Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interrupt
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
I. METHODOLOGY
ACTIVITY
CHART
8:00
9:00
###
###
12:00 12:30
1:00
1:30
2:30
3:00
3:30
4:00
5:00
TARGET
TIME
RESPONSIBLE
PERSON
1 hr
ZWCI/ZCWD
2. Pressure Monitoring
30 mins
ZWCI/ZCWD
30 mins
ZCWD
1 hr
ZWCI/ZCWD
1 hr
ZWCI/ZCWD
30 mins
ZCWD
30 mins
ZWCI/ZCWD
1 hr
ZWCI/ZCWD
WHAT IF
Option 1:
Option 2:
Parties attending this CPR agreed on the methodology and time of implementation of the proposed activity. Any deviation from this plan wiil not be tolerated unless emergency in nature.
Responsible Person :
Efren Salvacion
Carl Perez/Ed Agbay
Customer Incident Mana Edgar Baos
Over all Incident Manag
Site Incident Manager
page 1 of 6
Cabatangan
Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interruption
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
II. MATERIALS
QTY
YES
NO
QTY
DESCRIPTION
Valve Key
YES
NO
page 2 of 6
Cabatangan
Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interruption
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
IV. MANPOWER
QTY
:
:
YES
NO
QTY
8
1 set
DESCRIPTION
:
Traffic Cones
PPE
YES
NO
page 3 of 6
Cabatangan
Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interruption
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
SCHEMATIC DIAGRAM
page 4 of 6
Cabatangan
Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interruption
Duration of Activity
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
DEPARTMENT
FUNCTION/ROLE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
page 5 of 6
Cabatangan
Date/Time of CAAR
DMA Name
Lupong
1481
Activity
Total Affected HH
1481
Contractor
Date/Time of Interruption
Duration of Activity
Activity Location
Along Brgy. Cabatangan, part of Brgy. San Roque & Gov. Ramos.
:
:
:
:
:
Total Number Water
Service Connections
affected
:
:
:
:
Total Number of
Households affected
:
:
EST.1481 WSC
:
Customer Informed
Through
Flyers / Leaflets
Public Address
at Corporate Affairs
Edgar Baos
ZCWD
VALVES TO BE EXERCISED
No.
1
2
3
4
5
6
SIZE
150mm
150mm
250mm
150mm
250mm
100mm
LOCATION
Near Lupong Eagle (Shut-Off Valve)
Along Gov.Ramos-Cabatangan Intersection.
Along Gov.Ramos-Cabatangan Intersection.
Along Gov.Ramos-Cabatangan Intersection.
Along San Roque Road-Talungun Road Intersection.
Near Pasay Drive.
REMARKS
Shut-Off Valve
Isolation Valve
Isolation Valve
Isolation Valve
Isolation Valve
Isolation Valve