REKAPITULASI

Pekerjaan

: Replacement Dermaga dan Trestle Faspel Laut Tual

Kegiatan

: Replacement Dermaga Beton (65,00 x 8,00) M2 Menjadi (65,00 x 12,00) M2 dan


Replacement Trestle Beton (36,00 x 6,00) M2 Menjadi (14,00 x 8,00) M2
: Pelabuhan Tual
: APBN 2016

Lokasi
T.A
No.

KegIatan

Jumlah Harga

(1)

(2)

(3)

PEKERJAAN PERSIAPAN

II

PEKERJAAN REPLACEMENT DERMAGA BETON (65,00 x 8,00) M2 MENJADI (65,00 x 12,00) M2

III

PEKERJAAN REPLACEMENT TRESTLE BETON (36,00 x 6,00) M2 MENJADI (14,00 x 8,00) M2

IV

PEKERJAAN AKHIR

SUB JUMLAH
PPn 10%
JUMLAH TERMASUK PPn
DIBULATKAN

Terbilang :

...................................................................................................................................-

..........., ....................... 2016


......................................

......................................
......................................

NIP. 19720914 199803 1 001

RENCANA ANGGARAN BIAYA


Pekerjaan

: Replacement Dermaga dan Trestle Faspel Laut Tual

Kegiatan

: Replacement Dermaga Beton (65,00 x 8,00) M2 Menjadi (65,00 x 12,00) M2 dan


Replacement Trestle Beton (36,00 x 6,00) M2 Menjadi (14,00 x 8,00) M2
: Pelabuhan Tual
: APBN 2016

Lokasi
T.A
No.

AnlsID

Kegiatan

Satuan

Volume

Harga Satuan

Jumlah Harga

(1)

(2)

(3)

(4)

(5)

(6)

(7)

I
1
2
3
4
5
6
7
8
II
A
1
B
1
2
3
4
5
6
7
8
C
1
2

3
4

20
3038
3036
9
11
3040
3044

PEKERJAAN PERSIAPAN
Pembuatan Papan Nama Proyek
Pembersihan Awal
Pengukuran dan Positioning
Direksi Keet
Gudang dan Bangsal Kerja
Penerangan, Keamanan dan Keselamatan Kerja
Penyediaan Air Kerja
Mobilisasi dan Demobilisasi

bh
hr
hr
m2
m2
hr
hr
ls

1.00
5.00
14.00
40.00
60.00
210.00
210.00
1.00

PEKERJAAN REPLACEMENT DERMAGA BETON (65,00 x 8,00) M2 MENJADI (65,00 x 12,00) M2


Pekerjaan Bongkaran
m2
- Pembongkaran Dermaga Lama
520.00

3037
3037
3008
3006
3007
3009
3010
3019

Pemancangan
Pengadaan dan Angkutan Tiang Pancang Baja D.508 mm t 12 mm
Transport Tiang Pancang Baja D.508 mm t 12 mm ke Lokasi Pekerjaan
Penyambungan Tiang Pancang
Pemancangan Tiang Tegak
Pemancangan Tiang Miring
Pemotongan Tiang Pancang
Pengecatan Tiang Pancang (12 m keatas)
Plat Stoper Tiang Pancang

3011
1434
2002
2002
1434
2001
2002
1434
2001
2002
1434
2001
2002
1434
2001
2002
1434
2001
2002
2002
2002
2002
1434
2001
2002
2002
2002
2002

Struktur Beton Bertulang K-350


Perlindungan Tiang Pancang dengan Splash Guard
Beton Isian Tiang
- Beton Mutu K-350
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Polos 10 mm
Besi Stek Poer Ke Balok
Beton Pile Cap Type I
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
Beton Pile Cap Type II
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
Beton Pile Cap Type III
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
Beton Dudukan Fender
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
Beton Balok Memanjang 50/70
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Ulir 16 mm
- Baja Tulangan Ulir 13 mm
- Baja Tulangan Polos 12 mm
Beton Balok Melintang 50/70
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Ulir 16 mm
- Baja Tulangan Ulir 13 mm
- Baja Tulangan Polos 12 mm

kg
kg
bh
m'
m'
bh
m2
m2

m2

263,130.00
255,486.00
252.00
1,778.40
1,094.40
84.00
1,607.88
17.02

401.97

m
kg
kg
kg

27.72
5,821.20
312.48
1,675.52

m3
m2
kg

18.36
97.92
3,813.75

m3
m2
kg

23.68
76.80
3,129.85

m3
m2
kg

25.90
112.00
5,867.80

m3
m2
kg

23.97
112.00
568.65

m3
m2
kg
kg
kg
kg
m3
m3
m2
kg
kg
kg
kg

56.96
316.00
7,364.01
666.64
2,267.15
1,334.20

50.32
234.60
6,505.57
566.28
2,002.86
1,178.66

No.

AnlsID

Kegiatan

Satuan

Volume

Harga Satuan

Jumlah Harga

(1)

(2)

(3)

(4)

(5)

(6)

(7)

10

14
15

1434
2001
2002
2002
3001
3002
3053
1434
2001
2002
1434
2001
2002
669
3012

Beton Lantai Precast


- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
- Baja Tulangan Ulir 16 mm
Pemasangan Lantai Precast
- Operasional Crawel Crane
- Operasional Ponton Transport
- Upah Pemasangan Lantai Precast
Beton Lantai Cast Insitu
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 16 mm
Beton Kansteen
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 13 mm
Pengecatan Kansteen
Perancah Kerja Pengecoran

D
1
2
3
4
5

3027
3033
3030
3028
-

Perlengkapan
Delatasi
Cleat
Bollard Kapasitas 35 ton
Pemasangan Fender Karet Type V 300H x 2500L
Instalasi Tiang Listrik & Perlengkapan Lampu Solar Cell

11

12

13

III
A
1
B
1
2
3
4
5
6
C
1
2

3
4

m3
m2
kg
kg

71.40
376.80
19,980.80
13,954.56

7.00
7.00
7.00

m3
m2
kg

162.60
185.00
20,792.00

m3
m2
kg
m2
m2

3.78
54.88
426.82
59.40
780.00

m'
bh
bh
bh
bh

52.00
12.00
5.00
17.00
5.00

hr
hr
ls/jam

3037
3008
3006
3009
3010
3019

PEKERJAAN REPLACEMENT TRESTLE BETON (36,00 x 6,00) M2 MENJADI (14,00 x 8,00) M2


Pekerjaan Bongkaran
m2
Pembongkaran Trestle Lama
216.00
Pemancangan
Pengadaan dan Angkutan Tiang Pancang Baja D.508 mm t 12 mm
kg
61,740.00
Penyambungan Tiang Pancang
ttk
28.00
Pemancangan Tiang Tegak
m'
310.80
Pemotongan Tiang Pancang
bh
14.00
m2
Pengecatan Tiang Pancang (12 m keatas)
267.98
m2
Plat Stoper Tiang Pancang
2.84

3011
1434
2002
2002
1434
2001
2002
1434
2001
2002
2002
2002
2002
1434
2001
2002
2002
2002
2002
1434
2001
2002
2002
3001
3002
3053

Struktur Beton Bertulang K-350


Perlindungan Tiang Pancang dengan Splash Guard
Beton Isian Tiang
- Beton Mutu K-350
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Polos 10 mm
Besi Stek Poer Ke Balok
Beton Pile Cap Type III
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
Beton Balok Memanjang 50/70
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Ulir 16 mm
- Baja Tulangan Ulir 13 mm
- Baja Tulangan Polos 12 mm
Beton Balok Melintang 50/70
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 25 mm
- Baja Tulangan Ulir 16 mm
- Baja Tulangan Ulir 13 mm
- Baja Tulangan Polos 12 mm
Beton Lantai Precast
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 19 mm
- Baja Tulangan Ulir 16 mm
Pemasangan Lantai Precast
- Operasional Crawel Crane
- Operasional Ponton Transport
- Upah Pemasangan Lantai Precast

m2
m3
m3
kg
kg
kg

4.62
970.20
52.08
344.96

m3
m2
kg

10.36
44.80
2,347.12

m3
m2
kg
kg
kg
kg
m3
m3
m2
kg
kg
kg
kg

11.09
63.90
1,590.39
124.80
440.44
256.54

9.70
45.40
774.56
113.53
384.61
222.27

m3
m2
kg
kg

6.75
31.50
1,806.30
1,526.28

1.72
1.72
1.72

hr
hr
ls/jam

67.00

No.

AnlsID

(1)

(2)

Kegiatan

Satuan

Volume

Harga Satuan

Jumlah Harga

(3)

(4)

(5)

(6)

(7)

m3
m2
kg
m3
m3
m3

31.91
114.40
8,412.00
161.00
3.15
6.30

m3
m2
kg
kg
m3
m2
m2
m3
m2

52.75
80.00
669.92
276.74
16.10
16.10
9.45
10.00
20.00

m3
m2
kg

2.40
4.00
587.81

m3
m2
kg
m2
m2

0.70
10.88
79.04
11.00
130.00

Bh
m'
bh

3.00
48.00
2.00

ls/bulan
ls
hr

7.00
1.00
5.00

15
16

1434
2001
2002
23
33
190
1434
2001
2002
2002
29
32
41
45
89
1434
2001
2002
1434
2001
2002
669
3012

D
1
2
3

Perlengkapan
- Elastomer
3027 Delatasi
- Instalasi Tiang Listrik & Perlengkapan Lampu Solar Cell

IV
1
2
3

PEKERJAAN AKHIR
3039 Pelaporan & Dokumentasi
3042 Test Material Beton
3038 Pembersihan Akhir

4
5
6
7

8
9
10
11
12
13

14

Beton Lantai Cast Insitu


- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 16 mm
Galian Tanah Untuk Abutmen
Urugan Pasir Bawah Abutmen t=5 cm
Lantai Kerja Beton Tumbuk 1Pc : 2Ps : 5 Kr Bawah Abutmen
Beton Abutmen
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 16 mm
- Baja Tulangan Polos 12 mm
Urugan Kembali Galian Abutmen
Pemadatan Tanah per 20 cm Bekas Galian Abutmen
Pasangan Batu Kosong (Anstamping)
Pasangan Batu Kali Tallud Pengaman Abutmen 1:4
Plesteran Tallud Pengaman Abutmen 1:2
Beton Plat Injak
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 13 mm
Beton Kansteen
- Beton Mutu K-350
- Bekisting
- Baja Tulangan Ulir 13 mm
Pengecatan Kansteen
Perancah Kerja Pengecoran

Вам также может понравиться

  • Surat Keterangan Kerja Agus
    Surat Keterangan Kerja Agus
    Документ4 страницы
    Surat Keterangan Kerja Agus
    Edwin Eko Marthin
    Оценок пока нет
  • On Going
    On Going
    Документ1 страница
    On Going
    Edwin Eko Marthin
    Оценок пока нет
  • On Going PDF
    On Going PDF
    Документ1 страница
    On Going PDF
    Edwin Eko Marthin
    Оценок пока нет
  • DocLelang Drainase Kawasan Kota Lubuk Linggau - Ulang
    DocLelang Drainase Kawasan Kota Lubuk Linggau - Ulang
    Документ211 страниц
    DocLelang Drainase Kawasan Kota Lubuk Linggau - Ulang
    Edwin Eko Marthin
    Оценок пока нет
  • Berita Acara Seleksi Gagal
    Berita Acara Seleksi Gagal
    Документ4 страницы
    Berita Acara Seleksi Gagal
    Edwin Eko Marthin
    Оценок пока нет
  • Pengumuman Drainase Kolaka Utara
    Pengumuman Drainase Kolaka Utara
    Документ1 страница
    Pengumuman Drainase Kolaka Utara
    Edwin Eko Marthin
    Оценок пока нет
  • DB KTR Capil (Lanjutan)
    DB KTR Capil (Lanjutan)
    Документ1 страница
    DB KTR Capil (Lanjutan)
    Edwin Eko Marthin
    Оценок пока нет
  • BA Aanwjzing KUA Sambas
    BA Aanwjzing KUA Sambas
    Документ5 страниц
    BA Aanwjzing KUA Sambas
    Mus Pa
    Оценок пока нет
  • LDK Dan LDP Lubuk Linggau
    LDK Dan LDP Lubuk Linggau
    Документ6 страниц
    LDK Dan LDP Lubuk Linggau
    Edwin Eko Marthin
    Оценок пока нет
  • Cv. Setara Bangun Konstruksi
    Cv. Setara Bangun Konstruksi
    Документ3 страницы
    Cv. Setara Bangun Konstruksi
    Edwin Eko Marthin
    Оценок пока нет
  • Lamp. SDP - BQ - Rumah Singgah
    Lamp. SDP - BQ - Rumah Singgah
    Документ8 страниц
    Lamp. SDP - BQ - Rumah Singgah
    Edwin Eko Marthin
    Оценок пока нет
  • Daftar
    Daftar
    Документ11 страниц
    Daftar
    Edwin Eko Marthin
    Оценок пока нет
  • Ba Aanwijzing
    Ba Aanwijzing
    Документ2 страницы
    Ba Aanwijzing
    Edwin Eko Marthin
    Оценок пока нет
  • Lamp. SDP - BQ - Kantor Iphi
    Lamp. SDP - BQ - Kantor Iphi
    Документ9 страниц
    Lamp. SDP - BQ - Kantor Iphi
    Edwin Eko Marthin
    Оценок пока нет
  • Catatan Lubuk Linggau
    Catatan Lubuk Linggau
    Документ1 страница
    Catatan Lubuk Linggau
    Edwin Eko Marthin
    Оценок пока нет
  • SDP - Kantor Iphi
    SDP - Kantor Iphi
    Документ121 страница
    SDP - Kantor Iphi
    Edwin Eko Marthin
    Оценок пока нет
  • Jadwal Kegiatan
    Jadwal Kegiatan
    Документ5 страниц
    Jadwal Kegiatan
    Edwin Eko Marthin
    Оценок пока нет
  • Syarat Rusus
    Syarat Rusus
    Документ2 страницы
    Syarat Rusus
    Edwin Eko Marthin
    Оценок пока нет
  • Jadwal Lelang
    Jadwal Lelang
    Документ1 страница
    Jadwal Lelang
    Edwin Eko Marthin
    Оценок пока нет
  • 03 Dok Lelang Pemb Dir Sermayam II (315 Ha)
    03 Dok Lelang Pemb Dir Sermayam II (315 Ha)
    Документ197 страниц
    03 Dok Lelang Pemb Dir Sermayam II (315 Ha)
    Bobby Bjah
    Оценок пока нет
  • Pengumuman II
    Pengumuman II
    Документ1 страница
    Pengumuman II
    Edwin Eko Marthin
    Оценок пока нет
  • Persyaratan Rusus Sambas
    Persyaratan Rusus Sambas
    Документ13 страниц
    Persyaratan Rusus Sambas
    Edwin Eko Marthin
    100% (1)
  • Surat Penawaran
    Surat Penawaran
    Документ1 страница
    Surat Penawaran
    Edwin Eko Marthin
    Оценок пока нет
  • Pengumuman Lubuk Linggau PDF
    Pengumuman Lubuk Linggau PDF
    Документ2 страницы
    Pengumuman Lubuk Linggau PDF
    Edwin Eko Marthin
    Оценок пока нет
  • Sungai Kinjil
    Sungai Kinjil
    Документ4 страницы
    Sungai Kinjil
    Edwin Eko Marthin
    Оценок пока нет
  • Personil Embung Teluk Bayur
    Personil Embung Teluk Bayur
    Документ3 страницы
    Personil Embung Teluk Bayur
    Edwin Eko Marthin
    Оценок пока нет
  • Dok. Pengadaan Pemb. Jalan Sirip Kab. Bengkayang
    Dok. Pengadaan Pemb. Jalan Sirip Kab. Bengkayang
    Документ227 страниц
    Dok. Pengadaan Pemb. Jalan Sirip Kab. Bengkayang
    Edwin Eko Marthin
    Оценок пока нет
  • Bahp Paket 152
    Bahp Paket 152
    Документ7 страниц
    Bahp Paket 152
    Edwin Eko Marthin
    Оценок пока нет
  • BA Aanwjzing KUA Sambas
    BA Aanwjzing KUA Sambas
    Документ5 страниц
    BA Aanwjzing KUA Sambas
    Mus Pa
    Оценок пока нет
  • PENGUMUMAN
    PENGUMUMAN
    Документ2 страницы
    PENGUMUMAN
    Edwin Eko Marthin
    Оценок пока нет