Академический Документы
Профессиональный Документы
Культура Документы
G/F MAQUILING BUILDER'S DEPOT, PRES LAUREL HIGHWAY, LIPA CITY 4217
DESIGNATION/S
Details of Quantities
W
AREA
INSIDE
OUTSIDE
PAVERS
LEVEL - 1
Veranda Front
Veranda Right
4.500
2.000
2.000
12.000
9.000
24.000
Master Bedroom
Master Walk-in
4.200
2.400
3.600
3.600
15.120
8.640
15.120
8.640
Masters' T&B
Living Room
Dining
1.800
4.500
5.700
3.600
3.600
3.900
6.480
16.200
22.230
6.480
16.200
22.230
Main Stair
Main Kitchen
4.500
4.200
2.400
4.800
10.800
20.160
10.800
20.160
Main Kitchen
Bedroom-1
1.300
2.900
1.200
3.900
1.560
11.310
1.560
11.310
Common T&B
Driveway
1.300
3.500
2.700
25.000
3.510
87.500
3.510
236.510
116.010
146.760
9.000
24.000
87.500
33.000
87.500
LEVEL - 2
Bedroom-2
Bedroom-3
Bedroom-4
2.900
2.900
4.200
3.900
3.600
3.600
11.310
10.440
15.120
11.310
10.440
15.120
Common T&B-2
Corridor-1
2.800
2.800
2.700
1.200
7.560
3.360
7.560
3.360
Corridor-2
Stair to Second Floor
1.300
4.200
3.600
2.400
4.680
10.080
4.680
10.080
Family Hall
View Deck
4.200
4.200
3.900
4.800
16.380
20.160
16.380
20.160
Veranda-3
Veranda-4
5.700
1.500
1.500
5.700
8.550
8.550
8.550
8.550
116.190
352.700
116.190
232.200
0.000
33.000
0.000
87.500
17,000.00
561,000.00
8,500.00
743,750.00
PhP
22,000.00
5,108,400.00
6,413,150.00
Prepared by:
Approved by:
332236280.xls / ProbableCost
10/05/2016 / 07:28:03
1 / 27
Project
Location
BRGY.
LIPA CITY
Owner
Subject
Date
###
BILL OF MATERIALS & COST ESTIMATES
###
12-May-2011
###
###
S U MMARY
MATERIALS
II
LABOR
TOTAL
53,000.00
329,700.00
382,700.00
STRUCTURAL WORKS
1,861,110.00
815,890.00
2,677,000.00
III
ARCHITECTURAL WORKS
1,243,024.00
599,976.00
1,843,000.00
IV
155,200.00
60,600.00
215,800.00
ELECTRICAL WORKS
145,800.00
74,700.00
220,500.00
3,458,134.00
1,880,866.00
###
3,458,134.00
1,880,866.00
20%
1,067,800.00
CONTRACTOR'S PROFIT
35% - 50%
0.00
10% - 12%
0.00
6,406,800.00
Prepared by:
Approved by:
OWNER/S
332236280.xls / Summary
10/05/2016 / 07:28:03
2 / 27
ITEM DESCRIPTION
I.
Details of Quantities
S/G
BARS
19.25
4.97
250.00
150.00
50.00
3.00
OTHERS
5.00
149.0100
-0.0100
32.21666667
-0.21666667
450.00
10,000
10,000.0
2,000
2,000.00
200
1,000
250.00
4.00
3,000.00
300.00
4,500.00
1,000.00
Sub-total
4.0 Earthworks
4.01
4.02
4.03
4.04
Excavation
F-1
F-2
TB-1
SV
CB
DP
Backfill/On-fill
Veranda Front
Veranda Right
Master Bedroom
Master Walk-in
Masters' T&B
Living Room
Dining
Main Stair
Main Kitchen
Bedroom-1
Common T&B
Gravel Fill
Compaction
L
1.40
1.20
82.70
6.00
0.80
41.35
42.80
4.50
2.00
4.20
2.40
1.80
4.50
5.70
4.50
4.20
2.90
1.30
W
1.40
1.20
0.30
2.00
0.80
0.40
72.30
2.00
12.00
3.60
3.60
3.60
3.60
3.90
2.40
4.80
3.90
2.70
11.31
15.00
112.243000
D
1.50
1.50
0.30
2.80
0.80
0.80
Area
9.00
24.00
15.12
8.64
6.48
16.20
22.23
10.80
20.16
11.31
3.51
236.51
QTY
4.00
11.00
1.00
1.00
18.00
2.00
Elev.
0.20
0.20
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.075
VOL
11.76
23.76
7.44
33.60
9.22
26.46
88.00400
1.80
4.80
6.05
3.46
2.59
6.48
8.89
4.32
8.06
4.52
1.40
17.73825
25.92
37.23
0.75700
-0.00400
0.26175
Sub-total
332236280.xls / BoM
10/05/2016 / 07:28:03
3 / 27
ITEM DESCRIPTION
Details of Quantities
332236280.xls / BoM
1.40
82.70
1.40
0.30
15.00
0.300
0.300
4.00
1.00
14.54700
2.35
7.44
0.45300
10.00
0.50
69,850.00
B
Ht
QTY
0.50000
0.50000
5.2500000
0.75000
10.00
30.00
0.50
72,800.00
QTY
23.65100
0.69900
10.00
0.50
91,250.00
B
QTY
1.00000
0.00000
10.00
0.50
127,400.00
W
2.90
2.90
4.20
2.80
2.80
4.20
4.20
5.70
1.50
L
3.90
3.60
3.60
2.70
1.20
3.90
4.80
1.50
5.70
0.00
Area
11.31
10.44
15.12
7.56
3.36
16.38
20.16
8.55
8.55
116.19
352.70
0.10
11.61900
0.38100
10.00
0.50
54,600.00
4.20
3.12
Area
13.10
13.10
3.27600
3.28
0.25
0.72400
10.00
0.50
18,700.00
L
QTY
11.90400
0.09600
10.00
0.50
10/05/2016 / 07:28:03
4 / 27
ITEM DESCRIPTION
Details of Quantities
56,100.00
Eqpt Rental
Sub-total
2.0 Masonry Works
5" CHB w/ rebars including
2.01
mortar & plaster finish
5" thk. CHB
Cement
Sand
10 mm Def. Bars
Ga. 18 G.I. Wire
4" CHB w/ rebars including
2.02
mortar & plaster finish
4" thk. CHB
Cement
Sand
10 mm Def. Bars
Ga. 18 G.I. Wire
Concrete trim at
2.03 exterior window /
door
Cement
Sand
10 mm Def. Bars
Ga. 18 G.I. Wire
2.03 Concrete floor topping
Cement
Sand
Sub-total
3.0 Reinforcing Steel Bars
3.01 Footings
F-1 & F-2
F-2
TB-1
10 mm Def. Bars
16 mm Def. Bars
Ga. 18 G.I. Wire
3.02 Columns / Pedestals
14 C-1
14 C-2
C-1
WF
C-2
WF
10 mm Def. Bars
12 mm Def. Bars
16 mm Def. Bars
Ga. 18 G.I. Wire
3.03 Slab on Fill / on Grade
Master Bedroom
Master Walk-in
Masters' T&B
332236280.xls / BoM
469.80
339.60
3.60
3.00
1.00
12.50
1.50
0.15
0.75
469.8000
0.20000
5,875.0000
705.0000
70.5000
352.5000
35.0000
25.00000
5.00000
0.50000
2.50000
0.50000
339.6000
0.40000
3.60
12.50
4,250.0000
50.00000
3.00
1.10
374.0000
6.00000
0.10
34.0000
0.75
255.0000
168.00
Fence
5.00000
26.0000
120.00
15.00
11.25
0.75
2.40
0.60000
20.00000
2.00000
G.F.
S.F.
236.51
116.19
DECK
0.00
17.63500
352.7000
0.36500
27.0000
9.0000
10
10
12
110.27
16
12.22
24.00
187.20
0.00
110.2666667
TIES
551.33
0.000000
0.000000
31.000000
10
15.11
62.33
0.00
12
0.00
0.00
0.00
16
20.36
56.00
0.00
0.00
0.00
0.00
20
TIES
53.33
146.67
0.00
0.00
77.4444
2.55556
0.0000
76.3636
3.63637
46.0000
L
4.20
2.40
1.80
W
3.60
3.60
3.60
10/05/2016 / 07:28:03
BARS
37.80
21.60
16.20
37.80
21.60
16.20
12.60
7.20
5.40
5 / 27
ITEM DESCRIPTION
Living Room
Dining
Main Stair
Main Kitchen
Main Kitchen
Bedroom-1
Common T&B
10 mm Def. Bars
Ga. 18 G.I. Wire
3.04 Beams
10 mm Def. Bars
12 mm Def. Bars
16 mm Def. Bars
Eqpt Rental
3.05 Suspended Slab
Bedroom-2
Bedroom-3
Bedroom-4
Common T&B-2
Corridor-1
Family Hall
View Deck
Veranda-3
Veranda-4
10 mm Def. Bars
12 mm Def. Bars
Ga. 18 G.I. Wire
3.06 Stair Slabs
Stair to Second Floor
10 mm Def. Bars
12 mm Def. Bars
Ga. 18 G.I. Wire
3.07 Misc Items
SV
CB
10 mm Def. Bars
12 mm Def. Bars
Ga. 18 G.I. Wire
Sub-total
4.0 Formworks & Scaffolds
4.01 Columns
C-1
C-2
" thk Plywood
2" x 3" Coco Lumber
2" x 4" Coco Lumber
Nails, assorted sizes
Consummables
4.03 Suspended Slab
332236280.xls / BoM
Details of Quantities
4.50
5.70
4.50
4.20
1.30
2.90
1.30
3.60
3.90
2.40
4.80
1.20
3.90
2.70
40.50
55.58
27.00
50.40
3.90
28.28
8.78
0.40
40.50
55.58
27.00
50.40
3.90
28.28
8.78
0.40
13.50
18.53
9.00
16.80
1.30
9.43
2.93
96.675000
9.600000
Length
10#
15#
22#
24#
26#
266.9000
2.55556
860.5200
320.4930
11.2000000
2.90
3.90
2.90
3.60
4.20
3.60
2.80
2.70
2.80
1.20
4.20
3.90
4.20
4.80
5.70
1.50
1.50
5.70
70.41818182
3.63637
-1.00000
10
37.70
34.80
50.40
25.20
11.20
54.60
67.20
28.50
28.50
12
37.70
34.80
50.40
25.20
11.20
54.60
67.20
28.50
28.50
16
-0.34545455
70.41818182
-0.34545455
17.50000000
4.20
3.90
2.00
273.00
273.00
0.50000000
0.50000000
9.20000
L
6.00
0.80
W
2.00
0.80
QTY
2.00
18.00
10
200.00
120.00
0.80000000
12
200.00
96.00
0.66666670
0.66666670
10.40
Ht
QTY
51.0000
0.35
0.5
4.00
13.60
0.35
0.5
11.00
37.40
17.71
17.70833
12
9.00
666.67
12
12.00
416.67
0.60000000
2.2916700
2.25
43,980.00
116.19000
10/05/2016 / 07:28:03
Area
3.81000
6 / 27
ITEM DESCRIPTION
Stair Slabs
Steel Deck or Tjoist
Sub-total
5.0 Roof Framing
5.01 Steel Framing & Purlins
1/4 x 2 x 2 Angle Bars
1/4 x 1.5 x 1.5 Angle Bars
2" x 4" x 1.2mm C-Purlins
2" x 6" x 1.2mm C-Purlins
12mm Dia. Plain Round Bars
Eqpt Rental & Consummables
Sub-total
Total for Structural Works
Details of Quantities
4.04
III
13.10400
Area
PhP
150.00
1.89600
1,008.54
2"x2"
1.5"x1.5"
QTY
259.64827586207
0.3517241
166.58620689655
3.4137931
292.00
65.00
64.909091
0.09091
64.00
16.00
14.5454545
5.45455
0.10
29,630.00
-120
ARCHITECTURAL WORKS
1.03
1.04
332236280.xls / BoM
108.500000
W
4.50
2.00
9.00
1.50
8.00
12.00
0.020
50.000
5,425.00000
8.13750
-0.1375
0.18
10,818.0000
-18.00000
70.95000
0.05000
197.222222
12.7777778
8.14
4.50
5.70
4.50
4.20
1.30
0.36
3.60
3.90
2.40
4.80
1.20
2.7778
16.20
22.23
10.80
20.16
1.56
2.0
0.14
4.20
4.80
20.16
5.70
1.50
8.55
1.50
5.70
8.55
0.16
6.25
2.0
1.80
3.60
6.48
1.30
2.70
3.51
2.80
2.70
7.56
11.11
5.00
100.00
10/05/2016 / 07:28:03
2.0
35.5000000
0.500000
5,040.00000
-4.00000
37.26000
2.74000
232.87500
17.1250000
20.00000
0.16
0.09
25.00000
3,360.00000
40.00000
17.5500
2.45000
222.22222
27.7777780
10.00000
7 / 27
ITEM DESCRIPTION
1.06
Details of Quantities
0.160
4.20
3.60
2.40
3.60
8.64
4.20
3.60
15.12
2.90
3.90
11.31
2.90
3.60
10.44
4.20
3.60
15.12
2.80
1.20
3.36
1.30
3.60
4.68
4.20
2.40
10.08
4.20
3.90
16.38
0.09
0.99
0.09
1,480.00000
520.00000
110.25000
4.75000
15.12
12.00000
1,380.00052
-0.00052
0.08
6,624.00002
-138.00000
312.0000
8.00000
Sub-total
2.0 Wall Finishes
2.01
2.02
2.03
2.05
332236280.xls / BoM
10.00
10.00
16.00
16.00
28.00
25.00
25.00
Ht
Area
60.00
60.00
96.00
96.00
11.43
12.80
12.80
6.00
6.00
6.00
6.00
1.00
1.00
2.00
10.00
0.15
W
Ht
Area
15.00
28.00
168,660.00
W
Ht
Area
1.80
1.30
2.80
3.60
2.70
2.70
2.4
2.4
2.4
11.11
25.92
19.20
26.40
71.52
5.00
1.00
357.60
0.09
805.8000
4.2000000
54.00000
28.92857
90.00000
7,560.00
71.52
777.7778
35.76000
2.0
202.52
5.0
Top
Splash
Area
9.00
2.80
1.20
0.60
0.60
0.60
0.2
0.2
0.2
7.20
2.24
0.96
14.88000
10/05/2016 / 07:28:03
11.4285714
12.8000000
25.6000000
12.5000000
32.0000000
7,185.00
40.50400
9,600.000
0.12000
8 / 27
ITEM DESCRIPTION
Details of Quantities
Cabs
Clo
Drwrs
High Cabs
50.00
27.00
23.00
60.00
4.00
5.00
177.390000
4.20
2.40
4.50
5.70
4.50
4.20
2.90
2.90
2.90
4.20
2.80
4.20
4.20
3.60
3.60
3.60
3.90
2.40
4.80
3.90
3.90
3.60
3.60
1.20
2.40
3.90
15.12
8.64
16.20
22.23
10.80
20.16
11.31
11.31
10.44
15.12
3.36
10.08
16.38
4.50
2.00
1.80
1.30
2.80
4.20
5.70
1.50
Hor
18.00
22.80
18.00
11.20
5.20
16.80
2.00
12.00
3.60
2.70
2.70
4.80
1.50
5.70
Vert
14.40
15.60
9.60
4.80
14.40
19.20
9.00
24.00
6.48
3.51
7.56
20.16
8.55
8.55
1.50
1.50
1.50
1.50
6.00
13.00
13.00
19.00
19.00
64.00
19.50
19.50
28.50
28.50
96.00
2.61000
87.810000
2.19000
340.00000
64.80
76.80
55.20
32.00
39.20
72.00
96.0000
320.0000
4.0 Waterproofing
Common T&B-2
View Deck
332236280.xls / BoM
2.80
4.20
2.70
4.80
10/05/2016 / 07:28:03
7.56
20.16
9 / 27
ITEM DESCRIPTION
4.01
Veranda-3
Veranda-4
Cementitous waterproofer
Sub-total
Details of Quantities
5.70
1.50
1.50
5.70
8.55
8.55
44.82
17.92800
2.07200
Ht
32.00
1.00
33.00
1.00
bdft/linm
32.00
33.00000
0.00
Sub-total
57,200.00
Closets
7.02
Low Cabinets
Dining
Main Kitchen
Master Bedroom
Family Hall
7.03
High Cabinets
7.05
Countertops
Dining
Main Kitchen
QTY
2.80
4.00
3.00
2.70
0.60
0.60
0.60
0.60
0.9
0.9
0.9
0.9
1.00
1.00
1.00
1.00
1.5120
2.1600
1.6200
1.4580
0.48800
0.84000
0.38000
0.54200
2.80
4.00
1.00
1.00
1.00
1.00
2.8000
4.0000
0.20000
BdFt
S. Area
Amount/Set
T. S. Area
2.00
Sub-total
8.0 Doors & Jambs
Cost/BF
1.0 x 2.10
1.0 x 2.10
0.80 x 2.10
0.90 x 2.10
0.60 x 2.10
0.70 x 2.10
Main Door
Master's Walk
Bedroom 1
Din/Kit/2ndFl
Common T&
Master's SD
65.52
18.00
18.00
18.00
18.00
18.00
18.00
1.35
1.35
1.35
1.35
1.35
1.35
8.02 Doors
332236280.xls / BoM
80.00
80.00
80.00
80.00
80.00
80.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1.35
1.35
1.35
10.80
2.70
1.35
13.00
10/05/2016 / 07:28:03
10 / 27
ITEM DESCRIPTION
D-1
D-4
D-5
D-6
D-2
D-3
1.0 x 2.10
0.90 x 2.10
0.60 x 2.10
0.70 x 2.10
1.0 x 2.10
0.80 x 2.10
Sub-total
Solid w/ Desi
Hollow Core
Hollow Core
Hollow Core
Hollow Core
Hollow Core
9.0 Windows
9.01
9.02
9.03
9.04
Aluminum Frame
W-1 Living
W-2 Living (Upper)
W-3 Bedrooms
W-4 Stair Landing
W-5 Stair Landing
W-6 T&B
W-7 Dining & Family Area
W-8 Family Area
W-9 Kitchen
6mm Glass panels
Aluminum Framed Screen
Tools & Accessories
Sub-total
Details of Quantities
96.00
48.00
42.67
45.33
48.00
48.00
4.20
3.78
2.52
2.94
4.20
3.36
72,860.00
Ht
4.00
6.20
0.80
2.00
0.60
0.80
3.60
0.80
1.00
160.00
60.00
60.00
60.00
60.00
60.00
Area
1.60
2.10
1.20
0.60
2.10
0.40
1.60
1.60
0.60
6.40
13.02
0.96
1.20
1.26
0.32
5.76
1.28
0.60
15,360.000
2,880.000
2,560.000
2,720.000
2,880.00
2,880.00
1,188.19
Cost/SqM
3,500.00
3,500.00
3,500.00
3,500.00
3,500.00
3,500.00
3,500.00
3,500.00
3,500.00
10.80
4.20
30.24
5.04
2.94
4.20
3.36
61.32
Amount/Set
22,400.00
45,570.00
3,360.00
4,200.00
4,410.00
1,120.00
20,160.00
4,480.00
2,100.00
501.33600
300.00000
56,800.00
T. S. Area
46.42000
6.40000
13.02000
8.64000
1.20000
2.52000
0.64000
11.52000
1.28000
1.20000
-1.336000
4.00000
223,368.00
98.28000
52.41600
2nd Flr
Eaves
Total
209.14
38.00
7.20
12.00
216.34
17.00
0.00
25.00
30.00
219,300.00
BdFt/Pc
Qty
8.00
54.00
-0.28000
-0.41600
Sloped Area
1.25
16.00
270.42750
83.00000
-0.42750
7.00000
55.00
6.00000
5.00000
432.00
64,800.00
332236280.xls / BoM
10/05/2016 / 07:28:03
11 / 27
ITEM DESCRIPTION
1.01
1.02
Sanitary
4" Pipe, Neltex
2" Pipe, Neltex
4" Tee, Neltex
2" Tee, Neltex
4" Wye, Neltex
2" Wye, Neltex
4" Elbow, Neltex
2" Elbow, Neltex
4" Clean Out, Neltex
2" Clean Out, Neltex
Pipe, Neltex
Tee, Neltex
Wye, Neltex
Elbow, Neltex
2,182.00
-82.00000
52.00
5.00
6.00
8.00
7.00
0.00
5.00
2.00
4.00
3.00
8.00
12.00
5.00
6.00
6.00
8,268.00
3.80000
20.80
31.20
1.06
36.00
Storm Drainage
6" Pipe, Neltex
4" Pipe, Neltex
1.05
57.00
Downspout
3" Pipe, Neltex
3" 90 Elbow, Neltex
3" 45 Elbow, Neltex
Accessories
1.04
55.00
30.00
Vent Line
2"
2"
2"
2"
1.03
Details of Quantities
52.00
52.000000
5.00
6.00
8.00
7.00
0.00
5.00
2.00
4.00
3.00
8.00
12.00
5.00
6.00
6.00
Plumbing Fixtures
Lavatory-A
Mixer-A
332236280.xls / BoM
10/05/2016 / 07:28:03
12 / 27
ITEM DESCRIPTION
Details of Quantities
Water Closet-A
Bidet Spray-A
S.H.-A
TP H-A
Shower Head-A
Shower Valve-a
K.S., SS, Dbl Bowl
K.S. Mixer
SS Bottle-Trap
HD Angle Valves
Flexible Hose
Faucet 4"
Faucet w/ HB
Other Accessories
3,241.00
9.00000
ELECTRICAL WORKS
56,300.0
111.00
54.00
0.50
165.0000
41.2500
-1.25000
307.5000
2.50000
124.0000
-4.00000
0.0000
0.0000
5,372.40
38,200.0
-106.40000
0.50
10.40
1.60000
64.00
6,831.60
38,200.0
2.40000
0.50
54.00
10.00
111.00
-11.00000
111.00
15,000.0
332236280.xls / BoM
10/05/2016 / 07:28:03
13 / 27
ITEM DESCRIPTION
Details of Quantities
Prepared by:
332236280.xls / BoM
10/05/2016 / 07:28:03
14 / 27
Qty Unit
2.00 T.L.
149.00 sq m
1.00 lot
1.00 lot
3.00 T.L.
Materials
Unit Cost
Cost
120.00
17,880.00
1.00
1.00
20.00
10.00
10.00
10.00
lot
lot
Mos
Sets
Mos
Mos
Mos
10,000.00
7,450.00
5,000.0
15,000.00
32,450.00
10,000.00
25,330.00
BY OWNER
BY OWNER
15,000.00
50,330.00
32,000.00
9,000.00
41,000.00
BY OWNER
BY OWNER
32,000.00
9,000.00
41,000.00
5,000.00
2,000.00
0.00
90,000.00
35,000.00
30,000.00
7,000.00
15,000.00
4,000.00
0.00
90,000.00
35,000.00
30,000.00
7,000.00
169,000.00
181,000.00
350.00
39,550.00
39,550.00
1,000.00
450.00
10,000.00
2,000.00
10,000.00
2,000.00
4,500.00
3,500.00
3,000.00
700.00
12,000.00
113.00 cu m
TOTAL
5,000.0
50.00
17,880.00
32.00 T.L.
20.00 pax
Cost
###
88.00 cu m
140.00
12,320.00
150.00
13,200.00
25,520.00
18.00 cu m
106.00 cu m
600.00
10,800.00
150.00
300.00
2,700.00
31,800.00
13,500.00
31,800.00
87,250.00
110,370.00
23,120.00
332236280.xls / BoM
10/05/2016 / 07:28:03
15 / 27
Qty Unit
Unit Cost
Materials
Cost
53,000.00
Cost
329,700.00
15.00 cu m
TOTAL
382,700.00
###
150.00
8.00
16.00
23.00
16.00
160.00
8.00
16.00
24.00
20.00
200.00
10.00
20.00
31.00
28.00
280.00
14.00
28.00
42.00
12.00
bags
cu m
cu m
days
cu m
bags
cu m
cu m
days
cu m
bags
cu m
cu m
days
cu m
bags
cu m
cu m
days
cu m
200.00
120.00
6.00
12.00
18.00
4.00
bags
cu m
cu m
days
cu m
200.00
700.00
750.00
40.00
2.00
4.00
8.00
12.00
120.00
6.00
12.00
bags
cu m
cu m
days
cu m
bags
cu m
cu m
200.00
700.00
750.00
8,000.00
1,400.00
3,000.00
70.00
250.00
250.00
250.00
2,800.00
500.00
1,000.00
2,000.00
10,800.00
1,900.00
4,000.00
2,000.00
200.00
24,000.00
4,200.00
9,000.00
70.00
250.00
250.00
8,400.00
1,500.00
3,000.00
32,400.00
5,700.00
12,000.00
332236280.xls / BoM
700.00
750.00
200.00
700.00
750.00
30,000.00
5,600.00
12,000.00
70.00
250.00
250.00
250.00
10,500.00
2,000.00
4,000.00
5,750.00
40,500.00
7,600.00
16,000.00
5,750.00
32,000.00
5,600.00
12,000.00
70.00
250.00
250.00
250.00
11,200.00
2,000.00
4,000.00
6,000.00
43,200.00
7,600.00
16,000.00
6,000.00
###
200.00
700.00
750.00
200.00
700.00
750.00
40,000.00
7,000.00
15,000.00
70.00
250.00
250.00
250.00
14,000.00
2,500.00
5,000.00
7,750.00
54,000.00
9,500.00
20,000.00
7,750.00
56,000.00
9,800.00
21,000.00
70.00
250.00
250.00
250.00
19,600.00
3,500.00
7,000.00
10,500.00
75,600.00
13,300.00
28,000.00
10,500.00
###
24,000.00
4,200.00
9,000.00
70.00
250.00
250.00
250.00
8,400.00
1,500.00
3,000.00
4,500.00
32,400.00
5,700.00
12,000.00
4,500.00
###
700.00
750.00
10/05/2016 / 07:28:03
16 / 27
Qty Unit
Unit Cost
Materials
Cost
24.00 days
Cost
6,000.00
157,900.00
332,800.00
TOTAL
6,000.00
490,700.00
470.00 sq m
5,900.00 pcs
710.00 bags
71.00 cu m
350.00 pcs
36.00 kg
7.00
200.00
700.00
125.00
65.00
41,300.00
142,000.00
49,700.00
43,750.00
2,340.00
4.00
70.00
250.00
30.00
20.00
23,600.00
49,700.00
17,750.00
10,500.00
720.00
64,900.00
191,700.00
67,450.00
54,250.00
3,060.00
6.00
25,800.00
76,000.00
23,800.00
32,500.00
1,690.00
4.00
70.00
250.00
30.00
20.00
17,200.00
26,600.00
8,500.00
7,800.00
520.00
43,000.00
102,600.00
32,300.00
40,300.00
2,210.00
9,600.00
2,100.00
2,500.00
130.00
70.00
250.00
30.00
3,360.00
750.00
600.00
0.00
12,960.00
2,850.00
3,100.00
130.00
5,400.00
6,300.00
464,910.00
70.00
250.00
1,550.00
2,250.00
171,400.00
6,950.00
8,550.00
636,310.00
340.00 sq m
4,300.00 pcs
380.00 bags
34.00 cu m
260.00 pcs
26.00 kg
200.00
700.00
125.00
65.00
120.00 lin m
48.00
3.00
20.00
2.00
18.00
27.00
9.00
bags
cu m
pcs
kg
cu m
bags
cu m
200.00
700.00
125.00
65.00
200.00
700.00
###
###
###
110.00 pcs
200.00 pcs
31.00 Kgs.
125.000
320.00
65.00
13,750.000
64,000.00
2,015.00
30.00
60.00
30.00
3,300.00
12,000.00
930.00
17,050.00
76,000.00
2,945.00
###
###
260.00 pcs
0.00 pcs
200.00 pcs
46.00 Kgs.
125.00
180.00
320.00
65.00
32,500.00
0.00
64,000.00
2,990.00
70.00
120.00
180.00
30.00
18,200.00
0.00
36,000.00
1,380.00
50,700.00
0.00
100,000.00
4,370.00
###
332236280.xls / BoM
10/05/2016 / 07:28:03
17 / 27
Qty Unit
Unit Cost
Materials
Cost
96.00 pcs
10.00 Kgs.
125.00
480.00 pcs
220.00 pcs
420.00 pcs
40.00 days
125.00
65.00
180.00
320.00
Cost
TOTAL
12,000.00
650.00
70.00
30.00
6,720.00
300.00
18,720.00
950.00
60,000.00
39,600.00
134,400.00
70.00
120.00
180.00
500.00
33,600.00
26,400.00
75,600.00
20,000.00
93,600.00
66,000.00
210,000.00
20,000.00
###
70.00 pcs
70.00 pcs
20.00 Kgs
125.00
46.00 0.00
46.00 0.00
10.00 0.00
125.00
54.00 pcs
50.00 pcs
11.00 Kgs
125.00
180.00
65.00
180.00
65.00
180.00
65.00
8,750.00
12,600.00
1,300.00
30.00
40.00
30.00
2,100.00
2,800.00
600.00
10,850.00
15,400.00
1,900.00
5,750.00
8,280.00
650.00
30.00
40.00
30.00
1,380.00
1,840.00
300.00
7,130.00
10,120.00
950.00
6,750.00
9,000.00
715.00
479,700.00
30.00
40.00
30.00
1,620.00
2,000.00
330.00
247,400.00
8,370.00
11,000.00
1,045.00
727,100.00
51.00 sq m
51.00 sq m
###
80.00 shts
420.00
4,000.00 bd ft
20.00
5,000.00 bd ft
20.00
90.00 kgs
1.00 Lot
120.00 sq m
70.00
332236280.xls / BoM
33,600.00
80,000.00
100,000.00
6,300.00
200.00
5.00
5.00
20.00
16,000.00
20,000.00
25,000.00
1,800.00
43,980.00
49,600.00
100,000.00
125,000.00
8,100.00
43,980.00
###
10/05/2016 / 07:28:04
18 / 27
Qty Unit
15.00 sq m
135.00 sq m
260.00
170.00
65.00
20.00
15.00
1.00
pcs
pcs
pcs
pcs
pcs
Lot
Unit Cost
Materials
Cost
Cost
TOTAL
500.00
67,500.00
287,400.00
150.00
20,250.00
127,030.00
87,750.00
414,430.00
680.00
176,800.00
76,500.00
27,300.00
13,000.00
2,700.00
200.00
120.00
100.00
150.00
50.00
52,000.00
20,400.00
6,500.00
3,000.00
750.00
29,510.00
112,160.00
815,890.00
228,800.00
96,900.00
33,800.00
16,000.00
3,450.00
29,510.00
408,460.00
2,677,000.00
###
5.00
27,250.00
81,750.00
5,600.00
10,800.00
0.00
450.00
420.00
650.00
180.00
296,300.00
1,861,110.00
108.50 sq m
5,450.00 pcs
8.00 cu m
1.00 lot
10.00
700.00
54,500.00
5,600.00
10,800.00
71.00 sq m
210.00 pcs
36.00 bags
1.00 lot
40.00 sq m
250.00 pcs
20.00 bags
1.00 lot
20.00 sq m
250.00 pcs
10.00 bags
332236280.xls / BoM
120.00
300.00
25,200.00
10,800.00
55.00
11,550.00
5,036.00
60.00
300.00
15,000.00
6,000.00
30.00
7,500.00
3,400.00
25.00
300.00
6,250.00
3,000.00
15.00
10/05/2016 / 07:28:04
3,750.00
36,750.00
10,800.00
5,036.00
22,500.00
6,000.00
3,400.00
10,000.00
3,000.00
19 / 27
Qty Unit
Unit Cost
Materials
Cost
1.00 lot
115.00 sq m
1,380.00
1.00
pcs
lot
60.00
82,800.00
12.00
209,150.00
Cost
2,000.00
TOTAL
2,000.00
16,560.00
6,486.00
99,360.00
6,486.00
94,332.00
303,482.00
320.00 sq m
12.00
12.00
26.00
15.00
32.00
1.00
810.00
54.00
30.00
90.00
1.00
70.00
gals
gals
gals
gals
bags
lot
sq m
bags
gals
gals
lot
sq m
580.00
400.00
740.00
380.00
350.00
6,960.00
4,800.00
19,240.00
5,700.00
11,200.00
450.00
500.00
500.00
400.00
500.00
5,400.00
6,000.00
13,000.00
6,000.00
16,000.00
7,200.00
12,360.00
10,800.00
32,240.00
11,700.00
27,200.00
7,200.00
350.00
450.00
480.00
18,900.00
13,500.00
43,200.00
500.00
450.00
500.00
27,000.00
13,500.00
45,000.00
7,560.00
45,900.00
27,000.00
88,200.00
7,560.00
32.00
25,600.00
10,800.00
2,000.00
15.00
12,000.00
37,600.00
10,800.00
2,000.00
9,600.00
800.00 pcs
36.00 bags
40.00 kgs
1.00 lot
300.00
50.00
15.00 sq m
4,500.00
332236280.xls / BoM
9,600.00
2,000.00
10/05/2016 / 07:28:04
0.00
20 / 27
Qty Unit
1.00
lot
77.00
22.00
60.00
4.00
6.00
sets
sets
sets
sets
sets
Unit Cost
Materials
Cost
TOTAL
Cost
0.00
0.00
168,260.00
0.00
0.00
0.00
0.00
0.00
330,160.00
100.00
250.00
50.00
500.00
100.00
400.00
900.00
200.00
1,100.00
250.00
161,900.00
180.00 sq m
450.00
81,000.00
130.00
23,400.00
104,400.00
90.00 sq m
460.00
41,400.00
130.00
11,700.00
53,100.00
340.00 L m
100.00
34,000.00
50.00
17,000.00
51,000.00
96.00 sqm
0.00 lin ft
320.00 L m
460.00
150.00
80.00
130.00
60.00
50.00
12,480.00
0.00
16,000.00
80,580.00
12,480.00
0.00
16,000.00
236,980.00
156,400.00
332236280.xls / BoM
10/05/2016 / 07:28:04
21 / 27
Qty Unit
Unit Cost
Materials
Cost
Cost
TOTAL
20.00 gals
2,800.00
56,000.00
56,000.00
280.00
5,600.00
5,600.00
61,600.00
61,600.00
1.00 set
8.00 sets
2.00 sets
2,000.00
2,000.00
3,600.00
800.00
450.00
200.00
200.00
450.00
1,600.00
400.00
2,450.00
5,200.00
1,200.00
2.00 pairs
12.00 pairs
4.00 pairs
250.00
150.00
500.00
2,400.00
600.00
100.00
100.00
100.00
200.00
1,200.00
400.00
700.00
3,600.00
1,000.00
10.00 sets
180.00
1,800.00
50.00
500.00
2,300.00
4,750.00
16,450.00
8,960.00
9,240.00
6,500.00
24,960.00
25,740.00
6,500.00
24,700.00
57,200.00
450.00
400.00
200.00
11,700.00
32.00 sq m
33.00 sq m
1.00 Lot
500.00
500.00
16,000.00
16,500.00
280.00
280.00
32,500.00
20.00 Cu m
5,000.00
14.00 Cu m
5,000.00
2.00
3.00
2.00
2.00
6.00
Cu m
Cu m
Cu m
Cu m
Cu m
5,000.00
16.00 sq m
3,000.00
3,500.00
70,000.00
3,500.00
0.00
49,000.00
3,500.00
48,000.00
1,200.00
119,000.00
0.00
19,200.00
67,200.00
68,200.00
186,200.00
500.00
500.00
500.00
4,000.00
1,000.00
800.00
1,940.00
1,940.00
1,940.00
15,520.00
3,880.00
2,240.00
3.00 sq m
4.00 sq m
118,000.00
1.00 Set
1.00 Set
1.00 Set
8.00 Set
2.00 Set
1.00 Sets
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
1,440.00
11,520.00
2,880.00
1,440.00
500.00
500.00
500.00
500.00
500.00
800.00
###
332236280.xls / BoM
10/05/2016 / 07:28:04
22 / 27
Qty Unit
1.00
8.00
2.00
1.00
1.00
1.00
Set
Sets
Set
Sets
Sets
Sets
21.00
1.00
1.00
9.00
1.00
2.00
2.00
2.00
1.00
2.00
500.00
300.00
1.00
Sets
Sets
Sets
Set
Sets
Sets
Sets
Set
Sets
sq ft
sq ft
Lot
Unit Cost
Materials
Cost
2,880.00
2,560.00
2,720.00
2,880.00
2,880.00
22,400.00
45,570.00
3,360.00
4,200.00
4,410.00
1,120.00
20,160.00
4,480.00
2,100.00
40.00
250.00
0.00
23,040.00
5,120.00
2,720.00
2,880.00
2,880.00
56,800.00
22,400.00
45,570.00
30,240.00
4,200.00
8,820.00
2,240.00
40,320.00
4,480.00
4,200.00
20,000.00
Cost
600.00
4,800.00
1,200.00
960.00
600.00
600.00
16,060.00
4,480.00
9,114.00
672.00
840.00
882.00
224.00
4,032.00
896.00
420.00
12.00
75.00
4,480.00
9,114.00
6,048.00
840.00
1,764.00
448.00
8,064.00
896.00
840.00
6,000.00
2,404.00
184,874.00
38,494.00
23,520.00
17,680.00
150.00
250.00
14,700.00
13,000.00
90.00
90.00
8,820.00
4,680.00
120.00 sq m
84.00 sq m
36.00 sq m
250.00
200.00
200.00
16,800.00
150.00
150.00
150.00
12,600.00
270.00
90.00
270.00
6.00
60.00
600.00
27,840.00
6,320.00
3,680.00
3,480.00
3,480.00
72,860.00
26,880.00
54,684.00
36,288.00
5,040.00
10,584.00
2,688.00
48,384.00
5,376.00
5,040.00
26,000.00
0.00
2,404.00
223,368.00
98.00 sq m
52.00 sq m
44,500.00
TOTAL
26,100.00
0.00
29,400.00
0.00
70,600.00
sq m
Lm
sq m
Lm
Lm
280.00
200.00
80.00
800.00
800.00
75,600.00
18,000.00
21,600.00
4,800.00
48,000.00
168,000.00
100.00
100.00
20.00
150.00
150.00
27,000.00
9,000.00
5,400.00
900.00
9,000.00
51,300.00
102,600.00
27,000.00
27,000.00
5,700.00
57,000.00
219,300.00
432.00 bd ft
1.00 lot
80.00
34,560.00
8,640.00
43,200.00
1,243,024.00
50.00
21,600.00
56,160.00
8,640.00
64,800.00
1,843,000.00
332236280.xls / BoM
10/05/2016 / 07:28:04
21,600.00
599,976.00
23 / 27
Qty Unit
Unit Cost
Materials
Cost
Cost
TOTAL
14.00
12.00
8.00
6.00
4.00
2.00
10.00
8.00
6.00
4.00
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
pcs
450.00
250.00
90.00
50.00
90.00
50.00
80.00
30.00
100.00
60.00
6,300.00
3,000.00
720.00
300.00
360.00
100.00
800.00
240.00
600.00
240.00
200.00
100.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
2,800.00
1,200.00
400.00
300.00
200.00
100.00
500.00
400.00
300.00
200.00
9,100.00
4,200.00
1,120.00
600.00
560.00
200.00
1,300.00
640.00
900.00
440.00
4.00
6.00
2.00
8.00
pcs
pcs
pcs
pcs
250.00
50.00
50.00
30.00
1,000.00
300.00
100.00
240.00
100.00
50.00
50.00
50.00
400.00
300.00
100.00
400.00
1,400.00
600.00
200.00
640.00
16.00
12.00
12.00
1.00
pcs
pcs
pcs
Lot
350.00
80.00
80.00
5,600.00
960.00
960.00
2,100.00
150.00
50.00
50.00
2,400.00
600.00
600.00
8,000.00
1,560.00
1,560.00
2,100.00
14.00
10.00
pcs
pcs
650.00
450.00
9,100.00
4,500.00
300.00
200.00
4,200.00
2,000.00
13,300.00
6,500.00
120.00 lin m
28.00 pcs
20.00 pcs
24.00 pcs
40.00 pcs
18.00 lin m
8.00 pcs
4.00 pcs
6.00 pcs
8.00 pcs
16.00 pcs
16.00 pcs
8.00 pcs
8.00 pcs
6.00 pcs
1.00 lot
120.00
130.00
120.00
80.00
80.00
150.00
650.00
600.00
400.00
400.00
15.00
20.00
30.00
25.00
450.00
14,400.00
3,640.00
2,400.00
1,920.00
3,200.00
2,700.00
5,200.00
2,400.00
2,400.00
3,200.00
240.00
320.00
240.00
200.00
2,700.00
7,700.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
50.00
100.00
6,000.00
1,400.00
1,000.00
1,200.00
2,000.00
900.00
400.00
200.00
300.00
400.00
800.00
800.00
400.00
400.00
600.00
20,400.00
5,040.00
3,400.00
3,120.00
5,200.00
3,600.00
5,600.00
2,600.00
2,700.00
3,600.00
1,040.00
1,120.00
640.00
600.00
3,300.00
7,700.00
3.00 sets
3.00 sets
2,400.00
1,800.00
7,200.00
5,400.00
1,000.00
500.00
3,000.00
1,500.00
10,200.00
6,900.00
332236280.xls / BoM
10/05/2016 / 07:28:04
24 / 27
Qty Unit
3.00
3.00
3.00
3.00
3.00
3.00
1.00
1.00
4.00
16.00
16.00
2.00
4.00
1.00
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
sets
lot
Unit Cost
155,200.00
165.00
40.00
310.00
120.00
10.00
1.00
1.00
pcs
pcs
pcs
pcs
pcs
set
lot
4.00
6.00
2.00
64.00
150.00
1.00
1.00
rolls
rolls
rolls
lin m
lin m
roll
lot
2,600.00
54.00
10.00
100.00
111.00
1.00
sets
sets
sets
sets
sets
180.00
18.00
20.00
80.00
120.00
180.00
2,970.00
800.00
24,800.00
14,400.00
1,800.00
3,800.00
4,900.00
120.00
25.00
2,500.00
280.00
180.00
280.00
32,000.00
32,000.00
145,800.00
215,800.00
10.00
10.00
30.00
40.00
60.00
800.00
1,650.00
400.00
9,300.00
4,800.00
600.00
800.00
4,620.00
1,200.00
34,100.00
19,200.00
2,400.00
800.00
5,266.00
1,200.00
1,500.00
1,600.00
50.00
75.00
1,500.00
4,800.00
9,000.00
3,200.00
3,200.00
11,250.00
1,500.00
15,200.00
31,800.00
13,000.00
10,880.00
15,000.00
4,000.00
6,834.00
80.00
100.00
80.00
80.00
2,000.00
4,320.00
1,000.00
8,000.00
8,880.00
2,000.00
74,700.00
4,320.00
1,000.00
8,000.00
8,880.00
34,000.00
220,500.00
1,880,866.00
5,339,000.00
3,458,134.00
1,880,866.00
5,339,000.00
3,458,134.00
54.39%
332236280.xls / BoM
24,000.00
3,150.00
2,250.00
2,250.00
4,950.00
9,000.00
9,600.00
3,300.00
3,120.00
5,280.00
4,320.00
900.00
2,000.00
0.00
60,600.00
5,266.00
10,400.00
22,800.00
9,800.00
7,680.00
3,750.00
2,500.00
6,834.00
TOTAL
10/05/2016 / 07:28:04
25 / 27
Qty Unit
Unit Cost
Materials
Cost
TOTAL
Cost
20%
35% - 50%
10% - 12%
0.20
0.00
0.00
1,067,800.00
0.00
0.00
6,406,800.00
Approved by:
332236280.xls / BoM
10/05/2016 / 07:28:04
26 / 27
Project:
Subject:
Owner/s:
Location:
BRGY.
T O TAL
6,406,800.00
9%
9%
6%
5%
1,316,125.00
1,256,210.00
Prepared by:
594,225.00
594,225.00
###
###
133,475.00
43,160.00
21,580.00
###
33,075.00
###
133,475.00
92,150.00
###
33,075.00
###
133,475.00
###
133,475.00
44,100.00
###
133,475.00
0.00
0.00
184,300.00
###
133,475.00
0.00
0.00
368,600.00
###
133,475.00
44,100.00
133,475.00
###
546,175.00
394,010.00
Approved by:
ARCHITECT (PRC#6539)
OWNER/S
0
0
332236280.xls/RevFundSched
19,135.00
###
###
66,150.00
0.00
###
0.00
75,530.00
460,750.00
###
64,740.00
460,750.00
###
10,790.00
276,450.00
###
0.00
###
###
###
0.00
669,250.00
###
936,950.00
57,405.00
###
1,070,800.00
1,406,415.00
114,810.00
###
191,350.00
###
9%
###
1,067,800.00
20%
###
ARCHITECT'S
PROFESSIONAL FEE/S
21%
###
VI
22%
###
220,500.00
FINAL
###
ELECTRICAL WORKS
7th
###
6th
###
215,800.00
5th
###
PLUMBING / SANITARY
WORKS
4th
###
IV
3rd
###
1,843,000.00
2nd
###
ARCHITECTURAL WORKS
1st
###
III
DEC
###
2,677,000.00
NOV
###
STRUCTURAL WORKS
OCT
###
II
382,700.00
SEP
###
GENERAL REQUIREMENTS /
SITEWORKS
AUG
###
Amount
JUL
###
Item Description
JUN
###
Item #
MAY
###
12-May-2011
###
Date:
27 / 27
299,415.00
###