixty)
days of the later of the expiry of the operation & maintenance period or the Defects
Liability Period under this Agreement. Notwithstanding the aforesaid, the Parties agree
that the Authority shall not be obliged to release the Performance Security until all
Defects identified during the Defects Liability Period have been rectified.
Retention Money7
From every payment for Works due to the Contractor in accordance with the provisions
of Clause 19.5, the Authority shall deduct 6% (six per cent) thereof as guarantee money
for performance of the obligations of the Contractor during the Construction Period (the
Retention Money) subject to the condition that the maximum amount of Retention
Money shall not exceed 5% (five per cent) of the Contract Price.
Upon occurrence of a Contractors Default, the Authority shall, without prejudice to its
other rights and remedies hereunder or in law, be entitled to appropriate the relevant
amounts from the Retention Money as Damages for such Contractors Default.
The Contractor may, upon furnishing an irrevocable and unconditional bank guarantee
substantially in the form provided at Annex-II of Schedule-G, require the Authority to
refund the Retention Money deducted by the Authority under the provisions of Clause
7.5.1. Provided that the refund hereunder shall be made in tranches of not less than 1%
(one per cent) of the Contract Price.
Within 15 (fifteen) days of the date of issue of the Completion Certificate, the Authority
shall discharge the bank guarantees furnished by the Contractor under the provisions of
Clause 7.5.3 and refund the balance of Retention Money remaining with the Authority
after adjusting the amounts appropriated under the provisions of Clause 7.5.2 and the
amounts refunded under the provisions of Clause 7.5.3.
The Parties agree that in the event of Termination of this Agreement, the Retention
Money and the bank guarantees specified in this Clause 7.5 shall be treated as if they are
Performance Security and shall be reckoned as such for the purposes of Termination
Payment under Clause 23.6.
The Authority may, in its discretion, omit Clause 7.5 and in lieu thereof increase the Performance Security under
Clause 7.1 from 7.5% (seven point five per cent) to 10% (ten per cent).
28
ARTICLE 8
8.1
The Site
The site of the Water Supply Project (the Site) shall comprise the site described in
Schedule-A in respect of which the land shall be provided by the Authority to the
Contractor. The Authority shall be responsible for:
(a)
acquiring and providing the site in accordance with the alignment finalised by the
Authority, free from all encroachments and encumbrances, and free access thereto
for the execution of this Agreement; and
(b)
obtaining licences and permits for environment clearance for the Water Supply
projects if requires.
8.2
Procurement of the Site for construction of structures :
8.2.1 The Authority Representative and the Contractor shall, within 10 (ten) days of
issue of LOA inspect the Site and prepare a memorandum containing an inventory
of the Site including the vacant and unencumbered land, buildings, structures, road
works, trees and any other immovable property on or attached to the Site. Subject
to the provisions of Clause 8.2.3, such memorandum shall have appended thereto
an appendix (the Appendix) specifying in reasonable detail those parts of the
Site to which vacant access and land has not been given to the Contractor. Signing of
the memorandum, in two counterparts (each of which shall constitute an original),
by the authorised representatives of the Parties shall be deemed to constitute a valid
evidence of giving the land to the Contractor for discharging its obligations under
and in accordance with the provisions of this Agreement and for no other purpose
whatsoever.
Whenever the Authority is ready to hand over any part or parts of the Site included in the
Appendix, it shall inform the Contractor, by notice, the proposed date and time such of
handing over. The Authority Representative and the Contractor shall, on the date so
notified, inspect the specified parts of the Site, and prepare a memorandum containing an
inventory of the vacant and unencumbered land, buildings, structures, road works, trees
and any other immovable property on or attached to the Site so handed over. Signing of
the memorandum, in two counterparts (each of which shall constitute an original), by the
authorised representatives of the Parties shall be deemed to constitute a valid evidence of
giving the relevant land to the Contractor.
8.2.2 The Authority shall provide all land to the Contractor included in the Appendix by the
date specified in Schedule-A for those parts of the Site referred to therein, or no later than
90 (ninety) days of the Appointed Date for those parts of the Site which have not been
specified in Schedule-A, and in the event of delay for any reason other than Force
Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor,
Damages in a sum calculated in accordance with Clause 8.3.
8.2.3 Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall
specify the parts of the Site, if any, for which land shall be provided to the Contractor on
the dates specified in Schedule-A. Such parts shall also be included in the Appendix
prepared in pursuance of Clause 8.2.1. For avoidance of doubt, the Parties expressly
agree that the Appendix shall in no event contain areas required for the Water Supply
Project cumulative area of which exceeds 10% (ten per cent) of the total area of the
Water Supply Project.
8.3
Damages for delay in handing over the Site for construction of structures / crossing
of Pipe line.
29
8.3.1 In the event any part of the construction Site is not provided by the Authority on or
before the date(s) specified in Clause 8.2 for any reason other than Force Majeure or
breach of this Agreement by the Contractor, the Authority shall pay Damages to the
Contractor in a sum calculated in accordance with the following formula for and in
respect of those parts of the Site which has not been provided:
Amount of Damages shall be paid in a sum calculated at the rate of Rs.5.00 (Rupees
Five) per day for every 1000 (One thousand) square meters or part thereof,
commencing from the 91st (Ninety first) day of the appointed date and until such site
is procured.
In the event that any Damages are due and payable to the Contractor under the provisions
of this Clause 8.3.1 for delay in providing the land, the Contractor shall, subject to the
provisions of Clause 10.5, be entitled to Time Extension equal to the period for which the
Damages have become due and payable under this Clause 8.3.1, save and except that:
(a)
if any delays involve time overlaps, the overlaps shall not be additive; and
(b)
such Time Extension shall be restricted only to the Works which are affected by
the delay in providing the land.
For the avoidance of doubt, the Parties expressly agree that the Damages specified
hereunder and the Time Extension specified in Clause 10.5 shall be restricted only to
failure of the Authority to provide the land for and in respect of the construction of major
structures.
8.3.2 Notwithstanding anything to the contrary contained in this Agreement, the Contractor
expressly agrees that Works on all parts of the Site for which land is granted within 90
(ninety) days of the Appointed Date, or with respect to the parts of the Site provided in
Schedule-A, no later than the date(s) specified therein, as the case may be, shall be
completed before the Scheduled Completion Date and shall not qualify for any Time
Extension under the provisions of Clause 8.3.1.
8.3.3 Notwithstanding anything to the contrary contained in this Agreement, the Authority may
at any time withdraw any Works forming part of this Agreement, subject to such Works
not exceeding an aggregate value, such value to be determined in accordance with
Schedule-H, equal to 10(ten) percent of the Contract Price.
Provided that if any Works cannot be undertaken within the municipal limits of a town or
within any area falling in a reserved forest or wildlife sanctuary, as the case may be,
because the requisite clearances or approvals for commencing construction of Works
therein have not been given within 240 (two hundred and forty) days of the Appointed
date, the affected Works shall be deemed to be withdrawn under the provisions of this
Clause 8.3.3 unless the Parties agree to the contrary, and such Works shall not be
computed for the purposes of the aforesaid ceiling of 10% (ten per cent) hereunder.
8.3.4 In the event of withdrawal of Works under Clause 8.3.3, the Contract Price shall be
reduced by an amount equal to 90 (ninety) per cent of the value of the Works withdrawn
and the Contractor shall not be entitled to any other compensation or Damages for the
withdrawal of Works.
Provided that if any Works are withdrawn after commencement of the Construction of
such works, the Authority shall pay to the Contractor 110% (one hundred and ten per
cent) of the fair value of the work done, as assessed by the Authoritys Engineer:
8.4
Site to be free from Encumbrances
Subject to the provisions of Clause 8.2, the Site shall be made available by the Authority
to the Contractor pursuant hereto free from all Encumbrances and occupations and
without the Contractor being required to make any payment to the Authority on account
of any costs, compensation, expenses and charges for the acquisition and use of such Site
for the duration of the Project Completion Schedule. For the avoidance of doubt, it is
agreed that the existing rights of way, easements, privileges, liberties and appurtenances
30
to the Site shall not be deemed to be Encumbrances. It is further agreed that, unless
otherwise specified in this Agreement, the Contractor accepts and undertakes to bear any
and all risks arising out of the inadequacy or physical condition of the Site.
8.5
Protection of Site from encroachments
On and after signing the memorandum and/or subsequent memorandum referred to in
Clause 8.2.1, and until the issue of the Completion Certificate, the Contractor shall
maintain a round-the-clock vigil over the Site and shall ensure and procure that no
encroachment thereon takes place. During the Construction Period, the Contractor shall
protect the Site from any and all occupations, encroachments or Encumbrances, and shall
not place or create nor permit any Sub-contractor or other person claiming through or
under the Agreement to place or create any Encumbrance or security threat over all or
any part of the Site or the Project Assets, or on any rights of the Contractor therein or
under this Agreement, save and except as otherwise expressly set forth in this
Agreement. In the event of any encroachment or occupation on any part of the Site, the
Contractor shall report such encroachment or occupation forthwith to the Authority and
undertake its removal at its own cost and expenses.
8.6
Special/temporary land
The Contractor shall bear all costs and charges for any special or temporary land required
by it in connection with access to the Site. The Contractor shall obtain at its cost such
facilities on or outside the Site as may be required by it for the purposes of the Water
Supply Project and the performance of its obligations under this Agreement.
8.7
Access to the Authority and the Authoritys Engineer
8.7.1 The land given to the Contractor hereunder shall always be subject to the right of access
of the Authority and the Authoritys Engineer and their employees and agents for
inspection, viewing and exercise of their rights and performance of their obligations
under this Agreement.
8.7.2 The Contractor shall ensure, subject to all relevant safety procedures, that the Authority
has un-restricted access to the Site during any emergency situation, as decided by the
Authoritys Engineer.
8.8
Geological and archaeological finds
It is expressly agreed that mining, geological or archaeological rights do not form part of
this Agreement with the Contractor for the Works, and the Contractor hereby
acknowledges that it shall not have any mining rights or interest in the underlying
minerals, fossils, antiquities, structures or other remnants or things either of particular
geological or archaeological interest and that such rights, interest and property on or
under the Site shall vest in and belong to the Authority or the concerned Government
Instrumentality. The Contractor shall take all reasonable precautions to prevent its
workmen or any other person from removing or damaging such interest or property and
shall inform the Authority forthwith of the discovery thereof and comply with such
instructions as the concerned Government Instrumentality may reasonably give for the
removal of such property. For the avoidance of doubt, it is agreed that any reasonable
expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is
also agreed that the Authority shall procure that the instructions hereunder are issued by
the concerned Government Instrumentality within a reasonable period.
31
ARTICLE 9
9.1
9.2
9.3
9.3.1
9.3.2
9.3.3
9.3.4
9.4
32
ARTICLE 10
33
34
10.2.5
10.2.6
10.2.7
10.3
10.3.1
35
the Works. The [as per the stipulated period of completion)* day from the Appointed
Date shall be the scheduled completion date (the Scheduled Completion Date) and the
Contractor agrees and undertakes that the construction shall be completed on or before
the Scheduled Completion Date, including any extension thereof.
* Period of completion.
10.3.2 The Contractor shall construct the Water Supply Project in accordance with the Project
Completion Schedule set forth in Schedule-J. In the event that the Contractor fails to
achieve any Project Milestone or the Scheduled Completion Date within a period of 30
(thirty) days from the date set forth in Schedule-J, unless such failure has occurred due to
Force Majeure or for reasons solely attributable to the Authority, it shall pay Damages to
the Authority of a sum calculated at the rate of 0.05% (zero point zero five percent) of the
Contract Price for delay of each day reckoned from the date specified in Schedule J and
until such Project Milestone is achieved or the Works are completed; provided that if the
period for any or all Project Milestones or the Scheduled Completion Date is extended in
accordance with the provisions of this Agreement, the dates set forth in Schedule-J shall
be deemed to be modified accordingly and the provisions of this Agreement shall apply
as if Schedule-J has been amended as above; provided further that in the event the Works
are completed within or before the Scheduled Completion Date including any Time
Extension, applicable for that work or section, the Damages paid under this Clause 10.3.2
shall be refunded by the Authority to the Contractor, but without any interest thereon. For
the avoidance of doubt, it is agreed that recovery of Damages under this Clause 10.3.2
shall be without prejudice to the rights of the Authority under this Agreement including
the right of Termination thereof. The Parties further agree that Time Extension
hereunder shall only be reckoned for and in respect of the affected works as specified in
Clause 10.5.2.
10.3.3 The Authority shall notify the Contractor of its decision to impose Damages in pursuance
with the provisions of this Clause 10.3. provided that no deduction on account of
Damages shall be effected by the Authority without notifying the Contractor of its
decision to impose the Damages, and taking into consideration the representation, if any,
made by the Contractor within 20 (twenty) days of such notice. The Parties expressly
agree that the total amount of Damages under Clause 10.3.2 shall not exceed 10% (ten
percent) of the Contract Price.
10.4 Deleted.
10.5 Extension of time for completion
10.5.1 Without prejudice to any other provision of this Agreement for and in respect of
extension of time, the Contractor shall be entitled to extension of time in the Project
Completion Schedule (the Time Extension) to the extent that completion of any
Project Milestone is or will be delayed by any of the following, namely:
(a)
delay in providing the land and clearances or approval of appropriate authorities,
specified in Clause 4.1.4;
(b)
Change of Scope (unless an adjustment to the Scheduled Completion Date has
been agreed under Article 13);
(c)
occurrence of a Force Majeure Event;
(d)
any delay, impediment or prevention caused by or attributable to the Authority,
the Authority's personnel or the Authority's other contractors on the Site; and
(e)
any other cause or delay which entitles the Contractor to Time Extension in
accordance with the provisions of this Agreement.
l10.5.2 The Contractor shall, no later than 15 (fifteen) business days from the occurrence of an
36
37
10.7
rights of the Authority under this Agreement including the right to termination under
Clause 23.1.
Operation & Maintenance Manual
No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall,
in consultation with the Authoritys Engineer, evolve a operation & maintenance manual
(the Operation & Maintenance Manual) for the regular and preventive operation &
maintenance of the Water Supply Project in conformity with the Specifications and
Standards, safety requirements and Good Industry Practice, and shall provide 5 (five)
copies thereof to the Authoritys Engineer. The Authoritys Engineer shall review the
Operation & Maintenance Manual within 15 (fifteen) days of its receipt and
communicate its comments to the Contractor for necessary modifications, if any.
38
ARTICLE 11
11.1
11.2
11.2.1
11.2.2
11.2.3
11.2.4
11.3.
11.4.
11.5
39
11.6
11.7
11.8
11.8.1
11.8.2
11.8.3
11.9
11.10
11.10.1
11.10.2
Engineer for taking remedial action in accordance with this Agreement. The Contractor
shall provide all assistance as may be required by the auditor in the conduct of its audit
hereunder. Notwithstanding anything contained in this Clause 11.5, the external technical
audit shall not affect any obligations of the Contractor or the Authoritys Engineer under
this Agreement.
Inspection of construction records
The Authority shall have the right to inspect the records of the Contractor relating to the
Works.
Monthly progress reports
During the Construction Period, the Contractor shall, no later than 10 (ten) days after the
close of each month, furnish to the Authority and the Authoritys Engineer a monthly
report on progress of the Works and shall promptly give such other relevant information
as may be required by the Authoritys Engineer.
Inspection
The Authoritys Engineer and its authorised representative shall at all reasonable times:
(a)
have full access to all parts of the Site and to all places from which natural
Materials are being obtained for use in the Works; and
(b)
during production, manufacture and construction at the Site and at the place of
production, be entitled to examine, inspect, measure and test the Materials and
workmanship, and to check the progress of manufacture of Materials.
The Contractor shall give the Authoritys Engineer and its authorised agents access,
facilities and safety equipment for carrying out their obligations under this Agreement.
The Authoritys Engineer shall submit a monthly inspection report (the Inspection
Report) to the Authority and the Contractor bringing out the results of inspections and
the remedial action taken by the Contractor in respect of Defects or deficiencies. For the
avoidance of doubt, such inspection or submission of Inspection Report by the
Authoritys Engineer shall not relieve or absolve the Contractor of its obligations and
liabilities under this Agreement in any manner whatsoever.
Samples
The Contractor shall submit the following samples of Materials and relevant information
to the Authoritys Engineer for pre-construction review:
(a)
manufacturer's test reports and standard samples of manufactured Materials; and
(b)
samples of such other Materials as the Authoritys Engineer may require.
Tests
For determining that the Works conform to the Specifications and Standards, the
Authoritys Engineer shall require the Contractor to carry out or cause to be carried out
tests, at such time and frequency and in such manner as specified in this Agreement, and
in accordance with Good Industry Practice for quality assurance. The test checks by the
Authoritys Engineer shall comprise at least 20 (twenty) percent of the quantity or
number of tests prescribed for each category or type of test for quality control by the
Contractor.
In the event that results of any tests conducted under this Clause 11.10 establish any
Defects or deficiencies in the Works, the Contractor shall carry out remedial measures
and furnish a report to the Authoritys Engineer in this behalf. The Authoritys Engineer
shall require the Contractor to carry out or cause to be carried out tests to determine that
such remedial measures have brought the Works into compliance with the Specifications
and Standards, and the procedure shall be repeated until such Works conform to the
Specifications and Standards. For the avoidance of doubt, the cost of such tests and
40
41
42
ARTICLE 12
COMPLETION CERTIFICATE
43
12.2.2 Upon issue of Provisional Certificate, the provisions of Articles 14 and 17 shall apply to
the completed parts of the Water Supply Project and the property and ownership of all
such completed Works shall vest in the Authority.
12.2.3 If the Authoritys Engineer determines that the Water Supply Project or any completed
part thereof does not conform to the provisions of this Agreement and cannot be safely
and reliably placed in operation, it shall forthwith make a report in this behalf and send
copies thereof to the Authority and the Contractor and withhold issuance of the
Provisional Certificate until the Defects or deficiencies are rectified by the Contractor
and Tests are successful in accordance with this Article 12.
12.2.4 Notwithstanding anything to the contrary contained in Clause 12.2.3, the Authority may,
at any time after receiving a report from the Authoritys Engineer under that Clause,
direct the Authoritys Engineer to issue a Provisional Certificate under Clause 12.2.1 and
such direction shall be complied forthwith.
12.2.5 No Provisional Certificate shall be issued under the provisions of this Clause 12.2 until
the Contractor has submitted valid claims for payment of at least 80% (eighty per cent) of
the amount arrived at after reducing the lump sum price specified in Clause 19.1.1 by the
amount attributable to works which have been withdrawn under the provisions of Clause
8.3.3. For the avoidance of doubt and by way of illustration, the Parties agree that if the
Contract Price specified in Clause 19.1.1 is Rs. 105 cr. (Rs. one hundred and five crore)
and the works withdrawn under Clause 8.3.3 have a value of Rs. 5 cr. (Rs. five crore), a
Provisional Certificate shall not be issued until valid claims for payment of an amount of
Rs. 80 cr. (Rs. eighty crore) have been submitted by the Contractor in accordance with
the provisions of this Agreement. It is further agreed that all price adjustments made in
pursuance of Clause 19.10 shall not be reckoned for computation of the claims for
payments referred to in this Clause 12.2.5.
12.3 Completion of remaining Works
All items in the Punch List shall be completed by the Contractor in accordance with the
provisions of this Agreement. For any delay in their completion other than for the
reasons solely attributable to the Authority or due to Force Majeure, the Authority shall
be entitled to recover Damages from the Contractor in accordance with the provisions of
Clause 10.3.2 of this Agreement.
12.4 Completion Certificate
12.4.1 Upon completion of all Works, including the items specified in the Punch List, and the
Authoritys Engineer determining the Tests to be successful, it shall forthwith issue to the
Contractor and the Authority a certificate substantially in the form set forth in ScheduleL (the Completion Certificate).
12.4.2 Upon receiving the Completion Certificate, the Contractor shall remove its equipment,
materials, debris and temporary works from the Site within a period of 30 (thirty) days
thereof, failing which the Authority may remove or cause to be removed, such
equipment, materials, debris and temporary works and recover from the Contractor an
amount equal to 120% (one hundred and twenty per cent) of the actual cost of removal
incurred by the Authority.
12.4.3 Without prejudice to the obligations of the Contractor specified in Articles 14 and 17, the
property and ownership of all the completed Works forming part of the Water Supply
Project shall vest in the Authority.
12.5 Rescheduling of Tests
If the Authoritys Engineer certifies to the Authority and the Contractor that it is unable
to issue the Completion Certificate or Provisional Certificate, as the case may be,
44
because of events or circumstances on account of which the Tests could not be held or
had to be suspended, the Contractor shall be entitled to re-schedule the Tests and hold the
same as soon as reasonably practicable.
45
ARTICLE 13
CHANGE OF SCOPE
46
(iii)
13.2.3
13.2.4
13.2.5
13.3
13.4
13.4.1
13.4.2
13.4.3
13.5
13.5.1
47
first ranked bid in terms of the selection criteria, subject to payment of 2% (two per cent)
of the bid amount to the Authority$, and thereupon securing the award of such works or
services. For the avoidance of doubt, it is agreed that the Contractor shall be entitled to
exercise such option only if it has participated in the bidding process and its bid does not
exceed the first ranked bid by more than 10% (ten percent) thereof. It is also agreed that
the Contractor shall provide assistance and cooperation to the person who undertakes the
works or services hereunder, but shall not be responsible for rectification of any Defects
and/ or operation & maintenance of works carried out by other agencies.
13.5.2 The works undertaken in accordance with this Clause 13.5 shall conform to the
Specifications and Standards and shall be carried out in a manner that minimises the
disruption in operation of the Water Supply Project. The provisions of this Agreement,
insofar as they relate to Works and Tests, shall apply mutatis mutandis to the works
carried out under this Clause 13.5.
The Authority shall transfer 75% (seventy five percent) of the amount so received to the first ranked bidder whose
bid shall have been matched by the Contractor.
$
48
ARTICLE 14
OPERATION & MAINTENANCE
49
50
Maintenance from any cause attributable to the Contractor, the Contractor shall, at its cost and
expense, rectify and remedy such loss or damage forthwith so that the Water Supply Project
conforms to the provisions of this Agreement.
14.9 Overriding powers of the Authority
14.9.1 If in the reasonable opinion of the Authority, the Contractor is in material breach of its
obligations under this Agreement and, in particular, the Operation & Maintenance Requirements,
and such breach is causing or likely to cause material hardship or danger to the Users and
pedestrians, the Authority may, without prejudice to any of its rights under this Agreement
including Termination thereof, by notice require the Contractor to take reasonable measures
immediately for rectifying or removing such hardship or danger, as the case may be.
14.9.2 In the event that the Contractor, upon notice under Clause 14.9.1, fails to rectify or remove any
hardship or danger within a reasonable period, the Authority may exercise overriding powers
under this Clause 14.9.2 and take over the performance of any or all the obligations of the
Contractor to the extent deemed necessary by it for rectifying or removing such hardship or
danger; provided that the exercise of such overriding powers by the Authority shall be of no
greater scope and of no longer duration than is reasonably required hereunder; provided further
that any costs and expenses incurred by the Authority in discharge of its obligations hereunder
shall be recovered by the Authority from the Contractor, and the Authority shall be entitled to
deduct any such costs and expenses incurred from the payments due to the Contractor under
Clause 19.7 for the performance of its Operation & Maintenance obligations.
14.9.3 In the event of a national emergency, civil commotion or any other circumstances specified in
Clause 21.3, the Authority may take over the performance of any or all the obligations of the
Contractor to the extent deemed necessary by it, and exercise such control over the Water Supply
Project or give such directions to the Contractor as may be deemed necessary; provided that the
exercise of such overriding powers by the Authority shall be of no greater scope and of no longer
duration than is reasonably required in the circumstances which caused the exercise of such
overriding power by the Authority. For the avoidance of doubt, it is agreed that the consequences
of such action shall be dealt in accordance with the provisions of Article 21. It is also agreed that
the Contractor shall comply with such instructions as the Authority may issue in pursuance of the
provisions of this Clause 14.9.3, and shall provide assistance and cooperation to the Authority, on
a best effort basis, for performance of its obligations hereunder.
51
ARTICLE 15
52
ARTICLE 16
TRAFFIC REGULATION
53
ARTICLE 17
DEFECTS LIABILITY
17.1 Defects Liability Period
17.1.1 The Contractor shall be responsible for all the Defects and deficiencies, except usual wear
and tear in the Water Supply Project or any Section thereof, till the expiry of a period of 5
(Five) years commencing from the date of Provisional Certificate (the Defects Liability
Period). Provided that the Defects Liability Period shall in no case be less than 60
(Sixty) months from the date of Completion Certificate for and in respect of works for
which Time Extension was granted. Provided further that in the event no Provisional
Certificate is issued, the Defects Liability Period shall commence from the date of the
Completion Certificate. For the avoidance of doubt, any repairs or restoration on
account of usual wear or tear in the Water Supply Project or any Section thereof shall
form a part of the Operation & Maintenance obligations of the Contractor as
specified in Article 14.
17.1.2 Deleted.
17.2 Remedying Defects
The Contractor shall repair or rectify all Defects and deficiencies observed by the
Authoritys Engineer during the Defects Liability Period within a period of 15 (fifteen)
days from the date of notice issued by the Authoritys Engineer in this behalf, or within
such reasonable period as may be determined by the Authoritys Engineer at the request of
the Contractor, in accordance with Good Industry Practice.
17.3 Cost of remedying Defects
For the avoidance of doubt, any repair or rectification undertaken in accordance with the
provisions of Clause 17.2, including any additional testing, shall be carried out by the
Contractor at its own risk and cost, to the extent that such rectification or repair is
attributable to:
(a)
the design of the Project;
(b)
Plant, Materials or workmanship not being in accordance with this Agreement and
the Specifications and Standards;
(c)
improper operation & maintenance during construction of the Water Supply
Project by the Contractor; and/ or
(d)
failure by the Contractor to comply with any other obligation under this
Agreement.
17.4 Contractors failure to rectify Defects
In the event that the Contractor fails to repair or rectify such Defect or deficiency within
the period specified in Clause 17.2, the Authority shall be entitled to get the same
repaired, rectified or remedied at the Contractors cost so as to make the Water Supply
Project conform to the Specifications and Standards and the provisions of this Agreement.
All costs consequent thereon shall, after due consultation with the Authority and the
Contractor, be determined by the Authoritys Engineer. The cost so determined and an
amount equal to twenty percent of the cost as Damages shall be recoverable by the
Authority from the Contractor and may be deducted by the Authority from any monies
due to the Contractor.
17.5 Contractor to search cause
17.5.1 The Authoritys Engineer may instruct the Contractor to examine the cause of any Defect
in the Works or part thereof before the expiry of the Defects Liability Period.
54
17.5.2 In the event any Defect identified under Clause 17.5.1 is attributable to the Contractor, the
Contractor shall rectify such Defect within the period specified by the Authoritys
Engineer, and shall bear the cost of the examination and rectification of such Defect.
17.5.3 In the event such Defect is not attributable to the Contractor, the Authoritys Engineer
shall, after due consultation with the Authority and the Contractor, determine the costs
incurred by the Contractor on such examination and notify the same to the Contractor,
with a copy to the Authority, and the Contractor shall be entitled to payment of such costs
by the Authority.
17.6. Extension of Defects Liability Period
The Defects Liability Period shall be deemed to be extended till the identified Defects
under Clause 17.2 have been remedied.
55
ARTICLE 18
AUTHORITYS ENGINEER
56
18.4.2 The instructions issued by the Authoritys Engineer shall be in writing. However, if the
Authoritys Engineer issues any oral instructions to the Contractor, it shall confirm in
writing the oral instructions within 2 (two) working days of issuing them.
18.4.3 In case the Contractor does not receive the confirmation of the oral instruction within the
time specified in Clause 18.4.2, the Contractor shall seek the written confirmation of the
oral instructions from the Authoritys Engineer. The Contractor shall obtain
acknowledgement from the Authoritys Engineer of the communication seeking written
confirmation. In case of failure of the Authoritys Engineer or its delegated assistant to
reply to the Contractor within 2 (two) days of the receipt of the communication from the
Contractor, the Contractor may not carry out the instruction.
18.4.4 In case of any dispute on any of the instructions issued by the delegated assistant, the
Contractor may refer the dispute to the Authoritys Engineer, who shall then confirm,
reverse or vary the instructions within [3 (three)] business days of the dispute being
referred.
18.5 Determination by the Authoritys Engineer
18.5.1 The Authoritys Engineer shall consult with each Party in an endeavour to reach
agreement wherever this Agreement provides for the determination of any matter by the
Authoritys Engineer. If such agreement is not achieved, the Authoritys Engineer shall
make a fair determination in accordance with this Agreement having due regard to all
relevant circumstances. The Authoritys Engineer shall give notice to both the Parties of
each agreement or determination, with supporting particulars.
18.5.2 Each Party shall give effect to each agreement or determination made by the Authoritys
Engineer in accordance with the provisions of this Agreement. Provided, however, that if
any Party disputes any instruction, decision, direction or determination of the Authoritys
Engineer, the Dispute shall be resolved in accordance with the Dispute Resolution
Procedure.
18.6 Remuneration of the Authoritys Engineer
The remuneration, cost and expenses of the Authoritys Engineer shall be paid by the
Authority.
18.7 Termination of the Authoritys Engineer
18.7.1 The Authority may, in its discretion, replace the Authoritys Engineer at any time, but only
after appointment of another Authoritys Engineer in accordance with Clause 18.1.
18.7.2 If the Contractor has reasons to believe that the Authoritys Engineer is not discharging its
duties and functions in accordance with the provisions of this Agreement, it may make a
written representation to the Authority and seek termination of the appointment of the
Authoritys Engineer. Upon receipt of such representation, the Authority shall hold a
tripartite meeting with the Contractor and Authoritys Engineer and make best efforts for
an amicable resolution of the representation. In the event that the appointment of the
Authoritys Engineer is terminated hereunder, the Authority shall appoint forthwith
another Authoritys Engineer in accordance with Clause 18.1.
57
Part IV
Financial Covenants
58
ARTICLE 19
PAYMENTS
19.1 Contract Price
19.1.1 The Authority shall make payments to the Contractor for the Works on the basis of the
lump sum price accepted by the Authority in consideration of the obligations specified in
this Agreement for an amount of Rs. (Rs. ) (the
Contract Price), which shall be subject to adjustments in accordance with the
provisions of this Agreement. For the avoidance of doubt, the Parties expressly agree that
the Contract Price shall not include the cost of Operation & Maintenance which shall be
paid separately in accordance with the provisions of Clause 19.7. The Parties further agree
that save and except as provided in this Agreement, the Contract Price shall be valid and
effective until issue of Completion Certificate.
19.1.2(a) The Contract Price includes all duties, taxes, royalty, and fees that may be levied in
accordance with the laws and regulations in force as on the Base Date on the
Contractor's equipment, Plant, Materials and supplies acquired for the purpose of this
Agreement and on the services performed under this Agreement. Nothing in this
Agreement shall relieve the Contractor from its responsibility to pay any tax including
any tax that may be levied in India on profits made by it in respect of this Agreement.
Statutory deduction of taxes as applicable & royalty shall be made from each bill at
the time of payment.
(b) The Building & Other Construction Workers Welfare Cess Act 1996: In accordance
with the provisions under the said Act 1% (One) of the approved agreement value will
be deducted from the R/A Bill at the time of making payment to the contractor and
such amount shall be remitted in favour of The Odisha Building & Other Construction
Workers Welfare Board.
19.1.3 The Contract Price shall not be adjusted for any change in costs stated in Clause 19.1.2
above, except as stated in Clauses 19.10 and 19.17.
19.1.4 The Contract Price shall not be adjusted to take account of any unforeseen difficulties or
costs, unless otherwise provided for in this Agreement.
19.1.5 Unless otherwise stated in this Agreement, the Contract Price covers all the Contractors
obligations for the Works under this Agreement and all things necessary for the
Construction and the remedying of any Defects in the Water Supply Project.
19.1.6 All payments under this Agreement shall be made in Indian Rupees.
19.2 Advance Payment
19.2.1 The Authority shall make an interest-bearing advance payment @10% per
Annum(the Advance Payment), equal in amount to 10 (ten) percent of the
Contract Price, for mobilization expenses and for acquisition of equipment. The
Advance Payment shall be made in four installments. The first installment shall be an
amount equal to 2% (two percent) of the Contract Price, the second installment
shall be equal to 3% (three percent) of the Contract Price, the third installment shall be
equal to 3% (three percent) of the Contract Price and the fourth installment shall be equal
to 2% (two percent) of the Contract Price.
19.2.2 The Contractor may apply to the Authority for the first installment of Advance
Payment at any time after the Appointed Date, along with an irrevocable and
unconditional guarantee from a Nationalised Bank, counter guaranteed by its branch at
59
Bhubaneswar for an amount equivalent to 110% (one hundred and ten per cent) of
such installment, substantially in the form provided at Annex-III of Schedule-G, to
remain effective till the complete and full repayment thereof.
19.2.3 At any time after 30 (thirty) days from the Appointed Date, the Contractor may apply for
the second instalment of the Advance Payment along with an irrevocable and
unconditional guarantee from a Nationalised Bank, counter guaranteed by its branch at
Bhubaneswar Bank for an amount equivalent to 110% (one hundred and ten per cent) of
such instalment, substantially in the form provided at Annex-III of Schedule-G, to remain
effective till the complete and full repayment thereof.
19.2.4 At any time, after 60 (sixty) days from the Appointed Date, the Contractor may apply to
the Authority for the third instalment of the Advance Payment along with an irrevocable
and unconditional guarantee from a Nationalised Bank, counter guaranteed by its branch
at Bhubaneswar Bank for an amount equivalent to 110% (one hundred and ten per cent)
of such instalment, substantially in the form provided at Annex-III of Schedule-G, to
remain effective till the complete and full repayment thereof.
19.2.4.1 At any time, after 90 (Ninety) days from the Appointed Date on verification of
acquisition of required materials and equipment by S.E., concerned P.H. Circle, the
Contractor may apply to the Authority for the fourth installment of the Advance Payment
along with an irrevocable and unconditional guarantee from a Nationalised Bank,
counter guaranteed by its branch at Bhubaneswar for an amount equivalent to 110%
(one hundred and ten per cent) of such installment, substantially in the form provided
at Annex-III of Schedule-G, to remain effective till the complete and full repayment
thereof
19.2.5 The first, second, third and the fourth instalments shall be paid by the Authority to the
Contractor within 15 (fifteen) days of the receipt of its respective requests in accordance
with the provisions of this Clause 19.2.
19.2.6 Each instalment of Advance Payment shall be repaid by the Contractor to the Authority no
later than 365 (three hundred and sixty five) days from the respective date of Advance
Payment.
19.2.7 The Contractor shall repay each instalment of the Advance Payment on or before the due
date of repayment. In the event of the Contractors failure to make the repayment on time,
the Authority shall be entitled to encash the Bank guarantee for Advance Payment. The
Parties expressly agree that for any delay in repayment of the Advance Payment, the
Contractor shall pay interest to the Authority for each day of delay, such interest to be
calculated at the rate of 18% (eighteen per cent) per annum.
19.2.8 If the Advance Payment has not been fully repaid prior to Termination under Clause 21.7
or Article 23, as the case may be, the whole of the balance then outstanding shall
immediately become due and payable by the Contractor to the Authority. Without
prejudice to the provisions of Clause 19.2.7, in the event of Termination for Contractor
Default, the Advance Payment shall be deemed to carry interest at the rate of 10% (ten per
cent) per annum from the date of Advance Payment to the date of recovery by encashment
of the Bank Guarantee for the Advance Payment. For the avoidance of doubt, the
aforesaid interest shall be payable on each instalment of the Advance Payment, regardless
of whether the instalment or any part thereof has been repaid to the Authority prior to
Termination.
19.3 Procedure for estimating the payment for the Works
19.3.1 The Authority shall make interim payments to the Contractor as certified by the
Authoritys Engineer on completion of a stage, in a length, number or area as specified
60
19.3.2
19.3.3
19.4
19.5
19.5.1
19.5.2
19.5.3
19.5.4
and valued in accordance with the proportion of the Contract Price assigned to each item
and its stage in Schedule-H.
The Contractor shall base its claim for interim payment for the stages completed till the
end of the month for which the payment is claimed, valued in accordance with Clause
19.3.1, supported with necessary particulars and documents in accordance with this
Agreement.
Any reduction in the Contract Price arising out of Change of Scope or the works
withdrawn under Clause 8.3 shall not affect the amounts payable for the items or stage
payments thereof which are not affected by such Change of Scope or withdrawal. For
avoidance of doubt and by way of illustration, the Parties agree that if the amount assigned
to Major structures is reduced owing to Change of Scope or withdrawal of work, the
reduction in payment shall be restricted to relevant payments for Major structures only and
the payment due in respect of all other stage payments shall not be affected in any manner.
The Parties further agree that the adjustments arising out of the aforesaid modifications
shall be carried out in a manner that the impact of such modifications is restricted to the
said Change of Scope or withdrawal, as the case may be, and does not alter the payments
due for and in respect of items or stage payments which do not form part of such Change
of Scope or withdrawal.
Stage Payment Statement for Works
The Contractor shall submit a statement (the Stage Payment Statement), in 3 copies,
by the 7th (seventh) day of the month to the Authoritys Engineer in the form set forth in
Schedule-O, showing the amount calculated in accordance with Clause 19.3 to which the
Contractor considers himself entitled for completed stage(s) of the Works. The Stage
Payment Statement shall be accompanied with the progress reports and any other
supporting documents. The Contractor shall not submit any claim for payment of
incomplete stages of work.
Stage Payment for Works
Within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor
pursuant to Clause 19.4, the Authoritys Engineer shall broadly determine the amount due
to the Contractor and recommend the release of 90 (ninety) percent of the amount so
determined as part payment against the Stage Payment Statement, pending issue of the
Interim Payment Certificate by the Authoritys Engineer. Within 10 (ten) days of the
receipt of recommendation of the Authoritys Engineer, the Authority shall make
electronic payment directly to the Contractors bank account.
Within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in
Clause 19.4, the Authoritys Engineer shall determine and shall deliver to the Authority
and the Contractor an IPC certifying the amount due and payable to the Contractor, after
adjusting the payments already released to the Contractor against the said statement. For
the avoidance of doubt, the Parties agree that the IPC shall specify all the amounts that
have been deducted from the Stage Payment Statement and the reasons there for.
In cases where there is a difference of opinion as to the value of any stage, the Authoritys
Engineers view shall prevail and interim payments shall be made to the Contractor on this
basis; provided that the foregoing shall be without prejudice to the Contractors right to
raise a Dispute.
The Authoritys Engineer may, for reasons to be recorded, withhold from payment:
(a)
the estimated value of work or obligation that the Contractor has failed to perform
in accordance with this Agreement and the Authoritys Engineer had notified the
lContractor; and
61
(b)
the estimated cost of rectification of work done being not in accordance with this
Agreement.
19.5.5 Payment by the Authority shall not be deemed to indicate the Authority's acceptance,
approval, consent or satisfaction with the work done.
19.6 Monthly Operation & Maintenance Statement of the Water Supply Project
19.6.1 The Contractor shall submit to the Authority a monthly operation & maintenance statement
(Monthly Operation & Maintenance Statement)/claim in 3 (three) copies by the 7th
(seventh) day of each month in the format set forth in Schedule-O for the Operation &
Maintenance of the Water Supply Project during the previous month.
19.6.2 The monthly lump sum amount payable for Operation & Maintenance shall be 1/12 th (one-twelfth)
of the annual cost of Operation & Maintenance as specified in Clause 14.1.1.
19.7
19.7.1 Within 15 (fifteen) days of receipt of the Monthly Operation & Maintenance Statement/claim from
the Contractor pursuant to Clause 19.6, the Authority shall verify the Contractors monthly
operation & maintenance statement and certify the amount to be paid to the Contractor taking into
account:
(a) Compliance with the Operation & Maintenance Requirements; and
(b) reduction for non-compliance with the Operation & Maintenance Requirement in accordance
with Clause 19.7.2.
The Authority shall approve or amend the monthly operation & maintenance statement/claim to
reflect the amount due to the Contractor in accordance with this Agreement.
19.7.2 Payment for Operation & Maintenance shall be made in fixed monthly amounts in accordance
with this Agreement. If the Operation & Maintenance Requirements set forth in Schedule-E are
not met, reduction in payments shall be made in accordance with the provisions of Schedule-M.
The reductions for non-compliance with the Operation & Maintenance Requirements shall be
applied on the basis of monthly inspections by the Authority.
19.7.3 The deduction made on account of non-compliance with the Operation & Maintenance
Requirements shall not be subsequently considered for payment after the compliance is achieved
by repair or rectification.
19.7.4 The Authority shall pay to the Contractor every month any amount due under this Clause 19.7. The
payment shall be made no later than 30 (thirty) days from the date of submission of the last claim
for the relevant month.
62
aforesaid period of 30 (thirty) days, the Authority shall pay the amount shown in
the Contractors Stage Payment Statement and any discrepancy therein shall be
added to, or deducted from, the next payment certificate issued to the Contractor;
and
(b)
payment shall be made no later than 30 (thirty) days from the date of submission of
the Final Payment Certificate for Works along with the discharge submitted to the
Authoritys Engineer in accordance with the provisions of Clause 19.15 for
certification.
19.9.2 In the event of the failure of the Authority to make payment to the Contractor within the
time period stated in this Clause 19.9, the Authority shall be liable to pay to the Contractor
interest at the Base Rate plus 2% (two percent), calculated at quarterly rests, on all sums
remaining unpaid from the date on which the same should have been paid, calculated in
accordance with the provisions of Clause 19.9.1(a) and (b) and till the date of actual
payment.
19.10. Price adjustment for the Works
19.10.1 The amounts payable to the Contractor for Works shall be adjusted in accordance with the
provisions of this Clause 19.10.
19.10.2 Subject to the provisions of Clause 19.10.3, the amounts payable to the Contractor for
Works, shall be adjusted in the IPC issued by the Authoritys Engineer for the increase or
decrease in the index cost of inputs for the Works, by the addition or subtraction of the
amounts determined by the formulae prescribed in Clause 19.10.4.
19.10.3 To the extent that full compensation for any increase or decrease in costs to the
Contractor is not covered by the provisions of this or other Clauses in this Agreement, the
costs and prices payable under this Agreement shall be deemed to include the amounts
required to cover the contingency of such other increase or decrease of costs and prices.
19.10.4 The Contract Price shall be adjusted for increase or decrease in rates and price of labour,
cement, steel, Plant, machinery and spares, bitumen, pipes, fuel and lubricants, and other
material inputs in accordance with the principles, procedures and formulae specified
below:
(a)
Price adjustment shall be applied on completion of the specified stage of the
respective item of work in accordance with Schedule-H;
(b)
Adjustment for each item of work/stage shall be made separately.
(c)
The following expressions and meanings are assigned to the value of the work
done:
RW= Value of work done for the completion of a stage under the following items
of Schedule-H:
(i)
Pipe line works; and
(d)
(ii)
Other works
BR = Value of work done for the completion of a stage under the items Major
Structures (Schedule-H)
Price adjustment for changes in cost shall be paid in accordance with the following
formulae:
(i)
VRW= 0.85 RW x [PL x (LI LO)/LO + PA x (AI AO)/AO + PF x (FI
FO)/FO + PB x (BI BO)/BO + PP x (PI-PO) / PO + PM x (MI MO)/MO
+ PC x (CI CO)/CO+ PS x (SI SO)/SO]
(ii)
VBR = 0.85 BR x [PL x (LI LO)/LO + PA x (AI AO)/AO + PF x (FI
FO)/FO + PM x (MI MO)/MO+ PC x (CI CO)/CO+PS x (SI SO)/SO]
63
(e)
Where
VRW = Increase or decrease in the cost of pipe line works/other works during the
period under consideration due to changes in the rates for relevant
components as stated in sub-paragraph (e)
VBR = Increase or decrease in the cost of Major Structures during the period under
consideration due to changes in the rates for relevant components as stated
in sub-paragraph (e)
PB, PP, PC, PL, PM, and PS are the percentages of bitumen, pipe, cement,
labour, other materials, and steel/components (including strands and cables)
respectively for the relevant item as stated in sub-paragraph (e)
PA is the percentage of Plant, machinery and spares component for the
relevant item as stated in sub-paragraph (e).
PF is the percentage of fuel and lubricants for the relevant items as stated in
sub-paragraph (e).
AO = The wholesale price index as published by the Ministry of Commerce &
Industry, Government of India (hereinafter called WPI) for construction
machinery for the month of the Base Date.
AI = The WPI for construction machinery for the month three months prior to the
month to which the IPC relates.
BO = The official retail price of bitumen at the nearest refinery at [Haladia/
Vizag] on the Base Date.
BI = The official retail price of bitumen at nearest refinery at [Haladia/ Vizag],
on the first day of the month three months prior to the month to which the
IPC relates.
PO = The official retail price of different types of pipes on the base date.
PI = The official retail price of different types of pipe on the 1st day of month
three months prior to the month to which the IPC relates.
CO = The WPI for cement for the month of the Base Date.
CI = The WPI for cement for the month three months prior to the month to
which the IPC relates.
FO = The official retail price of high speed diesel (HSD) oil at the existing
consumer pumps of Indian Oil Corporation (IOC) in the State of [Odisha]
on the Base Date.
FI = The official retail price of HSD at the existing consumer pumps of IOC in
the State of [Odisha] on the first day of the month three months prior to the
month to which the IPC relates.
LO = The consumer price index for industrial workers for the State of Odisha,
published by Labour Bureau, Ministry of Labour, Government of India,
(hereinafter called CPI) for the month of the Base Date.
LI = The CPI for the month three months prior to the month to which the IPC
relates.
MO = The WPI for all commodities for the month of the Base Date.
MI = The WPI for all commodities for the month three months prior to the month
to which the IPC relates.
SO = The WPI for steel (rods) for the month of the Base Date.
SI = The WPI for steel (rods) for the month three months prior to the month to
which the IPC relates.
The following percentages shall govern the price adjustment of the Contract Price:
64
Component
Item
Water Supply Works
Earthwork & other Pipe line work
Structural works
works
[20%]
[5 %]
[15%]
[5%]
Nil
[15%]
Nil
Nil
[20%]
Nil
Nil
Nil
Nil
[70%]
Nil
[10%]
Nil
[10%]
Labour (PL)
Cement (PC)
Steel (PS)
Bitumen (PB)
Pipe (PP)
Fuel
and
lubricants (PF)
[50%]
[25%]
[25%]
Other Materials
(PM)
[15%]
Nil
[15%]
Plant, machinery
and spares. (PA)
100%
100%
100%
Total
(f)
In case an IPC relates to a month which is within 3 (three) months from the Base
Date, no price adjustment shall be applicable.
19.11 Restrictions on price adjustment
Price adjustment shall be due and payable only in respect of the stages of Works for which
the Stage Payment Statement has been submitted by the Contractor no later than 30
(thirty) days from the date of the applicable Project Milestone or the Scheduled
Completion Date, as the case may be, including any Time Extension granted there for in
accordance with the provisions of this Agreement. For the avoidance of doubt, in the event
of submission of any Stage Payment Statement after the period specified herein, price
adjustment shall be applicable until the date of the respective Project Milestone or the
Scheduled Completion Date, as the case may be.
19.12. Price adjustment on labour for Operation & Maintenance of water supply Project.
Differential cost of labour due to enhancement of minimum wages by State Government
will be adjusted every quarter in accordance with following formula.
L = Increase in the quarterly payment on labour.
P = Quarterly lump sum payment due to contractor on labour.
L0 = Minimum wages prevailing on the bid due date.
L1 = The minimum wages for the first day of relevant quarter under consideration for
determining Price Adjustment.
L = P x (L1 L0)/ L0
19.13 Final Payment Statement
19.13.1 Within 60 (sixty) days after receiving the Completion Certificate under Clause 12.4, the
Contractor shall submit to the Authoritys Engineer for consideration six copies of a Final
Payment Statement (the Final Payment Statement) for Works, with supporting
documents showing in detail, in the form prescribed by the Authoritys Engineer:
(a)
the summary of Contractors Stage Payment claims for Works as submitted in
accordance with Clause 19.4;
(b)
the amounts received from the Authority against each claim; and
(c)
any further sums which the Contractor considers due to it from the Authority.
If the Authoritys Engineer disagrees with or cannot verify any part of the Final Payment
Statement, the Contractor shall submit such further information as the Authoritys
65
Engineer may reasonably require. The Authoritys Engineer shall deliver to the Authority:
(i)
an IPC for those parts of the Final Payment Statement which are not in dispute,
along with a list of disputed items which shall then be settled in accordance with
the provisions of Article 26; or
(ii)
a Final Payment Certificate in accordance with Clause 19.15 if there are no
disputed items.
19.13.2 If the Authoritys Engineer does not prescribe the form referred to in Clause 19.13.1
within 15 (fifteen) days of the date of issue of the Completion Certificate, the Contractor
shall submit the statement in such form as it deems fit.
19.14 Discharge
Upon submission of the Final Payment Statement for Works under Clause 19.13, the
Contractor shall give to the Authority, with a copy to the Authoritys Engineer, a written
discharge confirming that the total of the Final Payment Statement represents full and final
settlement of all monies due to the Contractor in respect of this Agreement for all the
Works arising out of this Agreement, except for any monies due to either Party on account
of any Defect. Provided that such discharge shall become effective only after the payment
due has been made in accordance with the Final Payment Certificate issued pursuant to
Clause 19.15.
19.15 Final Payment Certificate
19.15.1 Within 30 (thirty) days after receipt of the Final Payment Statement for Works under
Clause 19.13, and the written discharge under Clause 19.14, and there being no disputed
items of claim, the Authoritys Engineer shall deliver to the Authority, with a copy to the
Contractor, a final payment certificate (the Final Payment Certificate) stating the
amount which, in the opinion of the Authoritys Engineer, is finally due under this
Agreement or otherwise. For the avoidance of doubt, before issuing the Final Payment
Certificate, the Authoritys Engineer shall ascertain from the Authority all amounts
previously paid by the Authority and for all sums to which the Authority is entitled, the
balance, if any, due from the Authority to the Contractor or from the Contractor to the
Authority, as the case may be.
19.15.2 The Authority shall, in accordance with the provisions of Clause 19.9, pay to the
Contractor the amount which is stated as being finally due in the Final Payment
Certificate.
19.16 Final payment statement for Operation & Maintenance of Water Supply Project.
19.16.1 Within 30 (thirty) days after completion of the Operation & Maintenance Period, the Contractor
shall submit to the Authority six copies of the final payment statement for Operation &
Maintenance of the Water Supply Project, with supporting documents showing the details set
forth below in the form prescribed by the Authority:
(a) the total amount claimed in accordance with the monthly statement for Operation &
Maintenance of Water Supply Project;
(b) the amount paid in accordance with the Interim Payment Certificates/claims; and
(c) any sums which the Contractor considers to be due to it, with supporting documents.
19.16.2 The Authority shall check and approve the final payment within 30 (thirty) days of the receipt of
the final payment statement of Operation & Maintenance under Clause 19.16.1, segregating the
items of amount payable from the items of amount disallowed. The Authority shall make
payment on the basis of the final payment statement within a period of 30 (thirty) days there
after.
19.16.3 If the Authority does not prescribe the form within 15 (fifteen) days of the date of issue of the
Completion Certificate, the Contractor shall submit the statement in such form as it deems fit.
66
19.17.1 If as a result of Change in Law, the Contractor suffers any additional costs in the
execution of the Works or in relation to the performance of its other obligations under this
Agreement, the Contractor shall, within 15 (fifteen) days from the date it becomes
reasonably aware of such addition in cost, notify the Authority with a copy to the
Authoritys Engineer of such additional cost due to Change in Law.
19.17.2 If as a result of Change in Law, the Contractor benefits from any reduction in costs for the
execution of this Agreement or in accordance with the provisions of this Agreement,
either Party shall, within 15 (fifteen) days from the date it becomes reasonably aware of
such reduction in cost, notify the other Party with a copy to the Authoritys Engineer of
such reduction in cost due to Change in Law.
19.17.3 The Authoritys Engineer shall, within 15 (fifteen) days from the date of receipt of the
notice from the Contractor or the Authority, determine any addition or reduction to the
Contract Price, as the case may be, due to the Change in Law.
19.18 Correction of Interim Payment Certificates
The Authoritys Engineer may by an Interim Payment Certificate make any correction or
modification in any previous Interim Payment Certificate issued by the Authoritys
Engineer.
19.19 Authoritys claims
If the Authority considers itself to be entitled to any payment from the Contractor under
any Clause of this Agreement, it shall give notice and particulars to the Contractor 20
(twenty) days before making the recovery from any amount due to the Contractor, and
shall take into consideration the representation, if any, made by the Contractor in this
behalf, before making such recovery.
19.20 Bonus for early completion
In the event that the Project Completion Date occurs prior to the Scheduled Completion
Date, the Contractor shall be entitled to receive a payment of bonus equivalent to 0.03%
(zero point zero three per cent) of the Contract Price for each day by which the Project
Completion Date precedes the Scheduled Completion Date, but subject to a maximum of
3% (three per cent) of the Contract Price. Provided, however, that the payment of bonus, if
any, shall be made only after the issue of the Completion Certificate. For the avoidance of
the doubt, the Parties agree that for the purpose of determining the bonus payable
hereunder, the Contract Price shall always be deemed to be the amount specified in Clause
19.1.1, and shall exclude any revision thereof for any reason. The Parties also agree that
bonus shall be payable only if each work for which Extension of Time has been granted is
completed within respective Extended Time.
67
ARTICLE 20
INSURANCE
68
insurances that it proposes to effect and maintain in accordance with this Article 20.
Within 15 (fifteen) days of receipt of such notice, the Authority may require the
Contractor to effect and maintain such other insurances as may be necessary pursuant
hereto, and in the event of any difference or disagreement relating to any such insurance,
the Dispute Resolution Procedure shall apply.
20.3 Evidence of Insurance Cover
20.3.1 All insurances obtained by the Contractor in accordance with this Article 20 shall be
maintained with insurers on terms consistent with Good Industry Practice. Within 10 (ten)
days from the Appointed Date, the Contractor shall furnish to the Authority notarised true
copies of the certificate(s) of insurance, copies of insurance policies and premium
payment receipts in respect of such insurance, and no such insurance shall be cancelled,
modified, or allowed to expire or lapse until the expiration of at least 45 (forty-five) days
after notice of such proposed cancellation, modification or non-renewal has been delivered
by the Contractor to the Authority. The Contractor shall act in accordance with the
directions of the Authority. Provided that the Contractor shall produce to the Authority the
insurance policies in force and the receipts for payment of the current premium.
20.3.2 The Contractor shall ensure the adequacy of the insurances at all times in accordance with
the provisions of this Agreement.
20.4 Remedy for failure to insure
If the Contractor shall fail to effect and keep in force all insurances for which it is
responsible pursuant hereto, the Authority shall have the option to either keep in force any
such insurances, and pay such premium and recover the costs thereof from the Contractor,
or in the event of computation of a Termination Payment, treat an amount equal to the
Insurance Cover as deemed to have been received by the Contractor.
20.5 Waiver of subrogation
All insurance policies in respect of the insurance obtained by the Contractor pursuant to
this Article 20 shall include a waiver of any and all rights of subrogation or recovery of
the insurers there under against, inter alia, the Authority, and its assigns, successors,
undertakings and their subsidiaries, Affiliates, employees, insurers and underwriters, and
of any right of the insurers to any set-off or counterclaim or any other deduction, whether
by attachment or otherwise, in respect of any liability of any such person insured under
any such policy or in any way connected with any loss, liability or obligation covered by
such policies of insurance.
20.6 Contractors waiver
The Contractor hereby further releases, assigns and waives any and all rights of
subrogation or recovery against, inter alia, the Authority and its assigns, undertakings and
their subsidiaries, Affiliates, employees, successors, insurers and underwriters, which the
Contractor may otherwise have or acquire in or from or in any way connected with any
loss, liability or obligation covered by policies of insurance maintained or required to be
maintained by the Contractor pursuant to this Agreement (other than third party liability
insurance policies) or because of deductible clauses in or inadequacy of limits of any such
policies of insurance.
20.7 Cross liabilities
Any such insurance maintained or effected in pursuance of this Article 20 shall include a
cross liability clause such that the insurance shall apply to the Contractor and to the
Authority as separately insured.
20.8 Accident or injury to workmen
Notwithstanding anything stated in this Agreement, it is hereby expressly agreed between
69
the Parties that the Authority shall not be liable for or in respect of any damages or
compensation payable to any workman or other person in the employment of the
Contractor or Sub-contractor, save and except as for death or injury resulting from any act,
omission or default of the Authority, its agents or servants. The Contractor shall indemnify
and keep indemnified the Authority from and against all such claims, proceedings,
damages, costs, charges, and expenses whatsoever in respect of the above save and except
for those acts, omissions or defaults for which the Authority shall be liable.
20.9 Insurance against accident to workmen
The Contractor shall effect and maintain during the Agreement such insurances as may be
required to insure the Contractors personnel and any other persons employed by it on the
water supply Project from and against any liability incurred in pursuance of this Article
20. Provided that for the purposes of this Clause 20.9, the Contractors personnel/any
person employed by the Contractor shall include the Sub-contractor and its personnel. It is
further provided that, in respect of any persons employed by any Sub-contractor, the
Contractor's obligations to insure as aforesaid under this Clause 20.9 shall be discharged if
the Sub-contractor shall have insured against any liability in respect of such persons in
such manner that the Authority is indemnified under the policy. The Contractor shall
require such Sub-contractor to produce before the Authority, when required, such policy
of insurance and the receipt for payment of the current premium within 10 (ten) days of
such demand being made by the Authority.
20.10 Application of insurance proceeds
The proceeds from all insurance claims, except for life and injury, shall be applied for any
necessary repair, reconstruction, reinstatement, replacement, improvement, delivery or
installation of the water supply Project and the provisions of this Agreement in respect of
construction of works shall apply mutatis mutandis to the works undertaken out of the
proceeds of insurance.
20.11 Compliance with policy conditions
Each Party hereby expressly agrees to fully indemnify the other Party from and against all
losses and claims arising from its failure to comply with conditions imposed by the
insurance policies effected in accordance with this Agreement.
70
Part V
71
ARTICLE 21
FORCE MAJEURE
21.1
21.2
21.3
Force Majeure
As used in this Agreement, the expression Force Majeure or Force Majeure Event
shall mean occurrence in India of any or all of Non-Political Event, Indirect Political
Event and Political Event, as defined in Clauses 21.2, 21.3 and 21.4 respectively, if it
affects the performance by the Party claiming the benefit of Force Majeure (the Affected
Party) of its obligations under this Agreement and which act or event (i) is beyond the
reasonable control of the Affected Party, and (ii) the Affected Party could not have
prevented or overcome by exercise of due diligence and following Good Industry Practice,
and (iii) has Material Adverse Effect on the Affected Party.
Non-Political Event
A Non-Political Event shall mean one or more of the following acts or events:
(a)
act of God, epidemic, extremely adverse weather conditions, lightning, earthquake,
landslide, cyclone, flood, volcanic eruption, chemical or radioactive contamination
or ionising radiation, fire or explosion (to the extent of contamination or radiation
or fire or explosion originating from a source external to the Site);
(b)
strikes or boycotts (other than those involving the Contractor, Sub-contractors or
their respective employees/representatives, or attributable to any act or omission of
any of them) interrupting supplies and services to the Water Supply Project for a
continuous period of 24 (twenty-four) hours and an aggregate period exceeding 30
(thirty) days in an Accounting Year, and not being an Indirect Political Event set
forth in Clause 21.3;
(c)
any failure or delay of a Sub-contractor but only to the extent caused by another
Non-Political Event;
(d)
any judgement or order of any court of competent jurisdiction or statutory
authority made against the Contractor in any proceedings for reasons other than (i)
failure of the Contractor to comply with any Applicable Law or Applicable Permit,
or (ii) on account of breach of any Applicable Law or Applicable Permit or of any
contract, or (iii) enforcement of this Agreement, or (iv) exercise of any of its rights
under this Agreement by the Authority;
(e)
the discovery of geological conditions, toxic contamination or archaeological
remains on the Site that could not reasonably have been expected to be discovered
through a site inspection; or
(f)
any event or circumstances of a nature analogous to any of the foregoing.
Indirect Political Event
An Indirect Political Event shall mean one or more of the following acts or events:
(a)
an act of war (whether declared or undeclared), invasion, armed conflict or act of
foreign enemy, blockade, embargo, riot, insurrection, terrorist or military action,
civil commotion or politically motivated sabotage;
(b)
industry-wide or State-wide strikes or industrial action for a continuous period of
24 (twenty-four) hours and exceeding an aggregate period of 30 (thirty) days in an
Accounting Year;
(c)
any civil commotion, boycott or political agitation which prevents construction of
the Water Supply Project by the Contractor for an aggregate period exceeding 30
72
21.4
21.5
21.5.1
21.5.2
21.5.3
21.6
21.6.1
73
21.6.2
21.6.3
21.7
21.7.1
21.8
21.8.1
and attributable to such event and directly relating to this Agreement (the Force Majeure
costs) shall be allocated and paid as follows:
(a)
upon occurrence of a Non-Political Event, the Parties shall bear their respective
Force Majeure costs and neither Party shall be required to pay to the other Party
any costs thereof;
(b)
upon occurrence of an Indirect Political Event, all Force Majeure costs attributable
to such Indirect Political Event, and not exceeding the Insurance Cover for such
Indirect Political Event, shall be borne by the Contractor, and to the extent Force
Majeure costs exceed such Insurance Cover, one half of such excess amount shall
be reimbursed by the Authority to the Contractor for the Force Majeure events; and
(c)
upon occurrence of a Political Event, all Force Majeure costs attributable to such
Political Event shall be reimbursed by the Authority to the Contractor.
For the avoidance of doubt, Force Majeure costs may include costs directly attributable to
the Force Majeure Event, but shall not include debt repayment obligations, if any, of the
Contractor.
Save and except as expressly provided in this Article 21, neither Party shall be liable in
any manner whatsoever to the other Party in respect of any loss, damage, cost, expense,
claims, demands and proceedings relating to or arising out of occurrence or existence of
any Force Majeure Event or exercise of any right pursuant hereto.
Upon the occurrence of any Force Majeure Event during the Construction Period, the
Project Completion Schedule for and in respect of the affected Works shall be extended on
a day for day basis for such period as performance of the Contractors obligations is
affected on account of the Force Majeure Event or its subsisting effects.
Termination Notice for Force Majeure Event
If a Force Majeure Event subsists for a period of 60 (sixty) days or more within a
continuous period of 120 (one hundred and twenty) days, either Party may in its discretion
terminate this Agreement by issuing a Termination Notice to the other Party without being
liable in any manner whatsoever, save as provided in this Article 21, and upon issue of
such Termination Notice, this Agreement shall, notwithstanding anything to the contrary
contained herein, stand terminated forthwith; provided that before issuing such
Termination Notice, the Party intending to issue the Termination Notice shall inform the
other Party of such intention and grant 15 (fifteen) days time to make a representation, and
may after the expiry of such 15 (fifteen) days period, whether or not it is in receipt of such
representation, in its sole discretion issue the Termination Notice.
Termination Payment for Force Majeure Event
In the event of this Agreement being terminated on account of a Non-Political Event, the
Termination Payment shall be an amount equal to the sum payable under Clause 23.5.
Provided that in the event Termination occurs during the Operation & Maintenance
Period, the Authoritys Engineer shall only determine the value of Works associated with
Operation & Maintenance.
21.8.2 If Termination is on account of an Indirect Political Event, the Termination Payment shall
include:
(a)
any sums due and payable under Clause 23.5; and
(b)
the reasonable cost, as determined by the Authoritys Engineer, of the Plant and
Materials procured by the Contractor and transferred to the Authority for use in
Construction or Operation & Maintenance only if such Plant and Materials are in
conformity with the Specifications and Standards;
Provided that in the event Termination occurs during the Operation & Maintenance
74
Period, the Authoritys Engineer shall only determine the value of Works associated with
Operation & Maintenance.
21.8.3 If Termination is on account of a Political Event, the Authority shall make a Termination
Payment to the Contractor in an amount that would be payable under Clause 23.6.2 as if it
were an Authority Default.
21.9 Dispute resolution
In the event that the Parties are unable to agree in good faith about the occurrence or
existence of a Force Majeure Event, such Dispute shall be finally settled in accordance
with the Dispute Resolution Procedure; provided that the burden of proof as to the
occurrence or existence of such Force Majeure Event shall be upon the Party claiming
relief and/or excuse on account of such Force Majeure Event.
21.10 Excuse from performance of obligations
If the Affected Party is rendered wholly or partially unable to perform its obligations
under this Agreement because of a Force Majeure Event, it shall be excused from
performance of such of its obligations to the extent it is unable to perform on account of
such Force Majeure Event; provided that:
(a)
the suspension of performance shall be of no greater scope and of no longer
duration than is reasonably required by the Force Majeure Event;
(b)
the Affected Party shall make all reasonable efforts to mitigate or limit damage to
the other Party arising out of or as a result of the existence or occurrence of such
Force Majeure Event and to cure the same with due diligence; and
(c)
when the Affected Party is able to resume performance of its obligations under this
Agreement, it shall give to the other Party notice to that effect and shall promptly
resume performance of its obligations hereunder.
75
ARTICLE 22
22.1
ARTICLE 23
TERMINATION
23.1 Termination for Contractor Default
23.1.1 Save as otherwise provided in this Agreement, in the event that any of the defaults
specified below shall have occurred, and the Contractor fails to cure the default within the
Cure Period set forth below, or where no Cure Period is specified, then within a Cure
Period of 60 (sixty) days, the Contractor shall be deemed to be in default of this
Agreement (the Contractor Default), unless the default has occurred solely as a result
of any breach of this Agreement by the Authority or due to Force Majeure. The defaults
referred to herein shall include:
(a)
the Contractor fails to provide, extend or replenish, as the case may be, the
Performance Security in accordance with this Agreement;
(b)
subsequent to the replenishment or furnishing of fresh Performance Security in
accordance with Clause 7.3, the Contractor fails to cure, within a Cure Period of 30
(thirty) days, the Contractor Default for which the whole or part of the
Performance Security was appropriated;
(c)
the Contractor does not achieve the latest outstanding Project Milestone due in
accordance with the provisions of Schedule-J, subject to any Time Extension, and
continues to be in default for 45 (forty five) days;
(d)
the Contractor abandons or manifests intention to abandon the construction or
Operation & Maintenance of the Water Supply Project without the prior written
consent of the Authority;
(e)
the Contractor fails to proceed with the Works in accordance with the provisions of
Clause 10.1 or stops Works and/or the operation & maintenance for 30 (thirty)
days without reflecting the same in the current programme and such stoppage has
not been authorised by the Authoritys Engineer;
(f)
the Project Completion Date does not occur within the period specified in
Schedule-J for the Scheduled Completion Date, or any extension thereof;
(g)
failure to complete the Punch List items within the periods stipulated therefor in
Clause 12.2.1;
(h)
the Contractor fails to rectify any Defect, the non rectification of which shall have
a Material Adverse Effect on the Project, within the time specified in this
Agreement or as directed by the Authoritys Engineer;
(i)
the Contractor subcontracts the Works or any part thereof in violation of this
Agreement or assigns any part of the Works without the prior approval of the
Authority;
(j)
the Contractor creates any Encumbrance in breach of this Agreement;
(k)
an execution levied on any of the assets of the Contractor has caused a Material
Adverse Effect ;
(l)
the Contractor is adjudged bankrupt or insolvent, or if a trustee or receiver is
appointed for the Contractor or for the whole or material part of its assets that has a
material bearing on the Project;
(m)
the Contractor has been, or is in the process of being liquidated, dissolved, woundup, amalgamated or reconstituted in a manner that would cause, in the reasonable
opinion of the Authority, a Material Adverse Effect;
(n)
a resolution for winding up of the Contractor is passed, or any petition for winding
up of the Contractor is admitted by a court of competent jurisdiction and a
77
(o)
(p)
provisional liquidator or receiver is appointed and such order has not been set aside
within 90 (ninety) days of the date thereof or the Contractor is ordered to be wound
up by court except for the purpose of amalgamation or reconstruction; provided
that, as part of such amalgamation or reconstruction, the entire property, assets and
undertaking of the Contractor are transferred to the amalgamated or reconstructed
entity and that the amalgamated or reconstructed entity has unconditionally
assumed the obligations of the Contractor under this Agreement; and provided
that:
(i)
the amalgamated or reconstructed entity has the capability and experience
necessary for the performance of its obligations under this Agreement; and
(ii)
the amalgamated or reconstructed entity has the financial standing to
perform its obligations under this Agreement and has a credit worthiness at
least as good as that of the Contractor as at the Appointed Date;
any representation or warranty of the Contractor herein contained which is, as of
the date hereof, found to be materially false or the Contractor is at any time
hereafter found to be in breach thereof;
the Contractor submits to the Authority any statement, notice or other document, in
written or electronic form, which has a material effect on the Authoritys rights,
obligations or interests and which is false in material particulars;
(q)
the Contractor has failed to fulfil any obligation, for which failure Termination has
been specified in this Agreement; or
(r)
the Contractor commits a default in complying with any other provision of this
Agreement if such a default causes a Material Adverse Effect on the Project or on
the Authority.
23.1.2 Without prejudice to any other rights or remedies which the Authority may have under
this Agreement, upon occurrence of a Contractor Default, the Authority shall be entitled to
terminate this Agreement by issuing a Termination Notice to the Contractor; provided that
before issuing the Termination Notice, the Authority shall by a notice inform the
Contractor of its intention to issue such Termination Notice and grant 15 (fifteen) days to
the Contractor to make a representation, and may after the expiry of such 15 (fifteen) days,
whether or not it is in receipt of such representation, issue the Termination Notice.
23.1.3 After termination of this Agreement for Contractor Default, the Authority may complete
the Works and/or arrange for any other entities to do so. The Authority and these entities
may then use any Materials, Plant and equipment, Contractors documents and other
design documents made by or on behalf of the Contractor.
78
23.5.1 Within a period of 45 (forty-five) days after Termination under Clause 23.1, 23.2 or 23.3,
as the case may be, has taken effect, the Authoritys Engineer shall proceed in accordance
with Clause 18.5 to determine as follows the valuation of unpaid Works (the Valuation
of Unpaid Works):
(a)
value of the completed stage of the Works, less payments already made;
(b)
reasonable value of the partially completed stages of works as on the date of
Termination, only if such works conform with the Specifications and Standards;
and
(c)
Deleted
and shall adjust from the sum thereof (i) any other amounts payable or recoverable, as the
case may be, in accordance with the provisions of this Agreement; and (ii) all taxes due to
be deducted at source.
23.5.2 The Valuation of Unpaid Works shall be communicated to the Authority, with a copy to
the Contractor, within a period of 30 (thirty) days from the date of Termination.
23.6 Termination Payment
23.6.1 Upon Termination on account of Contractors Default under Clause 23.1, the Authority
shall:
(a)
encash and appropriate the Performance Security and Retention Money, or in the
event the Contractor has failed to replenish or extend the Performance Security,
claim the amount stipulated in Clause 7.1.1, as agreed pre-determined compensation
to the Authority for any losses, delays and cost of completing the Works and
Operation & Maintenance if any;
(b) encash and appropriate the bank guarantee, if any, for and in respect of the
outstanding Advance Payment and interest thereon; and
(c) pay to the Contractor, by way of Termination Payment, an amount equivalent to the
Valuation of Unpaid Works after adjusting any other sums payable or recoverable,
as the case may be, in accordance with the provisions of this Agreement.
23.6.2 Upon Termination on account of an Authority Default under Clause 23.2 or for
Authoritys convenience under Clause 23.3, the Authority shall:
(a)
return the Performance Security and Retention Money forthwith;
(b)
encash and appropriate the bank guarantee, if any, for and in respect of the
outstanding Advance Payment; and
(c)
pay to the Contractor, by way of Termination Payment, an amount equal to:
(i)
Valuation of Unpaid Works;
(ii)
the reasonable cost, as determined by the Authoritys Engineer, of the Plant
and Materials procured by the Contractor and transferred to the Authority
for its use, only if such Plant and Materials are in conformity with the
Specifications and Standards;
(iii)
the reasonable cost of temporary works, as determined by the Authoritys
Engineer; and
(iv)
10% (ten per cent) of the cost of the Works and Operation &
Maintenance that are not commenced or not completed,
and shall adjust from the sum thereof (i) any other amounts payable or recoverable, as the
case may be, in accordance with the provisions of this Agreement, and (ii) all taxes due to
be deducted at source.
23.6.3 Termination Payment shall become due and payable to the Contractor within 30 (thirty)
days of a demand being made by the Contractor to the Authority with the necessary
80
particulars, and in the event of any delay, the Authority shall pay interest at the Base Rate
plus 2% (two percent), calculated at quarterly rests, on the amount of Termination
Payment remaining unpaid; provided that such delay shall not exceed 90 (ninety) days.
For the avoidance of doubt, it is expressly agreed that Termination Payment shall
constitute full discharge by the Authority of its payment obligations in respect thereof
hereunder.
23.6.4 The Contractor expressly agrees that Termination Payment under this Article 23 shall
constitute a full and final settlement of all claims of the Contractor on account of
Termination of this Agreement and that it shall not have any further right or claim under
any law, treaty, convention, contract or otherwise.
23.7 Other rights and obligations of the Parties
Upon Termination for any reason whatsoever
(a)
property and ownership in all Materials, Plant and Works and the Water Supply
Project shall, as between the Contractor and the Authority, vest in the Authority in
whole; provided that the foregoing shall be without prejudice to Clause 23.6
(b)
risk of loss or damage to any Materials, Plant or Works and the care and custody
thereof shall pass from the Contractor to the Authority; and
(c)
the Authority shall be entitled to restrain the Contractor and any person claiming
through or under the Agreement from entering upon the Site or any part of the
Project except for taking possession of materials, stores, implements, construction
plants and equipment of the Contractor, which have not been vested in the
Authority in accordance with the provisions of this Agreement.
23.8 Survival of rights
Notwithstanding anything to the contrary contained in this Agreement any
Termination pursuant to the provisions of this Agreement shall be without
prejudice to the accrued rights of either Party including its right to claim and
recover money damages, insurance proceeds, security deposits, and other rights
and remedies, which it may have in law or Agreement. All rights and obligations
of either Party under this Agreement, including Termination Payments, shall
survive the Termination up to a period of 3 (three) years for giving effect to such
rights and obligations.
81
Part VI
Other Provisions
82
ARTICLE 24
24.1
24.2
83
ARTICLE 25
Party) it shall notify the other Party (the Indemnifying Party) within 15 (fifteen) days
of receipt of the claim or demand and shall not settle or pay the claim without the prior
approval of the Indemnifying Party, which approval shall not be unreasonably withheld or
delayed. In the event that the Indemnifying Party wishes to contest or dispute the claim or
demand, it may conduct the proceedings in the name of the Indemnified Party, subject to
the Indemnified Party being secured against any costs involved, to its reasonable
satisfaction.
25.4 Defence of claims
25.4.1 The Indemnified Party shall have the right, but not the obligation, to contest, defend and
litigate any claim, action, suit or proceeding by any third party alleged or asserted against
such Party in respect of, resulting from, related to or arising out of any matter for which it
is entitled to be indemnified hereunder, and reasonable costs and expenses thereof shall be
indemnified by the Indemnifying Party. If the Indemnifying Party acknowledges in
writing its obligation to indemnify the Indemnified Party in respect of loss to the full
extent provided by this Article 25, the Indemnifying Party shall be entitled, at its option, to
assume and control the defence of such claim, action, suit or proceeding, liabilities,
payments and obligations at its expense and through the counsel of its choice; provided it
gives prompt notice of its intention to do so to the Indemnified Party and reimburses the
Indemnified Party for the reasonable cost and expenses incurred by the Indemnified Party
prior to the assumption by the Indemnifying Party of such defence. The Indemnifying
Party shall not be entitled to settle or compromise any claim, demand, action, suit or
proceeding without the prior written consent of the Indemnified Party, unless the
Indemnifying Party provides such security to the Indemnified Party as shall be reasonably
required by the Indemnified Party to secure the loss to be indemnified hereunder to the
extent so compromised or settled.
25.4.2 If the Indemnifying Party has exercised its rights under Clause 25.3, the Indemnified Party
shall not be entitled to settle or compromise any claim, action, suit or proceeding without
the prior written consent of the Indemnifying Party (which consent shall not be
unreasonably withheld or delayed).
25.4.3 If the Indemnifying Party exercises its rights under Clause 25.3, the Indemnified Party
shall nevertheless have the right to employ its own counsel, and such counsel may
participate in such action, but the fees and expenses of such counsel shall be at the
expense of the Indemnified Party, when and as incurred, unless:
(a)
the employment of counsel by such party has been authorised in writing by the
Indemnifying Party; or
(b)
the Indemnified Party shall have reasonably concluded that there may be a conflict
of interest between the Indemnifying Party and the Indemnified Party in the
conduct of the defence of such action; or
(c)
the Indemnifying Party shall not, in fact, have employed independent counsel
reasonably satisfactory to the Indemnified Party, to assume the defence of such
action and shall have been so notified by the Indemnified Party; or
(d)
the Indemnified Party shall have reasonably concluded and specifically notified the
Indemnifying Party either:
(i)
that there may be specific defences available to it which are different from
or additional to those available to the Indemnifying Party; or
(ii)
that such claim, action, suit or proceeding involves or could have a material
adverse effect upon it beyond the scope of this Agreement:
Provided that if Sub-clauses (b), (c) or (d) of this Clause 25.4.3 shall be applicable, the
85
25.5
25.6
counsel for the Indemnified Party shall have the right to direct the defence of such claim,
demand, action, suit or proceeding on behalf of the Indemnified Party, and the reasonable
fees and disbursements of such counsel shall constitute legal or other expenses hereunder.
No consequential claims
Notwithstanding anything to the contrary contained in this Article 25, the indemnities
herein provided shall not include any claim or recovery in respect of any cost, expense,
loss or damage of an indirect, incidental or consequential nature, including loss of profit,
except as expressly provided in this Agreement.
Survival on Termination
The provisions of this Article 25 shall survive Termination.
86
ARTICLE 26
DISPUTE RESOLUTION
87
26.3.6 In the event the Party against whom the Award has been granted challenges the Award for
any reason in a court of law, it shall make an interim payment to the other Party for an
amount equal to 75% (seventy five per cent) of the Award, pending final settlement of the
Dispute. The aforesaid amount shall be paid forthwith upon furnishing an irrevocable
Bank Guarantee for a sum equal to 120 % (one hundred and twenty per cent) of the
aforesaid amount. Upon final settlement of the Dispute, the aforesaid interim payment
shall be adjusted and any balance amount due to be paid or returned, as the case may be,
shall be paid or returned with interest calculated at the rate of 10% (ten per cent) per
annum from the date of interim payment to the date of final settlement of such balance.
26.4 Adjudication by Regulatory Authority, Tribunal or Commission
In the event of constitution of a statutory regulatory authority, tribunal or commission, as
the case may be, with powers to adjudicate upon disputes between the Contractor and the
Authority, all Disputes arising after such constitution shall, instead of reference to
arbitration under Clause 26.3, be adjudicated upon by such regulatory authority, tribunal
or commission in accordance with the Applicable Law and all references to Dispute
Resolution Procedure shall be construed accordingly. For the avoidance of doubt, the
Parties hereto agree that the adjudication hereunder shall not be final and binding until an
appeal against such adjudication has been decided by an appellate tribunal or court of
competent jurisdiction, as the case may be, or no such appeal has been preferred within the
time specified in the Applicable Law.
88
ARTICLE 27
27.1
27.2
27.3
MISCELLANEOUS
Governing law and jurisdiction
This Agreement shall be construed and interpreted in accordance with and governed by
the laws of Odisha/ India, and the courts at [Bhubaneswar] shall have exclusive
jurisdiction over matters arising out of or relating to this Agreement.
Waiver of immunity
Each Party unconditionally and irrevocably:
(a)
agrees that the execution, delivery and performance by it of this Agreement
constitute commercial acts done and performed for commercial purpose;
(b)
agrees that, should any proceedings be brought against it or its assets, property or
revenues in any jurisdiction in relation to this Agreement or any transaction
contemplated by this Agreement, no immunity (whether by reason of sovereignty
or otherwise) from such proceedings shall be claimed by or on behalf of the Party
with respect to its assets;
(c)
waives any right of immunity which it or its assets, property or revenues now has,
may acquire in the future or which may be attributed to it in any jurisdiction; and
(d)
consents generally in respect of the enforcement of any judgement or award
against it in any such proceedings to the giving of any relief or the issue of any
process in any jurisdiction in connection with such proceedings (including the
making, enforcement or execution against it or in respect of any assets, property or
revenues whatsoever irrespective of their use or intended use of any order or
judgement that may be made or given in connection therewith).
Delayed payments
The Parties hereto agree that payments due from one Party to the other Party under the
provisions of this Agreement shall be made within the period set forth therein, and if no
such period is specified, within 30 (thirty) days of receiving a demand along with the
necessary particulars. In the event of delay beyond such period, the defaulting Party shall
pay interest for the period of delay calculated at a rate equal to Base Rate plus 2 (two)
percent, calculated at quarterly rests, and recovery thereof shall be without prejudice to the
rights of the Parties under this Agreement including Termination thereof.
27.4 Waiver
27.4.1 Waiver, including partial or conditional waiver, by either Party of any default by the other
Party in the observance and performance of any provision of or obligations under this
Agreement:(a)
shall not operate or be construed as a waiver of any other or subsequent default
hereof or of other provisions of or obligations under this Agreement;
(b)
shall not be effective unless it is in writing and executed by a duly authorised
representative of the Party; and
(c)
shall not affect the validity or enforceability of this Agreement in any manner.
27.4.2 Neither the failure by either Party to insist on any occasion upon the performance of the
terms, conditions and provisions of this Agreement or any obligation there under nor time
or other indulgence granted by a Party to the other Party shall be treated or deemed as
waiver of such breach or acceptance of any variation or the relinquishment of any such
right hereunder.
89
27.5
27.10 No partnership
This Agreement shall not be interpreted or construed to create an association, joint venture
or partnership between the Parties, or to impose any partnership obligation or liability
upon either Party, and neither Party shall have any right, power or authority to enter into
any agreement or undertaking for, or act on behalf of, or to act as or be an agent or
representative of, or to otherwise bind, the other Party.
27.11 Third parties
This Agreement is intended solely for the benefit of the Parties, and their respective
successors and permitted assigns, and nothing in this Agreement shall be construed to
create any duty to, standard of care with reference to, or any liability to, any person not a
Party to this Agreement.
27.12 Successors and assigns
This Agreement shall be binding upon, and inure to the benefit of the Parties and their
respective successors and permitted assigns.
27.13 Notices
Any notice or other communication to be given by any Party to the other Party under or in
connection with the matters contemplated by this Agreement shall be in writing and shall:
(a)
in the case of the Contractor, be given by facsimile or e-mail and by letter
delivered by hand to the address given and marked for attention of the person set
out below or to such other person as the Contractor may from time to time
designate by notice to the Authority; provided that notices or other
communications to be given to an address within Odisha may, if they are
subsequently confirmed by sending a copy thereof by registered acknowledgement
due, air mail or by courier, be sent by facsimile or e-mail to the person as the
Contractor may from time to time designate by notice to the Authority;
(b)
[***]
in the case of the Authority, be given by facsimile or e-mail and by letter delivered
by hand and be addressed to the Authority with a copy delivered to the Authority
Representative or such other person as the Authority may from time to time
designate by notice to the Contractor; provided that if the Contractor does not have
an office in [Bhubaneswar] it may send such notice by facsimile or e-mail and by
registered acknowledgement due, air mail or by courier; and
(c)
any notice or communication by a Party to the other Party, given in accordance
herewith, shall be deemed to have been delivered when in the normal course of
post it ought to have been delivered and in all other cases, it shall be deemed to
have been delivered on the actual date and time of delivery; provided that in the
case of facsimile or e-mail, it shall be deemed to have been delivered on the
working day following the date of its delivery.
27.14 Language
All notices required to be given by one Party to the other Party and all other
communications, Documentation and proceedings which are in any way relevant to this
Agreement shall be in writing and in English language.
27.15 Counterparts
This Agreement may be executed in two counterparts, each of which, when executed and
delivered, shall constitute an original of this Agreement.
27.16 Confidentiality
The Parties shall treat the details of this Agreement as private and confidential, except to
the extent necessary to carry out obligations under it or to comply with Applicable Laws.
91
The Contractor shall not publish, permit to be published, or disclose any particulars of the
Works in any trade or technical paper or elsewhere without the previous agreement of the
Authority.
27.17 Copyright and Intellectual Property rights
27.17.1 As between the Parties, the Contractor shall retain the copyright and other intellectual
property rights in the Contractor's Documents and other design documents made by (or on
behalf of) the Contractor. The Contractor shall be deemed (by signing this Agreement) to
give to the Authority a non-terminable transferable non-exclusive royalty-free licence to
copy, use and communicate the Contractor's Documents, including making and using
modifications of them. This licence shall:
(a)
apply throughout the actual or intended working life (whichever is longer) of the
relevant parts of the Works,
(b)
entitle any person in proper possession of the relevant part of the Works to copy,
use and communicate the Contractor's Documents for the purposes of completing,
operating, maintaining, altering, adjusting, repairing and demolishing the Works,
and
(c)
in the case of Contractor's Documents which are in the form of computer programs
and other software, permit their use on any computer on the Site and other places
as envisaged by this Agreement, including replacements of any computers supplied
by the Contractor:
27.17.2 The Contractor's Documents and other design documents made by (or on behalf of) the
Contractor shall not, without the Contractor's consent, be used, copied or communicated to
a third party by (or on behalf of) the Authority for purposes other than those permitted
under this Clause 27.17.
27.17.3 As between the Parties, the Authority shall retain the copyright and other intellectual
property rights in this Agreement and other documents made by (or on behalf of) the
Authority. The Contractor may, at its cost, copy, use, and obtain communication of these
documents for the purposes of this Agreement. They shall not, without the Authority's
consent, be copied, used or communicated to a third party by the Contractor, except as
necessary for the purposes of the contract.
27.18 Limitation of Liability
27.18.1 Neither Party shall be liable to the other Party for loss of use of any Works, loss of profit,
loss of any contract or for any indirect or consequential loss or damage which may be
suffered by the other Party in connection with this Agreement, save and except as
provided under Articles 23 and 25.
27.18.2 The total liability of one Party to the other Party under and in accordance with the
provisions of this Agreement, save and except as provided in Articles 23 and 25, shall not
exceed the Contract Price. For the avoidance of doubt, this Clause shall not limit the
liability in any case of fraud, deliberate default or reckless misconduct by the defaulting
Party.
92
ARTICLE 28
DEFINITIONS
28.1
Definitions
In this Agreement, the following words and expressions shall, unless repugnant to the
context or meaning thereof, have the meaning hereinafter respectively assigned to them:
Accounting Year means the financial year commencing from the first day of April of
any calendar year and ending on the thirty-first day of March of the next calendar year;
Advance Payment shall have the meaning set forth in Clause 19.2;
Affected Party shall have the meaning set forth in Clause 21.1;
Affiliate means, in relation to either Party {and/or Members}, a person who controls, is
controlled by, or is under the common control with such Party {or Member} (as used in
this definition, the expression control means, with respect to a person which is a
company or corporation, the ownership, directly or indirectly, of more than 50% (fifty per
cent) of the voting shares of such person, and with respect to a person which is not a
company or corporation, the power to direct the management and policies of such person,
whether by operation of law or by contract or otherwise);
Agreement means this Agreement, its Recitals, the Schedules hereto and any
amendments thereto made in accordance with the provisions contained in this Agreement;
Applicable Laws means all laws, brought into force and effect by GOI or the State
Government including rules, regulations and notifications made there under, and
judgements, decrees, injunctions, writs and orders of any court of record, applicable to this
Agreement and the exercise, performance and discharge of the respective rights and
obligations of the Parties hereunder, as may be in force and effect during the subsistence
of this Agreement;
Applicable Permits means all clearances, licences, permits, authorisations, no
objection certificates, consents, approvals and exemptions required to be obtained or
maintained under Applicable Laws in connection with the construction, operation and
maintenance of the Water Supply Projects during the subsistence of this Agreement;
Appointed Date means that date which is later of the 15th day of the date of this
Agreement, the date on which the Contractor has delivered the Performance Security in
accordance with the provisions of Article 7 and the date on which the Authority has
provided the land / site on no less than 90% (Ninety per cent) of the required length / area
of Water Supply Project;
Arbitration Act means the Arbitration and Conciliation Act, 1996 and shall include
modifications to or any re-enactment thereof, as in force from time to time;
Authority shall have the meaning attributed thereto in the array of Parties hereinabove
as set forth in the Recitals;
Authority Default shall have the meaning set forth in Clause 23.2;
Authoritys Engineer shall have the meaning set forth in Clause 18.1;
Authority Representative means such person or persons as may be authorised in
writing by the Authority to act on its behalf under this Agreement and shall include any
person or persons having authority to exercise any rights or perform and fulfil any
obligations of the Authority under this Agreement;
Bank means a Nationalised Bank in India;
Base Rate means the floor rate of interest announced by the State Bank of India for all
its lending operations;
93
Base Date means the last date of that calender month, which date precedes the Bid Due
Date by at least 28 (twenty eight) days;
Bid means the documents in their entirety comprised in the bid submitted by the
[selected bidder/Consortium] in response to the Request for Proposals in accordance with
the provisions thereof;
Bid Security means the bid security provided by the Contractor to the Authority in
accordance with the Request for Proposal, and which is to remain in force until substituted
by the Performance Security;
Change in Law means the occurrence of any of the following after the Base Date:
(a)
the enactment of any new Indian law;
(b)
the repeal, modification or re-enactment of any existing Indian law;
(c)
the commencement of any Indian law which has not entered into effect until the
Base Date;
(d)
a change in the interpretation or application of any Indian law by a judgement of a
court of record which has become final, conclusive and binding, as compared to
such interpretation or application by a court of record prior to the Base Date; or
(e)
any change in the rates of any of the Taxes or royalties that have a direct effect on
the Project;
Change of Scope shall have the meaning set forth in Article 13;
Change of Scope Notice shall have the meaning set forth in Clause 13.2.1;
Change of Scope Order shall have the meaning set forth in Clause 13.2.4;
Completion Certificate shall have the meaning set forth in Clause 12.4;
{Consortium means the consortium of entities which have formed a joint venture for
implementation of this Project;}$
Construction shall have the meaning set forth in Clause 1.2.1 (f);
Construction Period means the period commencing from the Appointed Date and
ending on the date of the Completion Certificate;
Contract Price means the amount specified in Clause 19.1.1;
Contractor shall have the meaning attributed thereto in the array of Parties hereinabove
as set forth in the Recitals;
Contractor Default shall have the meaning set forth in Clause 23.1;
Cure Period means the period specified in this Agreement for curing any breach or
default of any provision of this Agreement by the Party responsible for such breach or
default and shall:
(a)
commence from the date on which a notice is delivered by one Party to the other
Party asking the latter to cure the breach or default specified in such notice;
(b)
not relieve any Party from liability to pay Damages or compensation under the
provisions of this Agreement; and
(c)
not in any way be extended by any period of Suspension under this Agreement;
provided that if the cure of any breach by the Contractor requires any reasonable
action by the Contractor that must be approved by the Authority or the Authoritys
Engineer hereunder, the applicable Cure Period shall be extended by the period
taken by the Authority or the Authoritys Engineer to accord their approval;
CPHEEO means Central Public Health & Environmental Engineering Organisation,
MoUD, Govt. of India.
$
Damages shall have the meaning set forth in paragraph (w) of Clause 1.2.1;
Defect means any defect or deficiency in Construction of the Works or any part thereof,
94
which does not conform with the Specifications and Standards, and in the case of
Operation & Maintenance, means any defect or deficiency which is specified in ScheduleE;
Defects Liability Period shall have the meaning set forth in Clause 17.1;
Dispute shall have the meaning set forth in Clause 26.1.1;
Dispute Resolution Procedure means the procedure for resolution of Disputes set forth
in Article 26;
Drawings means all of the drawings, calculations and documents pertaining to the
Water Supply Project as set forth in Schedule-I, and shall include as built drawings of
the Water Supply Project;
Document or Documentation means documentation in printed or written form, or in
tapes, discs, drawings, computer programmes, writings, reports, photographs, films,
cassettes, or expressed in any other written, electronic, audio or visual form;
Emergency means a condition or situation that is likely to endanger the safety or
security of the individuals on or about the Water Supply Project, including Users thereof,
or which poses an immediate threat of material damage to any of the Project Assets;
Encumbrances means, in relation to the Water Supply Project, any encumbrances such
as mortgage, charge, pledge, lien, hypothecation, security interest, assignment, privilege or
priority of any kind having the effect of security or other such obligations, and shall
include any designation of loss payees or beneficiaries or any similar arrangement under
any insurance policy pertaining to the Water Supply Project, where applicable herein but
excluding utilities referred to in Clause 9.1;
EPC means engineering, procurement and construction;
Final Payment Certificate shall have the meaning set forth in Clause 19.15.1;
Final Payment Statement shall have the meaning set forth in Clause 19.13.1;
Force Majeure or Force Majeure Event shall have the meaning ascribed to it in
Clause 21.1;
GAD or General Arrangement Drawings shall have the meaning set forth in
Clause 4.1.3 (b);
GOI or Government means the Government of India;
Good Industry Practice means the practices, methods, techniques, designs, standards,
skills, diligence, efficiency, reliability and prudence which are generally and reasonably
expected from a reasonably skilled and experienced contractor engaged in the same type
of undertaking as envisaged under this Agreement and which would be expected to result
in the performance of its obligations by the Contractor in accordance with this Agreement,
Applicable Laws and Applicable Permits in reliable, safe, economical and efficient
manner;
Government Instrumentality means any department, division or sub-division of the
Government or the State Government and includes any commission, board, authority,
agency or municipal and other local authority or statutory body including panchayat under
the control of the Government or the State Government, as the case may be, and having
jurisdiction over all or any part of the Water Supply Project or the performance of all or
any of the services or obligations of the Contractor under or pursuant to this Agreement;
IRC means the Indian Roads Congress;
95
Indemnified Party means the Party entitled to the benefit of an indemnity pursuant to
Article 25;
Indemnifying Party means the Party obligated to indemnify the other Party pursuant to
Article 25;
Indirect Political Event shall have the meaning set forth in Clause 21.3;
Insurance Cover means the aggregate of the maximum sums insured under the
insurances taken out by the Contractor pursuant to Article 20, and includes all insurances
required to be taken out by the Contractor under Clauses 20.1 and 20.9 but not actually
taken, and when used in the context of any act or event, it shall mean the aggregate of the
maximum sums insured and payable or deemed to be insured and payable in relation to
such act or event;
Intellectual Property means all patents, trade marks, service marks, logos, get-up,
trade names, internet domain names, rights in designs, blue prints, programmes and
manuals, drawings, copyright (including rights in computer software), database rights,
semi-conductor, topography rights, utility models, rights in know-how and other
intellectual property rights, in each case whether registered or unregistered and including
applications for registration, and all rights or forms of protection having equivalent or
similar effect anywhere in the world;
Interim Payment Certificate or IPC means the interim payment certificate issued by
the Authoritys Engineer for payment to the Contractor in respect of Contractors claims
for payment raised in accordance with the provisions of this Agreement;
{Lead Member shall, in the case of a consortium, mean the member of such
consortium who shall have the authority to bind the contractor and each member of the
Consortium; and shall be deemed to be the Contractor for the purposes of this
Agreement;}$
LOA or Letter of Acceptance means the letter of acceptance referred to in Recital
(E);
Operation & Maintenance means the operation & maintenance of the Water Supply
Project as set forth in Article 14 for the period specified therein;
Operation & Maintenance Inspection Report shall have the meaning set forth in
Clause 15.2.1;
Operation & Maintenance Manual shall have the meaning ascribed to it in Clause
10.7;
Operation & Maintenance Programme shall have the meaning set forth in Clause
14.3;
Operation & Maintenance Period shall have the meaning set forth in Clause 14.1.1;
Operation & Maintenance Requirements shall have the meaning set forth in Clause
14.2;
Major structures means different units & components of WTP, ESR, GSR, Intake
arrangement, pumping stations;
Manual shall mean the Manual on water supply published by CPHEEO, MoUD, GoI;
Material Adverse Effect means a material adverse effect of any act or event on the
ability of either Party to perform any of its obligations under and in accordance with the
provisions of this Agreement and which act or event causes a material financial burden or
loss to either Party;
$ This definition may be omitted if the Contractor is not a Consortium.
96
Materials are all the supplies used by the Contractor for incorporation in the Works or
for the Operation & Maintenance of the Water Supply Project;
Monthly Operation & Maintenance Statement shall have the meaning set forth in
Clause 19.6.1;
MoUD means the Ministry of Urban Development, GoI;
Non-Political Event shall have the meaning set forth in Clause 21.2;
Parties means the parties to this Agreement collectively and Party shall mean any of
the parties to this Agreement individually;
Performance Security shall have the meaning set forth in Clause 7.1;
Plant means the apparatus and machinery intended to form or forming part of the
Works;
Political Event shall have the meaning set forth in Clause 21.4;
Programme shall have the meaning set forth in Clause 10.1.3;
Project means the construction and operation & maintenance of the Water Supply
Project in accordance with the provisions of this Agreement, and includes all works,
services and equipment relating to or in respect of the Scope of the Project;
Project Assets means all physical and other assets relating to (a) tangible assets such as
civil works, electrical works, mechanical works and equipments, electrical systems,
communication systems, rest areas and administrative offices, laboratory facilities; and (b)
Project Facilities situated on the Site; etc.
Project Completion Date means the date on which the Provisional Certificate is issued
and in the event no Provisional Certificate is issued, the date on which the Completion
Certificate is issued;
Project Completion Schedule means the progressive Project Milestones set forth in
Schedule-J for completion of the Water Supply Project on or before the Scheduled
Completion Date;
Project Facilities means all the amenities and facilities situated on the Site, as
described in Schedule-C;
Water Supply Project means the proposed water supply project to be executed as
mentioned at Annex I of schedule A in accordance with this Agreement;
Project Milestone means the project milestone set forth in Schedule-J;
Proof Consultant shall have the meaning set forth in Clause 10.2.2;
Provisional Certificate shall have the meaning set forth in Clause 12.2;
Punch List shall have the meaning set forth in Clause 12.2.1;
Quality Assurance Plan or QAP shall have the meaning set forth in Clause 11.2;
Re., Rs. or Rupees or Indian Rupees means the lawful currency of the
Republic of India;
Request for Proposals or RFP shall have the meaning set forth in Recital D;
Request for Qualification or RFQ shall have the meaning set forth in Recital C;
Retention Money shall have the meaning set forth in Clause 7.5.1;
Land / Site means the constructive possession of the Site free from encroachments and
encumbrances, together with all way leaves, easements, unrestricted access and other
rights of way, howsoever described, necessary for construction and operation &
maintenance of the Water Supply Project in accordance with this Agreement;
Safety Consultant shall have the meaning set forth in Clause 10.1.5;
Scheduled Completion Date shall be the date set forth in Clause 10.3.1;
Scope of the Project shall have the meaning set forth in Clause 2.1;
Section means a part of the Water Supply Project;
97
98
(Name)
(Designation)
In the presence of: 1.
(Name)
(Designation)
2.
{COUNTERSIGNED and accepted by:
Name and particulars of other members of the Consortium}
99
SCHEDULES
100
SCHEDULE A
(See Clauses 2.1 and 8.1)
1.1. Site of the WATER SUPPLY Project shall include the Intake arrangement, Raw Water
pipe line laying, WTP, Pumping Systems etc. as described in Annex-I of this Schedule-A.
1.2. The dates of handing over the site to the Contractor are specified in Annex-II of this
Schedule-A.
1.3. An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2.1 of this Agreement.
1.4. The alignment plans of the WATER SUPPLY Project are specified in Annex-III.
1.5. The status of the environment clearances obtained or awaited is given in Annex IV.
1.1 Site of the WATER SUPPLY Project shall include the Raw Water Gravity Main, Boosting
Pump House, Raw Water Pumping Main, Water Treatment Plant(WTP), Elevated Storage
Reservoirs (ESRs), Ground level Storage Reservoirs (GSRs),Clear Water Pumping Main,
Zonal Pumping Stations, Distribution system etc as described in Annex-I of this ScheduleA.
1.2 The dates of handing over the site to the Contractor are specified in Annex-II of this
Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2.1 of this Agreement.
1.4 The alignment plans of the WATER SUPPLY Project are specified in Annex-III.
1.5 The status of the environment clearances obtained or awaited is given in Annex-IV.
3. The Site Rourkela
1.1 Site of the WATER SUPPLY Project shall include Construction of UGR, GSR, ESR ,
Laying of Clear Water pipe line, Pumping Systems ,Power Sub- Station & construction of
Staff Quarter etc. as described in Annex-I of this Schedule-A.
1.2 The dates of handing over the site to the Contractor are specified in Annex-II of this
Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
101
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2.1 of this Agreement.
1.4 The alignment plans of the WATER SUPPLY Project are specified in Annex-III.
1.5 The status of the environment clearances obtained or awaited is given in Annex IV.
2. The Site Jharsuguda
2.1 Site of the WATER SUPPLY Project shall include the Intake arrangement, Raw Water
pipe line laying, WTP, Pumping Systems etc. as described in Annex-I of this Schedule-A.
2.2 The dates of handing over the site to the Contractor are specified in Annex-II of this
Schedule-A.
2.3 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2.1 of this Agreement.
2.4 The alignment plans of the WATER SUPPLY Project are specified in Annex-III.
2.5 The status of the environment clearances obtained or awaited is given in Annex IV.
102
Annex I
(Schedule-A)
Site
[Note: Through suitable drawings and description in words, the land, buildings, structures and
road works comprising the Site shall be specified briefly but precisely in this Annex-I.]
1. Site
The work Water Supply project to Baripada under UIDSSMT/AMRUT comprises the
Intake arrangement, Raw water pipe line alignment, WTP, storage reservoir, alignment of
clear water rising main & distribution network etc. commencing from Jambhira (SIP) to
different part of Baripada Town in the State of Odisha. The details of which are described
below.
2. Intake Arrangement
Sl. No.
1.
Place
Sarasposi.
Location
Area
Remarks
At Upstream of
Available Demarcation is to be given
Jambhira Dam, Deuli.
as per
in consultation with the
requirement
Water Resource
Department.
Place
Purnachandrapur
of Baripada
Municipality.
Land Mark
Right side of
MurgabadiDeuli Road
near D.W.O.
Office.
Remarks
Demarcated
in favour of
PHEO
The Raw water Rising Main will originate from Intake Point at Sarasposi & will be laid up
to proposed WTP at Purnachandrapur, Baripada Municipality.
Place
Land Mark
Mouza/
Area
Remarks
Khata No./
Plot No./
Kissam
Belgadia,
Inside central Ambika sahi Ac.0.4 Ac. 0.45
near existing P.H. Store.
71/15/
5 dec. dec.out of
103
W.T.P. inside
central store
premises.
i)1.70 Ml. ESR on Adjacent to
18.5m. staging.
existing
ii)0.45Ml. GSR.
UGR, Pump
iii)Pump house of House.
PA-40 Sqm.
0.60 Ml. ESR on Purna15 M. staging.
chandra-pur.
2.
3.
4.
i)0.20Ml. ESR on
20m. staging.
ii)0.225 Ml. GSR.
iii)Pump house of
P.H. 40 Sqm.
i)0.80Ml. ESR on
24.5m. staging.
ii)0.45MlGSR.
iii) Pump house of
Ra 4054.
i)1.05 Ml. ESR on
23m. staging.
ii)0.45ML. GSR.
iii)Pump house of
P.A.40 sqm.
5.
6.
Raghunathpur.
Gharbari.
Ac.2.18 dec.
Adjacent to Tulsichoura
/168/128/
existing
Patita.
UGR and
Pump house.
Proposed
W.T.P.
premise.
Near existing
dumping yard
of Baripada
Munici-pality
Purnachandrapur/165/278/1/A
ssu.
Raghunathpur
/263/1822/
Takatpur.
Near NOU.
Sripadaganj,
Station
bazaar.
Under
existing
O.H.T.
premise.
Sripadganj/
127/169
Ac.0.1
9 dec.
7.
The Clear water Rising Main & distribution lines will be laid as per scope of work.
Site
The Site of the work Water Supply project to Greater Sambalpur under
UIDSSMT/AMRUT comprises the Raw Water Gravity Main between chainage 3500m &
9000m from Hirakud Dam to the existing WTP at Bareipali, Raw Water Boosting Pump
House with Raw Water Sump at Bareipali WTP, Raw Water Pumping Main from
Bareipali WTP to proposed WTP at Ainthapali, proposed WTP at Ainthapali, Clear Water
Pumping Main from WTP at Ainthapali to Sakhipada, Sunapali and Dhanupali, Zonal
Pumping Stations at Sakhipada, Sunapali and Dhanupali, Storage Reservoirs at Zonal
Pumping Stations and Kanijuri (Durgapali), Distribution system at Sakhipada, Sunapali
and Dhanupali etc within Sambalpur Town in the State of Odisha. The details of which
are described below.
Raw Water Gravity Main
Sl.
No.
1.
Place
Hirakud &
Sambalpur
Towns
Location
Area
Available as
per requirement
Remarks
104
Remed to Bareipali.
8.
9.
10.
11.
12.
Place
40 MLD
WTP at
Bareipali
Location
Place
Sambalpur
Town
Area
Sambalpur
Town
Sambalpur
Town
Sambalpur
Town
Area
Remarks
Available as
per requirement
Permission will be
obtained from NH
authority.
Area
Remarks
Available as
per requirement
Sl
Place/
Land Mark.
No
Provision
1. Sakhipada / 0.50
Near St. Joseph
ML GSR, 0.25 ML
Convent School
ESR &
Pump
house.
2. Sunapali / 0.75 ML Near Sunapali U.P.
GSR, 0.50 ML
School
ESR &
Pump
house.
3. Dhanupali / 0.50 Within P.H. Section
Remarks
Available as
per requirement
Location
accorded by NH authority
for NH portion.
Area
Remarks
Available as
per requirement
Permission
to
obtained
from
authority.
Available as
per requirement
Available as
per requirement
Available as
per requirement
Permission
to
be
obtained from SMC /
R&B authority.
Permission
to
be
obtained from SMC /
R&B authority.
Permission
to
be
obtained from SMC /
R&B authority
be
NH
Area.
Remarks.
Ac0.84
Dec.
Applied for
alienation
Ac0.60
Dec.
Applied for
alienation
Available
Own land of
105
4.
ML GSR, 0.50 ML
ESR &
Pump
house.
Kanijuri
(Durgapali) /
0.50 ML GSR &
Pump House.
office compound
Near Petrol Tank
Unit-10 Durgapali/
Khata No.234/Plot
No.1124, 1125
&1126
4
7
7
9
PHEO
Applied for
alienation
12.1
13.
Site
The Site of the work Water Supply project to Rourkela under UIDSSMT/AMRUT
comprises the Construction of UGR, GSR, ESR , Laying of Clear Water pipe line,
Pumping Systems, Power Sub- Station & construction of Staff Quarter etc. to different
part of Rourkela Town in the State of Odisha. The details of which are described below.
as per
requirement
Ac0.49
Dec.
Mouza/
Khata No./
Plot No./
Kissam
0.50 ML ESR
Ruputola
At entrance of Vill-RTU
above 20M.
Ruputola village No. 44/
staging & 0.25 ML
Khata No.
GSR
21/ Plot No.
395/P-010,
396/P-010,
396/P0.75,398/P0.38, 399/P0.33, 403/P0.34 ( RSP
Land )
-0.25 ML ESR
Industrial Estate Existing PHD
above 20M.
campus
staging & 0.25 ML
GSR
Rourkela
0.75 ML ESR
MadhusudanNear
above 20M.
palli
Laprosipadda Reserve Forest
staging & 0.25 ML
GSR
Rourkela
0.75 ML ESR
Timber Colony Near Vaistombo
Devi temple
Reserve Forest
above 20M.
staging & 0.25 ML
GSR
0.75 ML ESR
Jawaharnagar
Exsting PHD
--
Area
Remarks
2.00 Ac
Applied for
permission
Available as per
requirement
PHD land
2.00 Ac
Applied for
permission
1.00 Ac
Available as per
Applied for
permission
PHD land
106
9
10
1
2
above 20M.
staging
0.75 ML ESR
above 20M.
staging
0.75 ML ESR
above 20M.
staging & 0.25 ML
GSR
1.00 ML ESR
below 20M.
staging.
0.50 ML ESR
below 20M.
staging & 0.25 ML
GSR
campus
Birsa Chowk
Bandhamunda
-do-
--
do
do
do
do
do
do
TISCO
Existing PHD
campus
--
Tarapur
Deogoan
Modern India
Chowk
1.00 Ac
Vill-RTU
No. 44/
Khata No.
21/ Plot No.
1182/P-0.08,
1183/P0.255, 1184/
P-0..035,
1185/P-0.48,
1186/P-0.15=
1.00 Acres
( RSP Land )
-Available as per
requirement
11
0.25 ML ESR
below 20M.
staging.
0.50 ML ESR
below 20M.
staging.
0.25 ML ESR
below 20M.
staging.
0.50 ML UGR
0.50 ML UGR
0.75 ML UGR
0.25 ML GSR
55 MLD
OWSSB WTP
(1 +3) MGD
Panposh WTP
Civil Township
Govt. College
0.25 ML GSR
Twin Tower
0.50 ML GSR
Uditnagar
6
8
requirement
Applied for
permission
PHD land
Basanti Foot
Hill
Available as per
requirement
PHD land
Uditnagar (New)
Available as per
requirement
PHD land
Koelnagar WTP
Existing PHD
Campus
Existing PHD
Campus
Existing PHD
Campus
Existing PHD
Campus
Existing PHD
Campus
Existing PHD
Campus
Existing PHD
Campus
Available as per
requirement
Available as per
requirement
Available as per
requirement
Available as per
requirement
Available as per
requirement
Available as per
requirement
Available as per
requirement
PHD land
--------
PHD land
PHD land
PHD land
PHD land
PHD land
PHD land
107
11
0. 50 ML GSR
14.1
15.
16.
18.
Available as per
requirement
PHD land
Sl. No.
1.
17.
Koelnagar
Place
RIVER IB
near
H.Katapalli
Location
At Downstream of
proposed barrage to be
constructed by Irrigation
Deptt.
Area
Pvt. Land
Ac.0.32
Dec
Remarks
Land acquisition to be
obtained from land owner.
Remarks
Advanced
possession
taken by
PHEO
19.
Storage Reservoirs & Pumping Stations:
Zone Proposed Storage
Place
Land
No.
Reservoir &
Mark
pumping stations
1.
(i)0.57 ML OGR Pahadimandir Near
ii)Pump house of
existing
PA-29.25 Sqm.
ESR
2.
i)0.51 Ml. ESR on Sarbahal
Sarbahal
20.0m. staging.
High
ii)1.02Ml. OGR.
School
iii)Pump house of
PA-29.25 Sqm.
Kali
3.
i)0.61 Ml. ESR on BTM
Mandap
21.0m. staging.
ii)1.22Ml. OGR.
iii)Pump house of
PA-29.25 Sqm.
4.
i)0.38Ml. ESR on Industrial
Near
Mouza/ Khata
Area
No./ Plot No./
Kissam
Jharsuguda
Required
Khata No. 1269 Govt. Land
Plot No. 1148
Available
Jharsuguda Town Ac.0.56
Unit 5,
dec.
Khata No. 05,
Plot No. -4185,
Kisam -Gharabari
Jharsuguda town
Unit 1, BTM,
Khata No. 1044,
Plot No. 138,
kisam Industrial
Land
Jharsuguda
Remarks
Under
possession of
PHEO
Govt. Land
to be
alienated
Under
108
19.1
25m. staging.
Estate
existing
Khata No. 876 Govt. Land possession of
ii)Pump house of
WTP
Plot No. 2281
Available PHEO
P.H. 29.25 Sqm.
Alignment of Clear Water Rising Main & Distribution System
The Clear / Raw Water Rising Main of Water Supply Project is to be laid along the side of
NH in consultation with NH Deptt. & as per the scope of work.
109
Annex - II
(Schedule-A)
The dates on which the Authority shall provide site to the Contractor are stated below:
Sl. No
Site
Details of location
Date of providing
the site
4
Intake
WTP
45 days
3.
Zone-I
15 days
4.
Zone -II
15 days
5.
Zone-III
Site for 1170 KL ESR, 450 KL UGR & Pump House at MouzaTulsichoura / Khata No.168 / Plot No.128 / Area- A 0.36 dec.
15 days
6.
Zone-IV
15 days
7.
Zone-V
Site for 200KL ESR, 225KL UGR & Pump House at MouzaRaghunathpur / Khata No.263/Plot No.1822 / Area- A0.45 dec
Site for 800KL ESR, 450KL UGR & Pump House at MouzaHemachandrapur / Khata No.111/Plot No.232/ Area- A0.45 dec
15 days
8.
Zone-VI
Site for 1050KL ESR, 450KL UGR & Pump House at Mouza-Sripadganj
/ Khata No.127 / Plot No.169 / Area- A0.19 dec
15 days
Construction of Intake well WTP different &Capacity ESR & GSR at different places of
Baripada
.2.
Sl.
No
Site
Details of location
15 days
Date of providing
the site
110
Sl. No
Site
Details of location
3.
Zone-7
4.
-do-
5.
Zone-9
6.
-do-
10
Zone-5
11
Zone-6
12
Zone-8
Date of providing
the site
4
180 days
180 days
15 days
15 days
15 days
15 days
15 days
Zone-11
14
Zone-2
15
Zone-2
15 days
15 days
111
Zone-3
17
Zone-3
18
Zone-3
19
Zone-8
Sl. No
Details of location
3.
15 days
15 days
15 days
15 days
Construction of Intake well WTP different &Capacity ESR & GSR at different places of
Jharsuguda
1. Site for proposed Intake well at H.Katapalli at Downstream of proposed
90 days
barrage to be constructed by Irrigation Deptt.
2. Site for proposed WTP at H.Katapalli in front of proposed stadium.
45 days
4.
5.
6.
45 days
90 days
90 days
45 days
* The dates specified herein shall in no case be beyond 180 (One hundred and eighty) days after the Appointed
Date.
112
Annex III
(Schedule-A)
Alignment Plans
The proposed Layout Plan of Water Supply Project and General Arrangement of Intake Well & WTP of Baripada are as indicated below:
(i)
(iii)
(ii)
113
114
115
The proposed Layout plan and General Arrangement Drawing of the WTP etc for (Sambalpur) are attached as indicated below:
(i)
Schematic Diagram of Proposed Scheme-2 Nos
(ii)
Layout Plan of Raw Water Pumping Main
(iii) Site Plan of Proposed WTP
(iv)
Layout Plan of Clear Water Pumping Main
116
117
118
119
120
121
122
The proposed Layout Plan of Water Supply Project and General Arrangement of ESR, GSR, UGR Zone wise for (Rourkela).
(i)
123
124
The proposed Layout Plan of Water Supply Project and General Arrangement of Intake Well & WTP of Jarsuguda are as indicated below:
(i)
(iii)
(ii)
(iv)
125
126
127
128
129
130
Annex - IV
(Schedule-A)
Environment Clearances
Requirement of any Environment clearance is being assessed.
131
SCHEDULE - B
(See Clause 2.1)
132
Annex - I
(Schedule-B)
1.
The intent of this Section is to specify the work items to be covered on EPC Contract
Basis in conformity with the technical specifications as enumerated in the subsequent
clauses for the work Water Supply to Baripada Town under UIDSSMT/AMRUT
Scheme.
The present water supply scheme has been planned to receive water from Jambhira Dam,
which is approximately 15.0 Km away from the existing WTP located inside the town. An
intake well has been proposed inside the dam with a link channel up to the intake well.
From this intake well approximately 12.35 Km long 600mm diameter and 2.66 Km long
350mm diameter DI-K9 rising main would carry the raw water to the proposed water
treatment plant and existing water treatment plant respectively located inside the town.
A new water treatment plant of 16 MLD capacity (for intermediate design period i.e.
2030) has been proposed, which along with the existing one (9 MLD) would be able to
satisfy the intermediate design period demand. (In 2nd phase, additional WTP of 7 MLD
capacity will be constructed to cater water demand of ultimate design period, i.e., 2045)
The town is divided into 6 (Six) water supply zones. Each zone is provided with a
combination of one Elevated Service Reservoir (ESR), one Under Ground Reservoir
(UGR) and pump house building. This will be constructed in one compound having a
boundary wall along with one mild steel gate, walk-way including landscaping and
drainage, etc. Pumps provided at zonal pump houses will pump the water from UGR to
ESR. Water would be supplied to consumers from ESRs by gravity through a distribution
network.
The work proposed under 2nd phase is out of scope of this tender. However, provision of
space shall be made to accommodate the requirement of Phase-II of the project.
It is intent of the Engineer-in-Charge to construct a facility to provide basic need of human
being Water, using highest standards of construction and supply of material and
equipment to enable a sustained reliable system for performance over next 30 years. The
responsibility of the contract starts from the intake point of intake leading channel and
ends at the consumer points included in the project area.
2.1
Scope of Work
2.1.1 The bidder before bidding shall visit the site at his own cost and shall satisfy himself with
the nature and extent of the work involved, actual site conditions, and existing facilities.
Shall collect any other information which may be required before submitting the tender.
Any claim in this regard shall not be entertained.
133
2.1.2
The scope of work for the Water supply scheme covers surveys including Topographical
survey, Geo-technical survey, raw water quality testing, design & detailed engineering of
all components of the scheme, do the necessary changes as per site condition, develop
detail drawing and getting approval from Engineer-in-Charge, supply of equipment and
construction materials, testing at manufacturers works, delivery up to site, erection,
execution of works as per the work described under Scope of Work clause 16.0 or
elsewhere in the tender and as per IS codes, OPWD specifications and detailed
specifications attached hereto, final check-up, painting, testing, commissioning including
hydraulic testing of all water retaining structures and pipes with fittings, valves, etc. as per
relevant IS codes and relevant specification.
2.1.3
The work shall be carried out according to the design / drawings submitted by bidder and
approved by Engineer-in-Charge. For building, facilities, systems, structures, etc.,
necessary layout and details are furnished with tender document. Any changes, if required,
shall be done by the bidder keeping in view the scope, minimum specified requirement,
the statuary and functional requirement and providing enough space and access for
operation, use and maintenance. The bidders work shall cover the complete requirement
as per tender specification.
2.1.4
The work to be performed under the specification consists of providing all labours,
supervision, materials, scaffolding, construction power, fuel, construction water, and
construction equipment, testing equipment, tools and plants, supplies, transportation and
all incidental items not shown or specified but necessary for successful completion of the
work.
2.1.5
The nature of work generally involves site clearance, dismantling of existing above ground
and underground structures, excavation in all types of soils, foundation preparation,
dewatering and its disposal, backfilling, disposal of surplus excavated material, supply of
all construction material and supply of all necessary plant machinery and equipment, etc.,
construction with the materials of specified quality, constructing drains, embedding,
encasement of pipes, cleaning the site from all waste and surplus material after completion
of work and other ancillary work as per specifications, as per drawings submitted by the
contractor and approved by the Engineer-in-Charge.
2.1.6
Any items of work, either supply and / or erection of material / equipment which have not
been specifically mentioned in the scope / specifications but are necessary for operation
and guaranteed performance of the entire water supply scheme, and equipment offered
shall be deemed to be included within the scope of this specifications and shall be
provided by the bidder without any additional cost.
All material / equipment which have been mentioned and have not been specifically
mentioned in the scope / specifications but are necessary for operation and guaranteed
performance of the entire water supply scheme shall be any of the make mentioned in
Clause 2.17, Schedule-D. Contractor shall have to obtain written approval of make of any
item from Engineer-in-Charge before supply.
2.1.7
2.1.8
The scope of work also include shifting of electrical/ telephone/ any other type of cable,
electric poles, water, sewer or any other type of pipeline or any other facility. Any
arrangement for crossing roads, drains, nallah including bypass arrangement and their
134
2.2.2
The Contractor will make necessary arrangement for construction power and construction
water.
2.2.3 The Contractor shall make necessary arrangement for all the testing and inspection to be
conducted in a manner as specified in the specifications and as per codes.
2.2.4
Transportation of all equipment / raw material / spares from manufacturers work to the
project site, inclusive of all intermediate handling and unloading / storage at site and all
taxes, octroi, etc.
2.2.5
2.2.6
Deploying qualified and experienced staff for supervision of all erection and
commissioning services. The Contractor shall also arrange for rectifying the defects during
defect liability period.
2.2.7
During defect liability period of five year the contractor has to replace any equipment,
component, etc. for manufacturing defect, malfunctioning and below rated performance.
He will make good any structure or part of it if found defective or becomes during
functioning.
2.2.8
Application of the final paints and final finishing work shall be done by the Contractor
after complete erection and testing, trial run but before handing over to the department.
2.2.9
The contractor shall also arrange technical experts of equipment from proprietary supplier
as and when necessary till the commissioning, trial run and performance guarantee period
of the equipment.
2.2.10 Any survey/ leveling/ fixation of bench mark/ reference level required for detailed
engineering of the any component of the scheme will be done by survey team deputed by
contractor. The survey team will carry out the area survey and leveling of Intake, WTP,
ESR compounds or wherever required as per the instruction of Engineer-in-Charge.
2.2.11 The detailed scope of work has been mentioned in clause no 16.0 of this chapter.
2.2.12 Nothing extra over the quoted price shall be paid to contractor on account of any financial
implications of all the conditions and specifications. It will be treated that necessary
135
financial provision are deemed to have been kept in the quoted price. Any contiguous item
or any provision / requirement, if not included in the general specification and scope of
work, special specification and detailed specification but necessary to be provided for the
completion of the work and for its functional necessity, shall be provided at no extra cost
above quoted price. The decision of the Engineer-in-Charge in such cases shall be final
and biding on the contractor.
2.2.13 The time is the essence of this contract. The entire work described under Scope of Work
clause 16.0 or elsewhere in the tender (Design, approval of design & drawings, execution
and commissioning) is to be completed within a time frame of 36 (thirty six) calendar
months from the date of issue of work order.
3
Tender Drawings
The Tender drawings shall form the part of tender document. The contractor shall submit
detail design and drawing of all component of the water supply scheme (except hydraulic
design of rising mains and distribution network) for its sufficiency in all respect before
taking up the construction work. The contractor can do addition, modification, alteration or
detailing in the drawings as per the prevailing conditions and he has to take approval from
Engineer-in-Charge. The structural stability throughout its working life lies with the
contractor. The work has to be executed as per the construction drawings (latest revision)
with additions, alterations and modifications made from time to time as required and
approved by the Engineer-in-Charge and also according to any other drawing prepared by
contractor progressively during the execution of the contract.
Specifications
The detailed specifications, IS codes and OPWD specifications are intended for the
general description of the work, quality and workmanship. All work is to be carried out
according to the specifications. Wherever reference to the standard codes of practice etc. is
made, they shall be taken as the latest edition of the same issued within one month before
the date of submission of the Tender.
Construction Method
The bidder shall submit a pert chart along with this tender showing the time schedule for
the overall constructions activities along with construction methodology. The construction
method and mobilization of resources to be adopted by the contractor shall match with this
time schedule and shall be approved by the Engineer-in-Charge. After approval of tender
the contractor will submit his detailed schedule of work.
Testing of Materials
All arrangement shall be made by the contractor to provide testing requirement as
specified in the specifications. For the tests for which, equipments required is not available
with the contractor shall provide the same or will arrange the test to be done at a
Government approved laboratory. No extra claim is admissible in this regard.
10
Approach Roads
The Contractor where required shall make his own arrangement for approach to the work
site (including, burrow and disposal area) and for movement of men, machinery, other
equipment etc. required for carrying out the work included under this contract. The
contractor will also arrange for any land required for burrowing earth or disposal of any
dispensable material.
11
12
Prevention of pollution
12.1
Arrangement shall be made by the contractor to prevent Air Pollution and pollution in any
stream, nallah or rivers. Arrangements for sprinkling of water in the construction and
burrow area to prevent any dust blowing also shall be done by the contractor. The
contractor shall be solely responsible and liable for all damage caused by any pollution
that may take place during the execution of the works, and he shall make arrangements as
the Engineer-in-Charge may approve, for preventing pollution.
12.2
13
Safety Measures
In respect of all labour directly or indirectly employed in the work for the performance of
137
the contractors part of this agreement, the contractor shall at his own expense arrange for
the safety provision as per IS code framed from time to time and shall at his own expense
provide for all facilities in connection therewith. In case the contractor fails to make the
above arrangement Engineer-in-charge shall be at liberty to make arrangements and
provide facilities as aforesaid and recover the cost incurred on his behalf from the
contractor.
The contractor shall ensure the safety of men, material, machinery, existing structure and
any other facilities. Since the work is to be done on road/lanes/by lanes, all necessary
safety arrangements including proper barricading and lighting etc. shall be done by the
contractor.
The Contractor shall be absolutely and solely responsible for any accident that may occur
during the progress of the work and for injury or damage to the men, material, machinery,
existing structure and any other facilities of any description whatsoever which may be
caused by or result from the execution of work. The Contractor shall make good any
damage due to accident or pay any claim arising out of accident and will indemnify the
employer of expenses on account thereof. No separate payment shall be made for safety
measures.
14
15
15.1
Reinforcement
Reinforcement steel shall be stored in a manner that no damage/rusting is caused to the
material.
15.2
Cement
The Cement shall be stored as per IS code and in a manner that no damage/setting is
caused to the material.
15.3
come in contact with dirt, clay, grass or any other foreign substance at any stage.
Aggregates of different sizes shall be kept in separate stacks. Aggregates from different
sources shall be stacked separately, if so desired by the Engineer-in-Charge with proper
care to prevent intermixing.
15.4
Sand
Sand shall be stored on brick soling or an equivalent platform so that they do not come in
contact with dirt, clay, grass or any other foreign substance at any stage.
15.5
Pipes
Pipes shall be stored in stacks as per relevant IS codes.
15.6
Electro-mechanical equipment
A Godown with roof and brick soling floor of sufficient size is to be constructed by the
contractor for storage of equipment to protect from rust, damage, theft, etc. All electromechanical equipment shall be stored in the godown.
15.7
All other material required for construction will be stored properly by the contractor.
16
16.1
The work shall be carried out according to the detailed specifications, IS codes and
OPWD/PHEO specifications. The design/drawings shall be submitted by the contractor
and approved by Engineer-in-Charge. For building, facilities, systems, structures etc.,
necessary layout and details are to be developed by the bidder keeping in view the scope,
minimum specified requirement, the statutory and functional requirement and providing
enough space and access for operation, use and maintenance. The bidders work shall
cover the complete requirement as per tender specification.
16.2
16.3
Preparation of work areas, clearing site, jungle clearance etc. in the entire area including
dismantling and removing of any existing above ground and underground structures
including existing roads, uprooting of all the trees, debris and vegetation and their
disposal, shifting of pipes, cables, electrical poles etc. The dismantled and removed
material shall be stacked/ disposed as per direction of Engineer in Charge. The bidders
should visit the site prior to submission of bid and make himself conversant with the site
conditions to estimate the dismantling/removing work.
Shifting of electrical or any other type of cables ,electric poles, water, sewer, gas or any
other type of pipeline or any other facility, their restoration to the satisfaction of Engineer139
Intake
The scope of work of intake arrangement shall consist of three main components with
details as follows:
Carrying out necessary site surveys and design of channel to carry water from deepest
point of dam to intake well. The channel will be trapezoidal in shape and shall be designed
and constructed on appropriate gradient so that water flows from inlet point of channel to
Intake well smoothly by gravity.
ii.
River training works & protection works with stone pitching and guard wall to be provided
for protection of channel. Rough stone dry packing to be provided in lead channel near the
Intake Well up to 100 mtr. length and width 9 mtr. in trapezoidal shape.
Excavation of trapezoidal channel of required width, depth and slope (as per details below)
up to the specified level including site dressing, leveling, shoring and shuttering, wherever
required. The dead storage level of the dam is 57.9m above MSL. The invert level of the
intake point of channel will be kept as 55.0m above MSL.
iii.
:
:
:
3.0m (minimum)
1200m approximately
55.0m MSL (i.e. 2.9m below DSL
approximately at Intake point)
1 vertical: 2 horizontal (minimum)
ii.
Civil structure will be constructed for 32.0 MLD capacity (considering 22 hours pumping);
however presently pumping machinery will be installed for 25.0 MLD capacity only. The
minimum requirement of intake well is as below:
Civil Structure-Type : RCC Circular well Type Intake Well and Brick
masonry pump house over the well
Inside Diameter
: 7.00m (minimum)
RCC wall Thickness : 900mm (minimum)
Grade of concrete
: M-25 or above
140
The plinth slab of intake well shall be of RCC with cut-out provision (as per requirement
of pumps for ultimate stage) for pump and motors.
iii.
The scope of work includes, design, detailed engineering, supply of material, construction,
installation, testing, commissioning and five year of defect liability period of all Civil,
Mechanical, Electrical and Instrumentation works of all components covered in the scope
of work.
iv.
Site clearance and removal of all trees, debris, etc., excavation and backfilling, disposal of
surplus excavated earth, site dressing, leveling as per the direction of Engineer-in-Charge.
v.
Supply of all material and construction of intake and pump house, including finishing
work, flooring, internal and external plastering, roof treatment, fixing of doors, windows
and all fixtures as per the detailed specifications.
vi.
Supply, installation, commissioning & testing of following Vertical Turbine pumps as per
table 1.1 with suitable motor of make mentioned in Clause 2.17, Schedule-D of the
document, including MS base plate and coupling, air cooled A.T.S. control panel & Motor
Control Centre (3 phase A.C. power supply 50 Hz), as per detailed specifications.
Table 1.1: Details of Pumps at Intake
Type of
Pump
Vertical
Shaft
Squirrel
cage
Hours of
Pumping
22 hours
Capacity
Head of
of Each
Each Pump
Pump
145 LPS
61 Mtr
No. of
Working
Pump
02
No. of
Standbye
Pump
01
Total No. of
Pumps
03
The capacity and head mentioned in above table is minimum requirement. Contractor has
to verify the same and provide accordingly without any extra cost.
vii)
Suitable Motor control panel, capacitor bank, VFD with bypass arrangement & APFC panel
including EMS, all other accessories including PLC panel with SCADA, HMI for local
and remote operation along with the required size of incoming & out going cables with a
spare one shall be installed. The EMS with licensed soft ware is to be tagged to be
available with PHEO server at NIC, Bhubaneswar. All grade switchgear should be AC3
type and all are intelligent type, Control voltage for 33KV & 0.4 KV will be 24 V/110V
DC. Control voltage for 0.415KV switch gear shall be AC of 220V.
Supply & fixing of pipes (delivery and common header, etc.),3 sets of Specials/Manifolds
of 600mm dia over base slab, 3nos of 350mm dia Sluice Valves, 3nos of 350mm dia NonReturn Valves, dismantling joints, of make mentioned in Clause 2.17, Schedule-D of the
document , pipe support, thrust block as per detailed specifications.
viii.
Supply and installation of PVC encapsulated mild steel rungs for inspection inside the
well.
ix.
Supply & installation of 4nos of dial type Pressure gauge of make mentioned in Clause
2.17, Schedule-D of the document, on the delivery sides of the pumps and one on the
common header with two-way stop cork.
x.
Supply, erection, testing and commissioning of 1 set 600 mm dia full bore type
Electromagnetic Flow meter.
Supply & fixing of 3.0 MT electrically operated travelling crane with gantry girder, etc.
for lifting pumps, etc., including painting of all equipment and steel sections as per
detailed specification.
xi.
142
xii.
xiii.
xiv.
xv.
xvi.
xvii.
xviii.
Supply of all material and painting of inside of pump house building, inside-2 coats of oil
bound distemper, including application of putties, primer, etc. to obtain smooth surface.
Doors and windows shall be painted with enamel paint after one coat of primer.
Providing MS grating with checkered plates including painting, fixing in position.
Providing CI Control gate with screen including painting, fixing in position.
Supply of all material & painting of exposed outer surfaces of pump house with two coats
of weather coat paint including application of putties, primer, etc. to obtain smooth
surface.
Supply, erection & painting of structural steel pipe supports, pipe, and other equipment as
per detailed specification.
Supply and construction of 230mm thick brick masonry Boundary wall of 1.50m height
above finished ground level with 25mm thick cement concrete coping and pillars at 2.5m
interval around the campus.
ii)
iii)
Carrying out necessary site surveys, design and obtaining approval to construct truck-able
bituminous approach road as per OPWD specifications from intake well to the peripheral
road of the dam with security post, drainage and lighting arrangement. Road shall be
designed for class AA vehicular loading as per detailed specification.
Width of road
: 4.0m (minimum)
Length of road
: 330.0m (approx.)
Shoulder width
: 1.5m both side (minimum)
Side slope
: 1 vertical: 2 horizontal (minimum)
Top level of road
: 80.6m
Loosening, leveling and Compacting original ground supporting embankment to facilitate
placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water
at OMC and then compacted by rolling so as to achieve minimum dry density as given
table 300-2 for embankment construction & clause 305 of MoSRT&H specifications for
Road & Bridge works (4th Revision)
Construction of embankment with approved material obtained from borrow pits with all
lifts and leads, transporting to site by mechanical means within a lead of 5kms, spreading,
grading to required slope and compacting to meet requirement of table 300-2 & clause 305
of MoSRT&H specifications for Road & Bridge works (4th Revision)
iii)
Supplying & Filling in foundation and plinth with sand watered and rammed including
cost of sand & labour, T & P all complete.
iv)
Construction of granular sub-base by providing Close graded Granular subbase GradingIII material as per table 400-1, spreading in uniform layers with motor grader on prepared
143
surface, mixing by mix in place method with rotavator at OMC, and compacting with
vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H
specifications for Road & Bridge works (4th Revision)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water
bound macadam specification including spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber,
applying and brooming requisite type of screening/binding materials to fill up the
interstices of coarse aggregate, watering and compacting to the required density as per
clause 404 of MoSRT&H specifications for Road & Bridge works (4th Revision)
v)
vi)
Providing and laying dense graded bituminous macadam with hot mix plant using crushed
aggregates of specified grading, premixed with bituminous binder of 60/70 penetration
grade of bitumen, transporting the hot mix to work site, laying with a hydrostatic paver
finisher with sensor control to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 507
of MoSRT&H specifications for Road & Bridge works (4th Revision)
vii)
Construction of Shoulder with supplying & Filling in approved material from borrow pit
with all lifts and leads, transporting to site by mechanical means within a lead of 5kms,
spreading, grading to required slope and compacting to meet requirement of table 300-2 &
& clause 305 of MoSRT&H specifications for Road & Bridge works (4 th Revision)
viii.
Supply and erection of MS Gate at entry as per detailed specification and fixing it to the
RCC columns.
ix.
Supply and fixing of electric poles throughout the entire length of approach road on one
side only for electrification, including supply of all material such as poles, lamps, switches
and cables, etc. as per detailed specification.
x.
Supply of fluorescent Glow Sign Board captioned Baripada Water Works with other
details in attractive colors with all fittings, etc. of appropriate size and fixing it at
appropriate height at the entrance gate as per detailed specifications.
Detailed engineering of raw water rising main, water hammer / surge protection system
including allied works, thrust blocks, etc. as per CPHEEO manual. Raw water rising main
has been designed for minimum 32 MLD capacity (considering 22 hour pumping).
ii.
Excavation of trenches in all kind of soils, including shoring and shuttering, wherever
required, as per the approved alignment up to the depth to maintain minimum one meter
earth cover over crown of the pipe for laying of pipes and fittings, including proper
stacking of excavated soil/material, backfilling and disposal of surplus material.
iii.
Supply, laying & jointing of following raw water rising main pipes as per IS: 8329, Socket
and Spigot joint and ISI marked rubber gasket conforming to IS: 5382 as shown in
relevant drawings and detailed specifications.
144
a. Raw Water Rising Main-1: From the pump house at intake up to the junction near
proposed WTP
Total length
Flow
Type
Lining Internal
Lining External
Diameter (minimum)
: 12,350m (approx.)
: 32 MLD (considering 22 hours pumping)
: Ductile Iron Class K-9 & M.S. Pipe
: Cement lined
: Bituminous coating
: 600mm
The raw water rising main shall be extended up to cascade aerator in the proposed
WTP from junction near WTP. The diameter of this portion of rising main will be
400mm and the length will be approx. 36m.
b. Raw Water Rising Main-2: From junction near proposed WTP to inlet chamber of
existing WTP.
Total length
Flow
Type
Lining Internal
Lining External
Diameter (minimum)
Sl.
No.
1.
2.
3.
: 2660m (approx.)
: 9 MLD (considering 22 Hours pumping)
: Ductile Iron Class K-9 & M.S. Pipe
: Cement lined
: Bituminous coating
: 350mm
600
400
Mild Steel
617
6
Total
14290
756
350
2527
133
iv.
Supply & laying of ISI marked Ductile Iron fittings (Tee, tail piece, bend etc.) of required
sizes conforming to IS: 9523 with latest amendment.
v.
Supply, laying & jointing Mild Steel Pipes conforming to IS: 3589 Fe410 grade pressure
pipes of required diameter and quantity for nallah and other crossing and special bends,
etc. as per detailed specifications.
vi.
Supply & erection of ISI marked double flanged Cast Iron sluice valves, scour valves,
double acting kinetic air valves as per IS specification and Zero velocity valve confirming
to relevant IS specification as per site requirement & as per instruction of Engineer-inCharge.
145
Quantity
Remarks
4 No.
1 No.
1 No.
6 Nos.
IS:14846 PN 1.6
IS:14846 PN 1.6
IS:14846 PN 1.6
IS:14846 PN 1.6
4 Nos.
As per relevant IS
specification
IS:14845 PN 1.6
10 Nos.
26 Nos.
vii.
Construction of thrust blocks of required size as per approved drawing at all bends and
other necessary locations in the pipeline approximately 23 nos.
viii.
Construction of valve chambers as per approved drawing for all types of valves as per site
requirement & as per instruction of Engineer-in-Charge.
ix.
Backfilling of the excavated trenches with selected excavated earth. Backfilling shall be
done in layers of 150mm thickness and shall be watered and compacted as per detailed
specifications.
x.
Making all arrangements for laying of pipes and its stability for crossing of
Rail Way Crossing 1 No., Canal Crossing- 1 No., NH Crossing 1 No., PWD Road
Crossing 2 Nos. and small culverts/nallah / drain / road / any other facility and their
restoration with minimum disruption including making any by-pass arrangement and
dismantling of all above arrangement after completion and testing of work. At every
crossing over, the pipeline will be supported through a suitable steel structure as per
direction of Engineer-in-Charge.
xi.
Repair to damages caused during construction to any existing road, bridge, culvert, water
supply line, sewerage line, drain, electricity cable & pole, gas pipeline and telephone line,
etc. shall be reinstated as per the original specification and satisfaction of concerned
authorities / Engineer-in-Charge.
xii.
Cutting of road surface for taking of pipeline at required depth will be done with making
good to the damages by mending & repair to existing condition.
xiii.
To provide inter-connections of raw water rising main with the intake chamber of existing
WTP, including fixing of sluice valve to regulate the flow at existing WTP.
xiv.
To connect the raw water rising main to the cascade aerator at the proposed WTP.
xv.
Testing and commissioning of raw water rising mains as per relevant IS code and to ensure
minimum terminal head of 3.0m.
146
d. Site Development
e. Staff Qrs.- 2 Nos.( Approx. Floor area -45 Sqm each)
f. Compound Wall-400m
g. External Drainage System 1500 mtr. for waste water disposal of WTP.
19. Instrumentation
i) 350mm dia full bore type Electromagnetic Flow meter 1 No.
ii) Lab equipment.
i.
ii.
iii.
iv.
v.
vi.
vii.
viii.
Works to be performed:
The scope of work includes, but is not limited to design, detailed engineering, supply of
material, construction, installation, testing & commissioning, and five year of defect
liability period for all Civil, Mechanical, Electrical and Instrumentation Works for the
WTP and all associated works including centering, shuttering, reinforcement, all piping
arrangements, etc. as per detailed specifications.
Conducting necessary investigations e.g. topographical survey, geotechnical survey,
leveling etc., preparation of contour maps where ever necessary.
Preparation of work area, clearing site, jungle clearance, etc., including dismantling and
removing of any existing above ground and underground structures including existing
roads, uprooting of all trees and vegetation and their disposal, shifting of pipes, cables,
electrical poles, etc. and site dressing, leveling of the surrounding ground to final ground
level, stacking and disposal of surplus material.
Construction of Chemical House (2 floors): It shall be two storied RCC framed structure
with doors, widows, ventilators etc. having minimum floor area of 150sqm per floor.
Chemical storage area shall be provided at ground floor. Chemical tanks, dosing system
shall also be accommodated at first floor. The chemical tanks shall be designed for
ultimate capacity of the WTP. Water tank of 8.00 cum capacity shall be provided on the
roof of the first floor. The RCC stairs shall be up to roof of the first floor and shall be
provided with mumty. The construction of the building shall be as per detailed
specification.
Construction of Clear Water Pump House: It is single storied building having minimum
floor area of 60.00 sqm. It shall be RCC framed structure with doors, widows, ventilators
etc. The construction of the building shall be as per detailed specification.
Construction of Chlorine house: The Chlorine house shall be RCC framed structure having
minimum floor area of 35 sqm. It shall be planned to accommodate chlorine gas tonner
storage, dosing system with adequate safety measures for the ultimate capacity of WTP i.e.
23 MLD. It shall have 5.0 cum potable water tank on the roof. Aluminium ladder shall be
provided to access the roof of the building. Proper ventilation shall be provided as per
specification in the chlorine house. It is to be furnished with gas chlorination unit with four
nos. of toners of 0.9 MT capacity each. 3 MT capacity EOT crane with gantry girder for
lifting of chlorine toner is to be provided.
The Filter House Annex building shall be RCC framed structure having minimum floor
area of 35 sqm & will be provided with an attached toilet.
Construction of Office-cum-Laboratory Building: It is single storied building having
minimum floor area of 120.00 sqm. It shall be RCC framed structure with doors, widows,
ventilators etc. It shall consist of office space, spare parts storage area and toilets. Potable
water tank shall be provided on the roof. All sanitary fittings shall be installed in the
148
ix.
x.
xi.
xii.
toilets. RCC stairs along with mumty shall be provided to access the roof of the building.
The construction of the building shall be as per detailed specification. The laboratory
building should be furnished with all necessary equipments & chemicals & furnitures for
water testing purpose as per CPHEEO manual comprising mainly of pH Meter, Turbidity
Analyser, Chlorimeter, Jar Test Apparatus etc. as per direction Engineer-in-charge.
Supply, erection and commissioning of 1.0 MT electrically operated travelling crane with
monorail to lift the chemicals in chemical house. A cutout of adequate size in the roof of
the ground floor at appropriate location shall be provided for lifting of chemicals in crane
bucket from ground floor to first floor.
Design, supply of material, construction of Paved Parking area for staff vehicles.
Sufficient area for parking shall be provided for staff vehicles/departmental vehicles.
Safety equipment such as portable fire extinguisher of all types of adequate size and
numbers including other safety equipments as required shall be provided in the Officecum-laboratory Building, Chlorine House and Chemical house.
Excavation up to the foundation in all kinds of soil including shoring and shuttering,
wherever required, stacking of excavated material for all the units of the WTP.
xiii.
Backfilling of the foundations with selected excavated earth. Backfilling shall be done in
layers of 150mm thickness and shall be watered and compacted as per detailed
specifications.
xiv.
Supply of all material and finishing of all buildings of WTP, like flooring, internal and
external plastering, painting of 2 coats of weather coat on all exterior surfaces and 2 coats
of oil bound distemper on all interior surfaces, including application of putties, primer, etc.
to obtain smooth surfaces, roof treatment, rain water pipes, fixing & painting of doors and
fixtures and windows, etc. as per the detailed specification.
xv.
All other units of WTP shall be painted with 2 coats of weather coat on exterior surface
and 2 coats of epoxy paint on internal surfaces coming in contact with water.
iv)
The scope includes all supervision, inspection charges etc including all
incidental fees/ charges as per the estimate of concerned electrical authority
is to be deposited by the bidder excluding security deposit charges which
will be born by the department.
v).
vi).
vii)
Suitable size of switch yard and meter room/panel room for 33/0.433KV grade
with Power cable & data cable and cable tray.
Supply, installation and commissioning 125 KVA DG Set 1 no. with AMF panel
including metering, all other accessories and data should be monitored at central
PLC.
viii)
xvi.
Supply and construction of 230mm thick brick masonry Boundary wall of 1.50m height
above finished ground level with 25mm thick cement concrete coping and pillars at 2.5m
interval around the WTP campus.
xvii.
Supply and erection of MS Gate at entry as per detailed specification and fixing it to the
RCC columns.
xviii.
Supply of all materials and construction of wastewater disposal system to dispose the
wastewater generated from the toilets of Administrative and Laboratory building.
xix.
Supply & fixing of 3.0 MT electrically operated travelling crane with gantry girder, etc.
for lifting pumps, etc., including painting of all equipment and steel sections as per
detailed specification.
xx.
xxi.
Supply of all material and construction of open drainage system for WTP compound with
brick masonry and its connection with nearest drain as per approved drawing.
xxii.
Supply of material and construction of 1.5m wide PCC walkway to connect various units
of WTP as per approved drawing.
xxiii.
Construction of bituminous approach road of required width and length inside the WTP
compound, including supply of material as per detailed specification and joining it to the
nearest road.
xxiv.
xxv.
Supply of fluorescent Glow Sign Board captioned Water Treatment Plant Baripada
with details in attractive colors with all fittings, etc. of appropriate size and fixing it at
appropriate height at the entrance gate as per detailed specifications.
150
xxvi.
Guarantee the outlet quality parameters of the treated water for drinking purpose as per IS:
10500 with latest amendments. The Guarantee of the treated water quality is irrespective
of raw water quality. While designing the units of WTP the contractor shall keep this in
mind.
xxvii.
Supply of one number wall mounted board with flow sheet including details of all units,
pumps, motors in attractive colours for mounting on the wall at appropriate height as per
aesthetic requirement of the Administrative building.
xxviii.
The waste water generated from WTP is to be disposed of under gravity to the nearby
natural nallah at a distance of 1500 mtr. approximately by laying required size of RCC
Hume Pipe with required nos, of Man Hole Chambers. The minimum dia. of pipe line
should not be less than 300mm.
xxix.
xxx.
ON-Line Analyzer:
Continuous on-line analyzer for monitoring of raw water and treated water quality
for Ph & Turbidity (with a range of 0 to 2000 NTU) and Ph, Turbidity (range 0 to 100
NTU) & residual chlorine respectively. The system is to be tagged to PLC for real time
data monitoring with local and remote operation. There shall be required capacity of
battery back up system for one hour.
The wall of chemical house shall be minimum 25cm thick brick masonry. Chemical
storage area shall be provided at ground floor. Chemical tanks, dosing system shall also be
accommodated at first floor. The RCC stairs shall be up to roof of the first floor and shall
be provided with mumty. Suitable stair case , platforms etc shall be provided to have clear
access to different units. The 2 nos. Alum and 2nos. lime tanks shall be provided & lined
internally with acid resistance tiles. Floor and walls of chemical house shall be lined with
acid resistant tiles. One no. 10Cum capacity PAC storage tanks with dosing pumps 2
Nos.(1w+1s) with metering unit integrated to PLC for local and remote operation to
regulate automatically the dosing of chemicals according to quantity and quality of raw
water. The floor and dados shall be provided with chemical resistance tiles. The dosing
pumps are linked with PLC for remote operation (change of flow and raw water quality) at
the outlet valve of the solution preparation tank, the inlet and discharge of the dosing
pumps are to be electrically actuated and there should be a level measuring system to
measure the level in the tank.
16.7 Clear Water Reservoir (CWR) and Clear Water Pump House (CWPH)
General Description
CWR and CWPH shall be constructed within proposed WTP premises. It shall be noted
that CWPH of the proposed WTP shall also accommodate the pumps for feeding ESR of
Zone-3. The CWPH to be constructed at existing WTP shall also accommodate the pumps
for feeding ESR of Zone-1. Contractor shall fit the layout within available land. Sufficient
space shall be left for future reservoir.
151
Works to be performed
The scope includes Design, Construction, Supply, Installation, Testing, Commissioning
and five years defect liability period of all Civil, Mechanical, Electrical and
Instrumentation Works for the CWR and CWPH, which include the following as per
detailed specification.
a. Supply of all materials and construction of RCC flat slab CWR of minimum capacity 2000
cum, It should have two equal compartments with common pump suction pit which shall
be connected to CWR compartments. Adequate natural ventilation should be provided on
the top slab of the CWR. RCC stairs for access to each CWR compartment with covered
mumty shall be provided. Drain valve, overflow arrangement including piping shall also
be provided as per detailed specifications.
b. Supply and installation of steel doors for the mumty of stairs.
c. Supply and installation of double flanged cast iron sluice valve as per IS: 14846 PN 1.6
with extended spindle (up to the top slab of the common pump suction pit) for isolation of
CWR compartments for cleaning and maintenance without disturbing the water supply.
d. Connection of Pump suction pipes with common suction pit.
e. Supply of all materials and construction of RCC framed structure CWPH as per detailed
specifications. Minimum covered area of the CWPH shall be 60 sqm. The level of pump
house floor shall be so adjusted that pumps should have positive suction.
f. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.2 with suitable motor for pumping water to zonal UGRs of zone-2,4 & 5 of make
mentioned in Clause 2.17, Schedule-D of the document, including MS base plate,
coupling, air cooled A.T.S. Control Panel & Motor Controlled Centre (3 phase A.C. power
supply 50Hz) etc. as per detailed specifications.
Table 1.2: Details of pumps at Clear Water Pump House at proposed WTP
Type of Pump
Hours of Capacity Head of
No. of
No. of
Total
Pumping of Each
Each
Working Standbye No. of
Pump
Pump
Pump
Pump
Pumps
Horizontal Split casing 20 hours 88 LPS 49 Mtr
02
01
03
Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
g. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.3 with suitable motor for pumping water to ESR of Zone-3, of make mentioned in
Clause 2.17, Schedule-D of the document, including MS base plate, coupling, etc. as per
detailed specifications.
152
Table 1.3: Details of pumps at Clear Water Pump House at proposed WTP
Type of Pump
Hours of Capacity Head of
No. of
No. of
Total
Pumping of Each
Each
Working Stand bye No. of
Pump
Pump
Pump
Pump
Pumps
Horizontal Split casing 20 hours 38 LPS 28 Mtr
01
01
02
Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
h. Suitable Motor control panel, capacitor bank, VFD with bypass arrangement & APFC
panel including EMS, all other accessories including PLC panel with SCADA, HMI for
local and remote operation along with the required size of incoming & out going cables
with a spare one shall be installed. All grade switchgear should be AC3 type and all are
intelligent type, Control voltage for 0.415KV switch gear shall be AC of 220V. The EMS
with licensed soft ware is to be tagged to available PHEO server at NIC, Bhubaneswar.
i. Supply & installation of Pressure gauges of make mentioned in Clause 2.17, Schedule-D
of the document, one each on the suction and delivery sides of the pumps and one on the
common header with two-way stop cork.
j. Supply, erection and testing of Electromagnetic type Flow meter / Bulk water meter at the
common header of the pumps.
k. Supply & fixing of pipes (suction and delivery and common header, etc.), valves (Sluice
valve, non-return valve etc.), dismantling joints, of make mentioned in Clause 2.17,
Schedule-D of the document , pipe support, thrust block as per detailed specifications.
l. Supply and installation of water hammer / surge protection device as required.
m. Supply & fixing of 3.0 MT electrically operated travelling crane with gantry girder, etc.
for lifting pumps, including painting of all equipment and steel sections as per detailed
specification.
n. Supply of all material and construction of intake and pump house, including finishing
work, flooring, internal and external plastering, roof treatment, fixing of doors, windows,
ventilators, rain water pipes and all fixtures as per the detailed specifications.
o. Supply, installation, testing and commissioning of external and internal lighting, push
buttons, power and control cables, earthing, etc. to complete the system in totality.
p. Supply of all material and painting of exposed outer surfaces of pump house with two
coats of weather coat paint including application of putties, primer, etc. to obtain smooth
surface.
q. Supply of all material and painting of inside of pump house building, inside two coats of
oil bound distemper, including application of putties, primer, etc. to obtain smooth surface.
Doors and windows shall be painted with enamel paint after one coat of primer.
153
r. Supply, erection and painting of structural steel pipe supports, pipes, and other equipment
as per detailed specification.
s. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.4 with suitable motor for pumping water from CWR of existing WTP to UGR of
Zone-6, of make mentioned in Clause 2.17, Schedule-D of the document, including MS
base plate, coupling, air cooled A.T.S. Control Panel & Motor Controlled Centre (3 phase
A.C. power supply 50Hz) etc. as per detailed specifications.
Table 1.4: Details of pumps at Clear Water Pump House at existing WTP
Type of Pump
Hours of Capacity Head of
No. of
No. of
Total
Pumping of Each
Each
Working Standbye No. of
Pump
Pump
Pump
Pump
Pumps
Horizontal Split
20 hours 43 LPS 30 Mtr
02
01
03
casing Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
t. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.5 with suitable motor for pumping water from CWR of existing WTP to ESR of
Zone-1, of make mentioned in Clause 2.17, Schedule-D of the document, including MS
base plate, coupling, air cooled A.T.S. Control Panel & Motor Controlled Centre (3 phase
A.C. power supply 50Hz) etc. as per detailed specifications.
Table 1.5: Details of pumps at Clear Water Pump House at existing WTP
Type of Pump
Hours of Capacity Head of
No. of
No. of
Total
of Each
Pumping
Each
Working Standbye No. of
Pump
Pump
Pump
Pump
Pumps
Horizontal Split
20 hours 19 LPS 36 Mtr
01
01
02
casing Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
u. Suitable Motor control panel, capacitor bank, VFD with bypass arrangement & APFC
panel including EMS, all other accessories including PLC panel with SCADA, HMI for
local and remote operation along with the required size of incoming & out going cables
with a spare one shall be installed. All grade switchgear should be AC3 type and all are
intelligent type, Control voltage for 0.415KV switch gear shall be AC of 220V. The EMS
with licensed soft ware is to be tagged to available PHEO server at NIC, Bhubaneswar.
16.8 Clear Water Rising Mains
a. Supply, laying, jointing of DI pipes as per IS 8329 Socket and Spigot joint and ISI
marked rubber gasket conforming to IS 5382 from the water treatment plant to the zonal
Under Ground Reservoirs (UGR) as per the table below and layout drawing provided and
as per detailed specification.
154
b. Supply, laying & jointing Mild Steel Pipes conforming to IS: 3589 Fe410 grade pressure
pipes of required diameter and quantity for nallah and other crossing and special bends, etc.
as per detailed specifications.
1.
2.
4.
5.
350
300
Sl.
No.
3.
6.
7.
existing UGR)
NH-5 (in front of existing UGR) to
Takatpur Chock
NH-5 to Existing UGR Dargadahi
Takatpur Chock to MPC (auto)
College
Takatpur Chock to station Bazar ESR
Dargadahi Chock to little flower ITI
350
200
150
Total:
333
16
1712
2611
9613
90
137
505
90
1747
6
92
c. Supply and laying of ISI marked Ductile iron fittings (Tee, tail piece, bend etc.) of
required sizes conforming to IS: 9523 with latest amendment as per site requirement & as
per instruction of Engineer-in-Charge.
d. Supply and erection of ISI marked double flanged cast iron sluice valves, scour valve as
per IS: 14846 PN 1.6 and double acting kinetic air valve as per IS: 14845 PN 1.6. as per
site requirement & as per instruction of Engineer-in-Charge.
Details of Valves in Clear Water Rising Main
Description of Items
Diameter
(in mm)
Double flanged Cast Iron
450
Sluice valves
Double flanged Cast Iron
400
Sluice valves
Double flanged Cast Iron
350
Sluice valves
Double flanged Cast Iron
300
Sluice valves
Double flanged Cast Iron
200
Sluice valves
Double flanged Cast Iron
150
Sluice valves
C.I. double acting kinetic air
80
valve
Total:
Quantity
IS Specification
2 Nos.
1 No.
2 Nos.
2 Nos.
1 No.
1 No.
6 Nos.
15 os.
155
e. Excavation of trenches for laying of pipes and their refilling after completion of work in
all kind of soil, including shoring and shuttering, wherever required as per the alignment
up to the depth to maintain minimum one meter earth cover over crown of the pipe and
fittings, including proper stacking of excavated soil/material and disposal of surplus
material.
f. Making all arrangements for laying of pipes and its stability for crossing of
NH Crossing 2 Nos., PWD Road Crossing 2 Nos. and small culverts/nallah / drain /
road / any other facility and their restoration with minimum disruption including making
any by-pass arrangement and dismantling of all above arrangement after completion and
testing of work. At every crossing over, the pipeline will be supported through a suitable
steel structure as per direction of Engineer-in-Charge.
g. Supply of material and construction of thrust block of required size as per approved
drawing at all bends provided in the pipeline as per site requirement & as per instruction of
Engineer-in-Charge.
h. Supply of material and construction of valve chambers as per approved drawing for all
types of valves as per site requirement & as per instruction of Engineer-in-Charge.
i. All work required for connection of clear water rising main with respective UGRs.
j. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
k. Cutting of road surface for taking of pipeline at required depth will be done with making
good to the damages by mending & repair to existing condition.
l. Testing & commissioning of the clear water rising mains as per relevant IS code.
A. Underground Service Reservoirs (UGRs)
a. All UGRs will be located in the Zonal pump house compound.
b. Site clearance and removal of all trees, debris, above and underground structures etc.
Stacking of dismantled material and disposal of surplus material. Site dressing and
leveling the surrounding ground to the final ground level.
c. Excavation up to the foundation in all kinds of soil, including shoring and shuttering,
wherever required, and stacking of excavated material as per direction of Engineer-inCharge.
d. Design and detailed engineering, Supply of material, Construction, Testing and
Commissioning of R.C.C. M-30 Dome type circular clear water Under Ground Reservoirs,
including all piping arrangements, centering, shuttering, reinforcement etc. as per
approved drawings at locations given in following table and as per the layout drawing
provided.
156
5
6
60 Sqm
45 Sqm
251 Sqm
d. Supply of all material and construction of all building, including finishing work, flooring,
internal and external plastering, whitewashing, roof treatment, rain water pipes, fixing &
painting of doors, windows & fixtures, etc. as per the detailed specification.
e. Supply of all material and painting of inside and outside of building as follows:
(i)
Inside-2 coats of oil bound distemper including application of putties, primer etc.
to obtain smooth surface.
(ii) Outside-2 coats of weather coat paint including application of putties, primer etc.
to obtain smooth surface.
f. Backfilling of foundation with selected excavated earth and disposal of the surplus earth as
per detailed specification.
g. Supply and installation of internal electrification work i.e. lighting, switches, fans and
ventilation system, etc. of make mentioned in schedule of makes.
h. Supply, installation, commissioning & testing of Horizontal split case centrifugal pumps
with suitable motor of make mentioned in schedule of makes, including MS base plate and
coupling, A.T.S Control panel (3 phase A.C. power supply 50Hz) of approved make, for
pump capacity above 15 HP and star delta starter for pump capacity below 15 HP, piping
work at zonal pumping stations as per the table below and as per the instruction of
Engineer-in-Charge.
Zone
No.
2
4
5
6
No. of
Standbye
Pump
01
01
01
01
Total
No. of
Pumps
03
02
03
03
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
i.
Supply, installation, commissioning & testing of Horizontal split casing centrifugal pumps
with suitable motor of make mentioned in schedule of makes, including MS base plate and
coupling (3 phase A.C. power supply 50Hz) of approved make, for pump capacity above
15 HP and star delta starter for pump capacity below 15 HP with capacitor bank for PF
correction. Suitable Motor control panel, capacitor bank, ATS control panel & APFC
panel including EMS, all other accessories including PLC panel with SCADA, HMI for
local and remote operation along with the required size of incoming & out going cables
with a spare one shall be installed. The EMS with licensed soft ware is to be tagged to
158
Capacity of
DG Set (KVA)
100
100
100
100
159
p. Supplying, laying and jointing cable between the transformer and main LT Distribution
Board any of make mentioned in schedule of makes.
q. Supplying, installation, making connection and testing of LT panel board with LMCCB
suitable for 100/150 KVA transformer of make mentioned in schedule of makes.
r. Supply, laying, jointing and testing of cables between the main LT Distribution Board
(main LTDB) and all the required equipment, illumination, ventilation, plug-sockets, etc.
of any of make mentioned in schedule of makes.
s. Supply, laying, jointing and testing of earthing for all installations as per IS: 3043. The
earthing shall cover all the motor, control panel, control post, cable racks, illumination and
ventilation etc. The size of G.I. strips to be used for earthing for different equipment shall
be suitably selected and shall be subjected to the approval of the Engineer-in-Charge and
shall meet the stipulation of the Indian Electricity Rules and Regulations to the satisfaction
of State Government Electricity Inspector.
C. Elevated Service Reservoirs (ESRs)
a. All ESRs will be located in the Zonal pump house compound.
b. Site clearance and removal of all trees, debris, above and underground structures etc.
Stacking of dismantled material and disposal of surplus material. Site dressing and
leveling the surrounding ground to the final ground level.
c. Excavation in foundation in all kinds of soil, including shoring and shuttering wherever
required. Stacking of excavated material and disposal of surplus material.
d. Design and detailed engineering, Supply of material, Construction of R.C.C. M-30 Intze
type staged ESRs with circular column/shaft of various capacities and staging heights
along with stairs and all piping arrangements, including centering, shuttering,
reinforcement and brick work, etc., including its testing and commissioning as per
approved drawing, at locations given in following table and as per the layout drawing
provided.
Table 1.11: Details of Elevated Service Reservoirs
ESR
Zones
Location
capacity
(KL)
1
Near Existing WTP
350
2
Near Dargadahi Golai, Near Existing GSR
1,700
3
Proposed WTP
600
Near St. Marys Convent School,
4
200
Raghunathpur
5
Inside MPC Autonomous College
800
6
At station Bazar, Near Existing ESR
1,050
Stage
height
(m)
23.0
18.5
15.0
20.0
24.5
23.0
160
e. Backfilling of foundation with selected excavated earth and disposal of the surplus earth as
per detailed specification.
f. Supplying, laying, jointing and fixing of DI-K7 double flanged pipes (inlet, outlet,
overflow and scour, etc.), specials and valves of required size including embedding puddle
collar in RCC floor of the reservoir, wherever necessary, excavation of trench for laying of
pipe line, construction of valve chamber, testing and commissioning of pipe line. The
overflow and scour pipeline is to be extended up to nearest drain.
g. Supply, erection and testing of Mechanical Float type water level indicator to indicate the
water level in the ESR and Bulk water meter/Flow meter (Electromagnetic type) at the
outlet of ESR.
h. Manholes with CI cover, stainless steel access ladder for inside of tank and another fixed
type MS ladder on outside wall of tank and railing, etc. as per approved drawing.
i. Construction of required number and size of valve chambers as per approved drawing.
j. Supply and fixing of one number lightening arrester on top of dome of Elevated Service
Reservoir as per relevant IS code.
k. Supply of all material and painting of exposed surfaces of ESRs with two coats of weather
coat paint, including application of putties, primer, etc. to obtain smooth surface.
D. Boundary wall with MS Gate at Zonal Pump House Compound
a. Excavation in foundation in all kinds of soil including shoring and shuttering wherever
required. Stacking of excavated material and disposal of surplus material.
b. Supply and construction of 230mm thick brick masonry Boundary wall of 1.5 m height
above plinth of boundary wall with 25 thick cement concrete coping and pillars at 2.5m
interval around the Zonal pump house compound as per approved drawing at locations
given in table below.
Table 1.12: Details of Boundary wall
Zone
Location
2 Near Dargadahi Golai
4 Near St. Marys Convent School, Raghunathpur
5 Inside MPC Autonomous College
TOTAL
Length
200 Mtr
180 Mtr
180 Mtr
560 Mtr
c. Supply erection of MS Gate for all locations as per the detailed specification and fixing it
to the RCC column.
d. Supply of all material and construction of open drainage system for the zonal pump house
compound with brick masonry and its connection with nearest drain as per approved
drawing.
161
e. Supply of material and Construction of 1.5m wide PCC walkway to connect ESR, UGR
and pump house as per approved drawing.
f. Backfilling of foundation with selected excavated earth and disposal of the surplus earth as
per detailed specification.
g. Landscaping of the zonal pump house compound as per the detailed specification.
h. Supply of one number wall mounted board with flow sheet including details of pumps,
motors in attractive colors for mounting on the wall at appropriate height as per aesthetic
requirement of the Pump house building.
i. Supply of fluorescent Glow Sign Board captioned Baripada Waterworks in attractive
colours with all fittings etc. of appropriate size and fixing it at appropriate height at the
entrance gate.
E. Distribution Network
a. Supplying, Laying & Jointing of ISI marked centrifugally cast (spun) ductile iron class K7 conforming to IS: 8329 S/S pressure pipes and ISI marked rubber gasket conforming to
IS: 5382 of required diameter and quantity as tabulated below.
Table 1.13: Details of Distribution Network
Diameter (in MM)
Approximate length of Pipe (in Mtr)
Ductile Iron (K-7)
M.S.
1
100
74762
3935
2
150
19134
1007
3
200
12932
681
4
250
5541
292
5
300
2,489
131
6
350
1403
74
7
400
76
4
8
450
83
4
9
500
91
5
TOTAL
LENGTH
116511
6133
Sl. No.
b. Supplying, Laying & Jointing of Mild Steel Pipes conforming to IS: 3589 Fe 410 grade
pressure pipes of required diameter and quantity for nallah crossing, special bends and
fittings, etc.
c. Supplying, Laying & Jointing of ISI marked cast iron sluice valves, scour valve of as per
IS: 14846 PN 1.6 and double acting kinetic air valve conforming to IS: 14845 PN 1.6.
Details of Sluice Valves/Scour Valves/Air valves in Distribution Mains
Description of Items
Diameter Quantity IS Specification
(in mm)
Double flanged Cast Iron Sluice valves
500
1 No.
IS: 14846 PN 1.6
Double flanged Cast Iron Sluice valves
450
1 No.
IS: 14846 PN 1.6
Double flanged Cast Iron Sluice valves
400
1 No.
IS: 14846 PN 1.6
162
350
300
250
200
150
100
100
4 Nos.
7 Nos.
15 Nos.
40 Nos.
60 Nos.
240 Nos.
40 Nos.
40 mm
Total
20 Nos.
429 Nos.
d. Supplying, laying and jointing of ISI marked Ductile iron fittings (TEE, tail piece, bend
etc.) of required sizes conforming to IS: 9523.
e. Excavation in trenches in all kind of soil, including shoring and shuttering, wherever
required, as per the alignment up to the depth to maintain minimum one meter earth cover
for laying of pipes and fittings and proper stacking of excavated soil and disposal of the
surplus material.
f. Laying and jointing of pipes of required size as per distribution network drawing and
making all joints water tight.
g. Supplying all materials, labour, T&P and providing connection of delivery pipeline of
ESR with distribution system in all zones
h. Backfilling of excavated trench with selected excavated earth and disposal of the surplus
earth as per detailed specification.
i. Fixing of ISI marked Cast iron sluice valves, scour valve and double acting kinetic air
valve.
j. Construction of Valve chambers as per required size as per approved drawing.
k.
Making all arrangements for laying of pipes and its stability for crossing of
Rail Way Crossing 7 Nos., NH Crossing 2 Nos., PWD Road 1 No. and small
culverts/nallah / drain / road / any other facility and their restoration with minimum
disruption including making any by-pass arrangement and dismantling of all above
arrangement after completion and testing of work. At every crossing over, the pipeline will
be supported through a suitable steel structure as per direction of Engineer-in-Charge.
l. Wherever there is inter-connection of new pipe with existing pipe shown in the network
drawing provided, contractor will provide all T &P for making interconnection of new
pipe with the existing one and vice-versa.
m. Wherever there is bend encountered along the alignment, the contractor shall make thrust
block of required size and as approved by Engineer-in-Charge.
n. Connection of distribution network with the Elevated Service Reservoir.
163
o. Testing and commissioning of the network with contractors liability to ensure minimum
terminal head at all consumer end up to end of defect liability period.
p. Reinstatement of roads after laying of pipes shall be done as per original specification and
satisfaction of Engineer in charge.
q. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
r. Cutting of road surface for taking of pipeline at required depth will be done with making
good to the damages by mending & repair to existing condition.
F. House Service Connection
Providing house service connection of 100 Nos.including earth work excavation, cutting
and restoration of road, jointing ferule, laying of pipe, construction of meter chamber, fixing
of 20 mm multi jet water meter confirming to IS:779 (1994)/ Class-B ISO 4064 and full
way valve all complete including cost of all material, labour T&P, etc all complete.
G.
Any item or any provision/requirement if not included in this section, but is necessary to
be provided for the completion of the project and for its functional necessity, the same
shall be provided by the contractor. No extra payment shall be admissible on this account.
1.
The intent of this Section is to specify the work items to be covered on EPC Contract
Basis in conformity with the technical specifications as enumerated in the subsequent
clauses for the work Water Supply to Greater Sambalpur including Fringe Area.
The existing 1000 mm dia PSC/MS Raw Water Gravity Main laid from the left sluice of
Hirakud Dam to the 40 MLD Water Treatment Plant at Bareipali requires to be replaced at
critical and vulnerable zones where the leakages and breakages are high with 1016 mm
outer dia M.S. pipe with wall thickness 10 mm having food grade epoxy painting to in side
surface and out coating with aromatic Polyurethane for 1800 mtr.
A new 4.0 MLD Water Treatment Plant is to be constructed at Ainthapali (to meet the
demand for mid design year i.e. 2030), which along with the existing 40 MLD Water
Treatment Plant at Bareipali and 11.20 MLD Water Treatment Plant at Modipada would
be able to satisfy the mid design year demand of the Sambalpur town and the fringe area.
Since the ground level at Ainthapali does not permit to receive water from Hirakud Dam
by gravity, it is proposed to construct a boosting pump house along with a 0.10 ML
capacity GSR within the 40 MLD Water Treatment Plant site at Bareipali. From this
boosting pump house Raw water shall be pumped to the proposed 4.0 MLD Water
Treatment Plant at Ainthapali through a 400 mm dia D.I. K-9 Raw water pumping main.
The treated water from the proposed 4.0 MLD Water Treatment Plant at Ainthapali shall
be supplied to three zones, i.e. Sakhipada, Sunapali, Dhanupali, Kanijuri (Durgapali) and
adjacent fringe areas of Sambalpur Town. Each zone is provided with a combination of
one Under Ground Reservoir (UGR) and/or one Elevated Service Reservoir (ESR),) along
with a Pump House. These will be constructed in one compound having a boundary wall
along with one mild steel gate. Pumps to be installed at zonal pump houses will pump the
water from UGR to ESR and water would be supplied to consumers from the ESRs by
164
16.5
16.5.1
16.5.2
16.5.3
16.5.4
16.5.5
16.5.6
shall be deemed to be included within the scope of this specifications and shall be
provided by the bidder without any additional cost.
16.5.7 All material / equipment which have been mentioned and have not been specifically
mentioned in the scope / specifications but are necessary for operation and guaranteed
performance of the entire water supply scheme shall be any of the make mentioned in
Clause 2.17, Schedule-D. Contractor shall have to obtain written approval of make of any
item from Engineer-in-Charge before supply.
16.5.8 The scope of work also include shifting of electrical/ telephone/ any other type of cable,
electric poles, water, sewer or any other type of pipeline or any other facility. Any
arrangement for crossing roads, drains, nallah including bypass arrangement and their
restoration to the satisfaction of Engineer-in-Charge after completion of particular work
also included in the Scope of work.
16.6 Services to be Provided by the Contractor
16.6.1 The contactor shall open a fully furnished site office with all necessary facilities having
office equipment such as computer, printer, etc. A separate room shall be provided to the
Engineer-in-Charge or its representative.
16.6.2 The Contractor will make necessary arrangement for construction power and construction
water.
16.6.3 The Contractor shall make necessary arrangement for all the testing and inspection to be
conducted in a manner as specified in the specifications and as per codes.
16.6.4 Transportation of all equipment / raw material / spares from manufacturers work to the
project site, inclusive of all intermediate handling and unloading / storage at site and all
taxes, octroi, etc.
16.6.5 Supply, erection as per manufacturers recommendations / specifications, inspection,
testing, start up and running of the equipment during trial run / performance guarantee
period at rated capacity and speed.
16.6.6 Deploying qualified and experienced staff for supervision of all erection and
commissioning services. The Contractor shall also arrange for rectifying the defects during
defect liability period.
16.6.7 During defect liability period of five year the contractor has to replace any equipment,
component, etc. for manufacturing defect, malfunctioning and below rated performance.
He will make good any structure or part of it if found defective or becomes during
functioning.
16.6.8 Application of the final paints and final finishing work shall be done by the Contractor
after complete erection and testing, trial run but before handing over to the department.
16.6.9 The contractor shall also arrange technical experts of equipment from proprietary supplier
as and when necessary till the commissioning, trial run and performance guarantee period
of the equipment.
16.6.10
Any survey/ leveling/ fixation of bench mark/ reference level required for detailed
engineering of the any component of the scheme will be done by survey team deputed by
contractor. The survey team will carry out the area survey and leveling of Intake, WTP,
ESR compounds or wherever required as per the instruction of Engineer-in-Charge.
16.6.11
The detailed scope of work has been mentioned in clause no 16.0 of this chapter.
16.6.12
Nothing extra over the quoted price shall be paid to contractor on account of any
financial implications of all the conditions and specifications. It will be treated that
necessary financial provision are deemed to have been kept in the quoted price. Any
contiguous item or any provision / requirement, if not included in the general specification
and scope of work, special specification and detailed specification but necessary to be
166
provided for the completion of the work and for its functional necessity, shall be provided
at no extra cost above quoted price. The decision of the Engineer-in-Charge in such cases
shall be final and biding on the contractor.
16.6.13
The time is the essence of this contract. The entire work described under Scope of
Work clause 16.0 or elsewhere in the tender (Design, approval of design & drawings,
execution and commissioning) is to be completed within a time frame of 36 (thirty six)
calendar months from the date of issue of work order.
17
Tender Drawings
The Tender drawings shall form the part of tender document. The contractor shall submit
detail design and drawing of all component of the water supply scheme (except hydraulic
design of rising mains and distribution network) for its sufficiency in all respect before
taking up the construction work. The contractor can do addition, modification, alteration or
detailing in the drawings as per the prevailing conditions and he has to take approval from
Engineer-in-Charge. The structural stability throughout its working life lies with the
contractor. The work has to be executed as per the construction drawings (latest revision)
with additions, alterations and modifications made from time to time as required and
approved by the Engineer-in-Charge and also according to any other drawing prepared by
contractor progressively during the execution of the contract.
18
Test for Material/Workmanship
All tests required for all brought out materials as desired by the Engineer-in-Charge shall
be carried out by the contractor as per relevant IS code and at his own cost in the presence
of authorized representative of the Engineer-in-Charge.
19
Specifications
The detailed specifications, IS codes and OPWD specifications are intended for the
general description of the work, quality and workmanship. All work is to be carried out
according to the specifications. Wherever reference to the standard codes of practice etc. is
made, they shall be taken as the latest edition of the same issued within one month before
the date of submission of the Tender.
20
Layout and Levels
The layout and levels of all structures etc. shall be made by the contractor at his own cost
from the general grid of the plot and bench marks given by the Engineer-in-Charge.
Contractor shall provide all help in instruments, materials and men to the Engineer-inCharge at no extra cost for checking the detailed layout and correctness of the layout and
levels. However the Contractor shall be solely responsible for correctness of layout and
levels.
Permanent reference pillars shall be established by the contractor and under no
circumstances shall the contractor remove or disturb any permanent/reference pillar/
benchmark without the approval of the Engineer-in-Charge. The contractor shall carefully
maintain and protect all benchmarks and reference points and shall mark the layout of all
his work by accurate reference to the benchmarks and reference points.
21
Construction Method
The bidder shall submit a pert chart along with this tender showing the time schedule for
the overall constructions activities along with construction methodology. The construction
method and mobilization of resources to be adopted by the contractor shall match with this
time schedule and shall be approved by the Engineer-in-Charge. After approval of tender
the contractor will submit his detailed schedule of work.
22
Quality Assurance Plan
A Quality Assurance plan giving details of necessary tests to be carried out on various
167
23
24
25
26
26.1
26.2
27
materials for construction of work shall be submitted by the contractor for approval before
start of the work. The Contractor shall be responsible for carrying out such tests. The
contractor shall test the samples of all materials in presence of authorized representative of
the Engineer-in-Charge at the specified frequencies as per relevant IS codes or elsewhere
given in the tender document and keep proper record of all tests.
Testing of Materials
All arrangement shall be made by the contractor to provide testing requirement as
specified in the specifications. For the tests for which, equipments required is not available
with the contractor shall provide the same or will arrange the test to be done at a
Government approved laboratory. No extra claim is admissible in this regard.
Approach Roads
The Contractor where required shall make his own arrangement for approach to the work
site (including, burrow and disposal area) and for movement of men, machinery, other
equipment etc. required for carrying out the work included under this contract. The
contractor will also arrange for any land required for burrowing earth or disposal of any
dispensable material.
Dealing with Water / Dewatering,
Bailing and Pumping out of subsoil water may have to be carried out during execution of
work. The contractors program and methods must be capable of dealing with rainfall /
subsoil water. The contractor shall supply, install and operate his own temporary pumping
equipments wherever required.
Prevention of pollution
Arrangement shall be made by the contractor to prevent Air Pollution and pollution in any
stream, nallah or rivers. Arrangements for sprinkling of water in the construction and
burrow area to prevent any dust blowing also shall be done by the contractor. The
contractor shall be solely responsible and liable for all damage caused by any pollution
that may take place during the execution of the works, and he shall make arrangements as
the Engineer-in-Charge may approve, for preventing pollution.
No separate payment shall be made for the pollution control measures.
Safety Measures
In respect of all labour directly or indirectly employed in the work for the performance of
the contractors part of this agreement, the contractor shall at his own expense arrange for
the safety provision as per IS code framed from time to time and shall at his own expense
provide for all facilities in connection therewith. In case the contractor fails to make the
above arrangement Engineer-in-charge shall be at liberty to make arrangements and
provide facilities as aforesaid and recover the cost incurred on his behalf from the
contractor.
The contractor shall ensure the safety of men, material, machinery, existing structure and
any other facilities. Since the work is to be done on road/lanes/by lanes, all necessary
safety arrangements including proper barricading and lighting etc. shall be done by the
contractor.
The Contractor shall be absolutely and solely responsible for any accident that may occur
during the progress of the work and for injury or damage to the men, material, machinery,
existing structure and any other facilities of any description whatsoever which may be
caused by or result from the execution of work. The Contractor shall make good any
damage due to accident or pay any claim arising out of accident and will indemnify the
employer of expenses on account thereof. No separate payment shall be made for safety
measures.
168
28
29
29.1
29.2
29.3
29.4
29.5
29.6
29.7
30
30.1
requirement, the statutory and functional requirement and providing enough space and
access for operation, use and maintenance. The bidders work shall cover the complete
requirement as per tender specification.
30.2 The Geo-technical investigation at Water Treatment Plant, Elevated Service Reservoirs,
Underground Reservoirs & other RCC structures locations shall be carried out by the
contractor for structural design of civil structures proposed in the compound or as
required.
30.3 Preparation of work areas, clearing site, jungle clearance etc. in the entire area including
dismantling and removing of any existing above ground and underground structures
including existing roads, uprooting of all the trees, debris and vegetation and their
disposal, shifting of pipes, cables, electrical poles etc. The dismantled and removed
material shall be stacked/ disposed as per direction of Engineer in Charge. The bidders
should visit the site prior to submission of bid and make himself conversant with the site
conditions to estimate the dismantling/removing work.
Shifting of electrical or any other type of cables ,electric poles, water, sewer, gas or any
other type of pipeline or any other facility, their restoration to the satisfaction of Engineerin-Charge after completion of work.
16.4.1 Raw Water Gravity Main
The existing 1000 mm dia PSC/MS Raw Water Gravity Main laid from the left sluice of
Hirakud Dam to the 40 MLD Water Treatment Plant at Bareipali are to be replaced at
critical and vulnerable zones where the leakages and breakages are high with 1016 mm
outer dia M.S. ERW/SAW pipe with wall thickness 10 mm having cement mortar in-lining
and cement mortar out coating for 1800 mtr. The work includes
(i)
Supplying of TATA / SAIL make 1000mm Dia M.S. ERW / SAW pressure pipe
conforming to IS 3589Fe 410 grade having wall thickness not less than 10mm
with cement mortar in lining and cement mortar out coating for 1800 mtr.
(ii)
Excavating of trenches in proper alignment in all kind of soils, including shoring
and shuttering, wherever required up to the depth to maintain minimum one meter
earth cover over crown of the pipe for laying of pipes and fittings, including proper
stacking of excavated soil / material, backfilling and disposal of surplus material.
(iii)
Dismantling the existing 1000 mm dia PSC/MS Raw Water Gravity Main at
critical and vulnerable zones where the leakages and breakages are high, fishing
out the same from trenches and transporting & stacking the pipe in the
departmental store for re-use.
(iv)
Laying of 1000 mm Dia M.S. ERW / SAW pressure pipe and 1000 mm dia M.S.
Specials in proper alignment in the trenches and jointing the same by 3 round of
butt-welding with necessary interconnection with the existing PSC / M.S pipe line
as per instruction of the Engineer-in-Charge.
(v)
Supplying & fixing 5 nos of ISI marked double acting kinetic air valve as per IS:
14845 PN 1.6. as per site requirement & as per instruction of the Engineer-inCharge.
(vi)
Constructing thrust blocks of required size as per approved drawing at all bends
and other necessary locations in the pipeline.
(vii) Constructing of valve chambers as per approved drawing for all types of valves as
per site requirement & as per instruction of Engineer-in-Charge.
(viii) Backfilling shall be done in layers of 150mm thickness and shall be watered and
compacted as per specification.
170
16.8.2 Raw Water Sump & Raw water Boosting Pump House
The Raw Water Sump (0.1 ML Capacity) & Raw water Boosting Pump House with
sunken floor for complete positive suction of clear internal size of 6.0M X 4.0 M shall be
constructed within the existing 40 MLD WTP premises at Bareipali. The proposed pump
house shall accommodate the pump sets required to pump the raw water to the proposed 4
MLD WTP at Ainthapali.
Works to be performed:The scope includes Design, Construction, Supply, Installation, Testing, Commissioning
and five years defect liability period of all Civil, Mechanical, Electrical and
Instrumentation Works of the Raw Water Sump & Raw water Boosting Pump House,
which include the following as per detailed specification.
v. Supply of all materials and construction of RCC Raw Water Storage Reservoir having flat
roof slab of 0.10ML capacity. It should have a suction pit to enable the pumps to empty
the reservoir to the dead storage level and a sludge pit to de-sludge. Adequate natural
ventilation should be provided on the top slab of the Reservoir. Stainless Steel ladders to
access to the roof from GL and from roof to the bed of the Reservoir shall be provided.
Piping for Inlet, Suction, Overflow arrangement including valves shall be provided as per
detailed specifications.
w. Supply of all materials, labour, T&P etc for laying of 400mm dia M.S pipe of 6.3mm wall
thickness feeder line (Approx. 90 mtrs) for interconnecting the 1000 mm dia Raw Water
Gravity main with the proposed Raw Water Storage Reservoir at Bareipali, which shall be
the Inlet of the Reservoir, including all ancillary works such as earth work excavation,
fitting fixing of Air valve, all specials and fabricating items etc.
x. Supply of all materials, labour, T&P etc for fixing and fitting of 400 mm dia MS. Inlet
pipe with a 400 mm dia PN 1.6 Sluice Valve and 400mm dia DI K-7 pipe for 15 mtrs as
Over flow pipe of the reservoir. An ultra-sonic level indicator shall be provided to the
reservoir.
y. Supply of all materials and construction of RCC framed structure Raw Water Pump House
(RWPH) as per detailed specifications. There will be two nos. M.S. Doors (M.S. frame
with cold rolled M.S. sheet shutter) of size 1.5M x 2.25M, one no. Door of size
2.5Mx3.0M with M.S. Rolling Shutter and 2nos. Windows of size 1.5M x 1.25M with
M.S. frame with M.S. grill (having Sliding type of Aluminium frame and black glass panel
shutter).
z. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.1 with suitable motor for pumping water to the proposed 4 MLD WTP at
Ainthapali, of make mentioned in Clause 2.17, Schedule-D of the document, including MS
base plate, coupling, etc. as per detailed specifications.
Table 1.1: Details of pumps at Raw Water Pump House at Bareipali WTP
Type of Hours of Capacity of Head of
No. of
No. of Total No. of
Pumping
Pump
Each
Each
Working Stand bye
Pumps
Pump
Pump
Pump
Pump
Horizontal 22 hours 51 LPS
41 Mtr
01
01
02
Split casing
Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
aa. Suitable Motor control panel, capacitor bank, VFD with bypass arrangement & APFC
171
panel including EMS, all other accessories including PLC panel with SCADA, HMI for
local and remote operation along with the required size of incoming & out going cables
with a spare one shall be installed. All grade switchgear should be AC3 type and all are
intelligent type, Control voltage for 0.415KV switch gear shall be AC of 220V. The EMS
with licensed soft ware is to be tagged to available PHEO server at NIC, Bhubaneswar.
bb. Supply, installation, testing and commissioning with suitable motor including MS base
plate & coupling , (3 phase A.C. power supply 50 Hz), push buttons, power and control
cables etc. to complete the system in totality for pump house as per detailed specification.
cc. Supply, installation, testing and commissioning of 11/0.4 KV sub-station, with indoor
sub-station, comprising of 100KVA transformer-2 No., 2 pole structure with D.P.
structure, AB switch, HG Fuse, outdoor distribution panel, lightening arrester, required
nos of earthing, transformer panel with Circuit Breakers with 100KVA industrial grade
DG set including AMF pannel to complete the system in totality
dd. Execution of Electrical works should be conforming to specifications as per Electricity
rules, Electricity Act-2003 and OERC guide lines 2004.
ee. The required amount of supervision charges, security deposit, service connection charges
& scrutiny fee, etc., for external & internal power supply is to be deposited by the bidder
with the concerned electrical authority/distribution company.
ff.
gg. Supply & installation of Pressure gauges of make mentioned in Clause 2.17, Schedule-D
of the document, one each on the suction and delivery sides of the pumps and one on the
common header with two-way stop cock.
hh. Supply, erection and testing of 400 mm bore Electromagnetic type Flow meter at the
common header of the pumps.
ii. Supply & fixing of pipes (suction and delivery and common header, etc.), electrically
operated valve actuators (Sluice valve, non-return valve etc.), dismantling joints, of make
mentioned in Clause 2.17, Schedule-D of the document , pipe support, thrust block as per
detailed specifications.
jj. Supply and installation of water hammer / surge protection device as required.
kk. Supply of all material and construction of pump house, including finishing work, in situ
concrete flooring, internal and external plastering, roof treatment, fixing of doors,
windows, ventilators, rain water pipes and all fixtures as per the detailed specifications.
ll. Supply, installation, testing and commissioning of external power supply from the existing
substation through required size of power cable and internal electrification, lighting, push
buttons, power and control cables, earthing, etc. to complete the system in totality.
mm.
Supply of all material and painting of exposed outer surfaces of pump house with
two coats of weather coat paint including application of putties, primer, etc. to obtain
smooth surface.
nn. Supply of all material and painting of inside of pump house building, inside two coats of
oil bound distemper, including application of putties, primer, etc. to obtain smooth surface.
Doors and windows shall be painted with enamel paint after one coat of primer.
oo. Supply, erection and painting of structural steel pipe supports, pipes, and other equipment
as per detailed specification.
172
xix.
xx.
xxi.
Sl
No.
Location
Dia of pipe
(in mm)
01
Bareipali to Ainthapali
400
The raw water rising main shall be extended up to cascade aerator in the proposed WTP
from junction near WTP. The diameter of this portion of rising main will be 400 mm and
the length will be approx. 30m.
Supply & laying of ISI marked Ductile Iron fittings (Tee, tail piece, bend etc.) of required
sizes conforming to IS: 9523 with latest amendment.
Supply, laying & jointing Mild Steel Pipes conforming to IS: 3589 Fe 410 grade pressure
pipes of required diameter and quantity for nallah and other crossing and special bends,
etc. as per detailed specifications.
Supply & erection of ISI marked double flanged Cast Iron sluice valves/actuators, scour
valves as per IS: 14486 PN 1.6 and double acting kinetic air valve as per IS: 14845 PN 1.6.
as per site requirement & as per instruction of Engineer-in-Charge Minimum size of scour
valve shall be 100 mm. Minimum size of air valves shall be 100 mm.
173
xxxi.
Contractor shall design and fit all the works required for ultimate capacity in the available
land accordingly.
The Water Treatment Plant is to be designed based on conventional treatment technology
consisting of Clari-flocculator and Rapid sand Gravity filters. The contractor shall
essentially follow the CPHEEO Manual, which is a guideline for the system design.
However following the same concept does not relieve the bidder of his guaranteeing the
performance of the plant including treated water quality.
The proposed WTP of 4 MLD capacity shall consist of the following units:
20. Cascade Aerator
21. Raw Water Channel (No. of Unit-1, Overload-50%, Electromagnetic flow meter- 2
MLD to 6 MLD, Leading channel to Rapid Mixer-1 nos)
22. HBCF
23. Settling Tank -2 nos.
24. Rapid Gravity Filter as per requirement.
25. A separately located over head Back Wash Over Head Tank of suitable capacity with
loading pumping unit and Air blower as per design requirement.
26. Chemical House (2 floors) (Approx. Floor area of each floor 30 sqm)
27. Chlorine House- (Approx. Floor area -30 Sqm)
28. Chlorination system (Gas Chlorinator - 01 unit )
29. Clear Water reservoir-2.25 ML Capacity-01 No.
30. Office cum Lab Buildings (Approx 80 sqm floor area.).
31. Waste water recycling/ sludge disposal system as per requirement.
32. Filter house Annex building (Floor area as per requirement.)
33. Guard room(Approx floor area 10 sqm)
34. Pump house (Approx floor area 24 sqm)
35. All inter-connecting piping, sluice gates, valves and appurtenant work
36. Yard & Street Lighting.
37. Glow sign board, Name Plate, Floor diagram etc.
38. Allied Structures
h. Compound Wall- 1400 m (including the length of the compound wall for 4 zonal
pump houses) with 2 nos of M.S. Gates for each location (i.e. WTP & Zonal Pump
Houses )
i. Construction of 4.0m wide BT road- 370 m. (The length of road includes approach
roads to WTP & internal roads and all the 4 Zonal pump houses )
j. 1.5 m wide CC walkway (Pathway) -110 m (The length of path way includes
inside WTP campus and all the 4 Zonal pump houses)
k. Storm water drains approximately 550mtr.
l. Site Development as per requirement.
m. Staff Qrs -(2 nos approx floor area -110 Sqm)
20 Instrumentation
i) 300 mm dia full bore type Electromagnetic Flow meter at the outlet of the clear
water pump sets.
ii) Lab equipment
iii) PLC console panel for filter house and Automation.
Works to be performed:The scope of work includes, but is not limited to design, detailed engineering, supply of
material, construction, installation, testing & commissioning, and five year of defect
liability period for all Civil, Mechanical, Electrical and Instrumentation Works for the
175
xxxii.
xxxiii.
xxxiv.
xxxv.
xxxvi.
xxxvii.
xxxviii.
xxxix.
WTP and all associated works including centering, shuttering, reinforcement, all piping
arrangements, etc. as per detailed specifications.
Conducting necessary investigations e.g. topographical survey, geotechnical survey,
leveling etc., preparation of contour maps where ever necessary.
Preparation of work area, clearing site, jungle clearance, etc., including dismantling and
removing of any existing above ground and underground structures including existing
roads, uprooting of all trees and vegetation and their disposal, shifting of pipes, cables,
electrical poles, etc. and site dressing, leveling of the surrounding ground to final ground
level, stacking and disposal of surplus material.
Construction of Chemical House (2 floors): It shall be two storied RCC framed structure
with doors, widows, ventilators etc. having minimum floor area of 60 sqm per floor.
Chemical storage area shall be provided at ground floor. Chemical tanks, dosing system
shall be accommodated at first floor. The chemical tanks shall be designed for 4 MLD
WTP. Water tank of required capacity shall be provided on the roof of the first floor. The
RCC stairs shall be up to roof of the first floor and shall be provided with mumty. The
construction of the building shall be as per detailed specification.
Construction of Clear Water Pump House: It is a single storied building with sunken base
for complete positive suction arrangement having 24 sqm minimum floor area. It shall be
RCC framed structure with doors, widows, ventilators etc with same provisions as outlined
for Raw Water Pump House in 16.4.2 above.
Construction of Chlorine house: The Chlorine house shall be RCC framed structure having
minimum floor area 35sqm. It shall be planned to accommodate chlorine gas tonner
storage, dosing system with adequate safety measures for the WTP. Aluminium ladder
shall be provided to access to the roof of the building. Proper ventilation shall be provided
as per specification in the chlorine house. It is to be furnished with gas chlorination unit
with two nos. of toners of 0.9 MT capacity each.3MT capacity EOT crane with gantry
girder for lifting of chlorine tonner is to be provided.
The Filter House Annex building shall be RCC framed structure having floor area as per
requirement & will be provided with an attached toilet of minimum internal size of
4.0Mx3.0M with all sanitary fittings including one EWC , one IWC with two standing
urinals and one wash hand basin. The toilet shall be provided with floor tiles and wall tiles
of best quality as per sample approved by Engineer-in-charge.
Construction of Office-cum-Laboratory Building: It is a single-storied building having
minimum floor area of 80.00 sqm. It shall be RCC framed structure with doors, widows,
ventilators etc. It shall consist of office space, laboratory room and two toilets. Potable
water tank shall be provided on the roof. All sanitary fittings shall be installed in the
toilets. RCC stairs along with mumty shall be provided to access the roof of the building.
The construction of the building shall be as per the detailed specification. The laboratory
building should be furnished with all necessary equipments and chemicals /re-agents and
furnitures for water testing purpose as per CPHEEO Manual comprising mainly P H meter
turbidity analyzer, chlorimeter, Jar test apparatus etc. as per direction of Engineer-incharge. The entire building including toilets shall be provided on the floor and dado as
well as on the walls of the toilets with tiles of best quality as per sample approved by
Engineer-in-charge.
Design, supply of material, construction of Paved Parking area for staff vehicles.
Sufficient area for parking shall be provided for staff vehicles/departmental vehicles.
176
xl.
xli.
xlii.
xliii.
xliv.
xlv.
xlvi.
xlvii.
xlviii.
xlix.
l.
li.
lii.
liii.
Safety equipment such as portable fire extinguisher of all types of adequate size and
numbers including other safety equipments as required shall be provided in the Officecum-laboratory Building, Chlorine House and Chemical house.
Excavation up to the foundation in all kinds of soil including shoring and shuttering,
wherever required, stacking of excavated material for all the units of the WTP.
Backfilling of the foundations with selected excavated earth. Backfilling shall be done in
layers of 150mm thickness and shall be watered and compacted as per detailed
specifications.
Supply of all material and finishing of all buildings of WTP, like flooring, internal and
external plastering, painting of 2 coats of weather coat on all exterior surfaces and 2 coats
of oil bound distemper on all interior surfaces, including application of putties, primer, etc.
to obtain smooth surfaces, roof treatment, rain water pipes, fixing & painting of doors and
fixtures and windows, etc. as per the detailed specification.
All other units of WTP shall be painted with 2 coats of weather coat on exterior surface
and 2 coats of epoxy paint on internal surfaces coming in contact with water.
Supply, construction & Erection of 3-phase 3-wired 11 KV power supply HT line of
approximately 300mtr shall be drawn with 150x150x6mm R/S joist- 11mtr. Long pole
along with 100mmsq. AAAC conductor and where ever road crossing, guarding shall be
provided. Each pole should be supported with anti climbing devices and danger boards as
well as individual earthings. Where ever the line passes adjacent to jungle, bushes, over
head insulated conductor to be provided. The each span should be of 50 mtr. having
horizontal configuration.
Supply, installation, testing and commissioning of 11/0.4 KV sub station ,with indoor
sub station , comprising of 100KVA transformer-2 No., 2 pole structure with D.P.
structure, AB switch, HG Fuse, outdoor distribution panel, lightening arrester, required
nos of earthing, transformer panel with Circuit Breakers with 100KVA industrial grade
DG set including AMF pannel to complete the system in totality
Execution of Electrical works should be conforming to specifications as per Electricity
rules, Electricity Act-2003 and OERC guide lines 2004.
The required amount of supervision charges, security deposit, service connection charges
& scrutiny fee, etc., for external & internal power supply is to be deposited by the bidder
with the concerned electrical authority/distribution company.
Supply, installation, testing and commissioning of ATS control panel & Motor Control
Centre (3 phase A.C. power supply 50 Hz), push buttons, power and control cables etc. to
complete the system in totality for pump house and filter house as per detailed
specification.
Supply and installation of internal and external electrification work i.e. lighting, switches,
fans, ventilation system, etc. as per schedule of make and detailed specification.
Supply and construction of 230 mm thick brick masonry Boundary wall of 1.50m height
above finished ground level with 25 mm thick cement concrete coping and pillars at 2.5 m
interval around the WTP campus.
Supply of all material & painting of exposed outer surfaces of pump house with two coats
of weather coat paint including application of putties, primer, etc. to obtain smooth
surface.
Supply and erection of MS Gate at entry as per detailed specification and fixing it to the
RCC columns.
177
liv.
lv.
lvi.
lvii.
lviii.
lix.
lx.
lxi.
lxii.
lxiii.
lxiv.
lxv.
Supply of all materials and construction of wastewater /storm water disposal system to
dispose the wastewater generated from the toilets of Administrative and Laboratory
building.
The WTP shall have adequate arrangement for recycling of waste water to minimize water
loss in treatment plant.
Potable piped drinking water supply arrangement shall be provided within the WTP
compound.
Supply of all material and construction of open drainage system for WTP compound with
brick masonry and its connection with nearest drain as per approved drawing.
Supply of material and construction of 1.5m wide C.C. walkway to connect various units
of WTP as per approved drawing.
Construction of bituminous approach road of required width and length inside the WTP
compound, including supply of material as per detailed specification and joining it to the
nearest road.
Supply and plantation of saplings of different types in a properly designed landscaping.
Supply of fluorescent Glow Sign Board captioned Water Treatment Plant Sambalpur
with details in attractive colors with all fittings, etc. of appropriate size and fixing it at
appropriate height at the entrance gate as per detailed specifications and direction of
Engineer-in-charge..
Guarantee the outlet quality parameters of the treated water for drinking purpose as per IS:
10500 with latest amendments. The Guarantee of the treated water quality is irrespective
of raw water quality. While designing the units of WTP the contractor shall keep this in
mind.
Supply of one number wall mounted board with flow sheet including details of all units,
pumps, motors in attractive colours for mounting on the wall at appropriate height as per
aesthetic requirement of the Administrative building and as per direction of Engineer-incharge.
ON-Line Analyzer:
Continuous on-line analyzer for monitoring of raw water and treated water quality for Ph
& Turbidity (with a range of 0 to 2000 NTU) and Ph, Turbidity (range 0 to 100 NTU) &
residual chlorine respectively. The system is to be tagged to PLC for real time data
monitoring with local and remote operation. There shall be required capacity of battery
back up system for one hour.
The wall of chemical house shall be minimum 25cm thick brick masonry. Chemical
storage area shall be provided at ground floor. Chemical tanks, dosing system shall also be
accommodated at first floor. The RCC stairs shall be up to roof of the first floor and shall
be provided with mumty. Suitable stair case , platforms etc shall be provided to have clear
access to different units. The 2 nos. Alum and 2nos. lime tanks shall be provided & lined
internally with acid resistance tiles. Floor and walls of chemical house shall be lined with
acid resistant tiles. One no. 10Cum capacity PAC storage tanks with dosing pumps 2
Nos.(1w+1s) with metering unit integrated to PLC for local and remote operation to
regulate automatically the dosing of chemicals according to quantity and quality of raw
water. The floor and dados shall be provided with chemical resistance tiles. The dosing
pumps are linked with PLC for remote operation (change of flow and raw water quality) at
the outlet valve of the solution preparation tank, the inlet and discharge of the dosing
pumps are to be electrically actuated and there should be a level measuring system to
measure the level in the tank.
178
16.8.5 Clear Water Reservoir (CWR) and Clear Water Pump House (CWPH)
General Description
CWR and CWPH (As indicated at 16.4.4) shall be constructed within proposed WTP
premises.
Contractor shall fit the layout within available land.
Works to be performed
The scope includes Design, Construction, Supply, Installation, Testing, Commissioning
and five years defect liability period of all Civil, Mechanical, Electrical and
Instrumentation Works for the CWR and CWPH, which include the following as per
detailed specification.
a. Supply of all materials and construction of RCC Clear Water Reservoir having flat roof
slab of 2.25 ML capacity. It should have a suction pit to enable the pumps to empty the
reservoir to the dead storage level and a sludge pit to de-sludge. Adequate natural
ventilation should be provided on the top slab of the Reservoir. Stainless Steel ladders to
access to the roof from GL and from roof to the bed of the Reservoir shall be provided.
Piping for Inlet, Suction, Overflow arrangement including valves shall be provided as per
detailed specifications.
b. Supply of all materials and construction of RCC framed structure Clear Water Pump
House with sunken base for complete positive suction arrangement (CWPH) of internal
size 6.00 m x 4.00 m as per detailed specifications. There will be two nos. M.S. Doors
(M.S. frame with cold rolled M.S. sheet shutter) of size 1.5 M x 2.25 M, one no. Door of
size 2.5 Mx3.0 M with M.S. Rolling Shutter and 2nos. Windows of size 1.5 M x 1.25 M
with M.S. frame with M.S. grill (having Sliding type of Aluminium frame and black glass
panel shutter).
b. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per Table
1.2 with suitable motor for pumping water to zonal GSRs, of make mentioned in Clause
2.17, Schedule-D of the document, including MS base plate, coupling, etc. as per detailed
specifications.
Table 1.2: Details of pumps at Clear Water Pump House at proposed WTP
Type of Pump Hours of Capacity Head of
No. of
No. of
Total No. of
Pumping of Each
Each
Working Stand-bye
Pumps
Pump
Pump
Pump
Pump
Horizontal
12 hours 90 LPS 40 Mtr
01
01
02
Split casing
Centrifugal
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
c. Suitable Motor control panel, capacitor bank, VFD with bypass arrangement & APFC panel
including EMS, all other accessories including PLC panel with SCADA, HMI for local and
remote operation along with the required size of incoming & out going cables with a spare
one shall be installed. All grade switchgear should be AC3 type and all are intelligent type,
Control voltage for 0.415KV switch gear shall be AC of 220V. The EMS with licensed soft
ware is to be tagged to available PHEO server at NIC, Bhubaneswar.
d. Supply & installation of Pressure gauges of make mentioned in Clause 2.17, Schedule-D of
the document, one each on the suction and delivery sides of the pumps and one on the
common header with two-way stop cock.
179
e. Supply, erection and testing of 400 mm dia. Full bore type Electromagnetic type Flow
meter at the common header of the pumps.
f. Supply & fixing of pipes (suction and delivery and common header, etc.), electrically
operated valve actuators (Sluice valve, non-return valve etc.), dismantling joints, of make
mentioned in Clause 2.17, Schedule-D of the document , pipe support, thrust block as per
detailed specifications.
g. Supply and installation of water hammer / surge protection device as required.
h. Supply of all material and construction of pump house, including finishing work, in situ
concrete flooring, internal and external plastering, roof treatment, fixing of doors, windows,
ventilators, rain water pipes and all fixtures as per the detailed specifications.
i. Supply, installation, testing and commissioning of external and internal electrification,
lighting, push buttons, power and control cables, earthing, etc. to complete the system in
totality.
j. Supply of all material and painting of exposed outer surfaces of pump house with two coats
of weather coat paint including application of putties, primer, etc. to obtain smooth surface.
k. Supply of all material and painting of inside of pump house building, inside two coats of oil
bound distemper, including application of putties, primer, etc. to obtain smooth surface.
Doors and windows shall be painted with enamel paint after one coat of primer.
l. Supply, erection and painting of structural steel pipe supports, pipes, and other equipment
as per detailed specification.
16.8.6 Clear Water Rising Mains
m. Supply, laying, jointing of Socket and Spigot ended ISI marked DI pipes as per IS
8329:2000 and subsequent amendments and ISI marked rubber gasket conforming to IS
5382 for push-on joints from the Water Treatment Plant to the zonal Under Ground
Reservoirs (UGR) as per the table below and layout drawing provided and as per detailed
specification.
Table 1.6: Details of Clear Water Rising Mains
Approximate length of
Sl.
Diameter
Location
Pipes
No.
(in MM)
(in Mtr)
1.
DI (K-9)
M.S.
1. Proposed WTP
at Ainthapali to
400
2090
110
Sarlkani Chowk
2. Sarlkani Chowk to Sindurpank Chowk
350
3420
180
3. Sindurpank Chowk to Dhanupali
300
3470
180
Chowk to the GSR at Govindtala
4. Sarlkani Chowk to GSR at Sakhipada
300
1570
80
5. Dhankauda Chowk to GSR at Sonapali
300
1660
90
6. Khadiapada Chowk to GSR at
300
2090
110
Kanijuri(Durgapali)
Total:
14300
750
The contractor shall also procure and lay Mild Steel Pipes conforming to IS: 3589 Fe 410
grade pressure pipes and M.S. Special etc of required diameter and quantity for nallah
crossing.
n. Supply and laying of ISI marked Ductile iron fittings (Tee, tail piece, bend etc.) of
required sizes conforming to IS: 9523 with latest amendment as per site requirement & as
per instruction of Engineer-in-Charge.
180
o. Supply and erection of ISI marked double flanged cast iron sluice valves, scour valve as
per IS: 14846 PN 1.6 and double acting kinetic air valve as per IS: 14845 PN 1.6. as per
site requirement & as per instruction of Engineer-in-Charge.
Details of Valves in Clear Water Rising Main
Description of Items
Diameter
Quantity
IS Specification
(in mm)
Double flanged Cast Iron Sluice
400
4 Nos.
IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
350
6 Nos.
IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
300
12 Nos.
IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
150
15 Nos.
IS: 14846 PN 1.6
valves for scour purpose
C.I. double acting kinetic air valve
80
11 Nos.
IS: 14845 PN 1.6
Total:
48 Nos.
The no. of valves mentioned in the table above is the minimum requirement. Contractor
has to verify the actual requirement and provide accordingly without any extra cost.
p. Excavation of trenches for laying of pipes and their refilling after completion of work in
all kind of soil, including shoring and shuttering, wherever required as per the alignment
up to the depth to maintain minimum one meter earth cover over crown of the pipe and
fittings, including proper stacking of excavated soil/material and disposal of surplus
material.
q. Making all arrangements for laying of pipes and its stability for crossing of nallah / drain /
roads / any other facility and their restoration with minimum disruption, including making
any by-pass arrangement and dismantling of all above arrangement after completion and
testing of work.
r. Supplying all materials and making arrangement for crossing the Railway Track near
Railway Over Bridge at Tangarpali between 4.00 MLD WTP at Ainthapali and Sarlakani
Chowk by pushing method through horizontal drilling by providing, fixing & fitting of
required size of casing MS for 400 mm dia carrier M.S. Pipe all complete as per Railway
specification and the direction of the Engineer-in-Charge. The Department shall provide
the Way Leave permission from the Railway Authority, however the agency shall bear the
Way Leave Charges (for 10 years) to be paid to the Railway Authority.
s. Supply of material and construction of thrust block of required size as per approved
drawing at all bends provided in the pipeline as per site requirement & as per instruction of
Engineer-in-Charge.
t. Supply of material and construction of valve chambers as per approved drawing for all
types of valves as per site requirement & as per instruction of Engineer-in-Charge.
u. All work required for connection of clear water rising main with respective UGRs.
v. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
w. Testing & commissioning of the clear water rising mains as per relevant IS code.
x. Restoration of roads damaged during laying of clear water rising mains shall be done as
per original specification and satisfaction of Engineer in charge.
181
p.
q.
r.
s.
t.
u.
v.
16.8.8
a.
Sunapali
750
2
Sakhipada
500
3
Dhanupali
500
4
Durgapali
500
Supplying fitting and fixing of ISI marked DI / CI pipes puddle collars of required size,
including embedding in R.C.C. wall and / or floor of the GSR, wherever required.
Supply and erection of Mechanical Float type water level indicator at every underground
reservoir.
Manholes with CI manhole cover; stainless steel access ladder, etc. shall be provided as
per I.S. specification and approved drawing.
Backfilling with selected excavated earth and disposal of the surplus earth as per detailed
specification.
Testing and commissioning of the Under Ground Reservoirs as per IS codes and detailed
specification.
Supply of all material and painting of exposed surfaces of GSRs with two coats of weather
coat, including application of putties, primer, etc. to obtain smooth surface.
Display of relevant data about Under Ground Reservoir at proper place as per direction of
Engineer-in-Charge.
Zonal Pump House
Works to be performed
The scope includes Design, Construction, Supply, Installation, Testing, Commissioning
and five years defect liability period of all Civil, Mechanical, Electrical and
Instrumentation Works for the Zonal Pump Houses at Sakhipada, Sunapali, Dhanupali and
Kanijuri (Durgapali) with minimum floor area of 29.25 Sqm each, which include the
following.
Supply of all materials and construction of RCC framed structure, Zonal Pump Houses
with sunken floor for complete positive suction arrangement of internal size 6.00 m x 4.00
m as per detailed specifications. The level of pump house floor shall be so adjusted that
182
b.
c.
d.
e.
f.
g.
h.
i.
j.
k.
l.
pumps should have positive suction. There will be two nos. M.S. Doors (M.S. frame with
cold rolled M.S. sheet shutter) of size 1.5M x 2.25M, one no. & Door of size 2.5Mx3.0M
with M.S. Rolling Shutter- 1 No. alongwith 2nos. Windows of size 1.5M x 1.25M with
M.S. frame with M.S. grill (having Sliding type of Aluminium frame and black glass panel
shutter).
Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.3 with suitable motor for pumping water to zonal GSRs, of make mentioned in
Clause 2.17, Schedule-D of the document, including MS base plate, coupling, etc. as per
detailed specifications.
Table 1.3: Details of Pumping Machinery
Zone Hours of Capacity of Head of Each No. of
No. of Total No. of
Standbye
Pumping
Working
No.
Each Pump Pump (Mtr)
Pumps
Pump
(Hours)
Pump
(LPS)
1
4
40
30
02
01
03
2
2
35
32
02
01
03
3
4
35
34
02
01
03
4
4
35
32
02
01
03
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
Supply, installation, testing and commissioning of ATS control panel & APFC panel
including EMS, all other accessories including PLC panel with SCADA, HMI for local
and remote operation along with the required size of incoming & out going cables with a
spare one shall be installed. All grade switchgear should be AC3 type and all are
intelligent type,
Supply & installation of Pressure gauges of make mentioned in Clause 2.17, Schedule-D
of the document, one each on the suction and delivery sides of the pumps and one on the
common header with two-way stop cock.
Supply, installation, testing and commissioning of Electromagnetic Flow meter, 1 no. for
each zone on the distribution main in the outlet of the respective zonal pump houses.
Supply & fixing of pipes (suction and delivery and common header, etc.), electrically
operated valve actuators (Sluice valve, non-return valve etc.), dismantling joints, of make
mentioned in Clause 2.17, Schedule-D of the document , pipe support, thrust block as per
detailed specifications.
Supply and installation of water hammer / surge protection device as required.
Supply of all material and construction of pump house, including finishing work, in situ
concrete flooring, internal and external plastering, roof treatment, fixing of doors,
windows, ventilators, rain water pipes and all fixtures as per the detailed specifications.
Supply, installation, testing and commissioning of external and internal electrification,
lighting, push buttons, power and control cables, earthing, etc. to complete the system in
totality.
Supply of all material and painting of exposed outer surfaces of pump house with two
coats of weather coat paint including application of putties, primer, etc. to obtain smooth
surface.
Supply of all material and painting of inside of pump house building, inside two coats of
oil bound distemper, including application of putties, primer, etc. to obtain smooth surface.
Doors and windows shall be painted with enamel paint after one coat of primer.
Supply, erection and painting of structural steel pipe supports, pipes, and other equipment
as per detailed specification.
183
m.
n.
o.
p.
q.
r.
s.
t.
u.
v.
w.
x.
All work for electric supply connection from 11/ 0.4 KV sub-station including connection
charges, supply and laying of underground cable including its jointing.
Supply, construction & Erection of 3-phase 3-wired 11 KV power supply HT line of
approximately 600mtr (covering all four zonal pump houses) shall be drawn with
150x150x6mm R/S joist- 11 mtr. Long pole along with 100mmsq. AAAC conductor and
where ever road crossing, guarding shall be provided. Each pole should be supported with
anti climbing devices and danger boards as well as individual earthings. Where ever the
line passes adjacent to jungle, bushes, over head insulated conductor to be provided. The
each span should be of 50mtr having horizontal configuration.
Supply, installation, testing and commissioning of 11/0.4 KV sub station ,with indoor
sub station , comprising of 100KVA transformer-1 No., 2 pole structure with D.P.
structure, AB switch, HG Fuse, outdoor distribution panel, lightening arrester, required
nos of earthing, transformer panel with Circuit Breakers with 100KVA industrial grade
DG set including AMF pannel to complete the system in totality
Execution of Electrical works should be conforming to specifications as per Electricity
Rules, Electricity Act-2003 and OERC guide lines 2004.
The required amount of supervision charges, security deposit, service connection charges
& scrutiny fee, etc., for external & internal power supply is to be deposited by the bidder
with the concerned electrical authority/distribution company.
Supply and installation of internal and external electrification work i.e. lighting, switches,
fans, ventilation system, etc. as per schedule of make and detailed specification.
Table 1.4: Details of Transformer & DG
Capacity of DG set
Capacity of
Zones
Location
(KVA)
Transformer (KVA)
1
Sunapali
100
100
100
2
Sakhipada
100
100
3
Dhanupali
100
100
4
Kanijuri (Durgapali)
100
Supply, laying, jointing and testing of earthing for all installations as per IS: 3043. The
earthing shall cover all the motor, control panel, control post, cable racks, illumination and
ventilation etc. The size of G.I. strips to be used for earthing for different equipment shall
be suitably selected and shall be subjected to the approval of the Engineer-in-Charge and
shall meet the stipulation of the Indian Electricity Rules and Regulations to the satisfaction
of State Government Electricity Inspector.
Supply of all material and construction of open drainage system for the zonal pump house
compounds with brick masonry and its connection with nearest drain as per approved
drawing.
Supply of material and Construction of 1.5m wide CC pathway to connect ESR, UGR and
pump house as per approved drawing.
Landscaping of the zonal pump house compounds as per the detailed specification.
Supply of one number wall mounted board with flow sheet including details of pumps,
motors in attractive colors for mounting on the wall at appropriate height as per aesthetic
requirement of the Pump house building.
Supply of fluorescent Glow Sign Board captioned Zonal Pump House, Sonapali /
Sakhipada / Dhanupali / Kanijuri as the case may be or as per direction of Engineer-inCharge in attractive colours with all fittings etc. of appropriate size and fixing it at
appropriate height at the entrance gate.
184
d. Backfilling of foundation with selected excavated earth and disposal of the surplus earth as
per detailed specification.
16.8.11 Distribution Network
a. Procurement of ISI marked Ductile Iron class K-7 conforming to IS: 8329 S/S pressure
pipes and ISI marked rubber gasket conforming to IS: 5382 of required diameter and
quantity as tabulated below.
Table 1.13: Details of Distribution Network
Sl. No.
Diameter (in MM)
Approximate length of pipe line (in Mtr)
DI-K7
M.S.
1
100
10600
519
2
150
5,300
318
3
200
1900
104
4
250
380
20
TOTAL
18180
961
s. Procurement of Mild Steel Pipes conforming to IS: 3589 Fe 410 grade pressure pipes of
required diameter and quantity for nallah crossing, special bends and fittings, etc.
t. Procurement of ISI marked cast iron sluice valves, scour valve of as per IS: 14846 PN 1.0
and double acting kinetic air valve conforming to IS: 14845 PN 1.0.
Details of Sluice Valves/Scour Valves/Air valves in Distribution Mains
Description of Items
Diameter Quantity IS Specification
(in mm)
Double flanged Cast Iron Sluice valves
250
2 Nos.
IS: 14846 PN 1.6
Double flanged Cast Iron Sluice valves
200
8 Nos.
IS: 14846 PN 1.6
Double flanged Cast Iron Sluice valves
150
20 Nos. IS: 14846 PN 1.6
Double flanged Cast Iron Sluice valves
100
42 Nos. IS: 14846 PN 1.6
Cast Iron Single Air valve
25
12 Nos. IS: 14845
The no. of valves mentioned in the table above is the minimum requirement. Contractor
has to verify the actual requirement and provide accordingly without any extra cost.
u. Procurement of ISI marked Ductile iron fittings (Tee, tail piece, bend etc.) of required
sizes conforming to IS: 9523.
v. Excavation in trenches in all kind of soil, including shoring and shuttering, wherever
required, as per the alignment up to the depth to maintain minimum one meter earth cover
for laying of pipes and fittings and proper stacking of excavated soil and disposal of the
surplus material.
w. Laying and jointing of pipes of required size as per distribution network drawing and
making all joints water tight.
x. Laying and jointing of ISI marked ductile iron fittings (Tee, tail piece, bend etc.) of
required sizes conforming to IS: 9523.
y. Supplying all materials, labour, T&P and providing connection of delivery pipeline of
ESR /GSR, as applicable with distribution system in all zones
z. Backfilling of excavated trench with selected excavated earth and disposal of the surplus
earth as per detailed specification.
aa. Fixing of ISI marked Cast iron sluice valves, scour valve and double acting kinetic air
valve.
bb. Construction of Valve chambers as per required size as per approved drawing.
186
cc. Wherever nallah / drain, etc. crossing is encountered along the alignment, the contractor
shall make necessary arrangement for laying of pipe with construction of trestles etc. and
its stability during its operation.
dd. Wherever there is inter-connection of new pipe with existing pipe shown in the network
drawing provided, contractor will provide all T &P for making interconnection of new
pipe with the existing one and vice-versa as per direction of Engineer-in-charge.
ee. Wherever there is replacement of pipe shown in the network drawing provided, contractor
will provide all T&P for replacing the existing pipe with new pipe of specified diameter.
ff. Wherever there is bend encountered along the alignment, the contractor shall make thrust
block of required size and as approved by Engineer-in-Charge.
gg. Connection of distribution network with the Elevated Service Reservoir.
hh. Testing and commissioning of the network with contractors liability to ensure minimum
terminal head at all consumer end up to end of defect liability period.
ii. Reinstatement of roads after laying of pipes shall be done as per original specification and
satisfaction of Engineer in charge.
jj. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
16.8.12 House Service Connections
Providing house connections ( 100 nos) by supplying, fixing, fitting of 8 mm nominal bore
20 mm size Gun metal ferule cock, / Gun metal Brass Full Way valve with wheel
(Domestic type) with moulded case PVC meter box ( 1 no each) and 15 / 20 / 25 mm
nominal bore G.I. pipe and fittings as per field condition for a minimum length of 7 mtr
including required earthwork in excavation / back-filling.
16.8.13 SCADA & Automation
Supervisory Control and Data Acquisition system is proposed to facilitate operational
automation. The same will be installed in all the operating stations such as; Raw water
boosting pumping station at Bareipali, Proposed WTP at Ainthapali, and all four zonal
pumping stations which will facilitate centralized control at Bareipali,. The entire
Automation & SCADA system is to be designed so that, it is compatible to the existing
system and should be integrated with the existing arrangement & made efficiently
operated. The bidder is required to inspect the existing system prior to bidding and rates
should be quoted accordingly. The system would have the following facilities:
* Communication between all the locations with Bareipali existing control room by Fiber
optic cables with all accessories.
* Remote control of all pumps and valves
* Flow, level & pressure monitoring
* On-line water quality Analysers (pH, Turbidity & Residual Chlorine)
* Automation of Filtration Plant & other units of WTP
* Automation of power supply system
16.9 Any item or any provision/requirement if not included in this section, but is necessary to
be provided for the completion of the project and for its functional necessity, the same
shall be provided by the contractor. No extra payment shall be admissible on this account.
1.
30.4
30.4.1
30.4.2
30.4.3
30.4.4
30.4.5
clauses for the work Improvement of Water Supply to Rourkela Town The present
water supply scheme has been planned to receive water from the existing WTP located
inside the town. In this scheme the town has been divided into 11 zones supported with11
Nos GSRs, 12 Nos of ESRs with pump houses & electrical/mechanical installations
along with provision of SCADA system in the Existing control room at 55MLD
WTP(Panposh) .
Provision of about 12.33 K.M of (150 mm dia to 400 mm dia) K-9 D.I pipe are made for
clear water rising main & about 186.46 KM of (100mm dia to 400mm dia) K-7 D.I pipe
for distribution pipe lines are made.
Apart from this there are three Nos of UGR of capacity 0.50 ML at Koelnagar WTP, 0.50
ML capacity at the existing 55 MLD WTP & 0.75 ML capacity at (1 + 3) MGD WTP are
to be provided.
100 Nos of house connections with 20mm feris to be provide with metering facilities.
The 55 MLD WTP is also for Atomization.
In this scheme it is designed to meet the water demand up to 2045 with 24/7 facility.
Scope of Work
The bidder before bidding shall visit the site at his own cost and shall satisfy himself with
the nature and extent of the work involved, actual site conditions, and existing facilities.
Shall collect any other information which may be required before submitting the tender.
Any claim in this regard shall not be entertained.
The scope of work for the Water supply scheme covers surveys including Topographical
survey, Geo-technical survey, raw water quality testing, design & detailed engineering of
all components of the scheme, do the necessary changes as per site condition, develop
detail drawing and getting approval from Engineer-in-Charge, supply of equipment and
construction materials, testing at manufacturers works, delivery up to site, erection,
execution of works as per the work described under Scope of Work clause 16.0 or
elsewhere in the tender and as per IS codes, OPWD specifications and detailed
specifications attached hereto, final check-up, painting, testing, commissioning including
hydraulic testing of all water retaining structures and pipes with fittings, valves, etc. as per
relevant IS codes and relevant specification.
The work shall be carried out according to the design / drawings submitted by bidder and
approved by Engineer-in-Charge. For building, facilities, systems, structures, etc.,
necessary layout and details are furnished with tender document. Any changes, if required,
shall be done by the bidder keeping in view the scope, minimum specified requirement,
the statuary and functional requirement and providing enough space and access for
operation, use and maintenance. The bidders work shall cover the complete requirement
as per tender specification.
The work to be performed under the specification consists of providing all labours,
supervision, materials, scaffolding, construction power, fuel, construction water, and
construction equipment, testing equipment, tools and plants, supplies, transportation and
all incidental items not shown or specified but necessary for successful completion of the
work.
The nature of work generally involves site clearance, dismantling of existing above ground
and underground structures, excavation in all types of soils, foundation preparation,
dewatering and its disposal, backfilling, disposal of surplus excavated material, supply of
all construction material and supply of all necessary plant machinery and equipment, etc.,
construction with the materials of specified quality, constructing drains, embedding,
encasement of pipes, cleaning the site from all waste and surplus material after completion
188
of work and other ancillary work as per specifications, as per drawings submitted by the
contractor and approved by the Engineer-in-Charge.
30.4.6 Any items of work, either supply and / or erection of material / equipment which have not
been specifically mentioned in the scope / specifications but are necessary for operation
and guaranteed performance of the entire water supply scheme, and equipment offered
shall be deemed to be included within the scope of this specifications and shall be
provided by the bidder without any additional cost.
30.4.7 All material / equipment which have been mentioned and have not been specifically
mentioned in the scope / specifications but are necessary for operation and guaranteed
performance of the entire water supply scheme shall be any of the make mentioned in
Clause 2.17, Schedule-D. Contractor shall have to obtain written approval of make of any
item from Engineer-in-Charge before supply.
30.4.8 The scope of work also include shifting of electrical/ telephone/ any other type of cable,
electric poles, water, sewer or any other type of pipeline or any other facility. Any
arrangement for crossing roads, drains, nallah including bypass arrangement and their
restoration to the satisfaction of Engineer-in-Charge after completion of particular work
also included in the Scope of work.
30.5 Services to be Provided by the Contractor
30.5.1 The contactor shall open a fully furnished site office with all necessary facilities having
office equipment such as computer, printer, etc. A separate room shall be provided to the
Engineer-in-Charge or its representative.
30.5.2 The Contractor will make necessary arrangement for construction power and construction
water.
30.5.3 The Contractor shall make necessary arrangement for all the testing and inspection to be
conducted in a manner as specified in the specifications and as per codes.
30.5.4 Transportation of all equipment / raw material / spares from manufacturers work to the
project site, inclusive of all intermediate handling and unloading / storage at site and all
taxes, octroi, etc.
30.5.5 Supply, erection as per manufacturers recommendations / specifications, inspection,
testing, start up and running of the equipment during trial run / performance guarantee
period at rated capacity and speed.
30.5.6 Deploying qualified and experienced staff for supervision of all erection and
commissioning services. The Contractor shall also arrange for rectifying the defects during
defect liability period.
30.5.7 During defect liability period of five year the contractor has to replace any equipment,
component, etc. for manufacturing defect, malfunctioning and below rated performance.
He will make good any structure or part of it if found defective or becomes during
functioning.
30.5.8 Application of the final paints and final finishing work shall be done by the Contractor
after complete erection and testing, trial run but before handing over to the department.
30.5.9 The contractor shall also arrange technical experts of equipment from proprietary supplier
as and when necessary till the commissioning, trial run and performance guarantee period
of the equipment.
30.5.10
Any survey/ leveling/ fixation of bench mark/ reference level required for detailed
engineering of the any component of the scheme will be done by survey team deputed by
contractor. The survey team will carry out the area survey and leveling of OGR/ESR
compounds or wherever required as per the instruction of Engineer-in-Charge.
30.5.11
The detailed scope of work has been mentioned in clause no 16.0 of this chapter.
189
30.5.12
Nothing extra over the quoted price shall be paid to contractor on account of any
financial implications of all the conditions and specifications. It will be treated that
necessary financial provision are deemed to have been kept in the quoted price. Any
contiguous item or any provision / requirement, if not included in the general specification
and scope of work, special specification and detailed specification but necessary to be
provided for the completion of the work and for its functional necessity, shall be provided
at no extra cost above quoted price. The decision of the Engineer-in-Charge in such cases
shall be final and binding on the contractor.
30.5.13
The time is the essence of this contract. The entire work described under Scope of
Work clause 16.0 or elsewhere in the tender (Design, approval of design & drawings,
execution and commissioning) is to be completed within a time frame of 36 (thirty six)
calendar months from the date of issue of work order.
31
Tender Drawings
The Tender drawings shall form the part of tender document. The contractor shall submit
detail design and drawing of all component of the water supply scheme (except hydraulic
design of rising mains and distribution network) for its sufficiency in all respect before
taking up the construction work. The contractor can do addition, modification, alteration or
detailing in the drawings as per the prevailing conditions and he has to take approval from
Engineer-in-Charge. The structural stability throughout its working life lies with the
contractor. The work has to be executed as per the construction drawings (latest revision)
with additions, alterations and modifications made from time to time as required and
approved by the Engineer-in-Charge and also according to any other drawing prepared by
contractor progressively during the execution of the contract.
32
Test for Material/Workmanship
All tests required for all brought out materials as desired by the Engineer-in-Charge shall
be carried out by the contractor as per relevant IS code and at his own cost in the presence
of authorized representative of the Engineer-in-Charge.
33
Specifications
The detailed specifications, IS codes and OPWD specifications are intended for the
general description of the work, quality and workmanship. All work is to be carried out
according to the specifications. Wherever reference to the standard codes of practice etc. is
made, they shall be taken as the latest edition of the same issued within one month before
the date of submission of the Tender.
34
Layout and Levels
The layout and levels of all structures etc. shall be made by the contractor at his own cost
from the general grid of the plot and bench marks given by the Engineer-in-Charge.
Contractor shall provide all help in instruments, materials and men to the Engineer-inCharge at no extra cost for checking the detailed layout and correctness of the layout and
levels. However the Contractor shall be solely responsible for correctness of layout and
levels.
Permanent reference pillars shall be established by the contractor and under no
circumstances shall the contractor remove or disturb any permanent/reference pillar/
benchmark without the approval of the Engineer-in-Charge. The contractor shall carefully
maintain and protect all benchmarks and reference points and shall mark the layout of all
his work by accurate reference to the benchmarks and reference points.
35
Construction Method
The bidder shall submit a pert chart along with this tender showing the time schedule for
the overall constructions activities along with construction methodology. The construction
190
36
37
38
39
40
40.1
40.2
41
method and mobilization of resources to be adopted by the contractor shall match with this
time schedule and shall be approved by the Engineer-in-Charge. After approval of tender
the contractor will submit his detailed schedule of work.
Quality Assurance Plan
A Quality Assurance plan giving details of necessary tests to be carried out on various
materials for construction of work shall be submitted by the contractor for approval before
start of the work. The Contractor shall be responsible for carrying out such tests. The
contractor shall test the samples of all materials in presence of authorized representative of
the Engineer-in-Charge at the specified frequencies as per relevant IS codes or elsewhere
given in the tender document and keep proper record of all tests.
Testing of Materials
All arrangement shall be made by the contractor to provide testing requirement as
specified in the specifications. For the tests for which, equipments required is not available
with the contractor shall provide the same or will arrange the test to be done at a
Government approved laboratory. No extra claim is admissible in this regard.
Approach Roads
The Contractor where required shall make his own arrangement for approach to the work
site (including, burrow and disposal area) and for movement of men, machinery, other
equipment etc. required for carrying out the work included under this contract. The
contractor will also arrange for any land required for burrowing earth or disposal of any
dispensable material.
Dealing with Water / Dewatering,
Bailing and Pumping out of subsoil water may have to be carried out during execution of
work. The contractors program and methods must be capable of dealing with rainfall /
subsoil water. The contractor shall supply, install and operate his own temporary pumping
equipments wherever required.
Prevention of pollution
Arrangement shall be made by the contractor to prevent Air Pollution and pollution in any
stream, nallah or rivers. Arrangements for sprinkling of water in the construction and
burrow area to prevent any dust blowing also shall be done by the contractor. The
contractor shall be solely responsible and liable for all damage caused by any pollution
that may take place during the execution of the works, and he shall make arrangements as
the Engineer-in-Charge may approve, for preventing pollution.
No separate payment shall be made for the pollution control measures.
Safety Measures
In respect of all labour directly or indirectly employed in the work for the performance of
the contractors part of this agreement, the contractor shall at his own expense arrange for
the safety provision as per IS code framed from time to time and shall at his own expense
provide for all facilities in connection therewith. In case the contractor fails to make the
above arrangement Engineer-in-charge shall be at liberty to make arrangements and
provide facilities as aforesaid and recover the cost incurred on his behalf from the
contractor.
The contractor shall ensure the safety of men, material, machinery, existing structure and
any other facilities. Since the work is to be done on road/lanes/by lanes, all necessary
safety arrangements including proper barricading and lighting etc. shall be done by the
contractor.
The Contractor shall be absolutely and solely responsible for any accident that may occur
during the progress of the work and for injury or damage to the men, material, machinery,
191
42
43
43.1
43.2
43.3
43.4
43.5
43.6
43.7
44
existing structure and any other facilities of any description whatsoever which may be
caused by or result from the execution of work. The Contractor shall make good any
damage due to accident or pay any claim arising out of accident and will indemnify the
employer of expenses on account thereof. No separate payment shall be made for safety
measures.
Equipments & Machinery.
The contractor shall have to use his own earth moving equipments & concreting
equipment such as dumpers, pocklains, dozers, batching & mixing plant vibrators etc. and
any other machinery required for the entire scope of work including the work of
excavation and conveyance of earth from the burrow areas to site and also shall have to
use his own compaction machinery to compact the fill material such as vibratory
/pneumatic rubber typed rollers, water tankers etc. A list of equipments/machinery to be
deployed at site as per the requirement of the project schedule shall be submitted by the
contractor within one week of award of work. All the equipments/machinery shall be kept
in working condition by the contractor during the tenancy of the contract. Contractor will
not move any equipment/machinery without written permission of Engineer-in-charge to
any other work which is not under the scope of this work.
Storage and Handling of Materials
The protection all material and machinery from dirt, clay, rust, theft or damage at any
stage of the project is the responsibility of the contractor and no claim will entertained in
this regard.
Reinforcement
Reinforcement steel shall be stored in a manner that no damage/rusting is caused to the
material.
Cement
The Cement shall be stored as per IS code and in a manner that no damage/setting is
caused to the material.
Coarse and Fine Aggregate
Aggregates shall be stored on brick soling or an equivalent platform so that they do not
come in contact with dirt, clay, grass or any other foreign substance at any stage.
Aggregates of different sizes shall be kept in separate stacks. Aggregates from different
sources shall be stacked separately, if so desired by the Engineer-in-Charge with proper
care to prevent intermixing.
Sand
Sand shall be stored on brick soling or an equivalent platform so that they do not come in
contact with dirt, clay, grass or any other foreign substance at any stage.
Pipes
Pipes shall be stored in stacks as per relevant IS codes.
Electro-mechanical equipment
A Godown with roof and brick soling floor of sufficient size is to be constructed by the
contractor for storage of equipment to protect from rust, damage, theft, etc. All electromechanical equipment shall be stored in the godown.
All other material required for construction will be stored properly by the contractor.
Detailed scope of work
The work involves Civil, Mechanical, Electrical and Instrumentation, preparation of detail
design and drawing, supply of labour, materials, equipment, fabrication, erection,
construction, testing, commissioning, guaranteeing the performance of the proposed
system. The work involve under these specifications is mainly related but not limited to
192
the following:
The work shall be carried out according to the detailed specifications, IS codes and OPWD
specifications. The design/drawings shall be submitted by the contractor and approved by
Engineer-in-Charge. For building, facilities, systems, structures etc., necessary layout and
details are to be developed by the bidder keeping in view the scope, minimum specified
requirement, the statutory and functional requirement and providing enough space and
access for operation, use and maintenance. The bidders work shall cover the complete
requirement as per tender specification.
44.2 The Geo-technical investigation at Water Treatment Plant, Elevated Service Reservoirs,
Underground Reservoirs & other RCC structures locations shall be carried out by the
contractor for structural design of civil structures proposed in the compound or as
required.
44.3 Preparation of work areas, clearing site, jungle clearance etc. in the entire area including
dismantling and removing of any existing above ground and underground structures
including existing roads, uprooting of all the trees, debris and vegetation and their
disposal, shifting of pipes, cables, electrical poles etc. The dismantled and removed
material shall be stacked/ disposed as per direction of Engineer in Charge. The bidders
should visit the site prior to submission of bid and make himself conversant with the site
conditions to estimate the dismantling/removing work.
Shifting of electrical or any other type of cables ,electric poles, water, sewer, gas or any
other type of pipeline or any other facility, their restoration to the satisfaction of Engineerin-Charge after completion of work.
44.4 Clear Water Feeder Mains
y. Supply, laying, jointing of DI pipes as per IS 8329 Socket and Spigot joint and ISI
marked rubber gasket conforming to IS 5382 from the water treatment plant & existing
riser main to the zonal Under Ground Reservoirs (UGR) as per the table below and layout
drawing provided and as per detailed specification.
z. Supply, laying & jointing Mild Steel Pipes conforming to IS: 3589 Fe410 grade pressure
pipes of required diameter and quantity for nallah and other crossing and special bends, etc.
as per detailed specifications.
aa. Table 1.1: Details of Clear Water Rising Mains
Sl.
Diameter
Approximate Length of Pipes
Location
No.
(in MM)
(in Mtr)
Ductile Iron (K-9)
M.S.
1.
Existing riser main at Birsa
400
140
30
Stadium to Rly Crossing
2. Nallah & Culvert crossing
350
-30
3. Madhusudanpalli existing main
300
90
-to Madhusudanpalli UGR
4. Existing
main
from
250
7,810
-Bandhomunda line near OSAP
branch to Bandhomunda UGR,
WTP to Ruptola Chowk, R.P
line gate to ITI foot hill UGR ,
Birsa Munda Stadium Rly.
Level Crossing to Timber
Colony UGR.
5. Ruptola Chowk to Tarapur UGR
200
3,611
-44.1
193
6.
150
625
-12,276
60
bb. Supply and laying of ISI marked Ductile iron fittings (Tee, tail piece, bend etc.) of
required sizes conforming to IS: 9523 with latest amendment as per site requirement & as
per instruction of Engineer-in-Charge.
cc. Supply and erection of ISI marked double flanged cast iron sluice valves, scour
valves as per IS: 14846 PN 1.6 and double acting kinetic air valve as per IS: 14845 PN 1.6.
as per site requirement & as per instruction of Engineer-in-Charge.
Details of Valves in Clear Water Rising Main
Description of Items
Diameter
Quantity
IS Specification
(in mm)
Double flanged Cast Iron
400
2 Nos.
IS: 14846 PN 1.6
Sluice valves
Double flanged Cast Iron
300
6 Nos.
IS: 14846 PN 1.6
Sluice valves
Double flanged Cast Iron
200
9 Nos.
IS: 14846 PN 1.6
Sluice valves
C.I. double acting kinetic air
100
14 Nos.
IS: 14845 PN 1.6
valve
Total :31 Nos
dd. Excavation of trenches for laying of pipes and their refilling after completion of work in
all kind of soil, including shoring and shuttering, wherever required as per the alignment
up to the depth to maintain minimum one meter earth cover over crown of the pipe and
fittings, including proper stacking of excavated soil/material and disposal of surplus
material.
ee. Making all arrangements for laying of pipes and its stability for crossing of
Crossing of small culverts/nallah / drain / road / any other facility and their restoration
with minimum disruption including making any by-pass arrangement and dismantling of
all above arrangement after completion and testing of work. At every crossing over, the
pipeline will be supported through a suitable steel structure/trestles as per direction of
Engineer-in-Charge. The bidder has to deposit the way leave charges to the Railway
Authority as per their estimate.
ff. Supply of material and construction of thrust block of required size as per approved
drawing at all bends provided in the pipeline as per site requirement & as per instruction of
Engineer-in-Charge.
gg. Supply of material and construction of valve chambers as per approved drawing for all
types of valves as per site requirement & as per instruction of Engineer-in-Charge.
hh. All work required for connection of clear water rising main with respective GSRs.
ii. Wherever there is inter-connection of new pipe with existing pipe shown in the network
drawing provided, contractor will provide all T &P for making interconnection of new
pipe with the existing one and vice-versa. Approximate no. of connections are; ( 400mm
dia.= 2 Nos, 300mm dia. = 2 Nos, 250mm dia. = 20 Nos , 200mm dia. = 10 Nos &
150mm dia. = 8 Nos)
jj. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
kk. Cutting of road surface for taking of pipeline at required depth will be done with making
good to the damages by mending & repair to existing condition.
194
ll. Supplying , erection, testing & commissioning Electromagnetic type of flow meter with
battery back up etc. with standard accessories including fitting & fixing , construction of
chamber all complete as per table given below.
Details of Electromagnetic type Flow meter in Clear Water Rising Main
Sl. No.
Dia. (in mm)
Quantity (in Nos.)
1.
250
11
mm.
Testing & commissioning of the clear water rising mains as per relevant IS code.
H. Ground Storage Reservoirs (GSRs)
e. All GSRs will be located in the Zonal pump house compound & UGRs will be located at
WTP.
f. Site clearance and removal of all trees, debris, above and underground structures etc.
Stacking of dismantled material and disposal of surplus material. Site dressing and
leveling the surrounding ground to the final ground level.
g. Excavation up to the foundation in all kinds of soil, including shoring and shuttering,
wherever required, and stacking of excavated material as per direction of Engineer-inCharge.
h. Design and detailed engineering, Supply of material, Construction, Testing and
Commissioning of R.C.C. M-30 grade Dome type circular clear water Under Ground
Reservoirs & Ground Storage Reservoirs, including all piping arrangements, centering,
shuttering, reinforcement etc. as per approved drawings at locations given in following
table and as per the layout drawing provided.
Table 1.2: Details of Underground Reservoirs & Ground Storage Reservoirs
UGR Capacity
Zones
Location
( ML)
2
Inside Koelnagar WTP
0.50
4
Inside 55 MLD OWSSB WTP, Panposh
0.50
5
Inside (1 + 3) MGD WTP, Panposh
0.75
Ground Storage Reservoirs
Sl. No.
GSR Capacity
Zones
Location
( ML)
1.
2
Ruptola
0.25
2.
2
Tarapur
0.25
3.
3
Civil Township (Twin Tower)
0.25
4.
3
Civil Township (Govt. College)
0.25
5.
3
Civil Township (7 & 8 Area)
0.25
6.
4
Industrial Estate
0.25
7.
7
Madhusudanpalli
0.25
8.
7
Timber Colony
0.25
9.
8
Uditnagar
0.50
10.
10
Bandhamunda
0.25
11.
11
Koelnagar
0.50
i. Supplying fitting and fixing of ISI marked DI / CI pipes puddle collars and sluice valves
of required size, including embedding in R.C.C. wall and / or floor of the UGR & GSR,
wherever required.
195
j. Supply and erection of Mechanical Float type water level indicator at every underground
reservoir & Ground Storage Reservoir.
k. Manholes with CI manhole cover; stainless steel access ladder, etc. shall be provided as
per I.S. specification and approved drawing.
l. Backfilling with selected excavated earth and disposal of the surplus earth as per detailed
specification.
m. Testing and commissioning of the Under Ground Reservoirs & Ground Storage Reservoir
as per IS codes and detailed specification.
n. Supply of all material and painting of exposed surfaces of UGRs & GSRs with two coats
of weather coat, including application of putties, primer, etc. to obtain smooth surface.
o. Display of relevant data about Under Ground Reservoir & Ground Storage Reservoir at
proper place as per direction of Engineer-in-Charge.
I. Zonal Pump House
t. Site clearance and removal of all trees, debris, above and underground structures etc.,
including stacking of the dismantled material and disposal of surplus material. Site
dressing and leveling the surrounding ground to final ground level.
u. Excavation up to the foundation in all kind of soil, including shoring and shuttering,
wherever required. Stacking of excavated material and disposal of surplus material.
v. Supply of material, Construction, Testing and Commissioning of R.C.C. M-25 with
Sunken base in order to achieve complete positive suction arrangement for Pump House
building, including centering, shuttering, reinforcement, brick work, RCC pump and motor
foundation, etc. as per approved drawings at locations given in following table and as per
the layout drawing provided.
Table 1.3: Details of Pump House
Sl. No.
Minimum Floor
Zone
Location
Area
1.
1
TISCO
40 Sqm
2.
2
Ruptola
40 Sqm
3.
2
Tarapur
40 Sqm
4.
3
Govt. College
40 Sqm
5.
3
Civil Township
40 Sqm
6.
3
Twin Tower
40 Sqm
7.
5
ITI Foot Hill (Industrial)
40 Sqm
8.
5
Chhend Phase-I
40 Sqm
9.
6
Basanti OWSSB New
40 Sqm
10.
7
Madhusudanpalli
40 Sqm
11.
7
Timber Colony
40 Sqm
12.
8
Uditnagar New
40 Sqm
13.
8
Bandhamunda
40 Sqm
TOTAL
520 Sqm
w. Supply of all material and construction of all building, including finishing work, flooring,
internal and external plastering, whitewashing, roof treatment, rain water pipes, fixing &
painting of doors, windows & fixtures, etc. as per the detailed specification.
x. Supply of all material and painting of inside and outside of building as follows:
196
(iii) Inside-2 coats of oil bound distemper including application of putties, primer etc.
197
9
b.
c.
d.
e.
f.
g.
h.
Birsa Chowk
20
450.00
90.00
01
01
02
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
Supply and fixing of pipes (suction, delivery, overflow, common header, etc. up to ESR),
valves (Sluice valve, Non Return Valve, Foot Valve etc.), and dismantling joints of make
mentioned in Clause 2.17, Schedule-D, pipe support, thrust block as per the system
requirement.
Supply and installation of Pressure gauges of make mentioned in Clause 2.17, Schedule-D,
one each on delivery sides of the pumps and one on the common header with two way stop
cork.
Supply and painting of structural steel pipe supports, pipes and other equipment as per
detailed specification.
All work for electric supply connection from 11 KV sub-station including connection
charges, supply and laying of underground cable including its jointing.
Supply, construction & Erection of 3-phase 3-wired 11 KV power supply HT line of
approximately 6.5 KM (0.5 KM each for 13 nos. substations) shall be drawn with
150x150x6mm R/S joist- 11mtr. Long pole along with 100mmsq. AAAC conductor and
where ever road crossing, guarding shall be provided. Each pole should be supported with
anti climbing devices and danger boards as well as individual earthings. Where ever the
line passes adjacent to jungle, bushes, over head insulated conductor to be provided. The
each span should be of 50 mtr. having horizontal configuration.
Supply, installation, testing and commissioning of 11/0.4 KV sub station ,with indoor
sub station , comprising of 100KVA transformer-1 No., 2 pole structure with D.P.
structure, AB switch, HG Fuse, outdoor distribution panel, lightening arrester, required
nos of earthing, transformer panel with Circuit Breakers with 100KVA industrial grade
DG set including AMF pannel to complete the system in totality as per detailed
specification.
Execution of Electrical works should be conforming to specifications as per Electricity
rules, Electricity Act-2003 and OERC guide lines 2004
Table 1.5: Details of Transformer
Capacity of
Capacity of
Zones
Location
Transformer (KVA) DG Set (KVA)
100
1
TISCO
100
100
2
Ruptola
100
100
2
Tarapur
100
100
3
Govt. College
100
100
3
Civil Township
100
100
3
Twin Tower
100
100
5
ITI Foot Hill (Industrial)
100
100
5
Chhend Phase-I
100
100
6
Basanti OWSSB New
100
100
7
Madhusudanpalli
100
100
7
Timber Colony
100
100
8
Uditnagar New
100
100
8
Bandhamunda
100
198
i. Supplying, laying and jointing cable between the transformer and main LT Distribution
Board any of make mentioned in schedule of makes.
j. Supplying, installation, making connection and testing of LT panel board with LMCCB
suitable for 100/150 KVA transformer of make mentioned in schedule of makes.
k. Supply, laying, jointing and testing of cables between the main LT Distribution Board
(main LTDB) and all the required equipment, illumination, ventilation, plug-sockets, etc.
of any of make mentioned in schedule of makes.
l. Supply, laying, jointing and testing of earthing for all installations as per IS: 3043. The
earthing shall cover all the motor, control panel, control post, cable racks, illumination and
ventilation etc. The size of G.I. strips to be used for earthing for different equipment shall
be suitably selected and shall be subjected to the approval of the Engineer-in-Charge and
shall meet the stipulation of the Indian Electricity Rules and Regulations to the satisfaction
of State Government Electricity Inspector.
m. The required amount of supervision charges, security deposit, service connection charges
& scrutiny fee, etc., for external & internal power supply is to be deposited by the bidder
with the concerned electrical authority/distribution company.
J. Elevated Service Reservoirs (ESRs)
v. All ESRs will be located in the Zonal pump house compound.
w. Site clearance and removal of all trees, debris, above and underground structures etc.
Stacking of dismantled material and disposal of surplus material. Site dressing and
leveling the surrounding ground to the final ground level.
x. Excavation in foundation in all kinds of soil, including shoring and shuttering wherever
required. Stacking of excavated material and disposal of surplus material.
y. Design and detailed engineering, Supply of material, Construction of R.C.C. M-30 grade,
Intze type staged ESRs with circular column of various capacities and staging heights
along with stairs and all piping arrangements, including centering, shuttering,
reinforcement and brick work, etc., including its testing and commissioning as per
approved drawing, at locations given in following table and as per the layout drawing
provided.
Table 1.6: Details of Elevated Service Reservoirs
Sl. No.
ESR
Staging
Zones
Location
capacity
height
(ML)
(m)
1.
1
Tisco Area
1.00
15.00
2.
2
Ruptola
0.50
25.00
3.
2
Tarapur
0.50
20.00
4.
4
Industrial Estate
0.25
22.00
5.
5
Chhend Colony Ph-I
0.25
10.00
6.
6
Basanti Foot Hill
0.50
10.00
7.
7
Madhusudanpalli
0.75
25.00
8.
7
Timber Colony
0.75
25.00
9.
8
Uditnagar (New)
0.25
15.00
10.
9
Jawaharnagar
0.75
25.00
11.
9
Birsa Chowk
0.75
23.00
12.
10
Bandhamunda (P-I)
0.75
25.00
Total :7.00
199
z. Backfilling of foundation with selected excavated earth and disposal of the surplus earth as
per detailed specification.
aa. Supplying, laying, jointing and fixing of DI-K7 double flanged pipes (inlet, outlet,
overflow and scour, etc.), specials and valves of required size including embedding puddle
collar in RCC floor of the reservoir, wherever necessary, excavation of trench for laying of
pipe line, construction of valve chamber, testing and commissioning of pipe line. The
overflow and scour pipeline is to be extended up to nearest drain.
bb. Supply, erection and testing of Mechanical Float type water level indicator to indicate the
water level in the ESR .
cc. Manholes with CI cover, stainless steel access ladder for inside of tank and another fixed
type MS ladder on outside wall of tank and railing, etc. as per approved drawing.
dd. Construction of required number and size of valve chambers as per approved drawing.
ee. Supply and fixing of one number lightening arrester on top of dome of Elevated Service
Reservoir as per relevant IS code.
ff. Supply of all material and painting of exposed surfaces of ESRs with two coats of weather
coat paint, including application of putties, primer, etc. to obtain smooth surface.
K. Distribution Network
a. Procurement of ISI marked centrifugally cast (spun) ductile iron class K-7 conforming to
IS: 8329 S/S pressure pipes and ISI marked rubber gasket conforming to IS: 5382 of
required diameter and quantity as tabulated below.
Table 1.7: Details of Distribution Network
Sl. No. Diameter (in MM)
Approximate length of Pipe (in Mtr)
Ductile Iron (K-7)
M.S.
1
100
1,50,169
300
2
150
19,563
80
3
200
5,743
40
4
250
3,840
45
5
300
4,444
30
6
350
769
-7
400
1,443
-TOTAL
LENGTH
1,85,971
495
kk. Procurement of Mild Steel Pipes conforming to IS: 3589 Fe 410 grade pressure pipes of
required diameter and quantity for nallah crossing, special bends and fittings, etc.
ll. Procurement of ISI marked cast iron sluice valves, scour valve of as per IS: 14846 PN 1.0
and double acting kinetic air valve conforming to IS: 14845 PN 1.0.
Details of Sluice Valves/Scour Valves/Air valves in Distribution Mains
Description of Items
Diameter Quantity IS Specification
(in mm)
Double flanged Cast Iron Sluice valves
400
5 No.
IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
350
5 Nos.
IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
300
10 Nos. IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
250
10 Nos. IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
200
20 Nos. IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
150
25 Nos. IS: 14846 PN 1.0
Double flanged Cast Iron Sluice valves
100
450 Nos. IS: 14846 PN 1.0
C.I. double acting kinetic air valve
100
13 Nos. IS: 14845 PN 1.0
Total
538 Nos.
200
i) Supply and fixing of Differential Float Control valves for GSR/ESR including
construction of 2.5mx2.5m RCC chamber with fitting of sluice valve at both end, RCPC
cover to sustain load of 20 Tonn with other mechanical arrangement, of following sizes at
inlet point of 12 nos of zonal reservoir with data logging system to local PLC inside pump
house.
Sl.
Type of valves
Dia. of
No. of Make
No.
valves
valves
(in mm)
1
Differential Float
200
12 nos. Dorot/Bermad
Control Valve
2
Altitude pilot Control
200
12 nos. Dorot/Bermad
Valve
mm.
Procurement, laying and jointing of ISI marked Ductile iron fittings (Tee, tail
piece, bend etc.) of required sizes conforming to IS: 9523.
nn. Excavation in trenches in all kind of soil, including shoring and shuttering, wherever
required, as per the alignment up to the depth to maintain minimum one meter earth cover
for laying of pipes and fittings and proper stacking of excavated soil and disposal of the
surplus material.
oo. Laying and jointing of pipes of required size as per distribution network drawing and
making all joints water tight.
pp. Supplying all materials, labour, T&P and providing connection of delivery pipeline of
ESR with distribution system in all zones
qq. Backfilling of excavated trench with selected excavated earth and disposal of the surplus
earth as per detailed specification.
rr. Fixing of ISI marked Cast iron sluice valves, scour valve and double acting kinetic air
valve.
ss. Construction of Valve chambers as per required size as per approved drawing.
tt. Making all arrangements for laying of pipes and its stability for crossing of
small culverts/nallah / drain / road / any other facility and their restoration with minimum
disruption including making any by-pass arrangement and dismantling of all above
arrangement after completion and testing of work. At every crossing over, the pipeline will
be supported through a suitable steel structure as per direction of Engineer-in-Charge.
uu. Wherever there is inter-connection of new pipe with existing pipe shown in the network
drawing provided, contractor will provide all T &P for making interconnection of new
pipe with the existing one and vice-versa. Approximate no. of connections are; 250mm dia
- 10 Nos, 200 mm dia - 20 Nos, 150 mm dia - 20 Nos & 100 mm dia - 10 Nos.
vv. Wherever there is bend encountered along the alignment, the contractor shall make thrust
block of required size and as approved by Engineer-in-Charge.
ww.
Connection of distribution network with the Elevated Service Reservoir.
xx. Testing and commissioning of the network with contractors liability to ensure minimum
terminal head at all consumer end up to end of defect liability period.
yy. Reinstatement of roads after laying of pipes shall be done as per original specification and
satisfaction of Engineer in charge.
zz. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
201
aaa.
Cutting of road surface for taking of pipeline at required depth will be done with
making good to the damages by mending & repair to existing condition.
bbb.
Supplying , erection, testing & commissioning Electromagnetic type of flow meter
with battery back up etc. with standard accessories including fitting & fixing ,
construction of chamber all complete as per table given below.
Details of Electromagnetic type Flow meter in Distribution Main
Sl. No.
Dia. (in mm)
Quantity (in Nos.)
1.
150
2
2.
200
2
3.
250
2
4.
300
13
5.
400
6
6.
450
1
7.
600
1
Total:
27
a. Construction of Staff Qrs 2 blocks ( 2 storied x 4 nos) (Flat type) having plinth
area 270 sqm each floor in each block.
b. Site clearance and removal of all trees, debris, above and underground structures
etc., including stacking of the dismantled material and disposal of surplus material.
Site dressing and leveling the surrounding ground to final ground level.
c. Excavation up to the foundation in all kind of soil, including shoring and
shuttering, wherever required. Stacking of excavated material and disposal of
surplus material.
d. Supply of material, Construction including centering, shuttering, reinforcement,
brick work, RCC M-25 etc. as per approved drawings.
e. Supply of all material and construction of all building, including finishing work,
flooring, internal and external plastering, whitewashing, roof treatment, rain water
pipes, fixing & painting of doors, windows & fixtures, etc. as per the detailed
specification.
f. Supply of all material and painting of inside and outside of building as follows:
i.
Inside-2 coats of oil bound distemper including application of putties,
primer etc. to obtain smooth surface.
ii.
Outside-2 coats of weather coat paint including application of putties,
primer etc. to obtain smooth surface.
g. Backfilling of foundation with selected excavated earth and disposal of the surplus
earth as per detailed specification.
h. Supply and installation of internal electrification work i.e. lighting, switches, fans
and ventilation system, etc. of make mentioned in schedule of makes.
i. Supply & installation of internal & external water supply & internal Sanitary
Installation & external Sewerage Disposal as per PH Specification & direction of
Engineer-in-Charge.
L. House Service Connection
Providing house connections ( 100 nos) by supplying, fixing, fitting of 8 mm nominal bore
20 mm size Gun metal ferule cock, 15mm size Brass / Gun metal Full Way valve with
wheel and 20 mm nominal bore AMR compatible Water meter confirming to IS:779
(1994)/ Class-B ISO 4064 with moulded case PVC meter box ( 1 no each) and 15 / 20 / 25
mm nominal bore G.I. /HDPE pipe and fittings as per field condition for a minimum
length of 7 mtr including required earthwork in excavation / back-filling.
202
M.
N.
Supplying, erection, testing & commissioning of Water Leak detector with standard
accessories etc. all complete.
i) Pipe line locator with standard accessories etc. all complete 2 Nos
ii) Leak detector with standard accessories etc. all complete 2 Nos
iii) Water leakage management Software etc. all complete 1 No
Instrumentation, Automation & SCADA for existing 55 MLD WTP
Supervisory Control and Data Acquisition (SCADA) system is proposed to facilitate
operational automation. The entire Automation & SCADA system is to be designed so
that, it is compatible to the existing system and should be integrated with the existing
arrangement & made efficiently operated. The bidder is required to inspect the existing
system prior to bidding and rates should quote accordingly. The system will have the
following facilities.
Table 1.9: Details of Automation & SCADA
Sl. No.
Description
No. or Quantity
1
Water Treatment Plant
a
b
c
d
f
g
h
i
O.
Control Panel
1 Set
Filler Bed Console
10 Nos
Electrical Valve Actuator
( 10 X 8) = 80 Nos
LOH & ROF Meter
20 Nos
On line pH Analyzer
1 No
On line Turbidity Analyzer
1 No
On line Residual Chlorine Analyzer
1 No
Other Miscellaneous Items
1 Job
ON-Line Analyzer:
Continuous on-line analyzer for monitoring of raw water and treated water quality
for Ph & Turbidity (with a range of 0 to 2000 NTU) and Ph, Turbidity (range 0 to
100 NTU) & residual chlorine respectively. The system is to be tagged to PLC for
real time data monitoring with local and remote operation. There shall be required
capacity of battery back up system for one hour.
The wall of chemical house shall be minimum 25cm thick brick masonry. Chemical
storage area shall be provided at ground floor. Chemical tanks, dosing system shall also be
accommodated at first floor. The RCC stairs shall be up to roof of the first floor and shall
be provided with mumty. Suitable stair case , platforms etc shall be provided to have clear
access to different units. The 2 nos. Alum and 2nos. lime tanks shall be provided & lined
internally with acid resistance tiles. Floor and walls of chemical house shall be lined with
acid resistant tiles. One no. 10Cum capacity PAC storage tanks with dosing pumps 2
Nos.(1w+1s) with metering unit integrated to PLC for local and remote operation to
regulate automatically the dosing of chemicals according to quantity and quality of raw
water. The floor and dados shall be provided with chemical resistance tiles. The dosing
pumps are linked with PLC for remote operation (change of flow and raw water quality) at
the outlet valve of the solution preparation tank, the inlet and discharge of the dosing
pumps are to be electrically actuated and there should be a level measuring system to
measure the level in the tank.
203
P.
Any item or any provision/requirement if not included in this section, but is necessary to
be provided for the completion of the project and for its functional necessity, the same shall be
provided by the contractor.
1. General Features of the Water Supply Project to Jharsuguda Municipality:
o The intent of this Section is to specify the work items to be covered on EPC
Contract Basis in conformity with the technical specifications as enumerated in the
subsequent clauses for the work Water Supply to Jharsuguda Municipality.
o The present water supply scheme has been planned to receive water from River IB,
which is approximately 4.6 Km from propsed WTP located at H.Katapalli. An intake
well has been proposed inside the River IB with pump house to supply raw water to
WTP. From this intake well approximately 4.6 Km long 500mm diameter DI-K9/MS
rising main would carry the raw water to the proposed water treatment plant.
o A new water treatment plant of 19 MLD capacity (for mid design year i.e. 2033) has
been proposed, which would be able to satisfy the mid design year demand.
o The Municipality is divided into 4 (Four) water supply zones. Each zone is provided
with a combination of one Elevated Service Reservoir (ESR), one Under Ground
Reservoir (UGR) and pump house building. This will be constructed in one compound
having a boundary wall along with one mild steel gate, walk-way including
landscaping and drainage, etc. Pumps provided at zonal pump houses will pump the
water from UGR to ESR. Water would be supplied to consumers from ESRs by
gravity through a distribution network.
o It is intent of the Engineer-in-Charge to construct a facility to provide basic need of
human being Water, using highest standards of construction and supply of material
and equipment to enable a sustained reliable system for performance over next 30
years. The responsibility of the contract starts from the intake point of intake leading
channel and ends at the consumer points included in the project area. The
words
Purchaser, Owner and Employer mentioned in subsequent pages mean Public
Health Division Jharsuguda represented by Engineer in charge. Similarly, the word
Vendor, Bidder and Contractor refers to the successful bidder or the
Manufacturer of the equipment as is relevant to the context.
44.5
Scope of Work
44.5.1 The bidder before bidding shall visit the site at his own cost and shall satisfy
himself with the nature and extent of the work involved, actual site conditions, and
existing facilities. Shall collect any other information which may be required before
submitting the tender. Any claim in this regard shall not be entertained.
44.5.2 The scope of work for the Water supply scheme covers surveys including
Topographical survey, Geo-technical survey, raw water quality testing, design &
detailed engineering of all components of the scheme, do the necessary changes as
per site condition, develop detail drawing and getting approval from Engineer-inCharge, supply of equipment and construction materials, testing at manufacturers
works, delivery up to site, erection, execution of works as per the work described
under Scope of Work clause 16.0 or elsewhere in the tender and as per IS codes,
OPWD specifications and detailed specifications attached hereto, final check-up,
painting, testing, commissioning including hydraulic testing of all water retaining
structures and pipes with fittings, valves, etc. as per relevant IS codes and relevant
specification.
44.5.3 The work shall be carried out according to the design / drawings submitted by
bidder and approved by Engineer-in-Charge. For building, facilities, systems,
204
44.6
structures, etc., necessary layout and details are furnished with tender document.
Any changes, if required, shall be done by the bidder keeping in view the scope,
minimum specified requirement, the statuary and functional requirement and
providing enough space and access for operation, use and maintenance. The
bidders work shall cover the complete requirement as per tender specification.
44.5.4 The work to be performed under the specification consists of providing all labours,
supervision, materials, scaffolding, construction power, fuel, construction water,
and construction equipment, testing equipment, tools and plants, supplies,
transportation and all incidental items not shown or specified but necessary for
successful completion of the work.
44.5.5 The nature of work generally involves site clearance, dismantling of existing above
ground and underground structures, excavation in all types of soils, foundation
preparation, dewatering and its disposal, backfilling, disposal of surplus excavated
material, supply of all construction material and supply of all necessary plant
machinery and equipment, etc., construction with the materials of specified quality,
constructing drains, embedding, encasement of pipes, cleaning the site from all
waste and surplus material after completion of work and other ancillary work as per
specifications, as per drawings submitted by the contractor and approved by the
Engineer-in-Charge.
44.5.6 Any items of work, either supply and / or erection of material / equipment which
have not been specifically mentioned in the scope / specifications but are necessary
for operation and guaranteed performance of the entire water supply scheme, and
equipment offered shall be deemed to be included within the scope of this
specifications and shall be provided by the bidder without any additional cost.
44.5.7 All material / equipment which have been mentioned and have not been
specifically mentioned in the scope / specifications but are necessary for operation
and guaranteed performance of the entire water supply scheme shall be any of the
make mentioned in Clause 2.17, Schedule-D. Contractor shall have to obtain
written approval of make of any item from Engineer-in-Charge before supply.
44.5.8 The scope of work also include shifting of electrical/ telephone/ any other type of
cable, electric poles, water, sewer or any other type of pipeline or any other facility.
Any arrangement for crossing roads, drains, nallah including bypass arrangement
and their restoration to the satisfaction of Engineer-in-Charge after completion of
particular work also included in the Scope of work.
Services to be Provided by the Contractor
44.6.1 The contactor shall open a fully furnished site office with all necessary facilities
having office equipment such as computer, printer, etc. A separate room shall be
provided to the Engineer-in-Charge or its representative.
44.6.2 The Contractor will make necessary arrangement for construction power and
construction water.
44.6.3 The Contractor shall make necessary arrangement for all the testing and inspection
to be conducted in a manner as specified in the specifications and as per codes.
44.6.4 Transportation of all equipment / raw material / spares from manufacturers work to
the project site, inclusive of all intermediate handling and unloading / storage at site
and all taxes, octroi, etc.
44.6.5 Supply, erection as per manufacturers recommendations / specifications,
inspection, testing, start up and running of the equipment during trial run /
performance guarantee period at rated capacity and speed.
205
Deploying qualified and experienced staff for supervision of all erection and
commissioning services. The Contractor shall also arrange for rectifying the defects
during defect liability period.
44.6.7 During defect liability period of five year the contractor has to replace any
equipment, component, etc. for manufacturing defect, malfunctioning and below
rated performance. He will make good any structure or part of it if found defective
or becomes during functioning.
44.6.8 Application of the final paints and final finishing work shall be done by the
Contractor after complete erection and testing, trial run but before handing over to
the department.
44.6.9 The contractor shall also arrange technical experts of equipment from proprietary
supplier as and when necessary till the commissioning, trial run and performance
guarantee period of the equipment.
44.6.10 Any survey/ leveling/ fixation of bench mark/ reference level required for detailed
engineering of the any component of the scheme will be done by survey team
deputed by contractor. The survey team will carry out the area survey and leveling
of Intake, WTP, ESR compounds or wherever required as per the location drawing
and as per the instruction of Engineer-in-Charge.
44.6.11 The detailed scope of work has been mentioned in clause no 16.0 of this chapter.
44.6.12 Nothing extra over the quoted price shall be paid to contractor on account of any
financial implications of all the conditions and specifications. It will be treated that
necessary financial provision are deemed to have been kept in the quoted price.
Any contiguous item or any provision / requirement, if not included in the general
specification and scope of work, special specification and detailed specification but
necessary to be provided for the completion of the work and for its functional
necessity, shall be provided at no extra cost above quoted price. The decision of the
Engineer-in-Charge in such cases shall be final and biding on the contractor.
44.6.13 The time is the essence of this contract. The entire work described under Scope of
Work clause 16.0 or elsewhere in the tender (Design, approval of design &
drawings, execution and commissioning) is to be completed within a time frame of
24 (twenty-four) calendar months from the date of issue of work order.
Tender Drawings
The Tender drawings shall form the part of tender document. The contractor shall submit
detail design and drawing of all component of the water supply scheme (except hydraulic
design of rising mains and distribution network) for its sufficiency in all respect before
taking up the construction work. The contractor can do addition, modification, alteration or
detailing in the drawings as per the prevailing conditions and he has to take approval from
Engineer-in-Charge. The structural stability throughout its working life lies with the
contractor. The work has to be executed as per the construction drawings (latest revision)
with additions, alterations and modifications made from time to time as required and
approved by the Engineer-in-Charge and also according to any other drawing prepared by
contractor progressively during the execution of the contract.
Test for Material/Workmanship
All tests required for all bought out materials as desired by the Engineer-in-Charge shall
be carried out by the contractor as per relevant IS code and at his own cost in the presence
of authorized representative of the Engineer-in-Charge.
Specifications
The detailed specifications, IS codes and OPWD specifications are intended for the
44.6.6
3.
4.
5.
206
6.
7.
8.
9.
10.
11.
12.
12.1
general description of the work, quality and workmanship. All work is to be carried out
according to the specifications. Wherever reference to the standard codes of practice etc. is
made, they shall be taken as the latest edition of the same issued within one month before
the date of submission of the Tender.
Layout and Levels
o The layout and levels of all structures etc. shall be made by the contractor at his own
cost from the general grid of the plot and bench marks given by the Engineer-inCharge. Contractor shall provide all help in instruments, materials and men to the
Engineer-in-Charge at no extra cost for checking the detailed layout and correctness of
the layout and levels. However the Contractor shall be solely responsible for
correctness of layout and levels.
o Permanent reference pillars shall be established by the contractor and under no
circumstances shall the contractor remove or disturb any permanent/reference pillar/
benchmark without the approval of the Engineer-in-Charge. The contractor shall
carefully maintain and protect all benchmarks and reference points and shall mark the
layout of all his work by accurate reference to the benchmarks and reference points.
Construction Method
The bidder shall submit a pert chart along with this tender showing the time schedule for
the overall constructions activities along with construction methodology. The construction
method and mobilization of resources to be adopted by the contractor shall match with this
time schedule and shall be approved by the Engineer-in-Charge. After approval of tender
the contractor will submit his detailed schedule of work.
Quality Assurance Plan
A Quality Assurance plan giving details of necessary tests to be carried out on various
materials for construction of work shall be submitted by the contractor for approval before
start of the work. The Contractor shall be responsible for carrying out such tests. The
contractor shall test the samples of all materials in presence of authorized representative of
the Engineer-in-Charge at the specified frequencies as per relevant IS codes or elsewhere
given in the tender document and keep proper record of all tests.
Testing of Materials
All arrangement shall be made by the contractor to provide testing requirement as
specified in the specifications. For the tests for which, equipments required is not available
with the contractor shall provide the same or will arrange the test to be done at a
Government approved laboratory. No extra claim is admissible in this regard.
Approach Roads
The Contractor where required shall make his own arrangement for approach to the work
site (including, borrow and disposal area) and for movement of men, machinery, other
equipment etc. required for carrying out the work included under this contract. The
contractor will also arrange for any land required for borrowing earth or disposal of any
dispensable material.
Dealing with Water / Dewatering,
Bailing and Pumping out of subsoil water may have to be carried out during execution of
work. The contractors program and methods must be capable of dealing with rainfall /
subsoil water. The contractor shall supply, install and operate his own temporary pumping
equipments wherever required.
Prevention of pollution
Arrangement shall be made by the contractor to prevent Air Pollution and pollution in any
stream, nallah or rivers. Arrangements for sprinkling of water in the construction and
207
12.2
13
14
15
15.1
15.2
borrow area to prevent any dust blowing also shall be done by the contractor. The
contractor shall be solely responsible and liable for all damage caused by any pollution
that may take place during the execution of the works, and he shall make arrangements as
the Engineer-in-Charge may approve, for preventing pollution.
No separate payment shall be made for the pollution control measures.
Safety Measures
o In respect of all labour directly or indirectly employed in the work for the performance
of the contractors part of this agreement, the contractor shall at his own expense
arrange for the safety provision as per IS code framed from time to time and shall at
his own expense provide for all facilities in connection therewith. In case the
contractor fails to make the above arrangement Engineer-in-charge shall be at liberty
to make arrangements and provide facilities as aforesaid and recover the cost incurred
on his behalf from the contractor.
o The contractor shall ensure the safety of men, material, machinery, existing structure
and any other facilities. Since the work is to be done on road/lanes/by lanes, all
necessary safety arrangements including proper barricading etc. shall be done by the
contractor.
o The Contractor shall be absolutely and solely responsible for any accident that may
occur during the progress of the work and for injury or damage to the men, material,
machinery, existing structure and any other facilities of any description whatsoever
which may be caused by or result from the execution of work. The Contractor shall
make good any damage due to accident or pay any claim arising out of accident and
will indemnify the employer of expenses on account thereof. No separate payment
shall be made for safety measures.
Equipments & Machinery.
The contractor shall have to use his own earth moving equipments & concreting
equipment such as dumpers, pocklains, dozers, batching & mixing plant vibrators etc. and
any other machinery required for the entire scope of work including the work of
excavation and conveyance of earth from the borrow areas to site and also shall have to
use his own compaction machinery to compact the fill material such as vibratory
/pneumatic rubber typed rollers, water tankers etc. A list of equipments/machinery to be
deployed at site as per the requirement of the project schedule shall be submitted by the
contractor within one week of award of work. All the equipments/machinery shall be kept
in working condition by the contractor during the tenancy of the contract. Contractor will
not move any equipment/machinery without written permission of Engineer-in-charge to
any other work which is not under the scope of this work.
Storage and Handling of Materials
The protection all material and machinery from dirt, clay, rust, theft or damage at any
stage of the project is the responsibility of the contractor and no claim will entertained in
this regard.
Reinforcement
Reinforcement steel shall be stored in a manner that no damage/rusting is caused to the
material.
Cement
The Cement shall be stored as per IS code and in a manner that no damage/setting is
caused to the material.
208
15.3
xx.
xxi.
xxii.
xxiii.
xxiv.
Hours of
Pumping
Capacity
of Each
Pump
120 LPS
Head of
Each
Pump
50 Mtr
No. of
Working
Pump
02
No. of
Standbye
Pump
01
Total
No. of
Pumps
03
Vertical 22 hours
Turbine
The capacity and head mentioned in above table is minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
Power Supply at Intake Point:
i). Supply , construction and erection of 3-phase 33kv power supply HT line from
Budhipadar 132KV Grid (which is about 6.5 KM from Budhipadar Grid), with GI joist
pole of 13m height and suitable size AAA conductors, One dedicated VCB to be
provided at the grid. Each pole shall be provided with anti climbing devices and danger
boards as well as industrial earthlings. The proposed HT transmission line is single
circuit. The transmission line will be pole mounted and design parameter and the fault
current shall be collected from the electrical distribution company . The tapping point
structure are to be constructed at Takatpur Grid to tap 33 KV power supply.
210
xxvii.
xxviii.
xxix.
xxx.
xxxi.
xxxii.
Internal & External electrification of pump house with industrial exhaust fan
Supply & fixing of pipes (delivery and common header, etc.),3 sets of
Specials/Manifolds of 500mm dia over base slab, 3nos of 300mm dia Sluice
Valves, 3nos of 300mm dia Non-Return Valves, dismantling joints, of make
mentioned in Clause 2.17, Schedule-D of the document , pipe support, thrust block
as per detailed specifications.
Supply and installation of PVC encapsulated mild steel rungs for inspection inside
the well.
Supply & installation of 3nos of dial type Pressure gauge of make mentioned in
Clause 2.17, Schedule-D of the document, on the delivery sides of the pumps and
one on the common header with two-way stop cork.
Supply, erection and testing of Electromagnetic type full bore type Flow meter/
Bulk water meter of 500mm dia.
Supply & fixing of 3.0 MT electrically operated travelling crane with gantry girder,
etc. for lifting pumps, etc., including painting of all equipment and steel sections as
per detailed specification.
Supply of all material and painting of inside of pump house building, inside-2 coats
of oil bound distemper, including application of putties, primer, etc. to obtain
smooth surface. Doors and windows shall be painted with enamel paint after one
coat of primer.
Providing MS grating with chequered plates including painting, fixing in position
211
xxxiii.
xxxiv.
xxxv.
Minimum size of scour valve shall be 100mm. Minimum size of air valves shall be
100mm.
Details of valves in Raw Water Rising Main
Description of items
Diameter Quantity
Remarks
( in mm)
Double flanged Cast Iron Sluice
500
2 No.
IS:14846 PN 1.6
valves
Double flanged cast iron Scour
100
4 Nos. As per relevant IS
valves
specification
C.I. Double acting kinetic air valves
100
2 Nos.
IS:14845 PN 1.6
Total:
8 Nos.
xxxviii.
Construction of thrust blocks of required size as per approved drawing at all bends
and other necessary locations in the pipeline.
xxxix.
Construction of valve chambers as per approved drawing for all types of valves as
per site requirement & as per instruction of Engineer-in-Charge.
xl.
Backfilling of the excavated trenches with selected excavated earth. Backfilling
shall be done in layers of 150mm thickness and shall be watered and compacted as
per detailed specifications.
xli.
Making all arrangements for laying of pipes and its stability for crossing of nallah /
drain / road / any other facility and their restoration with minimum disruption
including making any by-pass arrangement and dismantling of all above
arrangement after completion and testing of work. At every crossing over nallah
the pipeline will be supported through a Structural steel truss bridge. Truss bridge
shall be of suitable width and shall be approved by Engineer-in-Charge.
xlii.
Repair to damages caused during construction to any existing road, bridge, culvert,
water supply line, sewerage line, drain, electricity cable & pole, gas pipeline and
telephone line, etc. It shall be reinstated as per the original specification and
satisfaction of concerned authorities / Engineer-in-Charge.
xliii.
Cutting of road surface for taking of pipeline at required depth will be done with
making good to the damages by mending & repair to existing condition.
xliv.
To connect the raw water rising main to the cascade aerator at the proposed WTP.
xlv.
Testing and commissioning of raw water rising mains as per relevant IS code and
to ensure minimum terminal head of 3.0m.
16.6 Water Treatment Plant
General Description
o The WTP will be designed and constructed for 19 MLD capacity considering 22 Hrs
of operation basing on the intermediate design period. However, Chemical house cum
Laboratory, Administrative building and chlorination house shall be designed for
ultimate capacity of 25 MLD. Maximum 3% water loss is permitted in the WTP.
o The land available for WTP is 10.00 acres. Contractor has to design WTP including
all associated works, CWR and Pump house and electrical sub-station, etc.,
considering the availability of land. Sufficient space shall be left for future expansion.
Contractor shall design and fit all the works required for ultimate capacity in the
available land accordingly.
o The Water Treatment Plant is to be designed based on conventional treatment
technology consisting of Clari-flocculator and rapid sand gravity filters. The
contractor shall essentially follow the CPHEEO Manual, which is a guideline for the
213
system design. However following the same concept does not relieve the bidder of his
guaranteeing the performance of the plant including treated water quality.
o The proposed WTP of 19 MLD capacity shall consist of the following units:
39.
Cascade Aerator (No. of Unit-1)
40.
Raw Water Channel (No. of Unit-1, Overload-50%, Mechanical Flow
meter-8MLD to 25 MLD, Lead channel to Flash Mixer-2 nos)
41.
Flash mixer (No. of Units-2)
42.
Clariflocculator unit (No. of Units-2)
43.
Rapid Gravity Filter
44.
Back wash Over Head Reservoir of suitable capacity as per design
requirement.
45.
Chemical House (2 floors)(Approx. Floor area of each floor150 sqm)
46.
Chlorine House-(Approx. Floor area -35 Sqm)
47.
Gas Chlorination system 01 unit
48. Pump house (Approx Floor area 60 sqm)
49. Filter house Annex building(Approx. Floor area-35 sqm)
50. Clear Water reservoir-2.00 ML Capacity-01 No
51. Office-cum-Lab building- (Approx. Floor area -120 Sqm)
52. Guard Room-( Approx. Floor area -10 Sqm)
53. Sludge disposal arrangement inside WTP.
54. All inter-connecting piping, sluice gates, valves and appurtenants
55. Glow Sign Board, Name Plate and Flow diagram etc.
56. Allied Structures
n. Construction of 4.0mwide BT road-250m & 1.5m wide CC walkway-150m
o. Road & Yard lighting
p. Internal Drainage
q. Site Development
r. Staff Qrs.- 4 Nos.( Approx. Floor area - 50 Sqm each)
s. Compound Wall- 800m
57. Instrumentation
iii) 450mm dia full bore type Electromagnetic Flow meter 1 No.
iv) Lab equipments.
Works to be performed:
lxvi.
The scope of work includes, to design, detailed engineering, supply of material,
construction, installation, testing & commissioning, and five year of defect liability
period for all Civil, Mechanical, Electrical and Instrumentation Works for the WTP
and all associated works including centering, shuttering, reinforcement, all piping
arrangements, etc. as per detailed specifications.
lxvii.
Conducting necessary investigations e.g. topographical survey, geotechnical survey,
leveling etc., preparation of contour maps where ever necessary.
lxviii.
Preparation of work area, clearing site, jungle clearance, etc., including dismantling
and removing of any existing above ground and underground structures including
existing roads, uprooting of all trees and vegetation and their disposal, shifting of
pipes, cables, electrical poles, etc. and site dressing, leveling of the surrounding
ground to final ground level, stacking and disposal of surplus material.
lxix.
Construction of Chemical House (2 floors): It shall be two storied RCC framed
structure with doors, widows, ventilators etc. Chemical storage area shall be
provided at ground floor. Chemical tanks, dosing system shall also be
214
lxx.
lxxi.
lxxii.
lxxiii.
lxxiv.
lxxv.
lxxvi.
lxxvii.
lxxviii.
lxxix.
accommodated at first floor. The chemical tanks shall be designed for ultimate
capacity of the WTP. The RCC stairs shall be up to roof of the first floor and shall be
provided with mumty. The construction of the building shall be as per detailed
specification.
Construction of Clear Water Pump House: It is single storied building having
minimum floor area of 60 sqm. It shall be RCC framed structure with doors, widows,
ventilators etc. The construction of the building shall be as per detailed specification.
Construction of Chlorine house: The Chlorine house shall be RCC framed structure.
It shall be planned to accommodate chlorine gas tonner storage, dosing system for
the ultimate capacity of WTP i.e. (25) MLD. It shall have 5 cum potable water tank
on the roof. Aluminium ladder shall be provided to access the roof of the building.
Proper ventilation shall be provided as per specification in the chlorine house. It is to
be furnished with gas chlorination unit with 4 nos of tonners of 0.9 MT capacity
each. 3 MT capacity EOT crane with gantry girder for lifting of toner is to be
provided.
The Annex building shall be RCC framed structure & will be provided with an
attached toilet.
Construction of Office-cum-Laboratory Building: It is single storied building having
minimum floor area of 120.00 sqm. It shall be RCC framed structure with doors,
widows, ventilators etc. It shall consist of office space, spare parts storage area and
toilets. Potable water tank shall be provided on the roof. All sanitary fittings shall be
installed in the toilets. RCC stairs along with mumty shall be provided to access the
roof of the building. The construction of the building shall be as per detailed
specification. The laboratory building should be furnished with all necessary
equipments & chemicals & furnitures for water testing purpose as per CPHEEO
manual comprising mainly of pH Meter, Turbidity Analyser, Chlorimeter, Jar Test
Apparatus etc
Supply, erection and commissioning of 1 MT capacity electrically operated
travelling crane with monorail to lift the chemicals in chemical house. A cutout of
adequate size in the roof of the ground floor at appropriate location shall be provided
for lifting of chemicals in crane bucket from ground floor to first floor.
Design, supply of material, construction of Paved Parking area for staff vehicles.
Sufficient area for parking shall be provided for staff vehicles/departmental vehicles.
Safety equipment such as portable fire extinguisher of all types of adequate size and
numbers shall be provided in the Office-cum-laboratory Building, Chlorine House
and Chemical house.
Excavation up to the foundation in all kinds of soil including shoring and shuttering,
wherever required, stacking of excavated material for all the units of the WTP.
Backfilling of the foundations with selected excavated earth. Backfilling shall be
done in layers of 150mm thickness and shall be watered and compacted as per
detailed specifications.
Supply of all material and finishing of all buildings of WTP, like flooring, internal
and external plastering, painting of 2 coats of cement paint on all exterior surfaces
and 2 coats of oil bound distemper on all interior surfaces, including application of
putties, primer, etc. to obtain smooth surfaces, roof treatment, rain water pipes,
fixing & painting of doors and fixtures and windows, etc. as per the detailed
specification.
215
lxxx.
All other units of WTP shall be painted with 2 coats of weather coat on exterior
surface and 2 coats of epoxy paint on internal surfaces coming in contact with water.
Power Supply at WTP
i).
Supply , construction and erection of 3-phase, 3 wired 33kv power supply HT line
1.5KM from Budhi padar 132KV grid, with GI joist pole of 13m height and
suitable size AAA conductors with construction of Bay at grid. One dedicated
VCB to be installed at grid feeder. Each pole shall be provided with anti climbing
devices and danger boards as well as industrial earthings. The proposed HT
transmission line is single circuit. The trans mission line will be pole mounted and
design parameter and the fault current shall be collected from the eletricl
distribution company.
ii)
iv)
v).
vi).
vii)
Suitable size of switch yard and meter room/panel room for 33/0.433KV grade
with Power cable & data cable and cable tray.
Supply, installation and commissioning 125 KVA DG Set 1 no. with AMF panel
including metering, all other accessories and data should be monitored at central
PLC.
viii)
lxxxi.
lxxxii.
lxxxiii.
lxxxiv.
A.T.S. control panel & Motor Control Centre (3 phase A.C. power supply 50 Hz),
push buttons, power and control cables etc. to complete the system in totality as per
detailed specification.
Supply and installation of internal and external electrification work i.e. lighting,
switches, fans, ventilation system, etc. as per schedule of make and detailed
specification.
Supply and construction of 230mm thick brick masonry Boundary wall of 5 feet
height above finished ground level with 25mm thick cement concrete coping and
pillars at 2.5m interval around the WTP campus.
Supply and erection of MS Gate at entry as per detailed specification and fixing it to
the RCC columns.
216
lxxxv.
Supply of all materials and construction of wastewater disposal system to dispose the
wastewater generated from the toilets of Administrative and Laboratory building.
lxxxvi.
Supply & fixing of 3.0 MT electrically operated raveling crane with gantry girder,
etc. for lifting pumps, etc., including painting of all equipment and steel sections as
per detailed specification.
lxxxvii.
Potable water supply shall be provided within the WTP compound.
lxxxviii.
Supply of all material and construction of open drainage system for WTP compound
with brick masonry and its connection with nearest drain as per approved drawing.
lxxxix.
Supply of material and construction of 1.5m wide PCC walkway to connect various
units of WTP as per approved drawing.
xc.
Construction of bituminous approach road of required width and length inside the
WTP compound, including supply of material as per detailed specification and
joining it to the nearest road.
xci.
Supply and plantation of saplings of different types in a properly designed
landscaping.
xcii. Supply of fluorescent Glow Sign Board captioned Water Treatment Plant
Jharsuguda with details in attractive colors with all fittings, etc. of appropriate size
and fixing it at appropriate height at the entrance gate as per detailed specifications.
xciii. Guarantee the outlet quality parameters of the treated water for drinking purpose as
per IS:10500 with latest amendments. The Guarantee of the treated water quality is
irrespective of raw water quality. While designing the units of WTP the contractor
shall keep this in mind.
xciv.
Supply of one number wall mounted board with flow sheet including details of all
units, pumps, motors in attractive colours for mounting on the wall at appropriate
height as per aesthetic requirement of the Administrative building.
xcv.
ON-Line Analyzer:
xcvi.
Continuous on-line analyzer for monitoring of raw water and treated water quality
for Ph & Turbidity (with a range of 0 to 2000 NTU) and Ph, Turbidity (range 0 to
100 NTU) & residual chlorine respectively. The system is to be tagged to PLC for
real time data monitoring with local and remote operation. There shall be required
capacity of battery back up system for one hour.
xcvii.
The wall of chemical house shall be minimum 25cm thick brick masonry.
Chemical storage area shall be provided at ground floor. Chemical tanks, dosing
system shall also be accommodated at first floor. The RCC stairs shall be up to
roof of the first floor and shall be provided with mumty. Suitable stair case ,
platforms etc shall be provided to have clear access to different units. The 2 nos.
Alum and 2nos. lime tanks shall be provided & lined internally with acid resistance
tiles. Floor and walls of chemical house shall be lined with acid resistant tiles. One
no. 10Cum capacity PAC storage tanks with dosing pumps 2 Nos.(1w+1s) with
metering unit integrated to PLC for local and remote operation to regulate
automatically the dosing of chemicals according to quantity and quality of raw
water. The floor and dados shall be provided with chemical resistance tiles. The
dosing pumps are linked with PLC for remote operation (change of flow and raw
water quality) at the outlet valve of the solution preparation tank, the inlet and
discharge of the dosing pumps are to be electrically actuated and there should be a
level measuring system to measure the level in the tank.
217
16.7
Clear Water Reservoir (CWR) and Clear Water Pump House (CWPH)
General Description
o CWR and CWPH shall be constructed within proposed WTP premises.
o CWPH is to be suitably located in the layout having minimum plinth area of 60 sqm .
o Contractor shall fit the layout within available land. Sufficient space shall be left for
future reservoir.
Works to be performed
The scope includes Design, Construction, Supply, Installation, Testing, Commissioning
and five
year defect liability period of all Civil, Mechanical, Electrical and
Instrumentation Works for the CWR and CWPH, which include the following as per
detailed specification.
pp. Supply of all materials and construction of RCC flat slab CWR of minimum capacity
2.00ML 1 no. Adequate natural ventilation should be provided on the top slab of the
CWR. RCC stairs for access to the each CWR with covered mumty shall be provided.
Drain valve, overflow arrangement including piping shall also be provided as per
detailed specifications.
qq. Supply and installation of steel doors for the mumty of stairs.
rr. Supply and installation of double flanged cast iron sluice valve as per IS: 14846 PN
1.6 with extended spindle (up to the top slab of the common pump suction pit) for
isolation of CWR compartments for cleaning and maintenance without disturbing the
water supply.
ss. Connection of Pump suction pipes with common suction pit.
tt. Supply of all materials and construction of RCC framed structure CWPH as per
detailed specifications. Minimum covered area of the CWPH shall be 60 sqm
uu. Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.2 with suitable motor for pumping water to zonal UGRs, of make mentioned
in Clause 2.17, Schedule-D of the document, including MS base plate, coupling, etc.
as per detailed specifications.
Table 1.2: Details of pumps at Clear Water Pump House at proposed WTP
Type of Pump
Hours of
Pumping
Discharge
Head of
No. of
of Each Each Pump Working
Pump
Pump
No. of
Standbye
Pump
Total No.
of Pumps
Horizontal Split
20 hours 100 LPS 60 Mtr
02
01
03
casing Centrifugal for
Zone-1, 3 & 4
The capacity and head mentioned in the table above is the minimum requirement.
Contractor has to verify the same and provide accordingly without any extra cost.
vv. Supply & installation of Pressure gauges of make mentioned in Clause 2.17,
Schedule-D of the document, one each on the suction and delivery sides of the pumps
and one on the common header with two-way stop cork.
ww. Supply, erection and testing of Electromagnetic type Flow meter / Bulk water
meter at the common header of the pumps.
xx. Supply & fixing of pipes (suction and delivery and common header, etc.), valves
(Sluice valve, non-return valve etc.), dismantling joints, of make mentioned in Clause
2.17, Schedule-D of the document , pipe support, thrust block as per detailed
specifications.
yy. Supply and installation of water hammer / surge protection device as required.
218
16.8
16.9
zz. Supply of all material and construction of intake and pump house, including finishing
work, flooring, internal and external plastering, roof treatment, fixing of doors,
windows, ventilators, rain water pipes and all fixtures as per the detailed
specifications.
aaa. Supply & fixing of 3.0 MT electrically operated travelling crane with gantry girder,
etc. for lifting pumps, including painting of all equipment and steel sections as per
detailed specification.
bbb. Supply, installation, testing and commissioning of external and internal lighting,
push buttons, power and control cables, earthing, etc. to complete the system in
totality.
ccc. Supply of all material and painting of exposed outer surfaces of pump house with
two coats of cement paint including application of putties, primer, etc. to obtain
smooth surface.
ddd. Supply of all material and painting of inside of pump house building, inside two
coats of oil bound distemper, including application of putties, primer, etc. to obtain
smooth surface. Doors and windows shall be painted with enamel paint after one coat
of primer.
eee. Supply, erection and painting of structural steel pipe supports, pipes, and other
equipment as per detailed specification.
Supply, installation, testing & commissioning of Horizontal centrifugal pumps as per
Table 1.2 with suitable motor for pumping water from CWR, of make mentioned in Clause
2.17, Schedule-D of the document, including MS base plate, coupling Supply, installation,
commissioning & testing of Horizontal split casing centrifugal pumps with suitable motor
of make mentioned in schedule of makes, including MS base plate and coupling (3 phase
A.C. power supply 50Hz) of approved make, for pump capacity above 15 HP and star
delta starter for pump capacity below 15 HP with capacitor bank for PF correction.
Suitable Motor control panel, capacitor bank, ATS control panel & APFC panel including
EMS, all other accessories including PLC panel with SCADA, HMI for local and remote
operation along with the required size of incoming & out going cables with a spare one
shall be installed. The EMS with licensed soft ware is to be tagged to available PHEO
server at NIC, Bhubaneswar.
Clear Water Rising Mains
Supply, laying, jointing of DI pipes as per IS 8329 Socket and Spigot joint and ISI
marked rubber gasket conforming to IS 5382 from the water treatment plant to the zonal
Under Ground Reservoirs (UGR) as per the table below and layout drawing provided and
as per detailed specification.
Table 1.3: Details of Clear Water Rising Mains & valves
Approximate Length of
Diameter
pipe (in Mtr)
Sl. No.
Location
(in MM)
DI-K-9
M.S.
1.
Proposed WTP to BTM Chowk
450
2700
100
2.
BTM Chowk to Bomay Chowk
350
900
100
3.
Proposed WTP to Sarbahal high
300
5700
300
School
4.
Bomay Chowk to Existing WTP
250
1500
100
219
nn. Supply, laying, jointing of Mild Steel Pipes conforming to IS: 3589 Fe 410 grade of
required diameter including specials, bends etc for nallah and other crossing as per
detailed specifications.
oo. Supply and laying of ISI marked Ductile iron fittings (Tee, tail piece, bend etc.) of
required sizes conforming to IS: 9523 with latest amendment as per site requirement
& as per instruction of Engineer-in-Charge.
pp. Supply and erection of ISI marked double flanged cast iron sluice valves, scour valve
as per IS: 14486 PN 1.6 and double acting kinetic air valve as per IS: 14845 PN 1.6.
as per site requirement & as per instruction of Engineer-in-Charge.
Details of Valves in Clear Water Rising Main
Description of Items
Diameter Quantity IS Specification
(in mm)
Double flanged Cast Iron Sluice
450
2 Nos. IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
350
1 Nos. IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
300
3 Nos. IS: 14846 PN 1.6
valves
Double flanged Cast Iron Sluice
250
2 No. IS: 14846 PN 1.6
valves
Double flanged Cast Iron Scour valves
100
14 No. IS: 14846 PN 1.6
C.I. double acting kinetic air valve
100
10 Nos. IS: 14845 PN 1.6
Total:
32Nos.
qq. Excavation of trenches for laying of pipes and their refilling after completion of work
in all kind of soil, including shoring and shuttering, wherever required as per the
alignment up to the depth to maintain minimum one meter earth cover over crown of
the pipe and fittings, including proper stacking of excavated soil/material and disposal
of surplus material.
rr. Making all arrangements for laying of pipes and its stability for crossing 2 nos. of
Railway crossing & 1 No. of NH crossing and nallah / drain / roads / any other facility
and their restoration with minimum disruption, including making any by-pass
arrangement and dismantling of all above arrangement after completion and testing of
work. The length of crossing and size of casing pipe for 300 mm dia carrier pipe for
Railway and NH crossing shall be as per the site requirement and guide lines and
specification of Railway & NH authority.
ss. Supply of material and construction of thrust block of required size as per approved
drawing at all bends provided in the pipeline as per site requirement & as per
instruction of Engineer-in-Charge.
tt. Supply of material and construction of valve chambers as per approved drawing for all
types of valves as per site requirement & as per instruction of Engineer-in-Charge.
uu. All work required for connection of clear water rising main with respective UGRs.
vv. Repair to damages caused during construction to any existing bridge, culvert, water
supply line, sewerage line, drain, electricity cable, telephone line, etc. It shall be
reinstated as per the original specification and satisfaction of Engineer-in-Charge.
ww. Cutting of road surface for laying of pipe line at required depth will be done with
making good to the damages by mending and repair to existing condition.
xx. Testing & commissioning of the clear water rising mains as per relevant IS code.
220
A.
B.
Zone
Zone-2
Zone-3
Zone-4
For Zone-I, ZoneIII & Zone-IV
Location
Minimum Floor
Area
29.25 Sqm
29.25 Sqm
29.25 Sqm
29.25 Sqm
TOTAL
117 Sqm
q. Supply of all material and construction of all building, including finishing work,
flooring, internal and external plastering, whitewashing, roof treatment, rain water
pipes, fixing & painting of doors, windows & fixtures, etc. as per the detailed
specification.
r. Supply of all material and painting of inside and outside of building as follows:
(v) Inside-2 coats of oil bound distemper including application of putties, primer etc.
to obtain smooth surface.
(vi)
Outside-2 coats of cement paint including application of putties, primer etc.
to obtain smooth surface.
s. Backfilling of foundation with selected excavated earth and disposal of the surplus
earth as per detailed specification.
t. Supply and installation of internal electrification work i.e. lighting, switches, fans and
ventilation system, etc. of make mentioned in schedule of makes.
u. Supply, installation, commissioning & testing of Horizontal split casing centrifugal
pumps with suitable motor of make mentioned in schedule of makes, including MS
base plate and coupling (3 phase A.C. power supply 50Hz) of approved make, for
pump capacity above 15 HP and star delta starter for pump capacity below 15 HP with
capacitor bank for PF correction. Suitable Motor control panel, capacitor bank, ATS
control panel & APFC panel including EMS, all other accessories including PLC
panel with SCADA, HMI for local and remote operation along with the required size
of incoming & out going cables with a spare one shall be installed. The EMS with
licensed soft ware is to be tagged to available PHEO server at NIC, Bhubaneswar.
v. All the instrument should be connected to PLC with screened data cable and control
cable.
Table 1.6: Details of Pumping Machinery
Hours of Discharge of
Head of
No. of
No. of
Total
Pumping Each Pump Each Pump Working Standbye
No. of
Pump
(Hours)
Pump
LPS
(Mtr)
Pumps
2
20
62
40
01
01
02
3
20
75
40
01
01
02
4
20
50
40
01
01
02
WTP campus
20
35
45
02
01
03
w. Supply and fixing of pipes (suction, delivery, overflow, common header, etc. up to
ESR), valves (Sluice valve, Non Return Valve, Foot Valve etc.), and dismantling
joints of make mentioned in Clause 2.17, Schedule-D, pipe support, thrust block as
per the system requirement.
Zone No.
222
line
100
Zone-2
Sarbahal High School
100
0.5 Km
100
Zone-3
BTM Kali Mandap
100
0.7 Km
100
Zone-4
Existing WTP
100
0.2 Km
dd. Supplying, laying and jointing cable between the transformer and main LT
Distribution Board any of make mentioned in schedule of makes.
ee. Supplying, installation, making connection and testing of LT panel board with
LMCCB suitable for 100 KVA transformer of make mentioned in schedule of makes.
ff. Supply, laying, jointing and testing of cables between the main LT Distribution Board
(main LTDB) and all the required equipment, illumination, ventilation, plug-sockets,
etc. of any of make mentioned in schedule of makes.
gg. Supply, laying, jointing and testing of earthing for all installations as per IS: 3043.
The earthing shall cover all the motor, control panel, control post, cable racks,
illumination and ventilation etc. The size of G.I. strips to be used for earthing for
different equipment shall be suitably selected and shall be subjected to the approval of
the Engineer-in-Charge and shall meet the stipulation of the Indian Electricity Rules
and Regulations to the satisfaction of State Government Electricity Inspector.
223
C.
D.
200 Mtr
Sarbahal High School
300 Mtr
BTM Kali Mandap
1500 Mtr
Total
l. Supply erection of MS Gate for all locations as per the detailed specification and
fixing it to the RCC column.
m. Supply of all material and construction of open drainage system for the zonal pump
house compound with brick masonry and its connection with nearest drain as per
approved drawing.
n. Supply of material and Construction of 1.5m wide PCC walkway to connect ESR,
UGR and pump house as per approved drawing.
o. Backfilling of foundation with selected excavated earth and disposal of the surplus
earth as per detailed specification.
p. Landscaping of the zonal pump house compound as per the detailed specification.
q. Supply of one number wall mounted board with flow sheet including details of pumps,
motors in attractive colors for mounting on the wall at appropriate height as per
aesthetic requirement of the Pump house building.
r. Supply of fluorescent Glow Sign Board captioned Jharsuguda Waterworks in
attractive colours with all fittings etc. of appropriate size and fixing it at appropriate
height at the entrance gate.
Distribution Network
j. Supplying, laying and jointing of ductile iron class K-7 & PVC Class III & MS pipe
conforming to IS: 8329 S/S pressure pipes for DI pipes and ISI marked rubber gasket
conforming to IS: 5382 of required diameter and quantity as tabulated below.
Table 1.10: Details of pipe line and valves in distribution network.
Sl. No. Diameter
Approximate length of Pipes (in Mtr)
(in MM)
1
110
PVC Class-III
D.I.-K-7
M.S.
1
110
24100
-700 (100mm dia.)
2
160
21500
-1000 (150 mm dia.)
3
200
-7000
216
4
250
-2800
160
5
300
-1300
45
6
350
-3500
130
7
400
-3000
160
8
450
-500
80
9
500
-150
-ccc. Procurement of Mild Steel Pipes conforming to IS: 3589 Fe 410 grade pressure
pipes of required diameter and quantity for nallah crossing, special bends and fittings,
etc.
ddd. Procurement of ISI marked cast iron sluice valves, scour valve of as per IS: 14846
PN 1.0 and double acting kinetic air valve conforming to IS: 14845 PN 1.0.
Zone-2
Zone-3
E.
225
ooo.
Wherever there is replacement of pipe shown in the network drawing provided,
contractor will provide all T&P for replacing the existing pipe with new pipe of specified
diameter.
ppp.
Wherever there is bend encountered along the alignment, the contractor shall make
thrust block of required size and as approved by Engineer-in-Charge.
qqq.
Connection of distribution network with the Elevated Service Reservoir.
rrr. Testing and commissioning of the network with contractors liability to ensure minimum
terminal head at all consumer end up to end of defect liability period.
sss. Reinstatement of roads after laying of pipes shall be done as per original specification and
satisfaction of Engineer in charge.
ttt. Repair to damages caused during construction to any existing bridge, culvert, water supply
line, sewerage line, drain, electricity cable, telephone line, etc. It shall be reinstated as per
the original specification and satisfaction of Engineer-in-Charge.
F.
Any item or any provision/requirement if not included in this section, but is necessary to
be provided for the completion of the project and for its functional necessity, the same
shall be provided by the contractor. No extra payment shall be admissible on this account.
17.
18.
19.
CHANGE OF SCOPE
The length of Pipe lines and capacity of different structures of Civil, Mechanical and
electrical installations specified hereinabove shall be treated as an approximate
assessment. The actual lengths and capacity as required on the basis of detailed
investigations shall be determined by the Contractor in accordance with the Specifications
and Standards. Any variations in the lengths specified in this Schedule-B shall not
constitute a Change of Scope, save and except any variations in the length arising out of a
Change of Scope expressly undertaken in accordance with the provisions of Article 13.
Operation & Maintenance:
On issue of provisional completion certificate, the Operation & Maintenance of the
project are to be under taken by the Executing Agency for a period of 5 (Five) years with
supply of manpower, chemicals, consumables & other repair & maintenance works
including spare parts, if any. The energy charges shall be paid by the Department directly
to the concerned electrical authority. Any defects/discrepancies noticed in civil,
mechanical and electrical works has to be attended promptly. It is to be ensured that the
quant;ity, quality of water and minimum residual head at the consumers end has to be
maintained by the Executing Agency as per CPHEEO standard. Daily test of water
samples is to be carried out by the Executing Agency. It should be ensured that the
quality of clear water must satisfy the permissible limit as per CPHEEO standard. The
entire project needs to be operated up to 22 Hours per day.
Works to be performed for Operation & Maintenance:
19.1 Raw water collection and Storage
i)
Monitoring of inflows, Drawals, Quality of Raw Water shall be assessed.
ii)
It should be ensured that sufficient water level is maintained in Raw Water Sump
at Bareipali in order to ensure drawal of required quantity of water.
Source & Intakes
i)
Monitoring of inflows, Drawals, Quality of Raw Water shall be
assessed.
ii)
It should be ensured that sufficient water level is maintained at Head works in
order to ensure drawal of required quantity water into intake works.
227
iii)
iv)
v)
vi)
19.2
Transmission systems
The transmission mains would include raw/treated water pumping as well as gravity
mains from source to treatment works, treatment works to clear water reservoirs in the
distribution systems.
A)
All pipes
i)
Sufficient stock of spare pipes and specials and jointing materials should be
maintained for replacement of damaged ones.
ii)
Performance of Sluice valves, air valves, expansion joints, etc. shall be monitored
regularly.
iii)
Regular Leak detection surveys should be undertaken particularly for bursting of
pipes and leaky joints.
iv)
A detailed record of break downs and leaks observed and repaired should be
maintained section-wise so that more vulnerable lengths could be identified and
special measures to repair / replace them could be undertaking.
v)
A regular schedule of inspection and attendance to all valves including air and
scour valves should be drawn up and the same followed scrupulously. Specials
attention should be given to air valves.
B)
M.S. Pipes laid above ground
i.
Pipes should be painted at least once in five years to prevent corrosion.
ii.
Appurtenances such as sluice valves, air valves, expansion joints, roller should be
checked, cleaned at least twice a year and worn-out parts replaced. The cleaning
and lubrication of rollers should also be done twice a year, preferably pre and post
monsoon.
iii.
Expansion joints should be inspected every month.
iv.
The catch drains provided for the portion of water mains laid in cutting should be
cleaned before on set of monsoon so that no water accumulates in the cutting portion,
resulting in uplift pressure on pipes.
19.3.
Water Treatment Plant
The person in charge of the maintenance and operation of water treatment plants should
have a thorough knowledge of the functions of the several units under his control should
be a position to bring to the notice of the concerned Engineer-in-charge any faults in
design and execution giving rise to problems during the course of operation and rectify
them immediately.
The maintenance programme should observe the following general rules.
a)
Keep a set of plans giving details of the several units and indicting the layout and
position of all pipe lines and appurtenances.
b)
Establish a systematic plan of daily operations.
228
c)
ii)
iii)
iv)
v)
19.3.8.3 Quarterly
(i)
For motor:
(a) Blow away dust and clean any splashing of oil or grease
(b) Check wear of slip ring and bushes, smoothen contact-faces or replace, if necessary.
Check spring-tension. Check bush-setting for proper contact on the slip-ring.
(c) Check cable connections and terminals and insulation of the cable near the lugs, clean
all contacts, if insulation is damaged by overheating investigate and rectify. All
contacts should be fully tight.
(ii)
For panel, circuit-breaker, starter, etc.
(a) Check fixed and moving contacts of the circuit breakers/ switches. Check and
smoothen contacts with fine glass-paper or file.
(b) Check condition and quantity of oil / liquid in circuit-breaker, auto-transformer
starter and rotor-controller.
(iii) For transformer substation:
(a) Check condition of the H.T. bushing.
(b) Check the condition of the dehydrating breather and replace the silica-gel charge, if
necessary. Reactivate old charge for reuse.
19.8.3.4 Semi-Annual
(i)
For motor
(a) Check condition of oil or grease and replace if necessary. While greasing avoid
excessive greasing.
(b) Test insulation by megger.
(ii)
For panel, etc
Check for corrosion and take remedial measures. Check by megger the insulationresistance of switches, bus-bar, starter-terminals, auto-transformer, etc for phase-to-earth
and phase-to-phase, resistance.
(iii) For transformer substation,
(a) Check dia-electric strength and acid-test of transformer oil and filter, if necessary.
(b) Test insulation by megger
(c) Check continuity for proper earth connections.
19.8.3.5 Annual
(i)
For motors
(a) Examine bearings for flaws, clean and replace if necessary
(b) Check end-play of bearings and reset by lock nuts, wherever provided.
(ii)
For panel, etc
(a) All indicating meters should be calibrated
(iii) For transformer substation
(a) Check resistance of earth pit/earth electrode
19.8.3.6 Bi-Annual
(i)
For motor: Same as Annual
(ii)
For panel, etc. Same as Annual
(iii) For transformer substation
(a) Complete examination including internal connections, core and windings.
19.9 TROUBLE SHOOTING FOR ELECTRICAL EQUIPMENT
Trouble-shooting comprises detecting the trouble, diagnosing the cause and taking
remedial action. Detection of the trouble is prompted by noticing the symptoms. The
trouble shooting details are hence outlined hereunder for various symptoms.
231
v)
Readings of pressure, voltage and current
Half Yearly checks
vi)
Free movement of the gland of stuffing box
vii)
Cleaning and oiling of gland bolts
viii) Inspection of the gland packing and repacking, if necessary.
ix)
Alignment of pump and drive
x)
Cleaning of oil/grease lubricated bearings and replenishing fresh oil and grease
Annual Checks :
xi)
Clean and examine all bearings for flows
xii)
Examine shaft sleeves for wear or scour
xiii) Check clearance at wearing ring
xiv) Check impeller hubs and vane tips for pitting or erosion
xv)
Calibration of all instruments and flow meters
xvi) Check performance of pump Q, H, KW and efficiency
xvii) Check for availability of required tools
xviii) Check for availability of lubricants and other consumables such as gland packing,
bolts etc.
xix) Check for repair facilities such as pullers, clamps, machinery, welding set,
grinder, blower, drilling machine etc.
xx)
Records to be kept on the Operations.
xxi) Stock of fast moving recommended spares for two years of trouble free operation
shall be kept.
19.11 Clear Water and Underground/ Elevated Service Reservoir
i)
Check for proper operation of valves, functioning of Water level indicators,
lighting arrestor, functioning /cleaning of ventilators; to guard against mosquito
breeding and bird dropping.
ii)
Check for corrosion of Manhole covers; inter connecting pipes, ladder and
railings and replace, if required.
iii)
Cleaning of reservoirs shall be under taken at least once in a year.
iv)
Roofing shall be periodically checked to ensure no leakages are there.
v)
Check for any structural damages/leakages through the structure of reservoirs and
interconnecting pipes, valves etc.. Structural damages and leakage should be
promptly repaired.
vi)
Check for any possibilities of pollution of the water stored in the reservoir
vii)
Check for the availability of consumables , spares and tools
viii) General cleanliness in around the reservoirs should be maintained.
19.12 Checks to be carried out in the distribution system :
i)
Check for leakages in pipes, valves, appurtenances, gland, bolts etc. Shall be made
at regular intervals.
ii) Inspect for any possibilities of pollution of water in the distribution system.
iii) Adequate spares for valves and pipes and jointing materials shall be kept.
iv) Special inspection of pipe lines through marshy or high water table areas, crossing
across waste channels, pipes etc. and in the vicinity of sewers shall be carried out
at regular interval.
v)
A regular programme of leak detection of entire distribution system shall be made
at least once in three years. Leaks and damages detected shall be promptly
required.
233
vi)
i)
Preparation of water budget for each zone served by one reservoir shall be made.
Recording of number of connections given, Status of bulk metering and consumer
Metering number of meters out of order, quantity of inflows and outflows shall be
made.
ii) Identification and disconnection of unauthorised connections if any shall be made.
iii) Monthly water tariff bills generated should be served to the consumers.
19.13 Control of quality of water:
The physical, chemical and bacteriological tests of water samples need to be carried out
at frequent intervals as per direction of Engineer-in-charge at source, WTP and
distribution system.
57.14 Taste & Odour control: It shall be made as per CPHEEO Manual.
57.15 Meter Reading & Billing: The Meter Reader engaged by the contractor has to visit the
consumers house once in a month and take the meter reading and record in the meter
ledger and note the reading in the consumer meter card also and distribute monthly bills
to metered & non-metered consumers after their generation by the Meter Ledger Clerk &
Bill Clerk respectively.
The Meter Ledger Clerk engaged by the contractor has to generate the bill by 1st day of
the month as per meter reading every month and maintain the payment history of each
consumer and maintain the meter ledger every month.
The Bill Clerk engaged by the contractor has to generate Bills by 1st day of the month for
all non-metered consumers and maintain their payment history in the Ledger every
month.
234
SCHEDULE C
(See Clause 2.1)
PROJECT FACILITIES
DELETED
235
SCHEDULE D
(See Clause 2.1)
1
2
Construction
The Contractor shall comply with the Specifications and Standards set forth in Annex-I of
this Schedule-D for construction of the Water Supply Project.
Design Standards
The Water Supply Project shall conform to design requirements set out in the following
documents:
[CPHEEO manual on Water Supply and relevant I.S. Specification & Standards]
236
Annex I
(Schedule-D)
2.
2.1
2.2.
All Materials, works and construction operations shall conform to the relevant I.S.
Specifications and Standards of CPHEEO manual on Water Supply published by MoUD,
GoI. Where the specification for a work is not given, Good Industry Practice shall be
adopted to the satisfaction of the Authoritys Engineer.
TECHNICAL SPECIFICATION:
All the structure shall be designed conforming to state-of the art technology & practice to
produce and maintain output water quality hygienically safe and palatable in an
economical manner. The output quality of water shall conform to physical and chemical
standards stipulated in the manual on Water Supply and Treatment (latest edition)
published by Central Public Health & Environmental Engineering Organisation and Indian
Standard Code of Practice. Similarly, the RCC Intake Well, RCC Under Ground Reservoir,
RCC E.S.R. and W.T.P. shall be designed based on the latest concepts & principles
enumerated in the standard text books conforming to latest BIS Code.
ii)
The internal Cement Mortar lining as per IS11906/1986 & external 3 LPE (three layer of
poly ethylene) coating as per DIN standard for MS pipes of 700mm dia and above. At
welded joints there shall be Heat shrink sleeves need to be done at site as per
specification.
The internal and external lining shall be of food grade epoxy coating not less than 406
micron for MS pipes below 700 mm dia.
The MS pipes required for the work confirming to relevant IS specification and meeting
the standard prescribed shall be from any reputed manufacturer.
Specification for Ductile Iron(DI) Pipes and Fittings:
The DI pipes should be centrifugally cast (spun) and suitable for push on Rubber gasket
joints and confirm to IS:8329 ( latest revision).
The Ductile Iron pipe fittings shall be all socketed suitable for rubber gasket joints and
should confirm to IS:9523 (Latest revision).
The outer surface of the pipes and fittings shall be zinc coated with bitumen coating over
it, and the inside surface of the pipes and fittings are to be lined with cement mortar as per
IS:1196 ( latest revision).The lined surface shall be painted with one coat of bituminous
paint.
The inside lining and out side coatings shall be done in factory by the pipe manufacturer.
237
The pipes shall be supplied in standard lengths of 4.00, 5.00, 5.50, and 6.00 meters .The
pipes should have socket and spigot ends; the sockets ends should be suitably rounded and
chamfered; and fittings should have all socket ends.
iii).
Zinc CoatingZinc coating shall comply with ISO:8179 and shall be applied as a spray coating . The
mass of sprayed metal shall not be less than 130gm/ m2 as described in clause5.2 of ISO
:8179.
vi).
Bitumen Coating
The Bitumen coating shall be as per appendix C of IS:8329. It shall be of either coal tar or
asphaltic base with a minimum thickness of 0.1mm. The finished coating shall be
continuous, smooth, neither brittle when cold nor sticky when hot, and strongly adhere to
the surface of pipes and fittings.
v).
Specification for rubber gaskets for DI pipe joints.
The Rubber gaskets shall be manufactured from EPDM/SBR rubber and should confirm to
IS:5382.The rubber gaskets should also be supplied by the manufacturer of the pipes. They
should preferably be manufactured by the manufacturer of pipes. In case they are not, it
shall be the responsibility of the manufacturer of pipes to have them manufactured from a
suitable manufacturer under its own supervision and have it tested at his/ subcontractors
premises as per the contract. The pipe manufacturer will however be responsible for the
compatibility and quality of the products.
vi).
Flanged jointsFlanged joints if any shall confirm to the Clause 6.2 of IS:8329 for PN 10 flanges. The
pipe supply shall also include rubber gaskets for each flange. Flanged joints shall comply
with dimensions and drilling details in IS:8329 for PN 10 Flanges.
2.3 Specification of Valve:
a)
Generally, pressure designation shall not be less than PN 1.6. Valves should have integral
flanges drilled as specified in relevant IS specifications. Rubber used in valves shall be
Ethylene Propylene Diane Monomer(EPDM) or Styrene Butadiene Rubber (SBR).It shall
comply with the requirements of Appendix B of BS:5155 or of IS Specifications, be
suitable for making a long term flexible seals, and be resistant to anything causing
deterioration of the flexible seal.
2.3
238
3
3.1
3.1a
3.1b
3.1c
3.1d
3.1e
All tests required as per specification/IS codes and directed by the authority/ Authoritys Engineer
shall have to be done by the Contractor at his own cost and in the presence of Authoritys
Engineer.
Specification for Construction Works:
Laying & Jointing of pipes.
Transportation of pipes to site.
Pipes are to be carried to site through trucks loaded in such a way that they are secured, and no
movement should take place on the vehicle during transit, and pipes are not damaged during
handling. When using mechanical handling equipments, it is necessary to employ sufficient
personnel to carry out the operation efficiently with safety. The pipes should be lifted smoothly
without any jerking motion and pipe movement should be controlled by use of guide ropes in order
to prevent damage caused by pipe bumping together or against surrounding objects.
Stacking of pipes.
Pipes being taken to a stock ground for storage and held pending further distribution shall be
arranged in to a stack. The first layer of pipe should be laid on a firm foundation consisting of solid
timbers set level on the ground. Subsequent layers should be placed according to the method of
square or any other method of stacking. Care should be taken so that the pipes do not rest on their
sockets.
Inspection of the pipes.
Pipes are to be inspected at site to see if any damage to the pipe, including lining or outside coating
has occurred during transportation and handling. Damages if any shall be made good up to the
satisfaction of the Authoritys Engineer before laying.
A copy of the certificate and factory test reports from the recognized bodies preferably DGS&D
Should be obtained from the manufacturer or supplier and to be shown to the Authoritys Engineer
if he so desires. If desired by the Authority/ Authoritys Engineer , inspection to factory to witness
the testing of pipes shall be arranged by the contractor at his own cost.
Site Preparation.
Preliminary work required to be done before the laying of pipes include ,fixing the alignment of
pipe line ,pegging out, cleaning and disposal of all shrubs, grasses, large and small bushes, hedges
fences, gates, portions of old masonry, boulders and debris from the route. The alignment fixed in
the field is to be got approved by the Authoritys Engineer.
Excavation & Preparation of Trench
The excavation of trenches may be carried out manually or by mechanical means. The width of
trench at bottom between the faces of trench wall ( or faces of sheetings if any) shall be such as to
provide not less than 200mm clearance on either side of pipe except when rock excavation is
involved. Trenches shall be of such extra width , when required, as will permit the convenient
placing of timber supports, strutting and planking, and handling specials.
Special considerations should be given to the depth of the trench. The depth should provide a
Minimum cover of 1100mm when laid along side or across the roads. For cross country laying the
cover above the crown of the pipe may be 900mm. It may be necessary to increase the depth of
excavation to cross surface drains.
When crossing the National High ways, State High ways and Railway tracks and River
embankments, the guide line of respective authorities for minimum cover depths will govern the
excavation.
The beds of trench shall be filled with 150mm thick river sand to allow a level surface for the pipe
barrel and bell rest on ground. Firmly. All surface materials, which in the opinion of the
Authoritys Engineer are suitable for use in restoring the surface, shall be kept separate from the
general excavated material as directed by the Authoritys Engineer.
Care should be taken to avoid spoil banks causing an accumulation of water .All other excavated
material shall be stacked in such a manner that will not endanger the work men and it will avoid
obstructing foot paths, roads and drive ways. Care should be taken to avoid spoil banks causing an
accumulation of water. Utility controls shall be left on obstructed
240
3.1f
3.1g
Pipe Supports and Thrust Blocks When pipes are laid above ground, the pipes are to be laid on
saddles or rocker supports as Specified by the Authoritys Engineer. Each pipe shall be supported
within a support positioned behind the socket of the pipe. The pipe should be fixed to the supports
such that such that the axial movement due to expansion or contraction is taken up at individual
joints on the pipe line.
Thrust Blocks are to be provided at each bend .tees and tappers to resist the thrusts developed by
the internal pressure due to the fluid flowing through the pipes.
3.2
Fitting and Fixing of Valves
3.2.1 Sluice ValvesSluice valves will be used on the pipe lines as Isolation Valves to isolate the pipe section during
repair and maintenance, and with a Tee branch as Scour valves for draining out the water from the
pipe section to facilitate repair works. Tentative locations of these valves have been shown on the
Longitudinal Section of the pipe mains. However exact locations are to be determined at site at the
time of detailed Engineering and execution at site. Sluice valve are to be provided along the pipe
line at suitable intervals to serve as Isolation valve And at valley portion these are to be installed as
Scour valves. Dismantling joints shall be installed With the valves to facilitate replacement of
damaged valves.
3.2.2 Air Valves
Air valves should be DI tamper proof double orifice kinetic air valve fitted with isolation valves as
size of Air valves should not be less than 1/8th of nominal bore of the pipe. The Air valves shall be
fitted at every peak and at suitable intervals in straight reaches. The tentative location of Air
valves have been shown in Longitudinal section of the mains. However the locations and no. of Air
valves may change during detailed engineering and as per the direction of the Authoritys
Engineer at site.
3.2.3
Construction of Valve Chambers
All the valves are to be enclosed in chambers. The valve chamber in Raw water rising main and
clear water rising main shall be of RCC chamber and in all other pipe lines the valve Chambers
should be brick masonry chambers with removable precast RCC roof slabs. Drain pipes shall be
provided at the bottom of the chambers to drain out the leakage water from valves.
The contractor is to provide the drawing for approval by the Auhtority/ Authoritys Engineer.
3.2.4. Pipe Bedding To provide a firm bed for laying of pipes , sand filling of 150mm thick shall be
provided at the trench bottom and compacted properly before laying of pipes. The sand may be
river sand free from clay and stony materials.
3.3
Hydrostatic Testing of Pipeline.
After the pipe line is laid and jointed testing shall be done for
3.4
3.5
3.6
3.7
Soundness of any construction work in particular Thrust blocks and Anchor blocks.
Hydrostatic Testing is to be carried out as per IS12288
The completed pipe line should be tested first in sections and then the whole length. When the
Joints are left uncovered until after testing, sufficient back filling material shall be put over the
centre of each pipe to prevent movement under the test pressure. Each section should be properly
sealed off properly with special stop ends secured by adequate temporary anchors.
The Test Pressure to be applied should not be less than any of the following
a. The maximum sustained operating pressure
b. The maximum static pressure + 0.5 N/mm2
c. The maximum sustained operating pressure ( or the maximum static pressure) +
Maximum calculated Surge pressure
The test pressure should be measured at the lowest point of the section under the point of
the section under the test, or alternately an allowance should be made for the static head between
the lowest point and the point of measurement. If the test is not satisfactory, the fault should be
and found out and rectified immediately as per the direction of Authoritys Engineer. After all the
sections have been joined together on completion of section testing ,a test on the complete pipe
line should be carried out.
Backfilling of TrenchesBackfilling of trenches shall be done with approved backfilling materials free from boulders, sharp
objects, and rubbish. The backfilled material should be well watered and consolidated to 90% of
maximum dry density at optimum moisture content. Proper care should be taken to see that pipe
level and alignment are not disturbed. In raw water & clear water rising main passing under small
drains, culverts, NH crossing should be embedded with cement concrete of grade not less then
M20 grade.
Dewatering the trenches.
In high ground water level conditions, dewatering of trenches may be necessary to facilitate
excavation as well as laying & jointing of pipes and construction of valve chambers etc. Reference
should be made to the boring data in this regard.
Ground water as well as surface water shall be controlled to the extent that excavation and pipe
installation can proceed in the specified manner and such that the trench bottom is not disturbed to
the detriment of the pipe installation. Trench water shall not be permitted to enter the inside of the
pipes being installed.
The necessary pumps, well points, or other suitable ( subject to the approval of the Authoritys
Engineer) equipment shall be employed to keep excavation free of water. Caution shall be
exercised to make sure that foundations in proximity to pipe trench excavation are not adversely
affected by the excavation or dewatering process. Discharge from pumps, well points , or other
dewatering equipments shall be located and controlled so that loss, damage, nuisance or injury to
the public does not result.
Shoring & Shuttering
The sides of the excavations should be timbered and supported in such a way as is
necessary to secure these from falling in, and the shoring shall be maintained in
position as long as necessary. The contractor shall be responsible for the proper design
of the shoring to be approved by the Authoritys Engineer to hold the sides of the excavation in
position and ensure safety of persons and properties etc. The shoring shall be removed as directed
after the items for which it is required are completed. Suitable barricading should be provided for
safety purpose.
Connection to Pump header, Inlet and outlets to the UGR and existing ESR, and existing
pipe line.
Connection to inlet & outlets of UGR, OGR, Pump header and existing pipe lines wherever
242
necessary unless otherwise specified are within the scope of work and need to be done as directed
by the Authoritys Engineer. Wherever necessary for connecting to old existing pipelines,
Mechanical joints should be used.
3.8.1
The Rising Main/Distribution pipe line is to be laid along the road. On completion of
cutting the asphalt road/concrete road along/across the NH for laying of Rising
Main/Distribution pipe line the MS pipe with required width and making good to the
damage over the compacted granular material with 100mm thick PCC(M-10) followed by
250 mm thick PCC (M-20) for approximate length of 25000 M. The detailed drawing for
crossing and laying of pipeline along the NH are provided as below.
243
4.1
4.2
Concrete Works
General
Concrete grade shall be as designated in the drawings and specified for the respective structures
and their parts. In concrete grade M15,M220,M25 etc the numbers ie 15,20,25 etc represent the
specified characteristic compressive strength of 150mm cube at 28 days, expressed in N/sq.mm as
per IS:456.
Design Mix Concrete:
For Design Mix concrete, the mix shall be designed to provide the grade of concrete having the
required workability and characteristic strength not less than appropriate values given in Is:456.
The design mix shall be in addition to such that it is cohesive and does not segregate and should
result in a dense and durable concrete and also capable of giving the finish as specified. The
Contractor shall exercise great care while designing the concrete mix and executing the works to
achieve the desired result.
It will be the Contractors sole responsibility to adopt appropriate normal mix proportions to yield
the specified strength. The minimum cement content for Design Mix Concrete shall be as per
Appendix-A of IS:456 or as given blow whichever is higher.
Grade of Concrete
M15
M20
M25
M30
M35
The contractor shall submit the details of the source of all materials and the proposed quantities of
each ingredient per cubic meter of fully compacted concrete. The Contractor shall then make trial
mixes for each class of concrete using the same contractors equipment and the same material as
244
are proposed for the permanent works. He shall furnish to the Authoritys Engineer at least 30 days
before concreting operations, a statement of proportions proposed to be used for the various
concrete mix ascertained on 150mm cubes as per IS:516 shall comply with the requirements of
IS:456.
7days & 28days Compressive strength of different grades of concrete are as given below.
Serial
No.
1
2
3
4
5
6
Grade of
Concrete
M15
M20
M25
M30
M35
M40
The Contractor shall give 24 hours notice of such trials to enable the Authoritys Engineer to attend
for each trial mix, three separate and consecutive batches of concrete shall be made by the
contractor and the specimens shall be tested at 7 days and 28 days ( 9 specimens for 7 days and 9
specimens for 28 days) . For 7 days test the acceptance criteria shall be 70% of the corresponding
target mean strength.
The contractor shall not commence concreting in the permanent works until the details of trial
mixes and test results for each class of concrete have been submitted to and approved by the
Authoritys Engineer.
Unless otherwise specified, only medium graded fine aggregates shall be used for the concrete
.
A trial mix design will be approved by the Authoritys Engineer with respect to strength if the
average compressive strength of the nine specimens each at 7 days and 28 days is more than the
specified target mean strength appropriate to the grade of concrete.
The contractor shall not alter the approved mix proportions nor the approved source of supply of
any of the ingredients without having previously obtained the approval of the Authoritys
Engineer.
During production, the authority/ Authoritys Engineer may require trial mixes to be made before a
substantial change is made in the materials or in the proportion of the materials to be used.
A range of slumps which shall generally be used for various types of construction unless otherwise
instructed by the Authoritys Engineer is given below.
Structure/Member
Maximum Slump (in mm)
Minimum Slump (in mm)
Reinforced foundation walls 75
40
and footings
Slabs, Beams and reinforced 100
40
walls.
4.3
4.4
content in the aggregates. Water cement ratio specified for use by the Authority/s Engineer shall be
maintained. Each time the work stops , the mixer shall be cleaned, and while recommencing, the
first batch shall have 10% additional cement to allow for sticking in the drum.
Arrangement should be made by the contractor to have the cubes tested in an approved laboratory
or in field laboratory with prior consent of the Authority/ Authoritys Engineer. Sampling and
testing of strength and workability of concrete shall be as per IS:1199, IS:516 and IS:456
Formwork:
Formwork shall be all inclusive and shall consist of but limited to shores, bracings, sides of
footings, walls ,beams and columns, and bottom of slabs etc.
The design and engineering of form work as well as its construction shall be the responsibility of
the contractor. However if so desired by the Authoritys Engineer, the drawings and calculations
for the design of the form work shall be submitted to the Authoritys Engineer for approval.
Formworks shall be designed to fulfill the following requirements.
1.
Sufficiently rigid and tight to prevent loss of grout or mortar from the concrete at all stages
and appropriate to the methods of placing and compacting.
2.
Made of suitable materials
3.
Capable of providing concrete of the correct shape and surface finish with the specified
tolerance limit.
4.
Capable of withstanding without deflection the worst combination of self weight,
reinforcement and concrete weight, all loads and dynamic effects arising from construction
and compacting activities, wind and weather forces.
5.
Capable of easily striking without shock, disturbance or damage to the concrete.
6.
Capable of accommodating design temporary openings where necessary for these purposes
and to facilitate.
The form work shall be made of steel joists between form work and formwork and between form
work and structure all be sufficiently tight to prevent loss of slurry from concrete, using sealed if
necessary.
The faces of form work coming in contact with concrete shall be cleaned and two coats of
approved mould oil applied before fixing reinforcement. All rubbish ,particularly chippings ,
shavings, saw dust, wire pieces dust etc. shall be removed from the interior of the forms before the
concrete is placed. Where directed, cleaning of forms shall be done by blasting with a jet of
compressed air.
Forms intended for reuse shall be treated with care. Forms that have deteriorated shall not be used.
Before reuse, all forms shall be thoroughly scraped, cleaned, holes suitably plugged, and joints
repaired. The contractor shall equip himself with enough shuttering to allow for wastage so as to
complete the job in time.
Permanent form work shall be checked shall be checked for its durability and compatibility with
adjoining concrete before it is used in the structure. It shall be properly anchored to the concrete.
Wire ties passing through beams and walls shall not be allowed. In their place bolts passing
through sleeves shall be used. Form work spacers left in situ shall not impair the desired
appearance or durability of the structure by causing spacing, rust staining or allowing the passage
of moisture.
All corners and angles exposed in the finished structure shall have chamfers or fillets of 20mmX
20mm size, unless otherwise stated on the drawings or else where.
Forms for substructure may be omitted when, in the opinion of the Authoritys Engineer, the open
excavation is firm enough ( in hard non-porous soils) to act as a form. Such excavation shall be
larger, as approved by the Authoritys Engineer, than that required as per drawing to compensate
the irregularities in excavation.
The contractor shall provide adequate props carried down to a firm bearing without overloading
any of the structures.
The shuttering for beams and slabs shall be so erected that the side shuttering of beams can be
removed without disturbing the bottom shuttering. If the shuttering for a wall is erected for the full
246
4.4.1
4.5
4.6
4.6.1
4.6.2
4.6.3
4.6.4
height of the wall, one side shall be built up in sections as placing of concrete proceeds or windows
left for placing concrete from the side to limit the drop of concrete to 1.0m or as approved by the
Authoritys Engineer. The contractor shall temporarily and securely fix items to be cast
(embedment/inserts) in a manner that will not hinder the striking of forms or permit loss of grout.
Form work showing excessive distortion, during any stage of construction, shall be repositioned
and strengthened. Placed concrete affected by faulty form work, shall be entirely removed and
form work corrected prior to placement of new concrete.
Before concrete is actually placed in position, the inside of the form work shall be cleaned and
mould oil applied, inserts and reinforcements shall be correctly positioned and securely held,
necessary openings, pockets etc provided.
All arrangements-form work, equipments and proposed procedure, shall be approved by the
Authoritys Engineer.
Formwork Striking timeThe striking time for formwork shall be determined based on the following requirements.
.Development of adequate concrete strength.
Permissible deflection at time of striking form work
Curing procedure employed- its efficiency and effectiveness
Subsequent surface treatment to be done
Prevention of thermal cracking at re-entrant angles.
Ambient temperatures, and
Aggressiveness of the environment
Under normal circumstances ( where temperature are above 20 0C) forms may be struck after
expiry of the time period given in IS:456 unless approved otherwise by the authoritys Engineer.
For Portland Pozzolana/slag cement the stripping time shall be suitably modified as approved by
the Authoritys Engineer. It is the Contractors responsibility to ensure that forms are not struck
until the concrete has developed sufficient strength to support itself, does not under go excessive
deformation and resist surface damage and any stresses arising during the construction period.
Finish
The formwork for concrete works shall be such as to give the surface finish Type F1as specified
below. The contractor shall make good any unavoidable defects as approved consistent with type
of concrete and finish specified: defects due to bad workmanship ( e.g. damaged or misaligned
forms, defective or poorly compacted concrete) will not be accepted. The contractor shall construct
the formwork using the correct material and to meet the requirement of the design and drawing to
produce finish concrete to required dimensions , plumb, planes and finishes as per standard
specification.
Surface Finish Type F1
The main requirement is that of dense, well compacted concrete. No treatment is required except
repair of defective areas, filling all form tie holes and cleaning up of loose or adhering debris.
Tolerances
Variation from plumb, from specified batter or from curved surfaces of all structures
1.
In 2.5m :10mm
2.
In 5m :15mm
3.
In 10m or more :25mm
4.
In buried construction : Twice the above amounts
Variation from Level or Grade indicated in drawing of slab, beams, soffits and visible arches
1.
In 2.5m :5mm
2.
In 7.5m : 10mm
3.
In buried construction : Twice the above amounts.
variation in Cross-sectional dimensions of columns, beams, buttresses, and similar members
1.
Minus :5mm
2.
Plus : 10mm
Variation in thickness of slabs, walls, arch sections and similar members
247
4.6.5
4.6.6
4.7
1.
Minus :5mm
2.
Plus : 10mm
Footing for columns, piers, walls, buttresses and similar structures
1.
variation in dimensions in plan;
a).
Minus : 10mm
b).
Plus : 50mm
2.
Displacement or eccentricity : 2%footing width in the direction of misplacement but not
more than 50mm.
3.
Reduction in thickness : 5% of specified thickness subject to a maximum of 50mm.
Tolerance in fixing anchor bolts, or embedded parts
1.
Anchor bolts without sleeves ;1.5mm in plan
2.
Anchor bolts with sleeves :5mm for bolts up to 28mm dia and 3mm for bolts 32mm and
above
3.
Embeded parts : 5mm in all directions.
Transporting, Placing and Compacting Concrete.
Concrete should be transported from the mixing plant to pouring site with minimum time lapse by
methods that shall maintain the required workability and will prevent segregation, loss of any
ingredients or ingress of foreign matter or water.
In all cases concrete shall be deposited as nearly as practicable directly in its final position. To
avoid segregation, concrete shall not be re handled or caused to flow. For locations where direct
placement is not possible and in narrow forms the contractor shall provide suitable drops through
Elephant trucks. Concrete should not be dropped from a height of more than 1.0m.Concrete shall
not be placed in flowing water. Under water, concrete shall be placed in position by Tremies or by
pipeline from the mixer and shall never be allowed to fall freely through the water. While placing
concrete, the contractor shall proceed as specified below and shall ensure the following.
Continuously between construction joints and predetermined abutments.
Without disturbance to forms or reinforcement
Without disturbance to pipes, ducts, fixings, and the like to be cast in. Ensure that such
items are securely fixed, and that concrete can not enter open ends of pipes and conduits
etc.
Without dropping in a manner that could cause segregation or shock.
In deep pours ,only when the concrete and form work is designed for this purpose, and by
using suitable chutes or pipes.
Refraining from placing if the workability is such that full compaction cannot be
achieved Without disturbing the unsupported sides of excavations: prevent contamination
of concrete with earth. Provide sheeting if necessary. In supported excavation, with draw
the linings progressively as concrete is placed.
If placed directly on to hard core or any other porous material, dampen the surface to
reduce loss of water from the concrete.
Ensure that there is no damage or displacement to sheet membranes
Record the time and location of placing structural concrete.
Concrete shall normally be compacted in its final position within thirty minutes of leaving the
mixer . Concrete shall be compacted during placing with approved vibrating equipment without
causing segregation until it forms a solid mass free from voids thoroughly worked around
reinforcement and embedded fixtures and in to all corners of the formwork. Immersion
vibrators for compaction of concrete shall be electrically operated and vibrator needles shall be
of 60mm size only. Immersion vibrators shall be inserted vertically at points not more than
450mm apart and withdrawn slowly till air bubbles cease to come to the surface, leaving no
voids. When placing concrete in layers advancing horizontally, care should be taken to ensure
adequate vibration, blending and melding of the concrete between successive layers. Vibrators
248
shall not be allowed to come in contact with reinforcement, form work and finished surfaces
after start of initial set.
Concrete may be conveyed and placed by mechanically operated equipments after getting the
complete procedure approved by the Authoritys Engineer. The slump shall be held to the
minimum necessary for conveying concrete by this method. When concrete is to be pumped,
the concrete mix shall be specially designed to suit pumping. Care should be taken to avoid
stoppage in work once pumping has started.
Each placement of concrete in multiple lift work shall be allowed to set for at least 24 hours
after the final set of concrete before the start of subsequent placement. Placing shall stop when
concrete reaches the top of the opening in wall or bottom surface of slab, in slab and beam
construction, and it shall be resumed before concrete takes initial set but not until it has had
time to settle on approved by the Authoritys Engineer. Concrete shall be protected against
damage until final acceptance.
4.8
1.
2.
3.
4.
4.9
Curing :
Curing and protection shall start immediately after the compaction of the concrete to protect it
fromPremature drying out, particularly by solar radiation and wind
Leaching out by rain and flowing water
High internal thermal gradients
Vibration and impact which may disrupt the concrete and interfere with its bond to the
reinforcement.
The finished concrete shall be protected from direct exposure to the sun for the first three days
after being laid. On the day the concrete is laid, generally no watering can be done, but moist
condition have to be maintained and water shall be lightly sprinkled on the surface as soon as it is
hard enough to stand this. On the next day it shall be more freely sprinkled with water and kept
thoroughly wet by being covered with gunny bags or other suitable materials and kept constantly
wet. It shall be inundated and kept under water for at least 7 days. Surfaces where ponding is
impracticable shall be covered with very weight gunny bags. Curing with water will be continued
till the concrete is at least 10 days old. Shocks to the concrete by throwing materials over it or
excessive walking over it shall be avoided for at least 7 days.
During the curing period, it shall be particularly seen that all exposed surfaces are kept thoroughly
moist and not allowed to dry out. Verticals or inclined surfaces from which side forms have been
removed and also soffits from which centering has been removed shall be given special attention in
this respect by sprinkling with water or keeping covered with wet gunny bags as may be most
suitable.
All concrete ,unless approved otherwise by the Authoritys Engineer, shall be cured by use of
continuous sprays or ponded water or continuously saturated coverings of sacking, canvas,
hessian, or other absorbent material for the period of complete hydration with a minimum of 7
days. The quality of curing water shall be the same as that used for mixing.
Where a curing membrane is approved by the Authoritys Engineer to be used, the same shall be of
anon-wax base and shall not impair the concrete finish in any manner. The curing compound to be
used shall be approved by the Authoritys Engineer before use and shall be applied with spraying
equipment capable of a smooth, even textured coat. Curing may also be done by covering the
surface with an impermeable material such as polyethylene, which shall be well sealed and
fastened.
Construction Joints :
Construction joints shall be provided as shown in the drawings or as approved by the Authoritys
Engineer. Concrete shall be placed without interruption until completion of work between
construction joints. If stopping of concreting becomes unavoidable anywhere , a properly formed
construction joint shall be made with the approval of the Authoritys Engineer.
249
4.10.
4.11
4.12
Any excess water or laitance shall be removed from surface of joints after the concrete is deposited
and before it has set. When resuming work on the hardened concrete surface of the joint. It shall be
thoroughly cleaned, roughened and all lattices removed. The surface shall be swept clean with wire
brushes thoroughly wetted and treated with a thin layer of cement mortar consisting of equal
volume of sand and cement and fresh concreting will start.
As soon as the exposed concrete has sufficiently hardened , the surface of the joint shall be water
jetted or brushed with stiff brush to expose the larger aggregates without being disturbed.
Alternatively, if the preparation is not satisfactory, or proper joint preparation is not possible due
to inclement weather, the contractor shall thoroughly remove the laitance of hardened concrete by
mechanical chipping after seven days of concrete work at his own cost. Before placing fresh
concrete against a construction joint, all loose material shall be removed and the surface sluiced
with water until it is perfectly clean, there after all ponded water should be removed.
When concreting is to be resumed on surface which has not fully hardened, all lattices shall be
removed by wire brushing, the surface wetted, free water removed and a coat of cement slurry
applied. On this , a layer of concrete not exceeding 150mm thickness shall be placed and well
rammed against the old work. There after work shall proceed in the normal way.
Concreting records:
A written record of the concrete works shall be made each day by the contractor and kept available
for inspection by the Authoritys Engineer. The diary shall contain notes and record of:
1. The names of the contractors engineer who are responsible for the different phases of the
concrete work and also the names of their assistants.
2. The temperature of air, water, cement, aggregate, together with the air humidity and type of
weather.
3. Deliveries to the site of concrete materials (quantity, brand of concrete , materials etc).
4. Inspection carried out , tests performed etc and their results.
5. Times of commencement and completion of different parts of the concrete works and times of
erection and striking of.
Acceptance by the Engineer
The decision of the Authoritys Engineer as to acceptability or otherwise of any concrete work
shall be final and binding on the contractor.
For works not accepted, the Authoritys engineer may review and decide whether remedial
measures are feasible so as to render the work acceptable. The Authoritys Engineer shall in that
case direct the contractor to undertake and execute the remedial measures. These shall be
expeditiously and effectively implemented by the contractor. Nothing extra is to be paid to the
contractor for executing the remedial measures.
Repair and Replacement of Unsatisfactory Concrete.
Immediately after the shuttering is removed, all the defective areas such as honey- combed
surfaces, rough patches, and holes left by form bolts etc. shall be inspected by the Authoritys
Engineer who may permit patching of the defective areas or reject the concrete work.
All through holes for shuttering shall be filled for full depth and neatly plugged flush with surface.
Rejected concrete shall be removed and replaced by the contractor at no additional cost to the
Authority.
For patching of defective areas all loose materials shall be removed and the surface shall be
prepared as approved by the Authoritys Engineer. This work is to be done by the contractor at his
own cost.
Bonding between hardened and fresh concrete shall be done either by placing cement mortar or by
applying epoxy. The decision of the Authoritys Engineer as to the method of repair to be adopted
shall be final and binding on the contractor. The surface shall be saturated with water for 24 hours
before patching is done with 1:5 cement sand mortar. The use of epoxy for bonding fresh concrete
shall be carried out as approved by the Authoritys Engineer. The cost involved on this will be
borne by the contractor.
250
5.
Reinforcement Workmanship :
Reinforcing bars supplied bent or coils shall be straightened cold without damage.
All bars shall be accurately bent gradually and according to the sizes and shapes as shown
in drawings / schedules to be prepared by the contractor. Re bending or straightening incorrectly
shall not be done without approval of the Authoritys Engineer
Reinforcements shall be accurately fixed and maintained firmly in the correct position by the use
of blocks, spacers, chairs, binding wire etc to prevent displacement during placing and compaction
of concrete . The tied in place reinforcement shall be approved by the Authoritys Engineer prior to
concrete placement. Spacers shall be of such materials and designs as will be durable, not lead to
corrosion of the reinforcement and not cause spalling of the concrete cover. Binding wire shall be
16 gauge soft annealed wire . Ends of the binding wire shall be bent away from the concrete
surface, and in no case encroach in to the concrete cover.
Brick work :
Bricks to be used for brick work shall preferably be Kiln Burnt clay bricks confirming to IS:1077.
In case of non availability of KB clay bricks, Fly Ash bricks may be used on approval of the
Authority/ Authoritys Engineer. The compressive strength of bricks shall not be less than
75kg/cm2. The bricks shall be sound, hard and homo generous in texture. The specification of
cement mortar for brick work shall be as specified in the approved design and drawings of the
respective structures..
6.1.
6.2
provide a proper key for the plastering to be done. The face of brick work shall be cleaned daily
and all mortar droppings removed. The surface of each course shall be thoroughly cleaned of all
dirt before another course is laid on top. If mortar in the lower course has begun to set, the joints
shall be raked out to a depth of 12mm before another course is laid.
6.
Cement Plastering.
Both faces of brick work masonry walls are to be plastered with cement mortar as specified in the
drawing. All joints in masonry brick work shall be raked to a depth of 12mm with hooked tool
made for the purpose when the mortar is still green and in any case within 48 hours of laying. The
surface shall be washed with fresh clean water free from all dirt, loose material, grease etc and
thoroughly wetted for 6 hours before plastering work is commenced. Concrete surfaces to be
rendered will however be kept dry. The wall should not be too wet but only damp at the time of
plastering . The damping shall be uniform to get uniform bond between the plaster and the wall.
Cement shall be mixed thoroughly in dry condition and then just enough water added to maintain a
workable consistency. The quality of water, sand and cement shall be as per relevant IS. The
mortar thus mixed shall be used immediately and in no case shall the mortar be allowed to remain
for more than 25 minutes after mixing with water. Curing of plaster shall be started as soon as the
applied plaster has hardened enough so as not to be damaged. Curing shall be done by
continuously applying water in a fine spray and shall be carried out for at least 7 days unless
otherwise specified.
7 .1
7.2.
7. The surplus earth and debris should be lifted after completion of work and proper levelling of site
as directed by Engineer-in-charge without any extra claim.
General Conditions:
1.
Cement shall not be less than O.P.C.-43 grade/PPC/PSC-53 grade of reputed
manufactures confirming to relevant IS Specification.
2.
3.
As & when required, the steel/cement & other building materials will be tested by
Department at the cost of contractor to ensure proper quality as per IS
specification.
4.
5.
Machine mix shall be used in concrete work for all structure. Design mix of
concrete will be preferred. Vibrator of appropriate type shall be used for
compaction of concrete.
6.
All the structures are to be designed as permanent type and shall have aesthetic
elevation.
7.
Form work shall be of steel plates and frame, sound seasoned timber or any
approved materials as decided by Engineer-in-charge to be used for the centering
and shuttering of the structures.
8.
9.
All electrical work / earthings including wiring of pump & other buildings etc. to
be done as per relevant I.S. specification and Indian Electrical Rules. Single phase
wiring shall be done for lighting purpose & three phase wiring shall be done for
running pump motors, W.T.P. & wherever necessary.
10.
All the valves are to conform with relevant IS specification and of reputed make.
11.
The surplus earth and debris should be lifted after completion of work and proper
leveling of site as directed by Engineer-in-charge without any extra claim.
12.
13.
14.
15.
16.
The cost of such inspection, testing, trial run, demonstration etc. shall be borne by
the contractor. All responsibility of such inspection, testing, trial run,
demonstration etc. and any damage/loss that may cause directly or indirectly shall
exclusively rest with the contractor.
17.
Such inspection, testing, trial run, demonstration etc. shall, however, not relieve the
contractor of their liability for replacing/rectifying any defects, which may
subsequently appear or be detected during erection and guarantee period.
18.
19.
Testing for performance of equipment shall be carried out and be checked with the
approved parameters and performance characteristic curves for the purpose of
acceptance.
Electrical equipments/installation: All the Electrical equipments/ installations
shall be energy efficient and confirm to star rated/BEE as applicable. The
Electrical Power Factor should not be less than 1.
Reinforced cement concrete Grade M-30 in all members in contact with water and
members close to water like roof slab/dome etc.
20.
21.
7.3.a
The DI pipe should confirm IS:8329:2000 & its subsequent amendments and DI
Fittings should confirm IS:9523:2000 and its subsequent amendments, if any.
254
2)
As per the Notification No.12/2012-Central Excise dated 17th March 2012, the
excise duty will be exempted on any of the following cases on a certificate issued
by the Collector of the concerned District to the effect that such goods are cleared
for the intended use specified below:
Pipes & pipe fittings needed for delivery of water from its source to the Plant
(including the Clear Treated Water Reservoir, if any, thereof) and from there to
the 1st Storage Point.
Pipes & pipe fittings of outer diameter exceeding 10 cm when such pipes are
integral part of the water supply projects.
All items of machinery, including instruments, apparatus and appliances,
auxiliary equipment and their components/parts required for setting up of water
treatment plants.
3)
4)
Laying of different diameter D.I. and M.S. pipe lines at different places in
the project area
i.
i.
ii.
Excavation of foundation in all kinds of soil including rocks of any kind shoring,
shuttering and dewatering where ever required, site dressing and leveling the
pipeline trenches. The minimum width of the trench shall not be less than (d +
40cm) and minimum depth of the trench shall not be less than (d + 90cm) in any
case. In case of raw water rising main, the depth shall be (d+150cm) Where d is the
diameter of pipe in cm.
Supplying all materials labour T&P and construction of Brick masonry (i) Sluice
Valve Chamber (ii) Air Valve Chamber including earth work in excavation in all
types of soil, Providing minimum 15cm thick PCC (1:3:6), Brick work in Cement
Mortar ( 1:4 ) using KB brick of size 25x12x8cm size having crushing strength not
less than 75kg/sqcm, Cement plastering in Cement Mortar ( 1:4 ) at inside surface,
12 mm thick cement flush pointing (1:3) at the outside surface, and providing RCC
top slab of 100mm. thick (minimum) using M-20 cement concrete in RCC as per
the PWD/ PH and relevant IS specification and direction of the Engineer-in-charge
and as per the tender schedule.
Supplying all materials, labour and T&P for laying of MS ERW/SAW pipeline
including fabrication work at site for the canal crossing, culvert crossings, drain
crossing or at low level lands including making bends/ offsets where ever required
as per site condition. The MS pipes to be used are from reputed manufacture
confirming to relevant IS specification. Internal & external lining shall be of food
grade epoxy coating not less than 406micron.
255
I) The work shall conform to the following documents / specifications (latest revision or as
specified).
a) SSPC SP 10 / NACE 2 / Sa2
b) SSPC PA 2
c) ASTM D 4541
VIII) The material may be heated if necessary and applied by airless spray / plural component
spray system
COATING PROCEDURE AND APPLICATION
Surface Preparation :
Pipe shall be blast cleaned by sand. The cleanliness achieved prior to application shall be in
accordance with the requirement of SSPC SP 10 / NACE 2 / Sa2 of ISO 8501 (near white metal)
a) The blast pattern or profile depth shall be 40 to 100 micron and shall be measured by dial
micrometer.
b) Before sand blasting is started or during blasting or coating, temperature of the pipe surface
should be more than 3C above dew point temperature. Blast cleaned surface should be primed
within 4 hours and shall be protected from rainfall or surface moisture and shall not be allowed to
flash rust. If the rust occurs, the surface again to be prepared by sand blasting or wire brushing.
c) Application of epoxy coating system :
The epoxy coating system shall be applied as per recommendation of the manufacturer and shall be
applied by airless spray / plural component spray machine. For more than one coat, the second
shall applied with the time limits as recommended by the manufacturer.
Application of PU Coating
a) PU coating shall be applied when the pipe surface temperature atleast 3C above dew point
temperature (when R.H is more than 85%).
b) Material preparation and application shall be done as per manufacturer recommendation and
shall be applied by plural component machine.
TEST REQUIREMENTS :
ii.b) If the structure is less than 300 square feet, each 100 square feet should be measured.
ii.c) If the structure is between 300 and 1000 sq ft, select 3 random 100 square feet test areas and
measure.
ii.d) For structure exceeding 1000 square feet, select 3 random 100 square feet testing areas for the
first 1000 sq ft and select 1 random 100 square feet testing area for each additional 1000 square
feet
ii.e) Coating thickness Tolerance : Individual reading taken to get a representative measurement for
the spot are unrestricted (usually low or high readings are discarded). Spot measurements (the
average of 3 gauge readings) must be within 80% of the minimum thickness and 120% of the
maximum thickness. Area measurement must be within specified range.
b) Electrical Inspection (Holiday) Test :
i) All the coated / lined pipes shall be tested with an approved high voltage holiday detector
preferably equipped with an audio visual signaling device to indicate any faults, holes, breaks or
conductive particles in the protective coating.
ii) The applied output voltage of holiday detector shall have a spark discharge of thickness equal to
at least twice the thickness of the coating to assure adequate inspection voltage and compensate
for any variation in coating thickness. The electrode shall be passed over the coated surface at
approximately half the spark discharge distance from the coated surface only one time at the rate
of approximately 10 to 20m/min. The edge effect shall be ignored. Excessive voltage shall be
avoided as it tends to induce holiday in the coated surface thereby giving erroneous readings.
iii)
While selecting test voltages, consideration should be given to the tolerance on coating
thickness and voltage should be selected on the basis of maximum coating thickness likely to be
encountered during testing of a particular pipe.The testing voltage shall be calculated by using
following formula. (as per NACE 0274 : 2004) Testing Voltage V = 7900 _T 10 percent where
T is the average coating thickness in mm.
iv) Any audio visual sound or spark leads to indicate pinhole, break or conductive particle.
c) Adhesion Pull off Test :
After holiday the coated surface is subjected to adhesion pull off test as per ASTM D 4541.
i) Apparatus / Instrument : Adhesion tester consists of three basic components : A hand wheel, a
black column containing a dragging indicator pin and scale in the middle and a base containing
three legs and a pulling Jaw at the bottom and also dollies.
ii) Prepare the test surface : Once test area is selected, test area shall be free of grease, oil, dirt,
water. The area should be flat surfaces and large enough to accommodate the specified number of
replicate test.
259
iii) Prepare Dolly (Test Pull Stub) : The dolly is a round, two sided aluminium fixture. Both sides
of the dolly looks same, however, one side sloped on top surface while flat on bottom surface. As
the surface of the dolly is polished aluminium, roughen the same using a coarse sand paper.
iv) Select an adhesive : Use araldite, a 100% solid epoxy adhesive. This adhesive requires atleast
24 hours at room temperature to cure.
v) Attach the dolly to the surface.
v.a) Using a wooden stick, apply an even layer of adhesive to the entire contact surface area of the
dolly.
v.b) Carefully remove the excessive adhesive by using a cotton swab. Allow the adhesive to fully
cure before performing the adhesion test.
v.c) Attach the dolly to the coated surface and gently push downward to displace any excessive
adhesive.
v.d) Push the dolly inward against the surface, then apply tape across the head of the dolly.
vi) Determine whether scoring is required
vi.a) No standard including ASTM does not recommend any tape of scoring around the base of
dolly prior to testing. Scoring may produce tiny factures in the coating or may generate friction
heat, which can change the properties of coating and result in lower adhesion values.
vii) Perform the Adhesion Test
vii.a) Attach the adhesion tester to the dolly by rotating the hand wheel counter clockwise to lower
the jaw of the device.
vii.b) Slide the jaw completely under the head of the dolly. Position the three legs of the
instruments so that they are sitting flat on the coated surface.
vii.c) Slide the dragging indicator pin on the black column to zero by pushing it downward.
vii.d) firmly hold the base of the instrument in one hand and rotate the hand wheel clockwise to
raise the jaw of the device that is attached to the head of the dolly. The dragging indicator pin will
move upward on the black column as the force is increased and will hold the reading. Apply the
tension using a moderate speed. Continue to increase the tension on the head of the dolly until (a)
the minimum PSI/MPa/Kg/cm required by project specification is exceeded and the test is
discontinued, (b) the maximum PSI/MPa/Kg/cm of adhesion tester has been achieved and dolly is
still attached, (c) The force applied by the adhesion tester causes the dolly to dislodge.
vii.e) Read the scale and record the adhesion value. The black column near the middle of the
adhesion tester contains two scales and a dragging indicator pin in between. Right scale is PSI and
left scale is MPa. The dragging indicator pin will hold the reading until push back to zero. When
achieve the end point of test, read the scale across the bottom of the dragging pin.
260
d) Coating Repair
i) Defective Coating : Coating shall be repaired in accordance with the following subsections.
ii)Surface Preparation : Accessible areas of pipe requiring coating repairs shall be cleaned to
remove debris and damaged coating using surface grinders or other means. The adjacent coating
shall be feathered by sanding, grinding or other method. Accumulated debris shall be removed by
blowing with contaminant free air or wiping with clean rags. Areas not accessible for coating
repair such as interior surfaces of small diameter pipe shall be reprocessed and recoated.
iii) Coating Application : The coating system shall be applied to the prepared areas in accordance
with procedure.
iv) Repair Inspection : Repaired portion shall be electrically inspected using a holiday detector.
e) Welded Field Joints
i) Preparation : The weld joints shall be cleaned so as to be free from mud, oil, grease, welding
flux, weld spatter and other foreign contaminants. The cleaned metal surfaces of the weld joint
shall then be abraded using rotary abrading pads or emery paper. The adjacent liquid Epoxy / PU
coating shall be feathered by abrading the coating surface for a distance of 25 mm.
ii) Electrical Inspection : After curing the coating system applied to the welding joints shall be
holiday tested. Any holidays indicated by the detector shall be marked with chalk to identify the
area of repair.
iii.
The contractor shall cut the asphalt / metalled / concrete road during laying of pipe line
and same should be repaired after laying and testing of pipe line to its original
condition.
iv. Other Criteria shall follow Manual on Water Supply and Treatment by CPHEEO, Government of
India.
7.4.b
All concrete works for water retaining as well as the supporting structures shall be
executed, tested as per IS 456, 1978, IS 3370 (Part-I) 1965 and IS3370 (Part-II) 1965.
7.5.
from the concrete prepared for use in the following components of the structure. The
concrete mix design shall be prepared in a Govt. Laboratory recommended by the
Authority at the cost of the Contractor and design mix test report shall be submitted to the
Authority/ Authoritys Engineer for approval before starting the work.
i) Foundation
ii) Each lift of supporting structure (column/shaft)
iii) Supporting beams / Floor beams / Tie beams /Bracings.
iv) Floor
v) Each lift of the wall.
vi) Roof slab.
vii) Any other portion of the structure as desired by the Engineer-in-charge.
7.5.1
7.5.2.
In the event of deviation from the desired strength, the contractor shall dismantle the
defective parts of the construction and make good the same at his own cost and no extra
payment will be made by the department for the same.
All pipes, valves & fittings required, shall be of best quality confirming to relevant IS
specifications which shall be provided by the contractor at his own cost as per P.H.
specification and direction of Engineer-in-charge.
The safe bearing capacity of the soil is to be ascertained before preparation of drawing
& designs for construction of CWR, ESR, UGR, Each component of WTP, all types of
buildings and Intake Well etc.
7.5.3.
The contractor shall submit the design & drawing in a phased manner after one month
of issue of LoI and complete the same for the whole project within three months. Two
sets of design calculation and drawings to the Authoritys Engineer. The design and
drawings shall be scrutinized and preliminary approval will be communicated by the
competent authority.
7.5.4.
On receipt of preliminary approval, the contractor shall furnish within fifteen days, ten
sets of clearly typed design calculations and drawings for final approval and
communication to all concerned.
7.6
and bridges, the contractor has to collect all the required hydraulic & flow parameters of
the river/water way where the intake well and bridge structures are to be constructed, from
the Water Resources Department, and other data as will be required from the concerned
departments, at his own cost and risk & shall submit to the Authoritys Engineer for
approval. Then based on the approved data the agency has to prepare detail design &
drawing of Intake well and bridge structures.
While designing of the structures, it shall be ensured that the weight of the structure
including foundation, water, over burden earth on foundation / slab / raft etc. as applicable
shall be within the permissible limit of S.B.C. allowed by the Authoritys Engineer..
7.6.1
All the RCC Water Retaining structures shall be designed as per IS456-2000 and IS: 3370 2009. The structural design shall be done by working stress method. The concrete grade
for the water retaining members shall be M30. The steel used for reinforcement shall be
Corrosion resistance high yield strength deformed bars confirming to IS:1786 (with latest
revision)
i. Capacity of the reservoir shall be the volume of water stored between the full supply
level and the invert of the outlet pipe. Due allowance shall be made for plastering the
inside surface of the wall and floor, while calculating the net capacity of the reservoir.
ii. The elevated RCC reservoir shall be with RCC shaft /column bracing staging and
cylindrical container. The container and column shall be proportioned properly so as to
give architecturally good aesthetic view.
iii. Free board shall be minimum 350 mm.
iv. Minimum dead storage of 150 mm shall be provided at the bottom of the the reservoir.
v. Design shall be based on accepted norms and methods of design and the provision
contained in the latest versions of IS: 456, IS:3370, IS:1893, IS:875 and all other
relevant codes etc. No age factor shall be allowed in the design of the structure.
vi. Plain cement concrete of grade M-10 thickness, not less than 100 mm shall be provided
below the footings/ foundation.
vii. The minimum thickness of the structure numbers shall be as follows:
a)
Wall of reservoir
i)
Up to 4 m water depth
: 185 mm
ii)
Up to 5 m water depth
: 200 mm
iii)
Up to 6 m water depth
: 215 mm
b)
Floor of the reservoir in container
: 200 mm
c)
load bearing shaft of elevated reservoir
: 150 mm
d)
Top Roof slab if designed as shell
: 100 mm
e)
Top Roof slab flat
: 125 mm
viii. For the RCC column of the ESR minimum diameter of the column shall be 400 mm.
ix) Grade of RC concrete: RCC M-30 for water retaining members & RCC M-25 grade for
all other components of ESR (foundation to top of ESR).
x)
The design calculations and drawing shall be worked out in either metric or in S.I. unit.
xi) The water retaining component/ member including member subject to condensation like
Roof Slab shall be designed as un-cracked section with M-30 grade concrete.
xii) The minimum depth of foundation of elevated reservoir shall be 1.80 m below the
virgin ground level.
263
For access into the over head reservoir there shall be RCC stair case with RCC landings
at suitable intervals. The width of the stair and landing shall not be less than 800 mm.
The stairs shall be provided with MS railings of approved design for a minimum height
at 800 mm with two rows of horizontal runners at each side holding the vertical posts.
There shall be either a central access inside the tank or a catwalk with suitable guard
rails all around. In both the cases access to the roof & inside bed of the reservoir shall
be provided. Inlet & outlet pipe shall be as per pump motor & field requirement.
Overflow pipe dia shall be more than inlet dia. 100mm dia wash out pipe. Each
pipeline shall be provided with required puddle collars, expansion joint, duck foot bend,
DI/DF valves, valve chambers etc., as required for completeness. The limit of contract
of each pipeline for ESR is up to foundation trench from outer face of staging
shaft/column.
xiii) The roof of the overhead reservoir shall be provided with hand rail at the edges by
means of Stainless Steel posts and railings for a minimum height of 800 mm with two
rows of horizontal runners holding the vertical posts.
xiv) The overhead reservoir shall be provided with suitable ventilation arrangement at the
roof. The openings of the ventilators shall be protected with mosquito proof wire net of
copper wire net of copper wire mesh.
xv) One lightening arrestor shall be provided on the roof of the elevated reservoir as per
IS:2309. The same shall be suitable earthed with aluminum tape conductor as per I.S.
specifications.
xvi) Two Nos. of C.I. lockable hinge type manhole covers of minimum 600mm dia. with
frame shall be provided on the roof of the elevated reservoir.
xvii) All RCC works shall be finished perfectly smooth at his own cost the inside surface of
walls and floors shall be rendered with 20mm thick cement plaster (1:3) after necessary
surface cleaning.
xviii) All exposed faces of the concrete shall be given two coats of weather coat paint of
approved quality over a coat of primer. All expose iron works outside the reservoir shall
be painted with two coats of approved synthetic enamel paint over a coat of primer. All
expose iron works inside the reservoir shall be painted with two coats of approved
anticorrosive paint over a coat of priming.
xix) The Engineer-in-charge or his authorised representative shall have the right to inspect
and test the materials collected by the contractor for use in the work. The materials not
confirming to relevant specification shall be rejected and the contractor shall have to
replace the defective materials immediately.
xx) The Authoritys Engineer shall have the authority to reject or accept any or all the
works and materials and to direct the contractor to stop the work if the work is not taken
up to the specification. The Engineer-in-charge shall also have authority to suspend a
part or whole of the above and no claim whatsoever on this account made by the
contractor shall be entertained. In case of any dispute, the decision of the Engineer-inChief, P.H. (Urban) Odisha, Bhubaneswar shall be final and binding.
xxi) All design shall be submitted in the form of booklet in complete shape along with
relevant drawing and in a presentable manner neatly typewritten/ computer printed in
A4 size bond paper.
xxii) All design calculation/ findings shall be supported with illustrative drawings in form of
plan section etc as applicable which shall form a part of design book let.
xxiii) All reference made in the design shall be indicated in reference chapter of the design
264
booklet on demand, the contractor shall furnish reference materials to the department to
facilitate checking of design.
xxiv) All drawings shall be with black line on which tracing paper in metric scale in size 560
mm x 810 mm and shall be title cross reference and fully explanatory with the
contractors name date seal and signature on it. Each drawing shall contain the title at the
bottom of the right hand corner. Alternatively the contractor may submit computer
aided drawings drawn in different colours confirming to other specifications as
described above.
xxv) In case of computer aided design the firm shall also additionally submit the soft copy
containing the software and the design to the department to facilitate the checking of the
design. Contractor shall also furnish the design calculation through manual method if
demanded by the department.
7.7
Design Basis:
i)
All design shall be based on the best modern practices enumerated in the
standard text book/ reference books and hand books by author of international
and national repute, reference books like the Manual on Water Supply and
Treatment by CPHEEO. Government of India, latest Indian Standard code of
practice and specification norm fixed by Pollution Control Board and state/
central Electricity Authority shall also be followed whenever required. In case of
any contradiction the decision of the Authority of the department or his
representative shall be final.
ii)
For computer aided design the contractor shall use only widely accepted standard
software of international/ national repute.
iii)
Thumb rule design based on the contractors own experience / substandard books
and literature/ substandard software shall be out rightly rejected.
iv)
Size of pipes, fittings and valves will be as per design requirement for individual
reservoirs. The pipes should be double flanged Cast Iron Class-B or DI Class K9.
7.8
Civil Works:
a)
General:
i)
All the building and structures shall be of permanent type. The Treatment Plant
buildings shall have good aesthetic and imposing elevation and architecture with
the grounds attractively landscaped and well maintained. Reinforced cement
concrete fins, decorative Arch type windows, boxes, pebble dash/ rough cast
plaster, grills etc. may be proposed to elevate the look.
ii)
Sufficient consideration shall be given for the design of the buildings for aesthetic
look. Ordinary configurations without aesthetic shall not be accepted.
iii)
Foundations for all the buildings and structures of Treatment Plant Complex shall
be designed depending on Ground water table, sub-soil condition and bearing
capacity of soil. In no case the depth of foundation below the virgin soil shall be
less than 1.0 mtr.
iv)
Provision of pressure relief valves/earthen overburden for countering full or part of
uplift pressure shall not be allowed.
265
b)
Constructional Features:
The Water treatment Plant is of 60mld capacity
(i) Clear Water Reservoir / OGR:
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)
(j)
(k)
(l)
(m)
(n)
(o)
(p)
structure with 250mm thick brick filler walls. Sufficient doors & windows
shall be provided in the building. The foundation for pumps and motors
shall be designed for machine foundation in accordance with
relevant I.S. specifications. The floor shall be suitably sloped and
drains provided to let out any leakage water so as to keep the floor
dry. The floor of panel room and utility spaces shall be 150mm
higher than the pump floor.
b) Floorings of the Pump Houses shall be of Ceramic Tile of Johnson or
equivalent Make of approved colour. The walls of the Pump Houses shall be
provided with white glazed tiles up to 2.0mtr height from the finished floor
level. Entrance Step shall be finished with Mirror Polished Granite type
Flooring. All other items including electrical shall be standard PWD/Electrical
specification unless otherwise mentioned specifically elsewhere.
iii)
7.9.
a)
b)
c)
d)
Boundary Wall:
Boundary wall shall be of Brick Masonry in CM (1:4) .The brick used for the
purpose shall be good quality KB Clay bricks or Fly Ash bricks the compressive
strength of which shall not be less than 35kg/cm2. thick Both side surfaces of the
walls shall be plastered with 16mm thick CM(1:6). M-20 grade RCC Column &
Plinth Beam structure. Top of the wall shall be provided with 40mm thick
PCC (1:2:4) layer. Depth of foundation of Boundary wall shall be minimum
1.00M. R.C.C. Column for the Gate Opening shall be of 0.38m x 0.38m size &
2.0m high of M-20 grade structure. The depth of foundation of the R.C.C.
Column with isolated footing shall be minimum 1.00m below the ground level.
The both side of the compound wall should be painted with two coats of weather
coat paint over one coat of primer. Construction joints in boundary wall shall be
provided at suitable interval as per the direction of Engineer-in Charge.
General for all Buildings & Structures:
All tanks for alum & lime, aerator, Rapid mixing unit, flocculation, sedimentation,
filtration units, elevated water tank etc., backwash tank and all channels carrying
raw, coagulated, settled or filtered waters shall be of M30 grade and shall be
designed as water retaining tanks without considering any age factor. All the water
retaining structures shall be tested for water tightness before installing the
equipment, media etc. All channels of the Water Treatment Plant shall be cladded
with white glazed ceramic tile of approved make. Required type of foundation as
required with respect to actual soil condition & soil parameters, SBC , position of
maximum subsoil water table in worst rainy season condition shall be provided for
the units of WTP, Intake well, UGR, ESR, footway bridge, buildings and other
structures as per actual design requirements satisfying the requirements of books of
reputed authors & IS codes.
Minimum free board (FB) of 150mm shall be provided for channels unless
specified separately and the Filter Boxes in which case it shall be 500 mm.
All channels, launders, conduits etc. shall be designed for 50% overload.
267
e)
The plinth level of all the buildings shall be 0.75 m above the general ground
formation level unless otherwise specified.
f)
The room height (between finished floor level and ceiling) of the office and
laboratory building, Pump house shall be not less than 3.60 mtr.
g)
Plain cement concrete of grade M10 of thickness not less than 100 mm shall be
provided below the RCC floor slab and the footings and foundation unless
otherwise specified specifically.
h)
Mechanical type water level indicator shall be provided in reservoirs. All other
related items required for completeness of the reservoirs for smooth functioning
shall be provided.
i)
In case of Overhead tank with shaft staging there shall be an entrance door at plinth
level and ventilators at suitable locations shall be provided. The plinth shall be
provided with suitable flooring over a base course.
j)
All Iron works shall be painted with two coats of approved anticorrosive synthetic
enamel paint over a coat of primer. All wood works shall be painted with two coats
of approved paint over a coat of primer.
k)
All External surfaces shall be painted with two coats of Weather proof acrylic
emulsion paint of approved colour over a coat of primer. The Engineer-in-charge
shall approve the computerized colour code prior to application of paint.
l)
primer. Ceiling of all round of building shall be painted with two coats of white
distemper over a coat of primer.
v) Flooring :
Level of flooring shall be 0.75m above the virgin soil at respective structures.
There shall be sand filling between the virgin soil & the floor. The flooring shall be
of ceramic tile( stain less) flooring except pump house where the flooring shall be
done as AS flooring.. The dado in all types of flooring shall be of 0.3mtr height.
m) The contractor shall provide necessary sun shades/Chajja etc. wherever necessary.
n) The contractor shall provide ramp with gentle scope to the buildings wherever
required.
o) Plinth protection for a width of 1.00 m around all the buildings shall be provided.
It shall be C.C. checkered floor over 100 mm PCC.
p) All roofs shall be provided with grading plaster of 25 mm thick in 1:4 cement
plasters with required grading for drainage. There shall be drainage pipes of 110
mm PVC pipes with all fixtures and specials extending up to the surface drain for
disposal of rainwater. The number of pipes shall be as per the roof drainage plan to
be approved by the Department. A DPC coarse in 1:2:4 concrete shall be provided
at plinth level for a thickness of 40mm for all buildings.
q) There shall be parapet walls of 250 mm brick masonry up to 600 mm height above
the roof of all buildings.
r) Expansion joints shall be provided in exposed pipelines as per standard practice &
in conformity with relevant IS Specification.
i) In the event of any deviation from the desired strength, the contractor shall
dismantle the defective parts of the construction and make good the same at his
own cost. All the building materials including steel rods shall be tested in
recognized testing laboratory to be selected by Department at the cost of the
contractor. Any material found defective/not to specification shall be replaced
forth with by the contractor without any extra financial implication.
ii) All reinforcement shall be checked and recorded prior to concreting by the
Engineer-in-charge or his representative and the contractor shall countersign
this. Entire concreting work shall be done in the presence of an officer not
below the rank of Assistant Engineer, The contractor shall, therefore, give
notice of at least two days to the Engineer-in-charge or his representative so
that the works can be checked by him or his authorised representative.
iii) 1. The form work shall be of steel plates of steel frame, sound and seasoned
timber or of any approved materials, having sufficient strength to hold the
concrete and withstand ramming and vibrations. If timber shuttering is used it
shall be constructed in such a way that none of the concrete grout leaks away
and shall be such as to leave a clean smooth surface not requiring further
plastering. The surface of all forms in contact with concrete shall be clean,
rigid, tight and smooth. Before a piece of work on formwork is concreted, the
formwork shall be cleaned of all mortar, shavings, concrete from previous work
and all other dirt. It shall then be covered with thin coat of Mobil oil.
2. The joints in the form work shall be arranged in a regular pattern.
269
u)
Grouting :
Nominal minimum strength of grouting concrete shall be 40 N/mm2 or such other
values as may be shown on the approved drawings. The nominal maximum size of
aggregate for grouting concrete shall be 10 mm.
In case Dry concrete or mortar is used, slump shall not exceed 6 mm.
If Wet expanding concrete or mortar is used, slump shall be at least 125mm or
more but not exceeding 225 mm. An expanding grouting admixture shall be of
approved type and in accordance with the manufacturers instruction.
v) Doors/Window/Ventilators/Grills :
1.
There shall be adequate nos. of doors & windows in all the
buildings/structures.
2.
The area of openings shall not be less than 25% of floor area.
3.
All windows shall be with aluminum frame & 5 mm thick reinforced glass
panels provided with all related aluminum hardware fittings. The shutters
shall be of sliding type in two folds.
4.
All doors except for those specified separately shall be with aluminum
frame & 12mm thick pre laminated plywood panels provided with all
related aluminum hardware fittings.
5.
There shall be adequate nos. of ventilators of size 750mm x 300 mm fitted
with decorative RCC Jally.
6.
There shall be a 3 mtr. wide 2.4 mtr. height rolling MS shutter of standard
thickness with all hardware fittings suitably located to facilitate
conveyance of chemical bags in to the storage area. There shall be an
additional outside door for general thoroughfare.
270
7.
8.
9.
10.
11.
7.10
271
v)
7.11.
Walkway work:
The walkway shall be paved with Chequered tile and of 1 mtr wide and
constructed with the following specification.
The base shall consist of 150mm thick sand layer & above 100mm thick
PCC layer, paved with Chequered tile of approved design uniformly jointed
by 1:4 mixed cement mortar.
vi)
Disposal of Surplus Earth & Debris after construction:
The surplus left over earth and debris after completion of erection work and
leveling the site shall be transported and dumped in areas as directed by the
Departments Engineer without any extra claim.
Piping & Valves:
Specifications for C.I. pipe
IS:1536-1989 Class-A flanged and Tested.
Specifications for C.I. fittings
IS:1538-1976 (part-1 to 24) tested.
Type of joint
Flange Joint.
Code of practice for laying
IS:3114
Test pressure
1.5 times the working pressure subject to minimum 1.0
kg/cm2 for 24 hrs.
Specifications for D.I. pipe
Socket & Spigot ended Centrifugally Cast (Spun)
K-9
Ductile Iron (K-9) Pressure Pipes for water main and
distribution line of different sizes conforming to I.S:
8329/2000 and subsequent amendments, in standard
lengths suitable for Rubber Gasket (Push-on flexible
joint) jointing with inside cement mortar lining
and with an external bituminous coating and
duly ISI marked.
Specifications for D.I. pipe
Socket & Spigot ended Centrifugally Cast (Spun)
K-7
Ductile Iron (K-7) Pressure Pipes for water main and
distribution line of different sizes conforming to IS
8329/2000 & subsequent amendments, in standard
lengths suitable for Rubber Gasket (Push-on
flexible joint) jointing with inside cement mortar
lining and
with an external bituminous coating
and duly ISI marked.
MS pipe work :
The MS pipes of 100 & 150 mm dia shall confirm to
Specifications
272
Wall Thickness
Laying
Flange thickness
PVC pipes & fittings
DI pipes & fitting & their laying
Pump Delivery sluice valves &
scour valves.
IS:5822/1986
As per relevant ISS
For internal water supply/sewerage : Relevant ISS.
As per IS:8329/2000, IS:9523/1980 & IS:12288/1987
Non-return valves
Technical Requirement:
All the valves shall confirm to relevant BIS/BS/AWWA and bear such embossed
certification mark.
Valves, wherever required, shall be provided with extended spindle (AISI-410 material)
and head stock so that hand wheels can be provided at 1.2 m level for manual operation.
Sluice valves of sizes more than 400NB shall be provided with bypass arrangement and
shall be gear operated.
273
All valves for water supply & air applications shall be CI (IS:210, FG:220) body with 13%
Chrome-steel (AISI-410) spindle and seat & seat ring made of gun metal. All valves for
chemical & corrosive application shall be Teflon body & internals.
The valves shall be double flanged body with raised-face flanges and drilling to conform
IS: 1538.
RCC Valve chambers/CI surface box as required shall be provided for the valves with CI
lockable manhole of standard size.
Suitable Thrust blocks/anchor blocks shall be provided at bends and other locations where
unbalanced forces may develop under normal operation, during power failures, during
reverse flow or during testing of pipe line that tend to cause movements in the pipe line.
Valves of size NB 300 and above shall be installed with a dismantling joint or short-piece
in the pipe line to facilitate easy replacement.
On completion of erection, trial-run and testing all the pipelines, valves and fittings shall
be cleaned thoroughly and painted with 2 coats of enamel paint over by 1 coat of primer.
The colour code shall conform to Departments norms for identification of raw water/
clear water/ spent water/ wash water/ air etc. The flow direction shall also be stenciled on
the pipe lines.
The scope of work for the tender includes entire piping work & valves of all types as per
actual requirement at site for the completeness of the project. Any variation in piping work
& valves shall be borne by the contractor and shall not be entertained for extra payment.
7.13.
Instrumentations:
The scope of work for the contractor shall include the following instrumentations. The
Instrumentation shall be of latest technology and best of their kind used in Water Works.
They should be dust and moisture proof suitable for the environment in which they are
installed. Where hinged covers are necessary they shall be provided with lock. The
contractor shall furnish 2-3 makes as per approved make list with copies of catalogues
along with his tender documents that he intends to supply under this scope of work and
same shall form a part of contract. The instrument shall be suitable for indication in MKS
Units and the respective dials shall be calibrated and printed accordingly.
All instruments, gauge and meters shall be approved by the Authoritys Engineer before
use in the works.
a) The electromagnetic full bore type bulk flow meter shall be of approved make list
having MID approved and CE marked confirming ISO specification.
b) Pressure gauges and Meters shall be preferably Dial type with min. 100 mm dia.
Dial. The dials shall be white with black scales and lettering not subject to fading.
Scales shall be of such material that no peeling or discoloration will take place with
age under humid condition .The range for the pressure gauges shall be 2 times the
normal working pressure of the pipe line. The pressure gauge shall be mounted in
vertical position with a three-way cock. It shall have the scales in metric system.
c) Motor Ammeters shall be capable of withstanding the starting current and shall have
274
with all
accessories shall be provided to wet the bearings. The selection of material for such
bearing shall suit the quality of water to be pumped and the suspension length.
If shaft enclosing tube is not provided, the shaft bearings shall be lubricated by the
liquid being pumped.
v) Suction Case
Shall be made of closed grained cast iron, house bronze bearing and sand collar
which shall prevent entry of sand into suction case bearing ,guide flow of water
into the eye of the lowest impeller.
vi) Casing Pipe Shaft Tube
Shall be made of steel. Concentrically threaded for line shaft bronze bearing
vii)Column Assembly
The Column assembly shall consist of the column pipe to convey the
liquid
transferred from the bowl assembly to head assembly ,and shaft assembly. If shaft
enclosing tube is used for the line shaft, bearing shall be supported from shaft enclosing
tube. If shaft enclosing tube is not used, the line shaft bearing shall be supported from the
column pipe.
Shall be made of steel. Concentrically threaded as per Indian standards.
viii)Line Shaft
The Line Shaft shall be made of high carbon steel. Concentrically threaded at both
ends. The line shaft should have a stainless steel sleeve which should rotate in cut
less rubber bearing fitted in C.I. bearing retainer (spider).
The shaft shall be straight within 0.125mm for 3m length total dial indicator
reading. The maximum allowable error in the axial alignment of the thread axis
with the axis of the shaft shall be 0.05mm in 150mm.
The shaft shall be furnished with interchangeable sections. The bushing faces of
the shaft be machined square to the shaft axis and the shaft ends shall be chamfered
on the edges,
Couplings shall be designed with safety factor of 1.5 times the shaft safety factor
and shall have threads to tighten during pump operation.
ix)
Discharge Head
Shall be of robust construction, and should have an integral smooth discharge
elbow.The discharge head should house a stuffing box and renewable bushing. The
discharge elbow should be designed to directly connect to the discharge pipe
without a reducer/expander. Standard discharge outlet flange shall be drilled as per
IS specification.
It should have a base frame from which the column shaft assembly is suspended,
A tube tension plate shall be installed on the discharge head to tighten up the shaft
tbue ( incase a shaft tube is provided)for the purpose of aligning the shaft.
The pump shall be complete with base plate and foundation bolts.
7.15 (B) Specification for Centrifugal pumps
These Pumps will be installed in Clear water reservoir at WTP at jagadalpur and also at
Zonal Pump houses in the distribution system to pump clear water
The pumps should be coupled with suitable capacity 3 phase motor to operate in A.C.
power supply ranging 360 volt to 440 volt in the frequency 50 Hz in a common base plate.
The contractor has to submit detailed design, drawing, layout plan of all pumping units
showing therein all the piping arrangements at different pump houses including design of
276
RCC foundation for various pumps as per the relevant IS specifications for approval
before installation of pumps.
Pumps of particular category shall be identical and shall be suitable for parallel operation
with equal load division. Components of identical pumps shall be interchangeable
The pump shall confirm to relevant IS specification with latest amendments thereof. The
Pumps will be of horizontal split casing with high efficiency (minimum efficiency) 75%
and ensure satisfactory performance and having suction and delivery arrangement suitable
for inlet and outlet connection of pipe of suitable nominal bore size. The critical speed of
the pump shall not be less than 130% of the normal operating speed of the pump
Flow rate versus head curve shall have a stable and continuously rising characteri stics
towards the shutoff head. Besides the actual flow rate versus head curve , curves for
minimum and maximum impeller diameters shall also be shown.
The design of pumps shall be such that no thrust is transferred to the driving motor, and
where necessary a thrust bearing shall be provided. The combined thrust and journal
bearing shall be capable of carrying at least 10% more than the calculated design load and
shall be capable of reversed rotation as 130% of full speed. All Micnell bearing shall be
fitted with an oil level gauge and a dial type thermometer complete with adjustable alarm
and cut-out contacts.
Pumps shall be provided complete with all fixing bolts ,nuts and washers. Non return
valves of the non-slam, quick closing type and isolating valves shall be fitted to the pump
delivery branches and an isolating valve to the suction branch with dismantling joints.
Automatic float type air valves with cocks in the highest part of the casing or head bend to
assist priming shall be fitted. Automatic air valves shall be fitted with pipes to convey
leakage back to drains. The system shall be designed to provide for positive suction for the
pumps. Each pump shall be provided with suction and delivery pressure gauges.
(b)
Assembly of pump set.
(i) Casing: - The casing shall be made of cast iron grade FG-260 of IS:210 with
latest revision and shall be of such construction as to be capable to withstand a
hydrostatic test pressure of 1.5 times shut of pressure and two times the duty
pressure which is higher.
Pump casing shall be provided with drain and vent connection with plugged or
valve connection.
(ii)
Impeller: - The impeller shall made from bronze of grade OLTB -2 as per IS:318
with revision and shall be dynamically balanced as per VD 12060 class 6.3 at
1200 rpm. t. The impeller shall preferably be provided with balancing hold nut
with back vanes
(ii)
Shaft: - The shafts shall be made of high tensile steel confirming to IS:1570) (part
V/45 CB as per I.S.-5517) and accurately ground all over. It shall be of sufficient
size as to be capable of transmitting the required power over the entire range
The pump shaft shall be provided with renewable type casing ring . Pumps having
more than 1000m3/hr capacity shall be provided with impeller ring in addition to
casing ring
(iii)
Wearing ring, Stuffing Box, Impeller and Shaft Sleeves, and Bearings There shall be made of bronze AST-410 as Grade-II of IS:318 latest
revision. Pump should be fitted with double wearing rings. One is to be
fitted in casing and another behind the impeller.
Stuffing
277
boxes shall be designed for easy adjustment and replacement of the packing
material. Alternatively split mechanical seals may be provided.
Bearings shall be oil lubricated or grease lubricated and shall have a life of
40,000 hours of working. In case of oil lubricated bearing, constant oil
leveller with magnetic drain plug shall be provided.
(v)
Gaskets, Seats and Packing: -These shall confirm to the specification laid
down in IS:5120( latest revision )and the pump should be fitted with the
pack grease lubricated bearing.
(vi) Coupling: - The pump shall be directly coupled with the electric motor
through spacer /pin type coupling of reputed make so that both the rotating
parts function as one unit without casing .
(vii) Name Plate: - The pump shall have a name plate (Specification plate)
including
1. Manufacturers names of recognized trade mark.
2. Type / Model and Serial Number of pumping.
3. Speed.
4. Total head/Rate of flow / Best efficiency point with power input.
5. Range of head and corresponding rates of flow.
(c)
(II)
Pump Testing:
a. The overall efficiency of the pump set shall not be less than 75%
b. The overall efficiency of the pump shall be guaranteed at specified
point of rating only and the discharge shall be guaranteed for the range
of head between minus 25% & plus 10% of the specific head. The Firm
should furnish the guaranteed discharge at these head. There should not
be stiff rise and fall in head vrs. Discharge curve and discharge vrs.
overall efficacy curve.
c. The firm must furnish the curves authenticated by the manufacture to
enable the purchaser to judge the performance of the pump set.
i)
Head Vrs. Discharge Curve
ii)
Discharge Vrs. Pump efficiency curve
iii)
Discharge Vrs. Pump input at pump shaft curve.
MOTOR:
a).The Motor shall be of reputed make ,and should be energy efficient confirming
to the latest version of IS:325 and IS:12615 or equivalent international standards
and shall be of TEFC enclosure, rated for continuous duty, ambient temperature of
50o Celsius. The relative humidity can be up to the maximum of 100% Motor shall
be suitable for 3 phase electric power supply wide range voltage,3.3kV, 415 Volt
10% Hz. It should be designated for an over load capacity of 115% of rated capacity
of pump set for frequent operation. Motor efficiency should not be less than 85%.
The motors shall be suitable for DOL/ Star-Delta/ Soft Starters.
The Starting current of motor shall not exceed 200% of rated full load current for
Star/Delta starting and 600% of rated full load current for DOL starting, under any
circumstances.
278
Motors shall be capable of starting and accelerating the load with the applicable
method of starting ,without exceeding acceptable winding temperature, when the
supply voltage is in the range 85% of the rated motor voltage.
Motor shall be designed to withstand 120% of rated speed for two minutes without
any mechanical damage, in either direction of rotation.
(b)
i)
ASSEMBLY OF MOTOR
Winding: - The winding should be enameled copper / strip with F type
insulation and winding are braced to prevent soil deformation due to stress
caused by surges.
ii)
Core: -The core should be made from low loss; high permeability; varnish
insulated electrical grade sheet steel and stamping are hydraulically pressed
than clamped to form a rigid structure..
Shaft: - Shaft shall be made from high carbon steel of cross section
adequate enough to provide strength and rigidity to minimize the deflection
and vibration.
iii)
(III)
iv)
v)
Earthing stud: - The motor body shall have two separate earthings stud for
earthings in compliance with I.E. Rules.
vi)
BASE FRAME: - The base should be made out of Cast Iron or M.S.
Channels confirming to IS:226 grade with foundation Nut & Bolt.
CONTROL PANNEL:
i)
Construction - Equipment shall be fabricated out of 2mm for C.R.C.A.
sheet having non-compartmentalized type. Provision for cable entry at
bottom and all terminals of the equipment shall be accessible from
front/back.
ii)
Wiring: - All power wiring to be done with copper wire having good
insulation to with stand against 660 Volt of different colour or of black
colour with phase marking at both ends. All the control wiring shall be
done with 1.5 mm2 Flexible wire of Red colour with phase marking at both
the ends.
iii)
Painting shall be done with stoving primer and stoving finish of approved
colour
iv)
Individual Panel Board for Individual pump set and one main control panel
board to be provided.
v)
(IV)
CIRCUIT CONFIGURATION:
System Voltage
:
Utilization Category
:
Coil Voltage
:
Power
:
Back up protection
:
Isolator
:
Contactor
:
S.P.P.
Over load relay
:
:
Volt meter
Ampere Meter
(V)
Features :
Electro mechanic Control Panel Auto Transformer Start
Power Supply 3~50Hz, 380~415V AC+/- 10%
Short Circuit and Over Current protection (MCB/MCCB)
Overload protection
Phase failure protection
Air cooled Auto Transformer with 60%, 70% & 80% tappings
Water level controller with dry run protection
Contactors with thermal overload relay resetable
Electronic timer with master timer
Control Fuse
Volt meter, Ammeter, Indicating lamps (R,Y,B, trip)
Dust proof metal enclosure IP 44 with high quality finishing
c. VFD (Variable frequency drive) details -
ii)
System Conditions:
The Electrical installation and equipment shall be suitable for operation in the
following system conditions.
Supply voltage
:
415 volts +10%
Supply frequency
:
50Hz +5%
Number of phases
:
Three
Scope:
a)
Materials
All the materials, fittings, appliances used in electrical installations shall
conform to Indian Standard Specifications wherever these exist. A list of
approved materials is attached in Annexure-I. Materials not included in the
281
list as well as any particular make not included in the list should be
approved by the Authoritys Engineer before use. All required materials
covered under this specification shall be supplied and installed by the
contractor complete in all respect except in cases where it is clearly
mentioned otherwise. The materials and accessories required for completing
the work will form part of the work although they have not been specified
separately.
Selection of Materials and installation work shall be such as to simplify
operation, inspection, maintenance and testing. The work shall include all
reasonable pre-cautions and provision for safety of operation and
maintenance personnel.
b)
Standard:
Unless otherwise specified, all materials covered under this specification
shall be designed, manufactured, tested and installed in conformity with the
latest Indian Standard specifications. In case such Indian Standard
Specifications are not published equivalent British Standard Specifications
shall be followed. All equipment shall confirm to latest Indian Electricity
Rules, PWD and Local / State laws or bye-laws as regards to safety,
earthing and other essential provisions specified therein.
All equipment and materials selected shall also be supplied and installed
taking into consideration the Factories Act, Fire Regulations and Local laws
or bye-laws. All light fittings and equipment selected shall be of well tied
out design. All materials used in the assembly of fittings and their
accessories shall be of high quality and manufactured in accordance with
the best modern practice.
All the materials supplied by the contractor according to the contract
conditions will be subject to inspection and approval by the consultant or /
and Engineer-in-charge or their authorized representative from time to time.
The contractor shall extend all required facilities for such inspection free of
cost. At the time of inspection, the inspecting officer shall have full liberty
to reject any such material, which does not confirm to specifications or the
requirements. The owner shall not entertain any claim for the rejected
materials. The contractor shall remove all rejected materials from the site at
his own cost.
The owner shall not accept any surplus materials procured by the contractor.
The contractor will be responsible to get electrical installations inspected by
the Electrical Inspector of the State Govt. and to obtain the statutory
clearance for energisation. The owner will reimburse the necessary
inspection fees on production of documentary evidences.
The contractor should possess valid electrical contract license and labour
license issued by the appropriate statutory authority of the State Govt.
during the execution of the Contract.
282
283
Material/ Equipment
Cement
UPVC Pipes
IS marked
6
8
9
10
Steel Reinforcement
G I Pipes
HDPE Pipes
C I Sluice Valves
Butterfly Valve
11
13
12
14
Make
Tata,Jindal
IS marked
Kirloskar,IVI, Fouress,
VAG,Audco
VAG, Kirloskar
Reliable
Kirloskar / Mather & Platt / Voltas /
Greaves/KSB/WPIL/Grundfos/Willow/Xylom
Kirloskar, Mather & Platt, Greaves, KSB, Voltas,
WPIL
15
Centrifugal Pumps
17
19
Pressure Gauges
H. Guru,Budon tube,Gluck,Waree,Oricol
21
23
Chlorinator
16
18
20
22
24
25
a)
b)
26
a)
b)
Krohne, MEI
Reliable
Electrical motors
HT Switch Gear
ABB,Siemens
Power Transformer
VOLTAMP,CGL
284
27
DC Distribution board,MLDB,SLDB,
Lighting panel
29
Indoor Isolator
Cables
28
CT/PT
30
Local Control panel / Local Push Button Intelec,Control & Schematics,Power switch Gear,
Station
Universal Electric.
32
Instrumentation cables
31
33
Online UPS
35
Lighting Transformer
36
VFD
a)
38
40
Push Buttons
34
37
b)
39
41
42
43
Lighting Fittings
Areva,Kaycee,Siemens,L&T,Teknic
Terminal Box
MCB
Hooters
45
Earthing Materials
47
Cable Trays
48
Level indicator
49
Protective Relays
51
Ammeter,Voltmeter
52
53
54
55
Siemens,L&T,BCH
AMCO,EXIDE,AMRA RAJA,TATA,Power zone,
Phoenix Contact
CHHABI,AMAR RAJA,HBL
50
Battery Charger
44
46
Philips,Bajaj,Crompton, Havels,
Siemens,L&T,BCH
Siemens,Schneider, ESSEN
ABB,Siemens,Legrand, Schneider
Kheraj,Tullu,Waves elctronics
BCH, Shakti Electricals, CycloElectric,Kaypee
Electricals
3M,Raychem, Densons
ABB,Siemens, Schneider
Interposing Relays
Areva,L&T,OMRON,Jyoti,Phoenix Contact
Transducers
Lighening arrester
Capacitors
CGL.ELPRO,OBLUM, WS Insulator
56
Insulators
58
Relays
ABB,L&T,Schneider
57
59
60
61
62
63
64
65
66
67
68
Motor Contactors
Switch & Fuses
Kohler,caterpillar,Cumins,Jack son,Kirloskar
Level Transmitter
Level switch
Actuator
SCADA Software
72
75
Crompton, Orient,Usha,Khaitan,Bajaj
Diesel Generators
70
74
Crompton, GE,Bajaj
Lighting Fixtures
PLC
73
GE,L&T,Siemens,Bussmann
Exhaust Fans
69
71
Cromton,Philips,Wipro,Bajaj
Phoenix Contact,Molex,Finolex
Phoenix Contact,Hirchmann,Siemens
Sanitary Ware
Parryware,Neycer,hindware
Blower
Phoenix Contact,Molex
76
sanitary Fittings
Jaquar,ESS
78
Paints,Distemper
77
79
All Furniture
Godrej, Durian
laboratory Instruments
81
Online analyzer
83
Gear Box
80
82
Borosil
85
87
84
86
88
89
90
91
Greaves
Laser printer
HP,Canon,EPSON
EPSON,TVS
286
92
95
93
94
iv.
Power Supply:
Standard voltage shall be as follows :
i)
415V ( 6%, 3-Ph, 4-wire, 50 ( 5%) Hz AC available line for A.C. motors and
illumination/Ventilation.
ii)
230V, 1-ph, 50Hz. AC for control power and lighting.
7.17. Inspection, Testing, Trial-Run, Guarantee Test, Operation & Maintenance Manual,
Completion Drawings, Guarantee & Acceptance:
(i)
General:
All equipment, accessories, auxiliaries, piping, electrics, instruments, installations,
construction, buildings etc. including all mechanical, electrical & civil engineering
works covered under the scope of work of contractor shall be subjected to
inspection & testing by the Department for its material, quality, workmanship and
the performance. The contractor shall arrange and carry-out all such inspections,
testing, trial-run etc. and demonstrate in presence of the Engineer-in-Charge of the
Department.
The cost of such inspection, testing, trial-run, demonstration etc. shall be borne by
the contractor. All responsibility of such inspection, testing, trial-run,
demonstration etc. and any damage/loss that may cause directly or indirectly shall
exclusively rest with the contractor.
Such inspection, testing, trial-run, demonstration etc. shall, however, not relieve
the contractor of their liability for replacing/ rectifying any defects which may
subsequently appear or be detected during erection and guarantee period.
Copies of certificates for materials test, hardness, balancing test along with other
routine shops quality assurance tests shall be furnished by the contractor prior to
carrying out of the inspection and testing.
(ii)
Tests at works:
All equipment, sub-assembly and components, auxiliaries and accessories shall be
tested at manufacturers works in accordance with relevant Indian
Standards/International Standards. The contractor shall furnish all test certificates
etc. related to the quality of all the materials to the Department along with the
delivery of the materials at site without which no payment shall be released.
However, such test certificates, quality assurance certificates shall not relieve the
287
(vii)
Completion Drawings:
A set of approved process, hydraulic, structural, mechanical, electrical, equipment
drawings basing on the actual execution of the plant shall be handed over by the
contractor to the Authority/ Authoritys Engineer before completion of trial run and
performance guarantee test. The record drawings shall be prepared on best quality
polyester tracing papers. One set of Soft copies of the drawings shall also be
provided along with the hard copy.
(viii)
and operate on ball thrust bearings with hardened races. The lifting hooks shall comply
with requirements of Bs:2903/BS:3017 and shall have a safety latch to prevent rope
coming off the hook.
7.18 The following Special Specifications are applicable for construction and commissioning of
water supply scheme and other structures and shall be treated as part and partial of the
clauses of contract, conditions of contract, general specifications and special conditions
and scope of work and all are to be read together, unless otherwise specified.
7.19 Sound Engineering Practice to be followed
The work shall have to be executed according to relevant IS code and OPWD specification
and detailed specification but if at any point these IS code/OPWD specifications are silent,
then work can be executed according to sound engineering practices after obtaining
written approval of Engineer-in-Charge.
7.20
7.21
Hood covers shall be of mild steel sheets not less than 0.90 mm thick and of approved
shape.
Rolling shutters shall be provided with a central hasp and staple safety device in addition
to one pair of lever locks and sliding locks at the ends.
All component parts of the steel rolling shutter (excepting springs and insides of guide
channels) shall be apllied with one coat of zinc chrome primer conformity to IS: 2074 at
the shop before supply. These surfaces shall be given an additional coat of primer after
erection at the site along with the number of coats and type of finish paint as specified in
the respective items of works prepared by the Contractor and duly approved by the
Authoritys Engineer
Guide channels shall be installed truly plumb at the specified location. Bracket plate shall
be rigidly fixed with necessary bolts and holdfasts. Workmanship of erection shall ensure
strength and rigidity of rolling shutter for trouble free and smooth operation to the full
satisfaction of the Authoritys Engineer.
7.21.a Painting of Rolling Shutters, M.S. Grill, M.S. Gate G.I. Pipe Railing, Cast Iron and
other Steel Work etc.
All items mentioned above shall be painted with 3 coats of superior quality, synthetic
enamel paint of approved shade and quality prior to which priming coat after rubbing and
removal of rust shall be provided.
7.21.b Water Proof Treatment over the Roof
Roof of all the buildings shall be provided with integral cement based waterproofing
treatment as per OPWD specifications, after surface preparation..
7.21.c C.C. Gola and Khurras over the Roof
Roof of all the buildings shall be provided with C.C. Gola of 75 mm x 75 mm in 1:2:4 mix
along the parapet walls as per OPWD specifications. Similarly C.C. Khurra of 45 cm x 45
cm in 1:2:4 and 5 cm thick shall be provided over the roofs where rainwater pipes are to be
fixed as per OPWD specifications.
7.21.d PVC Rain Water Pipe
For draining rain water from all roofs, PVC rain water pipes of not less than 100 mm dia
from roof to plinth protection level shall be provided. The number of places shall be as
per drawing submitted by the contractor and approved by the Authoritys Engineer.
7.22. Exhaust Fans:
Exhaust fans shall comply with IS:2312. And should have ISI Marking
Fan blades shall be of mild steel? Cast aluminum of an airfoil design mounted on stream
lined hub. It shall be properly balanced so as to avoid noise and vibration. The blades and
blade carriers shall be securely fixed so that they do not loosen.. f
7.22.a Fire Extinguishers:
The Fire extinguishers shall be portable of 5kg capacity and shall of Carbon
dioxide
type . They shall confirm to requirements of NFPA 12 and shall be UL/ FM approved.
291
292
a) Unlimited Access: This will allow the user to read and write all PLC configuration
parameters such as local, network and system registers, Hardware input and output
registers, event logs and logic programs.
b) Access without configuration: This will allow reading and writing of all PLC
configuration parameters except system registers and ladder logic.
c) Access limited to only reading the PLC parameters
d) Access limited to PLC port configuration.
7.24.5 SCADA User Interface
The SCADA system shall permit the user to access displays via printing device and/or soft
key menus with a choice of function keys, cursor, control keys or any key on the keyboard.
The system shall support operator access to multiple displays at one time, including split
screens where the operator may view more than one process area at a time and permit popup displays.
The operator shall be able to have access to context sensitive help at any time during
operation of the system. The operator shall be able to access multiple data sources/items
with a single tag name.
7.24.6 Command/Control Functions
The system shall allow the user to control a specific set point or to adjust a set of points
depending on the operating limits. Control of individual set points shall be enabled based
upon a users security level.
7.24.7 Display Capability
The system shall allow the user to view animated graphics for process templates including
valves, meters, etc. The system shall support the capability for the operator to view
scanned images and be possible to animate these images.
7.24.8 Text Description
The system shall support use of true-type scale able fonts that may be scaled according to
the desired size of the text. The fonts shall be loaded by the operating system.
Text shall be able to blink based upon any user definable condition occurring in the system
such as an alarm on a particular set point.
7.24.9 Alarm Capabilities
i)
available.
It shall be possible to inform the operator of an alarm condition via an audible tone, a popup display or any combination of animation types on the screen.
Alarm acknowledgement may be performed on all alarms, alarms in a single group, and
alarms in a collection of groups in defined in alarm group hierarchy or on a point-by-point
basis.
ii)
iii)
Alarms shall be logged to a file for future viewing or review of alarm history data. The
user shall have the capability to review the file for cause and event analysis. The alarms
that are logged shall be configurable from a choice of the parameters listed during
configuration.
Alarm Printing Capability
Alarms shall be allowed to be printed and the format shall be configurable and made up of
any of the parameters listed during configuration.
parameters required for EMS. EMS should calculate pump running hours, total
energy consumption etc. Data from EMS shall be displayed on the HMI in the PLC
panel.
2
Supply ,installation ,Testing & commissioning of Pressure trans mitter with minimum
features as follows:
Pressure Transmitter:
Measuring Principle : Hydrostatic
Characteristic : Digital transmitter with capacitive sensor and ceramic membrane
Supply voltage : 4...20mA
Reference Accuracy : Standard: 0.05%
Platinum: up to 0.025%
Process temperature : -20C...150C
Ambient temperature : -40C...85C
Measuring cell : 100mbar...40bar or (1.5psi...600psi)
3 Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
4 Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
2mm.Side panel : 1.5mm. Gasket : polyurethene. Door : hinged door
Door designed : 130 degree hinged door. Looking arrangment : comfort handle
with security lock
5 Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 Limit switch for Differntial control valve and configured to PLC
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 HDPE Conduit pipe
11 Chemical Earthing - 3 pit system
B
295
Supply ,installation ,Testing & commissioning of PLC system with minimum features as
follows:
PLC: PLC should have Ethernet TCP/IP and MODBUS RTU/Profibus port. The
PLC can be easiliy extendable with additional IO cards in future. The PLC software
should support all 5 languages as per IEC 61131-3, The ambient operating
temperature shall be 55 deg C. Minimum no. of IOs should be DI-64 ; DO- 32 ; AI16 ; AO-8 ;Modbus- 4 channels. Suitable fuse terminal should be used in all DI &
DO. Intermediate relay should be considered for all DOs. Power supply to the PLC
should be redundant type with suitable diode oring module. Enclosure should be
neatly wired and with adequate space for ease of maintenance in future. Front & rear
access may also be considered if required.
HMI: 12", TFT Color, Panel mounted, touchscreen type, alarm generation, trend
generation, report generation with 30 days data back up facility.
Networking: Networking component should consists of required ethernet
components along with Fiber Optic & accessories to establish communication
between each zone and main WTP. Fiber optic should be Single Mode 9/125, 6 core
type, suitable for more than 20KM data transmission without any repeater. Whole
network infrasrtucture should have proper security system and firewall in each and
every location.
EMS: All energy meter should read Current, Voltage, Power, energy and any other
parameters required for EMS. EMS should calculate pump running hours, total
energy consumption etc. Data from EMS shall be displayed on the HMI in the PLC
panel
Supply ,installation ,Testing & commissioning of Pressure trans mitter with minimum
features as follows:
Pressure Transmitter:
Measuring Principle : Hydrostatic
Characteristic : Digital transmitter with capacitive sensor and ceramic membrane
Supply voltage : 4...20mA
Reference Accuracy : Standard: 0.05%
Platinum: up to 0.025%
Process temperature : -20C...150C
Ambient temperature : -40C...85C
Measuring cell : 100mbar...40bar or (1.5psi...600psi)
296
Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
4 Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
2mm.Side panel : 1.5mm. Gasket : polyurethene. Door : hinged door
Door designed : 130 degree hinged door. Looking arrangment : comfort handle
with security lock
5 Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 Limit switch for Differntial control valve and configured to PLC
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 HDPE Conduit pipe
11 Chemical Earthing - 3 pit system
II
1
Intake Area
Supply ,installation ,Testing & commissioning of PLC system with minimum features as
follows:
PLC: PLC should have Ethernet TCP/IP and MODBUS RTU/Profibus port. The
PLC can be easiliy extendable with additional IO cards in future. The PLC software
should support all 5 languages as per IEC 61131-3, The ambient operating
temperature shall be 55 deg C. Minimum no. of IOs should be DI-64 ; DO- 32 ; AI16 ; AO-8 ;Modbus- 4 channels. Suitable fuse terminal should be used in all DI &
DO. Intermediate relay should be considered for all DOs. Power supply to the PLC
should be redundant type with suitable diode oring module. Enclosure should be
neatly wired and with adequate space for ease of maintenance in future. Front & rear
access may also be considered if required.
HMI: 12", TFT Color, Panel mounted, touchscreen type, alarm generation, trend
generation, report generation with 30 days data back up facility.
297
Supply ,installation ,Testing & commissioning of Pressure trans mitter with minimum
features as follows:
Pressure Transmitter:
Measuring Principle : Hydrostatic
Characteristic : Digital transmitter with capacitive sensor and ceramic membrane
Supply voltage : 4...20mA
Reference Accuracy : Standard: 0.05%
Platinum: up to 0.025%
Process temperature : -20C...150C
Ambient temperature : -40C...85C
Measuring cell : 100mbar...40bar or (1.5psi...600psi)
Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
2mm.Side panel : 1.5mm. Gasket : polyurethene. Door : hinged door
Door designed : 130 degree hinged door. Looking arrangment : comfort handle
with security lock
298
Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 Limit switch for Differntial control valve and configured to PLC
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 HDPE Conduit pipe
11 Chemical Earthing - 3 pit system
HMI: 12", TFT Color, Panel mounted, touchscreen type, alarm generation, trend
generation, report generation with 30 days data back up facility. HMI should control
individual filter bed in auto mode. Individual PLC also should have send data to
centralized SCADA system which will be placed inside main control room.
Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
299
Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 31/2 core aluminium power cable ( 2.5sqm)
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 Chemical Earthing - 3 pit system
B
1
HMI: 12", TFT Color, Panel mounted, touchscreen type, alarm generation, trend
generation, report generation with 30 days data back up facility. HMI should control
individual filter bed in auto mode. Individual PLC also should have send data to
centralized SCADA system which will be placed inside main control room.
Supply ,installation ,Testing & commissioning of differential level transmitter,LOH/ROF
indicater with minimum features as follows: differential Level Transmitter:
Measuring Principle : Eletronic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
300
Supply ,installation ,Testing & commissioning of Pressure trans mitter with minimum
features as follows:
Pressure Transmitter:
Measuring Principle : Hydrostatic
Characteristic : Digital transmitter with capacitive sensor and ceramic membrane
Supply voltage : 4...20mA
Reference Accuracy : Standard: 0.05%
Platinum: up to 0.025%
Process temperature : -20C...150C
Ambient temperature : -40C...85C
Measuring cell : 100mbar...40bar or (1.5psi...600psi)
3 Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
4 Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
2mm.Side panel : 1.5mm. Gasket : polyurethene. Door : hinged door
Door designed : 130 degree hinged door. Looking arrangment : comfort handle
with security lock
5 Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 31/2 core aluminium power cable ( 2.5sqm)
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 Chemical Earthing - 3 pit system
C Wash water handling & recirculation system
301
Supply ,installation ,Testing & commissioning of PLC system with minimum features as
follows:
PLC: PLC should have Ethernet TCP/IP. The PLC can be easiliy extendable with
additional IO cards in future. The PLC software should support all 5 languages as per
IEC 61131-3, The ambient operating temperature shall be 55 deg C. Minimum no.
of IOs should be DI-64 ; DO- 32 ; AI-16 ; AO-4 .Suitable fuse terminal should be
used in all DI & DO. Intermediate relay should be considered for all DOs. Power
supply to the PLC should be redundant type with suitable diode oring module. The
PLC should be neatly wired up inside the operator console. Operator console also
should have push button & lamps for manual operation in case of failure of PLC.
Front & rear access may also be considered if required.
HMI: 12", TFT Color, Panel mounted, touchscreen type, alarm generation, trend
generation, report generation with 30 days data back up facility. HMI should control
individual filter bed in auto mode. Individual PLC also should have send data to
centralized SCADA system which will be placed inside main control room.
3 Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
Max. measurement distance : 8 m (26 ft)
Communication : 4 ... 20 mA
4 Supply of PLC enclosure of following specification;
Profile : 16 fold in a single steel construction
Painting : triple anti-corresion, nano-ceramic surface treatment with dipcoat priming
and textured power coating ral-7035.which help to protect rust &
corrosion.Protection : ip 55. Mounting plate : 3mm zinc plated.Front door :
2mm.Side panel : 1.5mm. Gasket : polyurethene. Door : hinged door
Door designed : 130 degree hinged door. Looking arrangment : comfort handle
with security lock
5 Supply ,installation ,Testing & commissioning of Online UPS (minimum 1 KVA with 1
Hour Backup) with following Specifications:
Rack mounted. Hot swapable battary replacement. Doubble Conversion
technology.Battery Type: VRLA (Dry - Maintenance Free).
Monitoring of battery health thru PLC
6 31/2 core aluminium power cable ( 2.5sqm)
7 Armoured Screened instrumentation cable - 2 Pair
8 Cable Gland
9 GI Coated Cable Tray
10 Chemical Earthing - 3 pit system
302
D
1
EMS: All energy meter should read Current, Voltage, Power, energy and any other
parameters required for EMS. EMS should calculate pump running hours, total
energy consumption etc. Data from EMS shall be displayed on the HMI in the PLC
panel
Supply ,installation ,Testing & commissioning of Pressure trans mitter with minimum
features as follows:
Pressure Transmitter:
Measuring Principle : Hydrostatic
Characteristic : Digital transmitter with capacitive sensor and ceramic membrane
Supply voltage : 4...20mA
Reference Accuracy : Standard: 0.05%
Platinum: up to 0.025%
Process temperature : -20C...150C
Ambient temperature : -40C...85C
Measuring cell : 100mbar...40bar or (1.5psi...600psi)
Supply ,installation ,Testing & commissioning of ultrasonic level transmitter with minimum
features as follows:Ultrasonic Level Transmitter:
Measuring Principle : Ultrasonic
Supply / Communication : 2/4-wire, PROFIBUS PA
Accuracy : +/- 2 mm or +/- 0,2 % of set measuring range
Ambient temperature : -40 C ... 80 C
Process temperature : -40 C ... 80 C
Main wetted parts : PVDF
Process connection : G / NPT 2"
Blocking distance : 0.35 m (1.15 ft)
303
All the PLCs in RAW WATER & CHEMICAL DOSING area, FILTER BED area,
WASH WATER HANDLING & RECIRCULATING area and CLEAR WATER
PUMPING area should communicate with SCAD system located in the CENTRAL
CONTROL ROOM located in WTP. In WTP redundant SCADA system shall be
considered for operator with one additional Engineering station.The SCADA system
should also read and write all ZONAL PLC and INTAKE PLC.
The SCADA software must support OPC. To establish the entire network between
ZONAL PLCs, INTAKE PLC and WTP PLC SYSTEM the designer should consider
required HARDWARE FIREWALL to restrict unauthorized entries into the network.
Fiber optic should be single mode type, 6 core, suitable for data transmission
minimum upto 80 KM. HDPE conduit also to be considered for FO.
All ETHERNET SWITCH required for the network establishment should be
INDUSTRIAL, DIN RAIL MOUNTED, MANAGED type with operating
temperature of 65 deg C. All ethernet switches must have spare ports for future use.
For converting the optic signal to ethernet signal and vice versa, fiber optic port
inbuilt in eternet switch shall be considered. No stand alone type medi converter will
be entertained.
One number of ODP server, sutiable to commuicate with 30 ODP clients shall be
considered in the centralised SCADA system.
304
Data transmission from WTP to NIC also shall be considered via VPN technology.
305
SCHEDULE E
(See Clauses 2.1 and 14.2)
1.2
1.3
2.
3.
7.
8.
Annex - I
(Schedule-E)
1.
2.
Transformers/Sub-stations
3.
4.
5.
6.
7.
8.
307
Annex - II
(Schedule-E)
:
: PH Division, Sambalpur
: Sambalpur
:
Agreement No.
: from to
1.
2.
3.
4.
:
:
Yes
Yes
No
No
:
:
:
Yes
Yes
No
No
Yes
Nos.
(Received)
No
Nos.
(Attended
within 24 Hrs.)
Yes
No
:
:
:
Distribution Systems
:
a) If Daily checks are undertaken to detect :
leakages
308
5.
6.
Nos.
(Received)
Nos.
(Attended
within 24 Hrs.)
Yes
Yes
No
No
Yes
No
Yes
No
:
:
:
:
:
Signature of JE/ AE
Signature of AE/ AEE/ DEE
Signature of EE
In case JE/ AE/ AEE/ DEE do not agree to the report then he shall return the report to the
reporting officer with reason.
309
Annex - III
(Schedule-E)
FOR 5 YEARS
2.
3.
310
Sl.
No.
1
1
2
3
4
5
6
7
8
Calculation for O & M Cost and Energy charges for base Year 2016-17
Location
Manpower
(in Rs.)
Chemicals
(in Rs.)
Units of Energy
(in Rs.)
2
Baripada
Sambalpur
Rourkela
Jharsuguda
Total
Or Say
O & M Cost (Excluding Energy
Charges & Diesel)
Energy Charges
3
12537000.00
15182000.00
18859000.00
5959000.00
52537000.00
52537000.00
4
9793000.00
3052000.00
29717000.00
9499000.00
52061000.00
52061000.00
5
4310934.70
1629805.30
6204229.85
4375174.70
104598000.00
Unit cost of
Energy
charges
(in Rs.)
6
7.00
7.00
7.00
7.00
7
30176543.00
11408637.00
43429609.00
30626223.00
115641012.00
115641000.00
115641000.00
311
REQUIREMENT OF MANPOWER FOR OPERATION AND MAINTENANCE OF STAFF AS PER PHEO YARD STICK
Sl.
No.
(1)
(2)
1.
Intake well 32 MLD
Capacity
2.
Raw water rising main
(15.01 KM)
3.
Water Treatment Plant
Capacity 16 MLD
4.
Clear water pump house.
5.
Clear
Water
Rising
main=10.118 K.M.
6.
Distribution net work
=122.64 K.Ms.
7.
Service
Connections
=10000 Nos. (Municipal
holdings)
8.
For Billing and reservice
connections for 10000 nos,
House connection.
9.
Telephone
booth
for
receiving complain.
10. Mechanical Staff.
11. Zonal Pumping Station,
Storage Reservoir(UGR)=
06 Nos.
Total:
(Baripada)
Pump
Driver
Khalasi
Fitter
Mistry
Filter
Operator
Meter
reader.
(3)
3
(4)
3
(5)
--
(6)
--
(7)
--
Meter
Ledger
Clerk.
(8)
--
--
--
--
--
--
3
--
3
1
-1
--
10
--
Bill
Clerk.
Mechanic.
Watch
Man
(9)
--
(10)
--
(11)
--
(12)
--
(13)
--
--
--
--
--
--
--
--
--
--
--
---
---
---
---
---
---
---
---
10
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
--
13
10
10
--
--
--
--
--
--
--
--
--
--
-18
---
---
---
---
---
---
1
--
---
---
---
24
23
13
13
10
10
312
Sl. No.
1.
2.
Man power.
Nos.
Category.
Highly skilled
Remuneration
per day ( Rs.)
260.00
Annual Cost
(In Rs.)
7117500.00
75
25
Skilled
240.00
2190000.00
100
9307500.00
Rs. 9307500.00
Rs. 1266751.00
=
=
Rs. 442107.00
Rs. 11016358.00
=
=
=
=
Rs. 1396125.00
Rs. 12412483.00
Rs. 124125.00
Rs. 12536608.00
Rs.12537000.00
Say
313
Name of Chemicals
Alum
Lime
Liquid Chlorine (Gas
Cylinder (Tonner)
Quantity in
MT required
102
34
11
Rate per
MT in Rs.
12415.00
5418.00
14,164.00
Total amount
(in Rs.)
1266330.00
184212.00
155804.00
TOTAL
1606346.00
314
Rs.1606346.00
Rs.5734656.00
Rs.7341002.00
Rs.
Over Head Charges & Contractors Profit @ 7.5% each (15%) on item (iii) =
Total cost for the year (2016-17)
73411.00
Rs.1101151.00
Rs.8515564.00
Rs.1277335.00
Total cost for the year (2019-20) i.e., 1st year of Maintenance
Rs.9792899.00
Say
Rs.9793000.00
315
ALUM.
Sl.
Item.
No.
1
2
1.
Alum
LIME.
Sl.
Item.
No.
1
2
1.
Lime
Rate.
Unit.
3
01 M.T.
4
8880.00
M.T.
Quantity.
Rate.
Unit.
3
01 M.T.
4
4190.00
M.T.
Unit.
5
M.T.
Amount.
6
8880.00
Amount.
6
4190.00
Amount.
6
8400.00
Vat
(13.5%).
7
1198.80
Vat
(13.5%).
7
565.70
Entry Tax
Carriage.
Total.
(1%).
8
9
10
100.80
2235.00/M.T. 12,414.60
or say:
12,415.00
11
Bhubaneswar
to Baripada
=280 K.M.
E.D.
Vat
Entry tax
Carriage
(12.5%). (13.5%).
(1%).
7
8
9
10
1050.00 1275.75 107.25
3,330.00 /
M.T.
Total
11
14,164.00/
M.T.
Total: :14,163.00/M.T.
TRANSPORTATION (CHLORINE CYLINDER):
1ST. 5 K.M.
=Rs. 169.00
Rate for 45 K.M.
8.60x45
=Rs. 387.00
Rest: 380 K.M.
7.30x380
=Rs.2,774.00
Total:
Rs.3,330.00/M.T.
Remarks.
Remarks.
11
Jayshree
Chemicals to
Baripada 430
K.M.
TRANSPORTATION (ALUM).
TRANSPORTATION (LIME).
1ST 5 K.M.
Rs. 169.00
1ST 5 K.M.
Rs.169.00
Rate 45 K.M. Rs. 387.00
Rate 45 K.M. Rs. 387.00
Rate 230 K.M. Rs.1,679.00
Rate 8 K.M.
Rs. 58.40
Rs.2,235.00/M.T.
Rs.614.40/M.T.
316
REQUIREMENT OF MANPOWER FOR OPERATION AND MAINTENANCE OF W/S SYSTEM AS PER PHEO YARD
STICK (Sambalpur)
Sl.
No.
1
1
2
3
4
5
6
7
7
System components
as per flow line
2
Pump
Driver
3
Khalasi
4
Fitter
Mistry
5
Filter
Operator
6
Meter
Meter
Bill Mechanic Watchman Analyst
Reader Ledger Clerk Clerk
7
8
9
10
11
12
Lab.
Asst.
13
--
12
12
--
--
25
20
20
18
27
25
20
20
1
1
317
Sl. No.
1.
2.
Man power.
Nos.
Category.
Highly skilled
Remuneration
per day ( Rs.)
260.00
Annual Cost
(In Rs.)
87,30,800.00
92
29
Skilled
240.00
25,40,400.00
121
1,12,71,200.00
Rs. 11271200.00
Rs. 1534010.00
=
=
Rs. 535382.00
Rs. 13340592.00
=
=
=
=
Rs. 1690680.00
Rs. 15031272.00
Rs. 150313.00
Rs. 15181585.00
Rs.15182000.00
Say
318
Average
Name of Chemicals
Alum
Lime
Liquid Chlorine (Gas
Cylinder (Tonner)
Quantity in
MT required
32
11
4
Rate per
MT in Rs.
11758.00
6090.00
14310.00
Total amount
(in Rs.)
376256.00
66990.00
57240.00
TOTAL
500486.00
319
Rs. 500486.00
(ii)
Rs.1786736.00
(iii)
Sub Total:
Rs.2287222.00
Rs. 22873.00
Over Head Charges & Contractors Profit @ 7.5% each (15%) on item (iii) =
Rs. 343084.00
Rs.2653179.00
Rs. 397977.00
Total cost for the year (2018-19) i.e., 1st year of Maintenance
Rs.3051156.00
Say
Rs.3052000.00
320
ALUM.
Sl.
Item.
No.
1
2
1.
Alum
LIME.
Sl.
Item.
No.
1
2
1.
Lime
Rate.
Unit.
3
01 M.T.
4
8880.00
5
M.T.
Quantity.
Rate.
Unit.
3
01 M.T.
4
4190.00
M.T.
Unit.
5
M.T.
Amount.
6
8880.00
Amount.
6
4190.00
Amount.
6
8400.00
=Rs. 169.00
Rate for 45 K.M.
8.60x45
=Rs. 387.00
Rest: 400 K.M.
7.30x400
=Rs. 2920.00
Total:
Rs.3,476.00/M.T.
Vat
(13.5%).
7
1198.80
Vat
(13.5%).
7
565.70
E.D.
Vat
Entry tax Carriage
Total per
(12.5%). (13.5%).
(1%).
per M.T.
M.T.
7
8
9
10
11
1050.00 1275.75 107.25
3476.00 14,310.00
TRANSPORTATION (ALUM).
1ST 5 K.M.
Rs. 169.00
Rate 45 K.M. Rs. 387.00
Rate 140 K.M. Rs. 1022.00
Rs. 1,578.00/M.T.
321
Remarks.
11
Jayshree
Chemicals
Sambalpur
K.M.
to
450
TRANSPORTATION (LIME).
1ST 5 K.M.
Rs. 169.00
Rate 45 K.M. Rs. 387.00
Rate 100 K.M. Rs. 730.00
Rs.1,286.00/M.T.
REQUIREMENT OF MANPOWER FOR OPERATION AND MAINTENANCE OF W/S SYSTEM AS PER PHEO YARD STICK
(Rourkela)
Sl.
No.
1
1
2
3
4
System components
as per flow line
2
Pump
Driver
3
Khalasi
4
Fitter
Mistry
5
Filter
Operator
6
39
16
39
Meter
Meter
Bill Mechanic Watchman Analyst
Reader Ledger Clerk Clerk
7
8
9
10
11
12
Lab.
Asst.
13
--
16
--
28
22
22
19
19
28
22
22
322
Sl. No.
1.
2.
Man power.
Nos.
Category.
Highly skilled
Remuneration
per day ( Rs.)
260.00
Annual Cost
(In Rs.)
1,23,37,000.00
130
19
Skilled
240.00
16,64,400.00
Total:
149
1,40,01,400.00
Rs. 14001400.00
Rs. 1905591.00
=
=
Rs. 665067.00
Rs. 16572058.00
=
=
=
=
Rs. 2100210.00
Rs. 18672268.00
Rs. 186723.00
Rs. 18858991.00
Rs.1,88,59,000.00
Say
323
Average
Name of Chemicals
Alum
Lime
Liquid Chlorine (Gas
Cylinder (Tonner)
Quantity in
MT required
358
120
38
Rate per
MT in Rs.
10349.00
5145.00
14529.00
Total amount
(in Rs.)
3704942.00
617400.00
552102.00
TOTAL
4874444.00
324
Rs. 4874444.00
Rs.17401766.00
=
=
Rs.22276210.00
Rs. 222763.00
Over Head Charges & Contractors Profit @ 7.5% each (15%) on item (i)
Rs.3341432.00
Rs.25840405.00
Rs.3876061.00
Total cost for the year (2019-20) i.e., 1st year of Maintenance
Rs.29716466.00
Say
Rs.29717000.00
325
ALUM.
Sl.
Item.
No.
1
2
1.
Alum
LIME.
Sl.
Item.
No.
1
2
1.
Lime
Rate.
Unit.
3
01 M.T.
4
8880.00
5
M.T.
Quantity.
Rate.
Unit.
3
01 M.T.
4
4190.00
M.T.
Unit.
5
M.T.
Amount.
6
8880.00
Amount.
6
4190.00
Amount.
6
8400.00
=Rs. 169.00
Rate for 45 K.M.
8.60x45
=Rs. 387.00
Rest: 430 K.M.
7.30x400
=Rs.3139.00
Total:
Rs.3,695.00/MT
Vat
(13.5%).
7
1198.80
Vat
(13.5%).
7
565.70
E.D.
Vat
Entry tax Carriage
Total per
(12.5%). (13.5%).
(1%).
per M.T.
M.T.
7
8
9
10
11
1050.00 1275.75 107.25
3695.00 14,529.00
TRANSPORTATION (ALUM).
1ST 5 K.M.
Rs. 169.00/MT
326
Remarks.
11
Jayshree
Chemicals
to
Rourkela 480 K.M.
TRANSPORTATION (LIME).
1ST 5 K.M.
Rs. 169.00
Rate 20 K.M. Rs. 172.00
Total :
Rs. 341.00/MT
REQUIREMENT OF MANPOWER FOR OPERATION AND MAINTENANCE OF W/S SYSTEM AS PER PHEO YARD STICK
(Jharsuguda)
Sl.
No.
1
1
2
3
4
5
6
7
System
components as
per flow line
2
Intake well
25 MLD
capacity
Raw Water &
C.W. rising
main (4.6
+11.4 =16
KM )
19 MLD WTP
( 4.22 MGD )
for 3 shift)
C.W. Pump
house at WTP
( For 3 shift)
Zonal pump
house 4 Nos.
(For 3 shifts)
Distribution
main (65.393 Km)
Mechanical
Staff
Total
Pump
Driver
Khalasi
Fitter
Filter
Meter Meter Ledger Bill Mechanic Watchman
Mistry Operator Reader Ledger Clerk Clerk
Clerk
5
6
7
8
9
10
11
12
Analyst
--
--
--
--
--
--
13
Lab. Electrician
Asst.
14
--
12
--
--
18
16
48
327
15
Remarks
16
Sl. No.
1.
2.
Man power.
Nos.
Category.
Highly skilled
Remuneration
per day ( Rs.)
260.00
Annual Cost
(In Rs.)
2847000.00
30
18
Skilled
240.00
1576800.00
48
4423800.00
Rs. 4423800.00
Rs.
=
=
Rs. 210131.00
Rs. 5236010.00
=
=
=
=
Rs.
Rs.
Rs.
Rs.
Rs. 5959000.00
Say
328
602079.00
663570.00
5899580.00
58996.00
5958576.00
Average
Name of Chemicals
Alum
Lime
Liquid Chlorine (Gas
Cylinder (Tonner)
Quantity in
MT required
105
35
11
Rate per
MT in Rs.
11393.00
5725.00
14675.00
Total amount
(in Rs.)
1196265.00
200375.00
161425.00
TOTAL
1558065.00
329
(ii)
(iii)
Rs. 1558065.00
Rs.5562293.00
Rs.7120358.00
Rs.
Over Head Charges & Contractors Profit @ 7.5% each (15%) on item (iii) =
Total cost for the year (2015-16)
71204.00
Rs.1068054.00
Rs.8259616.00
Rs.1238943.00
Total cost for the year (2018-19) i.e., 1st year of Maintenance
Rs.9498559.00
Say
Rs.9499000.00
330
ALUM.
Sl.
Item.
No.
1
2
1.
Alum
LIME.
Sl.
Item.
No.
1
2
1.
Lime
Rate.
Unit.
3
01 M.T.
4
8880.00
5
M.T.
Quantity.
Rate.
Unit.
3
01 M.T.
4
4190.00
M.T.
Unit.
5
M.T.
Amount.
6
8880.00
Amount.
6
4190.00
Amount.
6
8400.00
=Rs. 169.00
Rate for 45 K.M.
8.60x45
=Rs. 387.00
Rest: 450 K.M.
7.30x450
=Rs. 3,285.00
Total:
Rs.3,841.00/M.T.
Vat
(13.5%).
7
1198.80
Entry Tax
Carriage.
Total.
(1%).
8
9
10
100.80
1213.00/M.T. 11,393.00
Vat
(13.5%).
7
565.70
E.D.
Vat
Entry tax
Carriage
(12.5%). (13.5%).
(1%).
7
8
9
10
1050.00 1275.75 107.25
3,841.00 /
M.T.
TRANSPORTATION (ALUM).
1ST 5 K.M.
Rs. 169.00
Rate 45 K.M. Rs. 387.00
Rate 90 K.M. Rs. 657.00
Rs. 1213.00MT
331
Total
11
14,675.00/
M.T.
Remarks.
11
Rourkela
Jharsuguda
=140 K.M.
to
Remarks.
11
Jayshree
Chemicals
Jhrsuguda
K.M.
TRANSPORTATION (LIME).
1ST 5 K.M.
Rs.169.00
Rate 45 K.M. Rs. 387.00
Rate 50 K.M. Rs. 365.00
Rs. 921.00
to
500
SCHEDULE - F
(See Clause 3.1.7(a))
1
1.1
1.2
1.3
APPLICABLE PERMITS
Applicable Permits
The Contractor shall obtain permits and clearances as required under the Applicable
Laws for smooth execution of works:
Applicable Permits, as required, relating to environmental protection and conservation
shall have been procured by the Authority in accordance with the provisions of this
Agreement.
The Contractor shall be solely responsible for obtaining the required permits and the
Authority will not be liable for payment of compensation on any account for failure in
the part of the Contractor to obtain any such permits. However the authority will
facilitate to obtain permits/clearances from the concerned Department.
332
SCHEDULE - G
(See Clauses 7.1.1, 7.5.3 and 19.2)
Performance Security
WHEREAS:
(A)
Contractor") has executed an agreement (hereinafter called the Agreement) with the
3.
4.
5.
6.
7.
8.
9.
10.
$
or any other authority or body, or by the discharge of the Contractor for any reason
whatsoever.
In order to give effect to this Guarantee, the Authority shall be entitled to act as if the
Bank were the principal debtor and any change in the constitution of the Contractor
and/or the Bank, whether by their absorption with any other body or corporation or
otherwise, shall not in any way or manner affect the liability or obligation of the Bank
under this Guarantee.
It shall not be necessary, and the Bank hereby waives any necessity, for the Authority
to proceed against the Contractor before presenting to the Bank its demand under this
Guarantee.
The Authority shall have the liberty, without affecting in any manner the liability of the
Bank under this Guarantee, to vary at any time, the terms and conditions of the
Agreement or to extend the time or period for the compliance with, fulfillment and/ or
performance of all or any of the obligations of the Contractor contained in the
Agreement or to postpone for any time, and from time to time, any of the rights and
powers exercisable by the Authority against the Contractor, and either to enforce or
forbear from enforcing any of the terms and conditions contained in the Agreement
and/or the securities available to the Authority, and the Bank shall not be released from
its liability and obligation under these presents by any exercise by the Authority of the
liberty with reference to the matters aforesaid or by reason of time being given to the
Contractor or any other forbearance, indulgence, act or omission on the part of the
Authority or of any other matter or thing whatsoever which under any law relating to
sureties and guarantors would but for this provision have the effect of releasing the
Bank from its liability and obligation under this Guarantee and the Bank hereby waives
all of its rights under any such law.
This Guarantee is in addition to and not in substitution of any other guarantee or
security now or which may hereafter be held by the Authority in respect of or relating
to the Agreement or for the fulfillment, compliance and/or performance of all or any of
the obligations of the Contractor under the Agreement.
Notwithstanding anything contained hereinbefore, the liability of the Bank under this
Guarantee is restricted to the Guarantee Amount and this Guarantee will remain in
force for the period specified in paragraph 8 below and unless a demand or claim in
writing is made by the Authority on the Bank under this Guarantee all rights of the
Authority under this Guarantee shall be forfeited and the Bank shall be relieved from
its liabilities hereunder.
The Guarantee shall cease to be in force and effect on ****$. Unless a demand or claim
under this Guarantee is made in writing before expiry of the Guarantee, the Bank shall
be discharged from its liabilities hereunder.
The Bank undertakes not to revoke this Guarantee during its currency, except with the
previous express consent of the Authority in writing, and declares and warrants that it
has the power to issue this Guarantee and the undersigned has full powers to do so on
behalf of the Bank.
Any notice by way of request, demand or otherwise hereunder may be sent by post
Insert date being 2 (two) years from the date of issuance of this Guarantee (in accordance with Clause 7.2 of the
Agreement).
334
11.
addressed to the Bank at its above referred branch, which shall be deemed to have been
duly authorized to receive such notice and to effect payment thereof forthwith, and if
sent by post it shall be deemed to have been given at the time when it ought to have
been delivered in due course of post and in proving such notice, when given by post, it
shall be sufficient to prove that the envelope containing the notice was posted and a
certificate signed by an officer of the Authority that the envelope was so posted shall
be conclusive.
This Guarantee shall come into force with immediate effect and shall remain in force
and effect for up to the date specified in paragraph 8 above or until it is released earlier
by the Authority pursuant to the provisions of the Agreement.
(Designation)
(Code Number)
(Address)
NOTES:
(i)
The bank guarantee should contain the name, designation and code number of the
officer(s) signing the guarantee.
(ii)
The address, telephone number and other details of the head office of the Bank as well
as of issuing branch should be mentioned on the covering letter of issuing branch.
335
Annex II
(Schedule - G)
(See Clause 7.5.3)
[name and address of contractor] (hereinafter called the Contractor") has executed
in
Baripada,
Sambalpur,
Rourkela
&
Water Supply
Jharsuguda
under
4.
5.
6.
7.
8.
9.
10.
11.
337
(Name)
(Designation)
(Code Number)
(Address)
NOTES:
(i)
The bank guarantee should contain the name, designation and code number of the
officer(s) signing the guarantee.
(ii)
The address, telephone number and other details of the head office of the Bank as well
as of issuing branch should be mentioned on the covering letter of issuing branch.
338
Annex III
(Schedule - G)
(See Clause 19.2)
[name and address of contractor] (hereinafter called the Contractor") has executed
in
Baripada,
Sambalpur,
Rourkela
&
Water Supply
Jharsuguda
under
The Guarantee Amount should be equivalent to 110% of the value of the applicable instalment.
339
3.
4.
5.
6.
7.
8.
9.
Insert a date being 90 (ninety) days after the end of one year from the date of payment of the Advance payment
to the Contractor (in accordance with Clause 19.2 of the Agreement).
$
340
10.
11.
previous express consent of the Authority in writing, and declares and warrants that it
has the power to issue this Guarantee and the undersigned has full powers to do so on
behalf of the Bank.
Any notice by way of request, demand or otherwise hereunder may be sent by post
addressed to the Bank at its above referred branch, which shall be deemed to have been
duly authorised to receive such notice and to effect payment thereof forthwith, and if
sent by post it shall be deemed to have been given at the time when it ought to have
been delivered in due course of post and in proving such notice, when given by post, it
shall be sufficient to prove that the envelope containing the notice was posted and a
certificate signed by an officer of the Authority that the envelope was so posted shall
be conclusive.
This Guarantee shall come into force with immediate effect and shall remain in force
and effect up to the date specified in paragraph 8 above or until it is released earlier by
the Authority pursuant to the provisions of the Agreement.
(Designation)
(Code Number)
(Address)
NOTES:
(i)
The bank guarantee should contain the name, designation and code number of the
officer(s) signing the guarantee.
(ii)
The address, telephone number and other details of the head office of the Bank as well
as of issuing branch should be mentioned on the covering letter of issuing branch.
______
341
SCHEDULE - H
(See Clauses10.1.4 and 19.3)
A. SCHEDULE OF PAYMENT
Description
Type of
Payment
Plant
&Equip
ment
1st
2nd
3rd
..
..
36th
Total
Note:
(i)
The Employer and the Contractor may make necessary Approval and adjustments to the payment
schedule if the progress of work is substantially ahead of or behind the program.
(ii)
The Contractor shall make necessary break down of Civil works for Payment Schedule with reference
to the Table A0.
342
Total
Table A0 Break Down of Civil Works Payment Schedule for Interim Valuations
Type of
Payment
Payment
(in % of Total
Price)
LS
15%
(ii) Walls
LS
(a)
25%
2.
3.
25%
LS
25%
LS
5%
LS
5%
LS
25%
(ii) Walls
LS
50%
LS
15%
LS
10%
Other Units
Up to Plinth Level
LS
15%
(ii)
LS
25%
(iii)
LS
20%
(iv)
LS
30%
343
Table A0 Break Down of Civil Works Payment Schedule for Interim Valuations
Major Work Category
(v)
4.
5.
6.
LS
Payment
(in % of Total
Price)
10%
Type of
Payment
Up to Plinth Level
LS
10%
(ii)
LS
15%
(iii)
LS
15%
(iv)
LS
20%
(v)
LS
30%
(vi)
LS
10%
90%
LS
10%
Boundary Complete
(i)
(ii)
On successful Commissioning
Landscaping Complete
(i)
30%
(ii)
30%
(iii)
20%
(iv)
Completion
LS
20%
344
Table A0 Break Down of Civil Works Payment Schedule for Interim Valuations
Major Work Category
7.
(ii)
On successful Commissioning
Type of
Payment
Payment
(in % of Total
Price)
90%
LS
10%
345
SCHEDULE OF PRICES
Name of Work
Note: Discribed full name of work listed in PREAMBLE of Schedules of Rates and Prices
Item
Description
Unit
Quantity
Unit Rate
Local
Currency
Portion
(INR)
Total Price
Local (INR)
346
Item
Description
Unit
Quantity
Ex-Factory
Price
(INR)
Sales
Tax
(INR)
(INR)
347
Description
Unit
Quantity
Unit Rate
Local
Currency
Portion
(INR)
Total Price
Local
(INR)
348
A4-(a)Summary of Work
Name of Work
Note: Discribed full name of work listed in PREAMBLE of Schedules of Rates and Prices
Item
A-1
Description
Total Price
Local
A-2
A-3
349
Description
(iv)
(v)
350
351
Requirements for operation and maintenance of the Plant & Pumping Stations etc. for an initial
Five year period following completion of the Works.
Name of Work
Note: Discribed full name of work listed in PREAMBLE of Schedules of Rates and Prices
Description of
Operation
Year 1
a-.Routine operating costs
Electricity Energy (with details of
HP, KVA,KWH)
Recommended
Yearly
Yearly
Unit
Frequency of
Annual
Fixed Charges Variable Cost
Rate
Operation
Consumption/
(2016 2017 (2016 2017
(2016
(Daily, Weekly, Requirement
rates)
rates)
2017
Monthly,
rates)
Yearly, etc.)
b- Chemicals
Other inputs
Labour
(i)
(ii)
(iii)
C-Periodic maintenance
costs(as per
manufacturers
maintenance schedule)
Servicing (Labour)
Cost of oil, chemicals, lubricants,
etc.
d-Others
Repair and Replacement
Replacements:
(i)
(ii)
(iii)
Repairs
Miscellaneous (Others)
(i)
Sludge
Disposal
(ii)
(iii)
Total (a)+(b)+(c)+(d)
Maintenance )
352
Note: (The Bidder shall provide complete details on all aspects of the operating and maintenance requirements relating to
his proposed facilities in the above form or in any other form and detail as may be required for the Employer to
properly evaluate the annual costs of operating the facilities with due regard to the particular items of Plant and
equipment which the Bidder proposes to supply under the Contract. In preparing this schedule the Bidder shall
consider that the Plant and facilities will operate for 24 hours per day, 365 days per year, and shall be operating at
the specified design capacity throughout the entire period. Quantities and costs shall be estimated based on the
current rates for such activity (i.e. 2016-2017 costs), but the Year in which such expenditure is to be incurred shall
be
clearly
identified.)
353
O&M Year
Variable Cost
Total Cost
In Figure
In Figure
In Figure
In Words
In Words
In Words
Baripada
Sambalpur
Rourkela
Jharsuguda
Reserve Fund
For Major
Maintenance,
Repair and
replacement
Total Cost
Year-1
Year 2
Year 3
Year 4
Year 5
Total
for
Operation and
Maintenance
(carried
forward
to
letter of Price
Bid)
In Figure
Total Cost In Words
(b)
Index code
Index description
(c)
(d)
(e)
(f)
Nonadjustable
Labour
OPWDSR
INR
B: 0.2625
Cement
IJ/EA
INR
C: 0.15
Steel
IJ/EA
INR
D: 0.09
Pol
IJ/EA
INR
E: 0.0375
Others
IJ/EA
INR
F: 0.21
Total
1.00
2.
2.1
2.2
The cost for Operation & maintenance shall be as stated in Clause 14.1.1.
Payment for Operation & Maintenance shall be made in monthly installments in
accordance with the provisions of Clause 19.7.
356
SCHEDULE - I
DRAWINGS
Drawings
In compliance of the obligations set forth in Clause 10.2 of this Agreement, the Contractor
shall furnish to the Authoritys Engineer, free of cost, all Drawings listed in Annex-I of
this Schedule-I.
Additional Drawings
If the Authoritys Engineer determines that for discharging its duties and functions under
this Agreement, it requires any drawings other than those listed in Annex-I, it may by
notice require the Contractor to prepare and furnish such drawings forthwith. Upon
receiving a requisition to this effect, the Contractor shall promptly prepare and furnish
such drawings to the Authoritys Engineer, as if such drawings formed part of Annex-I of
this Schedule-I.
357
Annex - I
(Schedule - I)
List of Drawings
The contractor is required to furnish the following drawing to the Authoritys Engineer free of
cost under clause 10.2 including the details as attached in the Annexure herewith describing the
scope of work during survey, investigation and design stage.
358
SCHEDULE - J
(See Clause 10.3.2)
[In order to closely monitor the execution of the project and to ensure quality, cost and time of the project are
not compromised in any manner, the contractor shall provide work program in Primavara-6 in such a
realistic manner so that there will be balance between financial & physical progress with reference to cost &
completion time.]
2
2.1
2.2
3
3.1
3.2
4
4.1
4.2
5
5.1
5.2
6
SCHEDULE - K
(See Clause 12.1.2)
1
1.1
1.2
2
2.1
2.2
2.3
2.4
2.5
2.6
3
4
Tests on Completion
360
SCHEDULE - L
(See Clause 12.2 and 12.4)
PROVISIONAL CERTIFICATE
1
361
COMPLETION CERTIFICATE
(Signature)
(Name)
(Designation)
(Address)
362
SCHEDULE - M
(See Clauses 14.6, 15.2 and 19.7)
[A]
Payment reduction for non-compliance with the Operation & Maintenance Requirements
Monthly lump sum payments for Operation & maintenance shall be reduced in the case of noncompliance with the Operation & Maintenance Requirements set forth in Schedule-E.
Any deduction made on account of non-compliance with the Operation & Maintenance
requirements shall not be paid even after compliance subsequently. The deductions shall continue
to be made every month until compliance is done.
The Authority shall calculate the amount of payment reduction on the basis of weightage assigned
to non-conforming items as given in Paragraph 2.
Reductions in lump sum payments
The following shall govern the payment reduction:
4.
a)
b)
c)
5.
a)
b)
c)
6.
a)
b)
364
[B]
REDUCTION TO BE MADE FROM LUMP-SUM PAYMENT FOR NONPERFORMANCE OF PREVENTIVE MAINTENANCE AS DETAILED IN
CLAUSE NO.19.3.8 OF ANNEXURE-I, SCHEDULE-B OF EPC AGREEMENT.
Sl. No.
Items
Penalties
1.
Monthly
a)
Pumps, Panels, Circuit Breakers & Rs.800.00/month
Starters
b)
Transformers/Sub-stations
Rs.400.00/month
2.
Quarterly
a)
Motors, Panels, Circuit Breakers & Rs.1200.00/month
Starters, etc.
b)
Transformers/Sub-stations
Rs.800.00/month
3.
Semi-Annually (Half Yearly)
a)
Pumps, Motors, Panels, Circuit Breakers Rs.1600.00/month
& Starters, etc.
b)
Transformers/Sub-stations
Rs.1600.00/month
c)
De-sludging in water treatment units as These items of works will be taken up by
per recommendation in the CPHEEO the Department by engaging any other
manuals.
suitable agency and the cost thereof &
damages shall be recovered from the
contractor as per clause 14.7.
4.
Annually
a)
Pumps, Motors, Panels, Circuit Breakers Rs.2000.00/month
& Starters, etc.
b)
Transformers/Sub-stations
Rs.2000.00/month
c)
Cleaning of Reservoirs and de-silting of These items of works will be taken up by
approach channel and intake well
the Department by engaging any other
suitable agency and the cost thereof &
damages shall be recovered from the
contractor as per clause 14.7.
5.
Bi-Annually
a)
Transformers/Sub-stations
The complete examination including
internal connections, core & windings etc.,
as may be required & rectifications will be
taken up by the Department by engaging
any other suitable agency and the cost
thereof & damages shall be recovered
from the contractor as per clause 14.7.
365
SCHEDULE - N
(See Clause 18.1.1)
1
1.1
1.2
2
3
366
Annex I
(Schedule - N)
1
1.1
1.2
2
2.1
2.2
2.3
3.
3.1
3.2
(a)
(b)
(c)
(d)
3.3
3.4
3.5
3.6
Scope
These Terms of Reference (the TOR) for the Authoritys Engineer are being specified
pursuant to the EPC Agreement dated ........... (the Agreement), which has been entered
into between the [name and address of the Authority] (the Authority) and .......... (the
Contractor) for the work ( Name of the Project) in the State of Odisha on Engineering,
Procurement, Construction (EPC) basis, and a copy of which is annexed hereto and
marked as Annex-A to form part of this TOR.
The TOR shall apply to construction and operation & Maintenance of the Water Supply
Project.
Definitions and interpretation
The words and expressions beginning with or in capital letters and not defined herein but
defined in the Agreement shall have, unless repugnant to the context, the meaning
respectively assigned to them in the Agreement.
References to Articles, Clauses and Schedules in this TOR shall, except where the context
otherwise requires, be deemed to be references to the Articles, Clauses and Schedules of
the Agreement, and references to Paragraphs shall be deemed to be references to
Paragraphs of this TOR.
The rules of interpretation stated in Clauses 1.2, 1.3 and 1.4 of the Agreement shall apply,
mutatis mutandis, to this TOR.
General
The Authoritys Engineer shall discharge its duties in a fair, impartial and efficient
manner, consistent with the highest standards of professional integrity and Good Industry
Practice.
The Authoritys Engineer shall perform the duties and exercise the authority in accordance
with the provisions of this Agreement, but subject to obtaining prior written approval of
the Authority before determining:
any Time Extension;
any additional cost to be paid by the Authority to the Contractor;
the Termination Payment; or
any other matter which is not specified in (a), (b) or (c) above and which creates an
obligation or liability on either Party for a sum exceeding Rs. 5,000,000 (Rs. fifty lakh).
The Authoritys Engineer shall submit regular periodic reports, at least once every month,
to the Authority in respect of its duties and functions under this Agreement. Such reports
shall be submitted by the Authoritys Engineer within 10 (ten) days of the beginning of
every month.
The Authoritys Engineer shall inform the Contractor of any delegation of its duties and
responsibilities to its suitably qualified and experienced personnel; provided, however, that
it shall not delegate the authority to refer any matter for the Authoritys prior approval in
accordance with the provisions of Clause 18.2.
The Authoritys Engineer shall aid and advise the Authority on any proposal for Change of
Scope under Article 13.
In the event of any disagreement between the Parties regarding the meaning, scope and
nature of Good Industry Practice, as set forth in any provision of the Agreement, the
Authoritys Engineer shall specify such meaning, scope and nature by issuing a reasoned
written statement relying on good industry practice and authentic literature.
367
4
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
Construction Period
During the Construction Period, the Authoritys Engineer shall review the Drawings
furnished by the Contractor along with supporting data, including the geo-technical and
hydrological investigations, characteristics of materials from quarry sites, topographical
surveys, and the recommendations of the Safety Consultant in accordance with the
provisions of Clause 10.1.6. The Authoritys Engineer shall complete such review and
send its observations to the Authority and the Contractor within 15 (fifteen) days of receipt
of such Drawings; provided, however that in case of a Major Structures, the aforesaid
period of 15 (fifteen) days may be extended upto 30 (thirty) days. In particular, such
comments shall specify the conformity or otherwise of such Drawings with the Scope of
the Project and Specifications and Standards.
The Authoritys Engineer shall review any revised Drawings sent to it by the Contractor
and furnish its comments within 10 (ten) days of receiving such Drawings.
The Authoritys Engineer shall review the Quality Assurance Plan submitted by the
Contractor and shall convey its comments to the Contractor within a period of 21 (twentyone) days stating the modifications, if any, required thereto.
The Authoritys Engineer shall complete the review of the methodology proposed to be
adopted by the Contractor for executing the Works, and convey its comments to the
Contractor within a period of 10 (ten) days from the date of receipt of the proposed
methodology from the Contractor.
Deleted.
The Authoritys Engineer shall review the monthly progress report furnished by the
Contractor and send its comments thereon to the Authority and the Contractor within 7
(seven) days of receipt of such report.
The Authoritys Engineer shall inspect the Construction Works of the Water Supply
Project and shall submit a monthly Inspection Report bringing out the results of
inspections and the remedial action taken by the Contractor in respect of Defects or
deficiencies. In particular, the Authoritys Engineer shall include in its Inspection Report,
the compliance of the recommendations made by the Safety Consultant.
The Authoritys Engineer shall conduct the pre-construction review of manufacturer's test
reports and standard samples of manufactured Materials, and such other Materials as the
Authoritys Engineer may require.
For determining that the Works conform to Specifications and Standards, the Authoritys
Engineer shall require the Contractor to carry out, or cause to be carried out, tests at such
time and frequency and in such manner as specified in the Agreement and in accordance
with Good Industry Practice for quality assurance. For purposes of this Paragraph 4.9, the
tests specified in the relevant IS specification and CPHEEO manual on water supply
issued by MoUD or any modification/substitution thereof shall be deemed to be tests
conforming to Good Industry Practice for quality assurance.
The Authoritys Engineer shall test check at least 20 (twenty) percent of the quantity or
number of tests prescribed for each category or type of test for quality control by the
Contractor.
The timing of tests referred to in Paragraph 4.9, and the criteria for acceptance/ rejection of
their results shall be determined by the Authoritys Engineer in accordance with the
Quality Control Manuals. The tests shall be undertaken on a random sample basis and
shall be in addition to, and independent of, the tests that may be carried out by the
Contractor for its own quality assurance in accordance with Good Industry Practice.
In the event that results of any tests conducted under Clause 11.10 establish any Defects or
deficiencies in the Works, the Authoritys Engineer shall require the Contractor to carry
368
4.13
4.14
4.15
4.16
4.17
4.18
5.
5.1
5.2
5.3
5.4
5.5
6
6.1
6.2
6.3
7.
7.1
7.2
(a)
(b)
7.3
7.4
8.
9.
9.1
9.2
9.3
9.4
9.5
within 10 (ten) days of receipt of the Stage Payment Statement from the Contractor
pursuant to Clause 19.4, determine the amount due to the Contractor and recommend the
release of 90 (ninety) percent of the amount so determined as part payment, pending issue
of the Interim Payment Certificate; and
within 15 (fifteen) days of the receipt of the Stage Payment Statement referred to in Clause
19.4, deliver to the Authority and the Contractor an Interim Payment Certificate certifying
the amount due and payable to the Contractor, after adjustments in accordance with the
provisions of Clause 19.10.
Deleted
Deleted
Other duties and functions
The Authoritys Engineer shall perform all other duties and functions as specified in the
Agreement.
Miscellaneous
A copy of all communications, comments, instructions, Drawings or Documents sent by
the Authoritys Engineer to the Contractor pursuant to this TOR, and a copy of all the test
results with comments of the Authoritys Engineer thereon, shall be furnished by the
Authoritys Engineer to the Authority forthwith.
The Authoritys Engineer shall retain at least one copy each of all Drawings and
Documents received by it, including as-built Drawings, and keep them in its safe
custody.
Within 90 (ninety) days of the Project Completion Date, the Authoritys Engineer shall
obtain a complete set of as-built Drawings, in 2 (two) hard copies and in micro film form
or in such other medium as may be acceptable to the Authority, reflecting the Water
Supply Project as actually designed, engineered and constructed, including an as-built
survey illustrating the layout of the Water Supply Project and setback lines, if any, of the
buildings and structures forming part of Project Facilities; and shall hand them over to the
Authority against receipt thereof.
The Authoritys Engineer, if called upon by the Authority or the Contractor or both, shall
mediate and assist the Parties in arriving at an amicable settlement of any Dispute between
the Parties.
The Authoritys Engineer shall inform the Authority and the Contractor of any event of
Contractors Default within one week of its occurrence.
370
SCHEDULE - O
(See Clauses 19.4.1, 19.6.1, and 19.8.1)
1.
371
SCHEDULE - P
(See Clause 20.1)
1.
1.1
1.2
2.
3.
3.1
3.2
4.
INSURANCE
372
SCHEDULE - Q
(See Clause 1.2.3. of RFP)
FEASIBILITY REPORT
The present scheme Development of Water Supply Infrastructure in Baripada,
1.1.
1.2.
2.
3.
4.
5.
6.
7.
8.
9.
10.
373