Sit ‘Nwint09 W130 }WO8 = 8) +29= 1s cOo8L 000z9 \, \_ TANWd JONA4 MAN juantity-1 (Concri rk Location Remark [Temporary fence removal 2500 2.500 van | __stestshort oen0 2.000 1.000 20 Post 8 7 25 + 1 x 24 = 792m [F pipe Crossbarf 80 x 3 240m (2 pi Exist Fence Removal Pipe froundatio 05 x 05 x 07 x 38 - 58 m3 |oreaking [teel Sheet 60 / 06 + 1 x 2 = *87 ma |Concrete fence construction = 80m = 1.000 a 7 2 + 1 33 ea Post (2 x 0.2)-(05x07%2) ¥3 933 327 m3 foundation] (@0x10x02+04040733= 103 m3 New Fence installation PANEL gO / 25 X 4 = 128 ea 2.5*0.5*0.05 Form (asy202)404004207)33 = 63 m2 Rebar ((0.9*5*2)+ (1.244) +(1.243))833. = 574 Kg 0 Bcavaion] O04 +4BH/2x07x33-58 = me Back fi + AB) /2x07033 = 8 «3 Earth Work es 489) oe aa a4 Earth Work cwmton] @56 1 4159/2109") = = ‘ack om | 20878303 = = Disposal | 103 = Gea 625