DOCUMENTACIN

a - Acreditacin de la capacidad del solicitante.


b - Documentacin acreditativa de la constitucin de la garanta.
c - Valoracin de la solicitud.
d - Plan Elico.

NDICE DEL PLAN ELICO


1.-

Memoria Resumen ......................................................................... 1

1.1.1.2.1.3.1.4.1.5.1.6.-

2.-

Datos de potencia y energa de origen elico................................. 4

2.1.2.2.2.3.2.4.2.5.-

3.-

Peticionario .......................................................................................... 1
Representacin .................................................................................... 1
Datos relativos al Parque ..................................................................... 2
Terreno................................................................................................. 2
Identificacin de Espacios Naturales y Parques Elicos ms cercanos
2
Documentos de que constan el plan elico ......................................... 2
Potencia total y unitaria a instalar del parque elico. .............................
4
rea de terreno ocupado...................................................................... 4
Energa anual estimada producida por el parque elico ...................... 4
Horas equivalentes y Factor de Capacidad ......................................... 4
ndice de Eficiencia Energtica (IBEE) ................................................ 4

AEROGENERADORES.................................................................. 5

3.1.- Nmero de aerogeneradores a instalar ............................................... 5


3.2.- Descripcin tcnica detallada de los aerogeneradores a instalar ........ 5
3.2.1.Resumen de las caractersticas tcnicas.................................... 6
3.2.2.Comportamiento del generador .................................................. 7
3.3.- curvas de potencia certificadas de los aerogeneradores ..................... 8
3.4.- Certificacin de cumplimiento de los tarados de las protecciones..... 10
3.5.- Vida til .............................................................................................. 11

4.-

Seguridad en el suministro y afeccin al sistema elctrico........... 12

4.1.- Datos de la red elctrica de evacuacin ............................................ 12


4.2.- Acciones que mejoren la estabilidad/curva de carga del sistema...... 12
4.3.- Descripcin de los sistemas de gestin telemtica............................ 13
4.3.1.Funciones de regulacin de potencia ....................................... 15
4.4.- Consumo de energa reactiva y comportamiento frente a huecos de
tensin................................................................................................ 17

5.-

Localizacin geogrfica ................................................................ 20

5.1.5.2.5.3.-

6.-

Emplazamiento .................................................................................. 20
Ubicacin de los aerogeneradores .................................................... 21
Planos ................................................................................................ 21

TERRENOS.................................................................................. 22

6.1.-

Planos de terrenos ............................................................................. 22

Memoria del plan elico

6.2.6.3.-

7.-

Superficie de terreno afectada por el conjunto de los aerogeneradores


22
Documentacin justificativa de la disponibilidad de los terrenos ....... 22

Valoracin medioambiental. ......................................................... 23

7.1.7.2.7.3.7.4.-

Planos de Valoracin medioambiental ............................................... 23


Espacios protegidos cercanos ........................................................... 23
Espacios ZEPA y LIC cercanos ......................................................... 24
Sitios arqueolgicos o de inters histrico cercanos .............................
......................................................................................................... 26
7.4.1.Arqueologa............................................................................... 26
7.4.2.Etnografa ................................................................................. 27
7.5.- Propuestas para la mejora del entorno del parque ............................ 30
7.5.1.DOTACIN FINANCIERA DE LAS MEDIDAS CORRECTORAS
31
7.6.- Plan de desmantelamiento del parque............................................... 32
7.7.- CLASIFICACIN TERRITORIAL ....................................................... 34

8.-

Aspectos socio-econmicos ......................................................... 36

8.1.8.2.8.3.-

9.-

Presupuesto ....................................................................................... 36
Contribucin a Fines energticos, Medioambientales y Sociales ...... 36
Acreditacin de la capacidad econmica-financiera .......................... 37

Datos complementarios ................................................................ 38


ANEXO I: CLCULO DEL IBEE

1.2.3.4.5.-

Introduccin .................................................................................. 40
Datos de Partida ........................................................................... 40
Clculo de PAE............................................................................. 42
Configuracin geomtrica del parque por filas ............................. 45
Clculo del PAE con afeccin y del IBEE ..................................... 47

Memoria del plan elico

II

a- Acreditacin de la capacidad del solicitante


Se adjunta la acreditacin de la capacidad legal, tcnica y econmicafinanciera de acuerdo en los artculos 11.i y 15.4 del Decreto 161/2006, de 8 de
noviembre.

Memoria del plan elico

III

d- PLAN ELICO

Memoria del plan elico

VI

d- PLAN ELICO:
Parque elico Llano Blanco

1.- MEMORIA RESUMEN


1.1.- Peticionario
NOMBRE:
DIRECCIN SOCIAL:
MUNICIPIO:
DIRECCIN NOTIFICACIONES:
MUNICIPIO:
TELFONO 1:
E-MAIL:

C.I.F.:
C.P:
ISLA:
C.P:
ISLA:
FAX:

BAKUSONNE S.L.
La Naval, n 138
Las Palmas de Gran Canaria
La Naval, n 138
Las Palmas de Gran Canaria
928303200 TELFONO 2:

B-35100031
35008
Gran Canaria
35008
Gran Canaria
928

1.2.- Representacin
NOMBRE:
CARGO:
NOMBRE:
CARGO:

D. Antonio Bonny Miranda


Administrador solidario
Jos Juan Bonny Miranda
Administrador solidario

Memoria del plan elico

DNI:
TIPO DE REPRESENTACIN:
T.R.X:
TIPO DE REPRESENTACIN:

42.771.980-F
mancomunada
X 0102138-H
mancomunada

B-Documentacin acreditativa de la constitucin de la garanta


Se adjunta la documentacin acreditativa de la constitucin de la garanta en
concepto de presentacin al concurso segn los trminos del artculo 10 del Decreto
32/2006, de 27 de marzo y de acuerdo al modelo del anexo VI de la Orden de 27 de
Abril de 2007, por la que se convoca concurso pblico para la asignacin de potencia
en la modalidad de nuevos parques elicos destinados a verter toda la energa en los
sistemas elctricos insulares canarios.

Memoria del plan elico

IV

1.3.- Datos relativos al Parque


DENOMINACIN:
EMPLAZAMIENTO:
LOCALIDAD:
MUNICIPIO:
POTENCIA NOMINAL (kW):
ENERGA ANUAL ESTIMADA (kWh):
DESCRIPCIN DEL PROYECTO:

Parque Elico Llano Blanco


Finca las Rosas
Cruce de Arinaga
ISLA:
Agimes
N DE AEROGENERADORES:
9.200
HORAS EQUIVALENTES (H/AO):
28.980.222

Gran Canaria
4
3.150

AEROGENERADORES:
N

MODELO

VIDA TIL

POTENCIA
UNITARIA (Kw):

POTENCIA
MODELO (Kw)

ENERCON E-70

20

2.300

2.300

SUPERFICIE DE TERRENO DISPONIBLE (m2):


SUPERFICIE DE TERRENO AFECTADA POR EL CONJUNTO DE AEROGENERADORES (m2):
SUPERFICIE DE TERRENO AFECTADA POR INSTALACIONES ELICAS COLINDANTES (m2):

411.683
637.296
616.957

1.4.- Terreno

1.5.-

Identificacin de Espacios Naturales y Parques Elicos ms


cercanos

PARQUES NATURALES

IDENTIFICACIN

Monumento natural de Arinaga


Paisaje Protegido de la Montaa de Agimes
Monumento natural de Roque de Aguayro

C-18
C-28
C-16

PARQUES ELICOS

IDENTIFICACIN

P.E. Montaa San Francisco


P.E. Lomo Cabezo
P.E. La Florida

GC009
GC001
GC038

1.6.-

DISTANCIA
MNIMA (m)
3.245
775
5.260
DISTANCIA
MNIMA (m)
3.072
1.749
2.445

Documentos de que constan el plan elico

El presente plan elico consta de los siguientes documentos:


1.- Memoria
2.- Anexos
Anexo 1: Clculo del IBEE.
Anexo 2: Caractersticas tcnicas del aerogenerador Enercon E-70
2.300 kW.
Anexo 3: Certificado de la curva de potencia del aerogenerador
Enercon E-70 2.300 kW.
Anexo 4: Certificado tarado de las protecciones y Comportamiento
frente a huecos de tensin del aerogenerador Enercon E70 2.300 kW.
Anexo 5: Certificado de vida til del aerogenerador Enercon E-70
2.300 kW.

Memoria del plan elico

Anexo 6: Descripcin de los sistemas de telemando.


3.-Planos
1.
2.
3.
4.
5.
6.
7.

Memoria del plan elico

Plano de Situacin.
Plano de Superficie de terreno disponible.
Plano de Disposicin Aerogeneradores.
Plano de poligonal superficie afectada.
Plano de poligonal superficie afectada parques vecinos.
Plano de cimentaciones, canalizaciones y viales.
Plano de distancias a Espacios Protegidos.

2.- DATOS DE POTENCIA Y ENERGA DE ORIGEN ELICO


2.1.- Potencia total y unitaria a instalar del parque elico.
El presente parque elico estar formado por:

N de aerogeneradores: 4
Potencia unitaria: 2.300 kW
Potencia total del parque: 9,2 MW

2.2.- rea de terreno ocupado


Considerando la definicin que hace el Decreto32/2006 de 27 de marzo, en su
artculo 3, se ha calculado el valor rea de sensibilidad elica. El resultado obtenido, se
refleja en los planos y es el siguiente:
Terreno ocupado (rea de sensibilidad elica) = 637.296 m2

2.3.-

Energa anual estimada producida por el parque elico

En funcin de los datos de la Cartografa del Recurso elico de Canarias y el


mtodo de clculo del anexo IV de la Orden de 27 de Abril de 2007, la energa generada
por parque ascender a 28.980.222 kWh/ao.
El clculo detallado se adjunta en el anexo 1.

2.4.- Horas equivalentes y Factor de Capacidad


El parque tendr un rendimiento neto de 3.150 Horas Equivalentes anuales de
funcionamiento medio lo que representa un Factor de Capacidad del 36,0 %.

2.5.- ndice de Eficiencia Energtica (IBEE)


El clculo del ndice de Eficiencia Energtica del parque se muestra en el anexo 1
del presente plan elico. El IBEE del parque es de 45,47.
Dado el valor del IBEE del parque se solicita que:
La valoracin del parmetro A1 relativo al ndice de Eficiencia Energtica, de la
frmula de clculo de la puntuacin del concurso, adquiera el siguiente valor:
A1 = 25

Memoria del plan elico

3.- AEROGENERADORES
3.1.- Nmero de aerogeneradores a instalar
Se instalarn en el parque 4 aerogeneradores Enercon E-70 2.300 kW.

3.2.- Descripcin tcnica detallada de los aerogeneradores a instalar


La tecnologa seleccionada ha sido el aerogenerador Enercon E 70 / 2.300 Kw.
La eleccin de la compaa se ha realizado teniendo en cuenta la reconocida solvencia y
prestigio de Enercon, uno de los principales fabricantes de aerogeneradores a nivel
mundial.
Establecida en Aurich, Alemania, en 1.984, comenz desarrollando modelos
como E15, E16, logrando con el tiempo una gran penetracin en el mercado. Primero
en Alemania y posteriormente en Dinamarca, cuna tradicional de la tecnologa elica,
luego Estados Unidos y por fin implantndose en casi toda Europa incluida las Islas
Canarias, adems de Argentina, Brasil, India, Taiwn y progresando en todos aquellos
mercados emergentes. En la siguiente imagen se muestran todos los pases en los que
Enercon tiene presencia.

A fecha de abril de 2007, Enercon tena instalados en todo el mundo ms de


11.006 aerogeneradores, que representan 11.703 MW instalados.
Segn IBEE consulting la cuota de mercado de Enercon (2006) es la mayor del
mercado alemn, el pas con ms energa elica instalada del mundo.

Memoria del plan elico

Enercon dispone de centros de fabricacin de aerogeneradores en Alemania


(Aurich, Emden, Magdeburg), Suecia, Brasil, La India y Turqua, adems de tener en
proyecto nuevas fbricas en Portugal y en Espaa.
Una vez elegida la tecnologa, se opt por el modelo E-70 por varias razones:

La alta potencia unitaria de este modelo permite minimizar la utilizacin de


terreno.
La fiabilidad del modelo est suficientemente corroborada (ms de 3600 E-66
instalados desde 1997), siendo la megaturbina ms instalada en el mundo .
Funcionamiento ptimo en redes elctricas dbiles.
Excelente relacin rea barrida - potencia
Alta eficiencia energtica.
Elevada disponibilidad.
El sistema de control de potencia variable permite una operacin ptima y
eficiente del E-70 ante cargas variables, adems de prevenir rachas
indeseables.

En el anexo 2, de descripcin tcnica del aerogenerador, se adjunta una


descripcin exhaustiva de las caractersticas del modelo elegido.

3.2.1.-

Resumen de las caractersticas tcnicas

A continuacin se muestran las principales caractersticas tcnicas del modelo de


aerogenerador utilizado, realizndose una mayor descripcin de las mismas en el Anexo
2:
1. Datos Generales
Modelo: E-70
Potencia nominal: 2.300 kW
2. Parmetros de funcionamiento
Velocidad de arranque con produccin: 2 m/s
Velocidad de corte:28 a 34 m/s
Velocidad a la que se alcanza la potencia nominal: 12,5 m/s
Mxima velocidad de rfaga: 70 m/s de acuerdo con IEC
Tarados mximos y mnimos de protecciones frente al tensin y
frecuencia:

Mxima frecuencia: 57 Hz durante 0,2 s

Mnima frecuencia: 43 Hz durante 0,2 s

Mxima tensin:120% Vn durante 100 ms

Mnima tensin: 80% Vn durante 5 s


Sistema de control de potencia: Por regulacin pitch independiente
de las tres palas.
Sistema de telemando: ENERCON SCADA
Disponibilidad del aerogenerador: 98%
3. Rotor
Dimetro: 71 m
rea barrida:3.959 m2
Sentido de giro: En el de las agujas del reloj
Rango de velocidad de giro: De 6 a 21,5 rpm
Peso del buje: 23 Tm
4. Palas
Memoria del plan elico

Nmero de palas: 3
Longitud:32,8 m
Peso: 4 Tm cada una
5. Multiplicadora: No tiene
6. Torre: Cnica de acero
Alturas: 64,85, y 88 m
7. Generador
Tipo: Sncrono de velocidad variable
Potencia nominal: 2300 kW
Tensin: 400 V. Desviaciones de (+30%, -15%)
Frecuencia: 50Hz
Clase de proteccin: IP 23
Factor de potencia: 1 (Ajustable)
8. Sistema de frenos
Freno aerodinmico: 3 sistemas de pitch de pala independientes
con parada de emergencia
Freno del rotor: sistema hidrulico y elctrico
Freno mecnico: freno de servicio con disco de freno accionado
hidrulicamente
Tiempo mximo de frenado hasta parada total: 15 s
9. Sistema de orientacin
6 motores trifsicos AC de orientacin
3 motores de freno de orientacin y un motor electrnico de freno
Ratio de orientacin: 30 por minuto

Dado el tipo de control de pala del aerogenerador se solicita que:


La valoracin del parmetro A2 relativo al tipo de control de pala del
aerogenerador, de la frmula de clculo de la puntuacin del concurso, adquiera el valor
de 10, ya que el 100% de los aerogeneradores del parque tienen control de ngulo en las
palas.
A2 = 10

3.2.2.-

Comportamiento del generador

El generador en anilla ENERCON se acciona directamente mediante el rotor de la


turbina (las palas del rotor). El rotor del generador est conectado directamente al buje
del rotor y, por tanto, no necesita ningn cojinete. Con este fin se ha diseado
especficamente el generador multipolo de ENERCON, cuyo funcionamiento se basa en
un generador sncrono. Gracias a los avances realizados sobre el modelo de generador
sncrono clsico, se ha logrado una eficiencia muy elevada al mismo tiempo que se ha
reducido el peso del generador.
El generador del E-70 alcanza unos niveles de eficiencia de alrededor del 94 %
durante su rango completo de funcionamiento.
Dado el tipo de generador del aerogenerador se solicita que:

Memoria del plan elico

La valoracin del parmetro C1 relativo al tipo de generador, de la frmula de


clculo de la puntuacin del concurso, adquiera el valor de 10, ya que el 100% de los
aerogeneradores del parque son sncronos.
C1 = 10

3.3.- curvas de potencia certificadas de los aerogeneradores


La descripcin completa de los parmetros generales del aerogenerador Enercon
E-70 se encuentran en el anexo 1 de este documento. La curva de potencia certificada
del aerogenerador se adjunta a continuacin.

Memoria del plan elico

Las turbinas vienen provistas del llamado software de regulacin de control de


rfagas que evita las paradas en condiciones de vientos fuertes.
En vez de funcionar a partir de ciertos parmetros de parada como los
aerogeneradores convencionales, cuando se producen fuertes vientos, las palas giran su
posicin en cierta medida para reducir la velocidad rotativa y, por consiguiente, la salida
de potencia del equipo sin que ste tenga que detenerse por completo. Cuando amainan
las rfagas, las palas vuelven a su posicin anterior y la turbina retoma la velocidad
mxima inmediatamente sin que se haya originado un proceso de parada-arranque, con
la prdida de tiempo que ello implica.
De forma esquemtica, las curvas de potencia para los aerogeneradores
ENERCON, con el modo de control de rfagas de viento activado, muestran las
siguientes caractersticas:

Memoria del plan elico

Con el sistema de control de rfagas de viento patentado por ENERCON, la


potencia se reduce cuando los vientos oscilan entre 28 y 34 m/s. De esta manera la
turbina puede funcionar, en la mayora de los casos, con una potencia nominal de hasta
25 m/s (para promedios de 10 minutos). En este modo, no es necesario realizar una
deduccin por histresis de vientos fuertes cuando se calcula la produccin energtica
con la curva de potencia ampliada de hasta 25 m/s.
Adems, el sistema de control de rfagas de viento de ENERCON permite una
produccin superior en aquellos emplazamientos con velocidades medias anuales muy
altas y cuya distribucin del viento presente algunas horas con vientos por encima de los
25 m/s.
En la siguiente tabla se muestra la cuantificacin de la sobreproduccin que este
sistema produce.

La certificacin de la curva de potencia se adjunta en el anexo 3.

3.4.-

Certificacin de cumplimiento de los tarados de las


protecciones

En el anexo 4 se adjunta la certificacin que acredita que los aerogeneradores


cumplen con los tarados de protecciones de Nivel I mostrados en el punto 2 del artculo
11 de la Orden de la Conserjera de Industria, Comercio y Nuevas Tecnologa, de 15 de
noviembre de 2006, por la que se regulan las condiciones tcnico-administrativa de la
instalaciones elicas ubicadas en Canarias.
El tarado de las protecciones del citado artculo son:
Mxima frecuencia: ...................................... 51 Hz durante 0,1 seg
Mnima frecuencia: ....................................... 47,5 Hz durante 0,1 seg
Sobretensin: ............................................... 105 % durante 0,3 seg
El tarado ordinario de las protecciones del aerogenerador es:
Mxima frecuencia: ...................................... 52 Hz
Mnima frecuencia: ....................................... 47 Hz
Sobretensin: ............................................... 110 %
Subtensin: .................................................. 90 %
Por lo tanto el aerogenerador puede adaptarse a las condiciones especificadas en
el artculo 11 de la Orden de de 15 de noviembre de 2006.

Memoria del plan elico

10

De hecho el fabricante certifica que el aerogenerador podr tararse en los


siguientes valores:
Mxima frecuencia: ...................................... 57 Hz, 0,2 seg.
Mnima frecuencia: ....................................... 43 Hz, 0,2 seg.
Sobretensin: ............................................... 120 % Vn, 5 seg.
El nuevo convertidor Enercon FACTS posibilita reaccin a distintas faltas
equilibradas y desequilibradas, permite mantener el aerogenerador en operacin incluso
con graves perturbaciones de frecuencia (hasta 4 Hz/seg), lo que lo hace especialmente
indicado para su operacin en sistemas elctricos aislados.
Hay que recordar que el tarado de subfrecuencia de la isla es tal que a partir de lo
49 Hz se empiezan a producir deslastres de carga. Los ltimos escalones de deslastre
se sitan en torno a los 48 Hz, por lo que el parque se mantendr conectado a la red
ms tiempo que el que lo harn las cargas del sistema.

3.5.- Vida til


La vida til de la instalacin desde la puesta en servicio definitiva del parque
hasta el cese de su actividad de produccin se cifra en 20 aos. Dicha circunstancia esta
acreditada en el anexo 5 por certificado del fabricante.

Memoria del plan elico

11

4.- SEGURIDAD EN EL SUMINISTRO Y AFECCIN AL SISTEMA

ELCTRICO.
4.1.- Datos de la red elctrica de evacuacin
Las subestaciones ms cercanas al parque son la subestacin de Matorral (75
MVA de potencia de transformacin) y la subestacin de Carrizal (36 MVA de potencia
de transformacin). Segn el artculo 21 del Decreto 53/2003, los parques elicos
situados en Gran Canaria con ms de 6 MW deben conectarse a Subestaciones de 66
kV, por lo que el presente parque deber conectarse a dichas S.E.
Las lneas de 66 kV ms cercanas al parque son:
o
o
o
o

Barranco de Tirajana-Carrizal; lnea de 66kV, de 1 circuito y 60 MVA


capacidad de transporte
Carrizal-Telde; lnea de 66kV, de 1 circuito y 66 MVA de capacidad
transporte
Barranco de Tirajana-Matorral; lnea de 66kV, de 1 circuito y 60 MVA
capacidad de transporte
Matorral-Aldea Blanca; lnea de 66kV, de 1 circuito y 60 MVA
capacidad de transporte

de
de
de
de

El punto de conexin de la red de transporte existente que se propone es la


Subestacin de Matorral. No obstante se preferira realizar una nueva subestacin
situada en el Polgono de Arinaga. Los gastos de la realizacin de dicha subestacin
podran ser sufragados por los parques elicos de nueva adjudicacin de la zona,
Unelco-Endesa, etc.

4.2.- Acciones que mejoren la estabilidad/curva de carga del


sistema.
La instalacin del parque elico en si mismo provoca una serie de efectos que
mejoran la estabilidad del sistema. Estos efectos son:
Generacin por el da mayor que por la noche; la frecuencia del viento, y por lo
tanto la produccin energtica del parque es mayor durante las
10 de la maana y las 8 de la tarde, en definitiva durante las
horas de sol. La variacin se puede cifrar en un 10%, por lo tanto
el parque genera ms energa durante los periodos de mayor
consumo elctrico y reduce su generacin durante los periodos
de menor demanda.
Regulacin 100%; la energa generada por el parque se podr variar desde un
mximo determinado por las condiciones de viento en cada
momento y cero. Dicha posibilidad permitir disminuir la energa
generada por el parque en aquellos momentos que el operador
del sistema lo requiera.
Aumento del perfil de tensiones de la red; la inyeccin de energa en nodos de
la red distintos a los de las centrales de generacin convencional

Memoria del plan elico

12

provoca un aumento del perfil de tensiones de la red y por lo


tanto facilitan su regulacin.
Disminucin de perdidas en transporte; la generacin distribuida que
representa el parque provocar una disminucin del transito de
energa por la red de transporte de la isla y por lo tanto provocar
una disminucin en la prdidas energticas que se producen en
dichas redes.
Sistema de control de rachas: gracias al sistema de control de rachas se
eliminan las paradas bruscas del aerogenerador frente a vientos
fuertes.
Esta
caracterstica
diferenciadora
de
los
aerogeneradores Enercon elimina una desconexin repentina del
parque, que evidentemente no es beneficiosa para la red. Al
mantenerse conectado el parque no se provocan desequilibrios
instantneos en la relacin potencia generada y potencia
demandada de los sistemas elctricos.
Elevada

Disponibilidad del aerogenerador: Enercon garantiza una


disponibilidad del aerogenerador del 98%. Esto contribuye a
asegurar la potencia disponible en el parque de generacin
elica y por lo tanto maximiza, en la medida de lo posible, la
potencia elica disponible.

Estabilidad

del aerogenerador en redes dbiles: la tecnologa del


aerogenerador Enercon E-70, es la tecnologa de
aerogeneradores que ms adaptada esta para la operacin en
rede dbiles. Hay que tener en cuenta que el aerogenerador
Enercon:
Suministra una corriente sinoidal con unos valores de flicker
inapreciables.
Ante problemas de la red, el aerogenerador se mantiene
conectado hasta 5 segundos, pudiendo contribuir a la estabilidad
de la red mediante la tensin en cortocircuito.
El aerogenerador contribuye activamente en la estabilidad de
al frecuencia de la red por medio de la reduccin de potencia y
aumento de frecuencia incluso en caso de problemas en la red.
Posee medios para regular la tensin de redes de
distribucin manteniendo la calidad de la tensin.
La estabilidad del aerogenerador ante variaciones de
frecuencia en la red es extraordinario ( el aerogenerador soporta
subfrecuencias de 43 Hz y sobre frecuencias de 57 Hz).

4.3.- Descripcin de los sistemas de gestin telemtica


El sistema SCADA de ENERCON est formado por varios componentes, que
pueden ser instalados segn los requerimientos necesarios:
El software-hardware SCADA (SCADA SYSTEM) del parque elico supervisa
los aerogeneradores y registra diferentes datos, tales como:

Memoria del plan elico

13

VALOR

UNIDAD

Velocidad de Viento

M/s

Revoluciones

Rpm

Potencia

KW

Angulo de fase
Horas de servicio

Generacin de energa

kWh

Orientacin de la gndola

grados

Estado

Tambin es capaz de conectar y desconectar los aerogeneradores,


individualmente o colectivamente de forma remota. El SCADA SYSTEM incluye
los lazos de control con los aerogeneradores.
El hardware SCADA PC, situado en el parque elico permite el funcionamiento
de todos los paquetes del sistema SCADA.
El software SCADA METEO, permite la adquisicin de datos metereolgicos
desde una estacin metereolgica externa al parque elico.
El software de control remoto SCADA REMOTE permite que el operador
realice configuraciones on line, efecte evaluaciones de datos (tambin on line)
y descargue datos.
El software de bases de datos SCADA DATABASE permite continuar los
procesamientos y las evaluaciones off line. Esto ltimo tambin puede
realizarse mediante un programa de hoja de clculo.
El software SCADA AUTOMATIC DATA REQUEST, permite a un PC remoto
(PC del promotor), conectarse con el sistema SCADA y visualizar los
parmetros de funcionamiento del Parque Elico.
El software SCADA VCS, SCADA Voltage Control System, controla el voltaje
en el punto frontera del parque elico mediante la energa reactiva generada
por el parque.
El software SCADA SCU, SCADA Substation Control
Unit, permite
monitorizar y operar la subestacin mediante el sistema SCADA. Es el interface
entre el control PLC de la subestacin y el sistema SCADA.
El software SCADA GDA, SCADA Grid Data Acquisition, permite al sistema
SCADA el control de los parmetros de la red. Este software se utiliza en el
control de la potencia reactiva del parque. El esquema de este software se
muestra en la siguiente imagen:

Memoria del plan elico

14

El software SCADA PDI, SCADA Process Data Interfase, permite la


comunicacin del operador del sistema con el parque elico, permitindole al
mismo la configuracin de los valores del parque elico y la operacin sobre el
mismo. El esquema de este software se muestra en la siguiente imagen:

En el paquete de software se incluye una amplia documentacin sobre estas


aplicaciones. Adems, la documentacin del programa de supervisin de los
aerogeneradores incluye una descripcin completa del sistema de control
remoto.
Adems, existe la posibilidad de permitir que otros sistemas SCADA externos que
utilicen otros protocolos de transferencia diferentes puedan acceder a los datos SCADA
del aerogenerador.
El paquete SCADA permite satisfacer los ms exigentes requerimientos de
telecontrol, permitiendo al operador de la red realizar una adecuada gestin de la misma.
El sistema SCADA bsico incluye el SCADA PC, el ENERCON SCADA, el
SCADA REMOTE y el SCADA DATABASE. Adems se instalarn los mdulos de
SCADA GDA, SCADA PDI y SCADA AUTOMATIC DATA REQUEST. Si las exigencias
del gestor de la red se ampliarn, se instalarn todos aquellos mdulos necesarios para
cumplirlas.

4.3.1.-

Funciones de regulacin de potencia

Cada aerogenerador ENERCON incluye un sistema de entrada de datos para


controlar la produccin de energa elctrica de 0 a 100 %. Cuando se asigna un valor de,
por ejemplo, 350kW a ese sistema de entrada de datos, la potencia mxima de esta
turbina no sobrepasar el valor de referencia de 350 kW. Todo valor que se encuentre

Memoria del plan elico

15

entre 0 y la potencia nominal (p. ej. 0 a 600 kW) se puede introducir como valor de
referencia. Existen diversas posibilidades para utilizar este sistema de entrada de datos:
a) Se puede emplear directamente para limitar a un cierto valor la potencia de
salida de cada mquina.
b) La potencia del generador se puede controlar con la ayuda de un dispositivo de
control dependiente de la tensin de la red.
c) Por ltimo se destaca a continuacin la gestin de la potencia del parque
elico:
Posibilidad n.1: Todos los aerogeneradores tienen una potencia mxima
limitada mediante el valor de referencia (entrada de datos). As siempre se cumple el
requisito de una potencia mxima total.
Posibilidad n. 2: Se solicita que la potencia mxima total (= suma de la potencia
generada por todas las turbinas) no supere un cierto valor y, adems, se genera la
mxima cantidad de kWh.
Esto se consigue de la siguiente manera:
En las pocas en que soplan vientos de velocidad baja y media en el parque
elico, suele ocurrir que las turbinas mejor situadas (o en emplazamientos ms
favorables) se benefician de vientos mejores y, por tanto, deberan limitarse a un valor
dado, mientras que las turbinas situadas detrs de stas, en segunda o tercera lnea,
reciben vientos de velocidad inferior y su produccin queda limitada a un valor de
potencia menor.
Con la gestin de potencia del parque elico de ENERCON se controla cada
unidad del parque, las turbinas de la primera fila funcionan con una potencia superior, p.;
de este modo, la potencia elctrica total del parque elico aumenta. Sin embargo, el
sistema de gestin de potencia controla cada turbina para que no se exceda la potencia
de salida total mxima, a la vez que la energa generada (kWh) alcanza un valor mximo.
Por lo tanto el sistema de telemando a instalar permitir la regulacin de la
potencia del parque de 0 a 100%, segn la consigna dada por el operador del sistema.
Por lo tanto se solicita que se tenga en cuenta esta condicin a la hora de la valoracin
de esta solicitud.
La valoracin del parmetro C2 relativo al grado de control del sistema de gestin
telemtica, adquiera el valor de 9, ya que el sistema de control de potencia del parque
permite la regulacin del mismo en el intervalo de 0 al 100%.
C2 = 9
El promotor establecer los medios necesarios para realizar el telecontrol del
parque segn las Normas de conexin y desconexin de parques elicos que
establezca la Consejera. Adems cumplir con todo lo expuesto en la Orden de la
Consejera de industria de 15 de noviembre de 2006.
El parque dispondr de un sistema de gestin telemtica permanente de toda la
instalacin, dispondr de los medios necesarios para que el operador del sistema tenga
Memoria del plan elico

16

informacin en tiempo real de los distintos parmetros del parque. El sistema ser
permanente, fiable, y estar gestionado por la propiedad o por una empresa dedicada a
tal efecto.
En el anexo 6, descripcin de los sistemas de telemando, se desarrolla con
mucha ms profundidad el funcionamiento del sistema de telemando.

4.4.- Consumo de energa reactiva y comportamiento frente a


huecos de tensin
El aerogenerador Enercon E-70 tiene el siguiente comportamiento frente a
huecos de tensin:

El tiempo Tup estipulado en la Orden de 9 de septiembre de 2004, por la que se


regulan las condiciones tcnico-administrativas de las instalaciones elicas ubicadas en
Canarias, es de 1 segundo, por lo que todos los aerogeneradores del parque cumplen
con lo estipulado en el artculo 15 de la citada Orden.
En la siguiente grfica comentada se muestra el comportamiento de los
aerogeneradores Enercon frente a huecos de tensin.

Memoria del plan elico

17

El aerogenerador no consume energa reactiva durante los huecos de tensin y


adems el aerogenerador es capaz de aportar energa reactiva durante todo el rango de
tensiones. Dicho comportamiento se modeliza en la siguiente curva.

En la siguiente imagen se muestra el comportamiento en una falta.

Memoria del plan elico

18

Por todo esto se asegura que el aerogenerador Enercon E-70, no consume


energa activa ni reactiva cuando se produce un hueco de tensin, adems el
aerogenerador aporta energa reactiva en el rango de tensin comprendido entre el
80% y el 20% de la tensin nominal de la red.
Esta informacin se acredita en el Anexo 4.
Dado el comportamiento frente a la generacin de energa activa y reactiva
durante los huecos de tensin se solicita que:
La valoracin del parmetro C3 relativo al consumo de energa activa y/o reactiva
durante un hueco de tensin en la red, de la frmula de clculo de la puntuacin del
concurso, adquiera el valor de 6, ya que el 100% de los aerogeneradores del parque no
consumen energa reactiva y/o reactiva durante las condiciones expuestas.
C3 = 6
La valoracin del parmetro C4 relativo al aporte de energa a reactiva durante un
hueco de tensin en la red, de la frmula de clculo de la puntuacin del concurso,
adquiera el valor de 6, ya que el 100% de los aerogeneradores del parque aportan
energa reactiva a la red.
C4 = 6

Memoria del plan elico

19

5.- LOCALIZACIN GEOGRFICA


5.1.-

Emplazamiento

Las instalaciones se ubican en la finca situada en el T. M. de Agimes, en el lugar


denominado Finca Las Rosas, en la Isla de Gran Canaria, provincia de Las Palmas de
Gran Canaria ; tal y como se aprecia en los planos.

Municipio de Agimes

Emplazamiento

Fotografa area del emplazamiento

Memoria del plan elico

20

5.2.- Ubicacin de los aerogeneradores

5.3.- Planos
Para complementar y definir correctamente el emplazamiento se adjuntan en el
apartado de planos los siguientes documentos:
Plano de Situacin (Plano n 1)
Plano de Superficie de terreno disponible. (Plano n 2)

Memoria del plan elico

21

6.- TERRENOS
6.1.- Planos de terrenos
En el apartado de planos se muestran los siguientes documentos relativos a los
terrenos en donde se va a implantar el parque elico:

6.2.-

Plano de Disposicin Aerogeneradores (Plano n3)


Plano de poligonal superficie afectada. ( Plano n 4)
Plano de poligonal superficie afectada parques vecinos. (Plano n 5)
Plano de cimentaciones, canalizaciones y viales. ( Plano n 6)

Superficie de terreno afectada por el conjunto de los


aerogeneradores

Los datos de Superficie de terreno disponible por el solicitante, Superficie de


afeccin elica y Superficie de afeccin elica de las instalaciones elicas existentes
colindantes se muestran en la memoria resumen del presente plan elico y en los planos
4 y 5.
En las cercanas del emplazamiento se encuentran ubicados los siguientes
parques elicos:
Denominacin
P.E. Montaa San
Francisco
P.E. Lomo Cabezo
P.E. La Florida

Potencia
(MW)

Modelo de
Aerogenerador

Potencia
unitaria (kW)

Distancia al
parque

1,125

ACSA V-27

225

3.072

1,8
2,5

ENERCON E-40
GAMESA G-46

600
660

1.749
2.445

Dada la distancia entre el parque y los parques existentes y autorizados, la


superficie de afeccin elica del parque no afecta a ningn parque elico existente ni
es afectado por ningn parque elico existente.
Dicha circunstancia se muestra en los planos Poligonal superficie afectada
( Plano n 4) y en Poligonal superficie afectada parques vecinos (Plano n 5).

6.3.-

Documentacin justificativa de la disponibilidad de los terrenos

Los terrenos donde se sita el parque elico son propiedad de la empresa


promotora del parque, es decir de JULIANO BONNY GMEZ S.L. , tal y como queda
acreditado en la documentacin anexa.
Dado la disponibilidad de los terrenos se solicita que:
La valoracin del parmetro D2 relativo a la disponibilidad de los terrenos, de la
frmula de clculo de la puntuacin del concurso, adquiera el valor de 5.
D2 = 5

Memoria del plan elico

22

7.- VALORACIN MEDIOAMBIENTAL.


7.1.- Planos de Valoracin medioambiental
En el apartado de planos se muestran los siguientes documentos relativos a la
valoracin medioambiental del futuro parque:

Plano de distancias a Espacios Protegidos (Plano n 7).

7.2.- Espacios protegidos cercanos


Segn las disposiciones de la ley 12 de 19 de diciembre de espacios naturales de
Canarias, los parajes naturales ms cercanos a la zona de estudio son:
El Paisaje Protegido de la Montaa de Agimes ( C-28).
El Paisaje Protegido de la Montaa de Agimes (C-28).
El Monumento natural de Roque de Aguayro (C-16).

EL MONUMENTO NATURAL DE ARINAGA (C-18).


El cono volcnico de Arinaga, se encuentra en el municipio de Agimes y
constituye un elemento de inters geomorfolgico, hito referencial en el paisaje de la
costa SE de Gran Canaria, al constituir un elemento natural singularizado visible desde
gran distancia. En conjunto, el espacio protegido
forma parte de un rea seminatural ms extensa
donde se pueden observar diversos endemismos
amenazados, tanto vegetales como animales,
entre ellos el lagarto Gallotia atlntica delibesi. La
zona de Arinaga es la nica localidad donde vive
esta subespecie, y donde se encuentra la principal
poblacin ms densa de la isla.
Superficie: 90,7 hectreas
Poblacin: ninguna, pero existe un faro y un
antiguo albergue juvenil

EL PAISAJE PROTEGIDO DE LA MONTAA DE AGIMES (C-28)


La montaa de Agimes se encuentra en los municipios de Ingenio y Agimes,
constituye un elemento natural singularizado del
paisaje, enclavado en el margen derecho del
Barranco de Guayadeque. Se trata de una
manifestacin volcnica antigua, muy desmantelada
por procesos erosivos que constituye una referencia
paisajstica del territorio en el que se encuentra,
posee adems inters geolgico y geomorfolgico al
tratarse de un espacio volcnico individualizado que
contribuy a la formacin de este sector de la isla.
Memoria del plan elico

23

Superficie: 285,2 hectreas


Poblacin: ninguna.

EL MONUMENTO NATURAL DE ROQUE DE AGUAYRO (C-16).


El roque Aguayro, se encuentra entre los municipios de Santa Luca y Agimes,
constituye un elemento paisajstico muy
destacado, que domina y caracteriza la zona, al
tiempo que constituye una formacin natural de
notoria singularidad e inters cientfico. Junto a
estos valores estticos, destacan otros de
carcter cultural debido a la presencia de
petroglifos aborgenes en el lomo de los Letreros.
El monumento es por definicin rea de
sensibilidad ecolgica, a efectos de lo indicado
en la Ley 11/1990, de 13 de julio, de Prevencin
de Impacto Ecolgico.
Superficie: 806,6 hectreas.
Poblacin: ninguna.
Las distancias a los espacios naturales protegidos antes citados son:

3,2 km al Monumento natural de Arinaga (C-18).


775 m al Paisaje Protegido de la Montaa de Agimes (C-28).
5,2 km al Monumento natural de Roque de Aguayro (C-16).

Dado las distancias a Parques Naturales se solicita que:


La valoracin del parmetro B1 relativo a la distancia a Parques Naturales, de la
frmula de clculo de la puntuacin del concurso, adquiera el valor de 7,7, ya que el
parque elico se encuentra a 775 m de un Parque Natural.
B1 = 7,7

7.3.- Espacios ZEPA y LIC cercanos


En cuanto a los espacios incluidos en la Red Natura 2000, cercanos a la
parcela, nos encontramos con tres espacios dos terrestres y otro marino.

reas protegidas por la red natura 2000 en Gran Canaria

Memoria del plan elico

24

El primero, que coincide aproximadamente con el Monumento Natural de Arinaga,


denominado Arinaga (ES7010049), con criterio 1, protegido por ser un hbitat o lugar
donde se pueden encontrar especies prioritarias, como es el caso de su costa
acantilada, con flora macaronsica como el Atractylis preauxiana y el Convolvulus caputmedusae.
El segundo se denomina Punta de la Sal (ES7010052), se caracteriza por ser un
rea costera donde dominan materiales sedimentarias con arenas y caliches, junto a una
playa de callaos, donde se acumula arena de manera estacional. Tambin aparecen
materiales derivados del volcn de Arinaga. Encontramos una vegetacin dominada por
un matorral achaparrado de especies halfilo-psamfilo apareciendo en la playa un
saladar de alto inters para las aves. El rea costera tiene un extraordinario valor
florstico por la presencia de la poblacin ms importante de Canarias de Atractylis
preauxiana y la poblacin ms relevante de Convulvulus caput-medusae en Gran
Canaria. Tambin aparece un saladar en la costa de alto valor para aves migratorias y
limcolas.
El tercero de estos espacios mencionados es marino, y se denomina Playa del
Cabrn (ES7010053), que ocupa un rea de 956,20 ha desde Punta de la Sal hasta el
actual dique del Puerto de Arinaga, correspondiente a una franja litoral entre la costa y
los 30 metros de profundidad, cuyos hbtats ms representativos son los bancos de
arena cubiertos permanentemente por agua marina poco profunda con numerosas
comunidades de invertebrados y peces. En ellas se desarrollan las comunidades de
sebadales (Cymodocea nodosa) caractersticas de las costas cananas.
En la siguiente imagen se muestran los LIC y ZEPA de la zona.

Memoria del plan elico

25

Dado la distancia a las ZEPA y LIC se solicita que:


La valoracin del parmetro B2 relativo a la distancia a las ZEPA y LIC, de la
frmula de clculo de la puntuacin del concurso, adquiera el valor de 5, ya que el
parque elico se encuentra a ms de 1.000 m de los lugares ZEPA y LIC cercanos.
B2 = 5

7.4.-

Sitios arqueolgicos o de inters histrico cercanos


7.4.1.-

Arqueologa

En la zona de ubicacin del parque elico, no se han detectado restos


arqueolgicos.
Las zonas arqueolgicas importantes cercanas son el Barranco de Balos y el
Barranco de Guayadeque, ambos situados a suficiente distancia como para asegurar
que no sern impactados por el presente proyecto.
En las inmediaciones se encuentran los La Montaa de los Vlez y Los
Concheros de Punta de la Monja que pasamos a describir a continuacin:
MONTAA DE LOS VLEZ
Coordenadas UTM: 459488,3086764
Alteraciones y grado de afeccin
- Cada de muros: Natural y antinatural extendido.
- Erosin-sedimentacin: Natural extendido.
Clasificacin del suelo: Rstico.
Calificacin del suelo: Proteccin especial.
Observaciones generales: Se trata de una estructura de piedra seca de la que no se
puede definir con exactitud su morfologa original, ya que se encuentra muy alterada
por reconstrucciones bastante recientes, aunque se puede considerar una tendencia
circular. En la actualidad se aprecian algunas piedras del muro exterior y del interior.
En las proximidades, cercana a la cima de la montaa, se localiza una serie de
amontonamientos informes de piedras, o alineacin de muros, de los que algunos
podran corresponder a restos de estructuras muy desmanteladas. Aunque no se
conoce con exactitud su funcionalidad, esta estructura se ha relacionado con una
construccin habitacional. El estado de conservacin es malo. Asimismo, el grado de
fragilidad es alto, pues se halla muy prxima a ncleos de poblacin y vas de
comunicacin.
CONCHEROS DE PUNTA DE LA MONJA
Coordenadas UTM: 462158,3083100
Tipologa
- Econmico: Un conchero
Ergologa: Abundantes restos de conchas de malacofauna y en menor proporcin
fragmentos cermicos y piezas de industria ltica.
Alteraciones y grado de afeccin
- Erosin-sedimentacin: Natural extendido.
Memoria del plan elico

26

- Otros estados: Amasado por desmontes de tierra y la apertura de una pista.


Clasificacin del suelo: Rstico.
Calificacin del suelo: Proteccin especial.
Observaciones generales: Adems de conchas y moluscos existen, aunque en
poqusima cuanta, fragmentos de cermica, piezas de industria ltica y algn resto
seo de fauna vertebrada terrestre. El estado de conservacin es muy malo.
La Montaa de los Vlez, el emplazamiento ms cercano de ambos, se
encuentran a una distancia de 565 m., suficiente para considerar que no sern afectados
por ninguna actuacin derivada del proyecto.

7.4.2.-

Etnografa

Para conocer los emplazamientos con inters etnogrfico de la zona se consult


la carta etnogrfica de Gran Canaria de la FEDAC. El inventario del patrimonio
etnogrfico inmueble de Gran Canaria, se inclua en sus inicios en un ambicioso proyecto
desarrollado por la Direccin General de Patrimonio Histrico del Gobierno de Canarias y
los Cabildos Insulares, y desarrollaba el inventario del patrimonio histrico-artstico, el
arqueolgico y el etnogrfico de la totalidad del Archipilago. La carta etnogrfica de
Gran Canaria, se incluye en dicho proyecto y es un inventario de bienes inmuebles de
inters etnogrfico, en el que cada elemento est localizado sobre una base cartogrfica.
Las zonas cercanas encontradas son:
CUARTERIAS DE LOS BETANCOR
DATOS GENERALES
Cdigo: 580
Actividad: AGRICULTURA
Grupo
/
tipo:
EXPLOTACIONES
SINGULARES / CUARTERIAS
Antigedad: SIGLO XX
Superficie: 0 m2
Uso actual: OTROS USOS
LOCALIZACIN
35118 ROSAS (LAS)
AGIMES
UTM: Cuadrante 28, X: 459700 Y: 3085075
Altitud: 43 m.
Toponimias: LAS ROSAS
Cartografa: 55-90-S-1983
Edificacin compuesta por tres edificios, la cuartera, el almacn y un cuarto de
aperos. Los tres edificios estn adosados uno a otro por uno de sus laterales y presentan
techumbre plana. Estas cuarteras eran ocupadas por los aparceros de tomates de la
zona.
Se encuentra en buen estado de conservacin aunque ha sufrido modificaciones
ya que ahora es utilizado como vivienda por una familia.

Memoria del plan elico

27

POZO DE LOS BETANCOR


DATOS GENERALES
Cdigo: 582
Actividad: HIDRAULICA
Grupo / tipo: EXTRACCION / POZOS
Antigedad: SIGLO XX
Superficie: 9 m2
Uso actual: ABANDONADO
LOCALIZACIN
35118 ROSAS (LAS)
AGIMES
UTM: Cuadrante 28, X:
3085125
Altitud: 43 m.
Toponimias: LAS ROSAS
Cartografa: 55-90-S-1983

459875

Y:

El pozo esta formado por tres cuerpos adosados realizados en piedra y encalado
posterior. El bien perteneci a la familia Betancor, antiguos aguatenientes y tomateros de
la zona.
El pozo se encuentra sellado y totalmente abandonado.
CUARTERIAS
DATOS GENERALES
Cdigo: 417
Actividad: AGRICULTURA
Grupo
/
tipo:
EXPLOTACIONES
SINGULARES / CUARTERIAS
Antigedad: SIGLO XX
Superficie: 120 m2
Uso actual: ABANDONADO
LOCALIZACIN
35118 BANDA DE AGUIMES
AGIMES
UTM: Cuadrante 28, X: 458625 Y: 3085425
Altitud: 61 m.
Toponimias: LOMO CUMPLIDO
Cartografa: 55-90-S
Cuartearas compuestas por dos edificios, uno trasero mas largo y otro delantero
formado por bloques. Presentan techo plano y estructura de sillera y piedra en buen
estado.
Se encuentra en buen estado a pesar del abandono. Presenta basura y
escombros en los alrededores y desconches en las paredes.

Memoria del plan elico

28

POZO
DATOS GENERALES
Cdigo: 428
Actividad: HIDRAULICA
Grupo / tipo: EXTRACCION / POZOS
Antigedad: SIGLO XX
Superficie: 0 m2
Uso actual: ORIGINARIO
LOCALIZACIN
35118 BANDA DE AGUIMES
AGIMES
UTM: Cuadrante 28, X: 458675
3085500
Altitud: 61 m.
Toponimias: LOMO CUMPLIDO
Cartografa: 55-90-S-1983

Y:

Edificacin con planta en forma de "L" con techumbre a dos aguas de planchas
metlicas en una parte y plana en otras. Presenta el brocal y la boca en uno de sus
laterales. El pozo perteneci a la familia Betancor.
PICONERA
DATOS GENERALES
Cdigo: 583
Actividad: INDUSTRIAS EXTRACTIVASRECOLECTORAS
Grupo / tipo: CANTERAS / PICON
Antigedad: SIGLO XIX
Superficie: 0 m2
Uso actual: OTROS USOS
LOCALIZACIN
35118 ROSAS (LAS)
AGIMES
UTM: Cuadrante 28, X: 459275 Y:
3083825
Altitud: 75 m.
Toponimias: MONTAA PRIETO
Cartografa: 55-85-N-1983
La piconera es utilizada como corral y como vertedero, pero es una prueba
testimonial de la existencia de canteras en la zona. Antigua piconera de "Las Monjas".
Perteneci a la iglesia y a las familias lvarez y Melin de Agimes. Se elabor para la
elaboracin de sillera.
En el diseo del parque se ha respetado dichas construcciones. El bien ms
cercano a los aerogeneradores es el Pozo (cdigo 428) que se encuentra a 487 metros.
Por todo esto se puede afirmar que el parque no afectar a ningn sitio de inters
etnogrfico.

Memoria del plan elico

29

No obstante, se le comunicar el comienzo de las obras al Servicio de Patrimonio


Histrico del Cabildo de Gran Canaria para que personal del servicio puedan personarse
en el lugar. Independientemente de la presencia de dichos tcnicos durante las obras, si
se detectaran algunos de estos restos se le comunicar de inmediato al citado Servicio.

7.5.-

Propuestas para la mejora del entorno del parque

Para mitigar o reducir las actuaciones de un proyecto sobre el medio fsico y


cultural se describen en el siguiente desarrollo las nueve medidas correctoras que se
realizan durante el periodo de funcionamiento del parque:
Medida Correctora n 1

Carcter: Se prohibir el trnsito de maquinaria y vehculos pesados fuera de las zonas


de los accesos.
Objetivo: Trata de prevenir y atenuar los daos sobre los procesos erosivos y la roca
desnuda.
Duracin y fase: Se aplicar durante la fase de instalacin y operacin.
Medida Correctora n 2

Carcter: Se impedir el vertido de sustancias contaminantes sobre el suelo, adoptando


todas las medidas preventivas y correctoras adecuadas.
Objetivo: Medida preventiva para impedir la contaminacin del suelo.
Duracin y fase: Se realizar mientras duran las obras de instalacin y mientras sea
necesario durante la fase operativa.
Medida Correctora n 3

Carcter: Se restituir la capa edfica del terreno utilizado como plataforma de montaje
de los aerogeneradores.
Objetivo: Minimizar el impacto sobre la edafologa de la zona.
Duracin y fase: Se realizar una vez acabada la fase de instalacin.
Medida Correctora n 4

Carcter: Se realizarn plantaciones con especies locales en la base de los


aerogeneradores y en los mrgenes de las vas de acceso al parque.
Objetivo: Mitigar los efectos sobre la cubierta vegetal y mejorar la cobertura vegetal de
la zona.
Duracin y fase: Se aplicar durante la fase de operacin.
Medida Correctora n 5

Carcter: Las plantas que se encuentren en los trazados de los accesos y las
plataformas de montaje sern transplantadas a las zonas previstas para la revegetacin.
Objetivo: Reducir a cero las plantas destruidas en la fase de construccin.
Duracin y fase: Se aplicar durante la fase de instalacin y operacin.

Memoria del plan elico

30

Medida Correctora n 6

Carcter: Evitar causar daos o molestias innecesarias a reptiles o aves, as como a su


hbitat, realizando un exhaustivo estudio del impacto realizado mediante un programa de
vigilancia ambiental.
Objetivo: Minimizar efectos sobre la fauna.
Duracin y fase: Se realizar tanto en fase de instalacin como en fase operativa.
Medida Correctora n 7

Carcter: El edificio de mando se mimetizarn visualmente con el entorno.


Objetivo: Integracin paisajstica de los elementos constructivos accesorios del parque
elico.

Duracin y fase: Se realizar durante la fase de instalacin.


Medida Correctora n 8

Carcter: Se emplear de manera preferente a empresas y mano de obra de mbito


local.

Objetivo: Maximizar el efecto positivo econmico sobre el rea en la que se pretende


actuar.

Duracin y fase: Se tratar de incluir en las fases de instalacin y operacin.


Medida Correctora n 9
Carcter: Se cumplir escrupulosamente con lo dispuesto en Ley 1/1999, de 29 de
enero, de Residuos de Canarias, contratando a los gestores autorizados de residuos que
sean necesarios.
Objetivo: Minimizar la afeccin medioambiental del parque.
Duracin y fase: Se aplicar en las fases de instalacin, operacin y desmantelamiento.
Las medidas correctoras arriba enumeradas son las mnimas a realizar. El
parque, segn la Ley 11/1990 de 13 de Julio de prevencin del Impacto Ecolgico, el
Real Decreto Legislativo 1302/1986 de 28 de junio, de Evaluacin de Impacto Ambiental
y la Ley 8/2001, de 8 de Mayo, de modificacin del RD Legislativo 1302/1986, deber
realizar un estudio de Impacto Ambiental para su tramitacin administrativa. Ser en este
estudio de Impacto Ambiental cuando se definan con precisin estas y otras medidas
correctoras de aplicacin.

7.5.1.DOTACIN FINANCIERA DE LAS MEDIDAS


CORRECTORAS
El presupuesto de las medidas correctoras n 3,4,6 y 9 se cifra en 56.000 tal
como queda expresado en el presupuesto en la partida correspondiente a restitucin
medioambiental.
Las medidas 5 y 7 estn asumidas como criterios de diseo de la instalacin y su
presupuesto estn recogidas por lo tanto en el presupuesto de ejecucin de la
instalacin.

Memoria del plan elico

31

As mismo las medidas correctoras 1, 2 8 y 9 no tendrn repercusin econmica


al implicar pautas de comportamiento y no acciones con un desembolso econmico
especifico.

7.6.-

Plan de desmantelamiento del parque

Si el presente proyecto obtiene concesin de potencia, se desarrollar, al terminar


con la vida til de la instalacin, un plan de desmantelamiento del parque que contenga
al menos las siguientes acciones:
1.)
2.)

Desconexin de la red.
Extraccin del cableado de la torre, los armarios de control y de potencia, el
transformador, el poste de distribucin, etc.
3.) Desmontaje del buje del rotor, incluidas las palas.
4.) Extraccin del generador en anilla.
5.) Desmontaje de la carcasa del equipo.
6.) Desmontaje de la torre (el procedimiento depender del tipo de torre).
7.) Desmontaje de la cimentacin.
8.) Tratamiento de las mquinas y las zapatas.
9.) Medidas de restitucin del medio ambiente.
10.) Medidas de restitucin de la topologa del emplazamiento.
11.) Varios.
1) Desconexin de la red
Antes de comenzar con los trabajos de desmontaje propiamente dichos, se debe
desconectar los aerogeneradores de la interfaz ms prxima de la red elctrica.
2) Desmontaje del cableado de la torre, los armarios de control y de
potencia, el transformador, el poste de distribucin, etc.
Se debe proceder a desmontar todos los componentes tcnicos de la torre, como
el cableado, el transformador, el poste de distribucin, el ascensor y los armarios de
control y de potencia. Si no est prevista la reutilizacin de los componentes, casi todas
las piezas del aerogenerador (cobre, acero, componentes fundidos) se pueden reciclar
por completo.
El desmontaje de la cabeza del aerogenerador (palas del rotor, buje, generador,
carcasa) transcurre en el orden inverso al proceso de montaje del aerogenerador; para
ello, se necesitan los mismos dispositivos de gra y el mismo nmero de montadores.

3) Desmontaje del buje del rotor, incluidas las palas.

El buje junto con las palas del motor se separan del soporte
principal con la ayuda de una gra. Durante esta fase, el buje del
rotor se gira en el aire desde la posicin vertical a la horizontal. Las
palas del rotor se desmontan en el suelo.

Memoria del plan elico

32

4) Desmontaje del generador en anilla


El generador en anilla se desarma de la carcasa y se extrae con ayuda de la
gra. Una vez en el suelo, se separan los componentes del generador y se disponen
para su reciclaje.
5) Desmontaje de la carcasa del equipo
La gra sostiene la carcasa del equipo y entonces se separa de las bridas
superiores de la torre. El desmontaje completo de los componentes de la carcasa del
equipo se realiza en el suelo.
6) Desmontaje de la torre
Se aflojan los tornillos de las bridas para que se pueda proceder al desmontaje de
la torre por partes. Durante este proceso, la torre no suele sufrir daos, e incluso se
puede llegar a usar de nuevo. Si resulta imposible su reutilizacin, el acero de la torre
puede reciclarse por completo.
7) Desmontaje de la cimentacin
Los cimientos se pueden explosionar o se
pueden desarmar con la ayuda de herramientas
hidrulicas. Durante dicho proceso, se separan las
partes de acero y de hormign, con lo que se posibilita
una nueva utilizacin de estos componentes.
Las cimentaciones en superficie se desarman
totalmente. Para las cimentaciones profundas
(cimentaciones sobre pilotes), los pilotes se quedan
bajo tierra pues normalmente no se pueden extraer por
cuestiones tcnicas del suelo. Las cabezas de los pilotes se desmontan 2-3 m por debajo
de la superficie del suelo para permitir por ejemplo, la explotacin agrcola del terreno.
8) Tratamiento de las mquinas y las zapatas.
Los aerogeneradores una vez se desmantelen sern considerados residuos y se
gestionarn mediante gestor autorizado. Si al producirse el desmantelamiento del parque
los aerogeneradores fueran an operativos, el promotor se plantea la posibilidad de
donarlos a alguna institucin de colaboracin con los pases en vas de desarrollo
africanos para su instalacin en dichos pases.
9) Medidas de restitucin del medio ambiente.
Medidas para restituir la capa edfica; la restitucin de la capa edfica, dado que
actualmente el uso de la parcela es agrcola, es probable que tras el desmantelamiento
del parque se le de ese uso a los terrenos recuperados. En el caso de que la actividad
agrcola no se este desarrollando en el momento del desmantelamiento se revegetar la
zona con especies de la zona.

Memoria del plan elico

33

10) Medidas de restitucin de la topologa del emplazamiento.


Se establecern medidas de relleno encaminadas a restituir las superficies
correspondientes a las aberturas dejadas por las bases de los aerogeneradores y la
retirada del cableado elctrico. Las medidas definirn tipo de materiales, proveniencia y
disposicin. Los materiales de relleno utilizados sern a ser posible de la propia parcela
o similares a estos.
De la misma manera, se emprendern medidas para la restitucin de la pendiente
natural haciendo mencin a los mtodos que se van a utilizar en la ejecucin, con que
materiales y otras caractersticas. Tambin se establecern medidas contra la erosin.
11) Varios.
Llegado el fin de la vida til del parque o de su licencia administrativa, se revisar,
ampliar y presentar a la autoridad competente la versin definitiva del plan de
restitucin del parque comprometindose a la aplicacin integra de dicho plan, siempre
que la autoridad competente lo autorice. Dicho plan llevar adjunto una valoracin
econmica de las medidas que se pretenden acometer en el plan a fin de evaluar el
coste de las medidas de restitucin. Dicha valoracin econmica, tras ser consensuada
entre la propiedad y la autoridad competente, ser asumida por el promotor.

7.7.-

CLASIFICACIN TERRITORIAL

Los terrenos en los que se ubica el parque se encuentran en las zonas elicas
insulares definidas en PIO de GC. En la siguiente imagen se muestra la zona de
implantacin del parque elico en la citada planificacin.

Memoria del plan elico

34

Dado el tipo de terreno se solicita que:


La valoracin del parmetro B3 relativo a la clasificacin territorial, de la frmula
de clculo de la puntuacin del concurso, adquiera el valor de 5, ya que el parque elico
se encuentra en terreno de proteccin elica.
B3 = 5

Memoria del plan elico

35

ANEXO 2:
Caractersticas tcnicas del aerogenerador
Enercon E-70 2.300 kW.

ANEXOS

ANEXO 3:

Certificado de la curva de potencia del


aerogenerador Enercon E-70 2.300 kW.

ANEXOS

ANEXO 4:
Certificado tarado de las protecciones y
Comportamiento frente a huecos de
tensin
del aerogenerador Enercon E-70 2.300
kW.

ANEXOS

ANEXO 5 :

Certificado de vida til del


aerogenerador Enercon E-70 2.300
kW

ANEXOS

ANEXO 6 :

Descripcin de los sistemas de


telecontrol.

ANEXOS

Curva de potencia E-70


(dependiente de la densidad del aire)
dens. d. aire standard = 1,225 kg/m
Curva de potencia P Coef. de potencia cp
= 1,225 kg/m
= 1,225 kg/m
[kW]
[-]
0,0
0,00
2,0
0,10
18,0
0,27
56,0
0,36
127,0
0,42
240,0
0,46
400,0
0,48
626,0
0,50
892,0
0,50
1.223,0
0,50
1.590,0
0,49
1.900,0
0,45
2.080,0
0,39
2.230,0
0,34
2.300,0
0,28
2.310,0
0,23
2.310,0
0,19
2.310,0
0,16
2.310,0
0,14
2.310,0
0,12
2.310,0
0,10
2.310,0
0,09
2.310,0
0,08
2.310,0
0,07
2.310,0
0,06

viento
[m/s]
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

dens. d. aire modificada = 1,225 kg/m


Curva de potencia P Coef. de potencia cp
= 1,225 kg/m
= 1,225 kg/m
[kW]
[-]
0,0
0,00
2,0
0,10
18,0
0,27
56,0
0,36
127,0
0,42
240,0
0,46
400,0
0,48
626,0
0,50
892,0
0,50
1.223,0
0,50
1.590,0
0,49
1.900,0
0,45
2.080,0
0,39
2.230,0
0,34
2.300,0
0,28
2.310,0
0,23
2.310,0
0,19
2.310,0
0,16
2.310,0
0,14
2.310,0
0,12
2.310,0
0,10
2.310,0
0,09
2.310,0
0,08
2.310,0
0,07
2.310,0
0,06

Curvas E-70 con densidad del aire standard


2.400
2.200

Potencia P [kW]

2.000
1.800

0,40

1.600
1.400

0,30

1.200
1.000

0,20

800
600

0,10

400

Coeficiente de potencia cp [ - ]

0,50

200
0

0,00
0

10

15

20

25

Velocidad del viento v en altura de buje [m/s]


Curva de potencia P = 1,225 kg/m

Curva de potencia P = 1,225 kg/m

Coef. de potencia cp = 1,225 kg/m

Coef. de potencia cp = 1,225 kg/m

Curva de Potencia E70 2,3 MW calculada Rev 1_2

Rev.: 1.2

Impresin: 16.07.2007

ENERCON
Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

Curva de potencia de los


aerogeneradores ENERCON

pgina
1 de 6

En los tlimos aos y gracias a la amplia experiencia adquirida con miles de


aerogeneradores repartidos por diversos puntos del mundo, se ha demostrado que los
estndares vigentes (en la actualidad IEC 61400-12 y Measnet) en cuanto a la medida de la
curva de potencia de los aerogeneradores son deficientes en su propsito de medir,
certificar y verificar dicha curva de potencia.
Esto se debe entre otros motivos a que los estndares vigentes no han considerado o no
son claros en lo referente a los siguientes aspectos:
1. Cada tipo de anemmetro recoge diferentes datos de velocidad de viento, dando
como resultado distintas curvas de potencia. Los documentos incluidos a
continuacin muestran los resultados de las mediciones llevadas a cabo durante un
mismo intervalo de tiempo y en el mismo aerogenerador E-40/6.44 pero utilizando
anemmetros diferentes. Con las mediciones del anemmetro Thies se alcanza un valor
mximo Cp de 0,47 mientras que con las del anemmetro Vector la cifra alcanza una
mxima de 0,57 (certificados originales disponibles)

Cp mx. = 0,47
AnemmetroThies

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

Noviembre 2002

ENERCON
Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

Curva de potencia de los


aerogeneradores ENERCON

pgina
2 de 6

Cp mx. = 0,57
Anemmetro
Vector

Al calcular la produccin de energa con cada una de las curvas de potencia resultantes
se observa una diferencia de produccin de energa de entre un 4,5% y un 9% mayor
con la curva Vector (segn la velocidad anual de viento en el emplazamiento concreto)
a pesar de tratarse del mismo aerogenerador.
Esto constata la necesidad de tener en cuenta el tipo de anemmetro usado al comparar
las curvas de potencia o al predecir rendimientos energticos por medio de medidas de
viento. Los estndares han sido modificados recientemente y ahora aceptan slo el
anemmetro Vector/Riso. Sin embargo en el mercado an se encuentran curvas de
potencia medidas con todo tipo de anemmetros (atenindose a los estndares
anteriores).

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

Noviembre 2002

ENERCON

Curva de potencia de los


aerogeneradores ENERCON

Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

pgina
3 de 6

2. La curva del aerogenerador est directamente relacionada con las turbulencias del
emplazamiento concreto. El grfico de la medicin llevada a cabo con el
aerogenerador ENERCON E-30 lo ilustra claramente (DEWI, 1996 certificados
originales disponibles)
Las mediciones se tomaron durante el mismo intervalo de tiempo, en la misma turbina y
con el mismo tipo de anemmetro. Los datos de la medicin se corresponden con las
dos siguientes clases de turbulencias: 10% < ti < 14% and ti > 14%.

*3)

*2)

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

Noviembre 2002

ENERCON
Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

pgina
4 de 6

Curva de potencia de los


aerogeneradores ENERCON

Al calcular la produccin de energa con cada una de las curvas de potencia, se observa
una diferencia en la produccin de energa de un 2% (segn la velocidad anual de viento
en el emplazamiento concreto) tratndose del mismo aerogenerador.
Lo mismo sucede con el E-66/18.70 (DEWI, 2001). Seguimos hablando del mismo
espacio de tiempo, mismo aerogenerador y mismo anemmetro para turbulencias por
encima y por debajo del 10,8% (documentos originales DEWI disponibles).

ENERCON E-66 / 18.70


Evaluation of power curve measurement for one and the same turbine and
the same measurement period but two different turbulence classes
< 10,8% und > 10,8% (DEWI, August 2001)

0,5

2000
1800

0,4

Power output [kW]

1600
1400

0,3 Cp

1200

0,2

1000
800

P1 (Turbulence class0,1
< 10,8%)

600

P2 (Turbulence class0> 10,8%)

400

cp1 (Turbulence class < 10,8%)

-0,1

200

cp2 (Turbulence class > 10,8%)

-0,2

0
0 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
wind speed hub height [m/s]

De nuevo se observa que al calcular la produccin de energa con ambas curvas de


potencia, la produccin de energa vara en torno al 5% (segn la velocidad anual de
viento en el emplazamiento concreto) y sigue tratndose del mismo aerogenerador.
Los estndares vigentes no se ocupan de la relacin entre las curvas de potencia y la
intensidad de las turbulencias. Tampoco consideran las rfagas de viento que varan
segn el emplazamiento.
Lo ideal sera medir la familia de curvas de potencia y certificarla, definiendo una curva
para cada tipo de turbulencia y rfaga de viento.

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

Noviembre 2002

ENERCON
Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

Curva de potencia de los


aerogeneradores ENERCON

pgina
5 de 6

3. Las medidas de las curvas de potencia, suelen alcanzar mximos en torno a los
20m/s (con medias de 10 min.), ya que es casi imposible encontrar emplazamientos en
los que se superen los 25 m/s en medias de 10 min. Adems, la velocidad de viento de
corte de algunos aerogeneradores est muy por debajo de los 25 m/s y se produce una
gran histresis hasta conectar nuevamente. Sin embargo, los estndares vigentes no lo
tienen en consideracin y permiten incluir en los certificados una curva que aumenta de
forma lineal hasta los 25 m/s en los clculos de produccin de energa. Pero la realidad
es distinta. Normalmente los aerogeneradores cuentan con un procedimeitno de parada
que corta las curvas de potencia mucho antes (este aspecto se explica de forma ms
detallada en las descripciones del sistema de control ENERCON). Como resultado, los
clculos elaborados con esta curva de potencia sobreestiman la realidad. sto no
sucede con el sistema de control ENERCON.

Esto significa que las curvas de potencia de un mismo modelo de aerogenerador


medidas en distintos emplazamientos con diferentes equipos de medicin sern, sin
duda, distintas y que se debe por tanto tener especial cuidado al comparar curvas de
potencia de diferentes modelos de aerogeneradores.
Teniendo todo lo anterior presente y consciente del proceso de homologacin de los
estndares, ENERCON ofrece una garanta de produccin de acuerdo al siguiente
procedimiento:

Curva de potencia de los aerogeneradores ENERCON


El factor econmico decisivo de un parque elico, aparte del viento en el emplazamiento, no
radica en el cumplimiento al detalle de la curva de potencia certificada sino en la cifra de
produccin anual real de energa calculada con dicha curva de potencia. Por tanto se ha de
disponer de una curva de potencia fiable con la que calcular la produccin y de una garanta
de produccin del parque al utilizar dicha curva de potencia.

La curva de potencia de los aerogeneradores ENERCON se define en base a:

Las mediciones de curvas de potencia para el modelo de aerogenerador en cuestin


medidas por organismos oficiales y documentadas con sus respectivos certificados o en
base a
Clculos y experiencia con otros modelos en caso de que an no se hayan comenzado
o finalizado las mediciones.

Una intensidad de turbulencias media del 12%

Una densidad estndard del aire de 1,225 kg/m3

Supuestos realistas del comportamiento del anemmetro.

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

Noviembre 2002

ENERCON

Curva de potencia de los


aerogeneradores ENERCON

Spain
Av. Juan de la Cierva, 27 Parc
Tecnolgic - 46980 PATERNA
(Valencia), Spain
Tel.:+34 961 366 290
Fax:+34 96 136 78 75

pgina
6 de 6

Operacin del aerogenerador por medio del sistema de control patentado por
ENERCON que permite un funcionamiento del aerogenerador sin corte por fuertes
vientos. En consecuencia, la prolongacin de la curva de potencia ENERCON a 25 m/s
est justificada, ya que sus aerogeneradores operan a plena potencia alcanzando los 25
m/s (medidas de 10 min). Vase la documentacin relacionada con el sistema de control
ENERCON.

Partiendo de esta base, se pueden garantizar al 100% las curvas de potencia y por
tanto su utilizacin en el clculo de la produccin de energa. Es decir, todo clculo
de produccin de energa realizado con dichas curvas de potencia est a su vez 100%
garantizado (siempre en relacin directa con la velocidad de viento en el
emplazamiento concreto)
Adems, el sistema de control ENERCON dar producciones extra en emplazamientos con
medias anuales de velocidad de viento muy altas, donde se alcanzan velocidades que
superan los 25 m/s:

Produccin extra en
Meida anual de viento en la porcentaje de produccin
altura de buje
anual calculada con la
curva de potencia
garantizada
8 m/s
9 m/s
10 m/s
11 m/s

Version 1.0
Traduccin ingls-espaol de Ainhoa Robles ref. T03-022

1%
1,5 %
2%
2,5 %

Noviembre 2002

ENERCON
GmbH

ENERCON Storm control

Dreekamp 5 Tel.: 04941 / 927 - 0


26605 Aurich Fax: 04941 / 927 -109

page
1 of 3

Los aerogeneradores ENERCON pueden operar bajo el llamado modo de control de rfagas de
viento, que permite el funcionamiento de la turbina en condiciones de mucho viento sin que tengan
lugar procedimientos de parada y arranque, que provocan normalmente una prdida considerable
de produccin energtica.
1. Funcionamiento normal
De forma esquemtica, la curva de potencia de un aerogenerador muestra la siguiente tendencia:

Potencia
Pr

Velocidad de viento
v1

v2

v4

v3

En v1, conocida como velocidad de inicio, el aerogenerador comienza a girar y genera energa
conforme a la curva de potencia normal. La forma de la curva entre v1 y v2 depende en gran medida
de la intensidad de turbulencia (consulte la descripcin de curvas de potencia facilitada en
documento correspondiente). A partir de v2 (punto todava muy vinculado a la intensidad de
turbulencia), el aerogenerador funciona con una potencia nominal.
Durante el funcionamiento normal, existe lo que se llama la velocidad de parada v3 con la que la
turbina se detendra siguiendo un proceso similar al siguiente:
-

La turbina se detiene cuando se sobrepasa una determinada velocidad media mxima del
viento. Para los aerogeneradores ENERCON con el modo de control de rfagas de viento
desactivado, sta es de 25 m/s en un promedio de 20 segundos. Su funcionamiento no se
iniciar de nuevo hasta que la velocidad media real del viento sea inferior a la de parada o
incluso ms baja que la velocidad de reactivacin" del viento v4 (histresis de altos vientos).
Cuando se producen vientos racheados, se tarda cierto tiempo hasta que la velocidad media del
viento descienda por debajo de ese nivel. Por tanto, se desperdicia una gran cantidad de
energa con la turbina parada.

La turbina tambin se detiene si la velocidad momentnea de las rfagas de viento (p. ej.
durante 3 segundos) supera un nivel mximo y no se vuelve a activar hasta que la velocidad del
viento se reduce por debajo de un valor inferior.

Con todos los tiempos de espera, inicio y parada, se pierde mucha energa. Por tanto, hay que tener
en cuenta que se produce una prdida considerable de energa en cierto nmero de casos en los
que la velocidad media del viento es alta. Este hecho no se refleja en el clculo de produccin de
energa en el que se emplea una curva de potencia ampliada de hasta 25 m/s, ya que no es
representativa del del funcionamiento normal real de la turbina.
Versin 2.0

Marzo 2003

ENERCON
GmbH

ENERCON Storm control

Dreekamp 5 Tel.: 04941 / 927 - 0


26605 Aurich Fax: 04941 / 927 -109

page
2 of 3

El motivo son las rfagas de viento: con una velocidad media del viento de 25 m/s durante 10 min,
suele haber muchos casos de perodos de 20 segundos con una velocidad media de 25 m/s o
tambin puede haber rfagas de viento cuya velocidad sea superior a la de parada, con lo que la
turbina se detiene bastantes veces. Esto tambin puede pasar con medias de 24, 23 e incluso de 20
m/s.
El proceso completo de detencin y arranque suele tardar varios minutos, durante los cuales no se
genera energa. El resultado puede ser una prdida del 1 % de la produccin energtica anual en un
solo da de tormenta. As es como ocurre en la prctica. Hasta ahora un aerogenerador funcionando
en condiciones ideales a potencia nominal sin parar ante una velocidad media de 25 m/s era slo
teora.
Esta prdida de produccin energtica provocada por velocidad alta de viento ha sido una de las
razones por las que ENERCON ha desarrollado y patentado lo que se conoce como el modo
operativo de control de rfagas de viento.
2. Control de rfagas de viento ENERCON
Los aerogeneradores ENERCON se rigen por una filosofa distinta cuando se registran vientos
fuertes. Las turbinas vienen provistas del llamado software de regulacin de control de rfagas
que evita las paradas en condiciones de vientos fuertes.
En vez de funcionar a partir de ciertos parmetros de parada como los mencionados anteriormente,
cuando se producen fuertes vientos, las palas giran su posicin en cierta medida para reducir la
velocidad rotativa y, por consiguiente, la salida de potencia del equipo sin que ste tenga que
detenerse por completo. Cuando amainan las rfagas, las palas vuelven a su posicin anterior y la
turbina retoma la velocidad mxima inmediatamente sin que se haya originado un proceso de
parada-arranque, con la prdida de tiempo que ello implica.
De forma esquemtica, las curvas de potencia para los aerogeneradores ENERCON, con el modo
de control de rfagas de viento activado, muestran las siguientes caractersticas:
Potencia

Pr

v1

v2

Vrfagas

v0

Velocidad
viento

A partir de una cierta velocidad media del viento (vrfagas), la produccin de energa va disminuyendo
poco a poco hasta llegar a cero (en v0) sin llegar a detenerse. La velocidad de rotacin mnima es
de unas 6 rpm. y no hay desconexin de la red. Durante las rfagas de viento, la potencia de la
Versin 2.0

Marzo 2003

ENERCON
GmbH

ENERCON Storm control

Dreekamp 5 Tel.: 04941 / 927 - 0


26605 Aurich Fax: 04941 / 927 -109

page
3 of 3

turbina se mueve por la curva hacia un lado y otro, sin paradas y retoma la potencia nominal en
cuanto el viento lo permite.
Con el sistema de control de rfagas de viento patentado por ENERCON, la potencia se reduce
cuando los vientos oscilan entre 28 y 34 m/s. De esta manera la turbina puede funcionar, en la
mayora de los casos, con una potencia nominal de hasta 25 m/s (para promedios de 10 minutos).
En este modo, no es necesario realizar una deduccin por histresis de vientos fuertes cuando se
calcula la produccin energtica con la curva de potencia ampliada de hasta 25 m/s.

Adems, el sistema de control de rfagas de viento ENERCON permite una produccin superior en
aquellos emplazamientos con velocidades medias anuales muy altas y cuya distribucin del viento
presente algunas horas con vientos por encima de los 25 m/s:

velocidad media anual del


viento a altura de buje

8 m/s
9 m/s
10 m/s
11 m/s

produccin adicional como


porcentaje de la
produccin anual calculada
con la curva de potencia
garantizada
1%
1,5 %
2%
2,5 %

La evaluacin del diseo de los aerogeneradores ENERCON incluye los espectros de carga para
este modo de control de rfagas de viento. Dado que no hay procesos de parada y arranque
frecuentes, ni procesos de frenado, con condiciones de viento fuerte acompaado de picos de
carga, la carga de la turbina resulta ms moderada.

Versin 2.0

Marzo 2003

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE

TYPE:

ENERCON

VERSION:

E-70 E4

C O N FI GU R AT I O N : T, T R AN S M I S S I ON S T AN D AR D

1. I N T R OD U C T I O N
All data refer to the reference point showing in section 10.

2. R AT E D D AT A
Rated Apparent Power: Sr =

2.3 MVA

Rated Voltage:

Ur =

400 V

Ir =

3320 A

Max. Apparent Power:

Smax = 2.5 MVA

Rated Current at Pr:

Rated Active Power:

Pr =

Max. Short Circuit Current: ISC = 4500 A

Rated Frequency:

fr =

2.3 MW
50 / 60 Hz

Power Factor adjustable


Default value:

cos () = 1.0

3. L I M I T -R AT I N G P O W E R C U R V E
1,10

1,00

0,90

0,80

Active Power [pu]

0,70

0,60

0,50

0,40

0,30

0,20

0,10

0,00

-0,6
0,6

-0,5
0,5

-0,4
0,4

-0,3
0,3

-0,2
0,2

-0,1
0,1

0,0
0

0,1
0,1

0,2
0,2

0,3
0,3

0,4
0,4

0,5
0,5

0,6
0,6

Reactive power [pu]

overexcited*

underexcited*

* standard IEC 60034-3

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 1 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE
4. P OW E R V O LT AG E D I AG R AM

Temporary Maximum Value:

Umax,temp

= 120 %

480 V

Maximum Value*:

Umax

= 110 %

440 V

Rated Value:

Ur

= 100 %

400 V

Minimum Value*:

Umin

= 90 %

360 V

Temporary Minimum Value:

Umin,temp

= 80 %

320 V

Smax

0
Umin,temp

Umin

Ur

Umax Umax,temp U

In the hatched areas a continuous operation for more than 60 seconds can not be assured
due to stress of electronic components and devices (internal WEC protection).
If the voltage is between minimum value and temporary minimum value, see also section 8.
* continuous

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 2 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE
5. V O LT AG E P R OT E C T I ON
Overvoltage protection (for each phase)
uop= 100 . 120 % of rated value Ur / 3

Overvoltage protection setting data:


Step width:

1V

Reaction time: Time delay for overvoltage detection:


Step width:

0.05 s trop 2 s

0.01 s

Udo1 = 145% Ur

Overvoltage disconnection point*:

Reaction time: Time delay for overvoltage detection 1: Tdo1 5 ms


Overvoltage disconnection point*:

Udo2 = Umax,temp = 120% Ur

Reaction time: Time delay for overvoltage detection 2: Tdo2 = 5 half periods

(50 Hz : 50 ms)
(60 Hz : 41,6 ms)

Switch-off time for power circuit breaker:

Tpcb 40 ms

Tripping time overvoltage protection:


Tripping time overvoltage disconnection 1:
Tripping time overvoltage disconnection 2:

top = trop + Tpcb


Tdop1 = Tdo1 + Tpcb < 50 ms
Tdop2 = Tdo2 + Tpcb < 100 ms

* If the voltage rises above Udo1 or Udo2 within a time less than trop the WEC opens power circuit
breakers, but stays in operation. If the voltage returns between Umin,temp and Umax the WEC
resynchronises and reconnects instantaneously (within 400 ms).
1,70
1,65

Tdo1

1,60
1,55
1,50

Udo1= 1,45
1,40

Tdo2

(50 Hz)

Tdo2

(60 Hz)

Physical voltage limit


of the WEC

U/Ur 1,35
1,30
1,25

Udo2= 1,20
1,15
1,10

t op

1,05

u op

1,00
1

10

100

1000

10000

time [ms]

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 3 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE

Undervoltage protection (for each phase)


Uup = 80 % of rated value Ur / 3

Undervoltage protection setpoint:

Reaction time: Time delay for undervoltage detection: trup : 0.5 s U 5 s


Step width:

0.01 s

Undervoltage disconnection point*:

Udu = 15% Ur

Reaction time: Time delay for undervoltage detection: Tdu = 10 half periods

(50 Hz : 100 ms)


(60 Hz : 83 ms)

Switch-off time for power circuit breaker:

Tpcb 40 ms

Tripping time undervoltage protection:

tup = trup + Tpcb

Tripping time undervoltage disconnection:

Tup = Tdu + Tpcb 150ms

* If the voltage decreases under Udu the WEC opens circuit breakers, but stays in operation. If the
voltage returns between Umin,temp and Umax, the WEC resynchronises and reconnects
instantaneously (within 400 ms).

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 4 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE
6. P OW E R F R E Q U E N C Y D I AG R AM
Grid with 50 Hz

Grid with 60 Hz

Maximum Frequency:

fmax = 57 Hz

fmax = 67 Hz

Rated Frequency:

fr =

fr =

60 Hz

Minimum Frequency:

fmin = 43 Hz

fmin =

53 Hz

50 Hz

Smax

fmin

fr

fmax

7. F R E Q U E N C Y P R OT E C T I ON
Overfrequency protection
Setting data:

50 57 Hz / 60 67 Hz

Underfrequency protection
Setting data:
Step width:

0.1 Hz

Time delay:

200 ms

43 50 Hz / 53 60 Hz

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 5 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE

8. S H OR T C I R C U I T P E R F O R M AN C E
Undervoltage protection setpoint:

Uup = Umin,temp = 80% Ur

Voltage protection time delay:

t = tup 5 sec

Undervoltage disconnection point:

Udu = 15% Ur

Overvoltage disconnection point:

Udo2 = Umax,temp = 120% Ur

U
Umax,temp
Ur
Umin
Umin,temp

Udu
0
0
beginning of fault

T+ 1min

The WEC stays connected, if the voltage at the WEC terminals during or after the fault
remains within the grey area.
In the hatched areas the WEC opens power circuit breakers, but stays in operation. If the
voltage returns between Umin,temp and Umax,temp the WEC resynchronises and reconnects
instantaneously (within 400 ms).
Outside of the marked areas the WEC switches off.
If the WEC output power is less than 2.5% Pr the WEC switches off.
The voltage at the PCC has to be monitored by a wind farm protection relay. The characteristics of the voltage at the PCC at a fault leading to tripping of the wind farm, might be
very different from those at the clamps of the WEC. However, the settings of the voltage
protection of the WEC and the settings of the wind farm protection relay must be coordinated.
Short circuits in grids sensitive to stability can lead to stability loss. This may cause
ENERCON WECs to switch off. If the grid is sensitive to stability, ENERCON recommends
performing a stability analysis in the process of wind farm planning.
Short Circuit Current in all three phases (even in cases with unsymmetrical faults), if
all three phases of the voltage during the faults remain Udo2 > U > Udu:
1. Ik,max : 4500 A (Maximum Initial Symmetrical Short Circuit Current)
2. iP max : 6364 A (Maximum Peak Short Circuit Current)
3. Ib,max : 4500 A (Maximum Short Circuit Breaking Current)
4. Ik,max : 4500 A (Maximum Steady State Short Circuit Current)
For further details and explanations concerning the short circuit currents please see the
document Steady State Short Circuit Calculations (available on request).
prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 6 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE
9. P OW E R R AM P

Ramp-up
Normal start power gradient
maximum value:
dP/dt start,max =
minimum value:
dP/dt start,min =
default setting value:
dP/dt start =

180
3
40

kW/s
kW/s
kW/s

Power gradient after loss of voltage:


maximum value:
dP/dt,power, max =
minimum value:
dP/dt power, min =
default setting value:
dP/dt power =

40
3
3

kW/s
kW/s
kW/s

Operating power gradient:


maximum value:
minimum value:
nromal value:

400
5
120

kW/s
kW/s
kW/s

dP/dt oper,max =
dP/dt oper,min =
dP/dt oper,normal =

Ramp-down
Normal operation: The ramp-down rate depends on wind.
Intervention of grid operator: The power output is adjustable
ENERCON Storm Power Curve: For wind speeds higher than a defined limit the power is
decreased depending on the wind speed without stopping the turbine.

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 7 of 8

ENERCON
Wind Energy Converter
DATA SHEET: GRID PERFORMANCE
10. R E FE R E N C E P OI N T

location

wiring symbol

designation

synchronous generator

GS
nacelle
3

WEC Configuration

excitation controller

rectifier

tower

tower cable

chopper 1-9

power cabinet 1-9


(consist of dc link,
inverter, output filter)

tower
basement

Project Configuration

fused loadbreak switch


or power circuit breaker

reference
point
reference point

inside or
outdoor at
tower
basement

transformer

disconnecting switch

prepared by:

DBra

2004-05-10

revision:

1.3

approved:

MBA

2005-04-25

revision date:

05-09-23

Data Sheet E-70 E4_22-2005-09-23-70-23-71-T_rev1.3.doc

page: 8 of 8

Comment to requirements in Spain to provide a


certificate for WECs to meet PO 12.3 requirements

Page
1 of 2

Respecto al tema de "certificados" para pasar


huecos de tensin es importante saber, que
en el PO12.3 dice: "Segundo. Al objeto de
verificar el cumplimiento de los requisitos
especificados en este procedimiento de
operacin, se desarrollar un sistema de
certificacin de acuerdo con lo previsto en el
Real Decreto 2200/1995, ..."

Regarding the issue of a "certificate" for passing voltage dips it is important to know, that in
the PO12.3 it says: "Second. - To the object to
verify the performance of the requirements
specified in this procedure of operation, a system of certification will be developed in
agreement with the anticipated thing in Real
Decree 2200/1995... "

Desgraciadamente
este
"sistema
de
certificacin", que el sector elico desarroll
con apoyo de REE y otras institucines, est
pendiente de su aprobacin. El documento
"PROCEDIMIENTO DE VERIFICACION,
VALIDACION Y CERTI-FICACION DE LOS
REQUISITOS DEL PO 12.3 SOBRE LA
RESPUESTA DE LAS INSTALA-CIONES
ELICAS ANTE HUECOS DE TENSIN"
(=PVVC) est hecho hace meses, pero falta
que las instituciones responsables lo
aprueben. Antes de que este PVVC est en
vigor, es imposible para cualquiere fabricante
de
aero-generadores
(o
institucion
certificadora) de presentar un certificado, tal
como lo indica el PO12.3.

Unfortunately this "system of certification", that


the wind sector developed with support of REE
and others institutions, is pending of its approval. The document " PROCEDURE FOR
VERIFICATION VALIDATION AND CERTIFICATION OF THE REQUIREMENTS OF THE
PO 12.3 ON THE RESPONSE OF WIND
FARMS IN THE EVENT OF VOLTAGE DIPS"
(= PVVC) in finished since month, but the approval of the responsible institutions is missing.
Before this PVVC is in force, it is impossible for
any manufacturer of wind energy converters (or
certifying institution) to present a certificate, as
the PO 12.3 indicates it.

El PO12.3 se refiere al punto de conexin de


la instalacin elica en general, mientras el
fabricante al principio puede confirmar solo
un cierto comportamiento del aerogenerador
individual en sus bornes. El comportamiento
elctrico en el punto de conexin del parque
puede depender de la configuracin
especifica del proyecto. La posible diferencia
en el compor-tamiento del aerogenerador
individual y del parque total en el nudo de
conexin es tema clave del PVVC. All esta
definido exactamente bajo cuales condiciones
se admite asumir, que cuando el
aerogenerador
individual
cumple
los
requisitos del PO 12.3, tambien el parque
entero las cumple. Debido adems, que sin
la clarificacin tcnica del PVVC algunas
expresiones en el PO 12.3 son ambiguos, un
fabricante de aerogeneradores no puede
confirmar, que su aerogenerador individual
cumple con el PO 12.3.
Lo que ENERCON podra hacer es confirmar
que el aerogenerador cumplo con lo que est
establecido en el ENERCON Data Sheet Grid
Performance.

The PO12.3 refers to the point of connection of


the installation of turbines in general, while the
manufacturer can only confirm a certain behaviour of the individual wind energy converter at
its terminals. The electrical characteristics at
the point of connection of the wind farm can
depend on the special configuration of the project. The possible difference in the behaviour of
the individual wind energy converter and the
whole wind farm at the point of connection is
key subject of the PVVC. In there is defined exactly under which conditions it is admitted to
assume, that when the individual WEC meets
the requirements of PO 12.3, the whole wind
farm meets them too. Given additionally, that
without the technical clarification of the PVVC
some expressions in the PO 12.3 are ambiguous, a manufacturer of WECs cannot confirm,
that its individual WEC complies with the PO
12.3.
What ENERCON could do is to confirm that the
WEC meets with what is defined in the ENERCON Data Sheet Grid Performance.

In case of discrepancies the English version shall prevail


Document Information:
Compiled/Date/Rev.:
Department:
Checked/Date:

EQ-MB/3.7.2007Rev003 Translator/Date:
Sales/Technical Support Checked/Date:
X. XXX/XX.XX.XX File name:

SL_TS_Statement_certificate PO12.3_rev003_eng+spa

Comment to requirements in Spain to provide a


certificate for WECs to meet PO 12.3 requirements

Ahora es sobre todo un tema formal y legal si


el aerogenerador (o parque) cumple con los
requisitos del PO12.3 o no. De punto de vista
tcnico ENERCON no tiene dudas que
cuando el PVVC se aprobar de la forma
como esta previsto (vea borrador de AEE
enero 2007), tendremos dentro de poco un
certificado de una institucin independiente
para el aerogenerador individual, que podra
servir de acuerdo con lo establecido en el
"procedimiento particular" del PVVC
tambien para el parque entero.

Page
2 of 2

It is now mainly a formal and legal issue


whether the WECs (or wind farm) meet with the
requirements of the PO12.3. From the technical
point of view, ENERCON has no doubt that
when the PVVC will be approved in the way it is
intended (see AEE 's draft of January 2007), we
will soon have a certificate of an independent
institution for the individual WEC, that could be
also used according to what is defined in the
"particular procedure" of the PVVC for the
whole wind farm.

In case of discrepancies the English version shall prevail


Document Information:
Compiled/Date/Rev.:
Department:
Checked/Date:

EQ-MB/3.7.2007Rev003 Translator/Date:
Sales/Technical Support Checked/Date:
X. XXX/XX.XX.XX File name:

SL_TS_Statement_certificate PO12.3_rev003_eng+spa

ENERCON
Page

E-70 E4 2,3 MW WEC Characteristics

1 of 2

CARACTERSTICAS DEL AEROGENERADOR


E-70 E4 2,3 MW
Rotor
Modelo
Dimetro de rotor
rea barrida
Regulacin de potencia
Velocidad
Velocidad de arranque
Velocidad de corte
Velocidad a potencia nominal
Rfaga mxima de supervivencia

E-70 E4
71 m
3.959 m
Mediante control del ngulo de paso
Variable, 6-21,5 rpm
2,3 m/s
28-34 m/s (control de rfagas de viento
ENERCON)
12,5 m/s
70 m/s (de acuerdo con IEC)

Multiplicadora
No Aplica

Sin multiplicadora

Palas
Fabricante
Longitud de pala
Material
Proteccin contra rayos

ENERCON
32,8 m
GRP (Epoxy)
incluida

Generador
Fabricante
Potencia nominal
Tipo (modelo)
Velocidad de sincronismo
Clase de Proteccin

ENERCON
2300 kW
Sncrono, generador en anillo directamente
acoplado
Variable, 6-21,5 rpm
IP 23

Sistema de Orientacin
Tipo
Control de orientacin
Velocidad de giro

6 motores elctricos
Activa (basada en la seal de la veleta)
0,5/sec

Control
Fabricante
Tipo
Conexin a la red
Comunicacin remota
SAI (sistema de alimentacin interrumpida)
Frenos
Freno aerodinmico

Document information:
Author/date:
Department:
Approved/date:
Revision/ date

ENERCON
Microprocesador
Va Convertidor ENERCON
Sistema de Telemando de ENERCON
Incluida

Tres sistemas independientes de regulacin


de ngulo de paso de pala con suministro de
emergencia individual
Translation Information
S. Anla/07.09.05 Translator/date:
VI Revisor/date:
M. Kuhlmann/10.09.05 Reference:
0

C.Lpez/18.10.04
J.Hernn/28.10.04
VI-E-70 E4 2,3MW WEC CharacteristicsRev000eng-spa

ENERCON
Page

E-70 E4 2,3 MW WEC Characteristics


Aerodinmico, activacin
Tiempo para detener el rotor desde mxima
velocidad
Torre
Alturas de buje
Torre

Viento clase
Pesos
Nacelle, excl. rotor y buje
Rotor incl. buje/ eje principal
Generador
Peso total

64 m
63 m acero
3 tramos
I e II

2 of 2

Por Control mediante los motores elctricos


Aprox. 1 revolucin

85 m
84 m acero
4 tramos
II

98 m
Acero +
hormign
prefabricado
II

113 m
112 m
hormign
prefabricado
II

Aprox. 12 t
Aprox. 40 t
Aprox. 52 t
Aprox. 104 t

Fuente: Design Parameters, Manufacturers Certificate (Certificado del Fabricante)


Document information:
Author/date:
Department:
Approved/date:
Revision/ date

Translation Information
S. Anla/07.09.05 Translator/date:
VI Revisor/date:
M. Kuhlmann/10.09.05 Reference:
0

C.Lpez/18.10.04
J.Hernn/28.10.04
VI-E-70 E4 2,3MW WEC CharacteristicsRev000eng-spa

ENERCON SCADA SYSTEM


Product description

Page
1 of 25

ENERCON
SCADA SYSTEM

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
2 of 25

Table of contents
1.
2.

Introduction.......................................................................................................................... 3
SCADA SYSTEM function within a wind farm ...................................................................... 4
2.1. Schematic structure of an ENERCON SCADA SYSTEM .............................................. 4
2.2. Abstract representation of the ENERCON SCADA SYSTEM........................................ 5
3. How the SCADA system works............................................................................................ 7
3.1. Data acquisition ............................................................................................................ 7
3.2. Messages & communication ......................................................................................... 8
3.2.1. Status data ............................................................................................................ 8
3.2.2. Measured values ................................................................................................... 8
3.2.3. Wind farm data bus ............................................................................................... 8
3.2.4. How the SCADA SYSTEM communicates with the wind turbines .......................... 9
3.2.5. How the SCADA SYSTEM communicates with ENERCON Service .....................10
3.2.6. SCADA SYSTEM response in the event of communication breakdowns ..............11
3.2.7. SCADA REMOTE.................................................................................................11
3.3. Open-loop and closed-loop control with SCADA..........................................................13
3.3.1. Open-loop control systems: ..................................................................................14
3.3.1.1.
Setpoint open-loop control.............................................................................14
3.3.1.2.
Table-based control.......................................................................................14
3.3.1.3.
Control values via interfaces..........................................................................14
3.3.2. Closed-loop control systems:................................................................................15
3.3.3. Active power management ...................................................................................17
3.3.3.1.
Active power control ......................................................................................17
3.3.3.2.
Power gradient regulation..............................................................................18
3.3.4. Voltage-reactive power management ...................................................................19
3.3.4.1.
Power factor control.......................................................................................19
3.3.4.2.
SCADA Voltage Control System (VCS) .........................................................20
3.3.4.3.
Apparent power regulation (optimizing active power).....................................22
4. Requirements .....................................................................................................................23
5. Maintenance requirements .................................................................................................23
6. ENERCON SCADA SYSTEM in the ENERCON PARTNER KONZEPT (EPK)...................23
7. Standard scope of supply ...................................................................................................23
8. Miscellaneous.....................................................................................................................23
9. Technical specifications ......................................................................................................24
9.1. Functional specifications..............................................................................................24
9.2. Hardware specifications...............................................................................................24

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
3 of 25

1. Introduction
The ENERCON SCADA1 SYSTEM is used for data acquisition, remote monitoring, open-loop
and closed-loop control for both individual wind turbines and wind farms. It enables the customer
and ENERCON Service to monitor the operating state and to analyse saved operating data.
Furthermore, authorised users may use it to modify the operating parameters of the wind
turbines and the connection to the grid. Depending on the application concerned, the ENERCON
SCADA SYSTEM also provides additional options to enable closed-loop control based on
setpoints (e.g. power factor at the point of common coupling).
The SCADA SYSTEM developed by ENERCON was launched in 1998 and is now used in
conjunction with more than 8000 wind turbines worldwide.
This document is intended to provide an overview of the key functions of the ENERCON SCADA
SYSTEM.

SCADA: Supervisory Control And Data Acquisition

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
4 of 25

2. SCADA SYSTEM function within a wind farm


2.1.

Schematic structure of an ENERCON SCADA SYSTEM

Substation

GDA

SCADA PC

Wind farm

Telecommunications network

Externals
ENERCON
SERVICE

Figure 1

Null modem or network


connection

Home PC

Remote PC

A typical SCADA SYSTEM on a wind farm


Grey lines indicate additional options.

Symbols:
Optical fibre cables or 4-strand data cables

Modem

Telephone network
Weather station
Telephone connection

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

2.2.

Page
5 of 25

Abstract representation of the ENERCON SCADA SYSTEM

The ENERCON SCADA SYSTEM provides a framework for achieving open/closed-loop control
and communication within the wind farm. Depending on application requirements, several further
options can provide special functions especially for data acquisition or closed-loop control of the
wind farm. The following abstract representation shows the interaction between the system as a
whole and its individual components:

ENERCON SCADA SYSTEM


SCADA
REMOTE
SCADA PC
Available
Options :

Figure 2

PDI

GDA

SCU

VCS

METEO

Abstract representation of the ENERCON SCADA SYSTEM

SCADA PC:

The SCADA PC on the wind farm assumes the internal open or closed-loop
control functions, data storage and communication with the outside world.
Only the ENERCON SCADA software runs on this PC.

SCADA REMOTE: A program for remote monitoring and display of operating data with
database support (SCADA DATABASE). If access authorisation is granted,
operation intervention is also possible and operating parameters can be
modified.
PDI:

Process Data Interface; a system used to exchange online wind farm values
with external communication points, some of which are setpoint settings
from grid operators to the wind farm and exporting operating data.

GDA:

Grid Data Acquisition; a system used to measure all current electrical


values at the point of common coupling.

SCU:

Substation Control Unit, a system used for the acquisition of current states
within the substation of a wind farm and for remote switching operation in it.

VCS:

Voltage Control System, for dynamic voltage control at the point of common
coupling. The reactive power range available from the farms wind turbines
is used for this purpose.

METEO:

A system for the acquisition of weather data (wind speed, wind direction,
etc.) using a meteorological mast.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
6 of 25

Each of the components presented is documented. Constant reference will be made to these
throughout this text.
When speaking of the ENERCON SCADA SYSTEM this means all SCADA components
installed according to project specifics and their interaction. Standard equipment for an
ENERCON wind farm usually only includes the SCADA PC with operating system and the
ENERCON SCADA software package, as well as the licence for the ENERCON SCADA Remote
software package.
The ENERCON SCADA software on the SCADA PC in the wind farm covers numerous wind
farm functions including:
Requesting status data2 from all connected installations (wind turbines, weather
measurement equipment, grid data acquisition, etc.)
Storing operating data
Wind farm communication with external communication points (owner, grid operator,
ENERCON, etc.)
Open-loop / closed loop control of the wind farms electrical output values (if applicable)
Obstruction light control on wind farm (if applicable)
Special control for all or a group of wind turbines on the farm (e.g. Start or Stop depending
on the time, wind conditions or temperatures, status data, other installations, if required)
Many of the functions described hereafter are in fact features of the ENERCON SCADA
software.

For further details see Chapter 3.1

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
7 of 25

3. How the SCADA system works


3.1.

Data acquisition

A mass of data is recorded by the wind turbines sensors, which is then forwarded to the
turbines central controls. The turbines system control processes this for internal control
purposes and provides the SCADA SYSTEM with data.
A distinction is made between:
Operating data

Status data and warning messages

Mechanical characteristics: Speed, nacelle position,


torque
Electrical characteristics: Current and voltage
measured for each phase (at the low voltage terminals
of the converter); power, frequency, energy calculated.
Meteorological data gathered by the weather station
outside the nacelle: wind speed, wind direction and
ambient temperature
Temperature of rotor blades, nacelle interior, tower
interior etc.
Time counter records operating time and downtime

This data is generated from


various internal wind turbine
messages
and
provides
information about the current
operating state and the events
affecting operation.

Voltage and current transformers, temperature sensors, pulsers, vibration sensors, and angle
encoders are some of the sensor types used to gather the measured values. For each phase,
current and voltage is measured at the inverters' low voltage terminals. If required the power can
be measured using calibrated counters in the turbines control system.
Status data indicates all turbine operating states. This information is made up of a main status
and substatus or main warning and sub-warning (see Chapter 9.2). In the case of operating
states, that require an ENERCON Service intervention, the system converts the states to
appropriate messages which are then automatically transmitted to ENERCON.
In the following text the abovementioned status and warning messages will be referred to as
"status data".
Status data is updated up to four times per second. The SCADA PC on the wind farm and
ENERCON SCADA Remote both show the latest (current) status. In addition, SCADA Remote
indicates past status messages in chronological order together with the exact time at which they
occurred.
All other operating data is generated by the wind turbines control system as one-minute average
values and relayed to the SCADA PC. Furthermore, minimum and maximum speeds, power and
wind speed values occurring per minute are also sent to the SCADA PC.
Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
8 of 25

As long as an online connection is available, operating data is updated and transmitted to


SCADA REMOTE software on the remote PC with the maximum transfer rate of this online
connection. With conventional telecommunication connections via stable fixed networks, the
remote PC display is updated at least once per second.
Moreover, a multitude of other data recorded in the wind turbine is analysed in the turbine
control system. However it is only made available to ENERCON Service for detailed viewing
where required.
If an ENERCON wind farm has a relay station, a substation or a meteorological mast, the
operating data of these installations can also be integrated into the SCADA SYSTEM.3

3.2.

Messages & communication

3.2.1. Status data


Status messages will vary depending on the type of wind turbine (E-33, E-48, E-70/E4, E-82,
E-112) and control version. The larger the wind turbine, the greater the number of states
possible. Standard sets of main status messages are used for all ENERCON wind turbines.
These are listed on the technical data sheet further on in this document (see chapter 9.1).
3.2.2. Measured values
The SCADA REMOTE documentation contains an overview of all the measured values provided
by the SCADA SYSTEM.
Compared with SCADA REMOTE, the SCADA PC at the wind farm only provides an extremely
simplified visual representation of the current or stored measured values and status data. Its
main purpose is the wind farm control and data management, not the pleasing visualization of
online data. If, for example, a visual representation of the current operating states (wind speed,
power, etc.) is desired for use at a visitor centre, a REMOTE PC (as shown in Figure 1) or a
display panel showing selected values within the farm, can be provided.
3.2.3. Wind farm data bus
The wind turbines in a wind farm are connected to the SCADA PC via internal data bus systems,
generally with optical fibre cables. To prevent overvoltage and to maximize communication
speed, it is advisable to use optical fibre cables. Alternatively copper can be used.
In the interest of achieving a high degree of communication security, up to a maximum of 10
wind turbines are combined into one physical data bus. If there are more than 10, a number of
physical data bus lines are set up as a star configuration. The logical data bus system always
includes all the turbines on the farm.
The distance between two neighbouring turbines connected via the same physical optical fibre
data bus should not exceed 2 km (multimode). In the case of a data bus using copper cables,
the total length of the physical data bus should not exceed 3 km.4 Where larger distances
between two turbines are concerned, power amplifiers must be used in conjunction with copper
3

See separate documentation: ENERCON METEO SYSTEM or Substation Control Unit SCU
See separate documentation: SCADA PC
SUBJECT TO TECHNICAL CHANGE
Document information:

Author/ date:
Department:
Approved / date:
Revision:

WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
9 of 25

cables. In such a case of long distances the use of optical fibres requires a switch to single
mode, i.e. special optical fibre cables must be used along with the respective signal converters.
The copper cables must be 4-strand, shielded (telephone) cables. For redundancy and to create
several physical buses, at least 10-pair wiring should be used. Furthermore, in the case of a
copper data bus, surge protectors must be used at various interfaces to protect turbine control,
the SCADA PC, etc.
ENERCON recommends the use of optical fibre cables. This applies, in particular, if closed-loop
controls (see 3.3) are to be used and the number of turbines connected is greater than 10.
The farms internal bus system will also be referred to below as the ENERCON data bus.
3.2.4. How the SCADA SYSTEM communicates with the wind turbines
The SCADA SYSTEM carries out cyclic queries concerning the wind turbines operating and
status data. The SCADA PC (master) requests this data from the individual turbine controls
(slave) via the ENERCON data bus.
A data packet containing the values obtained over a one minute period is transmitted for each
installation. The SCADA PC creates and records the average values over 10-minute, day, week,
month and year periods, again with the respective minimum and maximum values in each case.
In doing so, reference is always made to the 1-minute mean value.
The data transmission rate within the wind farm will be between 2,400 and 28,800 bauds,
depending on the number of wind turbines connected and their configuration.
Subsequently the SCADA PC is the wind farm's central data node. All communication from the
wind farm with external points is transmitted via this node. A communication avoiding the
SCADA PC is not permitted, amongst other reasons for wind turbine security.
A permanent connection between the SCADA SYSTEM and the outside world is desirable, but is
not a requirement for secure operation. All the wind turbines continue to operate even if there is
a breakdown in communication within the wind farm itself or with external communication points.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
10 of 25

3.2.5. How the SCADA SYSTEM communicates with ENERCON Service


Generally speaking, the SCADA SYSTEM communicates with the external points via a
telephone connection.5 In the event of a fault, the SCADA SYSTEM automatically transmits
warning or status (fault) messages to the ENERCON Service Center. Here these are
automatically assigned to service teams and saved.

Wind farm

FAULT

Externals

?!?

ENERCON
SERVICE CENTER

SCADA PC

Fax

Telecommunications network

Figure 3

ENERCON SERVICE
@

SMS

How the SCADA SYSTEM communicates with ENERCON Service

If requested, the customer can be informed of any fault messages by the ENERCON Service
Center. Generally, this information can be provided via text message (SMS), fax or e-mail.
ENERCON recommends text messages as the best method of forwarding the information to the
customer, as it is a faster and more reliable means of communication than fax or e-mail.
Fault messages are automatically generated and immediately sent to customers without
involving ENERCON Service personnel. The time between receipt of the message by the
Service Center and transmission to the customer depends on the total number of incoming
messages being processed by the Service Center. This could take a maximum of 15 minutes in
a worst case scenario, but in practice it is usually considerably less than this.
ENERCON Service must be provided with the names and contact details of the designated
message recipients.
At night, ENERCON transfers data from all of its wind turbines around the world to the Control
Center, where it is saved (telephone access required). A status message update for the past 24
hours is requested along with the operating data for the past day and month. If more than 24
hours lie between the last successful communications, the length of the periods scanned are
adapted accordingly.
At any rate, if 24 hours have passed since the last communication with the ENERCON Service
Center, a test message is sent out by the SCADA SYSTEM. This ensures that a protracted
communication fault with the externals does not go unnoticed.

See telephone connection specification in the SCADA PC documentation


SUBJECT TO TECHNICAL CHANGE
Document information:
Author/ date:
Department:
Approved / date:
Revision:

WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
11 of 25

3.2.6. SCADA SYSTEM response in the event of communication breakdowns


The wind turbine itself functions is not dependent on the SCADA SYSTEM. It can therefore
continue to provide energy even in the event of a faulty data link.
A distinction must be made between
a) Communication errors within the wind farm itself:
Each wind turbine can store up to 10 status messages. The messages are
subsequently retrieved by the SCADA PC when communication is restored. Oneminute values pertaining to operating data are not stored.
During the communication fault, the status message for the wind turbine concerned is
generated by the SCADA SYSTEM.
b)

Communication faults between the wind farm and ENERCON Service:


On the SCADA PC, all the operating data and SCADA SYSTEM messages are stored
on the PCs hard drive. In general, this drive has sufficient capacity to store all the data
accumulated over the wind turbines 20-year service life. If data acquisition by the
SCADA SYSTEM also includes transmission substations, weather masts (or other), the
amount of data may increase considerably, meaning that the capacity limit will be
reached sooner.
Once 90% of the hard drive capacity is reached, the SCADA SYSTEM will issue a
warning message.

With a closed-loop control based on a setpoint for the point of common coupling, the wind
turbines' response in the event of a communication fault must be defined beforehand on a
project-by-project basis. While communication is down the solution could be:
the last current setpoint can be used as the default value or
a fixed value can be used as the default value.
These details should be agreed by the grid operator, the customer and ENERCON as early as
possible. It is mandatory that ENERCON Service be informed of the parameters.
3.2.7. SCADA REMOTE
ENERCON SCADA REMOTE is a software used for online monitoring, evaluation, and saving
turbine and operating data from a location outside the wind farm. The aforementioned operating
data and status messages are displayed to the customer.
Online data
The customer has the possibility of observing existing installations online. For this purpose, an
online connection must be established between the customers remote PC and the SCADA PC
(as in Figure 3)6. The display on the remote PC is updated at the same speed as the transfer
rate between the SCADA SYSTEM and the remote PC.

For the technical specifications (analogue, GSM modem, TCP/IP, etc.) see SCADA PC documentation
SUBJECT TO TECHNICAL CHANGE
Document information:
Author/ date:
Department:
Approved / date:
Revision:

WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
12 of 25

Data analysis
SCADA REMOTE and the integrated SCADA DATABASE software package can also be used to
transmit the data accumulated on the SCADA PC for selected periods to the (e.g. customers)
remote PC. As a result, an exact copy of the operating data is reproduced on the remote PC,
enabling evaluation to be performed irrespective of a further online connection.
The prompted data is then stored on the Remote PC in dBASE IV format. These are then
available for any type of evaluation in e.g. dBASE, calculation table programs or other software
applications.
With the appropriate additional software ENERCON SCADA Automatic Data Request 7, data
prompts from the wind farm can be automated. Time and amount of the automatic data prompts
can be user-defined.
Effect on wind farm
If respective access permission has been granted, SCADA REMOTE can be used to take
appropriate action on operation controls, as well as to modify operating parameters. This may be
as simple as starting or stopping the wind turbine or be as complex as modifying each individual
parameter for turbine control and switching operations in the transmission substation. To ensure
that wind turbine operation remains secure, customers have only very limited access.

See Documentation ENERCON SCADA REMOTE

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

3.3.

Page
13 of 25

Open-loop and closed-loop control with SCADA

The SCADA SYSTEM is a complex tool for implementing various open-loop or closed-loop
control functions of the wind farm. Generally, control of electrical parameters is related to the
point of common coupling. However, it may also just be a simple time dependent electrical
setpoint or even manual settings.
Wind

Setpoints

Figure 4

SCADA

Wind turbine

Actual values
(e.g. active power,
power factor...)

Structure of electrical values open-loop control with SCADA Open-loop control does not
have a feedback loop for actual values.
ENERCON's PDI can, for example, be used as an interface to SCADA to transmit
external setpoints

With the ENERCON's GDA system, the SCADA SYSTEM and the wind turbines a closed-loop
control can be established. Closed-loop control is performed in relation to the measurement
point which is usually the point of common coupling.
Wind

Setpoints

SCADA

Wind turbine

Actual values
(e.g. active power,
power factor...)

GDA

Figure 5

Structure of closed-loop control with typical output signal feedback. Should closed-loop
control be desired, it is always necessary to use ENERCON Grid Data Acquisition.
Again, ENERCON's PDI can, for example, be used as an interface to SCADA to transmit
external setpoints.

The control variable can, in principle, be active power (P), power factor (cos) or voltage (U).
Under certain conditions, combinations of the control variables are also possible. This is agreed
according to project specifics between the customer, ENERCON and the grid operator. The
accuracy and dynamics of closed-loop control will depend on the configuration of the farm, the
number of wind turbines connected, the class of instrument transformer and other factors.
Closed-loop control and its parameters are designed and set by ENERCON according to project
specifics. To ensure stable closed-loop control at the point of common coupling, close
collaboration between the customer, ENERCON and the grid operator is essential.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
14 of 25

It is the project developer's responsibility to check the requirements at the point of common
coupling with the grid operator in due time so that the appropriate time and costs can be taken
into consideration. Due to extensive experience with thousands of projects worldwide,
ENERCON can provide expert advice concerning this process.
3.3.1. Open-loop control systems:
3.3.1.1.

Setpoint open-loop control

The simplest way to influence a wind farm's operation is by open-loop control of the operating
parameters. Open-loop control (in contrast to closed-loop control) means that there is no
feedback of the setpoints effect. In other words, the actual value attained is not monitored and
cannot be automatically taken into account for the following control operation.
Setpoints for the maximum active power (as a percentage of rated power) and the phase angle
can be set as control parameters via the SCADA PC or SCADA REMOTE. These values apply
until new setpoints are specified.
3.3.1.2.

Table-based control

Table-based control can be used to set the maximum power of the farm and the phase angle for
anywhere up to 40 periods per week. The wind farms (open or closed-loop) control system
refers to these time-related setpoints.
The table values are only entered once via SCADA REMOTE or directly onto the SCADA PC.
Parameter modification is password-protected.
3.3.1.3.

Control values via interfaces

ENERCON provides interfaces which can also be used to transmit just straight control signals
e.g. from the grid operator to the wind farm's SCADA System. ENERCONs PDI 8 is the most
commonly used interface option for ENERCON SCADA. Other interfaces are available on
request. In the following, all interface options will be referred to as ENERCON PDI.
PDI is used to allow quick and easy setpoint changes to be carried out. Online" setpoint settings
are transmitted via ENERCONs PDI to the wind farm. In order to do so, a permanent data link
must be available (e.g. grid operator control and communication system or similar). In contrast,
setpoint settings using fixed parameter settings in SCADA as described above, and table-based
control do not provide short-term flexibility. Furthermore, compared to ENERCON SCADA
REMOTE, data exchange via PDI in particular offers the possibility to specify new setpoints
without time delays. New setpoints can be specified not more than every 5 seconds via the PDI,
however in practice these intervals are usually longer (15 minutes, hours or longer)9.
Depending on the type of PDI, online signals concerning the wind farms operating status are
also available. This can be used for electrical grid operation purposes as well as for other
possible external data processing systems. Further on, this time-flexible transfer of setpoint and
actual value data with PDI will be referred to as dynamic data transfer.
The functions and types of PDI, as well as the related technical interfaces and signals available
are described in the ENERCON PDI document.
8

See separate document concerning ENERCON Process Data Interface


Setpoint updates cannot be carried out too frequently via PDI. Solely with the PDI a closed-loop control can not be established.
Closed-loop control always needs to be concerted with ENERCON according to project specifics.
SUBJECT TO TECHNICAL CHANGE
Document information:

Author/ date:
Department:
Approved / date:
Revision:

WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
15 of 25

The appropriate setpoint setting is chosen according to project specifics.


3.3.2. Closed-loop control systems:
If actual values are available through the ENERCON GDA10, a closed-loop control of electrical
parameters can be established in relation to the measurement point. Generally, this is the point
of common coupling.
Depending on project-specific requirements, the setpoint can be either a parameterised constant
in SCADA, based on a weekly table or dynamic commands to the SCADA SYSTEM e.g. via
ENERCON PDI.
If no setpoints and/or actual values are available to the SCADA SYSTEM due to e.g. a
communication fault, the SCADA SYSTEM sends out an error code and the control variable
(active power, power factor, etc.) is limited to the default values. For this case, the default values
must be agreed previously with the grid operator.
Although actual value acquisition and setpoint interface require an additional investment, they
present the following advantages:
 Closed-loop control flexibility through dynamic setpoint setting according to the specific grid
situation
 Highly accurate actual values via ENERCON Grid Data Acquisition
 Power factor displacement within the farm (by transformers and cables to the point of
common coupling) can be partly compensated for.
 Communication faults involving individual turbines do not result in yield loss, because closedloop control is performed in relation to the measured power output.
 Measured values can be recorded and evaluated at the point of common coupling.
 When ample wind is available and the installed rated power is greater than the maximum
power feed limit, the power feed capacity can be used to the fullest. This increases the wind
farms overall yield compared to operation without actual value acquisition.
Time response of closed-loop controls using SCADA
For the purpose of closed-loop control, the actual values of the ENERCON GDA are used, built
over a period of approx. 1.5 seconds. Once the setpoints have been changed (externally via
PDI, for example), the SCADA SYSTEM generally transmits the new setpoints to the turbines
after a cycle has elapsed. This cycle time depends on the number of turbines integrated into the
SCADA SYSTEM and the nature of the farm configuration. It lies between 1 and 5 seconds.
Consequently, the time constant of closed-loop controls using the SCADA SYSTEM lies within
the range of several seconds. To ensure the rapid wind farm transmission rates, optical fibre
cables should be used for the ENERCON data bus (see 3.2.3). This response time is usually
suitable for active power or power factor closed-loop controls.
If in particular a voltage control is required at the point of common coupling, this usually requires
quicker actual value acquisition. In this case, a special version of the ENERCON GDA - the
10

See document concerning ENERCON Grid Data Acquisition

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
16 of 25

ENERCON medium voltage acquisition - is used, which provides only voltage values, but with a
rate of approximately every 400 ms. The time constant of such SCADA-based voltage control
ranges from just under one second up to several seconds, depending on the configuration of the
wind farm. (See 3.3.4.2)
To ensure that the voltage-reactive power controls described here have the desired effect at the
point of common coupling, they are deliberately implemented within the SCADA SYSTEM as a
relatively slow type of control. This prevents the regulator on a tap-changing transformer and the
wind farms closed-loop control from working against each other or at excessive rates.
In exceptional cases, when this SCADA voltage control time constant is still too high and faster
control dynamics are required, ENERCON VCS 11 has to be used.
Closed-loop control accuracy using SCADA
Control accuracy depends essentially on the class of instrument transformer used together with
ENERCON GDA, as well as the project-specific maximum regulator speed limit.

11

See documentation relating to the ENERCON VCS - Voltage Control System


SUBJECT TO TECHNICAL CHANGE
Document information:
Author/ date:
Department:
Approved / date:
Revision:

WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
17 of 25

3.3.3. Active power management


3.3.3.1.

Active power control

ENERCON wind turbines are designed to gain the highest possible output from the wind and to
feed it into the grid. However for grid operation reasons, wind turbines or wind farms may have
to limit their (active) power output for a certain period of time. Although this type of operation
reduces yield, affecting the projects economics, in some cases it actually allows wind farms to
be connected to the grid at all.
Every ENERCON wind turbine can limit its power output to any percentage value ranging from
zero to rated power. Initially, this operating mode is not time-limited. Coordination between pitch
control, generator and converters ensure that the maximum required power output is not
exceeded.
Power
Prated

Time
Figure 6

The wind farm's maximum power output can, for example, be limited when the grid
operator specifies a percentage value of the rated power.

Within the wind farm all cables and transformers between each wind turbines terminal and the
point of common coupling are, amongst other things, active power consumers. Losses from
these elements are not constant, but depend on power transmission, temperature and other
factors.
In order to make the best use of the maximum power infeed permitted at the point of common
coupling, actual active power feed is measured by the ENERCON GDA and transmitted to
SCADA: thus regulated.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

3.3.3.2.

Page
18 of 25

Power gradient regulation

In order to ensure a stable system operation it may be necessary, that a wind farm does not
increase its active power output directly as wind speed is increasing, but rather that the increase
in active power output is subject to a limitation.
The parameters for this type of limitation can be set at the terminals of each individual turbine12.
For grid operator requirements generally only the overall wind farm power gradient at the point of
common coupling is important.
If the grid operators limit value is to be met only by setting power gradients at the WEC
terminals, one must always assume a worst case" scenario, i.e. each turbine is assigned a low
max. power gradient. Since the turbines are spaced out on the farm, gusts, for example, do not
occur everywhere at the same time which means that a narrow maximum gradient setting for the
turbine would impair best use of the wind conditions.
A wind farm power gradient control for the point of common coupling is available on request.
ENERCON GDA is then installed at the point of common coupling to collect actual values.
Depending on specific project requirements ENERCON installs further hard- and software.
As for all closed-loop controls, the parameters must be agreed in close collaboration between
the customer, grid operator and ENERCON according to project specifics. It would be advisable,
for instance, to limit the 1- or 10-minute mean value of the positive active power gradient at the
point of common coupling.
The setpoint (active power gradient at the point of common coupling) can be set dynamically via
e.g. ENERCON PDI.
At any rate, with a limited power gradient the wind farm does not make the best use of the wind
conditions, as opposed to operation without any power gradient limitation or control.

12

See data sheet Grid Performance for Power-Ramps

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
19 of 25

3.3.4. Voltage-reactive power management


Supplying reactive power to or consuming reactive power from the grid can increase or reduce
the voltage at the point of common coupling. The amount of effect the reactive power supplied
(or consumed) by the wind farm has, depends on how "strong" the grid is. If ENERCON is
provided with grid data, this can be accurately calculated beforehand.
In addition to changes to reactive power supply, the grid voltage can also be influenced by
reducing active power feed or a combination of both. This is particularly valid in the case of weak
grids or at least for grids that are relatively "weak" at the point of common coupling. Reducing
active power feed means output reduction and would only be the second best solution (See
3.3.4.3).
The issue of whether voltage-reactive power management (power factor regulation, medium
voltage regulation etc.) is necessary at all, depends on the local grid and must be cleared with
the grid operator. The grid operator should also provide the normal actual operating voltage
value at the planned point of common coupling which lies within the tolerance range.
Generally speaking actual value acquisition is a measurement taken on the medium voltage
side. If the wind farm is connected to the grid via its own transmission substation, measurements
can also be taken on the high-voltage side. References to medium voltage below may
therefore be read as high voltage, where applicable. The costs and advantages associated
with such a high voltage measurement must be evaluated in relation to the specific project.
Setpoint settings in the SCADA SYSTEM can be carried out as follows:
A one-time fixed value parameter setting in SCADA or
be subject to a weekly table or
dynamically set via e.g. ENERCON PDI
Closed-loop control for voltage-reactive power management and its parameters are designed
and set by ENERCON according to project specifics. To ensure stable closed-loop control at the
point of common coupling, close collaboration between the customer, ENERCON and the grid
operator is required.
For the response time of a voltage control please see chapter 3.3.2.
3.3.4.1.

Power factor control

Generally, grid operators define the phase angle at the point of common coupling to comply with.
ENERCON GDA is used to collect an accurate actual phase angle at this point. The setpoint is
transmitted to SCADA, which in turn sends signals to each wind turbine on the farm so that the
actual value at the point of delivery matches the setpoint as closely as possible. This allows ideal
compensation for unavoidable phase angle displacement by active and reactive power
consumption between the wind turbines' terminals and the point of common coupling.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

3.3.4.2.

Page
20 of 25

SCADA Voltage Control System (VCS)

With SCADA VCS the phase angle of all the wind turbines is controlled according to a fixed
characteristic dependent on actual voltage at the point of common coupling and adapted to the
specific grid requirements. Depending on the characteristic, the voltage at the point of delivery is
thus increased or reduced.

cos()
cos() = f(U)
Reactive
power import
from the grid

cos() = constant

1,0

U<Urated
Reactive
power export
to grid

Figure 7

1,0

U>Urated

U/Urated

Vertex can be set in


SCADA SYSTEM

Example of a constant power factor (blue) compared with SCADA Voltage Control (red).
Concerning the latter, reactive power affecting voltage is neither delivered nor consumed
within a certain deadband (cos=1). Beyond this deadband the phase angle follows a predefined path depending on the grid voltage.

Actual voltage acquisition is carried out as described above with ENERCONs GDA special
version: the ENERCON medium voltage acquisition. The measured voltage values are
transmitted to the SCADA SYSTEM as control feedback.
The setpoints can be set in the SCADA SYSTEM using the abovementioned fixed values or
parameterized. The characteristic must be carefully planned for each individual connection point.
For the response time of a voltage control please see chapter 3.3.2.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

with activated
control

Page
21 of 25

with activated
control
with
deactivated
control

Figure 8

Example of a wind farm with 6 MW rated power. Indicated are: medium voltage at the
point of common coupling, active power and reactive power with activated and
deactivated SCADA Voltage Control System. One can clearly see voltage and active
power dependent reactive power supply.

with activated control

with deactivated control

desired
voltage range

Figure 9

Example of a wind farm with 6 MW rated power. Indicated are: medium voltage at the
point of common coupling, active power and reactive power with activated and
deactivated SCADA Voltage Control System. This extract from Figure 8 illustrates the
SCADA controls efficiency in the range of seconds.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description
3.3.4.3.

Page
22 of 25

Apparent power regulation (optimizing active power)

Apparent power regulation is a combination of power factor regulation and a reduction of active
power infeed. The exact determination of apparent power regulation and its parameter settings
depends on project specifics and must be agreed with ENERCON.
Example: According to agreements met with the grid operator, the wind farm is normally run at a
certain phase angle setpoint> 0. At the same time, the apparent power at the point of common
coupling is limited to Smax. The phase angle may be reduced to =0, if the maximum apparent
power limitation Smax is reached and an increase in active power is possible due to good wind
conditions.
Realisation with apparent power regulation:
In the partial load range, the wind farm runs at the setpoint phase angle. As the wind speed
increases so does the apparent power output Sactual. As the actual apparent power Sactual
approaches the maximum apparent power limit Smax, the controls reduce the phase angle setpoint
so that the apparent power does not exceed the limit Smax during further active power increase.
Actual value acquisition is carried out via ENERCON Grid Data Acquisition. Setpoint settings
(apparent power at the point of common coupling) in the SCADA SYSTEM can be carried out as
follows:
A one-time fixed value parameter setting in SCADA or
be subject to a weekly table
A wind farm with apparent power regulation, does not make the best use of the wind conditions,
when compared to operation without any apparent power regulation (less yield).

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
23 of 25

4. Requirements
The SCADA SYSTEM is based in its main functions on the program ENERCON SCADA,
running on the SCADA PC13. This SCADA PC and the software are prerequisites for SCADA
SYSTEM operation on the wind farm.
A permanent connection between the SCADA SYSTEM and the outside world is desirable, but is
not a requirement for secure operation. All the wind turbines continue to operate, even if there is
a breakdown in communication within the wind farm itself or with external points of
communication.
When it comes to the desired performance of the wind farms open-loop/closed-loop control
system in case of faults in the communication, the individual closed-loop (or open-loop) control
default values must be considered separately (see also 3.2.6).

5. Maintenance requirements
Maintenance measures required for the various hardware and software components of the
SCADA SYSTEM are stipulated in the respective components documentation.

6. ENERCON SCADA SYSTEM in the ENERCON PARTNER KONZEPT (EPK)


Whether and how the ENERCON SCADA SYSTEM is covered by the ENERCON PARTNER
KONZEPT is agreed on a project-by-project basis.

7. Standard scope of supply


ENERCON SCADA (Software on SCADA PC in wind farm) and ENERCON SCADA Remote on
a suitable customer PC, as well as a licence for both programs and hardware protection (dongle)
are all included in the standard scope of supply for a wind farm project with ENERCON wind
turbines.

8. Miscellaneous
Shutdown or curtailed operation of individual wind turbines, e.g. due to project-specific
stipulations regarding noise emissions or shadow casting, are not executed via the SCADA
SYSTEM, but are directly programmed in the turbines control system. The advantage of this is
compliance with emission limits even in the event of communication faults within the SCADA
SYSTEM.

13

See separate SCADA PC documentation

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
24 of 25

9. Technical specifications
9.1.

Functional specifications

See the following page for a list of ENERCON primary status messages.

9.2.

Hardware specifications

No hardware information is provided here in connection with the SCADA SYSTEM. Please
see the documentation relating to individual components, as listed in chapter 2.2.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

ENERCON SCADA SYSTEM


Product description

Page
25 of 25

List of ENERCON main status messages


Example of main status messages for the E-70/E4 and E-82 wind turbines
(EPROM identification I/O Control Cabinet Version 1.45)
The status messages listed are structured as "main status : additional status"
Additional status messages are not listed due to the volume of information:
A complete status list can be obtained through ENERCON Service Center on request.
0
1
2
3
4
5
7
8
9
10
11
12
14
15
16
17
20
21
22
25
29
30
31
40
41
42
43
44
45
46
47
48
49
55
60

Turbine in operation
Turbine stopped
Lack of wind
Storm
Shadow shutdown
Blade defroster
Unauthorized access
Maintenance
Generator heating
EMERGENCY STOP actuated
Rotor brake activated manual
Rotor lock
Formation of ice
Turbine moist
Overspeed switch test
Test safety system
Wind measurement fault
Cable twisted
Yaw control fault
Faulty yaw inverter
Anemometer interface
Vibration sensor
Tower oscillation
Rotor overspeed
Rotor overspeed switch
Pitch control error
Main security circuit fault
Fault emergency stop capacitor
Capacitor charging error
Fault capacitor test
Fault security system
Speed sensor error
Fault blade load control
Blade heating faulty
Mains failure

Example

61
62
64
65
66
67
69
70
72
73
76
80
90
91
95
96
112
122
150
152
153
155
158
202
204
206
207
220
221
222
223
228
229
240
300

Mains breakdown
Feeding fault
Overcurrent inverter
Overcurrent inverter
Fault rectifier
Overtemperature
Acoustic sensor
Generator overtemperature
Air gap monitoring
Torque monitoring
Bearing temperature
Excitation error
Protective circuit breaker tripped
Semiconductor fuse blown
Error temperature measurement
Error temperature measurement inverter
Smoke detector
Fault transformer
Initialize EEPROM!!
Program incompatible!!
No turbine ID
Wrong bootblock address
Serial number
Inverter bus error
Inverter bus error all inverters
No data from power control
Fault inverter control
Processor reset
Watchdog reset
Turbine reset
Software Update
Time out warn message
Too many warnings
Remote control PC
Turbine control bus error (Bus-Off)

302
303
304
305
306
307
310
315
318
319
320
402
403
404
405
411
412
413
414
415
421
422
423
424
425
426
427
428
429
432
433
434
435
438
441

Data bus error blade


Data bus error blade control (CAN3)
Data bus error (Timeout)
No data from I/O-Board control cabinet
No data from
Timeout angle encoder
Unknown node-ID
Invalid Index
Error CAN1-Interrupt
Error CAN2-Interrupt
Malfunction IIC-bus
Error +12V processor
Error -12V processor
Error +15V processor
Error -15V processor
Error +4V ref. processor
Error +5V ref. processor
Error -5V ref. processor
Error +10V ref. processor
Error -10V ref. processor
Error +5V sensoric
Error +12V sensoric
Error -12V sensoric
Error +15V sensoric
Error -15V sensoric
Error +20V sensoric
Error -20V sensoric
Error +12V relay
Error supply hardware
Error +5V sensoric
Error -5V sensoric
Error +10V sensoric
Error -10V sensoric
Error supply IGBT-driver
Error pos. supply current measure

Status message 20:52 means


Wind measurement fault : No signal from anemometer

Some sub-states indicate the header "W". These are warning messages which do not
necessarily lead to turbine shutdown. Depending on the type of warning message this may
remain for a certain number of days. If Service does not intervene, the turbine would then shut
down.
The main status messages of other ENERCON wind turbines are similar to those described
above. However ENERCON wind turbines differ from each other for example by the number of
inverters used and thus by the number of main status messages as well.
Document information:
Author/ date:
Department:
Approved / date:
Revision:

SUBJECT TO TECHNICAL CHANGE


WB / 24-05-2006
WRD-E Translator / date:
RSC / 01-06-2006 Revisor / date:
2.0 Reference:

C.Carsted 19-6-2006
EQ 21-6-2006
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_gereng.doc

Page
1 of 4

Design Basis E-70 E4

All ENERCON wind energy converters are designed and certified according to the latest
international standards. Currently the basis for design are the internationally acknowledged
IEC standards of the IEC-61400 series.
This implies several assumptions and conditions that are used to define the load cases which
the wind turbine has to survive. In the following, the main design conditions are listed. For
details it is hereby referred to the original IEC standards.
The safety system of the ENERCON wind turbines features various control sensors that
protect the turbine and its components from damage. This includes - among other things - high
and low temperatures, vibrations and oscillations, strain etc. In the case that one or more of
these sensors detect conditions outside the design limits, the main control of the turbine will
take the appropriate measures which range from small power limitations to complete stop of
the turbine.
In case it is planned to install the turbines in complex terrain (included but not limited to steep
hills, mountains, ridges, sites at more than 1000m above sea level, etc.), it is highly
recommended to consult with ENERCON at an early stage of the project in order to carry out a
detailed assessment of the site.
For sites with environmental conditions outside of the design conditions, ENERCON
cannot be held responsible for any defects, including but not limited to damages and/or
loss of energy yield.

IEC Design conditions: Wind classes


Wind turbine classes are defined in terms of wind speed and turbulence parameters. In case
of the standard wind turbine classes, the mean value of the wind speed over a time period of
10 min is assumed to be Rayleigh distributed for the purposes of design load calculations.
The E-70 E4 (turbine and 63m wind class I steel tower) is designed for sites with IEC class IA
wind characteristics:
1. Extreme wind speed (3 sec-average) in hub height

vE = 70.0 m/s

2. Extreme wind speed (10-min average) in hub height

v = 50.0 m/s

3. Annual average wind speed and turbulence intensity


The operational loads of wind energy converters depend on the combination of annual
average wind speed and average turbulence intensity at the site. The E-70 E4 has been
designed for
vm = 10 m/s
(annual average wind speed in hub height)
with constant turbulence intensity of 18% at v = 15 m/s
(according to IEC turbulence class A)

Document information:
Author / date:
Department:
Approved / date:
Revision / date:

ENERCON reserves the right to technical modifications


MK / 20.09.05
WRD Translator / date:
- Revisor / date:
WRD-04-Design Basis E-70-Rev2_1-eng-eng.doc
2.1 / 24.03.06 Reference:

Page
2 of 4

Design Basis E-70 E4

For IEC wind class II sites, other towers are available (57m, 63m, 69m, 84m, 97m, 98m,
112m) which are designed and certified according to IEC class IIA with the following wind
characteristics:
1. Extreme wind speed (3 sec-average) in hub height

vE = 59.5 m/s

2. Extreme wind speed (10-min average) in hub height

v = 42.5 m/s

3. Annual average wind speed and turbulence intensity


vm = 8,5 m/s
(annual average wind speed in hub height)
with constant turbulence intensity of 18% at v = 15 m/s
(according to IEC turbulence class A)

For the load calculations the following has been assumed:

safety factor on the loads of SF = 1.35 (normal and extreme loads)

inclination of mean flow with respect to the horizontal plane of up to 8


(invariant with height)

symmetrical icing on all blades (see below)

IEC Design conditions: Other environmental conditions


According to IEC among others the following environmental conditions are taken into account
for the design of the wind turbines:

normal system operation ambient


temperature range of

10C to +40C

extreme temperature range of

20C to +50C

relative humidity of up to

atmospheric content equivalent to that of a

solar radiation intensity of

1000 W/m2

air density of

1.225 kg/m3

95%
non-polluted inland atmosphere

Other Design conditions


In order to protect the wind turbine from damages, it will operate according to the following
scheme, not taking into account power losses due to changes of aerodynamic behavior when
icing occurs on the blades:

Document information:
Author / date:
Department:
Approved / date:
Revision / date:

ENERCON reserves the right to technical modifications


MK / 20.09.05
WRD Translator / date:
- Revisor / date:
WRD-04-Design Basis E-70-Rev2_1-eng-eng.doc
2.1 / 24.03.06 Reference:

Design Basis E-70 E4

Page
3 of 4

T = ambient temperature
T > -15C
-15C > T > -25C
T < -25C

normal operation
operation with maximum 25% rated power
operation with maximum 5% rated power

The turbine will continue to operate with maximum 5% rated power in order to keep the
rotating components moving and the turbine at a moderate temperature level.
Given this operational characteristics, the survival temperature for a standard E-70 is 40C.
According to the GL standard a cold climate site which will call for special requirements for the
wind turbines is defined as follows:
Minimum temperatures of below -20C have been observed during long term measurements
(preferably ten years or more) on an average of more than nine days a year. The nine-day
criteria is fulfilled, if the temperature at the site remains below -20C for one hour or more on
the respective days.
For sites with lower extreme temperatures, different materials will have to be used for various
turbine components including but not limited to lubrication and steel material.
Icing on the blades:
The IEC standard requires that symmetrical icing (i.e. the same amount on each blade) has to
be taken into account, but does not say how. Therefore ENERCON is calculating the ice loads
as described in the GL standard:
The ice accumulates on the leading edge of the blades. There is zero ice at the blade root, the
ice thickness increases linearly up to a value of at the middle of the blade and then remains
constant up to the blade tip.
Unsymmetrical icing (different ice mass on the three blades) does not have to be taken into
account, because the ENERCON turbines have a sensor for imbalance that will prevent the
turbine from operation with unsymmetrical ice (imbalance of the rotor).
Wind farm layout (Micrositing)
Loading of wind turbines in a wind farm is determined by the above mentioned external wind
conditions and additionally by the influence of neighboring wind turbines (so-called wake
effects). Behind the turbines the incoming wind speed is being reduced, while the turbulence
is increased. The effects of this on the operating loads have been assessed in so-called wake
expertises and the allowed minimum distances of the turbines are defined accordingly,
depending on the annual average wind speed and turbulence intensity at the site. These
expertises are available on request.
In general ENERCON wind turbines can be placed in distances of 5 rotor diameters in
prevailing wind direction and in distances of down to 3 rotor diameters in directions of less
distinct wind without further calculations.

Document information:
Author / date:
Department:
Approved / date:
Revision / date:

ENERCON reserves the right to technical modifications


MK / 20.09.05
WRD Translator / date:
- Revisor / date:
WRD-04-Design Basis E-70-Rev2_1-eng-eng.doc
2.1 / 24.03.06 Reference:

Design Basis E-70 E4

Page
4 of 4

If smaller distances are planned, ENERCON has to approve the park layout. If this
approval is not given or not being asked for, ENERCON cannot be held responsible for
any defects, including but not limited to damages and/or loss of energy yield.
Smaller distances can be allowed if the site and layout conditions comply with the data
mentioned in the wake expertises. If for any reason the conditions do not fit, there is the option
to carry out a site specific calculation at the expense of the customer. In this case please
contact your ENERCON sales representative at an early stage of the project.

Document information:
Author / date:
Department:
Approved / date:
Revision / date:

ENERCON reserves the right to technical modifications


MK / 20.09.05
WRD Translator / date:
- Revisor / date:
WRD-04-Design Basis E-70-Rev2_1-eng-eng.doc
2.1 / 24.03.06 Reference:

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
1 de 26

SISTEMA
ENERCON SCADA

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
2 de 26

ndice
1.
2.

Introduccin.......................................................................................................................3
Funcionamiento del sistema SCADA en un parque elico ...............................................4
2.1. Estructura esquemtica de un sistema ENERCON SCADA .....................................4
2.2. Estructura abstracta del sistema ENERCON SCADA ...............................................5
3. Funcionamiento del sistema SCADA ................................................................................7
3.1. Recogida de datos .....................................................................................................7
3.2. Mensajes y comunicacin..........................................................................................8
3.2.1. Datos de estado..................................................................................................8
3.2.2. Valores de mediciones .......................................................................................8
3.2.3. Bus de datos en el parque elico .......................................................................8
3.2.4. Comunicacin del sistema SCADA con el aerogenerador .................................9
3.2.5. Comunicacin del sistema SCADA con ENERCON SERVICE ........................10
3.2.6. Comportamiento del sistema SCADA en caso de fallos en la comunicacin ...11
3.2.7. SCADA REMOTE .............................................................................................11
3.3. Control y regulacin con SCADA.............................................................................13
3.3.1. Sistemas de control ..........................................................................................14
3.3.1.1.
Control del punto de consigna...................................................................14
3.3.1.2.
Control mediante tabla ..............................................................................14
3.3.1.3.
Valores de control a travs de interfaces ..................................................14
3.3.2. Sistemas de regulacin ....................................................................................15
3.3.3. Gestin de la potencia activa............................................................................17
3.3.3.1.
Regulacin de la potencia activa...............................................................17
3.3.3.2.
Regulacin de gradientes de potencia ......................................................18
3.3.4. Gestin de la potencia reactiva de la tensin ...................................................19
3.3.4.1.
Regulacin del factor de potencia .............................................................20
3.3.4.2.
Regulacin de la tensin SCADA..............................................................21
3.3.4.3.
Regulacin de la potencia aparente (optimizacin de potencia) ...............23
4. Condiciones previas........................................................................................................24
5. Necesidad de mantenimiento..........................................................................................24
6. Sistema ENERCON SCADA en ENERCON PARTNER KONZEPT (EPK) ....................24
7. Suministro de serie .........................................................................................................24
8. Otros ...............................................................................................................................24
9. Datos tcnicos.................................................................................................................25
9.1. Datos tcnicos del funcionamiento ..........................................................................25
9.2. Datos tcnicos del hardware....................................................................................25

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
3 de 26

1. Introduccin
El sistema ENERCON SCADA1 sirve para la recogida de datos, el control remoto, el control
y la regulacin de aerogeneradores, tanto por separado como en parques elicos. Ofrece a
los clientes y a ENERCON Service la posibilidad de supervisar el estado de funcionamiento
y de analizar los datos de funcionamiento almacenados. Adems, los usuarios autorizados
pueden modificar los parmetros de funcionamiento de los aerogeneradores y de la
conexin a la red elctrica. Dependiendo de la aplicacin, el sistema ENERCON SCADA
incluye opciones adicionales que permiten regular las cantidades nominales (p. ej. factor de
potencia en el punto de transferencia).
El sistema SCADA es un producto de la empresa ENERCON que se emplea desde 1998 en
ms de 8.000 aerogeneradores en todo el mundo.
El presente documento pretende proporcionar una visin general de las funciones ms
importantes del sistema ENERCON SCADA.

SCADA: Supervisory Control And Data Acquisition


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
4 de 26

2. Funcionamiento del sistema SCADA en un parque elico


2.1.

Estructura esquemtica de un sistema ENERCON SCADA

RECOGIDA DE
DATOS DE RED

SUBESTACIN

PC SCADA

Parque elico

Red de
telecomunicaciones

Exterior

ENERCON
SERVICE

Ilustracin 1

Mdem nulo o conexin de red

PC omstico

PC Remoto

Sistema SCADA tpico en un parque elico.


Las lneas grises presentan opciones adicionales.

Leyenda:
Cable de fibra ptica o 4-A de la lnea de
datos
Red telefnica

Estacin meteorolgica

Conexin telefnica

Document information:
Author/ date:
Department:
Approved / date:
Revision:

Mdem

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

2.2.

Pgina
5 de 26

Estructura abstracta del sistema ENERCON SCADA

El sistema ENERCON SCADA presenta el marco dentro del cual se llevan a cabo el
control/la regulacin y la comunicacin en el parque elico. Dependiendo de los requisitos
de aplicacin, puede ampliarse con opciones que facilitan funciones especiales,
fundamentalmente para la recogida de datos o la regulacin del parque elico. A
continuacin se muestra de forma abstracta la interaccin entre el sistema completo y sus
componentes:
SISTEMA ENERCON SCADA
SCADA
MOTE

PC SCADA
Opciones
disponibles:

Ilustracin 2

PDI

GDA

SCU

VCS

METEO

Representacin abstracta del sistema ENERCON SCADA

PC SCADA:

Dentro del parque elico, el PC SCADA se encarga de las funciones de


control o regulacin y almacenamiento de datos internos, y de
comunicacin hacia el exterior. En este PC se ejecuta nicamente el
software ENERCON SCADA.

SCADA REMOTE: Un programa para el control remoto y la presentacin de datos de


funcionamiento con ayuda de una base de datos (SCADA DATABASE).
Con autorizacin tambin se puede intervenir en el funcionamiento y
modificar parmetros de este.
PDI:

Process Data Interface, un sistema para la comunicacin de los valores


en lnea del parque elico con el exterior, entre otros datos,
especificacin de los valores nominales del operador de red en el
parque elico y publicacin de los datos de funcionamiento.

GDA:

Grid Data Acquisition (adquisicin de datos de red), un sistema para


el registro de los valores elctricos actuales en el punto de conexin con
el operador de red.

SCU:

Substation Control Unit, un sistema para el registro de los estados de


conexin actuales en la subestacin transformadora y el manejo remoto
de interruptores.

VCS:

Voltage Control System, para la regulacin dinmica de la tensin en el


punto de conexin con el operador de red. Para esto se utiliza la gama
de ajustes de la potencia reactiva disponibles en el parque a travs de
los aerogeneradores.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa
METEO:

Pgina
6 de 26

Un sistema para la recopilacin de datos meteorolgicos (velocidad del


viento, direccin del viento, etc.) con un poste de medicin.

Para cada uno de los componentes presentados existe documentacin a la que se har
referencia en lo sucesivo.

Por sistema ENERCON SCADA se entender la totalidad de los componentes SCADA y su


interaccin, que se instalan para proyectos concretos. Para un parque elico ENERCON
normalmente solo es necesario como equipamiento de serie el PC SCADA con sistema
operativo y el paquete de software ENERCON SCADA, as como la licencia para el paquete
de software ENERCON SCADA REMOTE.
El software ENERCON SCADA cumple una multitud de funciones en el parque elico, de las
cuales nicamente se mencionan algunas aqu:
Solicitud de datos de estado2 de todos los equipos conectados (aerogeneradores,
medicin meteorolgica, adquisicin de datos de red...).
Almacenamiento de datos de funcionamiento.
Comunicacin del parque elico con el exterior (propietario, operador de red,
ENERCON).
Control / regulacin (en su caso) de los valores de salida elctricos del parque elico.
Direccionamiento (en su caso) de las luces de balizamiento en el parque elico.
Controles especiales para la totalidad o un grupo de los aerogeneradores del parque
(p. ej. puesta en marcha o parada dependiente de la hora, las condiciones del viento o la
temperatura, datos de estado de otros equipos, en caso necesario).
Muchas de las funciones que se describen a continuacin son caractersticas del programa
ENERCON SCADA.

Para obtener informacin adicional sobre los datos de estado, vase el captulo 3
RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
7 de 26

3. Funcionamiento del sistema SCADA


3.1.

Recogida de datos

En el aerogenerador se recoge una gran cantidad de datos de los sensores y se transmite al


sistema de control central del aparato. El propio control del aerogenerador los transforma
para la regulacin interna y pone los datos a disposicin del sistema SCADA.
Se distingue entre:
Datos de funcionamiento

Datos estado y mensajes de aviso

Caractersticas mecnicas: revoluciones, posicin de


la gndola, torsin.
Caractersticas elctricas: medicin de la tensin,
corriente y frecuencia de cada fase (en los terminales
de baja tensin del inversor); potencia y trabajo.
Datos meteorolgicos que recopila fuera de la
gndola la estacin meteorolgica: velocidad del
viento, direccin del viento y temperatura exterior.
Temperaturas de las palas del rotor, interior de la
gndola, interior de la torre y muchos ms.
El contador de tiempo registra las horas de

Estos datos se generan de


diversos avisos del interior del
aerogenerador y proporcionan
informacin sobre el estado de
funcionamiento actual, as como
sobre los acontecimientos que
afectan al funcionamiento.
El estado de funcionamiento del
aerogenerador se define en todo
momento mediante un estado
clasificado claramente.

Para la recogida de datos se emplean transformadores de tensin y de corriente, sensores


de temperatura, sensores de proximidad, sensores de vibraciones y decodificadores
angulares, entre otros sensores. La corriente y la tensin de cada fase se miden en los
terminales de baja tensin del inversor. A peticin, la medicin de energa en el control del
aerogenerador puede realizarse con contadores calibrados.
Los datos de estado describen todos los estados de funcionamiento del aerogenerador.
Constan de estado principal y estado secundario, as como de aviso principal y aviso
secundario, en caso necesario (vase captulo 9.2). Cuando se producen estados de
funcionamiento que hacen necesarias acciones por parte de ENERCON Service, se crean
los mensajes correspondientes de los estados de funcionamiento y se envan
automticamente a ENERCON.
En lo sucesivo, los estados y avisos anteriormente mencionados se denominarn siempre
Datos de estado para lograr as una mayor simplificacin.
Los datos de estado se actualizan hasta cuatro veces por segundo. En el PC SCADA en el
parque elico y en ENERCON SCADA REMOTE se muestra siempre el ltimo estado
(actual). En SCADA REMOTE se presenta asimismo la cronologa de los mensajes de
estado acumulados en el pasado con su hora exacta.
El resto de los datos de funcionamiento los crea el sistema de control del aerogenerador en
forma de promedios por minuto y los pone a disposicin del PC SCADA. Adems, se
Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
8 de 26

comunican adicionalmente al PC SCADA los valores mnimos y mximos de revoluciones,


potencia y velocidad del viento por minuto.
Con la conexin en lnea existente con SCADA REMOTE los datos de funcionamiento se
actualizan y se transmiten al PC Remote tan rpidamente como permite la conexin de
comunicacin entre el parque elico y el PC Remote. Con las conexiones de
telecomunicacin habituales a travs de una red fija estable, los avisos del PC Remote se
actualizan como mnimo cada segundo.
Adems, se recopila una gran cantidad de datos adicionales en el aerogenerador y se
analizan en el sistema de control del aerogenerador, aunque solo se notifica detalladamente
en caso necesario para ENERCON Service.
Siempre que una subestacin transformadora, una celda o un poste de medicin
meteorolgica sean parte integrante de un parque elico ENERCON, sus datos de
funcionamiento podrn incluirse tambin en el sistema SCADA y en la representacin en
SCADA REMOTE.3

3.2.

Mensajes y comunicacin

3.2.1. Datos de estado


Existen distintos datos de estado dependiendo del tipo de aerogenerador (E-33, E-44, E-48,
E-70/E4, E-82, E-112) y de la versin de su sistema de control. Al aumentar el tamao del
aerogenerador, aumenta tambin la cantidad de estados posibles. Todos los
aerogeneradores ENERCON tienen grupos de mensajes de estado principal uniformes que
se enumeran en la hoja de datos tcnicos de esta documentacin (captulo 9.1).
3.2.2. Valores de mediciones
En la documentacin de SCADA REMOTE se encuentra un resumen de todos los valores de
mediciones que ofrece el sistema SCADA.
El PC SCADA en el parque elico ofrece nicamente una representacin grfica muy
simplificada de los valores de mediciones actuales o almacenados y de los datos de estado
en comparacin con SCADA REMOTE. Su funcin principal es el control y la regulacin del
parque elico, as como la gestin de datos, no la representacin atractiva de datos en lnea.
Cuando p. ej. se desee realizar una representacin grfica de los estados actuales de
funcionamiento, la velocidad del viento, la potencia, etc. para un centro de visitantes, puede
preverse dentro del parque un PC REMOTE (como en la ilustracin 2) o un panel indicador
con los valores seleccionados.
3.2.3. Bus de datos en el parque elico
Los aerogeneradores de un parque elico estn conectados con el PC SCADA mediante el
sistema de bus de datos interno del parque, por regla general con cables de fibra ptica. Por
su resistencia a la sobretensin y su velocidad de comunicacin, es recomendable emplear
cables de fibra ptica en el parque elico. Como alternativa pueden utilizarse cables de
cobre.
3

Vase la documentacin sobre el sistema ENERCON METEO o Substation Control Unit (SCU).
RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
9 de 26

Para lograr una elevada seguridad en las comunicaciones, se juntar un mximo de 10


aerogeneradores a un bus de datos fsico. En caso de que haya ms generadores en el
parque, se montarn varias conducciones fsicas de buses de datos en forma de estrella. El
sistema lgico de buses de datos incluye siempre todos los aerogeneradores del parque.
La distancia entre dos aerogeneradores cercanos de un bus de datos fsico de fibra ptica
no debera exceder los 2 km multimodo. En un bus de datos de cable de cobre, la longitud
total de un bus de datos fsico no debera exceder los 3 km.4 Si las distancias entre dos
aerogeneradores son mayores deber preverse un excitador de lnea para los cables de
cobre. Con distancias tan grandes, en cables de fibra ptica es necesario cambiar a
monomodo, es decir, deben emplearse cables especiales de fibra de vidrio y los
conversores de seal correspondientes.
Los cables de cobre deben ser cables (telefnicos) apantallados de 4 hilos. Por motivos de
redundancia y para la formacin de varios buses fsicos debern emplearse conducciones
de 10 pares. Asimismo, en un bus de datos de cobre deber preverse la presencia de
elementos de proteccin contra sobretensiones en diversas interfaces para proteger el
sistema de control del aerogenerador, el PC SCADA, etc.
ENERCON recomienda la utilizacin de cables de fibra ptica. Esto se aplica especialmente
cuando se prevn regulaciones (vase 0) y la cantidad de aerogeneradores conectados
excede las 10 unidades.
El sistema de buses interno del parque se denominar en adelante bus de datos
ENERCON.
3.2.4. Comunicacin del sistema SCADA con el aerogenerador
SCADA consulta cclicamente los datos de funcionamiento y de estado de los
aerogeneradores. El PC SCADA (maestro) los solicita a travs del bus de datos ENERCON
en los distintos sistemas de control del aerogenerador (esclavo).
Segn el aerogenerador, se transmite un paquete de datos con los valores hallados durante
un minuto. A partir de esta informacin se crean y almacenan en el PC SCADA los valores
promedio de 10 minutos, das, semanas, meses y aos, de nuevo con los valores mnimos y
mximos correspondientes en cada caso. As se vuelve siempre a los valores promedio para
1 minuto.
La tasa de transmisin de datos dentro del parque elico se encuentra entre 2.400 y 28.800
baudios, dependiendo de la cantidad y configuracin de los aerogeneradores conectados.
El PC SCADA es de esta forma el nodo de datos central del parque elico. A travs de este
nodo se produce toda comunicacin del parque con el exterior. No es posible la
comunicacin desde el exterior pasando por el PC SCADA por motivos de seguridad de
funcionamiento del aerogenerador.
Es deseable una conexin operativa del SCADA SYSTEM con el exterior en todo momento,
aunque no es indispensable para un funcionamiento seguro. Los aerogeneradores
permanecern en funcionamiento aunque haya problemas de comunicacin dentro del
parque elico o con el exterior.

Vase la documentacin separada sobre PC SCADA.


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
10 de 26

3.2.5. Comunicacin del sistema SCADA con ENERCON SERVICE


Para la comunicacin del sistema SCADA con el exterior, se utilizar por regla general la
lnea telefnica.5 En caso de fallo, el sistema SCADA enva de forma automtica mensajes
de aviso o de estado (mensajes de avera) a la central de ENERCON Service. All se
adjudican automticamente a equipos de servicio y se almacenan.

Parque elico exterior

AVERA
?!?

CENTRAL DE
ENERCON
SERVICE

PC SCADA
Red de
telecomunicacio
nes

Ilustracin 3

ENERCON SERVICE
@
Fax

Comunicacin del sistema SCADA con ENERCON Service

Si lo desea, el cliente puede recibir informacin de la central de ENERCON Service cuando


se produzcan mensajes de fallo. El aviso puede realizarse por SMS, fax o correo electrnico.
ENERCON recomienda la retransmisin a los clientes por SMS, puesto que la distribucin
es ms segura y rpida que el fax y el correo electrnico.
El mensaje de avera para los clientes se genera de forma automtica e inmediata; no
interviene ningn trabajador de ENERCON Service. El tiempo desde la entrada del mensaje
en la central de Service y la salida hacia los clientes depende de la cantidad total de
mensajes que entren en ese momento a la central de Service. En el peor de los casos
puede transcurrir un mximo de 15 minutos, pero en la prctica la espera suele ser bastante
menor.
Quienes deseen recibir los mensajes de avera debern comunicarlo a ENERCON Service
junto con sus datos de contacto.
ENERCON transmite a la central todas las noches los datos entregados por todos los
aerogeneradores del mundo y los almacena (siempre que exista disponibilidad telefnica).
Se recupera una actualizacin de los mensajes de estado de las ltimas 24 horas, as como
los datos de funcionamiento del ltimo da y mes. En caso de que hayan transcurrido ms
de 24 horas desde la ltima comunicacin exitosa, se consultar en periodos ms largos.
El sistema SCADA enva 24 horas despus de la ltima comunicacin con la central de
Service al menos un mensaje de prueba a la central de ENERCON Service. De esta forma
se garantiza que no pase inadvertido un fallo de comunicacin prolongado con el exterior.

Vanse las especificaciones de la conexin telefnica en la documentacin del PC SCADA.


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
11 de 26

3.2.6. Comportamiento del sistema SCADA en caso de fallos en la


comunicacin
El aerogenerador trabaja independientemente del sistema SCADA. En caso de fallo en la
transmisin de datos, puede seguir suministrando energa adicional.
Debe distinguirse entre:
a)
Fallos en la comunicacin dentro del parque:
En el aerogenerador se almacenan siempre los ltimos 10 mensajes de estado. El
PC SCADA los recupera posteriormente al restablecerse la comunicacin. Los
valores en minutos de los datos de funcionamiento no se almacenan.
Durante el fallo en la comunicacin, el sistema SCADA crea el mensaje de estado
de este aerogenerador.
b)

Fallos en la comunicacin del parque elico con ENERCON Service:


En el disco duro del PC SCADA se almacenan todos los datos de funcionamiento y
avisos del sistema SCADA. Se ha previsto una capacidad que permita almacenar
por regla general los datos completos de un periodo de funcionamiento de 20 aos.
En caso de que se incluyan subestaciones transformadoras, postes de medicin
meteorolgica o similares en la recogida de datos del sistema SCADA, la cantidad
de datos podr aumentar considerablemente y alcanzarse ms rpidamente el
lmite de capacidad.
Si se ha utilizado el 90% de la capacidad del disco duro, el sistema SCADA enva
un mensaje de aviso.

Siempre que exista una regulacin de un valor nominal en el punto de conexin con el
operador de red, deber establecerse de antemano para el proyecto cmo deben actuar los
aerogeneradores en caso de interrupcin de la comunicacin. Es concebible que mientras
haya un fallo de comunicacin:
se adopte el ltimo valor nominal actual como valor por defecto, o
se adopte un valor fijo como valor por defecto.
Esta decisin entre operadores de red, clientes y ENERCON debera tomarse lo antes
posible. Los parmetros debern comunicarse obligatoriamente a ENERCON Service.
3.2.7. SCADA REMOTE
ENERCON SCADA REMOTE es un software para controlar en lnea, evaluar y almacenar
datos de equipos y funcionamiento desde un emplazamiento fuera del parque elico. Los
datos de funcionamiento anteriormente mencionados y los mensajes de estado se
encuentran a disposicin de los clientes para su visualizacin.
Datos en lnea
El cliente tiene la posibilidad de observar en lnea los aerogeneradores existentes. Para
eso deber establecerse una conexin en lnea entre el PC Remote del cliente y el PC
SCADA (anloga a la Ilustracin 3 Comunicacin del sistema SCADA con ENERCON
Service

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
12 de 26

)6. La visualizacin en el PC Remote se actualizar lo ms rpido posible dependiendo de la


velocidad de transmisin de la conexin de datos entre el sistema SCADA y el PC Remote.
Evaluacin de los datos
Con SCADA REMOTE y el paquete de programas integrado SCADA DATABASE pueden
transmitirse adems los datos recopilados en el PC SCADA durante periodos seleccionados
al PC Remote (p. ej. del cliente). De esta forma se crea en el PC Remote una copia
completa de los datos de funcionamiento que permite la valoracin independiente de la
posterior conexin en lnea.
Los datos consultados se archivarn en el PC Remote en formato dBASE IV. Entonces
estarn disponibles para cualquier evaluacin, p. ej. en dBASE, hojas de clculo u otras
aplicaciones de software.
Con el software adicional opcional ENERCON SCADA Automatic Data Request7 puede
automatizarse la consulta de datos del parque elico. El usuario puede ajustar
individualmente el momento y la cantidad de los datos que se consultarn de forma
automtica.

Efecto sobre el parque elico


Siempre que el usuario cuente con la autorizacin correspondiente, tambin podr intervenir
en el funcionamiento a travs de SCADA REMOTE y modificar los parmetros de
funcionamiento. Puede ir desde la puesta en marcha y la parada del aerogenerador hasta la
modificacin de cada uno de los parmetros del sistema de control del aerogenerador o de
las operaciones de conexin en la subestacin transformadora. Para lograr un
funcionamiento ms seguro del aerogenerador, las posibilidades de acceso de los clientes
son muy limitadas.

Vase la documentacin del PC SCADA para consultar las especificaciones de las posibilidades tcnicas (analgica, mdem
GSM, TCP/IP, etc.)
7
Vase la documentacin de ENERCON SCADA REMOTE
RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

3.3.

Pgina
13 de 26

Control y regulacin con SCADA

El sistema SCADA es una compleja herramienta para la ejecucin de distintas funciones de


control o regulacin del parque elico. Por regla general, la regulacin de los parmetros
elctricos se aplica en el punto de conexin con el operador de red. No obstante, puede
tratarse tambin de una especificacin dependiente del momento o totalmente manual de
determinados valores nominales elctricos.
Viento

Valores
nominales

Ilustracin 4

SCADA

Aerogenerador

Valores reales
(p. ej. potencia activa,
factor de potencia)

Estructura de un sistema de control de magnitudes elctricas mediante SCADA. No


se produce la realimentacin de los valores reales en un sistema de control.
Los valores nominales externos pueden p. ej. integrarse como interfaz de SCADA a
travs de ENERCON PDI.

Con la adquisicin de datos de red ENERCON puede crearse un circuito cerrado de control
en conexin con el sistema SCADA y los aerogeneradores. La regulacin de magnitudes
elctricas hace referencia al punto de la adquisicin de datos de red, es decir, por lo general,
el punto de conexin con el operador de red.
Viento

Valores
NOMINALES

SCADA

Aerogenerador

Valores REALES
(p. ej. potencia activa,
factor de potencia)

Adquisicin datos de red

Ilustracin 5

Estructura de un sistema de regulacin con la caracterstica realimentacin de la


seal de salida. En caso de que se desee la regulacin, deber emplearse siempre la
adquisicin de datos de red ENERCON.
De nuevo los valores nominales externos pueden p. ej. integrarse como interfaz de
SCADA a travs de ENERCON PDI.

La magnitud regulada puede ser en principio la potencia activa (P), el factor de potencia
(cos) o la tensin (U). Eventualmente tambin es posible combinar distintas magnitudes
reguladas. Esto debe organizarse para cada caso en estrecha coordinacin entre el cliente,
el operador de red y ENERCON. La precisin y dinmica de la regulacin depende de la
configuracin del parque, de la cantidad de aerogeneradores integrados, de la clase de
transductores y de otros factores. ENERCON proyectar y adaptar el regulador y sus
parmetros para cada proyecto. Para garantizar una regulacin estable en el punto de
Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
14 de 26

conexin a la red, es necesaria una estrecha coordinacin entre los clientes, ENERCON y
los operadores de red.
El desarrollador del proyecto debe aclarar de antemano con el operador de red qu
requisitos deben cumplirse en el punto de conexin para que puedan incluirse con
antelacin las necesidades de tiempo y los posibles costes. ENERCON respalda el proceso
con la experiencia de miles de proyectos en todo el mundo.
3.3.1. Sistemas de control
3.3.1.1.

Control del punto de consigna

La forma ms sencilla de influir en el funcionamiento de un parque elico es el control de los


parmetros de funcionamiento. Control significa (en contraposicin a regulacin) que
no se realimenta el efecto de este ajuste de valor nominal, es decir, que no se supervisa ni
se incluye automticamente el valor real que se adapta en el siguiente procedimiento de
control.
En el PC SCADA o mediante SCADA REMOTE pueden fijarse como parmetros de control
los valores nominales para la potencia activa mxima que deber emitirse (en porcentaje de
la potencia nominal) y el ngulo de fase. Estos valores son vlidos hasta que se definan
nuevos valores nominales.
3.3.1.2.

Control mediante tabla

Con el control mediante tabla puede fijarse la potencia mxima del parque y el ngulo de
fase para una semana con un mximo de 40 intervalos. El control o regulacin del parque
elico recurre a estos valores nominales dependientes del momento.
Los valores de la tabla se fijan una vez a travs de SCADA REMOTE o en el PC SCADA. La
modificacin de parmetros est protegida mediante contrasea.
3.3.1.3.

Valores de control a travs de interfaces

Enercon ofrece interfaces a travs de las cuales tambin pueden transmitirse seales de
control ntidas, p. ej. del operador de red al sistema SCADA del parque elico. El ENERCON
PDI8 es la opcin de interfaz ms empleada para ENERCON SCADA. Es posible utilizar
otras interfaces previa solicitud. Para simplificar se agrupan en lo sucesivo todas las
opciones de interfaz bajo la denominacin ENERCON PDI.
La PDI se instala cuando deben efectuarse ajustes rpidos y flexibles del valor nominal. A
travs de ENERCON PDI se transmiten los valores nominales en lnea al parque elico.
Para hacerlo debe destinarse una conexin de datos permanente (p. ej. el sistema de
instrumentacin del operador de red o similar). En contraposicin, los ajustes de valores
nominales anteriormente descritos de valores parametrizados fijos en SCADA, al igual que
el control mediante tabla, no ofrecen flexibilidad a corto plazo. Asimismo, en comparacin
con el programa de control remoto ENERCON SCADA REMOTE, el intercambio de datos a
travs de la PDI ofrece sobre todo la posibilidad de fijar nuevos valores nominales sin
demora. A travs de la PDI pueden fijarse valores nominales nuevos cada 5 segundos como

Vase la documentacin separada sobre ENERCON Process Data Interface.


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
15 de 26

mximo; no obstante, lo habitual y prctico son intervalos mucho mayores (15 minutos,
horas o ms)9.
Dependiendo del tipo de PDI, existen seales en lnea del parque elico sobre su estado
de funcionamiento. Esto puede utilizarse tanto para gestionar el sistema elctrico como para
otros posibles sistemas externos de tratamiento de datos. En lo sucesivo se designar esta
transmisin de datos flexible y temporal de valores nominales y reales en la PDI como
transmisin de datos dinmica.
Las funciones y los tipos de PDI, as como las seales e interfaces tcnicas disponibles, se
describen en la documentacin de ENERCON PDI.
La forma idnea de los ajustes de valores nominales se escoger para cada proyecto.
3.3.2. Sistemas de regulacin
Siempre que exista un registro de valores reales con la adquisicin de datos de red
ENERCON10, puede crearse una regulacin de parmetros elctricos que haga referencia al
punto de medicin. Por regla general se trata del punto de conexin a la red.
Dependiendo de los requisitos de cada proyecto, el valor nominal puede ser una constante
parametrizada en SCADA, basarse en una tabla semanal o determinarse de forma dinmica
en el sistema SCADA p. ej. a travs de ENERCON PDI.
Cuando el valor nominal y/o el valor real no estn a disposicin del sistema SCADA, p. ej.
por un fallo de comunicacin, este emitir un cdigo de error y la magnitud (potencia activa,
factor de potencia o similar) se limitar a los valores por defecto. Los valores por defecto
para este caso debern acordarse previamente con el operador de red.
Aunque el registro de valores reales y la interfaz de valores nominales requieren inversiones
adicionales, llevan consigo sobre todo las siguientes ventajas:
Flexibilidad especfica para cada situacin de la regulacin mediante ajuste dinmico de
valores nominales.
Precisin mxima de los valores reales mediante la adquisicin de datos de red
ENERCON.
El desplazamiento del factor de potencia en el parque puede corregirse en parte
(mediante transformadores y cables hasta el punto de alimentacin).
Los fallos de comunicacin con aerogeneradores individuales no tienen como
consecuencia una disminucin del rendimiento, ya que se regula en la potencia de salida
medida.
Es posible el registro y la evaluacin de los valores de mediciones en el punto de
conexin a la red.
Siempre que la potencia nominal instalada sea mayor que la potencia de alimentacin
mxima admisible y la velocidad del viento sea suficiente podr aprovecharse la
potencia de alimentacin mxima admisible. Esto aumenta la produccin total del parque
elico en comparacin con el funcionamiento sin registro de valores reales.

A travs de la PDI no pueden actualizarse los valores nominales con tanta frecuencia como para que haya solo con la PDI
una cuasirregulacin. La regulacin requiere siempre el acuerdo especfico para el proyecto de ENERCON.
10
Vase la documentacin del la adquisicin de datos de red ENERCON (ing.: ENERCON Grid Data Acquisition).
RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
16 de 26

Temporizacin de la regulacin con SCADA


Para la regulacin se emplean los valores promedio de la adquisicin de datos de red
ENERCON (valores reales) durante aprox. 1,5 segundos. Tras la modificacin de los ajustes
de valores nominales (desde el exterior, p. ej. a travs de la PDI), el sistema SCADA enva
nuevos valores nominales a los aerogeneradores, por regla general tras un ciclo. Este ciclo
depende a su vez de la cantidad de aerogeneradores integrados en el sistema SCADA y de
la configuracin del parque, y se encuentra entre 1 y 5 segundos. La constante de tiempo de
la regulacin con el sistema SCADA se encuentra, por lo tanto, en el rango de unos
segundos. Para configurar rpidamente la comunicacin en el parque elico, deber
instalarse el bus de datos ENERCON como fibra ptica (vase 3.2.3). Esta constante de
tiempo se ajusta por regla general para regulaciones de la potencia activa y el factor de
potencia.
Siempre que se exija la regulacin de la tensin en el punto de conexin (vase 3.3.4.2),
ser necesario por regla general un registro ms rpido de los valores reales. Entonces se
emplear como forma especial de la adquisicin de datos de red ENERCON el registro de
media tensin, que calcula solo los valores de tensin aprox. cada 400 ms y los transmite a
SCADA. La constante de tiempo de esta regulacin de la tensin basada en SCADA se
encuentra entonces entre apenas un segundo y varios segundos, dependiendo de la
configuracin del parque elico.
Para que las regulaciones de potencia reactiva de la tensin aqu descritas logren el efecto
deseado en el punto de conexin, se han previsto a propsito en el sistema SCADA como
regulacin relativamente lenta. De esta forma se evita que, p. ej. el regulador de un
transformador con regulador de tensin y la regulacin en el parque elico acten uno
contra otro o que incluso se eleven.
En casos excepcionales, si esta constante de tiempo de la regulacin de tensin de SCADA
tambin es demasiado grande y resulta necesaria una dinmica an mayor de la regulacin
de la tensin, se utiliza el ENERCON VCS11.

Precisin de la regulacin con SCADA


La precisin de la regulacin depende en esencia de la clase de transductores que se
utilizan con la adquisicin de datos de red ENERCON, as como de la velocidad mxima
posible del regulador para el proyecto.

11

Vase la documentacin ENERCON VCS (Voltage Control System).


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
17 de 26

3.3.3. Gestin de la potencia activa


3.3.3.1.

Regulacin de la potencia activa

Los aerogeneradores ENERCON estn diseados para obtener siempre la mxima potencia
del viento y alimentarla en la red. No obstante, por razones de funcionamiento de la red,
puede ser deseable que los aerogeneradores o los parques elicos limiten su potencia
(activa) de salida durante un periodo de tiempo determinado. Este modo de funcionamiento
reduce la produccin y, por tanto, afecta a la viabilidad econmica del proyecto, pero a
veces hace posible la conexin del parque elico.
Cada aerogenerador ENERCON puede limitar su potencia activa de salida a un valor
porcentual cualquiera entre cero y la potencia nominal. Este modo de funcionamiento no
est en principio limitado temporalmente. La interaccin del ajuste del ngulo de paso, el
generador y el inversor garantizan que no se supere la potencia de salida mxima
necesaria.
Potencia
Pnom

Tiempo
Ilustracin 6

La potencia activa de salida mxima de un parque elico puede fijarla p. ej. el


operador de red como valor porcentual de la potencia nominal.

Dentro de un parque elico, desde los terminales de cada aerogenerador hasta el punto de
conexin a la red, se encuentran cables y transformadores que, entre otros, representan a
los consumidores de potencia activa. Las prdidas de estos elementos no son constantes,
sino que dependen de la potencia transmitida, la temperatura y otros factores.
Para poder aprovechar siempre de forma ptima la alimentacin de potencia activa mxima
admisible en el punto de conexin a la red, la potencia activa real all alimentada se medir
con la adquisicin de datos de red ENERCON y se comunicar a SCADA de modo que se
regule.
Esta regulacin de la potencia activa solo la utilizar el operador de red en situaciones de
red crticas. No resulta prctico, por tanto, el ajuste de valores nominales en forma de tabla
semanal o incluso como parmetros fijos en el sistema SCADA, ms bien se fija el valor
nominal de forma dinmica en caso necesario a travs de ENERCON PDI.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

3.3.3.2.

Pgina
18 de 26

Regulacin de gradientes de potencia

Para lograr un funcionamiento estable de la red puede ser necesario que en caso de
aumento de la velocidad del viento, un parque elico no pase inmediatamente a la red el
incremento de la potencia en forma de aumento de la potencia activa, sino que la subida
est sujeta ms bien a una limitacin.
Una limitacin de este tipo puede parametrizarse, en relacin con los terminales del
aerogenerador, para cada aerogenerador individual12. No obstante, para los requisitos del
operador de red, por regla general solo es relevante el gradiente de potencia del parque
elico completo en el punto de conexin a la red.
En caso de que se desee lograr un valor lmite predeterminado por el operador de red
nicamente con el ajuste de los gradientes de potencia en los terminales del aerogenerador,
deber partirse siempre del caso ms desfavorable, es decir, se asignar a cada
aerogenerador un gradiente de potencia bajo. Debido a la distribucin espacial de los
aerogeneradores en el parque, p. ej. las rfagas de viento, en la prctica, no actan por
igual en todas partes a la vez, es decir, que la determinacin limitada y relacionada con los
aerogeneradores del gradiente mximo impide un aprovechamiento ptimo de las
condiciones del viento.
Es posible regular previa solicitud el gradiente de potencia de todo el parque en el punto de
conexin a la red. Para registrar los valores reales se instalar en el punto de conexin a la
red la adquisicin de datos de red ENERCON. ENERCON utilizar hardware y software
adicional dependiendo de los requisitos de cada proyecto.
Como con todos los sistemas de regulacin, deber coordinarse estrechamente entre el
cliente, el operador de red y ENERCON qu magnitud y qu procedimiento de regulacin se
desea para cada proyecto. Lo prctico sera, p. ej. limitar el valor medio de 1 10 minutos
del gradiente positivo de potencia activa en el punto de conexin a la red.
El valor nominal (gradiente de potencia activa en el punto de conexin a la red) puede fijarse
dinmicamente, p. ej. a travs de ENERCON PDI.
En cualquier caso, la regulacin del gradiente de potencia implica que no se aprovechan de
forma ptima las condiciones del viento, es decir, que disminuye el rendimiento en
comparacin con el funcionamiento sin regulacin de cada gradiente de potencia.

12

Vase Datasheet Grid Performance para rampas de energa.


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
19 de 26

3.3.4. Gestin de la potencia reactiva de la tensin


El suministro o la solicitud de potencia reactiva en la red pueden afectar a la tensin en el
punto de alimentacin de forma que esta aumente o disminuya. La intensidad con la que la
potencia reactiva alimentada (o solicitada) por el parque elico repercute en la tensin del
punto de conexin depende de la intensidad de la red en ese punto. Esto podr calcularse
previamente y de forma precisa siempre que los datos de la red de ENERCON estn
disponibles.
Junto con la modificacin de la alimentacin de la potencia reactiva, tambin puede influirse
en la tensin de red mediante la reduccin de la potencia activa alimentada o la combinacin
de ambas. Esto se aplica especialmente a las redes dbiles o al menos a las redes que son
relativamente dbiles en el punto de conexin. La reduccin de la potencia activa
alimentada lleva consigo, sin embargo, disminuciones del rendimiento y constituye por tanto
la segunda mejor opcin (vase 3.3.4.3).
Que la gestin de la potencia reactiva de la tensin (regulacin del factor de potencia,
regulacin de la tensin, etc.) sea necesaria depende de la red local y deber aclararse con
el operador de red. Tambin deber preguntrsele a qu valor de tensin real dentro de la
banda de tolerancia admisible funcionar habitualmente el punto previsto de conexin a la
red.
El registro de valores reales es por regla general una medicin para media tensin. Siempre
que el parque elico est conectado a travs de una subestacin transformadora propia con
el operador de red, la medicin podr realizarse tambin en alta tensin. Cuando se hable
en lo sucesivo de media tensin, tambin podr aplicarse alternativamente a alta tensin.
Los costes y la utilidad de una medicin de este tipo se sopesarn para cada proyecto.
El valor nominal puede predeterminarse en el sistema SCADA de una de las formas
siguientes:
parametrizndolo en SCADA una vez como valor fijo, o
sujeto a una tabla semanal, o
fijndolo de forma dinmica, p. ej. a travs de ENERCON PDI.
La regulacin en el marco de la gestin de la potencia reactiva de la tensin y sus
parmetros la disea y ajusta ENERCON especficamente para cada proyecto. Para
garantizar una regulacin estable en el punto de conexin a la red, es necesaria una
estrecha y temprana coordinacin entre los clientes, ENERCON y los operadores de red.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
20 de 26

En relacin con la constante de tiempo de una regulacin de tensin, consltese el captulo


0.
3.3.4.1.

Regulacin del factor de potencia

Es una prctica muy extendida que los operadores de red determinen un ngulo de fase
obligatorio en el punto de alimentacin.
Para registrar con precisin el ngulo de fase real, se emplea la adquisicin de datos de red
ENERCON. El valor real se comunica a SCADA, que enva a continuacin seales a cada
uno de los aerogeneradores del parque, para que en el punto de alimentacin el valor real
se corresponda con la mayor precisin posible con el valor nominal. El inevitable
desplazamiento del ngulo de fase por usuarios de potencia activa y reactiva entre los
terminales de los aerogeneradores y el punto de conexin a la red puede compensarse as
de forma ptima.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

3.3.4.2.

Pgina
21 de 26

Regulacin de la tensin SCADA

Mediante la regulacin de la tensin SCADA, el ngulo de fase de todos los


aerogeneradores se ajusta segn una curva caracterstica fija, apta para el punto especfico
de conexin a la red, que depende de la tensin REAL en el punto de conexin a la red.
Dependiendo de la curva caracterstica, se aumenta o disminuye la tensin del punto de
alimentacin.

cos()
cos() = f(U)
Importacin de la
potencia reactiva
de la red

cos() = constante

1,0

U<Unom

1,0

U/Unom

Exportacin de la
potencia reactiva
a la red
Punto angular prefijable
en el sistema SCADA

Ilustracin 7

Ejemplo de un factor de potencia constante (azul) comparado con una regulacin de


tensin SCADA (rojo). Con el ltimo no se alimenta ni solicita dentro de una zona
muerta determinada ninguna potencia reactiva para influir en la tensin (cos=1). Al
otro lado de esta zona muerta el ngulo de fase sigue un curso predefinido que
depende de la tensin de la red.

El registro de la tensin REAL se realiza, como se describi anteriormente, con la forma


especial de registro de media tensin ENERCON de la adquisicin de datos de red
ENERCON. Este transmite los valores de tensin medidos al sistema SCADA como
realimentacin para el sistema de regulacin.
Los valores nominales pueden fijarse o parametrizarse en el sistema SCADA mediante los
valores fijos arriba especificados. La curva caracterstica debe planearse para cada punto de
conexin. En relacin con la constante de tiempo de una regulacin de tensin, consltese
el captulo 0.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa
con regulacin
activada

Pgina
22 de 26

con regulacin
activada
con
regulacin
desactivada

Ilustracin 8

Ejemplo de un parque elico con una potencia nominal de 6 MW. Obsrvese la media
tensin en el punto de conexin con el operador de red, la potencia activa y la
potencia reactiva, con la regulacin de la tensin SCADA activada y desactivada.
Se distingue bien la disponibilidad de potencia reactiva en funcin de la tensin y de
la potencia activa.

con regulacin activada

con regulacin desactivada

Zona de
tensin deseada

Ilustracin 9

Ejemplo de un parque elico con una potencia nominal de 6 MW. Obsrvese la media
tensin en el punto de conexin con el operador de red, la potencia activa y la
potencia reactiva, con la regulacin de la tensin SCADA activada y desactivada.
En este detalle de la imagen superior se distingue la eficacia de la regulacin SCADA
en segundos.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa
3.3.4.3.

Pgina
23 de 26

Regulacin de la potencia aparente (optimizacin de potencia)

La regulacin de la potencia aparente es una combinacin de regulacin del factor de


potencia y reduccin de la potencia activa alimentada. Deber acordarse con ENERCON
especficamente para cada proyecto hacia qu valor exacto tiende la regulacin de la
potencia aparente y de qu forma se parametriza esta regulacin.
Ejemplo: conforme al acuerdo con el operador de red, el parque elico deber funcionar,
por regla general, con un ngulo de fase determinado nom > 0. Al mismo tiempo, la potencia
aparente en el punto de conexin a la red est limitada a Smx. El ngulo de fase puede
reducirse hasta =0 cuando se alcanza el lmite de potencia aparente Smx, y todava sera
posible aumentar la potencia activa con buenas condiciones del viento.
Realizacin con regulacin de la potencia aparente:
En el rango de carga parcial, el parque elico funciona con el ngulo de fase nom. Al
aumentar la velocidad del viento, aumenta tambin la potencia aparente generada SREAL. Al
acercarse la potencia aparente actual SREAL a la potencia aparente mxima admisible Smx, el
ngulo de fase REAL se reduce mediante el sistema de regulacin de forma que no se
superen el lmite de la potencia aparente Smx incluso aunque siga aumentando la potencia
activa.
El registro de valores reales se realiza a travs de la adquisicin de datos de red
ENERCON. El valor nominal (potencia aparente en el punto de conexin a la red) puede
predeterminarse en el sistema SCADA de una de las formas siguientes:
parametrizndolo en SCADA una vez como valor fijo, o
sujeto a una tabla semanal.
La regulacin de la potencia aparente puede traer consigo que no se aprovechen de forma
ptima las condiciones del viento, es decir que disminuya el rendimiento en comparacin
con el funcionamiento sin una regulacin de la potencia aparente.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
24 de 26

4. Condiciones previas
El sistema SCADA se ejecuta como programa en el PC SCADA13, esto es condicin previa
para el funcionamiento del sistema SCADA en el parque elico.
Es deseable una conexin operativa del sistema SCADA con el exterior en todo momento,
aunque no es indispensable para un funcionamiento seguro. Los aerogeneradores
permanecern en funcionamiento aunque haya problemas de comunicacin dentro del
parque elico o con el exterior.
Para el comportamiento del sistema de control/regulacin del parque elico en caso de fallo
de las lneas de comunicacin, debern considerarse por separado los procedimientos de
regulacin o control individuales (vase tambin 0).

5. Necesidad de mantenimiento
Las medidas de mantenimiento necesarias de los distintos componentes de hardware y
software del sistema SCADA estn registradas en la documentacin de los correspondientes
componentes.

6. Sistema ENERCON SCADA en ENERCON PARTNER KONZEPT (EPK)


Deber establecerse especficamente para cada proyecto si el sistema ENERCON SCADA
est cubierto por el contrato de mantenimiento ENERCON PARTNER KONZEPT y de qu
forma.

7. Suministro de serie
Como suministro de serie para un proyecto de parque elico con aerogeneradores
ENERCON se incluyen ENERCON SCADA (software del PC SCADA en el parque elico) y
ENERCON SCADA REMOTE para un PC indicado del cliente, as como una licencia para
cada uno de los programas y una proteccin de hardware (dongle).

8. Otros
Los procesos de desconexin o interrupcin de cada aerogenerador, p. ej. mediante
condiciones para la emisin de ruido o generacin de sombras especficas para cada
proyecto, no se realizan a travs del sistema SCADA, sino que se programan directamente
en el sistema de control del aerogenerador. Esto tiene la ventaja de que, incluso en caso de
fallos de comunicacin en el sistema SCADA, se respetan los lmites de emisin.

13

Vase la documentacin propia sobre PC SCADA.


RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS
Document information:
Author/ date:
WB / 24-05-2006
Translator / date:
Department:
WRD-E
Language Wire / 16.11.07
Revisor / date:
Approved / date:
RSC / 01-06-2006
C. Muoz - S. Veintemilla /19.11.07
Reference:
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa
Revision:
2.0

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
25 de 26

9. Datos tcnicos
9.1.

Datos tcnicos del funcionamiento

La lista de los mensajes de estado principal de ENERCON se puede consultar en la


pgina siguiente.

9.2.

Datos tcnicos del hardware

No hay datos de hardware para el sistema SCADA; consulte la documentacin de los


componentes individuales como la que figura en el captulo 2.2.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

SISTEMA ENERCON SCADA


Descripcin del programa

Pgina
26 de 26

Lista de los mensajes de estado principal de ENERCON


A modo de ejemplo se muestran los mensajes de estado principal de los aerogeneradores
E-70/E4 y E82 (EPROM I/O armario de control versin 1.45)
Los mensajes de estado estn organizados siguiendo el esquema estado principal: estado
adicional.
No se enumeran aqu los estados adicionales debido a su volumen.
Las listas completas de estados estn disponibles en ENERCON SERVICE previa solicitud.
0
1
2
3
4
5
7
8
9
10
11
12
14
15
16
17
20
21
22
25
29
30
31
40
41
42
43
44
45
46
47
48
49
55
60

Aerogenerador funcionando
Aerogenerador parado
Falta de viento
Temporal
Desconexin por sombras
Sist. calefaccin pala
Acceso no permitido
Mantenimiento
Calefaccin generador
Parada de emergencia activada
Freno mecnico activado manualmente
Bloqueo del rotor
Depsito de hielo
Presencia de humedad
Test interruptor sobrevelocidad
Test sistema seguridad
Sistema medicin viento averiado
Cable enrollado
Avera ngulo de orientacin
Avera inversor sistema orientacin
Interfaz anemmetro
Sensor de vibraciones
Oscilaciones de torre
Sobrevelocidad
Interruptor sobrevelocidad
Avera control ngulo de paso
Avera circuito seguridad principal
Avera condensador ajuste emergencia
Fallo condensador
Avera test condensador
Avera sistema de seguridad
Avera sensor de velocidad
Avera lmite carga pala
Avera sistema calefaccin pala
Avera red

Ejemplo

61
62
64
65
66
67
69
70
72
73
76
80
90
91
95
96
112
122
150
152
153
155
158
202
204
206
207
220
221
222
223
228
229
240
300

Cada de red
Avera alimentacin
Sobrecorriente convertidor
Sobretensin convertidor
Avera rectificador
Sobretemperatura
Sensor acstico
Sobretemperatura generador
Control del entrehierro
Control momento
Temperatura cojinete
Avera excitacin
Interruptor de proteccin activado
Proteccin semiconductores defectuosa
Avera medicin de temperatura
Avera medicin temperatura convertidor
Sensor de humo
Avera transformador
Inicie EEPROM!
Programa incompatible!
Sin identificador
Direccin boot block errnea
N. de serie
Avera bus convertidor
Avera bus datos todos convertidores
Ningn dato de power control
Avera Inverter Control
Reset procesador
Reset Watchdog
Reset aerogenerador
Actualizacin software
Tiempo lmite mensaje aviso excedido
Demasiados mensajes aviso
Sistema de control remoto
Avera bus de datos control

302
303
304
305
306
307
310
315
318
319
320
402
403
404
405
411
412
413
414
415
421
422
423
424
425
426
427
428
429
432
433
434
435
438
441

Avera bus de datos pala


Avera bus de datos control pala (CAN3)
Avera bus de datos (Timeout)
Ningn dato de tarjeta I/O armario control
No existen datos de
Timeout transductor angular
Componente de bus desconocido
ndice no vlido
Avera interruptor CAN1
Avera interruptor CAN2
Avera bus IIC
Avera procesador +12 V
Avera procesador -12 V
Avera procesador +15 V
Avera procesador -15 V
Avera +4 V ref. procesador
Avera +5 V ref. procesador
Avera -5 V ref. procesador
Avera +10 V ref. procesador
Avera -10 V ref. procesador
Avera +5 V sensores
Avera +12 V sensores
Avera -12 V sensores
Avera +15 V sensores
Avera -15 V sensores
Avera +20 V sensores
Avera -20 V sensores
Avera +12 V rel
Avera alimentacin hardware
Avera +5 V ref. sensores
Avera -5 V ref. sensores
Avera +10 V ref. sensores
Avera -10 V ref. sensores
Avera suministro excitador IGBT
Avera pos. alimentacin medidor corriente

El mensaje de estado 20:52 significa


Sistema medicin viento averiado: sin seal del anemmetro

Algunos estados adicionales van precedidos de W; se trata de mensajes de aviso que no


conducen a la desconexin inmediata del aerogenerador. Dependiendo del tipo de mensaje
de aviso, estos pueden quedar pendientes un nmero determinado de das hasta que se
produzca la desconexin si hasta entonces no ha habido intervencin de Service.
Los mensajes de estado principal de otros aerogeneradores ENERCON son en su mayor
parte idnticos; aunque se diferencian, p. ej. en la cantidad de inversores y, por tanto,
tambin en la cantidad de mensajes de avera de estado principal correspondientes.

Document information:
Author/ date:
Department:
Approved / date:
Revision:

RESERVADO EL DERECHO A REALIZAR MODIFICACIONES TCNICAS

WB / 24-05-2006
Translator / date:
WRD-E
Revisor / date:
RSC / 01-06-2006
Reference:
2.0

Language Wire / 16.11.07


C. Muoz - S. Veintemilla /19.11.07
WRD-E-04-SCADA_SYSTEM_060621_Rev2.0_ger-spa

J. Pons Ingenieros S.L.


c/ Teniente Coronel Castillo Olivares, n 1 bis.
Telf.:928-20-43-62
e-mail: jpons@coiic.es

PARQUE ELICO LLANO BLANCO


1.- Se adjuntan los decimales de las coordenadas de las posiciones de los
aerogeneradores del plan elico.
IDENTIFICACIN DEL
AEROGENERADOR

AE
AE
AE
AE

FILA

1
1
2
2

1
2
1
2

COORDENADAS UTM

X
458.903,3861
459.045,3861
458.903,3861
459.045,3861

Y
3.086.291,1628
3.086.291,1628
3.085.931,1628
3.085.931,1628

22-25

Z
80
77
72
69

POTENCIA
UNITARIA

DIRECCIN
VIENTO
DOMINANTE

(kW)

pred ()

2.300
2.300
2.300
2.300

0
0
0
0