CONTRACTOR
LOGO
DOCUMENT NO:
X-000-M-ITP-0310
DOCUMENT TITLE:
STRUCTURAL STEEL
FIREPROOFING
X-000-M-ITP-0310
:
TENGIZCHEVROIL /
TCO Project Title:
English
Russian
23/09/09
AZCO
ESUT
BSNF
DVVN
REV
DATE
PAGES
DESCRIPTION
BY
CHKD
APPR
CLIENT
TENGIZCHEVROIL
.
CONTRACTOR
LOGO
SYSTEM:
Activity
No.
Activity Description
DESCRIPTION
Inspection/Test Requirements
310-1.0
310-2.0
310-3.0
310-4.0
310-5.0
Surface cleanliness
310-6.0
M-0310
Rev. No.
Page
2 of 4
UNIT/ AREA:
Reference Document
(Specification/Procedure)
Contractor QC
H/R
W/R
Manufacturers
instructions and
procedures
Manufacturers
instructions and
procedures
Manufacturers
Verify environmental conditions
instructions and
Verify wet density & slump correct as per
procedures
vendor requirements
Verify mixer discharge and sprayhead density
Manufacturers
instructions and
procedures. (Fendolite
MII & Fendolite TG
Verify paint or galvanising (as applicable)
touch up at areas scraped for pin installation Manual for Application)
(and all other areas as necessary) complete Specification
O-ST-2001.
Standard drawing 600000-M-STD-0009-01.
Standard vessel
drawings C-ST-2004.
Painting specification
X-ST-2000.
Steel erection spec MST-2002
M-ST-2003.
Steelwork general
arrangement drawings
Manufacturers
Verify dry film thickness of tie coat when
instructions and
applied
procedures
Verify environmental conditions
Verify plastic coated galvanised mesh
properly spaced from substrate with min
overlap
Release for fireproofing application
Verify surfaces dry, free from oil, grease,
loose dust as per vendor instructions
ITP No.
Legend: S - Surveillance Inspection W - Witness Point H - Mandatory Hold Point For Inspection R - Record Review
TCO Ops
Inspection and
Report doc
Acceptance
Regulatory Authority Checklist/Akt/Form
/or TCO Reliability
SCL005A
FACILITIES ENGINEERING
CONTRACTOR
LOGO
SYSTEM:
Activity
No.
Activity Description
310-7.0
Fireproof application
310-8.0
310-9.0
Fireproofing thickness
310-10.0
Curing
310-11.0
Repairs
310-12.0
310-13.0
310-14.0
Final inspection
DESCRIPTION
Inspection/Test Requirements
ITP No.
M-0310
Rev. No.
Page
3 of 4
UNIT/ AREA:
Reference Document
(Specification/Procedure)
Contractor QC
TCO Ops
Inspection and
Report doc
Acceptance
Regulatory Authority Checklist/Akt/Form
/or TCO Reliability
Manufacturers
instructions and
procedures
Steelwork general
arrangement drawings
Manufacturers
instructions and
procedures
Standard drawing 600000-M-STD-0009-01.
SCL005A
SCL005A
Manufacturers
instructions and
procedures
H/R
H/R
H/R
Legend: S - Surveillance Inspection W - Witness Point H - Mandatory Hold Point For Inspection R - Record Review
H/R
SCL005A
Release Form
FACILITIES ENGINEERING