Академический Документы
Профессиональный Документы
Культура Документы
Grid X :
Grid Y:
ID NO:
COLUMN :
Y
S1
S
2
xf =
625
Data :
Ultimate strength of concrete,fc'=
Yield strength of rebar,fy=
Pile dia,D =
Pile spacing, 3D =
Pile distance C/C=
Pile cap Length,L= 1D from pile centreline to edge
Pile cap width,B= 2D from pile centreline to edge
Column Size ,S1 =
Column Size ,S2 =
Pile bearing capacity =
Service Load =
10% increament of Service Load,(Selfwt. Of Cap) =
Pile required =
Factored load= 1.5 X Service load=Pu =
Each Pile carry,Pi =
Structural design :
Assuming effective depth of Pile Cap,d =
So, Total thickness of pile cap =
PUNCHING SHEAR CHECK
Critical section at d/2 distance from face of the column
a1 = S1+d =
b1 = S2+d=
U = 2X (a1+b1)=
Stress developed,1=Pu/Ud =
Concrete takes,2=0.33fc'=
PUNCHING SHEAR OK
ONE WAY SHEAR CHECK
Critical section at d distance from face of the column
Width of the critical section,b=
Stress developed,1=Pu/bd=
20
415
500
1500
1500
2000
1000
250
450
250
220
242
0.968
363
375
600
675
850
1050
3800
0.15921053
1.25443414
1000
0.605
Concrete takes,2=0.17fc'=
ONE WAY SHEAR OK
0.64622365
1100
U= Pie X Do=
3455.76
Stress developed,1=Pi/Ud
0.00018086
Concrete takes,2=0.33fc'=
PUNCHING SHEAR OK
1.25443414
mm bar @
625
234375000
260416667
16.16
1060.12644
25.8795571
2024.09639
16
201.472
11 Nos.
mm bar @
2024.09639
16
201.472
11 Nos.
mm
MPA
MPA
mm
mm
mm
mm
mm
mm
mm
KN
KN
KN
Nos.
KN
KN
mm
mm
mm
N/mm2
N/mm2
mm
N/mm2
N/mm2
mm
mm
N/mm2
N/mm2
mm
N-mm
N-mm
mm
mm2
mm
mm2
mm
mm2
N
mm2
mm
mm2
ID NO:
COLUMN :
Y
500
S1
S
2
1500
500
###
##
1500
Data :
Ultimate strength of concrete,fc'=
Yield strength of rebar,fy=
Pile dia,D =
Pile spacing, 3D =
Pile distance C/C=
Pile Centre to edge distance,1D=
Pile cap Length,L (along x)=
Pile cap width,B (along y)=
Column Size ,S1 =
Column Size ,S2 =
Pile bearing capacity =
Service Load =
10% increament of Service Load,(Selfwt. Of Cap) =
Pile required =
Factored load= 1.5 X Service load=Pu =
Each Pile carry,Pi =
Structural design :
Assuming effective depth of Pile Cap,d =
So, Total thickness of pile cap =
PUNCHING SHEAR CHECK
Critical section at d/2 distance from face of the column
a1 = S1+d =
b1 = S2+d=
U = 2X (a1+b1)=
Stress developed,1=Pu/Ud =
20
415
500
1500
1500
500
2500
2300
250
450
150
300
330
2.2
495
225
700
775
950
1150
4200
0.16836735
Concrete takes,2=0.33fc'=
PUNCHING SHEAR OK
1.25443414
1150
450
950
1096.96396
1096.96396
0.64463636
Concrete takes,2=0.17fc'=
ONE WAY SHEAR OK
0.64622365
1200
U= Pie X Do=
3769.92
Stress developed,1=Pi/Ud
0.08526138
Concrete takes,2=0.33fc'=
PUNCHING SHEAR OK
1.25443414
mm bar @
525
118125000
131250000
5
453.42661
4.81258422
5903.61446
16
201.472
30 Nos.
16
mm bar @
5431.3253
16
201.472
27 Nos.
MPA
MPA
mm
mm
mm
mm
mm
mm
mm
mm
KN
KN
KN
Nos.
KN
KN
mm
mm
mm
N/mm2
N/mm2
mm
mm
mm
mm
N/mm2
N/mm2
mm
mm
N/mm2
N/mm2
n
mm
N-mm
N-mm
mm
mm2
mm
mm2
mm
mm2
mm2
mm
mm2