PARTS OF TYPICAL COST PLAN

PRELIMINARIES
PERMITS
DAILY WORK SCHEDULE
ADVANCE PAYMENT
RETENTION

BILL OF QUANTITIES
B.1

CSA(CIVIL/STRUCTURAL/ARCHITE
B.1.1

B.1.2

B.1.3

B.1.4

B.2

MEPF (MECHANICAL/ELECTRICAL
B.2.1
B.2.2
B.2.3
B.2.4
B.2.5

AILY WORK SCHEDULE


DVANCE PAYMENT
ETENTION

SA(CIVIL/STRUCTURAL/ARCHITECTURAL) WORKS
EARTHWORKS
CLEARING & GRUBBING
EXCAVATION
BACKFILL & COMPACTION
HAULING & DISPOSAL
SOIL POISONING
GRAVEL BEDDING
SLOPE PROTECTION

TRIMMING
DREDGING
SITEWORKS
LANDSCAPING

BOLLARDS
DRAINAGE
MANHOLE
CATCH BASIN
TRENCH
CURBS & GUTTER
PAINT MARKING
PERIMETER FENCE
EXTERIOR LIGHTINGS

ARCHITECTURAL
FINISHES

PARTITION

DOORS & HARWARES

WINDOW & HARWARES


WATERPROOFING

METAL WORKS

MISCELLANEOUS ITEM
TOILET ACCESSORIES

OTHERS

STRUCTURAL
BEAMS & GIRDERS

SLAB

COLUMN

SHEARWALL/ COREWALL
STAIR
SLAB ON GRADE
RC WALL*

RAMP

RETAINING WALL

PILE

PILE CAP
FOOTING

UNDERTANKS

OTHERS

MEPF (MECHANICAL/ELECTRICAL/PLUMBING/FIREPROTECTION) WORKS


HVAC
ELECTRICAL & AUXILARY
COMMINACATION
PLUMBING
FIRE PROTECTION

TERMITE CONTROL

SHEET PILE
SOIL NAILING

SOFT SCAPING

HARD SCAPING

TEMPORARY FENCING

FLOOR FINISH

WALL FINISH

CEILING FINISH

MASONRY

DRYWALL
LOW WALL
GLASS WALL
CURTAIN WALL
RC WALL*
(ALUMINUM COMPOSITE PANEL)
PHENOLIC BOARD
BUNDWALL

WOOD DOOR (QTY.)


FLUSH DOOR (QTY.)
PVC DOOR (QTY.)
STEEL DOOR (QTY.)
GLASS DOOR (QTY.)
ALUMINUM COATED
INTEGRAL WATERPROOFING
MEMBRANE WATERPROOFING

TORCH TYPE WATERPROOFING


CRYSTALLINE WATERPROOFING
CAPILLARY TYPE WATERPROOFING

BALCONY RAILINGS (METER)


FLOOR STAIR RAILING (METER)

SQM.

MOUNTED STAIR RAILING (METER)


HANDRAIL (METER)
STEEL TRENCH GRATING (METER)
NOSING (METER)
HALLWAY RAILING (METER)
SWIMMING POOL RAILING (METER)
COLUMN GUARD (QTY)
HOISTING BEAM
SEPARATOR BEAM
CORNER BEADS
LADDER RUNG (QTY)
LOUVER WALL (METER)
WELDED WIRE MESH (SQM)
STAINLESS STEEL PUSH PLATE (QTY)
GUARD RAIL (METER)

TISSUE HOLDER (QTY)


FACIAL MIRROR (QTY)
HAND DRYER (QTY)
GRAB BAR (QTY)
SOAP HOLDER (QTY)
PAPER HOLDER (QTY)
SIGNAGES(MALE,FEMALE and PWD) (QTY)

WHEELSTOPPER (QTY)
SKIRTING
CURTAIN COVE
HEADBOARD

TYPICAL BEAMS & GIRDERS (INTERMEDIATE BEAM/ GRAVITY BEAM)


PRECAST CONCRETE I BEAM (BRIDGE GIRDER)
FOOTING TIE BEAM

SUSPENDED SLAB (BEAM SUPPORTED, ONE WAY OR TWO WAY)


FLAT SLAB
RIBBED & WAFFLE SLAB
TYPICAL COLUMN
PLANTED COLUMN
WALL COLUMN

LOAD BEARING WALL


FIRE WALL
RAMP SLAB
RAMP BEAM
RC (TYPES; GRAVITY, CANTILEVER, SHEET PILE, ACHORED, COUNTERFORT)
SECANT PILE
SHEET PILE

DIAPHRAGM WALL
BORED PILE
DRIVEN PILE

SECANT PILE
CFA(CONTINUOS FLIGHT AUGER) PILE

ISOLATED
COMBINED
MAT/RAFT
SPREAD/ WALL FOOTING

DOMESTIC WATER TANK


FIRE RESERVED TANK
CISTERN TANK
SUMP PIT TANK

TRENCH PIT
CORBELS
RAKER BEAM
PEDESTAL
LINK BEAM
BOND BEAM/ CAPPING FOR SHEETPILE
TRENCH
ELEVATED WATER TANK SUPPORT
CONCRETE PAD
PRECAST
STEEL SECTION
TENDONS
SHEAR STUDS
SEALANT
WATERSTOP

REMOVAL/RELOCATION OF TREES
GRASS

TILE

TROWELED FINISH*
FLOOR HARDENER
PAINTING WORKS

(TO FLOOR)

PLASTERING

ACOUSTIC
GYPSUM

DROP DOWN CEILNG


CEILING COVE
BULKHEAD
SHADOWLINE (LM.)
RUBBED FINISH/PAINTED

BARE
(ALUMINUM COMPOSITE PANEL*) SQM

200MM
150MM
100MM
LINTEL BEAMS (METER)
STIFFINER COLUMN (METER)

NON LOAD BEARING WALL

CEMENTITIOUS WATERPROFING
LIQUID WATERPROOFING MEMBRANE
BITUMINOUS MEMBRANE
BITUMINOUS COATING
POLYURETHANE LIQUID MEMBRANE

(DISABLED RAMPS) (LOBBY ENTRANCE)


(TREADS AT STAIR)

(EVERY 300MM IN ELEVATOR PIT)

(PUBLIC TOILET)

SOLDIER PILE
WALER
TIEBACK
STRUTS

STATIC PUSH PILE


DYNAMIC (HAMMER TYPE)

HOMOGENOUS TILE
CERAMIC
WOOD LIKE TILE
NON SKID TILE
BOTTON TILE
VINYL TILE

REFLECTORIZED PAINT MARKING


ZEBRA PAINT

DIRECTIONAL ARROW (STRAIGHT ARROW) (NO.)


DIRECTIONAL ARROW (CURVE ARROW) (NO.)
PARKING NUMBER (NO.)
FIRE EXIT WALL PAINT FLOOR NUMBERING (NO.)
ELASTROMERIC PAINT
ACRYLIC PAINT

MOISTURE RESISTANCE
ORDINARY

SHEARWALL
EXTERIOR WALL OR INTERIOR WALL
INTERIOR WALL

(RAMP)

TRANSFORMER, AHU, DRIVEWAY, PARKING,GENSET

PARKING

PROCUREMENT

CLIENT/OWNER

PLANNING/CONCEPTUALISING DESIGN
FEASIBILITY STUDY
COST STUDY (BUDGET)
PREPARATION OF TENDER DOCUMENT
PERMITS
CONTRACT
CONSTRUCTION DRAWING
SPECIFICATION
COST PLAN
PRELIMINARIES
BILL OF QUANTITIES
QUANTITY TAKE OFF
COSTING
BIDDING STAGE
TENDER INVITATION
BID EVALUATION
TENDER REPORT
NEGOTIATION/BARGAINING
AWARD
CONSTRUCTION STAGE
MONITORING
BILLING
COMPLETION & MAINTENANCE

what is a quantity surveyor

a profession that..
a
calculate the amount of materials needed
b
manage all costs relating matter of a project
c
seek to minimise the cost of a project
d
know as "measurer" or estimator
e
able to work for a contractor, government or privately
f
did you know as quantity surveyor, you serve as engine
responsiblities of quantity surveyor in construction

responsibilities vary depending on the natures & stages of


a
b
c
d
e
f
g
h
i

prepare tender, contract document & bill of quantities


perform risk, value management/ value engineering an
advice on procurement strategy & conctractual claims
identify, analyze & develop responses to commercial ris
allocate works to subcontractors
survey to get the prices/ request for quotation
arrange payment & claims (progress billing during cons
write detailed progress report ( Tender Report)
maintain awareness of the different building contracts i

heirachy in construction industry


quantity surveyor
land surveyor
civil/structural engineer
mechanical& electrical engineer

project manager

relationship of quantity surveyor with other parties


architect
study the design and specification provided
contract prospective firm that have the appr
engineer
receive engineering drawings from engineer
study engineering drawing to estimate the q

conctractor
assist the PM in providing advice on procurem
receives monthly valuation from the main co
assist with negotiations with the contractor i

lease with the contractor in agreeing the fina

role of quantity surveyor in construction


pre construction stage
scrutinize, review of tender documents
compile the tender documents
analysis of the rate for labour, material and p
analyze and compare quotations received at
post contract stage
prepare and agree valuations
compile variation claim document
compile final account payment application
analyze and recommend subcontract payme
attend progress meeting and provide the cos
visit site to monitor the progress

of a project

ernment or privately
r, you serve as engineer, lawyer and also an accountant

onstruction

natures & stages of a project

nt & bill of quantities


value engineering and cost controll
conctractual claims
nses to commercial risk

or quotation
ess billing during construction stage)
nder Report)
nt building contracts in current use

roject manager

architect

client

ther parties

pecification provided by architect to produce bill of quantites


m that have the approval of the architect and the client, to determine whether they are available to bid for t

awings from engineer


wing to estimate the quantities of material, the cost of the materials

ng advice on procurement routes fot he main conctractor


tion from the main contractor
s with the contractor if any variation (change order) occur during the project

or in agreeing the final account

nder documents

labour, material and plant maintain vendors/supplier data base


quotations received at bid stage

document
ayment application
nd subcontract payment application
ng and provide the costs update to the client
progress

e available to bid for the project