ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 02 OF 23

TABLE OF CONTENT
1.0

PROJECT SCHEDULE BRIEF

2.0

HEALTH, SAFETY AND ENVIRONMENT

3.0

OVERALL

4.0

ENGINEERING

5.0

PROCUREMENT

6.0

QUALITY ASSURANCE AND QUALITY CONTROL

7.0

CONSTRUCTION, PRE-COMMISSIONING AND COMMISSIONG

8.0

AREA OF CONCERN

9.0

ATTACHMENTS

LOGO

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 03 OF 23

1.0 PROJECT SCHEDULE BRIEF

1.1 Engineering
Substantial Engineering work are to be complete.

P&ID and PFD Rev.0 by 15th December 2104

Long lead Items MR by 23rd December 2014

Tanks foundation drawings Rev.0 by

Piling drawings Rev.0 by 30th January 2015

All general arrangement drawings Rev.0 by

Substantial Engineering Completion by mid March 2015.

20th January 2015


mid February 2015

1.2 Procurement

All Long lead / critical Items Purchase order are expected to issue before 15th
February 2015.

Steel Plates for Tanks

G/L Separator are expected to deliver at site in October 2015


Oil/water Booster Pumps are expected to deliver at site in September 2015.

Pile material is expected to deliver at site in April 2015.

ESD & Control Valves are expected to deliver at site in end October 2015.

are expected to

deliver at site in May 2015

1.3 Construction

Mobilization of manpower and machinery to be started in Mid January 2105

Piling work , Tanks foundations, close/open vent pit are expected to be


complete before rain

Sedimentation tanks erection, underground piping, CP tank external are expected


to be complete before rainy season.

Mechanical completion is expected on 10th December 2015.

1.4 Commissioning

Detailed commissioning plan to be submitted 4 weeks prior to commissioning


carried out

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 04 OF 23

1.1 PROJECT MILESTONE DATE

Milestone No.

Milestone 1

Milestone Description

Contract Deffective Date

Schedule Date

10-Sep-14

Mechanical Completion Date


Milestone 2

10-Dec-15
(15 months after Effective Date)
Provisional Acceptance Date

Milestone 3

09-Jan-16
(16 months after Effective Date)
Final Acceptance Date

Milestone 4

09
Jan 17
09-Jan-17
(12 months after Provisional Accepta

1.2

CHRONOLOGY OF PORJECT
EVENT

S.NO

Date

Project award

10-Sep-14

Engineering work Start

11-Sep-14

Kick-off Meeting

27-Oct-14

HAZOP Meeting

3-Dec-14

PFD P&ID Completed

16-Dec-14

MR Rev.A has been completed

26-Jan-15

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17


1.3

PAGE 05 OF 23

CRITICAL PATH

LONGEST PATH
G/L Separator

ENGINEERING

PROCUREMENT

CONSTRUCTION

P&ID

PO issuance

Installation

Data Sheet

Manufacturing & Delivery

Tie-in

PRE-COM /COMM

Commissioning

Material RequisitionShipment to Port Sudan


TBE

Custom Clearance
Inland Transportation to site

CRITICAL PATH B
Booster Pumps

ENGINEERING

PROCUREMENT

CONSTRUCTION

P&ID

PO issuance

Installation

Data Sheet

Manufacturing & Delivery

Tie-in

PRE-COM /COMM
Commissioning

Material RequisitionShipment to Port Sudan


TBE

Custom Clearance
Inland Transportation to site

CRITICAL PATH C

ENGINEERING

Sedimentation Tanks P&ID

PROCUREMENT
PO issuance

Data Sheet

CONSTRUCTION

PRE-COM /COMM

Fabrication & Erection

Manufacturing & Delivery

Commissioning

Material RequisitionShipment to Port Sudan


TBE

Custom Clearance
Inland Transportation to site

NOTE:

Plan to complete Sedimentation tanks before rainy season start

CRITICAL PATH D

ENGINEERING

ESD & Control Valves P&ID


Data Sheet

PROCUREMENT

CONSTRUCTION

PO issuance

Installation

Manufacturing & Delivery

Termination

PRE-COM /COMM
Programming

Material RequisitionShipment to Port Sudan


TBE

Custom Clearance
Inland Transportation to site

For Details refere to Level 4 Schedule

Commissioning

LOGO

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 06 OF 23

2.0 HEALTH, SAFETY AND ENVIRONMENT (HSE)


2.1 HSE STATISTICS
TYPE OF ACCCIDENT
LOST TIME INJURY
Fatality
Permanent Total Disability
Permanent Partial Disability
Lost Workday Case

UP TO PREVIOUS
WEEK

THIS WEEK

CUMULATIVE

0
0
0

0
0
0

0
0
0

0
0
0
0

0
0
0
0

0
0

0
0
0

0
0
0

0
0
0

0
65520
7410
0
72930

0
3448
480
0
3928

0
68968
7890
0
76858

0
0
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

INJURIOUS NON-LTI
Restricted Work Cases
Medical Treatment Case
First Aid
Occupational Health Illness
NON-INJURIOUS
Fire / Explosion
Property / Equipment Damage
Near Miss
Environmental Case
Indirect Manhours
Direct Manhours
Third Party Manhours
Total Manhours Worked
LTI Frequency Rate
Lost Workdays
LTI Severity Rate
Total Recordable Case Frequency
Unsafe Act
Unsafe Condition
Nos. Of Safety Meeting
Nos. Of Safety Drills
2.2 HSE AND SECURITY HIGHLIGHTS

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

LOGO
OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

SYSTEM

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 07 OF 23

3.0 OVERALL PROGRESS


ACCUMULATIVE PROGRESS (%)
PROJECT PHASE

WTG (%)

5.00%
60.00%
33.00%
2.00%
100.00%

ENGINEERING
PROCUREMENT
CONSTRUCTION
COMMISSIONING
OVERALL

LAST WEEK (%)

THIS WEEK (%)

PLAN

ACTUAL

VARIANCE

PLAN

ACTUAL

VARIANCE

97.15%

88.56%

-8.59%

97.49%

89.40%

-8.09%

28.72%

23.14%

-5.58%

31.13%

27.59%

-3.54%

9.66%

1.20%

-8.46%

11.56%

1.20%

-10.36%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25.28%

18.71%

-6.57%

27.37%

21.42%

-5.95%

3.1 Delay Reasons

A. Engineering: 8.09% Delay

1. Delay in issuing document of Rev.B and Rev. 0. Weighted 7.86%.


1.1 Due to lately submission of vendor document, 110 drawings upgrading were impacted, weighted 3.09%.
1.2 41 Drawings were lately feedback and 12 Drawings were not feedback by PMC, weighted 1.19%.
1.3 133 drawings were not in time completed, weighted 3.58%.

2. Delay in issurance of TBE, totally 2 TBE weighted 0.23%. (Instrument Junction Box, Miscellaneous of
Tanks)

B. Procurement 3.54% Delay


Key Equipment such as Water Booster Pump Bottom,Centrifugal Pump, PCP Purchase order
1
have been lately issued due to delay in TBE and Clarification. This affect the procurement
progress.
2

MCC is under approval of commercial evaluation report.

Insulation of Piping, Hot Tapping and Electrical Heat Tracing, and PAGA Purchase Order not
issued due to delay in TBE

C. Construction 10.36% Delay


1

Due to progress of Civil Pad handover.

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

3.2 UPDATED OVERALL PROGRESS CURVE

OverallSCurve
110.00%
100.00%
90.00%Preparation of

Vendor documents for Owner Approval

80.00%

Progress

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

EarlyPlan

LaterPlan

Actual

PAGE 08 OF 23

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

LOGO

SYSTEM

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 09 OF 23

3.2 MANPOWER LOADING


TRADE

S/N

INDIRECT MANPOWER

MAN-DAY
DAY 1

DAY 2

DAY 3

DAY 4

DAY 5

DAY 6

DAY 7

SUN

MON

TUE

WED

THU

FRI

SAT

Project Management

Planning Engineer

Documents Controller

Engineering Management

Mechanical Engineer

12

12

12

12

12

12

Civil Engineer

Process Engineer

Piping Engineer

Electrical Engineer

10

Instrument & Control Eng.

11

Corrosion Control

12

Procurement Manager

13

Buyer -1

14

Procurement Coordinator

15

Purchaser

16

Expeditor

17

Logistic Officer

18

Construction Manager

19

HSE Officer

20

QA/QC Engineer

21

QA/QC Inspector

22

Construction Supervisor

23

Commissioning Engineer

SUBTOTAL (INDIRECT)

72

72

72

72

72

71

THIS WEEK MANHOURS (INDIRECT)

576

576

576

576

576

568

PRV. WEEK MANHOURS (INDIRECT)

56

11006

11002

11002

11002

11002

10450

CUMM. MANHOURS (INDIRECT)

56

11582

11578

11578

11578

11578

11018

MAN-DAY

DIRECT MANPOWER
1

Welder

Pipe fitter

Instrument Fitter

Instrument Tech

Electrician

General Worker

Heavy Machinery Operator

Mechanic/Millwright

Civil Technician

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

LOGO

SYSTEM

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 15

PAGE 10 OF 23

SUBTOTAL (DIRECT)

THIS WEEK MANHOURS (DIRECT)

80

80

80

80

80

80

PRV. WEEK MANHOURS (DIRECT)

630

1190

1190

1100

1100

1100

1100

CUMM. MANHOURS (DIRECT)

630

1270

1270

1180

1180

1180

1180

THIRD PARTY MANPOWER

MAN-DAY

1
2
3
4
SUBTOTAL (THIRD PARTY)
THIS WEEK MANHOURS (THIRD PARTY)
PRV. WEEK MANHOURS (THIRD PARTY)
CUMM. MANHOURS (THIRD PARTY)
GRAND TOTAL
THIS WEEK MANHOURS

656

656

656

656

656

648

PRV. WEEK MANHOURS

686

12196

12192

12102

12102

12102

11550

CUMM. MANHOURS

686

12852

12848

12758

12758

12758

12198

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

PAGE 11 OF 23

WEEKLY PROGRESS REPORT NO. 17


4.0 ENGINEERING
4.1 UPDATED ENGINEERING PROGRESS DESCIPLINE WISE
ACCUMULATIVE PROGRESS (%)
DISCIPLINE

WTG (%)

LAST WEEK (%)

THIS WEEK (%)

PLAN

ACTUAL

VARIANCE

PLAN

ACTUAL

VARIANCE

GEN

2.25%

2.25%

2.12%

-0.13%

2.25%

2.12%

-0.13%

Process

8.71%

8.71%

8.44%

-0.27%

8.71%

8.48%

-0.23%

Piping

30.12%

29.76%

24.90%

-4.86%

29.84%

25.08%

-4.76%

CP

2.54%

2.54%

2.39%

-0.15%

2.54%

2.39%

-0.15%

Mechanical

15.14%

15.14%

14.21%

-0.93%

15.14%

14.43%

-0.72%

Electrical

7.30%

7.08%

7.21%

0.13%

7.08%

7.30%

0.22%

TEL
Instrumentati
on

1.37%

1.33%

1.24%

-0.09%

1.37%

1.24%

-0.12%

8.83%

7.91%

-0.92%

8.89%

8.02%

-0.87%

CIV

21.67%

21.51%

20.14%

-1.37%

21.67%

20.34%

-1.33%

As-Built

1.96%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

Total

100%

97.15%

88.56%

-8.59%

97.49%

89.40%

-8.10%

8.95%

4.2 UPDATED ENGINEERING DOCUMENTS STATUS


Last Week
Discipline

GENERAL
PROCESS
PIPING
INSTRUMENT
ELECTRICAL
TELECOM
CP
CIVIL
MECHANICAL
Total
NOTE:
1-

Progress of this week

This Week

Total Estimated
Based on TDR

IFR (A)

IFA (B)

IFC (0)

IFR (A)

IFA (B)

IFC (0)

IFR (A)

IFA (B)

IFC (0)

10
72
297
75
91
16
31
244
133
969

10
72
289
74
91
16
31
244
132
959

4
48
256
39
5
1
19
3
121
496

3
62
57
53
79
9
30
101
116
510

10
72
290
74
91
16
31
244
132
960

4
49
257
39
5
1
19
3
121
498

3
65
61
56
79
9
30
117
124
544

0
0
1
0
0
0
0
0
0
1

0
1
1
0
0
0
0
0
0
2

0
3
4
3
0
0
0
16
8
34

TDR is updated on 2015.03.06.


PIPING added 8 document: PAL-1193-DWG-PIP-4255-01, PAL-1193-RP-PIP-(003-009)

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM


CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 12 OF 23

4.3 ACHIEVEMENT THIS WEEK


Following documents issued this week
PROCESS
No

Drawing / Document No.

Description

Rev

PAL-1193-DWG-PID-2160-02

P & ID for Instrument Air Distribution

IFA

PAL-1193-RP-PRO-001

HAZOP Report

IFC

PAL-1193-DWG-PID-2103-01

P & ID for 3-Phase Metering Skid

IFC

PAL-1193-DWG-PID-2160-02

P & ID for Instrument Air Distribution

IFC

No

Drawing / Document No.

Description

Rev

STATUS

PAL-1193-DWG-PIP-4255-01

Layout of valve pits for fire fighting system

IFR

PAL-1193-DWG-PIP-4384

ISOmetric Drawings-fire fighting system

IFA

PAL-1193-DWG-PIP-4001-1/1

Equipment Location Key Plan

IFC

PAL-1193-TBE-PIP-001

TBE for Bulk Valves

IFC

PAL-1193-MR-PIP-008

MR for Underground Firewater SWHDPE and GRE Pipes & Fittings

IFC

PAL-1193-MTO-PIP-008

MTO for Underground Firewater SWHDPE and GRE Pipes & Fittings

IFC

No

Drawing / Document No.


No

Description

Re
Rev

STATUS

PAL-1193-TBE-INT-001

TBE for ESD Valves & On-Off Valves

IFC

PAL-1193-TBE-INT-012

TBE for Instrument Bulks Material

IFC

PAL-1193-CEF-INT-002

Cause and Effect (Fire & Gas)

IFC

Drawing / Document No.

Description

Rev

STATUS

PAL-1193-DS-MEC-005

Data Sheet for Closed Drain Sump Pumps (P-2373A/B)

IFC

PAL-1193-DS-MEC-006

Data Sheet for Open Drain Sump Pumps (P-2376A/B)

IFC

PAL-1193-DS-MEC-007

Data Sheet for Sand Drain Pit Pumps(P-2374A/B)

IFC

PAL-1193-DS-MEC-008

Data Sheet for Vent Pit Oil Pumps (P-2375A/B)

IFC

PAL-1193-DS-MEC-010

Data Sheet for Anti-Foam Injection Skid(A-2357)

IFC

PAL-1193-MR-MEC-003

MR for Progressive Cavity Pumps

IFC

PAL-1193-DWG-MEC-3000-01

Equipment Layout Plan

IFC

PAL-1193-TBE-MEC-004

TBE for Anti-foam Injection Skids

IFC

STATUS

PIP

INSTRUMENTATION

MECHANICAL
No

CIV
No

Drawing / Document No.

Description

Rev

STATUS

PAL-1193-DWG-CIV-0457-01

Misc Civil Works

IFC

PAL-1193-DWG-STR-1650-03

Platform Structural Steel Sheet-03

IFC

PAL-1193-DWG-STR-1650-04

Platform Structural Steel Sheet-04

IFC

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM


CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 13 OF 23

No

Drawing / Document No.

Description

Rev

STATUS

PAL-1193-DWG-STR-1650-05

Platform Structural Steel Sheet-05

IFC

PAL-1193-DWG-STR-1650-06

Platform Structural Steel Sheet-06

IFC

PAL-1193-DWG-STR-1800-01

Walkway Structural Steel Sheet-01

IFC

PAL-1193-DWG-STR-1800-02

Walkway Structural Steel Sheet-02

IFC

PAL-1193-DWG-STR-1800-03

Walkway Structural Steel Sheet-03

IFC

PAL-1193-DWG-STR-1800-04

Walkway Structural Steel Sheet-04

IFC

10

PAL-1193-DWG-STR-1800-05

Walkway Structural Steel Sheet-05

IFC

11

PAL-1193-DWG-STR-1800-06

Walkway Structural Steel Sheet-06

IFC

12

PAL-1193-DWG-STR-1800-07

Walkway Structural Steel Sheet-07

IFC

13

PAL-1193-DWG-STR-1800-08

Walkway Structural Steel Sheet-08

IFC

14

PAL-1193-DWG-STR-1908-01

Anti-Foam Skid Shed Sheet-01

IFC

15

PAL-1193-DWG-STR-1908-02

Anti-Foam Skid Shed Sheet-02

IFC

16

PAL-1193-DWG-STR-1908-03

Anti-Foam Skid Shed Sheet-03

IFC

4.4 REASON OF DELAY IN PROGRESS


1.0

Design team delay in issue document Rev B and Rev.0, which weighted 8.36%.

2.0

Instrument Junction Box and Miscellaneous of Tanks Vendors take long time to submit the Technical
Document, TQ takes long time.This impact 2 TBE progress weighted 0.23%

4.5 MITIGATIONMEASURES
1.0
2.0
3.0

CPECC engineer team to work extra hour to catchup delay and Owner to review and return back
documents within time periode
Please PMC accelerate the review of document.
Monitor the progress of Vendor' response, accelerate the TBE's progress and Vendor
submission of Documents.

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM


CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 14 OF 23

4.6 FORECAST FOR NEXT WEEK

PROCESS
No

Drawing / Document No.

Description

Rev

PAL-1193-ML-PRO-001

Operating And Maintenance Manual

PAL-1193-ML-PRO-002

Pre-Commissioning And Commissioning Manual

PAL-1193-ML-PRO-003

Training Manual

PAL-1193-CAL-PRO-002

Flare Relief System Calculation Report

PAL-1193-SCH-PRO-001

Equipment List

PAL-1193-SCH-PRO-002

Line List

PAL-1193-SCH-PRO-003

Tie-in List

No

Drawing / Document No.

Description

Rev

PAL-1193-RP-PIP-001

Stress analysis Report

PAL-1193-RP-PIP-002

Stress Critical Line List

PAL-1193-RP-PIP-003

Stress analysis Report for System 2

PAL-1193-RP-PIP-004

Stress analysis Report for System 3

PAL-1193-RP-PIP-005

Stress analysis Report for System 4

PAL-1193-RP-PIP-006

Stress analysis Report for System 5

PAL
1193 RP PIP 007
PAL-1193-RP-PIP-007

St
l i Report
R
t for
f System
S t
Stress analysis
6

PAL-1193-RP-PIP-008

Stress analysis Report for System 7

PAL-1193-RP-PIP-009

Stress analysis Report for System 8

10

PAL-1193-DWG-PIP-4385

ISOmetric Drawings-pipe rack area

11

PAL-1193-DWG-PIP-4390-01

ISOmetric Drawings-tank area

12

PAL-1193-DWG-PIP-4391

ISOmetric Drawings-separator area

13

PAL-1193-TBE-PIP-008

TBE for Underground Firewater SWHDPE and GRE Pipes & Fittings

14

PAL-1193-TBE-PIP-009

TBE for Fire Fighting and Safety Elements

15

PAL-1193-DWG-PIP-4255-01

Layout of valve pits for fire fighting system

16

PAL-1193-MTO-PIP-001

MTO for Bulk Valves

17

PAL-1193-TBE-PIP-003

TBE for Aboveground Pipes & Fittings

18

PAL-1193-TBE-PIP-004

TBE for Access Fittings Assemblies

19

PAL-1193-TBE-PIP-005

TBE for Special items

20

PAL-1193-TBE-PIP-006

TBE for Insulation Materials

21

PAL-1193-TBE-PIP-007

TBE for Hot Tapping Materials

22

PAL-1193-DWG-PIP-4100-01

Tie-in Layout Plan

PIPING

23

PAL-1193-DWG-PIP-4102-01

Key Plan of Aboveground Piping General Arrangement

24

PAL-1193-DWG-PIP-(4300-4380)-01/02

Aboveground Piping General Arrangement DrawingArrangement

25

PAL-1193-DWG-PIP-4600-(01-53)

Standard Pipe Support Drawings

26

PAL-1193-MTO-PIP-009

MTO for Fire Fighting and Safety Elements

27

PAL-1193-MTO-PIP-015

MTO for Galvanized Pipe and Fitting for Fire Fighting System

28

PAL-1193-TBE-PIP-002

TBE for Underground Pipes & Fittings

29

PAL-1193-TBE-PIP-015

TBE for Galvanized Pipe and Fitting for Fire Fighting System

30

PAL-1193-DWG-PIP-4101-01

Underground Piping Key Plan

31

PAL-1193-DWG-PIP-(4201-4249)-01

Underground Piping General Arrangement -area 01-49

32

PAL-1193-DWG-PIP-4253-01

Valve Pit Details

33

PAL-1193-DWG-PIP-4253-02

Valve Pit Details

No

Drawing / Document No.

Description

Rev

PAL-1193-DWG-INT-7100-01

Instrument Interconnection Drawing

INSTRUMENT

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 15 OF 23

PAL-1193-DWG-INT-7200-01

Instrument Loop Drawings

PAL-1193-SCH-INT-007

Instrument Cable Drum Schedule

PAL-1193-MR-INT-010

MR for Instrument Cables and Glands

PAL-1193-MR-INT-011

MR for Instrument Junction Boxes

PAL-1193-DWG-INT-7001-01

Instrument Cable Block Diagram

PAL-1193-DWG-INT-7003-01

Building Fire Alarm and Clean Agent Fire Suppression System Block Diagram

PAL-1193-DWG-INT-7300-01

Instrument Hook-up Drawings

PAL-1193-DWG-INT-7500-01

Instrument Cable Tray&Trench Layout

10

PAL-1193-DWG-INT-7504-01

General Arrangement for Remote I/O Room

11

PAL-1193-DWG-INT-7600-01-137

Logic Diagram

12

PAL-1193-SCH-INT-001

Instrument Index

13

PAL-1193-SCH-INT-004

Alarm and Trip Schedule

14

PAL-1193-SCH-INT-005

Instrument Cable Schedule

15

PAL-1193-SCH-INT-006

Instrument Junction Box Schedule

16

PAL-1193-CEF-INT-001

Cause and Effect (ESD)

No

Drawing / Document No.

Description

Rev

PAL-1193-DWG-ELE-6152-03

Area Power Cable Routine Layout Sheet -03

PAL-1193-TBE-ELE-002

TBE for LV Switchgear and Motor Control Centre

No

Drawing / Document No.

Description

Rev

PAL-1193-DWG-CP-6959-001

Cathodic Protection System Layout for Piles and U/G Piping

No

Drawing / Document No.

Description

Rev

PAL-1193-DWG-CIV-0200-01

Pile layout Key Plan

PAL-1193-DWG-CIV-0300-01-38

Pile Layout Plan Sheet-01-38

PAL-1193-DWG-CIV-0601-01

T-2365 Closed Drain Sump Details

PAL-1193-DWG-CIV-0601-02

T-2365 Closed Drain Sump Details

PAL-1193-DWG-CIV-0602-01

T-2366 Open Drain Sump Details

PAL-1193-DWG-CIV-0602-02

T-2366 Open Drain Sump Details

PAL-1193-DWG-CIV-0603-01

T-2367 Sand Drain Pit Details

PAL-1193-DWG-CIV-0603-02

T-2367 Sand Drain Pit Details

PAL-1193-DWG-CIV-0604-01

T-2368 Vent Pit Details

10

PAL-1193-DWG-CIV-0605-01

T-2371A/B Sand Pond Details

11

PAL-1193-DWG-CIV-0606-01

Valve Pit 1 Details

12

PAL-1193-DWG-CIV-0606-02

Valve Pit 2 Details

13

PAL-1193-DWG-CIV-0606-03

Valve Pit 3 Details

14

PAL-1193-DWG-CIV-0606-04

Valve Pit 4 Details

15

PAL-1193-DWG-CIV-0704-01

FS-2344 Cold Vent Stack Foundation Details

16

PAL-1193-DWG-STR-1000-01

Structural Steel Layout Key Plan

17

PAL-1193-DWG-STR-1050-(01-47)

Structural Steel Layout Sheet-01-47

18

PAL-1193-DWG-STR-1600-(01-09)

Pipe Support Details Sheet-01-09

19

PAL-1193-DWG-STR-1601-(01-08)

Pipe Support Schedule Sheet-01-08

20

PAL-1193-DWG-STR-1650-01

Platform Structural Steel Sheet-01

21

PAL-1193-DWG-STR-1650-02

Platform Structural Steel Sheet-02

22

PAL-1193-DWG-STR-1704-01

P-2308A/B/C Crude Oil Booster Pumps Skid Details

23

PAL-1193-DWG-STR-1705-01

P-2318A/B/C Water Booster Pumps Skid Details

24

PAL-1193-DWG-STR-1706-01

V-2342 Flare Knock Out Drum Skid Details

25

PAL-1193-DWG-STR-1707-01

P-2342A/B Flare Drum Pumps Skid Details

ELECTRICAL

CORROSIONCONTROL

CIVIL

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM


CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 16 OF 23

26

PAL-1193-DWG-STR-1708-01

Transformer A/B Skid Details

27

PAL-1193-DWG-STR-1902-04

Control/Switchgear/Battery Room steel floor skid details Sheet-04

28

PAL-1193-DWG-STR-1905-01

Transformer Shed Sheet-01

29

PAL-1193-DWG-STR-1905-02

Transformer Shed Sheet-02

Drawing / Document No.

Description

Rev

MECHANICAL
No
1

PAL-1193-TBE-MEC-003

TBE for Progressive Cavity Pumps

PAL-1193-DWG-MEC-3001-01

Sedimentation Tank (T-2302A)General Arrangement

PAL-1193-DWG-MEC-3002-01

Sedimentation Tank (T-2302B)General Arrangement

PAL-1193-DWG-MEC-3051-01

Crude Oil Buffer Tank(T-2303)General Arrangement

PAL-1193-DWG-MEC-3101-01

Water Buffer Tank(T-2340)General Arrangement

PAL-1193-TBE-MEC-011

TBE for Centrifugal Pumps

PAL-1193-TBE-MEC-013

TBE for Sedimentation tank lattice dome roof

No

Drawing / Document No.

Description

Rev

PAL-1193TBE-TEL-002

Technical Bid Evaluation for PAGA Equipment

PAL-1193DWG-TEL-8003-001

CCTV steel pole and Camera Installation Drawings

PAL-1193DWG-TEL-8007-001

PA/GA System Wiring Diagram in Cabinet

PAL-1193TBE-TEL-001

Technical Bid Evaluation for CCTV Equipment

PAL-1193DWG-TEL-8006-001

PA/GA Cabinet Layout in Remote I/O Room

PAL-1193DWG-TEL-8008-001

PA/GA System Cabinet Arrangement Drawing

PAL-1193DWG-TEL-8009-001

PA/GA Equipment Installation Drawing on Pole

TELECOMMUNICATION

4.7 TECHNICAL DOCUMENT REGISTER


- Attachment

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 17 OF 23

5.0 PROCUREMENT
5.1 UPDATED MR

STATUS

Discipline

Total MR

Issued Last Week

Issued This Week

Remaining

Mechanical

13

Rev.A
13

Rev.0
10

Rev.A
0

Rev.0
1

Rev.A
0

Rev.0
2

Piping

10

10

Electrical

12

12

12

Corrosion Control

Instrumentation

15

15

13

Telecommunication

Civil/Structure
Total

5 2 UPDATED TBE
5.2

63

63

55

STATUS

Discipline

Total TBE

Issued Last Week

Issued This Week

Remaining

Rev.0
7

Rev.A
0

Rev.0
1

Rev.A
0

Rev.0
5

Mechanical

13

Rev.A
13

Piping

10

Electrical

12

12

11

Corrosion Control

Instrumentation

15

14

Telecommunication

Civil/Structure

62

60

33

25

Nos. of
Issued PO

Remaining
PO

Total

5.3 UPDATED PO

STATUS

Discipline

Total PO PO issue PO issue


Nos.
last Week This Week

Mechanical

13

11

12

Piping

10

Electrical

11

Corrosion Control

Instrumentation

15

12

14

Telecommunication

Civil/Structure

62

49

54

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

LOGO

SYSTEM

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 18 OF 23

5.2 ACHIEVEMENT THIS WEEK

1.0

Issue 5 PO,Insulation of Tanks, Fire Fighting & Safety Elements, U/G Unmetalic
Pipes and Fitting, Instrument Bulk Material, Fire Alarm System for Building.

2.0

Status of Vendor documents for approval

Discipline

No of
Vendors

Document received
from vendors

Document Submitted to
Owner for approval
for 1193 Project

Piping

Mechanical

Instrumentation

Telecommunication

Electrical

Total

30

30

30

Refer to attachment no 9.5

Already approved for Existing


(1280) Project

for more details of vendors

5.4 AREA OF CONCERN / REASON OF DELAY

1.0

2.0
3.0

Most PO of LLI have been issued, except MCC, monitor and push this PO.

Most TBE has been completed. Will Accelorate the approval of pengding commercial evaluation
and PO.
Miscelineous of Tank, Insulation of Pipe, Hot Tapping, Electrical Heat Tracing, Instrument
Junction Box, PAGA PO were not issued, will accelerate these PO.

5.5 MITIGATION MEASURES


1.0

CPECC try

2.0

CPECC will expedite pending PO within 2 weeks.

to complete issuing remaining TBE.

5.6 FORECAST FOR NEXT WEEK


1.0

Plan to issue PO of severel instrument, and piping

5.5 MATERIAL TRACKING REPORT


- Attachment

next week..

LOGO

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 19 OF 23

6.0 QUALITY ASSURANCE AND QUALITY CONTROL


6.1 SUMMARY

DOCUMENT NO.

DESCRIPTION

ISSUANCE DATE
PLAN

APPROVED DATE

REMARKS

ACTUAL

PAL-1193-PRO-QA-01

Project Quality Plan

07/01/15

08/01/15

Rev.0

DPOC-1193-RP-GEN-003

Document and Data Control Procedure

10/01/15

11/01/15

Rev.0

DPOC-1193-PR-SAF-001

SAFETY & SECURITY POLICY

23/01/15

DPOC-1193-PR-SAF-002

SAFETY MANUAL&PLAN

23/01/15

DPOC-1193-PR-SAF-003

SAFETY TRAINING

23/01/15

DPOC-1193-PR-SAF-004

EMERGENCY RESPONSE PLAN

23/01/15

DPOC-1193-PR-SAF-005

ACCIDENT/INCIDENT INVESTIGATION

23/01/15

DPOC-1193-PR-SAF-006

RADIOGRAPHY GUIDELINES

23/01/15

DPOC-1193-PR-SAF-007

PRESSURE TESTING GUIDELINES

23/01/15

DPOC-1193-PR-SAF-008

DRIVING GUIDELINES

23/01/15

DPOC-1193-PR-GEN-002

TEST PLAN

23/01/15

DPOC-1193-PR-GEN-004

TIE-IN PROCEDURE

23/01/15
/ /

DPOC-1193-PR-CIV-001

CIVIL INSPECTION AND TEST PLAN

23/01/15

DPOC-1193-PR-CIV-002

STEEL STRUCTURE QUALITY CONTROL


PLAN

23/01/15

DPOC-1193-PR-CIV-003

CIVIL WORK CONSTRUCTION PROCEDURE

06/02/15

DPOC-1193-PR-CIV-004

STEEL STRUCTURE CONSTRUCTION


PROCEDURE

06/02/15

DPOC-1193-PR-PIP-001

PIPING&PIPELINE QUALITY CONTROL PLAN

23/01/15

DPOC-1193-PR-PIP-002

PIPING&PIPELINE CONSTRUCTION
PROCEDURE

23/01/15

SAFETY

GENERAL/PROJECT (GEN

CIVIL/STRUCTURE CIV)

LAYOUT&PIPING (PIP)

MECHANICAL (MEC)

DPOC-1193-PR-MEC-001 STATIC EQUIPMENT&TANK INSPECTION AND


TEST PLAN
INSPECTION AND
DPOC-1193-PR-MEC-002 ROTATING EQUIPMENT

23/01/15
23/01/15

TEST PLAN
BLASTING AND PAINTING/COATING
INSPECTION PLAN

23/01/15

DPOC-1193-PR-MEC-004

INSULATION INSPECTION PLAN

23/01/15

DPOC-1193-PR-MEC-005

WELDING CONSUMABLE CONTROL

23/01/15

DPOC-1193-PR-MEC-003

WELDING PROCEDURE AND QUALIFICATION


DPOC-1193-PR-MEC-006
CONTROL

23/01/15

DPOC-1193-PR-MEC-007

QUALIFICATION OF WELDER AND WELDING


OPERATOR

23/01/15

DPOC-1193-PR-MEC-008

WELD EXAMINATION PROCEDURE

23/01/15

DPOC-1193-PR-MEC-009

WELD REPAIR PROCEDURE

06/02/15

DPOC-1193-PR-MEC-010 STRUCTURAL STEEL WELDING PROCEDURE

06/02/15

DPOC-1193-PR-MEC-011

WELDING AND INSPECTION PROCEDURE


FOR TANK

06/02/15

DPOC-1193-PR-MEC-012

PIPING&PIPELINE WELDING PROCEDURE

06/02/15

DPOC-1193-PR-MEC-013

STATIC EQUIPMENT&TANK INSTALLATION


PROCEDURE

06/02/15

DPOC-1193-PR-MEC-014

TANK WATER FILLING TEST PROCEDURE

06/02/15

RATATING EQUIPMENT INSTALLATION


PROCEDURE
THE SINGLE UNIT TEST RUN FOR ROTATING
DPOC-1193-PR-MEC-016
EQUIPMENT

DPOC-1193-PR-MEC-015

DPOC-1193-PR-MEC-017

BLASTING AND PAINTING/COATING


PROCEDURE

06/02/15
06/02/15
06/02/15

LOGO

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17


DPOC-1193-PR-MEC-018 INSULATION CONSTRUCTION PROCEDURE

06/02/15

DPOC-1193-PR-MEC-019

HOP TAPPING PROCEDURE

06/02/15

DPOC-1193-PR-ELE-001

ELECTRICAL INSPECTION PLAN

23/01/15

DPOC-1193-PR-ELE-002

CABLE INSTALLATION PROCEDURE

23/01/15

DPOC-1193-PR-ELE-003

INSTALLATION PROCEDURE OF
SUBSTATION AND SWITCH/MCC

06/02/15

EARTHING SYSTEM CONSTRUCTION


PROCEDURE
LIGHTING SYSTEM INSTALLATION
PROCEDURE

06/02/15

DPOC-1193-PR-INT-001

INSTRUMENT INSPECTION PLAN

23/01/15

DPOC-1193-PR-INT-002

INSTRUMENT INSTALLATION PROCEDURE

23/01/15

DPOC-1193-PR-INT-003

INSTRUMENT CALIBRATION PROCEDURE

06/02/15

DPOC-1193-PR-INT-004

LOOP TEST PROCEDURE

06/02/15

DPOC-1193-PR-PRC-001

MATERIAL HANDLING,DELIVERING AND


STORAGE PROCEDURE

23/01/15

DPOC-1193-PR-PRC-002

PROJECT PROCUREMENT PROCEDURE

23/01/15

DPOC-1193-PR-ELE-004
DPOC-1193-PR-ELE-005

PAGE 20 OF 23

06/02/15

6.2 HIGHLIGHT FOR THIS WEEK

6.3 NON-CONFORMANCE STATUS

NCR REPORT NO.

DESCRIPTION OF NCR

ACTION PARTY ISSUED DATE

STATUS
(OPEN /
CLOSED)

CLOSED DATE

REMARKS

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 21 OF 23

7.0 CONSTRUCTION, PRE-COMMISSIONING & COMMISSIONING


7.1 UPDATED PROGRESS DESIPLINE WISE

7.2 ACHIEVEMENT THIS WEEK


1.0

Key Construction Person and Equipment has been mobilized to Paloch

2.0

Ready to check and receive the Civil Pad

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING


OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION SYSTEM

LOGO

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 22 OF 23

7.3 AREA OF CONCERN AND MITIGATION MEASURES


1.0
2.0

To coordinate with Owner to reslove underground piping and cable issue


The Civil Pad not satisfy DPOC's specification of rough grading.

7.4 FORECAST FOR NEXT WEEK


1.0
2.0

Push the Owner handover civil pad.


Evaluate the schedule of civil work before rainy season based on right now stat

7.5 PROGRESS PHOTO FOR THIS WEEK

ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMISSIONING

LOGO

OF PALOCH FPF DE-BOTTLENECKING PROJECT SEDIMENTATION

SYSTEM

LOGO

CONTRACT NO.: DPOC/23/13-1193

WEEKLY PROGRESS REPORT NO. 17

PAGE 23 OF 23

8.0 AREA OF CONCERN

1.0

Owner requested to review and return back documents within a week for further action.

2.0

As agreement, civil pad shall be handedover before end of December, 2014. Owner is
requested to push this issue. CPECC will revise the construction plan based on the
handover time.

9.0 ATTACHMENTS
9.1 MEASUREMENT REPORTS
9.2

(Unapproved attached)

TECHNICAL DOCUMENT REGIST (Based on Rev.A attached )

9.3 MATERIAL TRACKING REPORT (MR status attached)


9.4 QA / QC DOCUMENTS REGISTER
9.5 VENDOR APPROVAL STATUS REP(Attached)

PALOCHFPFDEBOTTLENECKINGPROJECTSEDIMENTATIONPROCESSSYSTEM
OverallSCurve
110.00%
100.00%
90.00%
80.00%

Progresss

70.00%
60 00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

EarlyPlan

LaterPlan

Actual

PALOCHFPFDEBOTTLENECKINGPROJECTSEDIMENTATIONPROCESSSYSTEM
EngineeringSCurve
110.00%
100.00%
90.00%
80.00%

Progress

70.00%
60 00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
13Sep 13Oct 13Nov 13Dec

13Jan

13Feb 13Mar 13Apr 13May 13Jun

EarlyPlan

LaterPlan

13Jul

Actual

13Aug 13Sep 13Oct 13Nov 13Dec

PALOCHFPFDEBOTTLENECKINGPROJECTSEDIMENTATIONPROCESSSYSTEM
ProcurementSCurve
110.00%

100.00%

90.00%

80.00%

Progress

70.00%

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
13Sep 13Oct 13Nov 13Dec

13Jan

13Feb 13Mar 13Apr 13May 13Jun


EarlyPlan

LaterPlan

13Jul
Actual

13Aug 13Sep 13Oct 13Nov 13Dec

PALOCHFPFDEBOTTLENECKINGPROJECTSEDIMENTATIONPROCESSSYSTEM
ConstructionSCurve
110.00%
100.00%
90.00%
80.00%

Progres

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
13Sep 13Oct 13Nov 13Dec

13Jan

13Feb 13Mar 13Apr 13May 13Jun


EarlyPlan

LaterPlan

13Jul
Actual

13Aug 13Sep 13Oct 13Nov 13Dec

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

GEN

38636.00

100.00%

868.00

2.25%

1.1

GEN

Technical Document Register

PAL-1193-TDR-GEN-001

320.00

0.83%

1.2

GEN

Number System

PAL-1193-PR-GEN-001

56.00

0.14%

1.3
1
3
1.4
1.5

GEN
GEN
GEN

Planning Package
Plan Control Management Procedures
Progress Measurement Procedures

PAL-1193-PR-GEN-002
PAL-1193-PR-GEN-003
PAL-1193-PR-GEN-004

96 00
96.00
56.00

00.25%
25%
0.14%
0.14%

1.6

GEN

Engineering Change Management Procedure

PAL-1193-PR-GEN-005

56.00

0.14%

1.7

GEN

Document Control Procedure

PAL-1193-PR-GEN-006

56.00

0.14%

1.8
1.9

GEN
GEN

HSE Philosophy
Quality plan

PAL-1193-DB-GEN-001
PAL-1193-PL-GEN-001

56.00

0.14%
0.14%

56.00

56.00
60.00

0.16%

3364.00

8.71%

21
2.1

Process

Design Basis Memorandum

PAL 1193 DB PRO 001


PAL-1193-DB-PRO-001

160 00
160.00

0 41%
0.41%

2.2

Process

Operating,Control And Safeguarding Philosophy

PAL-1193-RP-PRO-002

120.00

0.31%

2.3

Process

HAZOP Close Out Report

PAL-1193-RP-PRO-003

60.00

0.16%

2.4

Process

Operating And Maintenance Manual

PAL-1193-ML-PRO-001

60.00

0.16%

2.5

Process

Pre-Commissioning And Commissioning Manual

PAL-1193-ML-PRO-002

80.00

0.21%

2.6
2.7
2.8
2.9
29
2.10
2.11
2.12
2.13

Process
Process
Process
Process
Process
Process
Process
Process

Training Manual
HAZOP Review Procedure
HAZOP Report
Equipment List
Line List
Tie-in List
Process Simulation Report
Flare Relief System Calculation Report

PAL-1193-ML-PRO-003
PAL-1193-PR-PRO-001
PAL-1193-RP-PRO-001
PAL
1193 SCH PRO 001
PAL-1193-SCH-PRO-001
PAL-1193-SCH-PRO-002
PAL-1193-SCH-PRO-003
PAL-1193-CAL-PRO-001
PAL-1193-CAL-PRO-002

0.00

0.00

0.00%
0.26%
0.00%
0.27%
0 27%
0.21%
0.06%
0.16%
0.00%

2.14

Process

PFD for Existing Oil Treating Facilities

PAL-1193-DWG-PFD-2011-01

32.00

0.08%

2.15
2.16

Process
Process

PFD for Existing Oil Treating Facilities


PFD for Inlet Manifold

PAL-1193-DWG-PFD-2011-02
PAL-1193-DWG-PFD-2012-01

32.00

0.08%
0.08%

1.10

GEN

HSE Plan

PAL-1193-PL-GEN-002

Process

100.00
0.00
104.00
80.00
24.00
60.00

32.00

2.17

Process

PFD for Existing Produced Water System Tie-in

PAL-1193-DWG-PFD-2013-01

32.00

0.08%

2.18

Process

PFD for Flare System

PAL-1193-DWG-PFD-2014-01

32.00

0.08%

2 19
2.19

Process

PFD for Crude Oil Treatment Facilities

PAL 1193 DWG PFD 2015 01


PAL-1193-DWG-PFD-2015-01

32 00
32.00

0 08%
0.08%

2.20

Process

PFD for Crude Oil Buffer Tank and Booster Pumps

PAL-1193-DWG-PFD-2016-01

32.00

0.08%

2.21
2.22

Process
Process

32.00
32.00

0.08%
0.08%

Process

PFD for Closed Drain System


PFD for Open Drain and Sand Drain System
PFD for Mass and Heat Balance Design CASE for New
Facility

PAL-1193-DWG-PFD-2017-01
PAL-1193-DWG-PFD-2018-01

2.23

PAL-1193-DWG-PFD-2019-01

40.00

0.10%

2.24

Process

PAL-1193-DWG-PFD-2019-02

40.00

0.10%

PFD for Mass and Heat Balance Normal Operation for


New Ficility

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
2.25%
P
P

2014-09-10

2014-09-21

2014-09-24

2014-10-14

2014-10-24

2014-09-10

2014-10-22

2014-11-04

2014-11-08

2014/11/15 b

2014-09-10

2014-09-21

2014-09-24

2014-10-14

2014-10-24

2014-09-12

2014-10-22

2014-10-30

2014-10-31

2014-12-9 b

P
P
P
P

2014-09-24
2014
09 24

2014-10-01
2014
10 01

2014-10-04
2014
10 04

2014-10-14
2014
10 14

2014-10-24
2014
10 24

2014-09-10
2014
09 10

2014-10-23
2014
10 23

2014-10-28
2014
10 28

2014-10-21
2014
10 21

2014/11/15 b

2014-11-22
2014
11 22

21-Nov-14
21
Nov 14

2014-09-10

2014-09-21

2014-09-24

2014-10-14

2014-10-24

2014-09-10

2014-10-23

2014-10-28

2014-10-21

2014/11/15 b

2014-11-22

21-Nov-14

25-Dec-14

2014-09-24

2014-10-01

2014-10-04

2014-10-14

2014-10-24

2014-09-26

2014-10-23

2014-10-28

2014-10-21

2014/11/15 b

2014-11-22

21-Nov-14

2014-09-26

2014-10-01

2014-10-04

2014-10-24

2014-11-03

2014-09-26

2014-10-22

2014-11-10

2014-11-17

2014-09-26

2014-10-03

2014-10-05

2014-10-20

2014-10-30

2014-09-26

2014-10-22

2014-11-10

2014-11-17

P
P
P

2014-09-26

2014-10-03

2014-10-05

2014-10-24

2014-11-03

2014-09-26

2014-11-21

2014-11-26

2014-11-22

2014-09-10

2014-09-21

2014-09-24

2014-10-14

2014-10-24

2014-09-10

2014-10-22

2014-10-24

2014-11-17

2014-09-26

2014-10-03

2014-10-05

2014-10-24

2014-11-03

2014-09-26

P
P

2014 10 10
2014-10-10

2014 10 18
2014-10-18

2014 10 21
2014-10-21

2014 11 10
2014-11-10

2014 11 20
2014-11-20

2014 10 10
2014-10-10

2014-11-11

2014-11-28

2014-12-01

2014-12-21

2014-12-31

2014-12-03

2014-12-28

2014-12-31

2015-01-20

2014-12-03

2014-12-28

2014-12-31

2015-01-20

2014-12-03

2014-12-24

2014-12-27

P
P
P
P
P
P
P
P
P

2014-12-04

2014-12-25

2014-12-03

2014-12-24

2015-01-05
2014
10 10
2014-10-10
2014-10-10

2014-12-01

12-10 c 1-4 b

85.00%
100.00%

25-Dec-14
25
Dec 14
25-Dec-14

00.2485%
2485%
0.1449%
0.1449%

100 00%
100.00%
100.00%
100.00%

0 2485%
0.2485%
0.1449%
0.1449%

100 00%
100.00%
100.00%
100.00%

11-25
REJECTED b

25-Dec-14

0.1449%

100.00%

0.1449%

100.00%

11-25
REJECTED b

25-Dec-14

0.1449%

100.00%

0.1449%

100.00%

5-Dec-14

0.1449%
0.1449%

100.00%
100.00%

0.1449%
0.1449%

95.00%
100.00%

18-Dec-14

0.1553%

100.00%

0.1553%

100.00%

2014-12-25
a

12-Feb-15
2014-11-25 c

12-5 0 a

1-Dec-14

1-Dec-14

11-Dec-14

11-Dec-14

2014-12-18
a

22 Dec 14
22-Dec-14

2014 12 25 b
2014-12-25

5 Jan 15
5-Jan-15

5 Jan 15
5-Jan-15

12-15 b 2-5

2014-12-19

19-Dec-14

2014-12-25 b

29-Dec-14

2015-01-26

30-Jan-15

2014/11/18 c

2014 12 22
2014-12-22

2014-11-11

2014-11-20

2014-11-24

2014-12-2 c

2014-12-19

2015-01-30

2014-12-03

2015-01-08

2015-01-08

2015/1/26 a

2015-01-30

2014-12-03

2015-02-09

2015-02-11

2015-03-06 c

2015-01-16

2015-01-26

2014-12-03

2015-02-09

2015-02-11

2015-03-06 c

2014-12-28

2015-01-17

2015-01-27

2014-12-04

2015-02-09

2015-02-11

2015-03-06 c

2014-12-27

2015-01-16

2015-01-26

2014-11-18

2014-11-28

2014-12-01

2014-12-9 b

2015-01-24

2015-01-27

2015-02-16

2015-02-26

2015-01-05

2015-01-14

2015-01-17

2015-01-17

2015-2-6 b

2014 10 18
2014-10-18
2014-10-18

2014 10 21
2014-10-21
2014-10-21

2014 11 10
2014-11-10
2014-11-10

2014 11 20
2014-11-20
2014-11-20

2014 10 10
2014-10-10
2014-10-10

2014 10 24
2014-10-24
2014-10-24

31
Dec 14
31-Dec-14
31-Dec-14

2015
01 05
2015-01-05
2015-01-05

2015/1/29 c
2015/1/29 c

2015
02 03
2015-02-03
2015-02-03

4
Feb 15
4-Feb-15
4-Feb-15

2
26 b 3-3
33
2-26
2-26 b 3-3

2014-10-10

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-10

2014-10-24

31-Dec-14

2015-01-05

2015/1/29 c

2015-02-03

4-Feb-15

2-26 b 3-3

2014-10-10

2014-10-19

2014-10-22

2014-11-11

2014-11-21

2014-10-10

2014-10-28

2014-11-05

2014-12-12 b

2014-11-20

2014-11-30

2014-12-03

2014-12-15

2014-12-30

2014-10-11

2015-02-03

2015-02-04

2015-2-28 c

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 b

P
P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

11-27b

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

11-27 a

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 c

10-Dec-14

10-Dec-14

P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

11-27 a

10-Dec-14

2014 09 10
2014-09-10

2014 10 08
2014-10-08

2014 10 11
2014-10-11

2014 10 31
2014-10-31

2014 11 10
2014-11-10

2014 09 10
2014-09-10

2014 10 14
2014-10-14

2014 10 27
2014-10-27

2014 11 05
2014-11-05

2014/11/7 c

2014 11 20
2014-11-20

21 Nov 14
21-Nov-14

2014 11 27 b
2014-11-27

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-11-05

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-10-27

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-09-10

2014-10-08

2014-10-11

2014-09-10

2014-10-08

2014-09-10

P
P
P

2.12%

0.8282%
0.1449%

2014-12-10 b

2.25%

100.00%
100.00%

2014-11-17

89.40%

0.8282%
24-Dec-14

2014 11 10
2014-11-10

Progress

100.00%

0.1449%

23-Dec-14

2014-11-07

2.25%

Earned Weight

25-Dec-14

1-Dec-14

2014 11 08
2014-11-08

2014 10 22
2014-10-22

Actual

Planned
IFC

29-Jan-15

8.71%

8.71%

8.71%

0 4141%
0.4141%

100 00%
100.00%

0 4141%
0.4141%

95 00%
95.00%

8.48%

30-Dec-14 12-30 a 2-15

30-Dec-14

0.3106%

100.00%

0.3106%

100.00%

2-6 c 2-15 227 a

27-Feb-15

0.1553%

100.00%

0.1553%

100.00%

0.1553%

100.00%

0.1553%

65.00%

0.2071%

100.00%

0.2071%

65.00%

0.0000%
0.2588%
0.0000%
0.2692%
0 2692%
0.2071%
0.0621%
0.1553%
0.0000%

100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.2588%
0.0000%
0.2692%
0 2692%
0.2071%
0.0621%
0.1553%
0.0000%

65.00%
100.00%
100.00%
85.00%
85 00%
85.00%
85.00%
100.00%
65.00%

2-Feb-15

12-Dec-14

12-Dec-14

12-15 a

15-Dec-14

15-Feb-15

15-Feb-15

2-27 a

27-Feb-15

31-Dec-14

31-Dec-14

2-6 b 2-11

28-Feb-15

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

31-Jan-15

2-Feb-15

7-Feb-15

31-Jan-15

2-Feb-15

2-7 a
2-7 c 2-15 3-

2-Mar-15

0.0828%
0.0828%

100.00%
100.00%

0.0828%
0.0828%

100.00%
100.00%

16-Dec-14

0.0828%

100.00%

0.0828%

100.00%

10-Dec-14

12-13 b 1215(1)
12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

10 Dec 14
10-Dec-14

10 Dec 14
10-Dec-14

12 13 a
12-13

13 Dec 14
13-Dec-14

0 0828%
0.0828%

100 00%
100.00%

0 0828%
0.0828%

100 00%
100.00%

2014-11-27 c

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

21-Nov-14

11-27 a

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

21-Nov-14

11-27 a

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%
0.0828%

100.00%
100.00%

0.0828%
0.0828%

100.00%
100.00%

21-Nov-14

11-27 a

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-11-20

21-Nov-14

11-27 a

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014/11/7 c

2014-11-20

21-Nov-14

11-27 a

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 b

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 b

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 b

10-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-10-14

2014-10-27

2014-11-05

2014/11/7 c

2014-11-20

21-Nov-14

2014-11-27 b

10-Dec-14

10-Dec-14

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

15-Dec-14

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2015-01-29

30-Jan-15

2-28 a

3-Mar-15

4-Mar-15

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 b

2014-11-27

27-Nov-14

11-29 b

15-Dec-14

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

2.25

Process

PFD for Mass and Heat Balance Normal Operation for


Existing Ficility

PAL-1193-DWG-PFD-2019-03

40.00

0.10%

2.26

Process

PFD for Gas Vent System

PAL-1193-DWG-PFD-2020-01

32.00

0.08%

2.27

Process

PFD for Produced Water System for New Facility

PAL-1193-DWG-PFD-2021-01

32.00

0.08%

2.28

Process

PFD for Anti-foam Injection Skid

PAL-1193-DWG-PFD-2022-01

32.00

0.08%

2.29

Process

PFD for Flare Knock-out Drum

PAL-1193-DWG-PFD-2023-01

32.00

0.08%

2.30

Process

Drawing Index - PALOCH FPF

PAL-1193-DWG-PID-2100-01

40.00

0.10%

2.31

Process

P & ID for Legend and Symbols (Sheet 1 OF 4)

PAL-1193-DWG-PID-2101--01

40.00

0.10%

2.32

Process

P & ID for Legend and Symbols (Sheet 2 OF 4)

PAL-1193-DWG-PID-2101-02

40.00

0.10%

2.33

Process

P & ID for Legend and Symbols (Sheet 3 OF 4)

PAL-1193-DWG-PID-2101-03

40.00

0.10%

2.34

Process

P & ID for Legend and Symbols (Sheet 4 OF 4)

PAL-1193-DWG-PID-2101-04

40.00

0.10%

2.35

Process

P & ID for Production Fluid Inlet

PAL-1193-DWG-PID-2102-01

40.00

0.10%

2.36
2.37

Process
Process

P & ID for 3-Phase Metering Skid


P & ID for Oil Gathering Manifold Tie-in

PAL-1193-DWG-PID-2103-01
PAL-1193-DWG-PID-2104-01

40.00
40.00

0.10%
0.10%

2.38

Process

P & ID for New Facility Header 2

PAL-1193-DWG-PID-2105-01

40.00

0.10%

2.39

Process

P & ID for Gas/Liquid Separator V-2303A

PAL-1193-DWG-PID-2106-01

40.00

0.10%

2.40

Process

P & ID for Gas/Liquid Separator V-2303B

PAL-1193-DWG-PID-2107-01

40.00

0.10%

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

1 18

2014-11-15
2014-11-27

2014-11-15

27-Nov-14

11-29 b

2014-11-15
2014-11-27

2014-11-15

27-Nov-14

2014-11-29 a

2014-11-15
27-Nov-14

2014-11-29 c

16-Dec-14

0.0828%

100.00%

0.0828%

100.00%

15-Dec-14

12-13 b 1215(1)
12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

3-6 a

6-Mar-15

12-16 a

16-Dec-14

0.1035%
0.1035%

100.00%
100.00%

0.1035%
0.1035%

100.00%
100.00%

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

2.41

Detailed Engineering
Process

P & ID for Gas/Liquid Separator V-2303C

38636.00

100.00%

PAL-1193-DWG-PID-2108-01

40.00

0.10%
0.10%

2.42

Process

P & ID for Gas/Liquid Separator V-2303D

PAL-1193-DWG-PID-2109-01

40.00

2.43

Process

P & ID for Sedimentation Tank T-2302A

PAL-1193-DWG-PID-2110-01

40.00

0.10%

2.44

Process

P & ID for Sedimentation Tank T-2302B

PAL-1193-DWG-PID-2111-01

40.00

0.10%

2.45

Process

P & ID for Crude Oil Buffer Tank T-2303

PAL-1193-DWG-PID-2112-01

40.00

0.10%

2.46

Process

P & ID for Crude Oil Booster Pumps P-2308A/B/C

PAL-1193-DWG-PID-2113-01

40.00

0.10%

2.47

Process

P & ID for Water Buffer Tank T-2340

PAL-1193-DWG-PID-2114-01

40.00

0.10%

2.48

Process

P & ID for Water Booster Pumps P-2318A/B/C

PAL-1193-DWG-PID-2115-01

40.00

0.10%

2.49

Process

P & ID for Closed Drain Header

PAL-1193-DWG-PID-2116-01

40.00

0.10%

2.50

Process

P & ID for Closed Drain Sump T-2365

PAL-1193-DWG-PID-2117-01

40.00

0.10%

2.51

Process

P & ID for Open Drain Header

PAL-1193-DWG-PID-2118-01

160.00

0.41%

2.52

Process

P & ID for Open Drain Sump T-2366

PAL-1193-DWG-PID-2119-01

40.00

0.10%

2.53

Process

P & ID for Vent Pit T-2368

PAL-1193-DWG-PID-2120-01

40.00

0.10%

2.54

Process

P & ID for Sand Drain Pit T-2367

PAL-1193-DWG-PID-2121-01

40.00

0.10%

2.55

Process

P & ID for New Heat Medium Distribution

PAL-1193-DWG-PID-2122-01

40.00

0.10%

2.56

Process

P & ID for New Flare Knock-out Drum

PAL-1193-DWG-PID-2123-01

40.00

0.10%

2.57
2 57

Process

P & ID for Anti


Anti-foam
foam Injection Skid

PAL-1193-DWG-PID-2124-01
PAL 1193 DWG PID 2124 01

40.00
40 00

0.10%
0 10%

2.58

Process

P & ID for Fire Water Distribution for New Facility

PAL-1193-DWG-PID-2125-01

40.00

0.10%

2.59

Process

P & ID for Foam Protection System

PAL-1193-DWG-PID-2126-01

40.00

0.10%

2.60

Process

P & ID for Produced Water Skim Tank T-2330A

PAL-1193-DWG-PID-2131-01

40.00

0.10%

2.61

Process

P & ID for Produced Water Skim Tank T-2330B

PAL-1193-DWG-PID-2132-01

40.00

0.10%

2.62
2.63
2.64
2.65
2.66
2.67
2.68

Process
Process
Process
Process
Process
Process
Process

P & ID for Demulsifier Injection Skid


P & ID for Corrosion Inhibitor Injection Skid
P & ID for De-scaler Injection Skid
P & ID for Instrument Air Distribution
P & ID for Instrument Air Distribution
P & ID for Nitrogen Distribution
P & ID for Tie-in to Existing Heating Medium System

PAL-1193-DWG-PID-2150-01
PAL-1193-DWG-PID-2152-01
PAL-1193-DWG-PID-2153-01
PAL-1193-DWG-PID-2160-01
PAL-1193-DWG-PID-2160-02
PAL-1193-DWG-PID-2161-01
PAL-1193-DWG-PID-2163-01

40.00

40.00

0.10%
0.26%
0.26%
0.10%
0.00%
0.10%
0.10%

2.69

Process

P & ID for Tie-in to Existing Fire Water Distribution

PAL-1193-DWG-PID-2170-01

40.00

0.10%

2.70
2.71

Process
Process

P & ID for Utility & Portable Water Distribution


P & ID for Tie-in to Existing Flare System

PAL-1193-DWG-PID-2171-01
PAL-1193-DWG-PID-2173-01

100.00

0.26%
0.10%

2.72

Process

P & ID for Tie-in to Existing Gas Boot V-2305B

PAL-1193-DWG-PID-2174-01

100.00
100.00
40.00
0.00
40.00

40.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.4141%

100.00%

0.4141%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 a

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10
2014 09 10

2014-10-08
2014 10 08

2014-10-11
2014 10 11

2014-10-31
2014 10 31

2014-11-10
2014 11 10

2014-09-10
2014 09 10

2014-10-14
2014 10 14

2014-11-08
2014 11 08

2014-11-10
2014 11 10

2014/11/15 a

15-Dec-14
15 Dec 14

15-Dec-14
15 Dec 14

12-16
12 16 a

16-Dec-14
16 Dec 14

0.1035%
0 1035%

100.00%
100 00%

0.1035%
0 1035%

100.00%
100 00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 a

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

27-Nov-14

2014-11-29 a

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 b

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-11-15

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

P
P
P
P
P
P
P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-11-15

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

2014-12-03

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-09-10

2014-10-14

2014-11-27

2014-11-27

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

2014-12-03

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-09-10

2014-10-14

2014-11-27

2014-11-27

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

15-Dec-14

15-Dec-14

2015-01-15

2015-01-30

2015-02-15

2015-02-28

2015-03-03

2015-02-12

2015-02-15

2015-02-15

2015-03-02 a

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1035%
0.2588%
0.2588%
0.1035%
0.0000%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
95.00%
100.00%
100.00%

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

P
P
P

2014-12-03

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-05

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 a

P
P
P
P
P
P

P
P
P
P
P
P
P
P
P

2014-11-15
2014-11-27

2014-11-10

2014-09-10

2014-10-14

2014-11-08

2014-11-10

2014/11/15 c

2014-11-27

2014-11-18

2014-11-28

2014-10-23

2014-10-22

2014-11-08

2014-11-11

2014/11/15 a

2014-11-24

2014-11-05
2015-02-04

2014-12-19
2015-02-14

2014-12-22
2015-02-16

2015-01-11
2015-02-28

2015-01-21
2015-03-05

2014-11-05
2015-02-04

2015-02-09
2015-02-07

2015-02-10
2015-02-07

2015-03-01
2015-03-01

2015-03-10
2015-03-07

2015-03-15
2015-03-15

2015-03-20
2015-03-20

2015-03-03
2015-03-03

2015-03-01

2015-03-07

2015-03-15

2015-03-20

2015-03-03

2015-03-01

2015-03-07

2015-03-15

2015-03-20

2015-03-03

2015-03-01

2015-03-07

2015-03-15

2015-03-20

2015-03-03

2015-03-01

2015-03-07

2015-03-15

2015-03-20

2015-03-01

2015-03-07

2015-03-15

2015-03-20

2015-03-03

PAL-1193-DS-PIP-007

32.00

3.19

Piping

Datasheet for Strainer

PAL-1193-DS-PIP-008

96.00

0.25%

3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

Datasheet for Flame Arresters


Datasheet for corrosion probe assembly
Datasheet for corrosion coupon assembly
Datasheet for Chemical Injection assembly
Datasheet for Quick coupling
MR for Bulk Valves
MR for Underground Bulk Pipes & Fittings
MR for Aboveground Bulk Pipes & Fittings
MR for Access Fitting Assemblies

PAL-1193-DS-PIP-009
PAL-1193-DS-PIP-010
PAL-1193-DS-PIP-011
PAL-1193-DS-PIP-012
PAL-1193-DS-PIP-013
PAL-1193-MR-PIP-001
PAL-1193-MR-PIP-002
PAL-1193-MR-PIP-003
PAL-1193-MR-PIP-004

32.00

0.08%
0.08%
0.08%
0.08%
0.33%
0.76%
0.09%
0.09%
0.08%

32.00
128.00
292.00
36.00
36.00
32.00

16-Dec-14

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

100.00%

0.1035%

100.00%

2014-11-15

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

2014-11-15

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.2588%
0.1035%

100.00%
100.00%

0.2588%
0.1035%

100.00%
100.00%

100.00%

0.1035%

100.00%

4-Mar-15

3-5 a

2014-11-15

2014-10-31

32.00

12-16 a

2014-11-27

2014-11-02

32.00

16-Dec-14

6-Mar-15
15-Dec-14

2015-03-02
2014-11-15

2014-10-11

32.00

12-16 a

6-Mar-15
15-Dec-14

0.1035%
0.2588%
0.2588%
0.1035%
0.0000%
0.1035%
0.1035%

2014-11-15
2015-03-03

2014-10-30

32.00

2014-11-29 c

2014-11-15
2014 11 15

2014-10-08

32.00

27-Nov-14
2014-11-15

2014-10-23

32.00

89.40%

2014-09-10

2014-09-10

36.00

Progress

100.00%

2014-11-10

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

64.00

Actual
Earned Weight

2014-11-10

0.33%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.17%
0.09%
0.08%
0.08%
0.08%
0.08%
0.08%

0.00

Progress

2014-10-31

0.10%

0.00

Earned
Weight

2014-10-31

30.12%

0.00

comments

Planned
IFC

2014-10-11

40.00

0.00

REV.0

As on: 6-Mar-2015

100%

2014-10-11

128.00

0.00

REV.0

95%
PMC

2014-10-08

11636.00

0.00

comments

95%

2014-10-08

PAL-1193-CAL-PIP-002
PAL-1193-RP-PIP-001
PAL-1193-RP-PIP-002
PAL-1193-RP-PIP-003
PAL-1193-RP-PIP-004
PAL-1193-RP-PIP-005
PAL-1193-RP-PIP-006
PAL-1193-RP-PIP-007
PAL-1193-RP-PIP-008
PAL-1193-RP-PIP-009
PAL-1193-RP-PIP-011
PAL-1193-SP-PIP-001
PAL-1193-DS-PIP-001
PAL-1193-DS-PIP-002
PAL-1193-DS-PIP-003
PAL-1193-DS-PIP-004
PAL-1193-DS-PIP-005

0.00
0.00

Issued

95%

BEB-SUDANSUDAN-PMC

2014-09-10

Wall Thickness Calculation Report


Stress analysis Report
Stress Critical Line List
Stress analysis Report for System 2
Stress analysis Report for System 3
Stress analysis Report for System 4
Stress analysis Report for System 5
Stress analysis Report for System 6
Stress analysis Report for System 7
Stress analysis Report for System 8
Material Selection Report
Specification for Piping Materials
Datasheet for Ball Valves
Datasheet for GATE Valves
Datasheet for GLOBE Valves
Datasheet for CHECK Valves
Datasheet for NEDDLE Valves
Datasheet for Flexible Connection

0.00
0.00

85%
PMC

2014-09-10

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

Piping

85%
IFA(Rev-B)

100.00% 97.49%

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18

REV-A

27-Nov-14

2014-11-15

2014-11-29 a

27-Nov-14

2014-11-29 c

15-Dec-14

15-Dec-14

12-16 a

16-Dec-14

0.1035%

30.12%

29.84%

30.12%

25.08%

27-Nov-14

2014-12-24 c

3-Feb-15

5-Feb-15

2-6 a

6-Feb-15

22-Jan-15

20-Jan-15

0.3313%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1656%
0.0932%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.3313%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1656%
0.0932%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

100.00%
65.00%
65.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
5.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
100.00%

2015-03-03

2014-12-15

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-15

31-Dec-14

2015-01-05

2015-1-16 b

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-10-02

2014-10-23

2014-10-31

2014-11-11

2014/11/15 a

28-Nov-14

29-Nov-14

1-27 a
12-25 c 2-5

27-Jan-15

2014-09-30
2014-09-30

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-10-02

2014-10-17

2014-10-23

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

6-Jan-15

6-Jan-15

1-8 a

8-Jan-15

2014-09-30

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-30

2014-10-17

2014-10-23

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

6-Jan-15

6-Jan-15

1-8 a

8-Jan-15

2014-09-30

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-30

2014-10-17

2014-10-25

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

6-Jan-15

6-Jan-15

1-8 a

8-Jan-15

2014-10-17

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-10-17

2014-10-17

2014-10-23

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

6-Jan-15

6-Jan-15

1-8 a

2014-10-17

2014-10-31

2014-11-03

2014-11-23

2014-12-03

2014-09-29

2014-10-17

2014-10-23

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

30-Dec-14

31-Dec-14

12-31 b 1-5

2014-10-24

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-24

2014-11-25

2014-11-26

2014-11-27

2014-12-25 a

14-Jan-15

2014-10-24

2014-11-20

2014-11-23

2014-12-13

2014-12-23

2014-10-24

2014-11-17

2014-11-25

2014-11-28

2014-12-25 b

7-Feb-15

0.2485%

100.00%

0.2485%

100.00%

2014-10-24

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-24

2014-11-17

2014-11-25

2014-11-21

2014-12-25 b

2014-12-29

22-Jan-15

23-Jan-15

P
P
P
P
P
P
P
P

2014-10-24

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-24

2014-11-20

2014-11-21

2014-11-22

2014-12-25 a

2014-12-30

2014-12-25

31-Dec-14

2015-1-4 c 1-9
1 19 b
2015-1-4 b

1-20 a
2015-1-4 c
2427
1-23 a

20-Jan-15

20-Jan-15

1-29 a

29-Jan-15

2014-10-24

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-24

2014-11-20

2014-11-21

2014-11-22

2014-12-25 a

2014-12-30

2014-12-25

31-Dec-14

2015-1-4 b

20-Jan-15

20-Jan-15

1-29 a

29-Jan-15

2014-10-24

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-24

2014-11-20

2014-11-21

2014-11-22

2014-12-25 a

2014-12-30

2014-12-25

31-Dec-14

2015-1-4 b

20-Jan-15

20-Jan-15

1-29 a

29-Jan-15

2014-11-05

2014-12-19

2014-12-22

2015-01-11

2015-01-21

2014-10-24

2014-11-20

2014-11-21

2014-11-22

2014-12-25 a

2014-12-30

2014-12-25

31-Dec-14

29-Jan-15

2-6 a

2014-11-20

2014-11-23

2014-12-13

2014-12-23

2014-10-24

2014-11-20

2014-11-26

2014-12-08

2014-12-20 c

2014-12-29

29-Dec-14

2015-1-4 b
12-29 c 1-21

29-Jan-15

2014-10-24

29-Jan-15

29-Jan-15

2-6 a

6-Feb-15

2014-11-17

2014-11-27

2014-11-30

2014-12-20

2014-12-30

2014-10-23

2014-10-31

2014-11-17

2014-11-19

2014-12-25 c

31-Dec-14

2-Jan-15

2015-1-4 c 1-

20-Jan-15

21-Jan-15

1-26 a

26-Jan-15

2014-10-23

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-27

2014-11-22

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

12-29 c 1-21

7-Feb-15

7-Feb-15

2014-10-27

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-28

2014-11-22

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

12-29 c 1-21

7-Feb-15

7-Feb-15

0.0828%
0.0828%
0.0828%
0.0828%
0.3313%
0.7558%
0.0932%
0.0932%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0828%
0.0828%
0.0828%
0.0828%
0.3313%
0.7558%
0.0932%
0.0932%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
95.00%

2 18

2014-11-15

2014-12-25
31-Dec-14
30-Dec-14

31-Dec-14

6-Mar-15

8-Jan-15

6-Feb-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

3.29
3.30
3.31
3.32
3.33
3.34
3.35
3.36
3.37
3.38
3.39
3.40
3.41
3.42
3.43
3.44
3.45
3.46
3.47
3.48
3.49
3.50
3.51
3.52
3.53
3.54
3.55
3.56
3.57
3.58
3.59
3.60
3.61

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
p g
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
p g
Piping
Piping
Piping
Piping
Piping
Piping

3.62

Piping

3.63

Piping

3.64

Piping

3 65
3.65

Piping

3.66

Piping

3.67

Piping

3.68

Piping

3.69

Piping

3.70

Piping

3.71

Piping

3.72

Piping

MR for Special items


MR for Insulation Materials
MR for Hot Tapping materials
MTO for Bulk Valves
MTO For Aboveground Bulk Pipes & Fittings
MTO for Access Fitting Assemblies
MTO for Special Items
MTO for Insulation
MTO for Hot Tap
TBE for Bulk Valves
TBE for Aboveground Pipes & Fittings
TBE for Access Fittings Assemblies
TBE for Special items
TBE for Insulation Materials
TBE for Hot Tapping Materials
Plot Plan
Equipment Location Key Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
q p
Equipment
Location Plan
Equipment Location Plan
Equipment Location Plan
Equipment Location Plan
Tie-in Layout Plan
Key Plan of Aboveground Piping General Arrangement
Aboveground Piping General Arrangement Drawing(P2308A/B/C)
Aboveground Piping General Arrangement Drawing(P2318A/B/C)
Aboveground Piping General Arrangement Drawing(T2303)
Aboveground Piping General Arrangement Drawing(T2340)
Aboveground Piping General Arrangement Drawing(T2303)
Aboveground Piping General Arrangement Drawing(T2340)
Aboveground Piping General Arrangement Drawing(T2302B)
Aboveground Piping General Arrangement Drawing(T2302B)
Aboveground Piping General Arrangement Drawing(T2302B)
Aboveground Piping General Arrangement Drawing(T2302B)
Aboveground Piping General Arrangement Drawing(T2302A)

38636.00

100.00%

0.00

32.00

0.00%
0.07%
0.07%
0.08%
0.10%
0.07%
0.10%
0.12%
0.06%
0.80%
0.09%
0.09%
0.00%
0.09%
0.09%
0.29%
0.08%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.06%
0.00%
0.00%
0.08%

PAL-1193-DWG-PIP-4300-01

32.00

0.08%

PAL-1193-DWG-PIP-4301-01

32.00

0.08%

PAL-1193-DWG-PIP-4302-01

32.00

0.08%

PAL-1193-DWG-PIP-4303-01

32 00
32.00

0 08%
0.08%

PAL-1193-DWG-PIP-4304-01

32.00

0.08%

PAL-1193-DWG-PIP-4305-01

32.00

0.08%

PAL-1193-DWG-PIP-4306-01

32.00

0.08%

PAL-1193-DWG-PIP-4307-01

32.00

0.08%

PAL-1193-DWG-PIP-4308-01

32.00

0.08%

PAL-1193-DWG-PIP-4309-01

32.00

0.08%

PAL-1193-DWG-PIP-4310-01

32.00

0.08%

PAL-1193-MR-PIP-005
PAL-1193-MR-PIP-006
PAL-1193-MR-PIP-007
PAL-1193-MTO-PIP-001
PAL-1193-MTO-PIP-003
PAL-1193-MTO-PIP-004
PAL-1193-MTO-PIP-005
PAL-1193-MTO-PIP-006
PAL-1193-MTO-PIP-007
PAL-1193-TBE-PIP-001
PAL-1193-TBE-PIP-003
PAL-1193-TBE-PIP-004
PAL-1193-TBE-PIP-005
PAL-1193-TBE-PIP-006
PAL-1193-TBE-PIP-007
PAL-1193-DWG-PIP-4000-01
PAL-1193-DWG-PIP-4001-1/1
PAL-1193-DWG-PIP-4002-1/1
PAL-1193-DWG-PIP-4003-1/1
PAL-1193-DWG-PIP-4004-1/1
PAL-1193-DWG-PIP-4005-1/1
PAL-1193-DWG-PIP-4006-1/1
PAL-1193-DWG-PIP-4007-1/1
PAL-1193-DWG-PIP-4008-1/1
PAL-1193-DWG-PIP-4009-1/1
PAL-1193-DWG-PIP-4010-1/1
PAL-1193-DWG-PIP-4011-1/1
PAL-1193-DWG-PIP-4012-1/1
PAL-1193-DWG-PIP-4013-1/1
PAL-1193-DWG-PIP-4014-1/1
PAL-1193-DWG-PIP-4015-1/1
PAL-1193-DWG-PIP-4100-01
PAL-1193-DWG-PIP-4102-01

28.00
28.00
32.00
40.00
28.00
40.00
48.00
24.00
308.00
36.00
36.00
0.00
36.00
36.00
112.00
32.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
24.00
0.00
0.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-10-23
2014-10-28

2014-11-20
2014-11-19

2014-11-23
2014-11-22

2014-12-23
2014-12-22

2014-10-23

2014-11-22

2014-11-26

2014-12-08

2014-12-20 c

2015-01-05

5-Jan-15

2014-12-12

2014-10-23

2014-11-22

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

2014-10-23

2014-11-20

2014-11-23

2014-12-13

2014-12-13

2014-12-23

2014-10-24

2014-11-18

2014-11-26

2014-12-08

2014-12-20 c

2014-12-30

31-Dec-14

2014-10-24

2014-11-20

2014-11-23

2014-12-13

2014-12-23

2014-10-23

2014-11-20

2014-11-26

2014-12-08

2014-12-20 c

2014-12-29

29-Dec-14

2015-1-4 b
12-29 c 2-10

2014-10-23

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-23

2014-11-22

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

12-29 c 1-21

2014-10-28

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-28

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

12-29 c 1-21

7-Feb-15

7-Feb-15

2014-10-23

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-23

2014-11-25

2014-11-26

2014-12-08

2014-12-20 c

2015-01-05

5-Jan-15

21-Jan-15

22-Jan-15

2014-10-28

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-28

2014-11-25

2014-11-26

2014-12-08

2014-12-20 c

2014-12-25

27-Dec-14

2015-1-7 b
12-29 c 1-21

12-Feb-15

10-Feb-15

2014-10-23

2014-11-21

2014-11-18

31-Dec-14

2015-1-4 b

29-Jan-15

9-Feb-15

3-4 a

6-Mar-15

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2014-10-09

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-09

2014-10-22

2014-10-25

2014-11-07

2014/11/13 a

31-Jan-15

2-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17
2014-11-17

2014-12-07
2014-12-07

2014-12-10
2014-12-10

2014-12-30
2014-12-30

2015-01-09
2015-01-09

2014-11-17
2014-11-17

2014-12-08
2014-12-08

2014-12-11
2014-12-11

2014-12-11
2014-12-11

2015-1-4 c
2015-1-4 c

2015-01-29
2015-01-29

29-Jan-15
29-Jan-15

2-7 b
2-7 b

15-Feb-15
15-Feb-15

15-Feb-15
15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-08

2014-12-11

2014-12-11

2015-1-4 c

2015-01-29

29-Jan-15

2-7 b

15-Feb-15

15-Feb-15

2015-01-25

2015-01-29

2015-02-15

2015-02-28

2015-03-03

2015-02-02

2015-02-15

2015-02-15

2015-2-28 c

2014-11-20

2014-11-26

2014-11-29

2014-12-19

2014-12-29

2014-11-20

2014-12-23

2014-12-24

2014-12-24

2015-1-5 c

2015-01-29

30-Jan-15

2-28 c

0.0000%
0.0725%
0.0725%
0.0828%
0.1035%
0.0725%
0.1035%
0.1242%
0.0621%
0.7972%
0.0932%
0.0932%
0.0000%
0.0932%
0.0932%
0.2899%
0.0828%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0000%
0.0000%
0.0828%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0 0828%
0.0828%

100 00%
100.00%

0 0828%
0.0828%

85 00%
85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2014-12-30

31-Dec-14

5-Jan-15

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-28

2014-12-31

2015-01-25

2015-02-06

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2014-12-14

2014-12-24

2014-10-23

2014-11-26

2014-12-08

2014-12-20 c

2014-12-30

2014-11-26

2014-12-24

2015-01-13

2015-01-23

2015-01-06

2015-01-24

2015-02-02

2015-2-4 c

2015-02-09

2014-11-27

2014-12-03

2014-12-16

2014-12-26

2015-01-05

2015-02-03

2015-02-04

2015-03-06 a

2015-03-06

2014-11-28

2014-12-23

2015-01-12

2015-01-22

2015-02-03

2015-02-04

2015-03-06 a

2015-03-06

2014-11-27

2014-12-03

2014-12-16

2014-12-26

2014-12-30

2015-02-03

2015-02-04

2015-03-06 a

2015-03-06

2014-11-28

2014-12-23

2015-01-12

2015-01-22

2014-12-24

2015-01-02

2015-01-05

2014-11-26

2014-12-24

2015-01-13

2015-01-23

2014-12-30

2015-02-03

2015-02-04

2015-03-06 a

3 18

2015-1-7 b
12-29 c 1-21

21-Jan-15

22-Jan-15

12-Feb-15

13-Feb-15

29-Jan-15

29-Jan-15

7-Feb-15

2-6 a

6-Feb-15

2-Feb-15

2-7 a

7-Feb-15

6-Mar-15

3-6 a

6-Mar-15

2-6 c 2-15 2-

5-Mar-15

7-Feb-15

2015-03-06
2014-11-13

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.0725%
0.0725%
0.0828%
0.1035%
0.0725%
0.1035%
0.1242%
0.0621%
0.7972%
0.0932%
0.0932%
0.0000%
0.0932%
0.0932%
0.2899%
0.0828%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0621%
0.0000%
0.0000%
0.0828%

95.00%
95.00%
100.00%
85.00%
95.00%
95.00%
95.00%
95.00%
100.00%
95.00%
85.00%
0.00%
85.00%
65.00%
85.00%
100.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
65.00%
85.00%

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

3.73

Piping

3.74

Piping

3.75

Piping

3.76

Piping

3.77

Piping

3.78

Piping

3.79

Piping

3.80

Piping

3 81
3.81

Pi i
Piping

3.82

Piping

3.83

Piping

3.84

Piping

3.85

Piping

3.86

Piping

3.87

p g
Piping

3.88

Piping

3.89

Piping

3.90

Piping

3.91

Piping

3.92

Piping

3.93

Piping

3.94

Piping

3.95

Piping

3.96

Piping

3.97

Piping

3.98

Piping

3.99

Piping

3.100

Piping

3.101

Piping

3.102

Piping

3.103

Piping

3.104

Piping

3.105

Piping

3 106
3.106

Pi i
Piping

3.107

Piping

3.108

Piping

3.109

Piping

3.110

Piping

3.111

Piping

3.112

Piping

3.113

Piping

Aboveground Piping General Arrangement Drawing(T2302A)


Aboveground Piping General Arrangement Drawing(T2302A)
Aboveground
b
d Piping
i i Generall Arrangement Drawing(Ti (
2302A)
Aboveground Piping General Arrangement Drawing (V2303A)
Aboveground Piping General Arrangement Drawing (V2303B)
Aboveground Piping General Arrangement Drawing(T2367)
Aboveground Piping General Arrangement Drawing(T2365/2366)
Aboveground Piping General Arrangement Drawing (V2303C)
(VAboveground Piping General Arrangement Drawing (V
2303D)
Aboveground Piping General Arrangement Drawing (V2342)
Aboveground Piping General Arrangement Drawing (V2368)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
R k)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack))
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground
Piping
Drawing
(Pipe
Ab
d Pi
i General
G
l Arrangement
A
D
i (Pi
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground
g
Piping
p g General Arrangement
g
Drawing
g (Pipe
( p
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)

38636.00

100.00%

PAL-1193-DWG-PIP-4311-01

32.00

0.08%

PAL-1193-DWG-PIP-4312-01

32.00

0.08%

PAL-1193-DWG-PIP-4313-01

32.00

0.08%

PAL-1193-DWG-PIP-4314-01

32.00

0.08%

PAL-1193-DWG-PIP-4315-01

32.00

0.08%

PAL-1193-DWG-PIP-4316-01

32.00

0.08%

PAL-1193-DWG-PIP-4317-01

32.00

0.08%

PAL-1193-DWG-PIP-4318-01

32.00

0.08%

PAL 1193 DWG PIP 4319 01


PAL-1193-DWG-PIP-4319-01

32 00
32.00

0 08%
0.08%

PAL-1193-DWG-PIP-4320-01

32.00

0.08%

PAL-1193-DWG-PIP-4321-01

32.00

0.08%

PAL-1193-DWG-PIP-4322-01

32.00

0.08%

PAL-1193-DWG-PIP-4322-02

0.00

0.00%

PAL-1193-DWG-PIP-4323-01

32.00

0.08%

PAL-1193-DWG-PIP-4323-02

0.00

%
0.00%

PAL-1193-DWG-PIP-4324-01

32.00

0.08%

PAL-1193-DWG-PIP-4324-02

0.00

0.00%

PAL-1193-DWG-PIP-4325-01

32.00

0.08%

PAL-1193-DWG-PIP-4325-02

0.00

0.00%

PAL-1193-DWG-PIP-4326-01

32.00

0.08%

PAL-1193-DWG-PIP-4327-01

32.00

0.08%

PAL-1193-DWG-PIP-4328-01

32.00

0.08%

PAL-1193-DWG-PIP-4328-02

0.00

0.00%

PAL-1193-DWG-PIP-4329-01

32.00

0.08%

PAL-1193-DWG-PIP-4329-02

0.00

0.00%

PAL-1193-DWG-PIP-4330-01

32.00

0.08%

PAL-1193-DWG-PIP-4330-02

0.00

0.00%

PAL-1193-DWG-PIP-4331-01

32.00

0.08%

PAL-1193-DWG-PIP-4332-01

32.00

0.08%

PAL-1193-DWG-PIP-4333-01

32.00

0.08%

PAL-1193-DWG-PIP-4334-01

32.00

0.08%

PAL-1193-DWG-PIP-4335-01

32.00

0.08%

PAL-1193-DWG-PIP-4336-01

32.00

0.08%

PAL 1193 DWG PIP 4336 02


PAL-1193-DWG-PIP-4336-02

0 00
0.00

0 00%
0.00%

PAL-1193-DWG-PIP-4337-01

32.00

0.08%

PAL-1193-DWG-PIP-4337-02

0.00

0.00%

PAL-1193-DWG-PIP-4338-01

32.00

0.08%

PAL-1193-DWG-PIP-4339-01

32.00

0.08%

PAL-1193-DWG-PIP-4340-01

32.00

0.08%

PAL-1193-DWG-PIP-4340-02

0.00

0.00%

PAL-1193-DWG-PIP-4341-01

32.00

0.08%

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014 11 24
2014-11-24

2015 01 05
2015-01-05

2015 01 07
2015-01-07

2015 02 01
2015-02-01

2015 02 13
2015-02-13

2014 11 24
2014-11-24

2015 01 09
2015-01-09

2015 01 14
2015-01-14

2015 01 15
2015-01-15

2015 1 20 c
2015-1-20

2015 02 07
2015-02-07

7
F b 15
7-Feb-15

2 28 c
2-28

0 0828%
0.0828%

100 00%
100.00%

0 0828%
0.0828%

85 00%
85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

%
0.0000%

%
100.00%

%
0.0000%

%
85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014 11 24
2014-11-24

2015 01 05
2015-01-05

2015 01 07
2015-01-07

2015 02 01
2015-02-01

2015 02 13
2015-02-13

2014 11 24
2014-11-24

2015 01 09
2015-01-09

2015 01 14
2015-01-14

2015 01 15
2015-01-15

2015 1 20 c
2015-1-20

2015 02 07
2015-02-07

7 F b 15
7-Feb-15

2 28 c
2-28

0 0000%
0.0000%

100 00%
100.00%

0 0000%
0.0000%

85 00%
85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0000%

100.00%

0.0000%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-09

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

4 18

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

3.114

Piping

3.115

Piping

3.116

Piping

3.117

Piping

3.118

Piping

3.119

Piping

3.120

Piping

3.121

Piping

3 122
3.122

Pi i
Piping

3.123

Piping

3.124

Piping

3.125

Piping

3.126

Piping

3.127

Piping

3.128

p g
Piping

3.129

Piping

3.130

Piping

3.131

Piping

3.132

Piping

3.133

Piping

3.134

Piping

3.135

Piping

3.136

Piping

3.137

Piping

3.138

Piping

3.139

Piping

3.140

Piping

3.141

Piping

3.142

Piping

3.143

Piping

3.144

Piping

3.145

Piping

3.146

Piping

3 147
3.147

Pi i
Piping

3.148

Piping

3.149

Piping

3.150

Piping

3.151

Piping

3.152

Piping

3.153
3.154
3.155

Piping
Piping
Piping

Aboveground Piping General Arrangement Drawing (Pipe


Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground
b
d Piping
i i Generall Arrangement Drawing
i (Pipe
( i
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
R k)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack))
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground
Piping
Drawing
(Pipe
Ab
d Pi
i General
G
l Arrangement
A
D
i (Pi
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground
g
Piping
p g General Arrangement
g
Drawing
g (Pipe
( p
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
Aboveground Piping General Arrangement Drawing (Pipe
Rack)
ISOmetric Drawings-pipe rack area
ISOmetric Drawings-tank area
ISOmetric Drawings-separator area

38636.00

100.00%

PAL-1193-DWG-PIP-4342-01

32.00

0.08%

PAL-1193-DWG-PIP-4343-01

32.00

0.08%

PAL-1193-DWG-PIP-4344-01

32.00

0.08%

PAL-1193-DWG-PIP-4345-01

32.00

0.08%

PAL-1193-DWG-PIP-4346-01

32.00

0.08%

PAL-1193-DWG-PIP-4347-01

32.00

0.08%

PAL-1193-DWG-PIP-4348-01

32.00

0.08%

PAL-1193-DWG-PIP-4349-01

32.00

0.08%

PAL 1193 DWG PIP 4350 01


PAL-1193-DWG-PIP-4350-01

32 00
32.00

0 08%
0.08%

PAL-1193-DWG-PIP-4351-01

32.00

0.08%

PAL-1193-DWG-PIP-4352-01

32.00

0.08%

PAL-1193-DWG-PIP-4353-01

32.00

0.08%

PAL-1193-DWG-PIP-4354-01

32.00

0.08%

PAL-1193-DWG-PIP-4355-01

32.00

0.08%

PAL-1193-DWG-PIP-4356-01

32.00

%
0.08%

PAL-1193-DWG-PIP-4357-01

32.00

0.08%

PAL-1193-DWG-PIP-4358-01

32.00

0.08%

PAL-1193-DWG-PIP-4359-01

32.00

0.08%

PAL-1193-DWG-PIP-4360-01

32.00

0.08%

PAL-1193-DWG-PIP-4361-01

32.00

0.08%

PAL-1193-DWG-PIP-4362-01

32.00

0.08%

PAL-1193-DWG-PIP-4363-01

32.00

0.08%

PAL-1193-DWG-PIP-4364-01

32.00

0.08%

PAL-1193-DWG-PIP-4365-01

32.00

0.08%

PAL-1193-DWG-PIP-4366-01

32.00

0.08%

PAL-1193-DWG-PIP-4367-01

32.00

0.08%

PAL-1193-DWG-PIP-4368-01

32.00

0.08%

PAL-1193-DWG-PIP-4369-01

32.00

0.08%

PAL-1193-DWG-PIP-4370-01

32.00

0.08%

PAL-1193-DWG-PIP-4371-01

32.00

0.08%

PAL-1193-DWG-PIP-4372-01

32.00

0.08%

PAL-1193-DWG-PIP-4373-01

32.00

0.08%

PAL-1193-DWG-PIP-4374-01

32.00

0.08%

PAL 1193 DWG PIP 4375 01


PAL-1193-DWG-PIP-4375-01

32 00
32.00

0 08%
0.08%

PAL-1193-DWG-PIP-4376-01

32.00

0.08%

PAL-1193-DWG-PIP-4377-01

32.00

0.08%

PAL-1193-DWG-PIP-4378-01

32.00

0.08%

PAL-1193-DWG-PIP-4379-01

32.00

0.08%

PAL-1193-DWG-PIP-4380-01

32.00

0.08%

PAL-1193-DWG-PIP-4385
PAL-1193-DWG-PIP-4390-01
PAL-1193-DWG-PIP-4391

2432.00

6.29%
1.24%
0.25%

480.00
96.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2015-01-09

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014 11 24
2014-11-24

2015 01 05
2015-01-05

2015 01 07
2015-01-07

2015 02 01
2015-02-01

2015 02 13
2015-02-13

2014 11 24
2014-11-24

2015 01 05
2015-01-05

2015 01 05
2015-01-05

2015/1/15 c

2015 02 07
2015-02-07

7
F b 15
7-Feb-15

2 28 c
2-28

0 0828%
0.0828%

100 00%
100.00%

0 0828%
0.0828%

85 00%
85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

9-Jan-15

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

%
0.0828%

%
100.00%

%
0.0828%

%
85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-05

2015-01-07

2015-02-01

2015-02-13

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-01-29

30-Jan-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-03

3-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

9-Jan-15

2015-01-14

2015-01-15

2015-1-20 c

2015-02-03

3-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

9-Jan-15

2015-01-14

2015-01-15

2015-1-20 c

2015-02-03

3-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

9-Jan-15

2015-01-14

2015-01-15

2015-1-20 c

2015-02-03

3-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

9-Jan-15

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014 11 24
2014-11-24

2015 01 08
2015-01-08

2015 01 10
2015-01-10

2015 02 04
2015-02-04

2015 02 16
2015-02-16

2014 11 24
2014-11-24

31 D 14
31-Dec-14

2015 01 05
2015-01-05

2015 01 05
2015-01-05

2015/1/15 c

2015 02 07
2015-02-07

7 F b 15
7-Feb-15

2 28 c
2-28

0 0828%
0.0828%

100 00%
100.00%

0 0828%
0.0828%

85 00%
85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

31-Dec-14

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-05

2015-01-05

2015/1/15 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-1-20 c

2015-02-07

7-Feb-15

2-28 c

0.0828%

100.00%

0.0828%

85.00%

2014-12-02

2015-01-30

2015-02-02

2015-02-12

2015-02-22

2014-12-02

2015-02-02

2015-02-04

2015-02-27 c

2014-12-25

2015-02-04

2015-02-07

2015-02-27

2015-03-09

2014-12-25

2015-01-30

2015-01-31

2015-02-27 c

2014-12-16

2015-02-25

2015-02-28

2015-03-20

2015-03-30

2014-12-16

2015-02-02

2015-02-04

2015-02-26 c

6.2946%
1.2424%
0.2485%

100.00%
85.00%
65.00%

6.2946%
1.2424%
0.2485%

65.00%
65.00%
65.00%

2015-01-09

5 18

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

3.156
3.157
3.158
3.159
3.160
3.161
3.162
3.163
3.164
3.165
3.166
3.167
3.168
3.169
3.170
3.171
3.172
3.173
3.174
3.175
3.176
3.177
3.178
3.179
3.180
3.181
3.182
3.183
3.184
3.185
3.186
3.187
3.188
3.189
3.190
3.191
3.192
3.193
3.194
3.195
3.196
3.197
3.198
3.199
3.200
3.201
3.202
3.203
3.204
3.205
3.206
3.207
3.208
3.209

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
p g
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
p g
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

3.210

Piping

3.211
3.212
3.213

Piping
Piping
Piping

3.214

Piping

3.215

Piping

3.216

Piping

3.217

Piping

3.218

Piping

MTO for Underground Firewater SWHDPE and GRE


Pipes & Fittings

3.219

Piping

3.220

Piping

3.221

Piping

3.222

Piping

3.223

Piping

3.224

Piping

3.225
3.226

Standard Pipe Support Drawings


Standard Pipe Support Drawing Index
Standard Pipe Support Ceneral Notes
Standard Pipe Support Allowable Pipe Support
Standard Pipe Support Resting Support Pss00
Standard Pipe Support U Bolt Guide Pss01
Standard Pipe Support U Bolt Guide Pss02
Standard Pipe Support Pipe Guide Pss03
Standard Pipe Support Pipe Hold Down Pss04
Standard Pipe Support Pipe Shoe Insulated Pss05
Standard Pipe Support Pipe Shoe Sloping Line Pss06
Standard Pipe Support Saddle Plate Pss07
Standard Pipe Support Pipe Shoe Guide Pss08
Standard Pipe Support Pipe Shoe Hold Down Pss09
Standard Pipe Support Pipe Stop Line Size 2 To 3 Pss10
Standard Pipe Support Pipe Stop Line Size 4 To 36
Standard Pipe Support Pipe Shoe Stop Pss12
Standard Pipe Support Pedestal Support On Elbow Pss13
Standard Pipe Support Pedestal Support On Pipe Pss14
Standard Pipe Support Dummy Leg On Elbow Yurn
Standard Pipe Support Dummy Leg On Elbow Turn
Standard Pipe Support Dummy Leg On Elbow Turn
Standard Pipe Support Pedestal Support Guide Pss18
Standard Pipe Support Pedestal Support Fixed Pss19
Standard Pipe Support Vertical Pipe Trunnion Pss20
Standard Pipe Support Riser Clamp Pss21
Standard Pipe Support Vertical Pipe Support Pss22
p Support
pp Vertical Pipe
p Guide Pss23
Standard Pipe
Standard Pipe Support Cantilever Pss24
Standard Pipe Support Cantilever Bracket Pss25
Standard Pipe Support Inverted Goal Post Pss26
Standard Pipe Support Goal Post Pss27
Standard Pipe Support Right Angle Support With Brace
Standard Pipe Support Right Angle Support Pss29
Standard Pipe Support Right Angle Support Pss30
Standard Pipe Support Inverted T Post Pss31
Standard Pipe Support T Post On Structure Pss32
Standard Pipe Support T Post On Grade Pss33
Standard Pipe Support Right Angle Bracket Pss34
Standard Pipe
p Support
pp Valve Saddle Support
pp Pss35
Standard Pipe Support Pedestal Support On ElbowStandard Pipe Support Pedestal Support On Pipe Standard Pipe Support Spring Support On Elbow - Type F
Standard Pipe Support Spring Support On Pipe - Type F
Standard Pipe Support Fire Monitor Support Pss40
Standard Pipe Support Pick-Up Support Pss41
Standard Pipe Support Angle Support For Horizontal Lines
Standard Pipe Support Angle Support For Vertical Lines
Standard Pipe Support Resting(Gre Piping) Saddle Support
Standard Pipe Support Pipe Clamp With Shoe Pss45 Guide
Standard Pipe Support Base Assembly (Standard) Pss46
Sta
da d Pipe
pe Suppo
ac g For
o Small
S a Pipe
pe Branch
a c
Standard
Supportt Bracing
Standard Pipe Support Resting (Gre Piping) Saddle
Datasheet for Butterfly Valves
Data Sheet for Fire Hydrant, Fire Monitor, and Foam Hose
Reel
Data Sheet for Safety Shower Station
Data Sheet for Foam Chamber and Water Spray Nozzle
Data Sheet for Extinguisher
MR for Underground Firewater SWHDPE and GRE Pipes
& Fittings
MR for Fire Fighting and Safety Elements
MR for Galvanized Pipe and Fitting for Fire Fighting
System
MTO for Underground Bulk Pipes & Fittings

38636.00

100.00%

PAL-1193-DWG-PIP-4600-01
PAL-1193-DWG-PIP-4600-02
PAL-1193-DWG-PIP-4600-03
PAL-1193-DWG-PIP-4600-04
PAL-1193-DWG-PIP-4600-05
PAL-1193-DWG-PIP-4600-06
PAL-1193-DWG-PIP-4600-07
PAL-1193-DWG-PIP-4600-08
PAL-1193-DWG-PIP-4600-09
PAL-1193-DWG-PIP-4600-10
PAL-1193-DWG-PIP-4600-11
PAL-1193-DWG-PIP-4600-12
PAL-1193-DWG-PIP-4600-13
PAL-1193-DWG-PIP-4600-14
PAL-1193-DWG-PIP-4600-15
PAL-1193-DWG-PIP-4600-16
PAL-1193-DWG-PIP-4600-17
PAL-1193-DWG-PIP-4600-18
PAL-1193-DWG-PIP-4600-19
PAL-1193-DWG-PIP-4600-20
PAL-1193-DWG-PIP-4600-21
PAL-1193-DWG-PIP-4600-22
PAL-1193-DWG-PIP-4600-23
PAL-1193-DWG-PIP-4600-24
PAL-1193-DWG-PIP-4600-25
PAL-1193-DWG-PIP-4600-26
PAL-1193-DWG-PIP-4600-27
PAL-1193-DWG-PIP-4600-28
PAL-1193-DWG-PIP-4600-29
PAL-1193-DWG-PIP-4600-30
PAL-1193-DWG-PIP-4600-31
PAL-1193-DWG-PIP-4600-32
PAL-1193-DWG-PIP-4600-33
PAL-1193-DWG-PIP-4600-34
PAL-1193-DWG-PIP-4600-35
PAL-1193-DWG-PIP-4600-36
PAL-1193-DWG-PIP-4600-37
PAL-1193-DWG-PIP-4600-38
PAL-1193-DWG-PIP-4600-39
PAL-1193-DWG-PIP-4600-40
PAL-1193-DWG-PIP-4600-41
PAL-1193-DWG-PIP-4600-42
PAL-1193-DWG-PIP-4600-43
PAL-1193-DWG-PIP-4600-44
PAL-1193-DWG-PIP-4600-45
PAL-1193-DWG-PIP-4600-46
PAL-1193-DWG-PIP-4600-47
PAL-1193-DWG-PIP-4600-48
PAL-1193-DWG-PIP-4600-49
PAL-1193-DWG-PIP-4600-50
PAL-1193-DWG-PIP-4600-51
PAL
1193 DWG PIP 4600 52
PAL-1193-DWG-PIP-4600-52
PAL-1193-DWG-PIP-4600-53
PAL-1193-DS-PIP-006

160.00

32.00

0.41%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.08%

PAL-1193-DS-PIP-021

250.00

0.65%

PAL-1193-DS-PIP-022
PAL-1193-DS-PIP-023
PAL-1193-DS-PIP-024

250.00
250.00

0.65%
0.65%
0.65%

PAL-1193-MR-PIP-008

32.00

0.08%

PAL-1193-MR-PIP-009

32.00

0.08%

PAL-1193-MR-PIP-015

96.00

0.25%

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

250.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c

2015-01-27

30-Jan-15

2-26 c

2014-10-23
2014 10 23
2014-10-23

2014-11-12
2014 11 12
2014-11-12

2014-11-15
2014 11 15
2014-11-15

2014-12-05
2014 12 05
2014-12-05

2014-12-15
2014 12 15
2014-12-15

2014-10-23
2014 10 23
2014-10-23

2014-11-21
2014 11 21
2014-11-21

2014-11-25
2014 11 25
2014-11-25

2014-11-26
2014 11 26
2014-11-26

2015-01-27
2015 01 27
2015-01-27

30-Jan-15
30 Jan 15
30-Jan-15

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-23

2014-11-21

2014-11-25

2014-11-26

2015-1-6 c
2015 1 6 c
2015-1-6
2015-1-6 c

2015-01-27

30-Jan-15

2-26 c
2 26 c
2-26
2-26 c

2014-10-17

2014-10-31

2014-11-03

2014-11-23

2014-12-03

2014-10-17

2014-11-06

2014-11-10

2014-11-14

2014-12-8 c

2014-12-18

19-Dec-14

2014-12-22 c

7-Jan-15

7-Jan-15

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-24

2014-11-18

2014-11-25

2014-11-28

2014-12-25 b

31-Dec-14

2-Jan-15

P
P
P
P

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-24

2014-11-18

2014-11-25

2014-11-28

2014-12-25 b

31-Dec-14

2-Jan-15

2015-1-4 c
1-28 2-4 c 36
2015-1-4
c

6-Feb-15

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-24

2014-11-18

2014-11-25

2014-11-28

2014-12-25 b

2014-10-23

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-24

2014-11-18

2014-11-25

2014-11-28

2014-12-25 b

2014-11-25

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-10-24

2014-10-31

2014-11-07

2014-11-15

2014-12-26 c

P
P

2014-10-24

2014-10-31

2014-11-03

2014-11-18

2014-11-28

2014-10-24

2014-10-31

2014-11-25

2014-11-28

2014-12-25 b

2014-10-24

2014-11-20

2014-11-18

2014-12-08

2014-12-18

2014-10-28

2014-11-26

2014-11-28

2014-11-28

2014-12-24 c

31-Dec-14

2-Jan-15

P
P

2014-11-17

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-10-28

2014-10-31

2014-11-17

2014-11-19

2014-12-25 c

31-Dec-14

2-Jan-15

2014-11-28

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-10-23

2014-10-31

2014-11-07

2014-11-15

2014-12-26 c

31-Dec-14

2-Jan-15

P
P

2014-12-01

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-10-23

2014-10-31

2014-11-25

2014-11-28

2014-12-25 b

31-Dec-14

2-Jan-15

2014-11-17

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-11-17

2014-11-24

2014-11-28

2014-11-28

2014-12-24 c

31-Dec-14

2-Jan-15

P
P

2014-12-09

2014-12-17

2014-12-30

2015-01-09

2014-12-12

2014-12-30

31-Dec-14

2015-1-4 c

2015-02-07

7-Feb-15

2014-12-09

2014-12-19

2014-12-30

2015-01-09

2015-02-04

P
P

2014-12-04

2014-12-15

2015-01-04

2015-01-14

2015-01-05

89.40%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
95.00%

0.4141%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.4141%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0828%

0.6471%

100.00%

0.6471%

95.00%

0.6471%
0.6471%
0.6471%

100.00%
100.00%
100.00%

0.6471%
0.6471%
0.6471%

100.00%
100.00%
100.00%

0.0828%

100.00%

0.0828%

95.00%

0.0828%

100.00%

0.0828%

95.00%

0.2485%

100.00%

0.2485%

100.00%

2-Jan-15

2015-1-4 c

20-Jan-15

2-Jan-15

2015-1-4 c

6-Feb-15

4-Mar-15

31-Dec-14

2-Jan-15

2015-1-4 c

5-Feb-15

6-Feb-15

2-10 a

20-Jan-15

21-Jan-15

0.0828%

100.00%

0.0828%

95.00%

3-Mar-15

4-Mar-15

0.1449%

100.00%

0.1449%

95.00%

0.1449%

100.00%

0.1449%

85.00%

0.1449%

100.00%

0.1449%

85.00%

0.0932%

100.00%

0.0932%

85.00%

2015-02-06

0.0932%

100.00%

0.0932%

0.00%

2015-02-13

2015-02-13

0.0932%

100.00%

0.0932%

65.00%

32.00

0.08%

56.00

0.14%

MTO for Fire Fighting and Safety Elements


MTO for Galvanized Pipe and Fitting for Fire Fighting
System
TBE for Underground Pipes & Fittings
TBE for Underground Firewater SWHDPE and GRE Pipes
& Fittings
TBE for Fire Fighting and Safety Elements
TBE for Galvanized Pipe and Fitting for Fire Fighting
System

PAL-1193-MTO-PIP-009

56.00

0.14%

PAL-1193-MTO-PIP-015

56.00

0.14%

PAL-1193-TBE-PIP-002

36.00

0.09%

PAL-1193-TBE-PIP-008

36.00

0.09%

PAL-1193-TBE-PIP-009

36.00

0.09%

PAL-1193-TBE-PIP-015

0.00

0.00%

2014-12-02

2014-12-15

2014-12-25

2014-12-16

2015-01-08

2015-01-08

2015-1-9 c

2015-02-07

Piping

Underground Piping Key Plan

PAL-1193-DWG-PIP-4101-01

56.00

0.14%

2014-11-24

2014-12-13

2014-12-16

2015-01-05

2015-01-15

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

Piping

Underground Piping General Arrangement -area 01

PAL-1193-DWG-PIP-4201-01

104.00

0.27%

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

6 18

Progress

100.00%

3-Mar-15

PAL-1193-MTO-PIP-002

2014-12-25

Earned Weight

31-Dec-14

31-Dec-14

31-Dec-14

PAL-1193-MTO-PIP-008

2014-11-26

Actual

Planned
IFC

2-Jan-15

2015-1-4 c 2-5
2-10 c
2015-1-4 c 127 1-29 a
2015-1-4 c 12015-1-4 c 2-5
2-10 c
2015-1-4 c 2-9
2015-1-4 c 127 1-29 a 2-5
29

0.0000%

100.00%

0.0000%

85.00%

3-2 c

0.1449%

100.00%

0.1449%

85.00%

3-2 b

0.2692%

100.00%

0.2692%

85.00%

7-Feb-15

11-Feb-15

10-Feb-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

3.227
3.228
3.229
3.230
3.231
3.232
3.233
3.234
3.235
3.236
3.237
3.238
3.239
3.240
3.241
3.242
3.243
3.244

Detailed Engineering
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

Underground Piping General Arrangement -area 02


Underground Piping General Arrangement -area 03
Underground Piping General Arrangement -area 04
Underground Piping General Arrangement -area 05
Underground Piping General Arrangement -area 06
Underground Piping General Arrangement -area 07
Underground Piping General Arrangement -area 08
Underground Piping General Arrangement -area 09
Underground Piping General Arrangement -area 10
Underground Piping General Arrangement -area 11
Underground Piping General Arrangement -area 12
Underground Piping General Arrangement -area 13
Underground Piping General Arrangement -area 14
Underground Piping General Arrangement -area 15
Underground Piping General Arrangement -area 16
Underground Piping General Arrangement -area 17
Underground Piping General Arrangement -area 18
Underground Piping General Arrangement -area 19

PAL-1193-DWG-PIP-4202-01
PAL-1193-DWG-PIP-4203-01
PAL-1193-DWG-PIP-4204-01
PAL-1193-DWG-PIP-4205-01
PAL-1193-DWG-PIP-4206-01
PAL-1193-DWG-PIP-4207-01
PAL-1193-DWG-PIP-4208-01
PAL-1193-DWG-PIP-4209-01
PAL-1193-DWG-PIP-4210-01
PAL-1193-DWG-PIP-4211-01
PAL-1193-DWG-PIP-4212-01
PAL-1193-DWG-PIP-4213-01
PAL-1193-DWG-PIP-4214-01
PAL-1193-DWG-PIP-4215-01
PAL-1193-DWG-PIP-4216-01
PAL-1193-DWG-PIP-4217-01
PAL-1193-DWG-PIP-4218-01
PAL-1193-DWG-PIP-4219-01

38636.00

100.00%

64.00

0.17%
0.17%
0.17%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%

64.00
64.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

7 18

Actual

Planned
IFC

0.1656%
0.1656%
0.1656%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Earned Weight

Progress

100.00%

89.40%

0.1656%
0.1656%
0.1656%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

3.245
3.246
3.247
3.248
3.249
3.250
3.251
3.252
3.253
3.254
3.255
3.256
3.257
3.258
3.259
3.260
3.261
3.262
3.263
3.264
3.265
3.266
3.267
3.268
3.269
3.270
3.271
3.272
3.273
3.274
3.275
3.276
3.277
3.278
3.279
3.280

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
p g
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

3.281

Piping

3.282

Piping

3.283

Piping

3.284

Piping

3.285
3.286
3.287
3.288
3.289
3.290
3.291
3.292
3.293
3.294
3.295
3.296

Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping
Piping

3.297

Piping

Underground Piping General Arrangement -area 20


Underground Piping General Arrangement -area 21
Underground Piping General Arrangement -area 22
Underground Piping General Arrangement -area 23
Underground Piping General Arrangement -area 24
Underground Piping General Arrangement -area 25
Underground Piping General Arrangement -area 26
Underground Piping General Arrangement -area 27
Underground Piping General Arrangement -area 28
Underground Piping General Arrangement -area 29
Underground Piping General Arrangement -area 30
Underground Piping General Arrangement -area 31
Underground Piping General Arrangement -area 32
Underground Piping General Arrangement -area 33
Underground Piping General Arrangement -area 34
Underground Piping General Arrangement -area 35
Underground Piping General Arrangement -area 36
Underground Piping General Arrangement -area 37
Underground Piping General Arrangement -area 38
Underground Piping General Arrangement -area 39
Underground Piping General Arrangement -area 40
Underground Piping General Arrangement -area 41
Underground Piping General Arrangement -area 42
Underground Piping General Arrangement -area 43
Underground Piping General Arrangement -area 44
Underground Piping General Arrangement -area 45
Underground Piping General Arrangement -area 46
g
p g General Arrangement
g
Underground
Piping
-area 47
Underground Piping General Arrangement -area 48
Underground Piping General Arrangement -area 49
Underground Piping Details
Underground Piping Details
Valve Pit Details
Valve Pit Details
Fire Extinguisher Layout
Layout of valve pits for fire fighting system
Fire Protection System for Sedimentation Tank T-2302A
Arrangement
Fire Protection System for Sedimentation Tank T-2302A
Arrangement
Fire Protection System for Sedimentation Tank T-2302B
Arrangement
Fire Porection System for Sedimentation T-2302B
Arrangement
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
Aboveground Piping General Arrangement Drawing
ISOmetric Drawings-fire fighting system

38636.00

100.00%

PAL-1193-DWG-PIP-4220-01
PAL-1193-DWG-PIP-4221-01
PAL-1193-DWG-PIP-4222-01
PAL-1193-DWG-PIP-4223-01
PAL-1193-DWG-PIP-4224-01
PAL-1193-DWG-PIP-4225-01
PAL-1193-DWG-PIP-4226-01
PAL-1193-DWG-PIP-4227-01
PAL-1193-DWG-PIP-4228-01
PAL-1193-DWG-PIP-4229-01
PAL-1193-DWG-PIP-4230-01
PAL-1193-DWG-PIP-4231-01
PAL-1193-DWG-PIP-4232-01
PAL-1193-DWG-PIP-4233-01
PAL-1193-DWG-PIP-4234-01
PAL-1193-DWG-PIP-4235-01
PAL-1193-DWG-PIP-4236-01
PAL-1193-DWG-PIP-4237-01
PAL-1193-DWG-PIP-4238-01
PAL-1193-DWG-PIP-4239-01
PAL-1193-DWG-PIP-4240-01
PAL-1193-DWG-PIP-4241-01
PAL-1193-DWG-PIP-4242-01
PAL-1193-DWG-PIP-4243-01
PAL-1193-DWG-PIP-4244-01
PAL-1193-DWG-PIP-4245-01
PAL-1193-DWG-PIP-4246-01
PAL-1193-DWG-PIP-4247-01
PAL-1193-DWG-PIP-4248-01
PAL-1193-DWG-PIP-4249-01
PAL-1193-DWG-PIP-4252-01
PAL-1193-DWG-PIP-4252-02
PAL-1193-DWG-PIP-4253-01
PAL-1193-DWG-PIP-4253-02
PAL-1193-DWG-PIP-4254-01
PAL-1193-DWG-PIP-4255-01

32.00

0.00

0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.08%
0.00%
0.00%
0.23%
0.00%
0.23%
0.00%
0.08%
0.00%

PAL-1193-DWG-PIP-4393-01

32.00

0.08%

PAL-1193-DWG-PIP-4393-02

32.00

0.08%

PAL-1193-DWG-PIP-4394-01

32.00

0.08%

PAL-1193-DWG-PIP-4394-02

0.00

0.00%

PAL-1193-DWG-PIP-4395-01
PAL-1193-DWG-PIP-4396-01
PAL-1193-DWG-PIP-4397-01
PAL-1193-DWG-PIP-4398-01
PAL-1193-DWG-PIP-4399-01
PAL-1193-DWG-PIP-4400-01
PAL-1193-DWG-PIP-4401-01
PAL-1193-DWG-PIP-4402-01
PAL-1193-DWG-PIP-4403-01
PAL-1193-DWG-PIP-4404-01
PAL-1193-DWG-PIP-4405-01
PAL-1193-DWG-PIP-4406-01

0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

PAL-1193-DWG-PIP-4384

0.00

0.00%

Instrument

32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
32.00
0.00
0.00
88.00
0.00
88.00
0.00
32.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

comments

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2014-12-25

2014-12-29

2014/12/31 c

2015-02-11

11-Feb-15

3-2 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2015-02-11

2015-02-11

2015-03-02 b

2014-11-24

2014-12-22

2014-12-25

2015-01-20

2015-02-04

2014-11-24

2015-02-11

2015-02-11

2015-03-02 b

2014-10-07

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-07

2014-11-07

2014-11-17

2014-11-21

2014-12-8 a

2014-10-07

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-07

2014-11-07

2014-11-17

2014-11-21

2014-12-8 a

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-07

2014-11-13

2014-11-17

2014-11-21

2014-12-8 a

2014-12-30

2014-12-08

31-Dec-14

1-19 c 1-23 1-

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-07

2014-11-13

2014-11-17

2014-11-21

2014-12-8 a

2014-12-30

2014-12-08

31-Dec-14

1-19 c 1-23 1-

2014-10-07

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-07

2014-11-20

2014-11-21

2014-11-22

16-Jan-15

1-19 a

2015-03-02

2015-02-12

2015-03-10

2015-03-14

2015-03-17

2015-03-02

2015-03-03

2015-03-03

2015-03-04

2015-03-06 c

2014-12-11

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-11

2015-01-09

2015-01-13

2015-01-13

2015-1-17 b

2014-12-11

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-11

2015-01-09

2015-01-13

2015-01-13

2014-12-11

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-11

2015-01-09

2015-01-13

2015-01-13

2014-12-11

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-11

2015-01-09

2015-01-13

P
P
P
P
P
P
P
P
P
P
P
P
P

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2014-11-24

2015-01-08

2015-01-10

2014-11-24

2015-01-08

2014-11-24

P
P
P

0.08%

0.00

0.00%

32.00

Issued

2015-02-04

32.00

32.00

2015-01-20

PAL-1193-DS-INT-015

32.00

REV.B

2015-01-20

PAL-1193-DS-INT-014

32.00

comments

85%
PMC

2015-01-20

Data Sheet for Level Transmitters

40.00

Issued

85%
IFA(Rev-B)

2014-12-25

Instrument

4.17

24.00

REV-A

REV-A

2014-12-25

Instrument

4.16

48.00

ISC Compl

ACTUAL DATE
85%
85%
BEB-SUDAN

2014-12-25

32.00

48.00

Issued

Started

65%
PMC

2014-12-22

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

24.00

Issued

IFC

65%
IFR(Rev-A)

2014-12-22

0.17%
0.17%
0.11%
0.25%
0.25%
0.06%
0.12%
0.12%
0.06%
0.10%
0.08%
0.08%
0.08%
0.08%
0.08%

96.00

ISC Compl

30%
BEB-SUDAN

2014-12-22

8.95%

96.00

30%

2014-11-24

64.00
42.00

5%

2014-11-24

3458.00
64.00

100%

2014-11-24

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

PAL-1193-CAL-INT-001
PAL-1193-CAL-INT-002
PAL-1193-DS-INT-001
PAL-1193-DS-INT-002
PAL-1193-DS-INT-003
PAL-1193-DS-INT-004
PAL-1193-DS-INT-005
PAL-1193-DS-INT-006
PAL-1193-DS-INT-007
PAL-1193-DS-INT-008
PAL-1193-DS-INT-009
PAL-1193-DS-INT-010
PAL-1193-DS-INT-011
PAL-1193-DS-INT-012
PAL-1193-DS-INT-013

Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument

85%

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

2014-12-08

Actual

Planned
IFC

Earned
Weight

Progress

100.00% 97.49%

Calculation for Instrument Air Consumption


Calculation for Instrument UPS Consumption
Data Sheet for Differential Pressure Transmitters
Data Sheet for ESD Valves & On-Off Valves
Data Sheet for Control Valves
Data Sheet for Pressure Vacuum Relief Valves
Data Sheet for Pressure Safety Valves
Data Sheet Pressure Transmitters
Data Sheet for Pressure Gauges
Data Sheet for Level Transmitters(Displacer Type)
Data Sheet for Level Transmitters(Servo Type)
Data Sheet for Temperature Transmitters
Data Sheet for Temperature Gauges
Data Sheet for F&G Detectors & Devices
Data Sheet for Rotameters
Data Sheet for Restriction Orifice Plate

4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
4.15

PLAN DATE
65%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight

Earned Weight

Progress

100.00%

89.40%

0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0000%
0.0000%
0.2278%
0.0000%
0.2278%
0.0000%
0.0828%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
30.00%

0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.0000%
0.0000%
0.2278%
0.0000%
0.2278%
0.0000%
0.0828%
0.0000%

85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
65.00%
65.00%
100.00%
100.00%
85.00%
85.00%
100.00%
65.00%

11-Feb-15 3-2 c 3-4 3-6


11-Feb-15 3-2 c 3-4 3-6

6-Mar-15

11-Feb-15

20-Jan-15

20-Jan-15

1-21 b 1-23

2-Mar-15

19-Jan-15

19-Jan-15

1-20 a

20-Jan-15

0.0828%

100.00%

0.0828%

100.00%

19-Jan-15

19-Jan-15

1-20 a

20-Jan-15

0.0828%

100.00%

0.0828%

100.00%

2015-1-17 b

19-Jan-15

19-Jan-15

1-20 a

20-Jan-15

0.0828%

100.00%

0.0828%

100.00%

2015-01-13

2015-1-17 b

19-Jan-15

19-Jan-15

1-20 a

20-Jan-15

0.0000%

100.00%

0.0000%

100.00%

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

2014-11-24

2015-01-08

2015-01-10

2015-02-04

2015-02-16

2014-11-24

2015-01-14

2015-01-15

2015-01-15

2015-1-19 c

2015-02-13

13-Feb-15

2-27 c 3-4

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%

85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%

2015-12-25

2015-02-09

2015-02-11

2015-03-08

2015-03-20

2015-02-02

2015-02-10

2015-02-11

2015-02-26 c

2015-03-05

5-Mar-15

2014-09-29

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-09-29

2014-10-16

2014-10-28

2014-11-17

2014/11/18 a

2014-11-18

1-Dec-14

1-Dec-14

12-6 a

6-Dec-14

2014-09-29

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-09-29

2014-10-16

2014-10-28

2014-11-17

2014/11/18 a

2014-11-18

1-Dec-14

1-Dec-14

12-6 a

6-Dec-14

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

2014-11-26

28-Nov-14

2014-12-8 a

30-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-13

2014/11/15 b

2014-11-26

28-Nov-14

2014-12-8 a

7-Jan-15

7-Jan-15

1-5 a

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-24

2014-10-31

2014-11-17

2014-11-26 b

2015-01-05

5-Jan-15

1-9 a

9-Jan-15

9-Jan-15

1-9 a

8-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-13

2014/11/15 b

2014-11-26

28-Nov-14

2014-12-8 a

30-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-13

2014/11/15 b

2014-11-26

28-Nov-14

2014-12-8 a

23-Dec-14

24-Dec-14

12-26 a

26-Dec-14

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

30-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 a

30-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

29-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

29-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

30-Dec-14

30-Dec-14

1-5 a

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-13

2014/11/15 b

30-Dec-14

30-Dec-14

1-5 a

5-Jan-15

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-13

2014/11/15 b

25-Dec-14

25-Dec-14

12-26 a

26-Dec-14

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-23

2014-10-31

2014-11-17

2014-11-26 b

13-Jan-15

13-Jan-15

1-15 a

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-13

2014/11/15 b

23-Dec-14

24-Dec-14

2014-12-31

2015-01-12

2015-01-15

2015-01-24

2015-01-30

2014-12-15

2014-12-30

31-Dec-14

2015-1-4 a

5-Jan-15

5-Jan-15

8 18

11-Feb-15

2014-12-08

2015-01-16

0.0000%

2014-11-15

2014-12-10

10-Dec-14

2014-11-26

28-Nov-14
2015-01-04

6-Mar-15

12-13 a
2014-12-8 a

0.00%

0.0000%

85.00%

8.95%

8.89%

8.95%

8.02%

15-Jan-15

0.1656%
0.1656%
0.1087%
0.2485%
0.2485%
0.0621%
0.1242%
0.1242%
0.0621%
0.1035%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1656%
0.1656%
0.1087%
0.2485%
0.2485%
0.0621%
0.1242%
0.1242%
0.0621%
0.1035%
0.0828%
0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

12-26 a

26-Dec-14

0.0828%

100.00%

0.0828%

100.00%

1-7 a

7-Jan-15

0.0000%

100.00%

0.0000%

100.00%

5-Jan-15

5-Jan-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

4.18

Instrument

MR for ESD Valves & On-Off Valves

PAL-1193-MR-INT-001

32.00

0.08%

4.19

Instrument

PAL-1193-MR-INT-002

32.00

0.08%

4.20

Instrument

PAL-1193-MR-INT-003

32.00

0.08%

4.21
4.22
4.23
4.24

Instrument
Instrument
Instrument
Instrument

MR for Control Valves


MR for Pressure Safety Valves & Pressure Vacuum Relief
V l
Valves
MR for Electronic Transmitters
MR for Level Transmitters
MR for Rotameters
MR for Gauges

PAL-1193-MR-INT-004
PAL-1193-MR-INT-005
PAL-1193-MR-INT-006
PAL-1193-MR-INT-007

32.00

32.00

0.08%
0.08%
0.08%
0.08%

4.25

Instrument

MR for Process Control System & Safeguarding System

PAL-1193-MR-INT-008

32.00

0.08%

4.26

Instrument

MR for Fire and Gas Detectors & Devices

PAL-1193-MR-INT-009

32.00

0.08%

4.27
4.28
4.29

Instrument
Instrument
Instrument

MR for Instrument Cables and Glands


MR for Instrument Junction Boxes
MR for Instrument Bulks Material
MR for Building Fire Alarm and Clean Agent Fire
Suppression System

PAL-1193-MR-INT-010
PAL-1193-MR-INT-011
PAL-1193-MR-INT-012

32.00
32.00

0.08%
0.08%
0.08%

32.00
32.00

32.00

4.30

Instrument

PAL-1193-MR-INT-013

32.00

0.08%

4.31

Instrument

MR for Restriction Orifice Plate

PAL-1193-MR-INT-014

32.00

0.08%

4.32
4.33
4.34

Instrument
Instrument
Instrument

PAL-1193-MR-INT-015
PAL-1193-TBE-INT-001
PAL-1193-TBE-INT-002

32.00
80.00

0.08%
0.14%
0.21%

4.35

Instrument

PAL-1193-TBE-INT-003

40.00

0.10%

4.36
4.37
4.38
4.39

Instrument
Instrument
Instrument
Instrument

MR for Instrument Cable Tray


TBE for ESD Valves & On-Off Valves
TBE for Control Valves
TBE for Pressure Safety Valves & Pressure Vacuum Relief
Valves
TBE for ElectronicTransmitters
TBE for Level Transmitters
TBE for Rotameters
g
TBE for Gauges

PAL-1193-TBE-INT-004
PAL-1193-TBE-INT-005
PAL-1193-TBE-INT-006
PAL-1193-TBE-INT-007

36.00

36.00

0.09%
0.09%
0.09%
0.09%

4.40

Instrument

TBE for Process Control System & Safeguarding System

PAL-1193-TBE-INT-008

56.00

0.14%

4.41
4.42
4.43
4.44

Instrument
Instrument
Instrument
Instrument

PAL-1193-TBE-INT-009
PAL-1193-TBE-INT-010
PAL-1193-TBE-INT-011
PAL-1193-TBE-INT-012

36.00

36.00

0.09%
0.09%
0.09%
0.09%

4.45

Instrument

PAL-1193-TBE-INT-013

36.00

0.09%

4.46
4.47

Instrument
Instrument

PAL-1193-TBE-INT-014
PAL-1193-TBE-INT-015

36.00
36.00

0.09%
0.09%

4.48

Instrument

PAL-1193-DWG-INT-7000-01

56.00

0.14%

4.49
4.50

Instrument
Instrument

PAL-1193-DWG-INT-7001-01
PAL-1193-DWG-INT-7002-01

56.00
40.00

0.14%
0.10%

4.51

Instrument

PAL-1193-DWG-INT-7003-01

32.00

0.08%

4.52
4.53
4.54
4.55
4.56
4.57
4.58

Instrument
Instrument
Instrument
Instrument
Instrument
Instrument
Instrument

TBE for Fire and Gas Detectors & Devices


TBE for Instrument Cables and Glands
TBE for Instrument Junction boxes
TBE for Instrument Bulks Material
TBE for Building Fire Alarm and Clean Agent Fire
Suppression System
TBE for Restriction Orifice Plate
TBE for Instrument Cable Tray
Overall Instrumentation and Control System Block
Diagram
Instrument Cable Block Diagram
F&G Cable Block Diagram
Building Fire Alarm and Clean Agent Fire Suppression
System Block Diagram
Instrument Interconnection Drawing
Instrument Loop Drawings
Instrument Hook-up Drawings
Instrument Support Details
Instrument Cable Tray&Trench Layout
Details of Instrument Cable Trench
Instrument Location Plan

PAL-1193-DWG-INT-7100-01
PAL-1193-DWG-INT-7200-01
PAL-1193-DWG-INT-7300-01
PAL-1193-DWG-INT-7400-01
PAL-1193-DWG-INT-7500-01
PAL-1193-DWG-INT-7501-01
PAL-1193-DWG-INT-7502-01

56.00

48.00

0.14%
0.14%
0.16%
0.10%
0.25%
0.06%
0.12%

4.59

Instrument

y Drawings
g
Fire & Gas Detectors and Devices Layout

PAL-1193-DWG-INT-7503-01

48.00

0.12%

4.60

Instrument

General Arrangement for Remote I/O Room

PAL-1193-DWG-INT-7504-01

32.00

0.08%

4.61
4.62

Instrument
Instrument

General Arrangement for Central Control Room


Building Fire Detector Layout Drawings

PAL-1193-DWG-INT-7505-01
PAL-1193-DWG-INT-7506-01

32.00
40.00

0.08%
0.10%

4.63

Instrument

Instrument Nameplate Drawings

0.00%

Instrument

128.00

0.33%

4.65

Instrument

PAL-1193-DWG-INT-7700-01

40.00

0.10%

4.66
4.67
4.68
4 69
4.69
4.70
4.71

Instrument
Instrument
Instrument
Instrument
Instrument
Instrument

Logic Diagram
Overall Instrumentation and Control System Earthing
System Diagram
Instrument Index
DCS I/O List
ESD System I/O List
Alarm and Trip Schedule
Instrument Cable Schedule
Instrument Junction Box Schedule

PAL-1193-DWG-INT-7507
PAL-1193-DWG-INT-7600-01-

0.00

4.64

PAL-1193-SCH-INT-001
PAL-1193-SCH-INT-002
PAL-1193-SCH-INT-003
PAL 1193 SCH INT 004
PAL-1193-SCH-INT-004
PAL-1193-SCH-INT-005
PAL-1193-SCH-INT-006

96.00

60.00

0.25%
0.25%
0.33%
0 12%
0.12%
0.16%
0.16%

4.72

Instrument

Instrument Cable Drum Schedule

PAL-1193-SCH-INT-007

0.00

4.73
4.74
4.75

Instrument
Instrument
Instrument

Cause and Effect (ESD)


Cause and Effect (Fire & Gas)
Cause and Effect (DCS)

PAL-1193-CEF-INT-001
PAL-1193-CEF-INT-002
PAL-1193-CEF-INT-003

96.00

56.00

36.00
36.00

36.00
36.00

56.00
60.00
40.00
96.00
24.00

96.00
128.00
48 00
48.00
60.00

5%

30%

ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-17

2014-11-26 b

P
P

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-24

2014-10-31

2014-11-17

2014-11-26 c

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-17

2014-11-26 b

P
P
P
P
P

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-17

2014-11-26 b

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-17

2014-11-26 b

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-23

2014-10-31

2014-11-17

2014-11-26 c

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-21

2014-10-28

2014-11-17

2014-11-26 b

2014-10-24

2014-10-31

2014-11-03

2014-11-23

2014-12-03

2014-10-24

2014-11-04

2014-11-10

2014-11-17

2014-11-26 a

2014-12-20

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-20

2014-10-28

2014-11-17

2014-11-26 b

2014-12-12

2014-11-17

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-17

2014-12-01

2014-12-02

2014-12-9 c

2015-01-04

4-Jan-15

1-5 a

2014-11-14

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-14

2014-11-19

2014-11-20

2014-11-26 b

2014-12-25

25-Dec-14

2014-12-29 a

2014-11-21

2014-12-14

2014-12-17

2015-01-06

2015-01-16

2014-11-21

2014-12-25

2014-12-25

2015-1-5 c

2015-01-16

16-Jan-15

1-23 a

2014-12-01

2014-12-04

2014-12-07

2014-12-27

2015-01-06

2014-11-10

2014-11-26

2014-11-27

2014-12-9 b

2014-12-25

25-Dec-14

2014-12-29 a

2014-09-29

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-29

2014-10-28

2014-11-17

2014-11-26 b

2014-12-12

15-Dec-14

2014-12-17 a

P
P
P
P

2014-10-24

2014-11-16

2014-11-19

2014-12-09

2014-12-19

2014-10-24

2014-11-27

2014-11-28

2014-12-2 b

2015-01-05

5-Jan-15

1-7 c 1-20 1-

2014-11-03

2014-11-11

2014-11-25

2014-12-05

2014-12-24

2015-01-10

2015-01-10

2015-1-12 c

2014-11-03

2014-11-11

2014-11-25

2014-12-05

2014-12-24

2015-01-13

2015-01-14

2015-1-16 c

2015-01-19

20-Jan-15

1-26 a

2014-11-05

2014-11-16

2014-12-06

2014-12-16

2014-12-30

2015-01-10

2015-01-10

2015-1-14 c

P
P
P
P
P

2014-11-05

2014-11-25

2014-12-15

2014-12-25

2014-12-30

2015-01-20

2015-01-21

2015-1-26 a

2014-11-07

2014-11-25

2014-12-15

2014-12-25

2014-12-30

2015-01-22

2015-01-22

2015-1-26 c

2014-11-07

2014-11-25

2014-12-15

2014-12-25

2014-12-30

2015-01-23

2015-01-23

2015-1-26 a

2014-11-07

2014-11-25

2014-12-15

2014-12-25

2014-12-30

2015-01-20

2015-01-21

2015-1-26 a

2014-11-12

2014-11-20

2014-12-06

2014-12-16

2014-12-16

2015-01-10

2015-01-12

2015-1-14 c

P
P
P
P
P

2014-11-07

2014-11-25

2014-12-15

2014-12-25

2014-12-25

2015-01-02

2015-01-18

2015-01-28

2014-12-17

2014-12-25

2015-01-10

2015-01-20

2014-12-24

2015-01-02

2015-01-18

2015-01-28

2014-12-17

2014-12-25

2015-01-10

2015-01-20

P
P
P

2014-11-07

2014-11-25

2014-12-15

2014-12-25

2014-11-28

2014-12-06

2014-12-22

2015-01-01

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-12-10

2014-10-20

P
P
P

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-12-10

2014-10-20

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-12-10

2014-10-20

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-12-10

P
P
P
P
P
P
P
P

2014-12-30

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-23

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-10-20

2014-11-07

2014-11-10

2014-12-23

2015-01-07

2015-01-10

2014-12-23

2015-01-07

2015-01-10

2014-12-23

2015-01-07

2014-12-23

2015-01-07

2015-01-22

P
P
P
P
P

P
P
P
P
P
P

2014-10-20

2014-12-12

15-Dec-14

2014-12-12

15-Dec-14

2014-11-26

2015-01-05

2014-12-17 a

2014-12-17 a

10-Feb-15

0.0828%

100.00%

0.0828%

100.00%

10-Feb-15

0.0828%

100.00%

0.0828%

100.00%

7-Jan-15

7-Jan-15

1-12 a

12-Jan-15

0.0828%

100.00%

0.0828%

100.00%

7-Jan-15

7-Jan-15

2015-1-10 a

10-Jan-15

9-Jan-15

10-Jan-15

1-12 a

12-Jan-15

19-Jan-15

20-Jan-15

1-21 a

21-Jan-15

100.00%
100.00%
100.00%
100.00%

0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%

7-Jan-15

7-Jan-15

2015-1-10 a

10-Jan-15

20-Dec-14

2014-12-24 a

17-Jan-15

17-Jan-15

1-19 a

19-Jan-15

0.0828%

100.00%

0.0828%

100.00%

15-Dec-14

2014-12-17 a

30-Dec-14

31-Dec-14

1-5 a

5-Jan-15

0.0828%

100.00%

0.0828%

100.00%

100.00%
100.00%
100.00%

0.0828%
0.0828%
0.0828%

85.00%
85.00%
100.00%

6-Feb-15

2-10 a

10-Feb-15

0.0828%
0.0828%
0.0828%

26-Jan-15

26-Jan-15

1-29 a

29-Jan-15

0.0828%

100.00%

0.0828%

100.00%

30-Dec-14

31-Dec-14

1-5 a

5-Jan-15

0.0828%

100.00%

0.0828%

100.00%

6-Feb-15

6-Feb-15

2-10 a

10-Feb-15

6-Mar-15

6-Mar-15
6-Feb-15

2-10 a

10-Feb-15

0.0828%
0.1449%
0.2071%

100.00%
100.00%
100.00%

0.0828%
0.1449%
0.2071%

100.00%
95.00%
100.00%

2-28 a

28-Feb-15

0.1035%

100.00%

0.1035%

100.00%

100.00%
100.00%
100.00%
100.00%

0.0932%
0.0932%
0.0932%
0.0932%

95.00%
85.00%
100.00%
100.00%

6-Feb-15

7-Feb-15

9-Feb-15

31-Jan-15

30-Jan-15

2015-01-26

27-Jan-15

28-Jan-15

2015-01-26

30-Jan-15

30-Jan-15

2-4 a

4-Feb-15

0.0932%
0.0932%
0.0932%
0.0932%

17-Jan-15

17-Jan-15

1-19 a

19-Jan-15

0.1449%

100.00%

0.1449%

100.00%

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

3-5 a

5-Mar-15

0.0932%
0.0932%
0.0932%
0.0932%

100.00%
100.00%
100.00%
100.00%

0.0932%
0.0932%
0.0932%
0.0932%

0.00%
85.00%
0.00%
100.00%

2015-01-29

30-Jan-15

2-2 c

2015-02-15

2015-02-15

2015-03-03 a

2015-03-03

4-Mar-15

4-Mar-15

2015-02-03

2015-02-04

2015-02-10 a

2015-02-10

7-Feb-15

7-Feb-15

2014-12-30

2015-01-07

2015-01-07

2015-1-7 c

2014-12-24

2015-01-26

2015-01-26

2015-1-29 a

2014-10-29

2014-11-01

2014-11-17

2014-11-26 c

2014-12-15

16-Dec-14

2014-12-22 a

2014-11-04

2014-11-10

2014-11-17

2014-11-26 c

2014-12-25

25-Dec-14

2014-12-29 a

2014-11-01

2014-11-10

2014-11-17

2014-11-26 c

2014-12-23

24-Dec-14

2014-12-26 a

2014-10-20

2014-11-19

2014-11-17

2014-11-26 c

2014-12-16

16-Dec-14

2014-12-22 a

2014-12-30

2015-01-10

2015-01-10

2015-1-14 c

2014-12-23

2015-01-06

2015-01-06

2015-1-9 c

2014-12-10

2014-10-20

2014-11-08

2014-11-17

2014-11-26 b

2014-12-25

2014-11-30

2014-12-10

2014-10-20

2014-11-17

2014-11-18

2014-11-26 c

2014-12-15

2015-01-30

2015-02-09

2014-12-23

2015-01-12

2015-01-12

2015-1-16 c

2015-02-12

2015-01-30

2015-02-09

2014-11-10

2014-11-27

2014-11-28

2014-11-29 a

2015-01-10

2015-01-30

2015-02-09

2014-12-23

2015-01-12

2015-01-12

2015-1-16 c

2015-01-10

2015-01-30

2015-02-09

2014-10-20

2014-11-17

2014-11-18

2014-11-26 c

2015-02-25

2015-02-28

2015-03-20

2015-03-30

2015-12-01

2014-12-11

2014-12-11

2014-12-13 a

2015-01-22

2015-02-25

2015-02-28

2015-03-20

2015-03-30

2015-12-30

2015-01-06

2015-01-06

2015-1-9 c

2014-11-27

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-11-10

2014-11-17

2014-11-20

2014-11-26 c

2014-11-28

2014-12-17

2014-12-20

2015-01-09

2015-01-19

2014-11-28

2015-01-04

2015-01-04

2014-12-18

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-18

2015-01-31

2015-02-04

2015-02-09 c

2014-11-19

2014-12-11

2014-12-14

2015-01-03

2015-01-13

2014-11-19

2014-12-01

2014-12-02

2014-12-10 a

2014-10-08

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-08

2014-10-23

2014-11-01

2014-11-17

2014-11-26 b

2015-01-12

12-Jan-15

1-19 b

2014-10-08

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-08

2014-10-21

2014-10-28

2014-11-17

2014-11-26 b

2014-12-20

20-Dec-14

2014-10-08

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-08

2014-10-21

2014-10-28

2014-11-17

2014-11-26 b

2014-12-20

20-Dec-14

2014 12 26 a
2014-12-26

0.00%

P
P
P
P
P
P
P

7.30%

32.00

0.08%

5.2

Electrical

Data Sheet for LV Switchgear and Motor Control Centre

PAL-1193-DS-ELE-002

32.00

0.08%

5.3

Electrical

Data Sheet for 230V AC UPS

PAL-1193-DS-ELE-003

32.00

0.08%

5.4

Electrical

Data Sheet for MV Power Cables and Termination Kits

PAL-1193-DS-ELE-004

32.00

0.08%

2015-01-20

13-Jan-15

1-26 a

2015-1-15 c

2015-01-29

25-Dec-14

2014-12-29 a

16-Dec-14

2014-12-22 a

11-Feb-15

2-13 b

2014-11-29
2014-12-01

2-Dec-14

2014-12-10 a

1-29 a

29-Jan-15

0.0932%

100.00%

0.0932%

0.00%

6-Feb-15

6-Feb-15

2-10 a

10-Feb-15

6-Feb-15

6-Feb-15

2-10 a

10-Feb-15

0.0932%
0.0932%

100.00%
100.00%

0.0932%
0.0932%

100.00%
100.00%

17-Jan-15

17-Jan-15

1-19 b 2-6
2-10 a

10-Feb-15

0.1449%

100.00%

0.1449%

100.00%

10-Feb-15

0.1449%
0.1035%

100.00%
100.00%

0.1449%
0.1035%

85.00%
100.00%

1-15 b

0.0828%

100.00%

0.0828%

85.00%

0.1449%
0.1449%
0.1553%
0.1035%
0.2485%
0.0621%
0.1242%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1449%
0.1449%
0.1553%
0.1035%
0.2485%
0.0621%
0.1242%

65.00%
65.00%
85.00%
100.00%
85.00%
100.00%
95.00%

0.1242%

100.00%

0.1242%

100.00%

0.0828%

65.00%

0.0828%

0.00%

6-Feb-15

6-Feb-15

2-10 a

29-Dec-14

29-Dec-14

1-5 a

5-Jan-15

1-Dec-14

1-Dec-14

12-6 a

6-Dec-14

12-Feb-15

12-Feb-15

2-13 d

6-Feb-15

6-Feb-15

2-10 a

10-Feb-15

2014-12-13
2014-12-16

16-Dec-14

2014-12-22 a

12-Feb-15

2-13 b

2015-01-05
2015-02-12

2014 12 07
2014-12-07

2014 12 10
2014-12-10

2014 12 30
2014-12-30

2015 01 09
2015-01-09

2014 11 17
2014-11-17

2014 12 20
2014-12-20

2014 12 20
2014-12-20

2014-11-09

2014-11-12

2014-12-02

2014-12-12

2014-10-22

2014-11-26

2014-11-27

2014-11-27 c

2014-12-26

2014-10-20

2014-11-07

2014-11-10

2014-11-30

2014-12-10

2014-10-20

2014-11-17

2014-11-18

2014-11-26 a

2014-12-25

2014-11-28

2014-12-22

2014-12-25

2015-01-14

2015-01-24

2014-11-28

2015-01-04

2015-01-04

2015-1-7 c

P
P
P

2014-11-20

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-20

2014-11-27

2014-11-28

2014-12-2 c

2014-11-25

2014-12-14

2014-12-17

2015-01-06

2015-01-16

2014-11-10

2014-11-17

2014-11-18

2014-11-26 c

2014-11-25

2014-12-14

2014-12-17

2015-01-06

2015-01-16

2014-11-25

2014-11-27

2014-11-28

2014-12-2 c

P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 b

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 a

P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 b

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 a

12-Jan-15

12-Jan-15

1-15 a

15-Jan-15

13-Jan-15

15-Jan-15

1-15 a

15-Jan-15

0.0828%
0.1035%

65.00%
100.00%

0.0828%
0.1035%

0.00%
100.00%

0.0000%

100.00%

0.0000%

100.00%

0.3313%

100.00%

0.3313%

85.00%

0.1035%

100.00%

0.1035%

100.00%

0.2485%
0.2485%
0.3313%
0 1242%
0.1242%
0.1553%
0.1553%

100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%

0.2485%
0.2485%
0.3313%
0 1242%
0.1242%
0.1553%
0.1553%

85.00%
95.00%
95.00%
85 00%
85.00%
85.00%
85.00%

0.0000%

100.00%

0.0000%

65.00%

100.00%
100.00%
100.00%

0.2485%
0.1656%
0.2071%

85.00%
100.00%
100.00%

22-Jan-15

22-Jan-15

1-26 a

29-Jan-15

12-Dec-14

12-Dec-14

12-13 a

13-Dec-14

2014-12-26 a

17-Jan-15

17-Jan-15

1-19 b

2014-12-26 a

17-Jan-15

17-Jan-15

1-19 b

28-Feb-15

2-Mar-15

3-4 a

2014-12-10

2014-10-22

9 18

20-Jan-15

2015-01-13

2014 11 17
2014-11-17

89.40%

0.0828%
0.0828%
0.0828%
0.0828%

2015-01-26

2015-1-5 a

Progress

100.00%

2-10 a

2015-01-05

Earned Weight

2-10 a

2015-01-26

80.00

Progress

6-Feb-15

2015-1-9 c

2820.00

Earned
Weight

6-Feb-15

2015-1-26 a

2014-11-01

Actual

Planned
IFC

6-Feb-15

2015-01-22

PAL-1193-DS-ELE-001

comments

As on: 6-Mar-2015

100%

6-Feb-15

2015-01-09

Data Sheet for Distribution Transformer

95%
PMC

100.00% 97.49%

2015-01-22

Electrical

Electrical

100%

2015-01-09

5.1

85%

2014-12-17

0.25%
0.17%
0.21%

64.00

PLAN DATE
65%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight

2014 12 25
2014-12-25
27-Dec-14

1-4 b

25-Dec-14

2014-12-29 a

2015-02-02

3-Feb-15

2-13 c

2015-02-02

3-Feb-15

2-13 c

2015-02-02

3-Feb-15

2-4 c

2014-11-26

2014-12-08

2014-12-08

9-Feb-15

10-Feb-15

2-13 a

13-Feb-15

0.2485%
0.1656%
0.2071%

7.30%

7.08%

7.30%

7.30%

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

0.0828%

100.00%

0.0828%

100.00%

4-Mar-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

Data Sheet for LV Cables and Cable Glands


Data Sheet for Electric Motors rated up to 150kW
Data Sheet for Electric Heat Tracing
Data Sheet for LV Motor Soft Starter
Data Sheet for 6.6V Switchgear
MR for Distribution Transformer
MR for LV Switchgear and Motor Control Centre
MR for 230V AC UPS
MR for MV Power Cables and Termination Kits
MR for LV Cables

PAL-1193-DS-ELE-005
PAL-1193-DS-ELE-006
PAL-1193-DS-ELE-007
PAL-1193-DS-ELE-008
PAL-1193-DS-ELE-009
PAL-1193-MR-ELE-001
PAL-1193-MR-ELE-002
PAL-1193-MR-ELE-003
PAL-1193-MR-ELE-004
PAL-1193-MR-ELE-005

32.00

40.00

0.08%
0.08%
0.08%
0.08%
0.08%
0.10%
0.10%
0.10%
0.10%
0.10%

5.15

Electrical

MR for Lighting Poles Fixtures & Junction Boxes

PAL-1193-MR-ELE-006

60.00

32.00
32.00
32.00
32.00
40.00
40.00
40.00
40.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 a

2014-12-08

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 a

2014-12-08

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-12-8 b

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-15

2014-10-23

2014-11-17

2014-12-8 a

9-Dec-14

10-Dec-14

12-13 a

13-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-11-25 c

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-11-21

2014-11-21

2014-12-10 b

15-Dec-14

16-Dec-14

12-17 a

17-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-11-25 c

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2012-11-25 c

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-12-08

2014-12-10

2014-12-13 a

16-Dec-14

17-Dec-14

12-20 a

0.16%

P
P
P
P
P
P
P
P
P
P
P

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-11-27

2014-11-27

2014-12-10 b

15-Dec-14

16-Dec-14

12-17 a

2014-12-8 b
2014-12-08

2014-12-13

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

20-Dec-14

0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0828%
0.0828%
0.0828%
0.0828%
0.0828%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

17-Dec-14

0.1553%

100.00%

0.1553%

100.00%

5.16

Electrical

MR for Electric Heat Tracingof Aboveground Pipe

PAL-1193-MR-ELE-007

30.00

0.08%

2014-10-17

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-17

2014-10-10

2014-12-11

2014-12-12

2014-12-15 a

2014-12-15

20-Dec-14

22-Dec-14

12-22 a

22-Dec-14

0.0776%

100.00%

0.0776%

100.00%

5.17
5.18
5.19
5.20
5.21
5.22
5.23
5.24
5.25
5.26
5.27

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

MR for Electric Bulk Materials


MR for Electrical Cable Tray & Accessories
MR for 6.6kV Switchgear
MR for Electric Heat Tracing of Underground Pipe
MR for Earthing Materials
MTO for Distribution Transformer
MTO for LV Switchgear and Motor Control Centre
MTO for 230V AC UPS
MTO for MV Power Cables and Termination Kits
MTO for LV Cables
MTO for Lighting Poles Fixtures & Junction Boxes

PAL-1193-MR-ELE-008
PAL-1193-MR-ELE-010
PAL-1193-MR-ELE-011
PAL-1193-MR-ELE-012
PAL-1193-MR-ELE-013
PAL-1193-MTO-ELE-001
PAL-1193-MTO-ELE-002
PAL-1193-MTO-ELE-003
PAL-1193-MTO-ELE-004
PAL-1193-MTO-ELE-005
PAL-1193-MTO-ELE-006

30.00

2014-12-13

2014-12-16

2015-01-05

2015-01-15

2014-10-18

2014-10-10

2014-12-08

2014-12-10

2014-12-13 a

2014-12-13

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-11-28

2014-11-28

2014-12-10 b

15-Dec-14

16-Dec-14

12-17 a

17-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-15

2014-10-23

2014-11-17

2012-11-25 c

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-10-17

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-17

2014-11-17

2014-11-19

2014-12-09

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-10-17

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-17

2014-11-17

2014-11-20

2014-12-9 b

11-Dec-14

12-Dec-14

12-15 a

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-23

2014-11-17

12-15 a

15-Dec-14

2014-10-28

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-28

2014-11-21

2014-11-21

12-17 a

17-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

12-15 a

15-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-10

2014-10-23

2014-11-17

2014-11-25 c

12-15 a

15-Dec-14

2014-11-03

2014-11-29

2014-12-02

2014-12-22

2015-01-01

2014-11-03

2014-12-08

2014-12-10

2014-12-13 a

2014-12-13

12-20 a

20-Dec-14

2014-11-07

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-07

2014-11-27

2014-11-27

2014-12-10 a

2014-12-10

12-17 a

17-Dec-14

0.0776%
0.0776%
0.0776%
0.0776%
0.0776%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0776%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0776%
0.0776%
0.0776%
0.0776%
0.0776%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0776%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

5.28

Electrical

MTO for Electric Heat Tracing of Aboveground Pipe

PAL-1193-MTO-ELE-007

30.00

0.08%

P
P
P
P
P
P
P
P
P
P
P
P

2014-10-29

30.00

0.08%
0.08%
0.08%
0.08%
0.08%
0.10%
0.10%
0.10%
0.10%
0.10%
0.08%

2014-10-17

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-17

2014-12-11

2014-12-12

2014-12-15 a

2014-12-15

12-22 a

22-Dec-14

0.0776%

100.00%

0.0776%

100.00%

5.29
5.30
5.31

Electrical
Electrical
Electrical

MTO for Electric Bulk Materials


MTO for Electrical Cable Tray & Accessories
MTO for 6.6kV Switchgear

PAL-1193-MTO-ELE-008
PAL-1193-MTO-ELE-010
PAL-1193-MTO-ELE-011

30.00

2014-12-13

2014-12-16

2015-01-05

2015-01-15

2014-10-29

2014-12-08

2014-12-10

2014-12-13 a

2014-12-13

12-20 a

20-Dec-14

2014-11-13

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-13

2014-11-28

2014-11-28

2014-12-10 a

2014-12-10

12-17 a

17-Dec-14

2014-09-10

2014-10-08

2014-10-11

2014-10-31

2014-11-10

2014-09-10

2014-10-23

2014-11-17

12-15 a

15-Dec-14

0.0776%
0.0776%
0.0776%

100.00%
100.00%
100.00%

0.0776%
0.0776%
0.0776%

100.00%
100.00%
100.00%

5.32

Electrical

MTO for Electric Heat Tracing of Underground Pipe

PAL-1193-MTO-ELE-012

30.00

0.08%

P
P
P
P

2014-10-29

30.00

0.08%
0.08%
0.08%

2014-10-17

2014-11-22

2014-11-25

12-15 a

5.33
5.34
5.35
5.36
5.37
5.38
5.39

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

MTO for Earthing Materials


TBE for Distribution Transformer
TBE for LV Switchgear and Motor Control Centre
TBE for 230V AC UPS
TBE for MV Power Cables and Termination Kits
TBE for LV Cables
TBE For Lighting Poles Fixtures & Junction Boxes

PAL-1193-MTO-ELE-013
PAL-1193-TBE-ELE-001
PAL-1193-TBE-ELE-002
PAL-1193-TBE-ELE-003
PAL-1193-TBE-ELE-004
PAL-1193-TBE-ELE-005
PAL-1193-TBE-ELE-006

30.00

2014-11-22

5.40

Electrical

TBE for Electric Heat Tracing of Aboveground Pipe

PAL-1193-TBE-ELE-007

21.00

0.05%

P
P
P
P
P
P
P
P

2014-10-17

21.00

0.08%
0.07%
0.07%
0.07%
0.07%
0.07%
0.05%

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

30.00
30.00
30.00
30.00
40.00
40.00
40.00
40.00
40.00

30.00

28.00
28.00
28.00
28.00
28.00

5.41
5.42
5.43
5.44
5.45
5.46
5.47
5.48
5.49

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

TBE for Electric Bulk Materials


TBE for Electric Cable Tray
TBE for 6.6kV Switchgear
TBE for Electric Heat Tracing of Underground Pipe
TBE for Earthing Materials
Calculation for Distribution Transformer Sizing
Calculation for Short Circuit Current
Calculation for 230V AC UPS Sizing
Cable Size Calculation

PAL-1193-TBE-ELE-008
PAL
1193 TBE ELE 008
PAL-1193-TBE-ELE-010
PAL-1193-TBE-ELE-011
PAL-1193-TBE-ELE-012
PAL-1193-TBE-ELE-013
PAL-1193-CAL-ELE-001
PAL-1193-CAL-ELE-002
PAL-1193-CAL-ELE-003
PAL-1193-CAL-ELE-004

21.00

40.00

0.05%
0.05%
0.05%
0.05%
0.05%
0.10%
0.10%
0.10%
0.10%

5.50

Electrical

Lighting Calculation

PAL-1193-CAL-ELE-005

40.00

0.10%

5.51
5.52

Electrical
Electrical

Electrical Load Schedule


Cable Schedule

PAL-1193-SCH-ELE-001
PAL-1193-SCH-ELE-002

40.00

0.10%
0.08%

5.53

Electrical

EICS I/O List Schedule

PAL-1193-SCH-ELE-003

32.00

0.08%

5.54
5.55
5.56
5.57
5.58
5.59
5.60
5.61
5.62
5.63
5 64
5.64
5.65

Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

PAL-1193-DWG-ELE-6000
PAL-1193-DWG-ELE-6001-01
PAL-1193-DWG-ELE-6001-02
PAL-1193-DWG-ELE-6002
PAL-1193-DWG-ELE-6020
PAL-1193-DWG-ELE-6021
PAL-1193-DWG-ELE-6022-01
PAL-1193-DWG-ELE-6022-02
PAL-1193-DWG-ELE-6022-03
PAL-1193-DWG-ELE-6023-01
PAL-1193-DWG-ELE-6023-02
PAL
1193 DWG ELE 6023 02
PAL-1193-DWG-ELE-6024

32.00

32.00

0.08%
0.10%
0.05%
0.10%
0.10%
0.10%
0.10%
0.10%
0.08%
0.08%
0 00%
0.00%
0.08%

5.66

Electrical

PAL-1193-DWG-ELE-6025-01

48.00

0.12%

5.67

Electrical

PAL-1193-DWG-ELE-6025-02

0.00

0.00%

5.68

Electrical

Electrical Standard Symbols


Hazardous Area Classification Sheet-01
Hazardous Area Classification Sheet-02
Electrical Sustation Plot Plan
Key Single Line Diagram
Single Line Diagram for MV Switchgear (HOLD)
Single Line Diagram for 400V Switchgear & MCC Sheet Single Line Diagram for 400V Switchgear & MCC Sheet Single Line Diagram for 400V Switchgear & MCC Sheet EICS Block Diagram
EICS Block Diagram
Single Line Diagram for 230V AC UPS System
Single Line Diagram for Outdoor Lighting Controlgear
Sheet -01
Single Line Diagram for Outdoor Lighting Controlgear
Sheet -02
Single Line Diagram for Outdoor Lighting Controlgear
Sheet -03

PAL-1193-DWG-ELE-6025-03

0.00

0.00%

5.69

Electrical

Single Line Diagram for CP & Small Power Controlgear

PAL-1193-DWG-ELE-6027

24.00

0.06%

5.70

Electrical

32.00

0.08%

5.71

Electrical

32.00

0.08%

5.72

Electrical

Control Schematic (TYPE-01) (For Motors < 5.5kW)


PAL-1193-DWG-ELE-6050
Control Schematic (TYPE-02) (For Motors >= 5.5kW and
PAL-1193-DWG-ELE-6051
<30kW)
Control Schematic (TYPE-03) (For Motors > 30kW and
PAL-1193-DWG-ELE-6052
<90kW)

32.00

0.08%

21.00
21.00
21.00
21.00
40.00
40.00
40.00

30.00

40.00
21.00
40.00
40.00
40.00
40.00
40.00
32.00
32.00
0.00

P
P
P
P
P
P

2014-10-10

2014-10-15

2014-12-10 a

2014-12-25

2014-12-10

2014-12-11

25-Dec-14
14-Dec-14

12-29 a
12-16 a

2014-12-15

2014-12-25

2014-10-17

2014-11-17

2014-11-19

2014-11-25

2014-12-15

2014-12-25

2014-10-17

2014-11-17

2014-11-20

2014-12-9 a

2014-12-09

2014-11-04

2014-11-11

2014-11-23

2014-12-03

2014-12-25

2014-12-29

2014-12-30

2014-12-31 a

31-Dec-14

2014-11-06

2014-11-13

2014-11-25

2014-12-05

2014-12-17

2015-02-02

2015-02-03

2015-2-6 c

2014-11-03

2014-11-11

2014-11-23

2014-12-03

2014-12-12

2014-12-30

2014-12-30

2014-12-31 a

4-Jan-15

5-Jan-15

1-5 a

5-Jan-15

2014-11-11

2014-11-18

2014-12-02

2014-12-12

2014-12-04

2015-01-09

2015-01-09

2015-1-9 c

16-Jan-15

16-Jan-15

1-19 a

19-Jan-15

2014-12-11

2014-12-18

2014-12-30

2015-01-09

2015-01-03

2015-01-09

2015-01-09

2015-1-9 c

14-Jan-15

14-Jan-15

1-15 a

15-Jan-15

2014-12-17

2014-12-24

2015-01-05

2015-01-15

2015-01-05

2015-01-09

2015-01-09

2015-1-10 c

2014-12-05

2014-12-14

2014-12-26

2015-01-05

2014-12-30

2015-01-10

2015-01-10

2015-2-2 c

2-Feb-15

3-Feb-15

2-4 a

2014-12-30

2015-01-08

2015-01-20

2015-01-30

2015-01-05

2015-01-09

2015-01-09

2015-1-10 c

16-Jan-15

16-Jan-15

1-19 a

2014-12-18

2014-12-29

2015-01-10

2015-01-20

2014-12-16

2015-01-09

2015-01-09

2015-1-10 c

14-Jan-15

14-Jan-15

1-15 a

15-Jan-15

2014-11-06

2014-11-13

2014-11-25

2014-12-05

2014-12-22

2014-12-30

31-Dec-14

2014/12/31 b

4-Jan-15

5-Jan-15

1-5 a

5-Jan-15

2014-12-05

2014-12-14

2015-01-05

31-Dec-14

2015-01-20

27-Jan-15

1-29 a

15-Dec-14

0.0776%

100.00%

0.0776%

100.00%

12-15 a

15-Dec-14

4-Jan-15

5-Jan-15

1-5 a

5-Jan-15

15-Feb-15

15-Feb-15

2-26 a

26-Feb-15

6-Feb-15

0.0776%
0.0725%
0.0725%
0.0725%
0.0725%
0.0725%
0.0544%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0776%
0.0725%
0.0725%
0.0725%
0.0725%
0.0725%
0.0544%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

4-Feb-15

0.0544%

100.00%

0.0544%

100.00%

19-Jan-15

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0544%
0.0544%
0.0544%
0.0544%
0.0544%
0.1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

31-Jan-15

2-Feb-15

2-6 a

29-Dec-14

30-Dec-14

12-31 a

31-Dec-14

23-Dec-14

24-Dec-14

25-Dec-14
25-Dec-14

0.1035%

100.00%

0.1035%

100.00%

24-Dec-14

12-25 a
12-20 b 1224 12-25 a
12-26 a

0.0544%
0.0544%
0.0544%
0.0544%
0.0544%
0.1035%
0.1035%
0.1035%
0.1035%

26-Dec-14

26-Jan-15

1-29 a

29-Jan-15

0.1035%
0.0776%

100.00%
100.00%

0.1035%
0.0776%

100.00%
100.00%

23-Dec-14

24-Dec-14

12-26 a

26-Dec-14

0.0828%

100.00%

0.0828%

100.00%

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

10-Dec-14

10-Dec-14

12-13 a

15-Dec-14

10-Dec-14

10-Dec-14

12-13 a

15-Dec-14

23-Dec-14

0.0828%
0.1035%
0.0544%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0828%
0.0828%
0 0000%
0.0000%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%

0.0828%
0.1035%
0.0544%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0828%
0.0828%
0 0000%
0.0000%
0.0828%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%

12-30 a

30-Dec-14

0.1242%

100.00%

0.1242%

100.00%

12-30 a

30-Dec-14

0.0000%

100.00%

0.0000%

100.00%

29-Dec-14

12-30 a

30-Dec-14

0.0000%

100.00%

0.0000%

100.00%

20-Dec-14

20-Dec-14

12-23 a

23-Dec-14

0.0621%

100.00%

0.0621%

100.00%

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

0.0828%

100.00%

0.0828%

100.00%

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

0.0828%

100.00%

0.0828%

100.00%

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-12-17

2015-01-09

9-Jan-15

2015-1-10 c

2014-12-14

2014-12-26

2015-01-05

2014-12-23

2015-01-09

9-Jan-15

2015-1-10 c

14-Jan-15

14-Jan-15

1-15 a

15-Jan-15

2014-11-10

2014-11-23

2014-11-26

2014-12-16

2014-12-26

2014-11-10

2014-11-20

21-Nov-14

2014-12-9 a

2014-12-09

23-Dec-14

24-Dec-14

12-26 a

26-Dec-14

2014-11-10

2014-11-23

2014-11-26

2014-12-16

2014-12-26

2014-11-10

2014-12-18

19-Dec-14

2014-12-23 a

2014-12-25

23-Dec-14

24-Dec-14

12-26 a

26-Dec-14

2014-11-24

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-24

2014-12-01

2-Dec-14

2014-12-10 a

2014-12-10

2014-11-24

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-24

2014-12-18

19-Dec-14

2014-12-20 b

2014-12-17

2014-12-21

2014-12-24

2015-01-05

2015-01-15

2014-11-15

2014-12-03

6-Dec-14

2014-12-10 a

18-Dec-14

17-Dec-14

2014-11-10

2014-11-23

2014-11-26

2014-12-16

2014-12-26

2014-11-10

2014-11-20

21-Nov-14

2014-12-9 b

23-Dec-14

2014-11-10

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-11-17

2015-01-10

10-Jan-15

2015-1-12 c

24-Jan-15

2014-11-24

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-24

2014-12-18

19-Dec-14

2014-12-20 c

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 c

2014-10-27

2014-11-06

2014-11-09

2014-11-29

2014-12-09

2014-10-27

2014-10-30

2014-10-31

17-Nov-14

2014-12-9 a

2014-12-09

2014-12-16

2015-12-20

2014-12-23

2015-01-04

2015-01-14

2014-10-27

2014-10-30

2014-10-31

17-Nov-14

2014-12-9 a

2014-12-09

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-10

2014-11-17

20-Nov-14

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-11-18

2014-11-27

2014-11-30

2014-12-20

2014-12-30

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-10-20

2014-10-25

2014-10-28

2014-11-17

2014-11-27

2014-10-20

2014-11-10

20-Nov-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-12-01

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-11-17

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

2014-12-08

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-11-11

2014-12-07

2014-12-10

2014-12-30

2015-01-09

2014-10-27

2014-11-10

20-Nov-14

2014-12-11 c

20-Dec-14

20-Dec-14

12-23 a

23-Dec-14

2015-01-15
2015
01 15

2015-01-19
2015
01 19

2015-01-22
2015
01 22

2015-01-30
2015
01 30

2015-02-05
2015
02 05

2015-01-15
2015
01 15

2015-01-19
2015
01 19

19-Jan-15
19
Jan 15

2015-1-20
2015
1 20 a

2015-01-20
2015
01 20

20-Jan-15
20
Jan 15

20-Jan-15
20
Jan 15

1-21
1
21 a

21-Jan-15
21
Jan 15

2014-10-23

2014-10-30

2014-11-02

2014-11-18

2014-11-28

2014-10-23

2014-11-10

20-Nov-14

2014-12-11 a

2014-12-11

20-Dec-14

20-Dec-14

12-23 a

2014-11-18

2014-11-27

2014-11-30

2014-12-20

2014-12-30

2014-11-18

2014-11-28

6-Dec-14

2014-12-12 c

29-Dec-14

29-Dec-14

2014-11-18

2014-11-27

2014-11-30

2014-12-20

2014-12-30

2014-11-18

2014-11-28

6-Dec-14

2014-12-12 c

29-Dec-14

29-Dec-14

2014-11-18

2014-11-27

2014-11-30

2014-12-20

2014-12-30

2014-11-18

2014-11-28

6-Dec-14

2014-12-12 c

29-Dec-14

2014-12-04

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-04

2014-12-11

12-Dec-14

2014-12-12 b

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-17

2014-11-10

20-Nov-14

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-17

2014-11-10

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-17

2014-11-10

2014-12-05

2014-12-26

2014-12-09

10 18

2014-12-11 c

28-Jan-15

2014-12-10

2015-01-26

26-Jan-15

1-29 a

28-Jan-15

1-29 a

29-Jan-15

19-Dec-14

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

5.73

Electrical

Control Schematic (TYPE-04) (For Motors>= 90kW and


<150kW)

PAL-1193-DWG-ELE-6053

32.00

0.08%

5.74

Electrical

Control Schematic (TYPE-05) (Welding Socket Feeder)

PAL-1193-DWG-ELE-6054

32.00

0.08%

5.75
5.76
5.77
5.78
5.79
5.80
5.81
5.82
5.83
5.84
5.85
5.86
5.87
5.88
5.89
5.90
5.91

Electrical
El
i l
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical
Electrical

Control Schematic (TYPE-06) (For panel)


Control Schematic (For Photocell)
Area Cable Trench and Cable Tray Layout Sheet -01
Area Cable Trench and Cable Tray Layout Sheet -02
Area Lighting & Small Power Layout
Area Power Cable Routine Layout Sheet -01
Area Power Cable Routine Layout Sheet -02
Area Power Cable Routine Layout Sheet -03
Area Earthing and Lightning Installation Layout Sheet-01
Area Earthing and Lightning Installation Layout Sheet-02
Typical Standard Cable Tray Installation Details
Typical Standard Cable Layout Installation Details
Typical Standard Earthing Installation Details Sheet-01
Typical Standard Earthing Installation Details Sheet-02
Typical Standard Earthing Installation Details Sheet-03
Typical Standard Lighting Installation Details Sheet-01
Typical Standard Lighting Installation Details Sheet-02

PAL-1193-DWG-ELE-6055
PAL-1193-DWG-ELE-6056
PAL-1193-DWG-ELE-6150-01
PAL-1193-DWG-ELE-6150-02
PAL-1193-DWG-ELE-6151
PAL-1193-DWG-ELE-6152-01
PAL-1193-DWG-ELE-6152-02
PAL-1193-DWG-ELE-6152-03
PAL-1193-DWG-ELE-6153-01
PAL-1193-DWG-ELE-6153-02
PAL-1193-DWG-ELE-6700
PAL-1193-DWG-ELE-6701
PAL-1193-DWG-ELE-6702-01
PAL-1193-DWG-ELE-6702-02
PAL-1193-DWG-ELE-6702-03
PAL-1193-DWG-ELE-6703-01
PAL-1193-DWG-ELE-6703-02

32.00

0.00

00.08%
08%
0.08%
0.10%
0.00%
0.21%
0.21%
0.00%
0.00%
0.21%
0.00%
0.08%
0.08%
0.08%
0.00%
0.00%
0.08%
0.00%

528.00

1.37%

6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6 16

Telecommunication
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation
Telecommunic
ation

32.00
40.00
0.00
80.00
80.00
0.00
0.00
80.00
0.00
32.00
32.00
32.00
0.00
0.00
32.00

DST for CCTV Equipment

PAL-1193DS-TEL-001

56.00

0.14%

DST for Fiber Optic Cable

PAL-1193DS-TEL-003

64.00

0.17%

Material Requisition for CCTV Equipment

PAL-1193MR-TEL-001

56.00

0.14%

Material Requisition for PAGA Equipment

PAL-1193MR-TEL-002

0.00

0.00%

Technical Bid Evaluation for CCTV Equipment

PAL-1193TBE-TEL-001

96.00

0.25%

Technical Bid Evaluation for PAGA Equipment

PAL-1193TBE-TEL-002

0.00

0.00%

CCTV System Block Diagram

PAL-1193DWG-TEL-8001-001

80.00

0.21%

CCTV System Layout Drawings

PAL-1193DWG-TEL-8002-001

80.00

0.21%

CCTV steel pole and Camera Installation Drawings

PAL-1193DWG-TEL-8003-001

96.00

0.25%

PA/GA System Layout Drawings

PAL-1193DWG-TEL-8004-001

0.00

0.00%

PA/GA System Block Diagram

PAL-1193DWG-TEL-8005-001

0.00

0.00%

PA/GA Cabinet Layout in Remote I/O Room

PAL-1193DWG-TEL-8006-001

0.00

0.00%

PA/GA System Wiring Diagram in Cabinet

PAL-1193DWG-TEL-8007-001

0.00

0.00%

PA/GA System Cabinet Arrangement Drawing

PAL-1193DWG-TEL-8008-001

0.00

0.00%

PA/GA Equipment Installation Drawing on Pole

PAL-1193DWG-TEL-8009-001

0.00

0.00%

Specification for PAGA System

PAL-1193
SP-TEL-001
PAL-1193SP-TEL-001

0.00
0 00

0.00%
0 00%

982.00

2.54%

40.00

CP

7.1
7.2

CP
CP

Specification for Painting and Coating


Specification for Cathodic Protection System

40.00

0.10%
0.10%

7.3

CP

Cathodic Protection Calculation for External Tank Bottom PAL-1193-CAL-CP-001

40.00

0.10%

7.4

CP

Cathodic Protection Calculation for Internal Tank Surface PAL-1193-CAL-CP-002

40.00

0.10%

7.5

CP

PAL-1193-CAL-CP-003

32.00

0.08%

7.6
7.7

CP
CP

Cathodic Protection Calculationn for Buried Pipes and


foundation steel pillings
MR for CP Materials for External Tank Bottom
MR for CP Materials For Internal Tank Surface
MR for CP Materials for Buried Pipes and foundation
steel pillings
MR for Painting and Coating
MTO for CP Materials for External Tank Bottom
MTO for CP Materials For Internal Tank Surface
MTO for CP Materials for Buried Pipes and foundation
steel pillings
MTO for Painting and Coating
TBE for CP Materials For External Tank Bottom
TBE for CP Materials For Internal Tank Surface
TBE for CP Materials for Buried Pipes and foundation
steel pillings
TBE for Painting and Coating
Wiring Schematic for Impressed Current CP System

PAL-1193-MR-CP-001
PAL-1193-MR-CP-002

32.00
32.00

0.08%
0.08%

7.8

CP

7.9
7.10
7.11

CP
CP
CP

7.12

CP

7.13
7.14
7.15

CP
CP
CP

7.16

CP

7.17
7.18

CP
CP

PAL-1193-SP-CP-001
PAL-1193-SP-CP-002

PAL-1193-MR-CP-003

32.00

0.08%

PAL-1193-MR-CP-004
PAL-1193-MTO-CP-001
PAL-1193-MTO-CP-002

32.00
24.00

0.08%
0.06%
0.06%

24.00

PAL-1193-MTO-CP-003

24.00

0.06%

PAL-1193-MTO-CP-004
PAL-1193-TBE-CP-001
PAL-1193-TBE-CP-002

24.00
16.00

0.06%
0.04%
0.04%

PAL-1193-TBE-CP-003

16.00

0.04%

PAL-1193-TBE-CP-004
PAL-1193-DWG-CP-6950-001

16.00

0.04%
0.18%

16.00

70.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-17

2014-11-10

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-10-17

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-17

2014-11-10

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

0.0828%

100.00%

0.0828%

100.00%

2014-10-17

2014-10-29

2014-11-01

2014-11-21

2014-12-01

2014-10-17

2014-11-10

20-Nov-14

2014-12-11 c

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-11-04

2014-11-26

2014-11-29

2014-12-19

2014-12-29

2014-12-15

2015-01-24

24-Jan-15

2015-1-26 c

6-Feb-15

9-Feb-15

2-10 a

10-Feb-15

2014-11-25

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-11-25

2014-11-28

6-Dec-14

2014-12-11 b

2-Feb-15

3-Feb-15

2-6 a

6-Feb-15

2014-11-25

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-11-25

2014-11-28

6-Dec-14

2014-12-11 a

2-Feb-15

3-Feb-15

2-6 a

6-Feb-15

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-11-28

6-Dec-14

2014-12-12 b

29-Dec-14

29-Dec-14

12-30 a

31-Dec-14

2014-12-02

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-15

2014-11-28

6-Dec-14

2014-12-11 b

2-Feb-15

3-Feb-15

2-6 a

2014-12-02

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-15

2014-11-28

6-Dec-14

2014-12-11 b

2015-02-02

2015-02-11

2015-02-13

2015-01-17

2015-01-27

2015-02-02

2015-02-12

2015-02-26

2014-12-02

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-10-27

2014-11-10

19-Nov-14

2014-12-02

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-10-27

2014-11-10

19-Nov-14

2014-12-11 c

31-Dec-14

2-Jan-15

1-4 a

4-Jan-15

2014-12-31

2015-02-12

2015-02-15

2015-03-07

2015-03-17

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2014-12-31

2015-02-12

2015-02-15

2015-03-07

2015-03-17

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2015-01-28

2015-03-12

2015-03-15

2015-04-04

2015-04-14

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2015-01-28

2015-03-12

2015-03-15

2015-04-04

2015-04-14

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2015-01-28

2015-03-12

2015-03-15

2015-04-04

2015-04-14

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2015-01-28

2015-03-12

2015-03-15

2015-04-04

2015-04-14

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

2015-01-28

2015-03-12

2015-03-15

2015-04-04

2015-04-14

2014-11-15

2014-11-28

8-Dec-14

2014-12-11 a

2014-12-11

15-Dec-14

16-Dec-14

12-19 a

19-Dec-14

00.0828%
0828%
0.0828%
0.1035%
0.0000%
0.2071%
0.2071%
0.0000%
0.0000%
0.2071%
0.0000%
0.0828%
0.0828%
0.0828%
0.0000%
0.0000%
0.0828%
0.0000%

100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
65.00%
65.00%
5.00%
5.00%
5.00%
5.00%
5.00%

0 0828%
0.0828%
0.0828%
0.1035%
0.0000%
0.2071%
0.2071%
0.0000%
0.0000%
0.2071%
0.0000%
0.0828%
0.0828%
0.0828%
0.0000%
0.0000%
0.0828%
0.0000%

100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.37%

1.37%

1.37%

1.24%

2014-12-16

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-11-17

2014-12-05

6-Dec-14

2014-12-12 a

2014-12-12

24-Dec-14

24-Dec-14

12-26 a

26-Dec-14

0.1449%

100.00%

0.1449%

100.00%

2014-11-17

2014-12-13

2014-12-16

2015-01-05

2015-01-15

2014-11-17

2014-12-05

6-Dec-14

2014-12-12 a

2014-12-12

24-Dec-14

24-Dec-14

12-26 a

26-Dec-14

0.1656%

100.00%

0.1656%

100.00%

2014-12-16

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-16

2014-12-24

24-Dec-14

2014-12-26 a

2014-12-25

27-Jan-15

27-Jan-15

1-29 a

29-Jan-15

0.1449%

100.00%

0.1449%

100.00%

2014-12-16

2014-12-31

2015-01-03

2015-01-23

2015-02-02

2014-12-16

2015-01-09

9-Jan-15

2015-1-15 c

3-Feb-15

3-Feb-15

2-4 a

4-Feb-15

0.0000%

100.00%

0.0000%

100.00%

2015-01-14

2015-02-04

2015-02-24

2015-03-06

2015-01-15

2015-01-27

28-Jan-15

2015-2-2 a

0.2485%

100.00%

0.2485%

85.00%

2015-01-14

2015-02-04

2015-02-24

2015-03-06

2015-02-02

2015-02-12

13-Feb-15

2015-02-13 c

0.0000%

100.00%

0.0000%

65.00%

2015-02-02

3-Feb-15

2-6 b

2014-12-11

2014-12-11 c

2015-01-27

28-Jan-15

2-2 c

6-Feb-15

2-Feb-15

3-Feb-15

2-6 a

6-Feb-15

15-Feb-15

15-Feb-15

2-26 a

26-Feb-15

31-Dec-14

2-Jan-15

1-4 a

4-Jan-15

2015-02-02

2014-12-31

2015-01-25

2015-01-28

2015-02-17

2015-02-27

2014-12-08

2014-12-15

16-Dec-14

2014-12-18 a

2014-12-18

24-Dec-14

24-Dec-14

12-26 a

26-Dec-14

0.2071%

100.00%

0.2071%

100.00%

2014-12-24

2015-01-11

2015-01-14

2015-02-03

2015-02-13

2014-12-08

2014-12-15

16-Dec-14

2014-12-18 a

2014-12-18

24-Dec-14

24-Dec-14

12-26 a

26-Dec-14

0.2071%

100.00%

0.2071%

100.00%

2015-01-06

2015-01-25

2015-01-28

2015-02-17

2015-02-27

2015-01-06

2015-02-12

13-Feb-15

2015-02-13 c

0.2485%

100.00%

0.2485%

65.00%

2014-12-25

2015-01-08

2015-01-18

2015-01-28

2015-02-10

2015-12-25

2015-01-09

9-Jan-15

2015-1-15 a

2015-01-15

27-Jan-15

27-Jan-15

1-29 a

29-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2014-12-25

2015-01-08

2015-01-18

2015-01-28

2015-02-10

2015-12-25

2015-01-09

9-Jan-15

2015-1-15 a

2015-01-15

27-Jan-15

27-Jan-15

1-29 a

29-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2015-01-05

2015-01-15

2015-01-20

2015-01-25

2015-02-15

2015-01-05

2015-02-12

13-Feb-15

2015-02-13 a

2015-02-13

0.0000%

100.00%

0.0000%

85.00%

2015-01-05

2015-01-15

2015-01-20

2015-01-25

2015-02-25

2015-01-05

2015-02-12

13-Feb-15

2015-02-13 c

0.0000%

100.00%

0.0000%

65.00%

2015-01-05

2015-01-15

2015-01-20

2015-01-25

2015-02-25

2015-01-05

2015-02-12

13-Feb-15

2015-02-13 b

0.0000%

100.00%

0.0000%

65.00%

2015-01-05

2015-01-15

2015-01-20

2015-01-25

2015-02-25

2015-01-05

2015-02-12

13-Feb-15

2015-02-13 b

0.0000%

100.00%

0.0000%

65.00%

2014
12 25
2014-12-25

2015
01 15
2015-01-15

2015
01 20
2015-01-20

2015
01 25
2015-01-25

2015
02 10
2015-02-10

2015
12 25
2015-12-25

2015
01 09
2015-01-09

9
Jan 15
9-Jan-15

2015
1 15 b
2015-1-15

100.00%
100 00%

0.0000%
0 0000%

2014-09-15

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-15

2014-10-20

2014-10-25

15-Nov-14

2014-12-10 a

2014-12-25

2014-09-15

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-15

2014-10-23

2014-10-25

15-Nov-14

2014-12-10 a

2014-12-25

31-Dec-14

2-Jan-15

1-5 a

2014-09-15

2014-10-22

2014-10-25

2014-11-14

2014-11-24

2014-09-15

2014-10-20

2014-10-25

15-Nov-14

2014-12-10 a

2014-12-10

25-Dec-14

25-Dec-14

12-29 a

2014-10-24

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-24

2014-11-20

21-Nov-14

2014-12-10 a

2014-12-10

4-Jan-15

5-Jan-15

2014-10-24

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-24

2014-11-25

2014-11-26

29-Nov-14

2014-12-11 a

2014-12-11

25-Dec-14

P
P
P

2014-09-22

2014-10-15

2014-10-18

2014-11-07

2014-11-17

2014-09-20

2014-10-23

2014-10-25

15-Nov-14

2014-12-10 a

2014-10-21

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-21

2014-12-01

2014-12-03

8-Dec-14

2014-12-9 b

2014-10-21

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-21

2014-12-01

2014-12-03

8-Dec-14

P
P
P
P

2014-11-03

2014-11-28

2014-12-01

2014-12-21

2014-12-31

2014-11-03

2014-12-15

2014-12-20

22-Dec-14

2014-12-23 c

2015-02-03

2014-09-22

2014-10-15

2014-10-18

2014-11-07

2014-11-17

2014-09-22

2014-10-23

2014-10-25

15-Nov-14

2014-12-10 a

2014-12-25

2014-10-21

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-21

2014-12-01

2014-12-03

8-Dec-14

2014-10-21

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-21

2014-12-01

2014-12-03

P
P
P
P

2014-11-03

2014-11-28

2014-12-01

2014-12-21

2014-12-31

2014-11-03

2014-12-15

2014-12-20

2014-11-07

2014-11-14

2014-11-28

2014-12-08

2014-12-04

2014-12-20

22-Dec-14

2014-12-23 a

2014-12-08

2014-12-16

2014-12-30

2015-01-09

2015-01-05

2015-01-10

10-Jan-15

2015-1-12 c

2014-11-24

2014-11-30

2014-12-14

2014-12-24

2014-12-30

2015-01-05

5-Jan-15

2015-1-6 a

P
P

2014-12-10

2014-12-16

2014-12-30

2015-01-09

2015-01-05

2015-02-11

11-Feb-15

2015-02-13 b

2014-11-26

2014-12-16

2014-12-26

2014-10-24

2014-12-25

25-Dec-14

2014/12/29 c

P
P
P
P
P
P
P
P
P

P
P
P
P
P

2014-10-24

2014-11-23

11 18

2014-12-25

2014-12-10

25-Dec-14

12-29 b

2014-12-10

25-Dec-14

12-29 b

2014-12-10

25-Dec-14

12-29 b

2014-12-9 b

27
Jan 15
27-Jan-15

27
Jan 15
27-Jan-15

1
29 a
1-29

29
Jan 15
29-Jan-15

0.0000%
0 0000%

2.54%

2.54%

2.54%

2.39%

3-Feb-15

4-Feb-15

2-6 a

6-Feb-15
5-Jan-15

0.1035%
0.1035%

100.00%
100.00%

0.1035%
0.1035%

100.00%
100.00%

0.00%
0 00%

31-Dec-14

0.1035%

100.00%

0.1035%

100.00%

1-5 a

5-Jan-15

0.1035%

100.00%

0.1035%

100.00%

25-Dec-14

12-29 a

31-Dec-14

0.0828%

100.00%

0.0828%

100.00%

4-Jan-15

5-Jan-15

1-5 a

5-Jan-15

24-Dec-14

24-Dec-14

12-29 a

31-Dec-14

0.0828%
0.0828%

100.00%
100.00%

0.0828%
0.0828%

100.00%
100.00%

25-Dec-14

25-Dec-14

12-29 a

31-Dec-14

0.0828%

100.00%

0.0828%

100.00%

4-Feb-15

2-6 b

11-Feb-15

11-Feb-15

2-13 a

13-Feb-15

25-Dec-14

12-29 b

4-Jan-15

5-Jan-15

1-5 a

5-Jan-15

2014-12-09

24-Dec-14

24-Dec-14

12-29 a

31-Dec-14

0.0828%
0.0621%
0.0621%

100.00%
100.00%
100.00%

0.0828%
0.0621%
0.0621%

100.00%
100.00%
100.00%

8-Dec-14

2014-12-09

25-Dec-14

25-Dec-14

12-29 a

31-Dec-14

0.0621%

100.00%

0.0621%

100.00%

22-Dec-14

2014-12-23 b

11-Feb-15

11-Feb-15

2-13 a

13-Feb-15

31-Dec-14

2-Jan-15

27-Jan-15

27-Jan-15

1-29 a

29-Jan-15

0.0621%
0.0414%
0.0414%

100.00%
100.00%
100.00%

0.0621%
0.0414%
0.0414%

100.00%
95.00%
100.00%

2014-12-10

2014-12-25
2015-01-14

14-Jan-15

1-15 a

2015-01-06
2015-01-26

26-Jan-15

1-27 a

27-Jan-15

27-Jan-15

1-29 a

29-Jan-15

0.0414%

100.00%

0.0414%

100.00%

15-Feb-15

15-Feb-15

2-28 a

28-Feb-15

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.0414%
0.1812%

100.00%
100.00%

0.0414%
0.1812%

100.00%
100.00%

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

7.19

CP

7.20

CP

7.21

CP

7.22

CP

7.23

CP

7.24

CP

7.25

CP

7.26

CP

7 27
7.27

CP

7.28

CP

7.29

CP

7.30

CP

7.31

CP

Grid Anode Installation Details For External Tank Bottom


(T-2302 A/B)
Grid Anode Installation Details For External Tank Bottom
(T-2303 A/B)
Grid
id Anode
d Installation
ll i Details
il For Externall Tankk Bottom
(TK-2303)
Grid Anode Installation Details For External Tank Bottom
(TK-2340)
Cathodic Protection System Layout-1 For External Tank
Bottom
Cathodic Protection System Layout-2 For External Tank
Bottom
Sacrificial Anode Layout For Internal Tank Surface(TK2302 A/B)
Sacrificial Anode Layout For Internal Tank Surface(TK2303 A/B)
Sacrificial Anode Layout For Internal Tank Surface
(T2303)
Sacrificial Anode Layout For Internal Tank Surface (T2340)
Cathodic Protection System Layout for Piles and U/G
Piping
Internal Sacrificial Anode Installation Details
Cathodic Protection Typical Cable Termination Details for
Piles

38636.00

100.00%

PAL-1193-DWG-CP-6951-001

52.00

0.13%

PAL-1193-DWG-CP-6951-002

0.00

0.00%

PAL-1193-DWG-CP-6952-001

16.00

0.04%

PAL-1193-DWG-CP-6953-001

16.00

0.04%

PAL-1193-DWG-CP-6954-001

22.00

0.06%

PAL-1193-DWG-CP-6955-001

22.00

0.06%

PAL-1193-DWG-CP-6956-001

16.00

0.04%

PAL-1193-DWG-CP-6956-002

0.00

0.00%

PAL 1193 DWG CP 6957 001


PAL-1193-DWG-CP-6957-001

16 00
16.00

0 04%
0.04%

PAL-1193-DWG-CP-6958-001

16.00

0.04%

PAL-1193-DWG-CP-6959-001

160.00

0.41%

PAL-1193-DWG-CP-6961-001

24.00

0.06%

PAL-1193-DWG-CP-6963-001

Mechanical

72.00

0.19%

5850.00

15.14%

8.1

Mechanical

Specification for Sedimentation tank lattice dome roof

PAL-1193-SP-MEC-001

48.00

0.12%

8.2
82

Mechanical

Calculation for Sedimentation Tanks(T-2302A/B)


Tanks(T 2302A/B)

PAL-1193-CAL-MEC-001
PAL 1193 CAL MEC 001

128.00
128 00

0.33%
0 33%

8.3

Mechanical

Calculation for Crude Oil Buffer Tank(T-2303)

PAL-1193-CAL-MEC-002

128.00

0.33%

8.4

Mechanical

Calculation for Water Buffer Tank(T-2340)

PAL-1193-CAL-MEC-003

128.00

0.33%

8.5

Mechanical

Data Sheet for Sedimentation Tanks(T-2302A/B)

PAL-1193-DS-MEC-001

40.00

0.10%

8.6

Mechanical

Data Sheet for Crude Oil Buffer Tank(T-2303)

PAL-1193-DS-MEC-002

40.00

0.10%

8.7

Mechanical

Data Sheet for Water Buffer Tank(T-2340)

PAL-1193-DS-MEC-003

40.00

0.10%

8.8

Mechanical

Data Sheet for Water Booster Pumps(P-2318A/B/C )

PAL-1193-DS-MEC-004

40.00

0.10%

8.9

Mechanical

Data Sheet for Closed Drain Sump Pumps(P-2373A/B)

PAL-1193-DS-MEC-005

32.00

0.08%

8.10

Mechanical

Data Sheet for Open Drain Sump Pumps(P-2376A/B)

PAL-1193-DS-MEC-006

32.00

0.08%

8.11

Mechanical

Data Sheet for Sand Drain Pit Pumps(P-2374A/B)

PAL-1193-DS-MEC-007

32.00

0.08%

8.12

Mechanical

Data Sheet for Vent Pit Oil Pumps (P-2375A/B)

PAL-1193-DS-MEC-008

32.00

0.08%

8.13

Mechanical

Data Sheet for Gas/Liquid Separator Skid(A2303A/B/C/D)

PAL-1193-DS-MEC-009

56.00

0.14%

8.14

Mechanical

Data Sheet for Anti-Foam Injection Skid(A-2357)

PAL-1193-DS-MEC-010

40.00

0.10%

8.15

Mechanical

Data Sheet for Foam Skid(A-230)

PAL-1193-DS-MEC-011

32.00

0.08%

8.16

Mechanical

Data Sheet for Crude Oil Booster Pumps (P-2308A/B/C)

PAL-1193-DS-MEC-012

40.00

0.10%

8.17

Mechanical

Data Sheet for Flare Knock Out(V-2342)

PAL-1193-DS-MEC-013

40.00

0.10%

8.18

Mechanical

Data Sheet for Vent Stack(Fs-2344)

PAL-1193-DS-MEC-014

32.00

0.08%

8.19
8.20
8.21
8.22
8.23

Mechanical
Mechanical
Mechanical
Mechanical
Mechanical

Data Sheet for Flare Drum Pumps (P-2342A/B)


MR for G-L Separator Skids
MR for Crude Oil Booster Pumps
MR for Progressive Cavity Pumps
MR for Anti-foam Injection Skids

PAL-1193-DS-MEC-015
PAL-1193-MR-MEC-001
PAL-1193-MR-MEC-002
PAL-1193-MR-MEC-003
PAL-1193-MR-MEC-004

48.00

40.00

0.12%
0.14%
0.14%
0.10%
0.10%

8.24

Mechanical

MR for Flare Knock out drum

PAL-1193-MR-MEC-005

40.00

0.10%

8.25
8.26

Mechanical
Mechanical

MR for Foam Skids


MR for Steel Plats of Tanks

PAL-1193-MR-MEC-006
PAL-1193-MR-MEC-007

40.00

0.10%
0.12%

56.00
56.00
40.00

48.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-13

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-23

24-Jan-15

1-26 a

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

0.1346%

100.00%

0.1346%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-13

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-23

24-Jan-15

1-26 a

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

0.0000%

100.00%

0.0000%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-23

24-Jan-15

1-26 a

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

0.0414%

100.00%

0.0414%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-23

24-Jan-15

1-26 a

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

0.0414%

100.00%

0.0414%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-02-05

6-Feb-15

2015-02-10 c

2015-02-12

13-Feb-15

2-13 a

15-Feb-15

15-Feb-15

2-28 a

28-Feb-15

0.0569%

100.00%

0.0569%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-02-05

6-Feb-15

2015-02-10 c

2015-02-12

13-Feb-15

2-13 a

15-Feb-15

15-Feb-15

2-28 a

28-Feb-15

0.0569%

100.00%

0.0569%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-26

26-Jan-15

1-27 a

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.0414%

100.00%

0.0414%

100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-26

26-Jan-15

1-27 a

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.0000%

100.00%

0.0000%

100.00%

2014 12 02
2014-12-02

2014 12 28
2014-12-28

2014 12 31
2014-12-31

2015 01 20
2015-01-20

2015 01 30
2015-01-30

2014 12 02
2014-12-02

2015 01 13
2015-01-13

2015 01 16
2015-01-16

16 J 15
16-Jan-15

2015 1 17 c
2015-1-17

2015 01 26
2015-01-26

26 J 15
26-Jan-15

1 27 a
1-27

28 J 15
28-Jan-15

29 J 15
29-Jan-15

22a
2-2

2 F b 15
2-Feb-15

0 0414%
0.0414%

100 00%
100.00%

0 0414%
0.0414%

100 00%
100.00%

2014-12-02

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-02

2015-01-13

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-26

26-Jan-15

1-27 a

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.0414%

100.00%

0.0414%

100.00%

2014-12-08

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-08

2015-02-15

15-Feb-15

2015-2-28 b

0.4141%

100.00%

0.4141%

65.00%

2014-11-20

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-11-20

2015-01-13

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-26

26-Jan-15

1-27 a

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.0621%

100.00%

0.0621%

100.00%

2014-11-20

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-11-20

2015-01-13

2015-01-16

16-Jan-15

2015-1-17 c

2015-01-26

26-Jan-15

1-27 a

28-Jan-15

29-Jan-15

2-2 a

2-Feb-15

0.1864%

100.00%

0.1864%

100.00%

15.14%

15.14%

15.14%

14.43%
95.00%

2014-11-25

2014-11-30

2014-12-03

2014-12-13

2014-12-23

2014-11-03

2014-10-25

2014-11-26

26-Nov-14

2014-12-24 c

6-Jan-15

7-Jan-15

1-9 c 1-29 130 c 2-3 2-6 a

27

27

2-26 b

0.1242%

100.00%

0.1242%

2014-10-31
2014 10 31

2014-11-15
2014 11 15

2014-11-18
2014 11 18

2014-12-08
2014 12 08

2014-12-18
2014 12 18

2014-10-31
2014 10 31

2014-10-25
2014 10 25

2014-11-26
2014 11 26

27-Nov-14
27 Nov 14

2014-12-24
2014 12 24 c

31-Dec-14
31 Dec 14

5-Jan-15
5 Jan 15

2-10
2 10 b

9-Feb-15
9 Feb 15

10-Feb-15
10 Feb 15

2-28
2 28 b

0.3313%
0 3313%

100.00%
100 00%

0.3313%
0 3313%

95.00%
95 00%

2014-10-07

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-07

2014-10-24

2014-10-29

15-Nov-14

2014-12-24 c

31-Dec-14

4-Jan-15

2-10 b

10-Feb-15

11-Feb-15

2-28 b

0.3313%

100.00%

0.3313%

95.00%

2014-10-07

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-07

2014-10-24

2014-10-29

15-Nov-14

2014-12-24 c

31-Dec-14

4-Jan-15

2-10 b

10-Feb-15

11-Feb-15

2-28 b

0.3313%

100.00%

0.3313%

95.00%

2014-11-24

2014-11-28

2014-12-01

2014-12-15

2014-12-25

2014-11-24

2014-11-25

2014-11-26

27-Nov-14

2014-12-24 c

2015-01-06

4-Jan-15

1-9 c 1-28 130 c 2-4

7-Feb-15

7-Feb-15

2-26 b 3-4

0.1035%

100.00%

0.1035%

95.00%

2014-11-24

2014-11-28

2014-12-01

2014-12-15

2014-12-25

2014-11-24

2014-11-25

2014-11-26

27-Nov-14

2014-12-20 c

31-Dec-14

4-Jan-15

2-10 b

10-Feb-15

11-Feb-15

2-28 b 3-4

0.1035%

100.00%

0.1035%

95.00%

2014-11-24

2014-11-28

2014-12-01

2014-12-15

2014-12-25

2014-11-24

2014-11-25

2014-11-27

27-Nov-14

2014-12-22c

31-Dec-14

4-Jan-15

2-10 b

10-Feb-15

11-Feb-15

2-28 b 3-4

0.1035%

100.00%

0.1035%

95.00%

2014-10-20

2014-10-22

2014-10-24

2014-11-04

2014-11-14

2014-10-20

2014-10-24

2014-10-29

26-Nov-14

2014-12-23 c

2014-12-30

31-Dec-14

2015-1-4 b

9-Jan-15

9-Jan-15

1-24 b 1-31
2 28 a
2-28

0.1035%

100.00%

0.1035%

100.00%

2014-10-31

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-31

2014-11-25

2014-11-26

24-Nov-14

2014-12-20 c

2015-01-08

8-Jan-15

2015-2-4 c 29 2-27 b

28-Feb-15

2-Mar-15

0.0828%

100.00%

0.0828%

95.00%

2014-10-31

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-31

2014-11-25

2014-11-26

27-Nov-14

2014-12-20 c

2015-01-08

8-Jan-15

2015-2-4 c 29 2-27 b

28-Feb-15

2-Mar-15

0.0828%

100.00%

0.0828%

95.00%

2014-10-31

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-31

2014-11-25

2014-11-26

27-Nov-14

2014-12-20 c

2015-01-08

8-Jan-15

2015-2-4 c 29 2-27 b

28-Feb-15

2-Mar-15

0.0828%

100.00%

0.0828%

95.00%

2014-10-31

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-31

2014-11-25

2014-11-26

27-Nov-14

2014-12-20 c

2015-01-08

8-Jan-15

2015-2-4 c 29 2-27 b

28-Feb-15

2-Mar-15

0.0828%

100.00%

0.0828%

95.00%

2014-11-03

2014-11-06

2014-11-09

2014-11-25

2014-12-05

2014-11-03

2014-11-04

2014-11-07

11-Nov-14

2014/11/18 b

2014-11-27

28-Nov-14

12-22 c 1-23
2-6 b

9-Feb-15

11-Feb-15

0.1449%

100.00%

0.1449%

100.00%

2014-10-31

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-31

2014-11-24

2014-11-29

1-Dec-14

2014-12-24 c

2015-01-23

24-Jan-15

2015-2-4 c 29 2-15 b

2014-10-17

2014-10-22

2014-10-25

2014-11-10

2014-11-20

2014-10-17

2014-10-22

2014-10-29

15-Nov-14

2014-11-25 b

2014-10-20

2014-10-22

2014-10-24

2014-11-04

2014-11-14

2014-10-20

2014-10-31

2014-11-10

14-Nov-14

2014-11-26 b

2014-12-01

1-Dec-14

2014-12-25 b
1-8 1-19 b

2014-10-31

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-31

2014-11-19

2014-11-22

24-Nov-14

2014-11-27 b

2014-12-04

8-Dec-14

2014-12-18 b

2014-10-31

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-10-31

2014-11-18

2014-11-19

20-Nov-14

2014-11-27 b

P
P
P
P
P
P

2014-11-25

2014-11-30

2014-12-03

2014-12-13

2014-12-23

2014-11-10

2014-11-21

2014-11-25

26-Nov-14

2014-12-23 b

31-Dec-14

31-Dec-14

2014-11-03

2014-11-06

2014-11-09

2014-11-25

2014-12-05

2014-11-03

2014-11-04

2014-11-07

11-Nov-14

2014/11/18 b

2014-11-27

28-Nov-14

2014-10-20

2014-10-22

2014-10-24

2014-11-04

2014-11-14

2014-10-20

2014-10-31

2014-11-10

14-Nov-14

2014-11-26 b

2014-12-01

1-Dec-14

2014-11-03

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-11-03

2014-11-26

2014-11-27

27-Nov-14

2014-12-22 c

2015-01-08

8-Jan-15

2014-12-25 b
2015-2-4 c 2-

2014-11-03

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-11-03

2014-11-24

2014-11-29

1-Dec-14

2014-12-22 c

2015-01-23

24-Jan-15

2015-2-4 c

2014-11-03

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-11-03

2014-11-19

2014-11-22

24-Nov-14

2014-11-27 b

P
P

2014-10-20

2014-10-26

2014-10-28

2014-11-11

2014-11-21

2014-10-20

2014-10-22

2014-10-29

15-Nov-14

2014-11-26 b

2014-11-25

2014-12-02

2014-12-05

2014-12-15

2014-12-25

2014-11-25

2014-12-06

2014-12-06

8-Dec-14

2014-12-22 c

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

12 18

2015-01-06

7-Jan-15

2015-1-4 b
2014-12-22 c

1-9 c 1-27 1-

28-Feb-15

2-13 a

13-Feb-15

27-Feb-15

2-Mar-15

0.1035%

100.00%

0.1035%

95.00%

28-Nov-14

29-Nov-14

12-25 a

25-Dec-14

0.0828%

100.00%

0.0828%

100.00%

27-Jan-15

28-Jan-15

2-6 a

6-Feb-15

0.1035%

100.00%

0.1035%

100.00%

20-Jan-15

21-Jan-15

0.1035%

100.00%

0.1035%

95.00%

4-Dec-14

8-Dec-14

2014-12-18
b 1-21 2-4 a
1-24 b 1-31

4-Feb-15

0.0828%

100.00%

0.0828%

100.00%

28-Feb-15

100.00%
100.00%
100.00%
100.00%
100.00%

0.1242%
0.1449%
0.1449%
0.1035%
0.1035%

100.00%
100.00%
100.00%
95.00%
100.00%

9-Jan-15

9-Jan-15

9-Feb-15

9-Feb-15

2-13 a

13-Feb-15

8-Jan-15

8-Jan-15

1-19 a

19-Jan-15

2-26 a

26-Feb-15

0.1242%
0.1449%
0.1449%
0.1035%
0.1035%

4-Feb-15

0.1035%

100.00%

0.1035%

100.00%

25-Dec-14

0.1035%
0.1242%

100.00%
100.00%

0.1035%
0.1242%

100.00%
95.00%

28-Feb-15

2-Mar-15

9-Feb-15

10-Feb-15

4-Dec-14

8-Dec-14

28-Nov-14

29-Nov-14

2014 12 18
2014-12-18
b 1-21 2-4 a
12-25 a

7-Feb-15

7-Feb-15

2-26 b

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

8.27
8.28
8.29
8.30
8.31

Mechanical
Mechanical
Mechanical
Mechanical
Mechanical

MTO for Steel Plats of Tanks


MR for Accessories of Tanks
MR for Miscellaneous Materials of Tanks
MR for Insulation of Tanks
MR for Centrifugal Pumps

PAL-1193-MTO-MEC-007
PAL-1193-MR-MEC-008
PAL-1193-MR-MEC-009
PAL-1193-MR-MEC-010
PAL-1193-MR-MEC-011

48.00

48.00

0.12%
0.00%
0.00%
0.12%
0.12%

8.32

Mechanical

MR for Vent Stack

PAL-1193-MR-MEC-012

40.00

0.10%

8.33
8.34

Mechanical
Mechanical

MR for Sedimentation tank lattice dome roof


Equipment Layout Plan

PAL-1193-MR-MEC-013
PAL-1193-DWG-MEC-3000-01

0.00
0.00

0.00%
0.00%

8.35

Mechanical

Sedimentation Tank (T-2302A)General Arrangement

PAL-1193-DWG-MEC-3001-01

48.00

0.12%

8.36

Mechanical

Sedimentation Tank (T-2302B)General Arrangement

PAL-1193-DWG-MEC-3002-01

48.00

8.37
8.38
8.39
8.40
8.41
8.42
8.43
8.44
8.45
8.46
8.47
8.48
8.49
8.50
8.51
8.52
8.53
8.54
8.55
8.56
8.57
8.58
8.59
8.60
8.61
8.62
8.63
8 64
8.64
8.65
8.66
8.67
8.68
8.69
8.70
8.71
8.72
8.73
8.74
8.75
8.76
8 76
8.77
8.78
8.79

Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical

Internal General Arrangement(T-2302A)


Internal General Arrangement(T-2302B)
Shell Accessories Orientation(T-2302A)
Shell Accessories Orientation(T-2302B)
(
)
Roof Accessories Orientation(T-2302A)
Roof Accessories Orientation(T-2302B)
Bottom Details(T-2302A)
Bottom Details(T-2302B)
Shell Details
Shell Developed Surface (T-2302A)
Shell Developed Surface (T-2302B)
Oil Collector Notch Assembly and Details
Oil Distributor Details Sheet-01
Oil Distributor Details Sheet-02
Oil Distributor Details Sheet-03
Oil Distributor Details Sheet-04
Sheet 04
Water Outlet Details
Water Collector Assembly and Details
Central Pipe Details
Ladder Assembly and Details
Level Controller Assembly
Level Controller Details
Level Controller Details
Level Controller Details
Level Controller Details
Level Dontroller Details
Sampling Hole Assembly and Details
24''x24''
Clean-out
24
x24 Shell Clean
out Door Assembly
24''x24'' Shell Clean-out Door Details
24'' Shell Mamhole Assembly
24'' Shell Mamhole Details
24'' Roof Mamhole Assembly and Details
Roof Nozzle Details I
Roof Nozzle Details III
Shell Nozzle Details I
Shell Nozzle Details II
Roof Platform Assembly and Details
Spiral Stairway Assembly and Details
Nameplate & Support Bracket Details(T-2302A)
Nameplate & Support Bracket Details(T-2302A)
Details(T 2302A)
Insulation Details
Hot oil coil
Anchor Chair Details

PAL-1193-DWG-MEC-3003-01
PAL-1193-DWG-MEC-3004-01
PAL-1193-DWG-MEC-3005-01
PAL-1193-DWG-MEC-3006-01
PAL-1193-DWG-MEC-3007-01
PAL-1193-DWG-MEC-3008-01
PAL-1193-DWG-MEC-3009-01
PAL-1193-DWG-MEC-3010-01
PAL-1193-DWG-MEC-3012-01
PAL-1193-DWG-MEC-3013-01
PAL-1193-DWG-MEC-3014-01
PAL-1193-DWG-MEC-3015-01
PAL-1193-DWG-MEC-3016-01
PAL-1193-DWG-MEC-3016-02
PAL-1193-DWG-MEC-3016-03
PAL
1193 DWG MEC 3016 04
PAL-1193-DWG-MEC-3016-04
PAL-1193-DWG-MEC-3017-01
PAL-1193-DWG-MEC-3018-01
PAL-1193-DWG-MEC-3019-01
PAL-1193-DWG-MEC-3020-01
PAL-1193-DWG-MEC-3021-01
PAL-1193-DWG-MEC-3022-01
PAL-1193-DWG-MEC-3023-01
PAL-1193-DWG-MEC-3024-01
PAL-1193-DWG-MEC-3025-01
PAL-1193-DWG-MEC-3026-01
PAL-1193-DWG-MEC-3027-01
PAL-1193-DWG-MEC-3028-01
PAL
1193 DWG MEC 3028 01
PAL-1193-DWG-MEC-3029-01
PAL-1193-DWG-MEC-3030-01
PAL-1193-DWG-MEC-3031-01
PAL-1193-DWG-MEC-3032-01
PAL-1193-DWG-MEC-3033-01
PAL-1193-DWG-MEC-3034-01
PAL-1193-DWG-MEC-3035-01
PAL-1193-DWG-MEC-3036-01
PAL-1193-DWG-MEC-3037-01
PAL-1193-DWG-MEC-3038-01
PAL-1193-DWG-MEC-3039-01
PAL-1193-DWG-MEC-3040-01
PAL 1193 DWG MEC 3040 01
PAL-1193-DWG-MEC-3041-01
PAL-1193-DWG-MEC-3042-01
PAL-1193-DWG-MEC-3043-01

44.00

0.00
0.00
48.00

44.00
44.00
44.00
44.00
44.00
44.00
44.00
88.00
44.00
44.00
44.00
44.00
0.00
0.00
0.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
44.00
42.00
40.00
40.00
40 00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40 00
40.00
40.00
40.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P

2014-11-25

2014-12-02

2014-12-05

2014-12-15

2014-12-25

2014-11-25

2014-11-25

2014-11-30

2014-12-03

2014-12-13

2014-12-23

2014-11-25

2015-01-09

9-Jan-15

2015-1-27 c

2014-11-25

2014-11-30

2014-12-03

2014-12-13

2014-12-23

2014-11-25

2014-12-06

2014-12-06
2015-01-24

26-Jan-15

2015-1-27 c

2015-01-06

2014-11-25

2014-11-30

2014-12-03

2014-12-13

2014-12-23

2014-11-25

2014-12-25

25-Dec-14

2014-12-26 b

2014-10-20

2014-10-25

2014-10-27

2014-11-04

2014-11-14

2014-10-20

2014-10-24

2014-10-29

26-Nov-14

2014-12-23 c

2014-11-03

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-11-03

2014-11-18

2014-11-19

20-Nov-14

2014-11-20 b

P
P
P

2014-11-03

2014-11-21

2014-11-24

2014-12-14

2014-12-24

2014-11-03

2014-10-25

2014-11-26

26-Nov-14

2014-12-24 c

2015-02-02

2015-02-13

2015-02-15

2015-02-28

2015-03-03

2015-02-02

2015-02-15

15-Feb-15

2015-2-28 c

2014-12-24

2015-01-01

2015-01-04

2015-01-20

2015-01-30

2014-12-24

2015-01-23

23-Jan-15

2015-1-26 c

2015-02-07

7-Feb-15

0.12%

2014-12-24

2015-01-01

2015-01-04

2015-01-20

2015-01-30

2014-12-24

2015-01-23

23-Jan-15

2015-1-26 c

2015-02-07

0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.23%
0.11%
0.11%
0.11%
0.11%
0.00%
0.00%
0.00%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.11%
0.10%
0.10%
0 10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0 10%
0.10%
0.10%
0.10%

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-21

21-Jan-15

2015-1-26 c

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-21

21-Jan-15

2015-1-26 c

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-23

23-Jan-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-23

23-Jan-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-23

23-Jan-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-23

2014-11-10

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-11-10

2014-11-28

2014-11-10

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-11-10

2014-11-10

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-11-10

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-10

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-11-10

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2014-12-08
2014-12-08

2014-12-24
2014-12-24

2014-12-27
2014-12-27

2014-12-08

2014-12-24

2014-12-08

2014-12-24

2014-12-08

2014-12-24

2014-12-08

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

6-Mar-15

0.1242%
0.0000%
0.0000%
0.1242%
0.1242%

100.00%
100.00%
100.00%
100.00%
100.00%

0.1242%
0.0000%
0.0000%
0.1242%
0.1242%

100.00%
100.00%
95.00%
100.00%
100.00%

4-Feb-15

0.1035%

100.00%

0.1035%

100.00%

5-Mar-15

0.0000%
0.0000%

100.00%
100.00%

0.0000%
0.0000%

95.00%
100.00%

2-26 b

0.1242%

100.00%

0.1242%

85.00%

7-Feb-15

2-26 b

0.1242%

100.00%

0.1242%

85.00%

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2015-1-26 c

2015-02-02

4-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2015-1-26 c

2015-02-02

4-Feb-15

2-9 a

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2015-1-26 c

2015-02-02

4-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

23-Jan-15

2015-1-26 c

2015-02-02

4-Feb-15

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-11-28

29-Nov-14

2015-1-9 c

2015-01-14

2015-01-15

2-6 b
2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-11-28

2014-11-28

29-Nov-14

2015-1-9 c

2015-01-14

2015-01-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-11-28

2014-11-28

29-Nov-14

2015-1-9 c

2015-01-14

2015-01-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2015-01-23

23-Jan-15

2014-1-29 c

2015-02-05

6-Feb-15

2-10 a

11-Feb-15

11-Feb-15

2-28 b

2015-01-23

23-Jan-15

2014-1-29 c

2015-02-05

6-Feb-15

2-10 a

11-Feb-15

11-Feb-15

2-28 b

2014-11-10

2015-01-16

16-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-10 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2014-12-08

2015-01-20

20-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2014-12-08

2015-01-20

20-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

2015-01-26

2014-12-08

2015-01-20

20-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2015-01-16
2015-01-16

2015-01-26
2015-01-26

2014-12-08
2014-12-08

2015-01-20
2015-01-16

20-Jan-15
16-Jan-15

2014-1-30 c
2014-1-30 c

2015-02-03
2015-02-03

6-Feb-15
6-Feb-15

2-9 a
2-9 a

10-Feb-15
10-Feb-15

10-Feb-15
10-Feb-15

2-16 a
2-16 a

16-Feb-15
16-Feb-15

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-16

16-Jan-15

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-16

16-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-23

23-Jan-15

2014-1-30 c

2015-02-03

6-Feb-15

2-9 a

10-Feb-15

10-Feb-15

2-16 a

16-Feb-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 b

4-Feb-15

6-Feb-15

2-7 a

7-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 a

4-Feb-15

6-Feb-15

2-7 a

7-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 a

4-Feb-15

6-Feb-15

2-7 a

7-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 a

4-Feb-15

6-Feb-15

2-7 a

7-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 a

4-Feb-15

6-Feb-15

2-7 a

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-06

7-Jan-15

2014-1-29 c

2015-01-31

2-Feb-15

2-4 a

4-Feb-15

6-Feb-15

2-7 a

7-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-20

20-Jan-15

2014-1-29 c

2015-02-05

6-Feb-15

2-10 a

10-Feb-15

10-Feb-15

16-Feb-15

2014-11-26
2014
11 26

2014-12-10
2014
12 10

2014-12-13
2014
12 13

2015-01-02
2015
01 02

2015-01-12
2015
01 12

2014-11-26
2014
11 26

2014-12-12
2014
12 12

15-Dec-14
15
Dec 14

2015-1-12
2015
1 12 c

2015-01-29
2015
01 29

29-Jan-15
29
Jan 15

2-10
2
10 a

11-Feb-15
11
Feb 15

11-Feb-15
11
Feb 15

2-16 a
2-28
8 b 2-28
8

2014-11-26

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-26

2014-12-12

15-Dec-14

2015-1-12 c

2015-01-29

29-Jan-15

2-10 a

11-Feb-15

11-Feb-15

2-28 a

28-Feb-15

2014-11-26

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-26

2014-12-12

15-Dec-14

2015-1-12 c

2015-01-29

29-Jan-15

2-10 a

11-Feb-15

11-Feb-15

2-28 a

28-Feb-15

2014-11-26

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-26

2014-12-12

15-Dec-14

2015-1-12 c

2015-01-29

29-Jan-15

2-10 a

11-Feb-15

11-Feb-15

2-28 a

28-Feb-15

2014-11-26

2014-12-10

2014-12-13

2015-01-02

2015-01-12

2014-11-26

2014-12-12

15-Dec-14

2015-1-12 c

2015-02-02

4-Feb-15

7-Feb-15

7-Feb-15

2-27 a

2014-12-01

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-01

2015-01-07

2015-01-07

2015-1-12 c

2015-01-31

2-Feb-15

2-6 b
2-10 c 2-11 2-

15-Feb-15

15-Feb-15

2-28 b 3-4

2014-12-01

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-01

2015-01-07

2015-01-07

2015-1-12 c

2015-01-31

30-Jan-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

2014-12-01

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-01

2015-01-07

2015-01-07

2015-1-12 c

2015-01-31

30-Jan-15

2-6 b

2014-12-01

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-01

2015-01-07

2015-01-07

2015-1-12 c

2015-02-05

6-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-12-01

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-01

2015-01-23

23-Jan-15

2014-1-29 c

2015-02-03

6-Feb-15

10-Feb-15

15-Feb-15

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

2-Feb-15

15-Feb-15

15-Feb-15

2-16 a
2-28 b 3-4

16-Feb-15

2014-12-04

2-9 a
2-10 c 2-11 2-

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

2014-12-25

25-Dec-14

2015-1-10 c

2015-01-31

2-Feb-15

2014-12-15
2014-12-15

2014-12-24
2014-12-24

2014-12-27
2014-12-27

2015-01-16
2015-01-16

2015-01-26
2015-01-26

2014-12-15
2014-12-15

2014-12-25
2014-12-25

25-Dec-14
25-Dec-14

2015-1-10 c
2015-1-12 c

2015-01-31
2015-01-31

2-Feb-15
2-Feb-15

2014-12-12

2014-12-26

2014-12-29

2015-01-18

2015-01-28

2014-12-12

2015-01-22

23-Jan-15

2014-1-29 c

2015-02-06

6-Feb-15

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

2014-12-25

25-Dec-14

2015-1-10 c

2015-01-31

2-Feb-15

0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.2278%
0.1139%
0.1139%
0.1139%
0.1139%
0.0000%
0.0000%
0.0000%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1087%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%

0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.2278%
0.1139%
0.1139%
0.1139%
0.1139%
0.0000%
0.0000%
0.0000%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1139%
0.1087%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
95.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
95.00%
100.00%
100.00%

13 18

8-Dec-14

2014-12-22 c

2014-1-30 c

7-Jan-15

1-9 c 1-27 1-

7-Feb-15

7-Feb-15

2-26 a

26-Feb-15

28-Jan-15

1-30 c 2-6 2-

11-Feb-15

11-Feb-15

2-28 a

28-Feb-15

2015-01-28

28-Jan-15

1-30 c 2-5 2-

11-Feb-15

11-Feb-15

5-Jan-15

5-Jan-15

2-28 b
2015-1-7 b

31-Dec-14

31-Dec-14

2015-1-4 c 1-9

31-Jan-15

30-Jan-15

4-Dec-14

8-Dec-14

7-Feb-15

7-Feb-15

2014-12-18
b 1-21 2-4 a
2-26 b 3-5

5-Mar-15

5-Mar-15

3-5 a

2015-01-27

2015-01-06

2015-02-03

7-Jan-15

6-Feb-15

1-9 c 1-27 1-

2-9 a

2-10 c 2-11 22 10 c 2-11


2 11 22
2-10
2-10 c 2-11 22-10 b
2-10 c 2-11 2-

10-Feb-15

7-Feb-15

10-Feb-15

7-Feb-15

2-28 b 3-2

2-16 a

2-27 a

6-Feb-15

27-Feb-15

16-Feb-15

16-Feb-15

7-Feb-15

6-Mar-15
6
Mar 15

27-Feb-15
27-Feb-15
27-Feb-15

6-Mar-15

15-Feb-15

15-Feb-15

2-28 a

28-Feb-15

15-Feb-15
15-Feb-15

15-Feb-15
15-Feb-15

28-Feb-15

11-Feb-15

11-Feb-15

2-28 a
2-28 c
2-16 b 2-27

15-Feb-15

15-Feb-15

2-28 a

28-Feb-15

6-Mar-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

8.80

Mechanical

Collecting Container

PAL-1193-DWG-MEC-3044-01

40.00

0.10%

8.81

Mechanical

Crude Oil Buffer Tank(T-2303)General Arrangement

PAL-1193-DWG-MEC-3051-01

64.00

0.17%

8.82
8.83
8.84
8.85
8.86
8.87
8.88
8.89
8.90
8.91
8.92
8.93
8.94
8.95
8.96
8.97
8.98
8.99
8.100
8.101
8.102
8.103
8.104
8.105
8.
06
8.106
8.107
8.108
8.109
8.110
8.111
8.112
8.113
8.114
8.115
8.116
8.117
8 118
8.118
8.119
8.120
8.121
8.122
8.123
8.124
8.125
8.126
8.127
8.128
8.129
8.130
8 130
8.131
8.132
8.133

Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
ec a ca
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical

Shell Accessories Orientation


Roof Accessories Orientation
Bottom Details
Roof Details
Shell Details
Shell Developed Surface
24''x24'' Shell Clean-out Door Assembly
24''x24'' Shell Clean-out Door Details
24'' Shell Mamhole Assembly
24'' Shell Mamhole Details
20'' Roof Mamhole Assembly and Details
Heat Coil Pipe
Roof Nozzle Details I
Shell Nozzle Details I
Spiral Stairway Assembly and Details
Nameplate & Support Bracket Details
Anchor Chair Details
Insulation Details
Water Buffer Tank(T-2340)General Arrangement
Shell Accessories Orientation
Roof Accessories Orientation
Bottom Details
Roof Details
Shell Details
S
e Developed
eve oped Su
ace
Shell
Surface
Oil Collector Notch Assembly and Details
24''x24'' Shell Clean-out Door Assembly
24''x24'' Shell Clean-out Door Details
24'' Shell Mamhole Assembly
24'' Shell Mamhole Details
20'' Roof Mamhole Assembly and Details
Heat Coil Pipe
Roof Nozzle Details I
Shell Nozzle Details I
Shell Nozzle Details II
Spiral Stairway Assembly and Details
Nameplate & Support Bracket Details
Anchor Chair Details
Insulation Details
TBE for G-L Separator Skids
TBE for Crude Oil Booster Pumps
TBE for Progressive Cavity Pumps
TBE for Anti-foam Injection Skids
TBE for Flare Knock out drum
TBE for Foam Skids
TBE for Steel Plats of Tanks
TBE for Accessories of Tanks
TBE for Miscellaneous Materials of Tanks
TBE for Insulation of Tanks
TBE for Centrifugal Pumps
TBE for Vent Stack
TBE for Sedimentation tank lattice dome roof

PAL-1193-DWG-MEC-3052-01
PAL-1193-DWG-MEC-3053-01
PAL-1193-DWG-MEC-3054-01
PAL-1193-DWG-MEC-3055-01
PAL-1193-DWG-MEC-3056-01
PAL-1193-DWG-MEC-3057-01
PAL-1193-DWG-MEC-3058-01
PAL-1193-DWG-MEC-3059-01
PAL-1193-DWG-MEC-3060-01
PAL-1193-DWG-MEC-3061-01
PAL-1193-DWG-MEC-3062-01
PAL-1193-DWG-MEC-3063-01
PAL-1193-DWG-MEC-3064-01
PAL-1193-DWG-MEC-3066-01
PAL-1193-DWG-MEC-3068-01
PAL-1193-DWG-MEC-3069-01
PAL-1193-DWG-MEC-3070-01
PAL-1193-DWG-MEC-3071-01
PAL-1193-DWG-MEC-3101-01
PAL-1193-DWG-MEC-3102-01
PAL-1193-DWG-MEC-3103-01
PAL-1193-DWG-MEC-3104-01
PAL-1193-DWG-MEC-3105-01
PAL-1193-DWG-MEC-3106-01
93 WG
C 3 07 0
PAL-1193-DWG-MEC-3107-01
PAL-1193-DWG-MEC-3108-01
PAL-1193-DWG-MEC-3109-01
PAL-1193-DWG-MEC-3110-01
PAL-1193-DWG-MEC-3111-01
PAL-1193-DWG-MEC-3112-01
PAL-1193-DWG-MEC-3113-01
PAL-1193-DWG-MEC-3114-01
PAL-1193-DWG-MEC-3115-01
PAL-1193-DWG-MEC-3117-01
PAL-1193-DWG-MEC-3118-01
PAL-1193-DWG-MEC-3119-01
PAL-1193-DWG-MEC-3120-01
PAL
1193 DWG MEC 3120 01
PAL-1193-DWG-MEC-3121-01
PAL-1193-DWG-MEC-3122-01
PAL-1193-TBE-MEC-001
PAL-1193-TBE-MEC-002
PAL-1193-TBE-MEC-003
PAL-1193-TBE-MEC-004
PAL-1193-TBE-MEC-005
PAL-1193-TBE-MEC-006
PAL-1193-TBE-MEC-007
PAL-1193-TBE-MEC-008
PAL-1193-TBE-MEC-009
PAL-1193-TBE-MEC-010
PAL-1193-TBE-MEC-011
PAL-1193-TBE-MEC-012
PAL-1193-TBE-MEC-013

40.00

Civil

9.1
9.2
9.3
9.4
9.5
9.6
9.7
98
9.8
9.9
9.10
9.11
9.12

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Ci il
Civil
Civil
Civil
Civil
Civil

Specification for Geotechnical Investigation


Specification for Topographical Survey
Calculation for Sedimentation Tank Foundation
Calculation for Crude Oil Buffer Tank Foundation
Calculation for Water Buffer Tank Foundation
Calculation for the Height of Dyke Wall
MR for Rebar Materials
MR ffor C
Concrete M
Materials
i l
MR for Structural Steel Materials
MR for Fencing Materials
MR for Speciality Materials
MR for Piling Materials

PAL-1193-SP-CIV-001
PAL-1193-SP-CIV-002
PAL-1193-CAL-CIV-004
PAL-1193-CAL-CIV-005
PAL-1193-CAL-CIV-006
PAL-1193-CAL-CIV-007
PAL-1193-MR-CIV-001
PAL 1193 MR CIV 002
PAL-1193-MR-CIV-002
PAL-1193-MR-CIV-003
PAL-1193-MR-CIV-004
PAL-1193-MR-CIV-005
PAL-1193-MR-CIV-006

9.13

Civil

MR for Control/Switchgear/BATTERY Room Building

PAL-1193-MR-CIV-007

9.14
9.15
9.16
9.17
9.18
9.19
9.20

Civil
Civil
Civil
Civil
Civil
Civil
Civil

MTO for Rebar Materials


MTO for Concrete Materials
MTO for Structural Steel Materials
MTO for Fencing Materials
MTO for Speciality Materials
MTO for Piling Materials
TBE For Reinforcing Bar Material

PAL-1193-MTO-CIV-001
PAL-1193-MTO-CIV-002
PAL-1193-MTO-CIV-003
PAL-1193-MTO-CIV-004
PAL-1193-MTO-CIV-005
PAL-1193-MTO-CIV-006
PAL-1193-TBE-CIV-001

0.00

0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.21%
0.21%
0.10%
0.10%
0.10%
0.10%
0.21%
0.10%
0.10%
0.10%
0.10%
0.10%
00.10%
0%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.21%
0.10%
0.10%
0.10%
0 10%
0.10%
0.10%
0.10%
0.17%
0.17%
0.14%
0.14%
0.14%
0.14%
0.14%
0.14%
0.14%
0.14%
0 14%
0.14%
0.14%
0.00%

8372.00

21.67%

56.00

40.00

0.14%
0.14%
0.38%
0.38%
0.38%
1.25%
0.10%
0 10%
0.10%
0.10%
0.10%
0.10%
0.10%

76.00

0.20%

36.00

0.09%
0.09%
0.09%
0.09%
0.09%
0.09%
0.00%

40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
80.00
80.00
40.00
40.00
40.00
40.00
80.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
80.00
40.00
40.00
40.00
40.00
40.00
40.00
64.00
64.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56.00
56 00
56.00
56.00

56.00
148.00
148.00
148.00
484.00
40.00
40 00
40.00
40.00
40.00
40.00

36.00
36.00
36.00
36.00
36.00
0.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P

2014-12-12

2014-12-26

2014-12-29

2015-01-18

2015-01-28

2014-12-12

2015-01-20

20-Jan-15

2014-1-29 c

2015-02-05

6-Feb-15

2-10 a

2014-12-24

2015-01-01

2015-01-04

2015-01-20

2015-01-30

2014-12-24

2015-01-22

23-Jan-15

2014-1-29 c

2015-02-07

7-Feb-15

2-26 b

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-10

10-Jan-15

2015-1-12 c

2015-02-02

3-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-15

15-Jan-15

2015-1-15 c

2015-02-02

3-Feb-15

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-10-23

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2-6 b
2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-10-23

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 b 3-4

2014-10-23

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-20

20-Jan-15

2015-1-29 c

2015-02-05

6-Feb-15

2-10 a

11-Feb-15

11-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-18

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b
2-28 b 2-28

6-Mar-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-18

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-18

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-18

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-11-18

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-12-04

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-04

2015-01-22

23-Jan-15

2015-1-29 c

2015-02-05

6-Feb-15

2-10 a

11-Feb-15

11-Feb-15

2-28 b 3-4

2014-12-04

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b 3-4

2014-12-04

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

29-Jan-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-12-04

2014-12-20

2014-12-23

2015-01-12

2015-01-22

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-02-02

3-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

2015-01-10

10-Jan-15

2015-1-12 c

2015-02-02

3-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 b 3-4
2-27 b 2-28

6-Mar-15

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

2015-01-10

10-Jan-15

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b 2-28

6-Mar-15

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

31-Dec-14

5-Jan-15

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 c

2014-12-25

2015-01-01

2015-01-04

2015-01-20

2015-01-30

2014-12-25

2015-01-22

22-Jan-15

2015-1-29 c

2015-02-07

7-Feb-15

2-26 b

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

10-Jan-15

2015-1-12 c

2015-02-02

3-Feb-15

2-6 b

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-12-08

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-08

2015-01-15

15-Jan-15

2015-1-15 c

2015-02-02

3-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2-6 b
2015-1-17 c

7-Feb-15

2014-10-23

7-Feb-15

7-Feb-15

2-27 a

27-Feb-15

2014-10-23

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 b 3-4

2014-10-23

2014-11-15

2014-11-18

2014-12-08

2014-12-18

2014-10-23

2014-11-19

2014-11-20

21-Nov-14

2015-1-12 c

2015-01-15

15-Jan-15

2015-1-17 c

7-Feb-15

7-Feb-15

2-27 a

2014-12-08
2014-12-08

2014-12-24
2014-12-24

2014-12-27
2014-12-27

2015-01-16
2015-01-16

2015-01-26
2015-01-26

2014-12-08
2014-12-08

2015-01-20
2015-01-22

20-Jan-15
23-Jan-15

2015-1-29 c
2015-1-29 c

2015-02-05
2015-02-05

6-Feb-15
6-Feb-15

2-10 a
2-10 a

11-Feb-15
11-Feb-15

11-Feb-15
11-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-27

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b
2-28 b
2-28 b 3-2

6-Mar-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-27

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-27

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-27

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-29

29-Jan-15

2-28 a

28-Feb-15

2014-11-18

2014-12-03

2014-12-06

2014-12-26

2015-01-05

2014-10-27

2014-12-12

2014-12-13

15-Dec-14

2015-1-9 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

28-Feb-15

2014-12-04

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-10-27

2015-01-22

22-Jan-15

2015-1-29 c

2015-02-05

6-Feb-15

2-10 a

11-Feb-15

11-Feb-15

2-28 b 3-4

2014-12-04

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-09-22

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b 3-4

2014-12-04

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 a

2014-12-04

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b 3-4

2014-12-04

2014-12-21

2014-12-24

2015-01-13

2015-01-23

2014-12-04

2014-12-25

25-Dec-14

2015-1-12 c

2015-02-02

3-Feb-15

2-6 b

7-Feb-15

7-Feb-15

6-Mar-15
6
Mar 15
6-Mar-15

2014-12-08

2014-12-28

2015-01-07

2014-12-12

P
P
P
P
P
P
P
P
P
P
P
P
P

2014-09-30

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-09-30

2014-09-26

2014-09-30

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-09-30

2014-09-26

2014-10-27

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-27

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-27

2014-11-22

2014-11-25

2014-12-15

2014-12-25

2014-10-27

2014-11-22

2014-11-25

2014-12-15

2014-09-22

2014-10-18

2014-10-21

2014-11-10

P
P
P
P
P
P
P

2015-01-10

2-6 a

2-6 a

10-Feb-15

7-Feb-15

7-Feb-15

10-Feb-15

7-Feb-15

7-Feb-15

2-16 a

2014-12-15
2014
12 15

2014-12-24
2014
12 24

2014-12-27
2014
12 27

2015-01-16
2015
01 16

2015-01-26
2015
01 26

2014-12-15
2014
12 15

2015-01-10
2015
01 10

10-Jan-15
10
Jan 15

2015-1-12
2015
1 12 c

2015-02-02
2015
02 02

3-Feb-15
3
Feb 15

2-6
2
6b

7-Feb-15
7
Feb 15

7-Feb-15
7
Feb 15

2-27 b 3-4
2-27 b 2-28

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

2015-01-10

10-Jan-15

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 b 2-28

2014-12-15

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-15

31-Dec-14

5-Jan-15

2015-1-12 c

2015-01-31

2-Feb-15

2-6 a

7-Feb-15

7-Feb-15

2-28 c

2014-11-20

2014-11-25

2014-12-05

2014-12-15

2014-12-12

2015-01-10

10-Jan-15

2015-1-12 c

2015-01-23

24-Jan-15

2-6 b

9-Feb-15

9-Feb-15

2-13 b 3-3

2014-11-14

2014-11-21

2014-12-05

2014-12-15

2014-12-17

2015-01-05

10-Jan-15

2015-1-14 c

2015-01-27

2014-12-01

2014-12-08

2014-12-28

2015-01-07

2014-12-12

2015-02-09

10-Feb-15

2014-12-01

2014-12-08

2014-12-28

2015-01-07

2014-12-12

2015-01-10

19-Jan-15

2015-1-26 c

2014-12-01

2014-12-08

2014-12-28

2015-01-07

2014-12-12

2015-01-05

5-Jan-15

2015-1-8 c

2014-12-01

2014-12-08

2014-12-28

2015-01-07

2014-12-17

2015-01-05

5-Jan-15

2015-1-8 c

2014-12-01

2014-12-07

2014-12-21

2014-12-31

2015-12-30

2015-01-05

5-Jan-15

2015-1-8 c

2014-12-24

2014-12-29

2015-01-12

2015-01-22

2015-01-05

2015-02-05

6-Feb-15

2015-02-10 a

2014-12-24

2014-12-29

2015-01-12

2015-01-22

2015-01-05

2014-12-24
2014-11-14

2014-12-29
2014-11-21

2015-01-12
2014-12-05

2015-01-22
2014-12-15

2015-01-05
2014-12-16

2015-02-05
2015-01-09

6-Feb-15
30-Jan-15

2015-02-08 b
2015-2-6 a

2014-12-01

2014-12-08

2014-12-28

2015-01-07

2014-12-23

2015-01-24

26-Jan-15

2015-1-29 c

2015-01-15

15-Jan-15

2015-1-16 c

2014-10-10

17-Nov-14

2014-12-9 b

2014-10-10

17-Nov-14

2014-12-9 a

2014-12-09

2014-10-27

2014-11-28

29-Nov-14

2014-12-9 a

2014-10-27

2014-11-21

24-Nov-14

2014-12-9 a

2014-10-27

2014-11-21

24-Nov-14

2014-12-9 a

2014-12-25

2014-10-27

2014-11-13

20-Nov-14

2014-12-9 a

2014-11-20

2014-09-22

2014-10-17

2014-10-21

15-Nov-14

2014-12-9 b

2014 09 22
2014-09-22

2014 10 17
2014-10-17

2014 10 21
2014-10-21

15 N 14
15-Nov-14

2014 12 9 b
2014-12-9

2014-12-01

16-Feb-15

27-Feb-15

27-Feb-15

28-Feb-15

28-Jan-15

2-6 b

11-Feb-15

11-Feb-15

28-Jan-15

2015-2-2 c 2-

3-Mar-15

4-Mar-15

2015-01-22

22-Jan-15

9-Feb-15

16-Jan-15

2015-1-29 c
1-19 b 1-23 1-

9-Feb-15

2015-01-16

2-Feb-15

2-Feb-15

2-10 b

2015-02-09

9-Feb-15

2-13 c
11-Feb-15

11-Feb-15

2-28 b

11-Feb-15

11-Feb-15

2-28 a

2-Feb-15

3-Feb-15

2-10 b 2-11

17-Dec-14

18-Dec-14

12-22 a

22-Dec-14

17-Dec-14

18-Dec-14

12-22 a

22-Dec-14

2014-12-09

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-12-09

9-Jan-15

9-Jan-15

1-12 a

2014-12-09

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-12-09

26-Dec-14

27-Dec-14

12-31 a

31-Dec-14

27-Dec-14

29-Dec-14

12-31 a

31-Dec-14

27 D 14
27-Dec-14

29 D 14
29-Dec-14

2015-02-10

2015-02-15

2015-02-06

2015-02-02

2-13 b 3-4

28-Feb-15

15-Feb-15
3-Feb-15

Actual

Planned
IFC

2-6 c 2-9 2-15

Earned Weight

Progress

100.00%

89.40%
100.00%

0.1035%

100.00%

0.1035%

0.1656%

100.00%

0.1656%

85.00%

0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
00.1035%
035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1656%
0.1656%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0 1449%
0.1449%
0.1449%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
00 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%

0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
00.1035%
035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1656%
0.1656%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0.1449%
0 1449%
0.1449%
0.1449%
0.0000%

100.00%
100.00%
100.00%
95.00%
100.00%
95.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
95.00%
100.00%
95.00%
100.00%
100.00%
95.00%
85.00%
100.00%
100.00%
100.00%
95.00%
100.00%
95
00%
95.00%
95.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
95.00%
100.00%
95.00%
95.00%
100 00%
100.00%
100.00%
95.00%
95.00%
95.00%
65.00%
95.00%
95.00%
95.00%
0.00%
95.00%
5.00%
100.00%
100 00%
85.00%
95.00%
85.00%

21.67%

21.67%

21.67%

20.34%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1449%
0.1449%
0.3831%
0.3831%
0.3831%
1.2527%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%

2014 09 22
2014-09-22

2014 10 18
2014-10-18

2014 10 21
2014-10-21

2014 11 10
2014-11-10

2014 11 20
2014-11-20

2014-10-27

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-27

2014-11-20

24-Nov-14

2014-12-9 b

6-Jan-15

6-Jan-15

1-7 a

7-Jan-15

2014-10-22

2014-11-09

2014-11-12

2014-12-02

2014-12-12

2014-11-13

20-Nov-14

2014-12-9 a

2014-12-09

26-Dec-14

27-Dec-14

12-31 a

31-Dec-14

2014-10-22

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-10-29

2014-11-05

17-Nov-14

2014-12-9 a

2014-12-09

24-Dec-14

24-Dec-14

12-31 a

31-Dec-14

2014-09-22

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-22
2014-10-22
2014-09-22

2014-10-17

2014-10-21

15-Nov-14

2014-12-9 a

2014-12-09

24-Dec-14

24-Dec-14

12-31 a

31-Dec-14

0.1449%
0.1449%
0.3831%
0.3831%
0.3831%
1.2527%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

2014-10-22

2014-11-07

2014-11-10

2014-11-30

2014-12-10

2014-10-22

2014-10-30

2014-11-05

17-Nov-14

2014-12-9 a

2014-12-09

6-Jan-15

6-Jan-15

1-7 a

7-Jan-15

0.1967%

100.00%

0.1967%

100.00%

2014-09-22

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-10-17

2014-10-21

15-Nov-14

2014-12-9 a

2014-12-09

27-Dec-14

29-Dec-14

31-Dec-14

2014-09-22

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2014-09-22
2014-09-22

2014-10-17

2014-10-21

15-Nov-14

2014-12-9 a

2014-12-09

27-Dec-14

29-Dec-14

2014-10-27

2014-11-12

2014-11-15

2014-12-05

2014-12-15

2014-10-27

2014-11-20

24-Nov-14

2014-12-9 a

2014-12-09

6-Jan-15

7-Jan-15

2014-10-22

2014-11-09

2014-11-12

2014-12-02

2014-12-12

2014-12-09

26-Dec-14

27-Dec-14

2014-11-19

2014-11-22

2014-12-12

2014-12-22

2014-09-22

2014-10-18

2014-10-21

2014-11-10

2014-11-20

2015-01-20

2015-01-12

2015-02-10

2015-02-13

2015-02-14

2014-10-22
2014-10-22
2014-09-22
2015-02-16

2014-12-9 a

2014-10-22

0.0932%
0.0932%
0.0932%
0.0932%
0.0932%
0.0932%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0932%
0.0932%
0.0932%
0.0932%
0.0932%
0.0932%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

2014-11-13

20-Nov-14

2014-10-29

2014-11-05

17-Nov-14

2014-12-09

24-Dec-14

24-Dec-14

2014-10-17

2014-10-21

15-Nov-14

2014-12-9 a

2014-12-09

24-Dec-14

24-Dec-14

2015-01-20

21-Jan-15

2015-1-21 a

2015-01-21

27-Jan-15

28-Jan-15

14 18

12 31 a
12-31

12-Jan-15

31 D 14
31-Dec-14

31-Dec-14
1-7 a

7-Jan-15
31-Dec-14
31-Dec-14
31-Dec-14

1-29 a

29-Jan-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

9.21
9.22
9.23
9.24

Civil
Civil
Civil
Civil

TBE for Structural Steel Materials


TBE for Fencing Materials
TBE for Speciality Materials
TBE for Piling Materials

PAL-1193-TBE-CIV-003
PAL-1193-TBE-CIV-004
PAL-1193-TBE-CIV-005
PAL-1193-TBE-CIV-006

32.00

32.00

0.08%
0.08%
0.08%
0.08%

9.25

Civil

TBE for Control/Switchgear/BATTERY Room Building

PAL-1193-TBE-CIV-007

32.00

0.08%

9.26
9.27
9.28
9.29
9.30
9.31
9.32
9.33
9.34
9.35
9.36
9.37
9.38
9.39
9.40
9.41
9.42
9.43
9.44
9.45
9.46
9.47
9.48
9.49
9.50
9.51
9.52
9.53
9.54
9.55
9.56
9.57
9.58
9.59
9.60
9.61
9.62
9.63
9.64
9.65
9.66
9.67
9.68
9.69
9.70
9.71
9.72
9.73
9.74
9.75
9.76
9.77
9.78
9.79
9.80
9.81
9.82
9.83
9.84
9.85
9.86
9.87
9.88
9.89
9.90
9.91
9.92
9.93
9.94
9.95
9.96
9.97

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

Boreholes and Test Pits Layout


Fencing and Gate Layout
Sign Boards Location Layout
Rough Grading Plan
Final Grading Plan Sheet -01
Final Grading Plan Sheet -02
Final Grading Plan Sheet -03
Final Grading Plan Sheet -04
Final Grading Plan Sheet -05
Grading, Drainage & Surfacing Typical Section Sheet-01
Grading, Drainage & Surfacing Typical Section Sheet-02
Pile layout Key Plan
Pile Layout Plan Sheet-01
Pile Layout Plan Sheet-02
Pile Layout Plan Sheet-03
Pile Layout Plan Sheet-04
Pile Layout Plan Sheet-05
Pile Layout Plan Sheet-06
Pile Layout Plan Sheet-07
Pile Layout Plan Sheet-08
Pile Layout Plan Sheet-09
Pile Layout Plan Sheet-10
Pile Layout Plan Sheet-11
Pile Layout Plan Sheet-12
Pile Layout Plan Sheet-13
Pile Layout Plan Sheet-14
Pile Layout Plan Sheet-15
Pile Layout Plan Sheet-16
Pile Layout Plan Sheet-17
Pile Layout Plan Sheet-18
Pile Layout Plan Sheet-19
Pile Layout Plan Sheet-20
Pile Layout Plan Sheet-21
Pile Layout Plan Sheet-22
Pile Layout Plan Sheet-23
Pile Layout Plan Sheet-24
Pile Layout Plan Sheet-25
Pile Layout Plan Sheet-26
Pile Layout Plan Sheet-27
Pile Layout Plan Sheet-28
Pile Layout Plan Sheet-29
Pile Layout Plan Sheet-30
Pile Layout Plan Sheet-31
Pile Layout Plan Sheet-32
Pile Layout Plan Sheet-33
Pile Layout Plan Sheet-34
Pile Layout Plan Sheet-35
Pile Layout Plan Sheet-36
Pile Layout Plan Sheet-37
Pile Layout Plan Sheet-38
Civil Work General Notes
Typical Fence and Gate Details
Typical Pile and Pile Cap Details
Typical Marker Post and Sign Board
Tank Farm Bund Wall Sheet-01
Tank Farm Bund Wall Sheet-02
Tank Farm Area Civil Works details
Misc Civil Works
Site Work General Notes
T-2365 Closed Drain Sump Details
T-2365 Closed Drain Sump Details
T-2366 Open Drain Sump Details
T-2366 Open Drain Sump Details
T-2367 Sand Drain Pit Details
T-2367 Sand Drain Pit Details
T-2368 Vent Pit Details
T-2371A/B Sand Pond Details
Valve Pit 1 Details
Valve Pit 2 Details
Valve Pit 3 Details
Valve Pit 4 Details
T-2302A/B Sedimentation Foundation Details

PAL-1193-DWG-CIV-0001-01
PAL-1193-DWG-CIV-0002-01
PAL-1193-DWG-CIV-0003-01
PAL-1193-DWG-CIV-0102-01
PAL-1193-DWG-CIV-0104-01
PAL-1193-DWG-CIV-0104-02
PAL-1193-DWG-CIV-0104-03
PAL-1193-DWG-CIV-0104-04
PAL-1193-DWG-CIV-0104-05
PAL-1193-DWG-CIV-0105-01
PAL-1193-DWG-CIV-0105-02
PAL-1193-DWG-CIV-0200-01
PAL-1193-DWG-CIV-0300-01
PAL-1193-DWG-CIV-0300-02
PAL-1193-DWG-CIV-0300-03
PAL-1193-DWG-CIV-0300-04
PAL-1193-DWG-CIV-0300-05
PAL-1193-DWG-CIV-0300-06
PAL-1193-DWG-CIV-0300-07
PAL-1193-DWG-CIV-0300-08
PAL-1193-DWG-CIV-0300-09
PAL-1193-DWG-CIV-0300-10
PAL-1193-DWG-CIV-0300-11
PAL-1193-DWG-CIV-0300-12
PAL-1193-DWG-CIV-0300-13
PAL-1193-DWG-CIV-0300-14
PAL-1193-DWG-CIV-0300-15
PAL-1193-DWG-CIV-0300-16
PAL-1193-DWG-CIV-0300-17
PAL-1193-DWG-CIV-0300-18
PAL-1193-DWG-CIV-0300-19
PAL-1193-DWG-CIV-0300-20
PAL-1193-DWG-CIV-0300-21
PAL-1193-DWG-CIV-0300-22
PAL-1193-DWG-CIV-0300-23
PAL-1193-DWG-CIV-0300-24
PAL-1193-DWG-CIV-0300-25
PAL-1193-DWG-CIV-0300-26
PAL-1193-DWG-CIV-0300-27
PAL-1193-DWG-CIV-0300-28
PAL-1193-DWG-CIV-0300-29
PAL-1193-DWG-CIV-0300-30
PAL-1193-DWG-CIV-0300-31
PAL-1193-DWG-CIV-0300-32
PAL-1193-DWG-CIV-0300-33
PAL-1193-DWG-CIV-0300-34
PAL-1193-DWG-CIV-0300-35
PAL-1193-DWG-CIV-0300-36
PAL-1193-DWG-CIV-0300-37
PAL-1193-DWG-CIV-0300-38
PAL-1193-DWG-CIV-0450-01
PAL-1193-DWG-CIV-0451-01
PAL-1193-DWG-CIV-0452-01
PAL-1193-DWG-CIV-0453-01
PAL-1193-DWG-CIV-0455-01
PAL-1193-DWG-CIV-0455-02
PAL-1193-DWG-CIV-0456-01
PAL-1193-DWG-CIV-0457-01
PAL-1193-DWG-CIV-0460-01
PAL-1193-DWG-CIV-0601-01
PAL-1193-DWG-CIV-0601-02
PAL-1193-DWG-CIV-0602-01
PAL-1193-DWG-CIV-0602-02
PAL-1193-DWG-CIV-0603-01
PAL-1193-DWG-CIV-0603-02
PAL-1193-DWG-CIV-0604-01
PAL-1193-DWG-CIV-0605-01
PAL-1193-DWG-CIV-0606-01
PAL-1193-DWG-CIV-0606-02
PAL-1193-DWG-CIV-0606-03
PAL-1193-DWG-CIV-0606-04
PAL-1193-DWG-CIV-0701-01

40.00

0.10%
0.14%
0.10%
0.10%
0.10%
0.00%
0.00%
0.00%
0.00%
0.10%
0.00%
0.00%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.21%
0.21%
0.21%
0.21%
0.21%
0.21%
0.10%
0.10%
0.48%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.21%
0.21%
0.10%
0.10%
0.00%
0.00%
0.21%

32.00
32.00

56.00
40.00
40.00
40.00
0.00
0.00
0.00
0.00
40.00
0.00
0.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
80.00
80.00
80.00
80.00
80.00
80.00
40.00
40.00
184.00
40.00
40.00
40.00
40.00
40.00
40.00
80.00
80.00
40.00
40.00
0.00
0.00
80.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P

2014-12-01

2014-12-06

2014-12-07

2014-12-17

2014-12-30

2015-01-06

7-Jan-15

2015-1-7 a

2015-01-07

27-Jan-15

28-Jan-15

1-29 a

29-Jan-15

2014-12-01

2014-12-06

2014-12-07

2014-12-17

2014-12-04

2014-12-15

16-Dec-14

2014-12-17 a

2014-12-17

26-Dec-14

27-Dec-14

12-31 a

31-Dec-14

2014-12-01

2014-12-13

2015-01-02

2015-01-12

2014-12-06

2014-12-10

10-Dec-14

2014-12-16 a

2014-12-16

24-Dec-14

24-Dec-14

12-31 a

31-Dec-14

2014-11-10

2014-11-17

2014-11-18

2014-11-28

2014-12-04

2014-12-10

10-Dec-14

2014-12-16 a

2014-12-16

24-Dec-14

24-Dec-14

12-31 a

2014-11-25

2014-11-30

2014-12-01

2014-12-11

2014-12-24

2015-01-09

9-Jan-15

2015-1-9 a

2015-01-09

27-Jan-15

28-Jan-15

1-29 a

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-09

2014-11-30
2015-01-20

2014-12-10
2015-01-30

2014-11-29 a
2014-12-13 a

2014-11-29
2014-12-13

17-Dec-14
15-Dec-14
17-Jan-15

18-Dec-14
16-Dec-14
20-Jan-15

12-22 a

2014-11-10
2014-12-31

17-Nov-14
24-Nov-14
10-Dec-14

2014-12-9 a

2014-11-07
2014-12-28

2014-09-20
2014-10-13

2014-10-10

2014-10-13
2014-12-01

1-21 a

21-Jan-15

2014-10-20

2014-11-05

2014-11-08

2014-11-28

2014-12-08

2014-10-20

2014-11-19

24-Nov-14

2014-11-29 a

2014-11-29

5-Jan-15

5-Jan-15

1-7 a

7-Jan-15

2014-10-10

2014-11-05

2014-11-08

2014-11-28

2014-12-08

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-11-05

2014-11-08

2014-11-28

2014-12-08

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-10-10

2014-11-05

2014-11-08

2014-11-28

2014-12-08

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-10-10

2014-11-05

2014-11-08

2014-11-28

2014-12-08

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-10-10

2014-11-05

2014-11-08

2014-11-28

2014-12-08

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-10-10

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-10-10

2014-10-26

2014-10-29

2014-11-18

2014-11-28

2014-10-10
2014-10-10
2014-10-10
2014-10-10
2014-10-10
2014-10-10
2014-10-10

2014-11-15

2014-10-10

2014-11-15

24-Nov-14

2014-11-29 a

2014-11-29

31-Jan-15

2-Feb-15

2-6 a

6-Feb-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01
2014-12-01

2014-12-28
2014-12-28

2014-12-31
2014-12-31

2015-01-20
2015-01-20

2015-01-30
2015-01-30

2014-12-01
2014-12-01

2015-01-23
2015-01-23

23-Jan-15
23-Jan-15

2015-1-30 a
2015-1-30 a

2015-01-30
2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01
2014-12-01

2014-12-28
2014-12-28

2014-12-31
2014-12-31

2015-01-20
2015-01-20

2015-01-30
2015-01-30

2014-12-01
2014-12-01

2015-01-23
2015-01-23

23-Jan-15
23-Jan-15

2015-1-30 a
2015-1-30 a

2015-01-30
2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-23

23-Jan-15

2015-1-30 a

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-11-28

29-Nov-14

2014-12-16 a

2014-12-16

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-10

2014-11-19

24-Nov-14

2014-11-29 a

2014-11-29

15-Dec-14

15-Dec-14

12-16 a

15-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-11-28

29-Nov-14

2014-12-16 a

2014-12-16

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-10-20

2014-11-05

24-Nov-14

2014/12/8 a

2014-12-08

24-Dec-14

24-Dec-14

12-31 a

31-Dec-14

2014-11-25

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-11-25

2014-12-26

30-Dec-14

2014-1-5 b

10-Jan-15

10-Jan-15

2015-1-10 a

2014-11-25

2014-12-06

2014-12-09

2014-12-29

2015-01-08

2014-11-25

2014-12-26

30-Dec-14

2015-1-5 a

2015-01-05

10-Jan-15

10-Jan-15

2015-1-10 a

10-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-31

2-Feb-15

2015-2-4 a

2015-02-04

7-Feb-15

7-Feb-15

2-12 a

12-Feb-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-10

11-Feb-15

2015-2-27 a

2015-02-27

4-Mar-15

4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-10

2014-12-26

30-Dec-14

2015-1-5 a

2015-01-05

10-Jan-15

10-Jan-15

2015-1-10 a

10-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-16

17-Jan-15

2015-1-30 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-14

14-Jan-15

2015-1-15 b

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-14

14-Jan-15

2015-1-15 b

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

14-Jan-15

2015-1-15 b

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-14

14-Jan-15

2015-1-15 b

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2014-12-30

31-Dec-14

2015-1-5 a

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-09-26

2014-11-19
2014-12-10

2014-12-01

2014-10-29

2014-12-01

15 18

2015-01-14

Earned Weight

Progress

100.00%

89.40%

31-Dec-14

0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%

0.0828%
0.0828%
0.0828%
0.0828%

100.00%
100.00%
100.00%
100.00%

29-Jan-15

0.0828%

100.00%

0.0828%

100.00%

22-Dec-14

0.1035%
0.1449%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.2071%
0.2071%
0.2071%
0.2071%
0.2071%
0.2071%
0.1035%
0.1035%
0.4762%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.0000%
0.0000%
0.2071%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1035%
0.1449%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.2071%
0.2071%
0.2071%
0.2071%
0.2071%
0.2071%
0.1035%
0.1035%
0.4762%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.0000%
0.0000%
0.2071%

100.00%
95.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
95.00%
100.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
65.00%
65.00%
65.00%
65.00%
100.00%

2015-01-30

2015-01-05

Actual

Planned
IFC

10-Jan-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

9.98
9.99
9.100
9.101
9.102
9.103
9.104
9.105
9.106
9.107
9.108
9.109
9.110
9.111
9.112
9.113
9.114
9.115
9.116
9.117
9.118
9.119
9.120
9.121
9.122
9.123

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

T-2302A/B Sedimentation Foundation Details


T-2303 Crude Oil Buffer Tank Foundation Details
T-2303 Crude Oil Buffer Tank Foundation Details
T-2340 Water Buffer Tank Foundation Details
T-2340 Water Buffer Tank Foundation Details
FS-2344 Cold Vent Stack Foundation Details
Structural Steel Layout Key Plan
Structural Steel Layout Sheet-01
Structural Steel Layout Sheet-02
Structural Steel Layout Sheet-03
Structural Steel Layout Sheet-04
Structural Steel Layout Sheet-05
Structural Steel Layout Sheet-06
Structural Steel Layout Sheet-07
Structural Steel Layout Sheet-08
Structural Steel Layout Sheet-09
Structural Steel Layout Sheet-10
Structural Steel Layout Sheet-11
Structural Steel Layout Sheet-12
Structural Steel Layout Sheet-13
Structural Steel Layout Sheet-14
Structural Steel Layout Sheet-15
Structural Steel Layout Sheet-16
Structural Steel Layout Sheet-17
Structural Steel Layout Sheet-18
Structural Steel Layout Sheet-19

PAL-1193-DWG-CIV-0701-02
PAL-1193-DWG-CIV-0702-01
PAL-1193-DWG-CIV-0702-02
PAL-1193-DWG-CIV-0703-01
PAL-1193-DWG-CIV-0703-02
PAL-1193-DWG-CIV-0704-01
PAL-1193-DWG-STR-1000-01
PAL-1193-DWG-STR-1050-01
PAL-1193-DWG-STR-1050-02
PAL-1193-DWG-STR-1050-03
PAL-1193-DWG-STR-1050-04
PAL-1193-DWG-STR-1050-05
PAL-1193-DWG-STR-1050-06
PAL-1193-DWG-STR-1050-07
PAL-1193-DWG-STR-1050-08
PAL-1193-DWG-STR-1050-09
PAL-1193-DWG-STR-1050-10
PAL-1193-DWG-STR-1050-11
PAL-1193-DWG-STR-1050-12
PAL-1193-DWG-STR-1050-13
PAL-1193-DWG-STR-1050-14
PAL-1193-DWG-STR-1050-15
PAL-1193-DWG-STR-1050-16
PAL-1193-DWG-STR-1050-17
PAL-1193-DWG-STR-1050-18
PAL-1193-DWG-STR-1050-19

40.00

40.00

0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%

9.124

Civil

Structural Steel Layout Sheet-20

PAL-1193-DWG-STR-1050-20

40.00

9.125
9 125

Civil

Structural Steel Layout Sheet


Sheet-21
21

PAL-1193-DWG-STR-1050-21
PAL 1193 DWG STR 1050 21

9.126

Civil

Structural Steel Layout Sheet-22

PAL-1193-DWG-STR-1050-22

PLAN DATE
65%

85%

100%

ISC Compl

Issued

Issued

IFC

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2015-02-09

2014-12-10

2015-01-07

2015-01-10

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2014-12-01

2014-12-28

2014-12-01

2014-12-28

2014-12-01

2014-12-28

2014-12-01

0.10%

0.00
0 00

0.00%
0 00%

0.00

40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00

30%

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Actual

Planned
IFC

Earned
Weight

Progress

100.00% 97.49%
2014-12-10

40.00

30%

BEB-SUDAN

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

40.00

5%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight

2014-12-30

31-Dec-14

2015-1-5 a

2015-01-05

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-12-30

31-Dec-14

2015-1-5 a

2015-01-05

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-12-30

31-Dec-14

2015-1-5 a

2015-01-05

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2015-02-09

2014-12-10
2014-12-10
2014-12-10
2014-12-10
2014-12-10
2014-12-10

2015-01-20

2015-01-30

2014-12-31

2015-01-20

2014-12-31

2015-01-20

2014-12-31

2015-01-20

2014-12-28

2014-12-31

2014-12-01

2014-12-28

2014-12-01

Earned Weight

Progress

100.00%

89.40%

2015-01-05

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2014-12-30

31-Dec-14

2015-1-5 a

2015-01-05

9-Jan-15

9-Jan-15

1-12 a

12-Jan-15

2015-01-30

2015-01-30

2015-2-2 a

2015-02-02

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.1035%

100.00%

0.1035%

2014-12-01
2014 12 01

2014-12-28
2014 12 28

2014-12-31
2014 12 31

2015-01-20
2015 01 20

2015-01-30
2015 01 30

2014-12-01
2014 12 01

2015-01-15
2015 01 15

2015-01-15
2015 01 15

2015-1-16
2015 1 16 a

2015-01-16
2015 01 16

0.0000%
0 0000%

100.00%
100 00%

0.0000%
0 0000%

85.00%
85 00%

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

2014-12-30

31-Dec-14

2015-1-5 a

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%

100.00%
100.00%
100.00%
100.00%
100.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%

9.127

Civil

Structural Steel Layout Sheet-23

PAL-1193-DWG-STR-1050-23

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

9.128

Civil

Structural Steel Layout Sheet-24

PAL-1193-DWG-STR-1050-24

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

9.129

Civil

Structural Steel Layout Sheet-25

PAL-1193-DWG-STR-1050-25

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

9.130

Civil

Structural Steel Layout Sheet-26

PAL-1193-DWG-STR-1050-26

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

9.131

Civil

Structural Steel Layout Sheet-27

PAL-1193-DWG-STR-1050-27

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

9.132

Civil

Structural Steel Layout Sheet-28

PAL-1193-DWG-STR-1050-28

0.00

0.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

0.0000%

100.00%

0.0000%

85.00%

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-15

2015-01-15

2015-1-16 a

2015-01-16

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2014-12-01
2014-12-01

2014-12-28
2014-12-28

2014-12-31
2014-12-31

2015-01-20
2015-01-20

2015-01-30
2015-01-30

2015-02-12
2015-02-12

2015-02-13
2015-02-13

2015-2-28 a
2015-2-28 a

2015-02-28
2015-02-28

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-11-28

2014-11-29

2014-12-16 a

2014-12-16

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-12-01

2014-12-02

2014-12-8 a

2014-12-08

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-12-01

2014-12-02

2014-12-8 a

2014-12-08

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-12-01

2014-12-02

2014-12-8 a

2014-12-08

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-11-15

2014-12-01

2014-12-02

2014-12-8 a

2014-12-08

16-Dec-14

17-Dec-14

12-20 a

20-Dec-14

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-14

2015-01-14

2015-1-15 a

2015-01-15

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%

85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

9.133

Civil

Structural Steel Layout Sheet-29

PAL-1193-DWG-STR-1050-29

0.00

0.00%

9.134
9.135
9.136
9.137
9.138
9.139
9.140
9.141
9.142
9.143
9.144
9.145
9.146
9.147
9.148
9.149
9.150
9.151
9.152
9.153
9.154
9.155
9.156
9.157
9.158
9.159
9.160
9.161
9.162
9.163
9.164
9.165
9.166
9.167
9.168
9.169
9.170
9.171
9.172

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

Structural Steel Layout Sheet-30


Structural Steel Layout Sheet-31
Structural Steel Layout Sheet-32
Structural Steel Layout Sheet-33
Structural Steel Layout Sheet-34
Structural Steel Layout Sheet-35
Structural Steel Layout Sheet-36
Structural Steel Layout Sheet-37
Structural Steel Layout Sheet-38
Structural Steel Layout Sheet-39
Structural Steel Layout Sheet-40
Structural Steel Layout Sheet-41
y Sheet-42
Structural Steel Layout
Structural Steel Layout Sheet-43
Structural Steel Layout Sheet-44
Structural Steel Layout Sheet-45
Structural Steel Layout Sheet-46
Structural Steel Layout Sheet-47
Structural Steel General Notes
Standard Ladder Sheet-01
Standard Ladder Sheet-02
Standard Stair Handrail Catwalk Sheet-01
Standard Stair Handrail Catwalk Sheet-02
Pipe Rack Key Plan
Pipe Rack
Rack-01
01 Plan, Elevation and Section
Pipe Rack-02 Plan, Elevation and Section
Pipe Rack-03 Plan, Elevation and Section Sheet-01
Pipe Rack-03 Plan, Elevation and Section Sheet-02
Pipe Rack-04 Plan, Elevation and Section Sheet-01
Pipe Rack-04 Plan, Elevation and Section Sheet-02
Pipe Rack-05 Plan, Elevation and Section
Pipe Rack-06 Plan, Elevation and Section Sheet-01
Pipe Rack-06 Plan, Elevation and Section Sheet-02
Pipe Rack-07 Plan, Elevation and Section Sheet-01
Pipe Rack-07 Plan, Elevation and Section Sheet-02
Pipe Rack-08 Plan, Elevation and Section Sheet-01
Pipe Rack-08 Plan, Elevation and Section Sheet-02
Pipe Rack-08 Plan, Elevation and Section Sheet-03
Pipe Rack-09 Plan, Elevation and Section Sheet-01

PAL-1193-DWG-STR-1050-30
PAL-1193-DWG-STR-1050-31
PAL-1193-DWG-STR-1050-32
PAL-1193-DWG-STR-1050-33
PAL-1193-DWG-STR-1050-34
PAL-1193-DWG-STR-1050-35
PAL-1193-DWG-STR-1050-36
PAL-1193-DWG-STR-1050-37
PAL-1193-DWG-STR-1050-38
PAL-1193-DWG-STR-1050-39
PAL-1193-DWG-STR-1050-40
PAL-1193-DWG-STR-1050-41
PAL-1193-DWG-STR-1050-42
PAL-1193-DWG-STR-1050-43
PAL-1193-DWG-STR-1050-44
PAL-1193-DWG-STR-1050-45
PAL-1193-DWG-STR-1050-46
PAL-1193-DWG-STR-1050-47
PAL-1193-DWG-STR-1250-01
PAL-1193-DWG-STR-1251-01
PAL-1193-DWG-STR-1251-02
PAL-1193-DWG-STR-1252-01
PAL-1193-DWG-STR-1252-02
PAL-1193-DWG-STR-1350-01
PAL
PAL-1193-DWG-STR-1401-01
1193 DWG STR 1401 01
PAL-1193-DWG-STR-1402-01
PAL-1193-DWG-STR-1403-01
PAL-1193-DWG-STR-1403-02
PAL-1193-DWG-STR-1404-01
PAL-1193-DWG-STR-1404-02
PAL-1193-DWG-STR-1405-01
PAL-1193-DWG-STR-1406-01
PAL-1193-DWG-STR-1406-02
PAL-1193-DWG-STR-1407-01
PAL-1193-DWG-STR-1407-02
PAL-1193-DWG-STR-1408-01
PAL-1193-DWG-STR-1408-02
PAL-1193-DWG-STR-1408-03
PAL-1193-DWG-STR-1409-01

0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.10%
0.10%
0.10%
0.10%
0.21%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.00%

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
80.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
0.00

16 18

2015-02-28

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

Detailed Engineering

38636.00

100.00%

0.00

9.173
9.174
9.175
9.176
9.177
9.178
9.179
9.180
9.181
9.182
9.183
9.184
9.185
9.186
9.187
9.188
9.189
9.190
9.191
9.192
9.193
9.194

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil

Pipe Rack-09 Plan, Elevation and Section Sheet-02


Pipe Rack-09 Plan, Elevation and Section Sheet-03
Pipe Rack-10 Plan, Elevation and Section
Pipe Rack-11 Plan, Elevation and Section
Pipe Rack-12 Plan, Elevation and Section Sheet-01
Pipe Rack-12 Plan, Elevation and Section Sheet-02
Pipe Rack-12 Plan, Elevation and Section Sheet-03
Pipe Rack-12 Plan, Elevation and Section Sheet-04
Pipe Rack-12 Plan, Elevation and Section Sheet-05
Pipe Rack-12 Plan, Elevation and Section Sheet-06
Pipe Rack-12 Plan, Elevation and Section Sheet-07
Pipe Rack Connection Details Sheet-01
Pipe Rack Connection Details Sheet-02
Pipe Bridge Plan & Elevations Sheet-01
Pipe Bridge Plan & Elevations Sheet-02
Pipe Bridge Plan & Elevations Sheet-03
Pipe Bridge Connection Details Sheet-01
Pipe Bridge Connection Details Sheet-02
Pipe Support Details Sheet-01
Pipe Support Details Sheet-02
Pipe Support Details Sheet-03
Pipe Support Details Sheet-04

PAL-1193-DWG-STR-1409-02
PAL-1193-DWG-STR-1409-03
PAL-1193-DWG-STR-1410-01
PAL-1193-DWG-STR-1411-01
PAL-1193-DWG-STR-1412-01
PAL-1193-DWG-STR-1412-02
PAL-1193-DWG-STR-1412-03
PAL-1193-DWG-STR-1412-04
PAL-1193-DWG-STR-1412-05
PAL-1193-DWG-STR-1412-06
PAL-1193-DWG-STR-1412-07
PAL-1193-DWG-STR-1500-01
PAL-1193-DWG-STR-1500-02
PAL-1193-DWG-STR-1501-01
PAL-1193-DWG-STR-1501-02
PAL-1193-DWG-STR-1501-03
PAL-1193-DWG-STR-1502-01
PAL-1193-DWG-STR-1502-02
PAL-1193-DWG-STR-1600-01
PAL-1193-DWG-STR-1600-02
PAL-1193-DWG-STR-1600-03
PAL-1193-DWG-STR-1600-04

0.00

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.10%
0.10%
0.10%
0.10%
0.21%
0.21%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.10%
0.00%

9.195

Civil

Pipe Support Details Sheet-05

PAL-1193-DWG-STR-1600-05

0.00

0.00%

9.196
9.197
9.198
9.199
9.200
9 200
9.201
9.202
9.203
9.204
9.205
9.206
9.207
9.208
9.209
9.210
9.211
9 212
9.212
9.213
9.214
9.215
9.216
9.217
9.218
9.219
9.220
9.221
9.222
9.223
9.224
9 224
9.225
9.226
9.227
9.228
9.229

Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Civil
Ci il
Civil
Civil
Civil
Civil
Civil

PAL-1193-DWG-STR-1600-06
PAL-1193-DWG-STR-1600-07
PAL-1193-DWG-STR-1600-08
PAL-1193-DWG-STR-1600-09
PAL-1193-DWG-STR-1601-01
PAL 1193 DWG STR 1601 01
PAL-1193-DWG-STR-1601-02
PAL-1193-DWG-STR-1601-03
PAL-1193-DWG-STR-1601-04
PAL-1193-DWG-STR-1601-05
PAL-1193-DWG-STR-1601-06
PAL-1193-DWG-STR-1601-07
PAL-1193-DWG-STR-1601-08
PAL-1193-DWG-STR-1650-01
PAL-1193-DWG-STR-1650-02
PAL-1193-DWG-STR-1650-03
PAL-1193-DWG-STR-1650-04
PAL 1193 DWG STR 1650 05
PAL-1193-DWG-STR-1650-05
PAL-1193-DWG-STR-1650-06
PAL-1193-DWG-STR-1704-01
PAL-1193-DWG-STR-1705-01
PAL-1193-DWG-STR-1706-01
PAL-1193-DWG-STR-1707-01
PAL-1193-DWG-STR-1708-01
PAL-1193-DWG-STR-1800-01
PAL-1193-DWG-STR-1800-02
PAL-1193-DWG-STR-1800-03
PAL-1193-DWG-STR-1800-04
PAL-1193-DWG-STR-1800-05
PAL-1193-DWG-STR-1800-06
PAL 1193 DWG STR 1800 06
PAL-1193-DWG-STR-1800-07
PAL-1193-DWG-STR-1800-08
PAL-1193-DWG-STR-1901-01
PAL-1193-DWG-STR-1901-02
PAL-1193-DWG-STR-1901-03

0.00

80.00

0.00%
0.00%
0.00%
0.00%
0.10%
0 10%
0.10%
0.10%
0.10%
0.00%
0.00%
0.00%
0.00%
0.21%
0.10%
0.10%
0.00%
0 00%
0.00%
0.00%
0.41%
0.10%
0.10%
0.10%
0.31%
0.10%
0.10%
0.10%
0.10%
0.10%
0.00%
0 00%
0.00%
0.00%
0.21%
0.21%
0.21%

9.230

Civil

PAL-1193-DWG-STR-1902-01

40.00

0.10%

9.231

Civil

PAL-1193-DWG-STR-1902-02

40.00

0.10%

9.232

Civil

PAL-1193-DWG-STR-1902-03

40.00

0.10%

9.233

Civil

PAL-1193-DWG-STR-1902-04

40.00

0.10%

9.234

Civil

PAL-1193-DWG-STR-1902-05

0.00

0.00%

9.235

Civil

PAL-1193-DWG-STR-1902-06

0.00

0.00%

9.236

Civil

Pipe Support Details Sheet-06


Pipe Support Details Sheet-07
Pipe Support Details Sheet-08
Pipe Support Details Sheet-09
Pipe Support Schedule Sheet
Sheet-01
01
Pipe Support Schedule Sheet-02
Pipe Support Schedule Sheet-03
Pipe Support Schedule Sheet-04
Pipe Support Schedule Sheet-05
Pipe Support Schedule Sheet-06
Pipe Support Schedule Sheet-07
Pipe Support Schedule Sheet-08
Platform Structural Steel Sheet-01
Platform Structural Steel Sheet-02
Platform Structural Steel Sheet-03
Platform Structural Steel Sheet-04
Sheet 05
Platform Structural Steel Sheet-05
Platform Structural Steel Sheet-06
P-2308A/B/C Crude Oil Booster Pumps Skid Details
P-2318A/B/C Water Booster Pumps Skid Details
V-2342 Flare Knock Out Drum Skid Details
P-2342A/B Flare Drum Pumps Skid Details
Transformer A/B Skid Details
Walkway Structural Steel Sheet-01
Walkway Structural Steel Sheet-02
Walkway Structural Steel Sheet-03
Walkway Structural Steel Sheet-04
Walkway Structural Steel Sheet-05
Walkway
Structural
W lk
St t l Steel
St l Sheet-06
Sh t 06
Walkway Structural Steel Sheet-07
Walkway Structural Steel Sheet-08
Control/Switchgear/Battery Room Sheet-01
Control/Switchgear/Battery Room Sheet-02
Control/Switchgear/Battery Room Sheet-03
Control/Switchgear/Battery Room steel floor skid details
Sheet-01
Control/Switchgear/Battery Room steel floor skid details
Sheet-02
Control/Switchgear/Battery Room steel floor skid details
Sheet-03
Control/Switchgear/Battery Room steel floor skid details
Sheet-04
Control/Switchgear/Battery Room Access Stair-1 Plan &
Section
Control/Switchgear/Battery Room Access Stair-2 Plan &
Section
Control/Switchgear/Battery Room Access Stair-3 Plan &
Section

PAL-1193-DWG-STR-1902-07

0.00

0.00%

9.237

Civil

Control/Switchgear/Battery Room Access Stair Details

PAL-1193-DWG-STR-1902-08

0.00

0.00%

9.238
9.239
9.240
9.241
9.242

Civil
Civil
Civil
Civil
Civil

Under The Building Fencing and Gate Layout Plan SheetUnder The Building Fencing and Gate Layout Plan SheetTransformer Shed Sheet-01
Transformer Shed Sheet-02
Anti-Foam Skid Shed Sheet-01

PAL-1193-DWG-STR-1904-01
PAL-1193-DWG-STR-1904-02
PAL-1193-DWG-STR-1905-01
PAL-1193-DWG-STR-1905-02
PAL-1193-DWG-STR-1908-01

40.00

0.10%
0.00%
0.21%
0.10%
0.21%

0.00
0.00
0.00
0.00
0.00
0.00
40.00
40.00
40.00
40.00
80.00
80.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00
40.00

0.00
0.00
0.00
40.00
40
00
40.00
40.00
40.00
0.00
0.00
0.00
0.00
80.00
40.00
40.00
0.00
0 00
0.00
0.00
160.00
40.00
40.00
40.00
120.00
40.00
40.00
40.00
40.00
40.00
0.00
0 00
0.00
0.00
80.00
80.00

0.00
80.00
40.00
80.00

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight
ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-05

2015-01-06

2015-1-7 a

2015-01-07

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-08

2015-01-08

2015-1-9 a

2015-01-09

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-08

2015-01-08

2015-1-7 a

2015-01-09

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-10

2015-01-16

2015-1-20 a

2015-01-20

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-10

2015-01-16

2015-1-20 a

2015-01-20

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-10

2015-01-16

2015-1-20 a

2015-01-20

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-10

2015-01-16

2015-1-20 a

2015-01-20

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-10

2015-01-16

2015-1-20 a

2015-01-20

23-Jan-15

23-Jan-15

1-26 a

26-Jan-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2015-2-27 a

P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2014-12-01
2014-12-01
2014 12 01

2014-12-28
2014-12-28
2014 12 28

2014-12-31
2014-12-31
2014 12 31

2015-01-20
2015-01-20
2015 01 20

2015-01-30
2015-01-30
2015 01 30

2015-02-02
2014-12-01
2014 12 01

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2014-12-01

2014-12-28

2014-12-31

2014-12-01

2014-12-28

2014-12-01

P
P
P
P
P
P
P
P
P
P
P
P

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

2015-01-30

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0.1035%
0.1035%
0.1035%
0.2071%
0.2071%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
85.00%
85.00%
85.00%
85.00%

2015-02-27

0.0000%

100.00%

0.0000%

85.00%

2015-2-27 a

2015-02-27

2015-02-11

2015-2-27 a

2015-02-27

2015-02-10

2015-02-11

2015-2-27 a

2015-02-27

2015-02-10
2015-01-22
2015
01 22
2015-01-22

2015-02-11
2015-01-27
2015
01 27
2015-01-27

2015-2-27 a
2015-1-29
2015
1 29 a
2015-1-29 a

2015-02-27
2015-01-30
2015 01 30

2014-12-01

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2015-01-30

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2015-01-30

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-01-22

2015-01-27

2015-1-29 a

2015-01-30

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2015-2-27 a

2015-02-27

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2015-2-27 a

2015-02-27

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-10 a

2015-02-10

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-10 a

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-10 a

2015-02-10

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2015-2-27 a

2015-02-27

4-Mar-15

4-Mar-15

2014 12 01
2014-12-01

2014 12 28
2014-12-28

2014 12 31
2014-12-31

2015 01 20
2015-01-20

2015 01 30
2015-01-30

2015 02 02
2015-02-02

2015 02 10
2015-02-10

2015 02 11
2015-02-11

2015 2 27 a
2015-2-27

2015 02 27
2015-02-27

4 Mar 15
4-Mar-15

4 Mar 15
4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2015-02-02

2015-02-10

2015-02-11

2015-2-27 a

2015-02-27

4-Mar-15

4-Mar-15

2015-01-05

2015-01-29

2015-02-01

2015-02-21

2015-03-03

2015-02-11

2015-2-27 a

2015-02-27

2015-01-29

2015-02-01

2015-02-21

2015-03-03

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2015-01-05

2015-01-29

2015-02-01

2015-02-21

2015-03-03

2015-01-30

2015-01-30

2015-01-05

2015-01-29

2015-02-01

2015-02-21

2015-03-03

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

2015-01-05

2015-01-29

2015-02-01

2015-02-21

2015-03-03

2015-01-05
2015-01-05
2015-01-05
2015-01-05
2015-01-05

2015-02-10

2015-01-05

2015-02-02

2015-02-05

2015-02-09 a

2015-02-09

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-09 a

2015-02-09

4-Mar-15

4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-09 a

2015-02-09

4-Mar-15

4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-09 a

2015-02-09

4-Mar-15

4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2015-02-02

2015-02-05

2015-02-09 a

2015-02-09

4-Mar-15

4-Mar-15

2014-12-01
2014-12-01
2014 12 01

2014-12-28
2014-12-28
2014 12 28

2014-12-31
2014-12-31
2014 12 31

2015-01-20
2015-01-20
2015 01 20

2015-01-30
2015-01-30
2015 01 30

2014-12-01
2014-12-01
2014 12 01

2015-02-02
2015-02-02
2015 02 02

2015-02-05
2015-02-05
2015 02 05

2015-02-09 a
2015-02-09
2015
02 09 a

2015-02-09
2015-02-09
2015 02 09

4-Mar-15
4-Mar-15
4 M 15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

4-Mar-15

4-Mar-15
4-Mar-15
4
M 15
4-Mar-15

2014-12-01

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2014-11-10

2014-11-29

2014-12-02

2014-12-22

2015-01-01

2014-11-10

2014-11-29

2014-12-02

2014-12-22

2015-01-01

2014-11-10

2014-11-29

2014-12-02

2014-12-22

2015-01-01

2014-10-20
2014-10-20
2014-10-20

100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100 00%
100.00%
100.00%
100.00%
100.00%
100.00%

0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.2071%
0.1035%
0.1035%
0.0000%
0 0000%
0.0000%
0.0000%
0.4141%
0.1035%
0.1035%
0.1035%
0.3106%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%
0 0000%
0.0000%
0.0000%
0.2071%
0.2071%
0.2071%

85.00%
85.00%
85.00%
85.00%
85.00%
85 00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
85.00%
95.00%
95.00%
95 00%
95.00%
95.00%
85.00%
85.00%
85.00%
85.00%
85.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95.00%
95 00%
95.00%
95.00%
100.00%
100.00%
100.00%

2014-12-01

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-01

2014-12-24

2014-12-27

2015-01-16

2014-12-01

2014-12-24

2014-12-27

2014-12-01

2014-12-24

2014-12-01

2015-01-30

4-Mar-15

4-Mar-15

30-Dec-14

2014-12-31 a

6-Jan-15

6-Jan-15

2015-1-7 a

7-Jan-15

30-Dec-14

2014-12-31 a

6-Jan-15

6-Jan-15

2015-1-7 a

7-Jan-15

30-Dec-14

2014-12-31 a

6-Jan-15

6-Jan-15

2015-1-7 a

7-Jan-15

0.0000%
0.0000%
0.0000%
0.0000%
0.1035%
0 1035%
0.1035%
0.1035%
0.1035%
0.0000%
0.0000%
0.0000%
0.0000%
0.2071%
0.1035%
0.1035%
0.0000%
0 0000%
0.0000%
0.0000%
0.4141%
0.1035%
0.1035%
0.1035%
0.3106%
0.1035%
0.1035%
0.1035%
0.1035%
0.1035%
0.0000%
0 0000%
0.0000%
0.0000%
0.2071%
0.2071%
0.2071%

2014-12-25

16-Jan-15

17-Jan-15

1-19 a

19-Jan-15

0.1035%

100.00%

0.1035%

100.00%

2014-12-26 a

2014-12-25

16-Jan-15

17-Jan-15

1-19 a

19-Jan-15

0.1035%

100.00%

0.1035%

100.00%

2014-12-20

2014-12-26 a

2014-12-25

16-Jan-15

17-Jan-15

1-19 a

19-Jan-15

0.1035%

100.00%

0.1035%

100.00%

2015-02-12

2015-02-13

2015-2-28 a

2015-02-28

0.1035%

100.00%

0.1035%

85.00%

2015-12-30

2015-01-07

2015-01-07

2015-1-9 a

2015-01-09

13-Jan-15

13-Jan-15

1-15 a

15-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2015-01-26

2015-12-30

2015-01-07

2015-01-07

2015-1-9 a

2015-01-09

13-Jan-15

13-Jan-15

1-15 a

15-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2015-01-16

2015-01-26

2015-12-30

2015-01-07

2015-01-07

2015-1-9 a

2015-01-09

13-Jan-15

13-Jan-15

1-15 a

15-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2014-12-27

2015-01-16

2015-01-26

2015-12-30

2015-01-07

2015-01-07

2015-1-9 a

2015-01-09

13-Jan-15

13-Jan-15

1-15 a

15-Jan-15

0.0000%

100.00%

0.0000%

0.00%

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2014-12-10

2014-12-10

2014-12-13 a

2014-12-13

17-Jan-15

1-19 a

19-Jan-15

2014-12-28

2014-12-31

2015-01-20

2015-01-30

2014-12-01

2014-12-10

2014-12-10

2014-12-13 a

2014-12-13

17-Jan-15

1-19 a

19-Jan-15

2015-01-01

2015-01-14

2015-01-17

2015-02-06

2015-02-16

2015-01-29

2015-2-2 a

2015-02-02

2015-01-14

2015-01-17

2015-02-06

2015-02-16

2015-01-29

2015-01-29

2015-2-2 a

2015-02-02

2015-01-01

2015-01-14

2015-01-17

2015-02-06

2015-02-16

2015-01-01
2015-01-01
2015-01-01

2015-01-29

2015-01-01

2015-01-30

2015-02-03

2015-2-4 a

2015-02-04

0.1035%
0.0000%
0.2071%
0.1035%
0.2071%

100.00%
100.00%
100.00%
100.00%
100.00%

0.1035%
0.0000%
0.2071%
0.1035%
0.2071%

100.00%
100.00%
85.00%
85.00%
95.00%

2014-12-01

2015-02-02

2015-01-30

2015-01-30

2015-02-10

2015-2-2 a

4-Mar-15

2015-02-02

2015-02-05

2015-02-09 a

2015-02-02

2015-02-05

2015-02-09 a

2014-10-30

2014-11-05

2014-11-24

2014-12-8 c

2014-12-23

2014-10-30

2014-11-05

2014-11-24

2014-12-8 a

2014-12-23

2014-10-30

2014-11-05

2014-11-24

2014-12-8 c

2014-12-23

2014-12-01

2014-12-20

2014-12-20

2014-12-26 a

2015-01-26

2014-12-01

2014-12-20

2014-12-20

2015-01-16

2015-01-26

2014-12-01

2014-12-20

2014-12-27

2015-01-16

2015-01-26

2014-12-01

2014-12-24

2014-12-27

2015-01-16

2015-01-26

2014-12-01

2014-12-24

2014-12-27

2015-01-16

2014-12-01

2014-12-24

2014-12-27

2014-12-01

2014-12-24

2014-12-01
2014-12-01

17 18

4-Mar-15

2015-02-09
2015-02-09
2014-12-08

4-Mar-15

4-Mar-15

DPOC
PALOCH FPF DE-BOTTLENECKING PROJECT
LEVEL-II SCHEDULE, ENGINEERING DELIVERABLES REGISTER (EDR)
5%
WBS

Disc

Title

Number

Man Hour

9.243
9.244

10

Detailed Engineering
Civil
Civil

Anti-Foam Skid Shed Sheet-02


Anti-Foam Skid Shed Sheet-03

As-Built

PAL-1193-DWG-STR-1908-02
PAL-1193-DWG-STR-1908-03

PLAN DATE
65%

85%

100%

5%

30%

IFR(Rev-A) IFA(Rev-B)
Started

30%

Weight

38636.00

100.00%

80.00
80.00

0.21%
0.21%

P
P

758.00

1.96%

ISC Compl

Issued

Issued

30%
BEB-SUDAN

IFC

Started

ISC Compl

REV-A

65%
IFR(Rev-A)
Issued

65%
PMC
comments

ACTUAL DATE
85%
85%
BEB-SUDAN
REV.B

REV-A
A

85%

85%

IFA(Rev-B)

PMC

Issued

comments

95%

95%

BEB-SUDANSUDAN-PMC
REV.0

REV.0

95%
comments

As on: 6-Mar-2015

100%

PMC

Earned
Weight

Progress

100.00% 97.49%
2015-01-01

2015-01-14

2015-01-17

2015-02-06

2015-02-16

2015-01-01

2015-01-14

2015-01-17

2015-02-06

2015-02-16

2015-01-01
2015-01-01

18 18

2015-01-30

2015-02-03

2015-2-4 a

2015-02-04

4-Mar-15

4-Mar-15

2015-01-30

2015-02-03

2015-2-4 a

2015-02-04

4-Mar-15

4-Mar-15

Actual

Planned
IFC

Earned Weight

Progress

100.00%

89.40%

0.2071%
0.2071%

100.00%
100.00%

0.2071%
0.2071%

95.00%
95.00%

1.96%

0.00%

1.96%

0.00%

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

A- Approved; B -Accepted with Correction

Status as of:

From BEB to CPECC

Title / Description
Sheet.

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

PROCESS
General

PAL-1193-TDR-GEN-001

Technical Document Register

PAL-1193-PR-GEN-001

Number System

PAL-1193-PR-GEN-002

Planning Package

PAL-1193-PR-GEN-003

Plan Control Management Procedures

PAL-1193-PR-GEN-004

Progress Measurement Procedures

6
8

PAL-1193-PR-GEN-005
PAL-1193-PR-GEN-006
PAL-1193-DB-GEN-001

Engineering Change Management Procedure


Document Control Procedure
HSE Philosophy

PAL-1193-PL-GEN-001

Quality plan

10

PAL-1193-PL-GEN-002

HSE Plan

40
39
40
44

A
B
C
D

4-Nov-2014
29-Nov-2014
31-Dec-2014
13-Feb-2015

B-C-T-0020
B-C-T-0091
B-C-T-0216
B-C-T-0570

8-Nov-2014
1-Dec-2014
31-Dec-2014
13-Feb-2015

C-P-BT-0007
C-P-BT-0090
C-P-BT-0220
C-P-BT-0581
C P BT 0581

15-Nov-2014
10-Dec-2014
4-Jan-2015
27-Feb-2015

B
C
B
C

P-C-BT-0008
P-C-BT-0065
P-C-BT-0199
P-C-BT-0512
P C BT 0512

15-Nov-2014
10-Dec-2014
4-Jan-2015
27-Feb-2015

C-B-BT-0010
C-B-BT-0068
C-B-BT-0202
C-B-BT-0515

14
14
19
23
7
7
6
6
8
22

A
0
A
B
A
B
A
B
A
A

C-P-BT-0002
C-P-BT-0163

9-Dec-2014
25-Dec-2014

B
A

P-C-BT-0054
P-C-BT-0138

9-Dec-2014
25-Dec-2014

C-B-BT-0057
C-B-BT-0141

17-Nov-2014
17-Nov-2014

C-P-BT-0032
C-P-BT-0032

25-Nov-2014
25-Nov-2014

REJECTED
REJECTED

P-C-BT-0012
P-C-BT-0012

25-Nov-2014
25-Nov-2014

C-B-BT-0015
C-B-BT-0015

A
0
A
0

B-C-T-0015
B-C-T-0160
B-C-T-0013
B-C-T-0057
B-C-T-0013
B-C-T-0057
B-C-T-0013
B-C-T-0057
B-C-T-0015
B-C-T-0015
B-C-T-0068
B-C-T-0007
B-C-T-0096
B-C-T-0022
B-C-T-0116

31-Oct-2014
24-Dec-2014

35
35
12
11

30-Oct-2014
23-Dec-2014
27-Oct-2014
22-Nov-2014
27-Oct-2014
22-Nov-2014
27-Oct-2014
22-Nov-2014
30-Oct-2014
30-Oct-2014
25-Nov-2014
24-Oct-2014
1-Dec-2014
7-Nov-2014
11-Dec-2014

17-Nov-2014
1-Dec-2014
17-Nov-2014
11-Dec-2014

C-P-BT-0032
C-P-BT-0093
C-P-BT-0024
C-P-BT-0118

25-Nov-2014
5-Dec-2014
10-Dec-2014
18-Dec-2014

C
A
B
A

P-C-BT-0012
P-C-BT-0034
P-C-BT-0059
P-C-BT-0103

25-Nov-2014
5-Dec-2014
10-Dec-2014
19-Dec-2014

C-B-BT-0015
C-B-BT-0037
C-B-BT-0062
C-B-BT-0106

25
Oct 2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
31-Jan-2015
25-Oct-2014
20-Nov-2014
31-Jan-2015
25-Oct-2014
20-Nov-2014
31-Jan-2015
15-Feb-2015
25-Oct-2014
20-Nov-2014
9-Dec-2014

B
C T 0010
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0449
B-C-T-0010
B-C-T-0048
B-C-T-0449
B-C-T-0010
B-C-T-0048
B-C-T-0449
B-C-T-0591
B-C-T-0010
B-C-T-0048
B-C-T-0112

5
Nov 2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
2-Feb-2012
5-Nov-2014
21-Nov-2014
2-Feb-2012
5-Nov-2014
21-Nov-2014
2-Feb-2012
15-Feb-2015
5-Nov-2014
21-Nov-2014
10-Dec-2014

C
P BT 0004
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0459
C-P-BT-0004
C-P-BT-0051
C-P-BT-0459
C-P-BT-0004
C-P-BT-0051
C-P-BT-0459
C-P-BT-0601
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111

7
Nov 2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Feb-2015
7-Nov-2014
27-Nov-2014
7-Feb-2015
7-Nov-2014
27-Nov-2014
7-Feb-2015
2-Mar-2015
7-Nov-2014
27-Nov-2014
13-Dec-2014

C
B
A
A
C
B
A
C
A
C
A
C
C
B

P
C BT 0001
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0449
P-C-BT-0001
P-C-BT-0024
P-C-BT-0449
P-C-BT-0001
P-C-BT-0024
P-C-BT-0449
P-C-BT-0543
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085

7
Nov 2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Feb-2015
7-Nov-2014
27-Nov-2014
7-Feb-2015
7-Nov-2014
27-Nov-2014
7-Feb-2015
2-Mar-2015
7-Nov-2014
27-Nov-2014
13-Dec-2014

C
B BT 0003
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0452
C-B-BT-0003
C-B-BT-0027
C-B-BT-0452
C-B-BT-0003
C-B-BT-0027
C-B-BT-0452
C-B-BT-0546
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088

25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014

B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048

5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014

C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C
P BT 0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051

7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014

C
A
A
C
B
A
C
C
A
C
A
A
C
A
A
C
A

P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P
C BT 0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024

7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014

C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027

PID&PFD

PAL-1193-DWG-PFD-2011-01

PFD for OIL TREATING FACILITIES

PAL-1193-DWG-PFD-2011-02

PFD for OIL TREATING FACILITIES

PAL-1193-DWG-PFD-2012-01

PFD for INLET MANIFOLD

1
1

PAL-1193-DWG-PFD-2013-01

PFD for PRODUCED WATER SYSTEM

PAL-1193-DWG-PFD-2014-01

PFD for FLARE SYSTEM

PAL-1193-DWG-PFD-2015-01
PAL
1193 DWG PFD 2015 01

PFD for CRUDE OIL TREATMENT FACILITIES

PAL-1193-DWG-PFD-2016-01

PFD for CRUDE OIL BUFFER TANK AND BOOSTER


PUMPS

PAL-1193-DWG-PFD-2017-01

PFD for CLOSED DRAIN SYSTEM

PAL-1193-DWG-PFD-2018-01

PFD for OPEN DRAIN SYSTEM

10

PAL-1193-DWG-PFD-2019-01

PFD for MASS AND HEAT BALANCE DESIGN CASE I


FOR NEW FACILITY

11

PAL-1193-DWG-PFD-2019-02

PFD for MASS AND HEAT BALANCE NORMAL


OPERATION CASE I - MAX.OIL(75.5%WC)

A
B
0
1
A
B
1
A
B
0
1

A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0

9-Dec-2014

B-C-T-0112

10-Dec-2014

C-P-BT-0111

13-Dec-2014

P-C-BT-0085

13-Dec-2014

C-B-BT-0088

25-Oct-2014
20-Nov-2014

B-C-T-0010
B-C-T-0048

5-Nov-2014
21-Nov-2014

C-P-BT-0004
C-P-BT-0051

7-Nov-2014
27-Nov-2014

C
A

P-C-BT-0001
P-C-BT-0024

7-Nov-2014
27-Nov-2014

C-B-BT-0003
C-B-BT-0027

9-Dec-2014

B-C-T-0112

10-Dec-2014

C-P-BT-0111

13-Dec-2014

P-C-BT-0085

13-Dec-2014

C-B-BT-0088

25-Oct-2014

B-C-T-0010

5-Nov-2014

C-P-BT-0004

7-Nov-2014

P-C-BT-0001

7-Nov-2014

C-B-BT-0003

B
0
A

Page 1 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

12

PAL-1193-DWG-PFD-2019-03

PFD for MASS AND HEAT BALANCE NORMAL


OPERATION CASE I - MAX.OIL(75.5%WC)

Submit Date

Trans. No.

20-Nov-2014

B-C-T-0048

21-Nov-2014

C-P-BT-0051

27-Nov-2014

P-C-BT-0024

27-Nov-2014

C-B-BT-0027

9-Dec-2014

B-C-T-0112

10-Dec-2014

C-P-BT-0111

13-Dec-2014

P-C-BT-0085

13-Dec-2014

C-B-BT-0088

8-Nov-2014
13-Dec-2014
8-Nov-2014

B-C-T-0026
B-C-T-0133
B-C-T-0026

10-Nov-2014
15-Dec-2014
10-Nov-2014

C-P-BT-0008
C-P-BT-0132
C-P-BT-0008

15-Nov-2014
16-Dec-2014
15-Nov-2014

A
A
A

P-C-BT-0005
P-C-BT-0095
P-C-BT-0005

15-Nov-2014
16-Dec-2014
15-Nov-2014

C-B-BT-0007
C-B-BT-0098
C-B-BT-0007

B
0
A

27-Nov-2014
13-Dec-2014
8-Nov-2014

B-C-T-0074
B-C-T-0133
B-C-T-0026

27-Nov-2014
15-Dec-2014
10-Nov-2014

C-P-BT-0069
C-P-BT-0132
C-P-BT-0008

29-Nov-2014
16-Dec-2014
15-Nov-2014

B
A
A

P-C-BT-0031
P-C-BT-0095
P-C-BT-0005

29-Nov-2014
16-Dec-2014
15-Nov-2014

C-B-BT-0034
C-B-BT-0098
C-B-BT-0007

16-Dec-2014

C-B-BT-0098

A
A
A
A

P-C-BT-0095
P C BT 0095
P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0005

16-Dec-2014

15-Nov-2014
29-Nov-2014
16-Dec-2014
15-Nov-2014

15-Nov-2014
29-Nov-2014
16-Dec-2014
15-Nov-2014

C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0007

16-Dec-2014
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
27-Feb-2015

A
C
C
B
A
A
C
A

P-C-BT-0095
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0516

16-Dec-2014
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
27-Feb-2015

C-B-BT-0098
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0519

15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29 Nov 2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014

B
B
A
A
C
C
B
A
A
C
C
B
A
A
C
C
B
A
A
C
C
B
A
A
C
C
B

P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P C BT 0031
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087

15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29 Nov 2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014

C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C B BT 0034
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090

PFD for ANTI-FOAM INJECTION SKID

16

PAL-1193-DWG-PFD-2023-01

PFD for FLARE KNOCK-OUT DRUM

17

PAL-1193-DWG-PID-2100-01

DRAWING INDEX - PALOCH FPF

18

PAL-1193-DWG-PID-2101--01

P & ID LEGEND AND SYMBOLS (SHEET 1 OF 4)

19

PAL-1193-DWG-PID-2101-02

P & ID LEGEND AND SYMBOLS (SHEET 2 OF 4)

P & ID 3-PHASE METERING SKID

Trans. No.

C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088
C-B-BT-0003
C-B-BT-0027
C-B-BT-0088

PAL-1193-DWG-PFD-2022-01

PAL-1193-DWG-PID-2103-01

Status.

7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014

15

23

Rec'd Date

P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085
P-C-BT-0001
P-C-BT-0024
P-C-BT-0085

P & ID PRODUCTION FLUID INLET

Trans. No.

C
B
A
C
B
A
C
B
A
C
B
A

PFD for PRODUCED WATER SYSTEM

PAL-1193-DWG-PID-2102-01

Submit Date

7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014
7-Nov-2014
27-Nov-2014
13-Dec-2014

PAL-1193-DWG-PFD-2021-01

22

Trans.No.

C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111
C-P-BT-0004
C-P-BT-0051
C-P-BT-0111

14

P & ID LEGEND AND SYMBOLS (SHEET 4 OF 4)

Renark
Date

5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014
5-Nov-2014
21-Nov-2014
10-Dec-2014

PAL-1193-DWG-PID-2101-04

CPECC to BEB

B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112
B-C-T-0010
B-C-T-0048
B-C-T-0112

PFD for GAS VENT SYSTEM

21

From PDOC to CPECC

25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014
25-Oct-2014
20-Nov-2014
9-Dec-2014

PAL-1193-DWG-PFD-2020-01

P & ID LEGEND AND SYMBOLS (SHEET 3 OF 4)

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

A
B
0
A
B
0
A
B
0
A
B
0
1
A
0
A

13

PAL-1193-DWG-PID-2101-03

2015/3/10

Rev.

20

A- Approved; B -Accepted with Correction

24

PAL-1193-DWG-PID-2104-01

P & ID OIL GATHERING MANIFOLD TIE-IN

25

PAL-1193-DWG-PID-2105-01

P & ID NEW FACILITY HEADER 2

26

PAL-1193-DWG-PID-2106-01

P & ID GAS/LIQUID SEPARATOR V-2303A

27

PAL-1193-DWG-PID-2107-01

P & ID GAS/LIQUID SEPARATOR V-2303B

28

PAL-1193-DWG-PID-2108-01

P & ID GAS/LIQUID SEPARATOR V-2303C

29

PAL-1193-DWG-PID-2109-01

P & ID GAS/LIQUID SEPARATOR V-2303D

13-Dec-2014

B-C-T-0133

15-Dec-2014

A
B
0
A

8-Nov-2014
27-Nov-2014
13-Dec-2014
8-Nov-2014

B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0026

10-Nov-2014
27-Nov-2014
15-Dec-2014
10-Nov-2014

C-P-BT-0132
C P BT 0132
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0008

0
A
B
C
0
1
A
B
0
A
B
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C

13-Dec-2014
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
29-Jan-2015
3-Mar-2015
8-Nov-2014
27-Nov-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27 Nov 2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014

B-C-T-0133
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0433
B-C-T-0601
B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0433
B-C-T-0026
B C T 0074
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121

15-Dec-2014
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
30-Jan-2015
4-Mar-2015
10-Nov-2014
27-Nov-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27 Nov 2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014

C-P-BT-0132
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0444
C-P-BT-0611
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C P BT 0069
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122

Page 2 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

A- Approved; B -Accepted with Correction

Status as of:

From BEB to CPECC

Title / Description
Sheet.

30

PAL-1193-DWG-PID-2110-01

P & ID SEDMENTATION TANK T-2302A

31

PAL-1193-DWG-PID-2111-01

P & ID SEDMENTATION TANK T-2302B

32

PAL-1193-DWG-PID-2112-01

P & ID CRUDE OIL BUFFER TANK T-2303

33

PAL-1193-DWG-PID-2113-01

P & ID CRUDE OIL BOOSTER PUMPS P-2308A/B/C

34

PAL-1193-DWG-PID-2114-01

P & ID WATER BUFFER TANK T-2340

35

PAL-1193-DWG-PID-2115-01

P & ID WATER BOOSTER PUMPS P-2318A/B/C

36

PAL-1193-DWG-PID-2116-01

P & ID CLOSED DRAIN HEADER

37

PAL-1193-DWG-PID-2117-01

P & ID CLOSED DRAIN SUMP T-2365

38

PAL-1193-DWG-PID-2118-01

P & ID OPEN DRAIN HEADER

39

PAL-1193-DWG-PID-2119-01
93
G
90

OPEN DRAIN SUMP


SU
T-2366
366
P & ID O

40

PAL-1193-DWG-PID-2120-01

P & ID VENT PIT T-3268

41

PAL-1193-DWG-PID-2121-01

P & ID SAND DRAIN PIT T-2367

42

PAL-1193-DWG-PID-2122-01

P & ID HEAT MEDIUM DISTRIBUTION

43

PAL-1193-DWG-PID-2123-01

P & ID FLARE KNOCKOUT DRUM

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0

13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13 Dec 2014
13-Dec-2014

B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B C T 0133
B-C-T-0133

15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15 Dec 2014
15-Dec-2014

C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C
P BT 0132
C-P-BT-0132

16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16 Dec 2014
16-Dec-2014

A
A
C
C
B
A
A
C
C
B
A
A
C
C
A
A
A
C
C
B
A
A
C
C
B
A

P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P
C BT 0095
P-C-BT-0095

16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16 Dec 2014
16-Dec-2014

C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C B BT 0098
C-B-BT-0098

1
A
B
C
0
1
A
0
A
B
C
0
1
A
0
1
A
B
C
0
1
A
B
C
0
1
A
B
C
0
1
A
B
0
1
A
B
C
0
1

29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
13-Dec-2014
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015

B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0133
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433

30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
15-Dec-2014
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015

C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0132
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C
P BT 0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444

27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
16-Dec-2014
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015

A
B
C
A
A
A
A
A
C
C
A
A
A
A
A
A
C
C
A
A
A
C
C
A
A
A
C
C
A
A
A
C
A
A
A
C
C
B
A
A

P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0095
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P
C BT 0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516

27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
16-Dec-2014
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015

C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0098
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519

Page 3 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

A- Approved; B -Accepted with Correction

Status as of:

From BEB to CPECC

Title / Description
Sheet.

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

A
0
1
A
B
0
1
A
B
0
1
2
3
A

8-Nov-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
13-Dec-2014
8-Jan-2015
22-Jan-2015
11-Feb-2015
8-Nov-2014

B-C-T-0026
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0275
B-C-T-0370
B-C-T-0556
B-C-T-0026

10-Nov-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
15-Dec-2014
8-Jan-2015
22-Jan-2015
11-Feb-2015
10-Nov-2014

C-P-BT-0008
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0275
C-P-BT-0372
C-P-BT-0566
C-P-BT-0008

15-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
19-Jan-2015
2-Feb-2015

A
A
A
C
A
A
A
C
A
A
A
B

P-C-BT-0005
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0297
P-C-BT-0394

15-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
16-Dec-2014
19-Jan-2015
2-Feb-2015

C-B-BT-0007
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0300
C-B-BT-0397

15-Nov-2014

P-C-BT-0005

15-Nov-2014

C-B-BT-0007

0
1
A

13-Dec-2014
29-Jan-2015
8-Nov-2014

B-C-T-0133
B-C-T-0433
B-C-T-0026

15-Dec-2014
30-Jan-2015
10-Nov-2014

C-P-BT-0132
C-P-BT-0444
C-P-BT-0008

16-Dec-2014
27-Feb-2015
15-Nov-2014

A
A
A

P-C-BT-0095
P-C-BT-0516
P-C-BT-0005

16-Dec-2014
27-Feb-2015
15-Nov-2014

C-B-BT-0098
C-B-BT-0519
C-B-BT-0007

0
A
0
A
B
0
A

13-Dec-2014
8-Nov-2014
13-Dec-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
27-Nov-2014

B-C-T-0133
B-C-T-0026
B-C-T-0133
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0074

15-Dec-2014
10-Nov-2014
15-Dec-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
27-Nov-2014

C-P-BT-0132
C-P-BT-0008
C-P-BT-0132
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0069

16-Dec-2014
15-Nov-2014
16-Dec-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
29-Nov-2014

A
A
A
C
A
A
C

P-C-BT-0095
P-C-BT-0005
P-C-BT-0095
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0031

16-Dec-2014
15-Nov-2014
16-Dec-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
29-Nov-2014

C-B-BT-0098
C-B-BT-0007
C-B-BT-0098
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0034

B
0
A
0
1
A
B
A
0
A
0
A
B
0
A

12-Dec-2014
13-Dec-2014
8-Nov-2014
13-Dec-2014
29-Jan-2015
15-Feb-2015
3-Mar-2015
8-Nov-2014
13-Dec-2014
8-Nov-2014
13-Dec-2014
8-Nov-2014
27-Nov-2014
13-Dec-2014
8-Nov-2014

B-C-T-0121
B-C-T-0133
B-C-T-0026
B-C-T-0133
B-C-T-0433
B-C-T-0591
B-C-T-0601
B-C-T-0026
B-C-T-0133
B-C-T-0026
B-C-T-0133
B-C-T-0026
B-C-T-0074
B-C-T-0133
B-C-T-0026

12-Dec-2014
15-Dec-2014
10-Nov-2014
15-Dec-2014
30-Jan-2015
15-Feb-2015
4-Mar-2015
10-Nov-2014
15-Dec-2014
10-Nov-2014
15-Dec-2014
10-Nov-2014
27-Nov-2014
15-Dec-2014
10-Nov-2014

C-P-BT-0122
C-P-BT-0132
C-P-BT-0008
C-P-BT-0132
C-P-BT-0444
C-P-BT-0601
C-P-BT-0611
C-P-BT-0008
C-P-BT-0132
C-P-BT-0008
C-P-BT-0132
C-P-BT-0008
C-P-BT-0069
C-P-BT-0132
C-P-BT-0008

15-Dec-2014
16-Dec-2014
15-Nov-2014
16-Dec-2014
27-Feb-2015
2-Mar-2015

A
A
A
A
A
A

P-C-BT-0087
P-C-BT-0095
P-C-BT-0005
P-C-BT-0095
P-C-BT-0516
P-C-BT-0543

15-Dec-2014
16-Dec-2014
15-Nov-2014
16-Dec-2014
27-Feb-2015
2-Mar-2015

C-B-BT-0090
C-B-BT-0098
C-B-BT-0007
C-B-BT-0098
C-B-BT-0519
C-B-BT-0546

15-Nov-2014
16-Dec-2014
15-Nov-2014
16-Dec-2014
15-Nov-2014
29-Nov-2014
16-Dec-2014
15-Nov-2014

A
A
A
A
C
A
A
A

P-C-BT-0005
P-C-BT-0095
P-C-BT-0005
P-C-BT-0095
P-C-BT-0005
P-C-BT-0031
P-C-BT-0095
P-C-BT-0005

15-Nov-2014
16-Dec-2014
15-Nov-2014
16-Dec-2014
15-Nov-2014
29-Nov-2014
16-Dec-2014
15-Nov-2014

C-B-BT-0007
C-B-BT-0098
C-B-BT-0007
C-B-BT-0098
C-B-BT-0007
C-B-BT-0034
C-B-BT-0098
C-B-BT-0007

0
1
A
0
1
A
B
C
0
1

13-Dec-2014
29-Jan-2015
8-Nov-2014
13 Dec 2014
13-Dec-2014
29-Jan-2015
8-Nov-2014
27-Nov-2014
12-Dec-2014
13-Dec-2014
29-Jan-2015

B-C-T-0133
B-C-T-0433
B-C-T-0026
B C T 0133
B-C-T-0133
B-C-T-0433
B-C-T-0026
B-C-T-0074
B-C-T-0121
B-C-T-0133
B-C-T-0433

15-Dec-2014
30-Jan-2015
10-Nov-2014
15 Dec 2014
15-Dec-2014
30-Jan-2015
10-Nov-2014
27-Nov-2014
12-Dec-2014
15-Dec-2014
30-Jan-2015

C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C P BT 0132
C-P-BT-0132
C-P-BT-0444
C-P-BT-0008
C-P-BT-0069
C-P-BT-0122
C-P-BT-0132
C-P-BT-0444

16-Dec-2014
27-Feb-2015
15-Nov-2014
16 Dec 2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015

A
A
A
A
A
C
C
B
A
A

P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P C BT 0095
P-C-BT-0095
P-C-BT-0516
P-C-BT-0005
P-C-BT-0031
P-C-BT-0087
P-C-BT-0095
P-C-BT-0516

16-Dec-2014
27-Feb-2015
15-Nov-2014
16 Dec 2014
16-Dec-2014
27-Feb-2015
15-Nov-2014
29-Nov-2014
15-Dec-2014
16-Dec-2014
27-Feb-2015

C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C B BT 0098
C-B-BT-0098
C-B-BT-0519
C-B-BT-0007
C-B-BT-0034
C-B-BT-0090
C-B-BT-0098
C-B-BT-0519

128
89
85
85
31

A
B
0
1
A

8-Nov-2014
22-Dec-2014
5-Jan-2015
5-Feb-2015
24-Nov-2014

B-C-T-0028
B-C-T-0159
B-C-T-0239
B-C-T-0499
B-C-T-0047

10-Nov-2014
22-Dec-2014
5-Jan-2015
5-Feb-2015
24-Nov-2014

C-P-BT-0009
C-P-BT-0160
C-P-BT-0242
C-P-BT-0497
C-P-BT-0061

18-Nov-2014
25-Dec-2014
12-Jan-15
28-Feb-15
2-Dec-2014

C
B
B
B
C

P-C-BT-0009
P-C-BT-0136
P-C-BT-0254
P-C-BT-0517
P-C-BT-0032

18-Nov-2014
25-Dec-2014
12-Jan-15
28-Feb-15
2-Dec-2014

C-B-BT-0012
C-B-BT-0139

28

19-Dec-2014

B-C-T-0149

19-Dec-2014

C-P-BT-0150

25-Dec-2014

P-C-BT-0137

25-Dec-2014

C-B-BT-0140

28

29-Dec-2014

B-C-T-0199

30-Dec-2014

C-P-BT-0201

30-Dec-2014

P-C-BT-0174

30-Dec-2014

C-B-BT-0177

30

15-Feb-2015

B-C-T-0590

15-Feb-2015

C-P-BT-0600

30

8-Jan-2015

B-C-T-0271

8-Jan-2015

C-P-BT-0274

26-Jan-2015

P-C-BT-0332

26-Jan-2015

C-B-BT-0335

31

29-Jan-2015

B-C-T-0434

30-Jan-2015

C-P-BT-0447

6-Feb-2015

P-C-BT-0419

6-Feb-2015

C-B-BT-0422

44

PAL-1193-DWG-PID-2124-01

P & ID ANTI-FOAM INJECTION SKID

46

PAL-1193-DWG-PID-2125-01

P & ID FIRE WATER DISTRIBUTION

47

PAL-1193-DWG-PID-2126-01

P & ID for Foam Protection System

48

PAL-1193-DWG-PID-2131-01

P & ID PRODUCED WATER SKIM TANK T-2330A

49

PAL-1193-DWG-PID-2132-01

P & ID PRODUCED WATER SKIM TANK T-2330B

50

PAL-1193-DWG-PID-2150-01

P & ID DEMULSIFIRE INJECTION SKID

51

PAL-1193-DWG-PID-2152-01

P & ID Corrosion Inhibitor Injection Skid

52

PAL-1193-DWG-PID-2153-01

P & ID De-Scaler Injection Skid

53

PAL-1193-DWG-PID-2160-01

P & ID INSTRUMENT AIR DISTRIBUTION

PAL-1193-DWG-PID-2160-02

P & ID INSTRUMENT AIR DISTRIBUTION

54

PAL-1193-DWG-PID-2161-01

P & ID NITROGRN DISTRIBUTION

55

PAL-1193-DWG-PID-2163-01

P & ID HEATING MEDIUM DISTRIBUTION

56

PAL-1193-DWG-PID-2170-01

P & ID FIRE WATER DISTRIBUTION

57

PAL-1193-DWG-PID-2171-01

P & ID UTILITY & POTABLE WATER DISTRIBUTION

58

PAL 1193 DWG PID 2173 01


PAL-1193-DWG-PID-2173-01

P & ID FLARE KNOCKOUT DRUM

59

PAL-1193-DWG-PID-2174-01

P & ID GAS BOOT V-2305B

1
1

1
1
1

PROCESS

PAL-1193-DB-PRO-001

Design Basis Memorandum

PAL-1193-RP-PRO-002

OPERATING,CONTROL AND SAFEGUARDING


PHILOSOPHY

PAL-1193-RP-PRO-003

HAZOP Close Out Report

Page 4 of 35

C-B-BT-0257
C-B-BT-0520
C-B-BT-0035

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-ML-PRO-001

From CPECC to PDOC/PMC

Trans.No.

Submit Date

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

27-Feb-2015

P-C-BT-0511

27-Feb-2015

C-B-BT-0514

29-Jan-2014
26-Feb-2015

C
B

P-C-BT-0350
P-C-BT-0502

29-Jan-2014
26-Feb-2015

C-B-BT-0353
C-B-BT-0505

29-Jan-2014
26-Feb-2015

C
B

P-C-BT-0350
P-C-BT-0502

29-Jan-2014
26-Feb-2015

C-B-BT-0353
C-B-BT-0505

29-Jan-2014
26-Feb-2015

C
B

P-C-BT-0350
P-C-BT-0502

29-Jan-2014
26-Feb-2015

C-B-BT-0353
C-B-BT-0505

12-Dec-2014
6-Feb-2015

B
B

P-C-BT-0075
P-C-BT-0410

12-Dec-2014
6-Feb-2015

C-B-BT-0078
C-B-BT-0413

15-Feb-2015

B-C-T-0581

15-Feb-2015

C-P-BT-0592

11-Feb-2015

B-C-T-0541

10-Feb-2015

C-P-BT-0555

86
60
2
2
2
21
21
23
2
2
2
56
58

A
A
A
B
C
A
B
C
A
B
C
A
0

11-Feb-2015
11-Feb-2015
5-Jan-2015
3-Feb-2015
3-Mar-2015
5-Jan-2015
3-Feb-2015
3-Mar-2015
5-Jan-2015
3-Mar-2015
4-Nov-2014
31-Dec-2014

B-C-T-0541
B-C-T-0541
B-C-T-0226
B-C-T-0483
B-C-T-0604
B-C-T-0226
B-C-T-0483
B-C-T-0604
B-C-T-0226
B-C-T-0483
B-C-T-0604
B-C-T-0011
B-C-T-0217

10-Feb-2015
10-Feb-2015
5-Jan-2015
4-Feb-2015
4-Mar-2015
5-Jan-2015
4-Feb-2015
4-Mar-2015
5-Jan-2015
4-Feb-2015
4-Mar-2015
5-Nov-2014
31-Dec-2014

C-P-BT-0555
C-P-BT-0555
C-P-BT-0234
C-P-BT-0494
C-P-BT-0614
C-P-BT-0234
C-P-BT-0494
C-P-BT-0614
C-P-BT-0234
C-P-BT-0494
C-P-BT-0614
C-P-BT-0005
C-P-BT-0221

PAL-1193-SCH-PRO-001

EQUIPMENT LIST

PAL-1193-SCH-PRO-002

LINE LIST

PAL-1193-SCH-PRO-003

TIE-IN LIST

PAL-1193-CAL-PRO-001

PROCESS SIMULATION REPORT

10

PAL-1193-CAL-PRO-002
PAL-1193-PR-PRO-001

Flare Relief System Calculation Report


HAZARDS and Operabiliy(HAZOP )Review Procedure

CPECC to BEB

Trans. No.

From PDOC to CPECC

Renark
Date

35

Pre-commissioning and Commissioning Manual


Training Manual

D- Data Accepted for Information Only

Rev.

66

PAL-1193-ML-PRO-002
PAL-1193-ML-PRO-003

58

12-Feb-2015

B-C-T-0562

12-Jan-2014

C-P-BT-0574

28-Feb-15

P-C-BT-0518

28-Feb-15

C-B-BT-0521

26

3-Feb-2015

B-C-T-0482

4-Feb-2015

C-P-BT-0491

28-Feb-15

P-C-BT-0537

28-Feb-2015

C-B-BT-0540

21

25-Nov-2014

B-C-T-0080

1-Dec-2014

C-P-BT-0087

9-Dec-2014

P-C-BT-0057

9-Dec-2014

C-B-BT-0060

21

12-Dec-2014

B-C-T-0122

12-Dec-2014

C-P-BT-0123

15-Dec-2014

P-C-BT-0091

15-Dec-2014

C-B-BT-0094

17-Jan-2015

B-C-T-0339

17-Jan-2014

C-P-BT-0341

6-Feb-2015

P-C-BT-0418

6-Feb-2015

C-B-BT-0421

15-Feb-2015

B-C-T-0585

15-Feb-2015

C-P-BT-0596

27-Feb-2015

P-C-BT-0510

27-Feb-2015

C-B-BT-0513

34
35
35
35
23
23
23
23
34
35
35
35
35
24
35
35
35
35
34
35
32
29
28
29
30
30
35
34
34
24

A
B
C
0
A
B
C
0
A
B
C
D
0
A
B
C
D
0
A
B
0
A
B
C
D
0
A
B
0
A

25-Nov-2014
27-Dec-2014
21-Jan-2015
29-Jan-2015
19-Nov-2014
2-Jan-2015
15-Jan-2015
21-Jan-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
25 N 2014
25-Nov-2014
5-Jan-2015
22-Jan-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
2-Feb-2015
13-Feb-2015
25-Nov-2014
30-Dec-2014
29-Jan-2015
6-Nov-2014

B-C-T-0070
B-C-T-0193
B-C-T-0368
B-C-T-0427
B-C-T-0040
B-C-T-0219
B-C-T-0330
B-C-T-0362
B-C-T-0070
B-C-T-0188
B-C-T-0368
B-C-T-0426
B-C-T-0528
B-C-T-0070
B-C-T-0188
B-C-T-0368
B-C-T-0426
B-C-T-0528
B C T 0070
B-C-T-0070
B-C-T-0243
B-C-T-0371
B-C-T-0070
B-C-T-0188
B-C-T-0369
B-C-T-0467
B-C-T-0571
B-C-T-0070
B-C-T-0207
B-C-T-0427
B-C-T-0023

8-Dec-2014
29-Dec-2014
21-Jan-2015
29-Jan-2015
19-Nov-2014
2-Jan-2015
15-Jan-2015
21-Jan-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
8 D 2014
8-Dec-2014
5-Jan-2015
22-Jan-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
3-Feb-2015
13-Feb-2015
8-Dec-2014
31-Dec-2014
29-Jan-2015
15-Nov-2014

C-P-BT-0106
C-P-BT-0195
C-P-BT-0370
C-P-BT-0439

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
19-Jan-2015
26-Jan-2015
20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C
C
B
A
C
C
A
A
C
C
C
A

P-C-BT-0109
P-C-BT-0167
P-C-BT-0323
P-C-BT-0439
P-C-BT-0143
P-C-BT-0187
P-C-BT-0296
P-C-BT-0336
P-C-BT-0109
P-C-BT-0168
P-C-BT-0323
P-C-BT-0440

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
19-Jan-2015
26-Jan-2015
20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C-B-BT-0112
C-B-BT-0170
C-B-BT-0326
C-B-BT-0442
C-B-BT-0146
C-B-BT-0190
C-B-BT-0299
C-B-BT-0339
C-B-BT-0112
C-B-BT-0171
C-B-BT-0326
C-B-BT-0443

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C
C
C
A

P-C-BT-0109
P-C-BT-0168
P-C-BT-0323
P-C-BT-0440

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C-B-BT-0112
C-B-BT-0171
C-B-BT-0326
C-B-BT-0443

20-Dec-2014
20
D 2014
7-Jan-2015

C
B

P-C-BT-0109
C
P-C-BT-0222

20-Dec-2014
20
D 2014
7-Jan-2015

C B BT 0112
C-B-BT-0112
C-B-BT-0225

20-Dec-2014
29-Dec-2014
23-Jan-2015
10-Feb-2015

C
C
C
B

P-C-BT-0109
P-C-BT-0168
P-C-BT-0324
P-C-BT-0469

20-Dec-2014
29-Dec-2014
23-Jan-2015
10-Feb-2015

C-B-BT-0112
C-B-BT-0171
C-B-BT-0327
C-B-BT-0472

20-Dec-2014
4-Jan-15
6-Feb-2015
26-Dec-2014

C
B
A
C

P-C-BT-0109
P-C-BT-0198
P-C-BT-0439
P-C-BT-0146

20-Dec-2014
4-Jan-2015
6-Feb-2015
26-Dec-2014

C-B-BT-0112
C-B-BT-0201
C-B-BT-0442
C-B-BT-0149

MR for Underground Firewater HDPE and GRE Pipes &

24

2-Jan-2015

B-C-T-0219

2-Jan-2015

C-P-BT-0224

4-Jan-2015

P-C-BT-0187

4-Jan-2015

C-B-BT-0190

Fittings

24

5-Feb-2015

B-C-T-0493

6-Feb-2015

C-P-BT-0512

10-Feb-2015

P-C-BT-0475

10-Feb-2015

C-B-BT-0478

24

3-Mar-2015

B-C-T-0600

4-Mar-2015

C-P-BT-0610

24
24
24
24
23
23

A
A
0
1
A
B

6-Nov-2014
25-Nov-2014
2-Jan-2015
10-Feb-2015
28-Nov-2014
2-Jan-2015

B-C-T-0023
B-C-T-0060
B-C-T-0219
B-C-T-0535
B-C-T-0084
B-C-T-0219

15-Nov-2014
28-Nov-2014
2-Jan-2015
10-Feb-2015
28-Nov-2014
2-Jan-2015

C-P-BT-0023
C-P-BT-0076
C-P-BT-0224
C-P-BT-0545
C-P-BT-0079
C-P-BT-0224

26-Dec-2014
25-Dec-2014
4-Jan-2015

C
B
C

P-C-BT-0146
P-C-BT-0135
P-C-BT-0187

26-Dec-2014
25-Dec-2014
4-Jan-2015

C-B-BT-0149
C-B-BT-0138
C-B-BT-0190

24-Dec-2014
4-Jan-2015

C
C

P-C-BT-0134
P-C-BT-0187

24-Dec-2014
4-Jan-2015

C-B-BT-0137
C-B-BT-0190

11

PAL-1193-RP-PRO-001

2015/3/10

Operation & Maintenance Manual

A- Approved; B -Accepted with Correction

HAZOP Report

22

12

PIPING
MR/MTO(PIP)

PAL-1193-MR-PIP-001

MR for Bulk Valves

PAL-1193-MR-PIP-002

MR for Underground Bulk Pipes & Fittings

PAL-1193-MR-PIP-003

MR for Aboveground Bulk Pipes & Fittings

PAL-1193-MR-PIP-004

MR for Access Fitting Assemblies

PAL-1193-MR-PIP-005

MR for special ltems

10

PAL-1193-MR-PIP-006

PAL-1193-MR-PIP-007

PAL-1193-MR-PIP-008

MR for Insulation Materials

MR for Hot Tapping Materials

PAL-1193-MR-PIP-009

MR for Fire Fighting and Safety Elements

PAL-1193-MR-PIP-009

MR for Fire Fighting and Safety Elements

PAL-1193-MR-PIP-015

MR for Galvanized Pipe and Fitting for Fire Fighting

Page 5 of 35

C-P-BT-0038
C-P-BT-0224
C-P-BT-0331
C-P-BT-0364
C-P-BT-0106
C-P-BT-0193
C-P-BT-0370
C-P-BT-0438
C-P-BT-0548
C-P-BT-0106
C-P-BT-0193
C-P-BT-0370
C-P-BT-0438
C-P-BT-0548
C P BT 0106
C-P-BT-0106
C-P-BT-0245
C-P-BT-0373
C-P-BT-0106
C-P-BT-0193
C-P-BT-0371
C-P-BT-0481
C-P-BT-0582
C-P-BT-0106
C-P-BT-0211
C-P-BT-0439
C-P-BT-0023

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

10

PAL-1193-MR-PIP-015

11

PAL-1193-MTO-PIP-001

System

Trans. No.

C-P-BT-0421
C-P-BT-0512
C-P-BT-0106
C-P-BT-0195
C-P-BT-0558

29-Jan-2014
9-Feb-2015
20-Dec-2014
29-Dec-2014

A
A
C
C

P-C-BT-0369
P-C-BT-0450
P-C-BT-0109
P-C-BT-0167

29-Jan-2014
9-Feb-2015
20-Dec-2014
29-Dec-2014

C-B-BT-0372
C-B-BT-0453
C-B-BT-0112
C-B-BT-0170

C-P-BT-0038
C-P-BT-0224
C-P-BT-0331
C-P-BT-0364
C-P-BT-0106
C-P-BT-0193
C-P-BT-0370
C-P-BT-0438
C-P-BT-0548
C-P-BT-0106
C-P-BT-0193
C-P-BT-0370
C-P-BT-0438
C-P-BT-0106
C-P-BT-0245
C-P-BT-0373
C-P-BT-0106
C-P-BT-0193
C-P-BT-0371

25-Dec-2014
4-Jan-2015
19-Jan-2015
26-Jan-2015
20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C
C
A
A
C
C
C
A

P-C-BT-0143
P-C-BT-0187
P-C-BT-0296
P-C-BT-0336
P-C-BT-0109
P-C-BT-0168
P-C-BT-0323
P-C-BT-0440

25-Dec-2014
4-Jan-2015
19-Jan-2015
26-Jan-2015
20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015

C-B-BT-0146
C-B-BT-0190
C-B-BT-0299
C-B-BT-0339
C-B-BT-0112
C-B-BT-0171
C-B-BT-0326
C-B-BT-0443

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015
20-Dec-2014
7-Jan-2015

C
B
C
A
C
B

P-C-BT-0109
P-C-BT-0168
P-C-BT-0323
P-C-BT-0440
P-C-BT-0109
P-C-BT-0222

20-Dec-2014
29-Dec-2014
23-Jan-2015
6-Feb-2015
20-Dec-2014
7-Jan-2015

C-B-BT-0112
C-B-BT-0171
C-B-BT-0326
C-B-BT-0443
C-B-BT-0112
C-B-BT-0225

20-Dec-2014
29-Dec-2014
23-Jan-2015
10-Feb-2015

C
C
C
B

P-C-BT-0109
P-C-BT-0168
P-C-BT-0324
P-C-BT-0469

20-Dec-2014
29-Dec-2014
23-Jan-2015
10-Feb-2015

C-B-BT-0112
C-B-BT-0171
C-B-BT-0327
C-B-BT-0472

20-Dec-2014
4-Jan-15
26-Dec-2014
4-Jan-2015
10-Feb-2015

C
B
C
C
C

P-C-BT-0109
P-C-BT-0198
P-C-BT-0146
P-C-BT-0187
P-C-BT-0475

20-Dec-2014
4-Jan-2015
26-Dec-2014
4-Jan-2015
10-Feb-2015

C-B-BT-0112
C-B-BT-0201
C-B-BT-0149
C-B-BT-0190
C-B-BT-0478

26-Dec-2014
25-Dec-2014
4-Jan-2015

C
B
C

P-C-BT-0146
P-C-BT-0135
P-C-BT-0187

26-Dec-2014
25-Dec-2014
4-Jan-2015

C-B-BT-0149
C-B-BT-0138
C-B-BT-0190

24-Dec-2014
4-Jan-2015
29-Jan-2014
9-Feb-2015

C
C
A
A

P-C-BT-0134
P-C-BT-0187
P-C-BT-0369
P-C-BT-0450

24-Dec-2014
4-Jan-2015
29-Jan-2014
9-Feb-2015

C-B-BT-0137
C-B-BT-0190
C-B-BT-0372
C-B-BT-0453

4-Feb-2015
4-Mar-2015
4-Jan-2015

C
A
C

P-C-BT-0401
P-C-BT-0549
P-C-BT-0188

4-Feb-2015
4-Mar-2015
4-Jan-2015

C-B-BT-0404
C-B-BT-0552
C-B-BT-0191

C-P-BT-0106
C-P-BT-0211

MTO for Underground Firewater SWHDPE and GRE Pipes

PAL-1193-MTO-PIP-005

MTO for Special Items

MTO for Aboveground Bulk Pipes & Fittings Material Take


Off

MTO for Insulation Material

Hot Tap Take Off


MTO for Underground Firewater HDPE and GRE Pipes &

20

Submit Date

8-Dec-2014
31-Dec-2014
15-Nov-2014
2-Jan-2015
6-Feb-2015

15

19

Trans. No.

B-C-T-0070
B-C-T-0207
B-C-T-0023
B-C-T-0219
B-C-T-0493

MTO for Access Fitting Assemblies Take Off

PAL-1193-MTO-PIP-008

Status.

25-Nov-2014
30-Dec-2014
6-Nov-2014
2-Jan-2015
5-Feb-2015

PAL-1193-MTO-PIP-004

18

Rec'd Date

A
B
A
B
C

14

PAL-1193-MTO-PIP-007

Trans. No.

2
2
2
2
2

PAL-1193-MTO-PIP-003

17

Renark
Submit Date
28-Jan-2015
6-Feb-2015
8-Dec-2014
29-Dec-2014
11-Feb-2015
19-Nov-2014
2-Jan-2015
15-Jan-2015
21-Jan-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
29-Jan-2015
8-Dec-2014
5-Jan-2015
22-Jan-2015
8-Dec-2014
27-Dec-2014
21-Jan-2015
3-Feb-2015
10 F b 2015
10-Feb-2015

13

Fittings

C-P-BT-0481
C P BT 0548
C-P-BT-0548

C-P-BT-0023
C-P-BT-0224
C-P-BT-0512

& Fittings

3-Mar-2015

B-C-T-0600

4-Mar-2015

C-P-BT-0610

PAL-1193-MTO-PIP-009

MTO for Fire Fighting and Safety Elements

PAL-1193-MTO-PIP-009

MTO for Fire Fighting and Safety Elements

1
1
2
2
3
65
65
77

A
A
B
C
A
B
C
D

6-Nov-2014
25-Nov-2014
2-Jan-2015
10-Feb-2015
28-Nov-2014
2-Jan-2015
27-Jan-2015
5-Feb-2015

B-C-T-0023
B-C-T-0060
B-C-T-0219
B-C-T-0535
B-C-T-0084
B-C-T-0219
B-C-T-0409
B-C-T-0493

15-Nov-2014
28-Nov-2014
2-Jan-2015
10-Feb-2015
28-Nov-2014
2-Jan-2015
28-Jan-2015
6-Feb-2015

C-P-BT-0023
C-P-BT-0076
C-P-BT-0224
C-P-BT-0545
C-P-BT-0079
C-P-BT-0224
C-P-BT-0421
C-P-BT-0512

10
20
6
8
5
5
6
6
5
6
5
4

A
B
A
B
A
A
A
A
A
A
A
A

2-Feb-2015
9-Feb-2015
30-Dec-2014
9-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015
3-Feb-2015

B-C-T-0397
B-C-T-0524
B-C-T-0213
B-C-T-0518
B-C-T-0477
B-C-T-0477
B-C-T-0477
B-C-T-0477
B-C-T-0477
B-C-T-0477
B-C-T-0477
B-C-T-0477

2-Feb-2015
9-Feb-2015
31-Dec-2014
9-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015
4-Feb-2015

C-P-BT-0408
C-P-BT-0535
C-P-BT-0217
C-P-BT-0530
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496
C-P-BT-0496

5
5
5
4
2

A
A
A
A
A

3-Feb-2015
3-Feb-2015
9-Feb-2015
3-Feb-2015
4-Feb-2015

B-C-T-0477
B-C-T-0477
B-C-T-0520
B-C-T-0477
B-C-T-0489

4-Feb-2015
4-Feb-2015
9-Feb-2015
4-Feb-2015
6-Feb-2015

C-P-BT-0496
C-P-BT-0496

C-P-BT-0504

10
3

A
A

13-Feb-2015
8-Jan-2015

B-C-T-0577
B-C-T-0272

13-Feb-2015
8-Jan-2015

C-P-BT-0587
C-P-BT-0276

9-Feb-2015

B-C-T-0518

9-Feb-2015

C-P-BT-0530

PAL-1193-MTO-PIP-015

MTO for Galvanized Pipe and Fitting for Fire Fighting


System

CPECC to BEB

Trans.No.
B-C-T-0409
B-C-T-0493
B-C-T-0070
B-C-T-0193
B-C-T-0548
B-C-T-0040
B-C-T-0219
B-C-T-0330
B-C-T-0362
B-C-T-0070
B-C-T-0188
B-C-T-0368
B-C-T-0426
B-C-T-0528
B-C-T-0070
B-C-T-0188
B-C-T-0368
B-C-T-0426
B-C-T-0070
B-C-T-0243
B-C-T-0371
B-C-T-0070
B-C-T-0188
B-C-T-0369
B-C-T-0467
B C T 0528
B-C-T-0528

MTO for Underground Bulk Pipes & Fittings

From PDOC to CPECC

Date
27-Jan-2015
5-Feb-2015
25-Nov-2014
27-Dec-2014
10-Feb-2015
19-Nov-2014
2-Jan-2015
15-Jan-2015
21-Jan-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
29-Jan-2015
10-Feb-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
29-Jan-2015
25-Nov-2014
5-Jan-2015
22-Jan-2015
25-Nov-2014
26-Dec-2014
21-Jan-2015
2-Feb-2015
10 F b 2015
10-Feb-2015

PAL-1193-MTO-PIP-002

PAL-1193-MTO-PIP-006

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

Rev.
C
0
A
B
C
A
B
C
D
A
B
C
D
0
A
B
C
D
A
B
0
A
B
C
D
0

12

16

2015/3/10

22
24
4
5
5
3
2
2
2
14
17
17
17
17
1
1
1
1
3
3
3
10
7
10
10
10

MTO for Bulk Valves

A- Approved; B -Accepted with Correction

TBE(PIP)
1

PAL-1193-TBE-PIP-001

TBE for Bulk Valves

PAL-1193-TBE-PIP-002

TBE for Underground Pipes & Fittings

4
5
6
7
8
9

PAL-1193-TBE-PIP-003A
PAL-1193-TBE-PIP-003B
PAL-1193-TBE-PIP-003C
PAL-1193-TBE-PIP-003D
PAL-1193-TBE-PIP-003E
PAL-1193-TBE-PIP-003F
PAL-1193-TBE-PIP-003G
PAL-1193-TBE-PIP-004
PAL-1193-TBE-PIP-005A
PAL-1193-TBE-PIP-005B
PAL-1193-TBE-PIP-005C
PAL-1193-TBE-PIP-006
PAL-1193-TBE-PIP-007

10

PAL-1193-TBE-PIP-008

TBE for Aboveground Pipes & Fittings


TBE for Aboveground Pipes & Fittings
TBE for Aboveground Pipes & Fittings
TBE for Aboveground Pipes & Fittings
TBE for Aboveground Pipes & Fittings
TBE for Aboveground Pipes & Fittings
TBE for Aboveground Pipes & Fittings
TBE for Access Fittings Assemblies
TBE for flexible Connection
TBE for Special Items
TBE for Special Items
TBE for Insulation Materials
TBE for Hot Tap
TBE for Underground Firewater HDPE and GRE Pipes &

11

PAL-1193-TBE-PIP-009

12

PAL-1193-TBE-PIP-015

Fittings
TBE for Fire Fighting and Safety Elements
TBE for Galvanized Pipe and Fitting For Fire Fighting
System

Page 6 of 35

C-P-BT-0526
C-P-BT-0496

BT-0240

9-Jan-2015

P-C-BT-0236

9-Jan-2015

C-B-BT-0239

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

A- Approved; B -Accepted with Correction

Status as of:

From BEB to CPECC

Title / Description
Sheet.

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

C-B-BT-0040
C-B-BT-0040
C-B-BT-0040
C-B-BT-0040
C-B-BT-0040
C-B-BT-0040
C-B-BT-0123
C-B-BT-0176
C-B-BT-0216

Data Sheet (PIP)


1
2
3
4
5
6

PAL-1193-DS-PIP-001A
PAL-1193-DS-PIP-001B
PAL-1193-DS-PIP-001C
PAL-1193-DS-PIP-001D
PAL-1193-DS-PIP-001E
PAL-1193-DS-PIP-001F

Datasheet for Ball Valves


Datasheet for GATE Valves
Datasheet for GLOBE Valves
Datasheet for CHECK Valves
Datasheet for NEDDLE Valves
Datasheet for Butterfly Valves

PAL-1193-DS-PIP-001

Datasheet for Ball Valves

10

PAL-1193-DS-PIP-002

PAL-1193-DS-PIP-003

PAL-1193-DS-PIP-004

Datasheet for Gate Valves

Datasheet for Globe Valves

Datasheet for Check Valves

11

PAL-1193-DS-PIP-005

Data sheet for Needle Valves

12

PAL-1193-DS-PIP-006

Data sheet for Butterfly Valves

13

PAL-1193-DS-PIP-007

Data Sheet for Flexible Connection

14

PAL-1193-DS-PIP-008

Data Sheet for Strainer

15

PAL-1193-DS-PIP-009

Data Sheet for Flame Arresters

PAL 1193 DS PIP 009


PAL-1193-DS-PIP-009

D t Sheet
Data
Sh t for
f
Flame
Fl
AArresters
t

PAL-1193-DS-PIP-010

Data Sheet For Corrosion Probe Assembly

16

17

18

PAL-1193-DS-PIP-011

PAL-1193-DS-PIP-012

Data Sheet For Corrosion Coupon Assembly

Data Sheet For Chemical Injection Assembly

19

PAL-1193-DS-PIP-013

20

PAL-1193-DS-PIP-021

21

PAL-1193-DS-PIP-022

Data Sheet for Safety Shower Station

22

PAL-1193-DS-PIP-023

Data Sheet for Foam Chamber and Water Spray Nozzle

Data Sheet For Quick Coupling


Data Sheet for Fire Hydrant, Fire Monitor and Foam Hose
Reel

7
8
7
4
2
3
20
23
22
22
11
11
11
11
7
8
8
8
4
5
4
4
3

A
A
A
A
A
A
B
C
D
0
B
C
D
0
B
C
D
0
B
C
D
0
B

22-Oct-2014
22-Oct-2014
24-Oct-2014
22-Oct-2014
22-Oct-2014
10-Nov-2014
17-Dec-2014
25-Dec-2014
31-Dec-2014
6-Jan-2015
17-Dec-2014
25-Dec-2014
31-Dec-2014
6-Jan-2015
17-Dec-2014
25-Dec-2014
31-Dec-2014
6-Jan-2015
17-Dec-2014
25-Dec-2014
31-Dec-2014
6-Jan-2015
17 D 2014
17-Dec-2014

B-C-T-0003
B-C-T-0003
B-C-T-0008
B-C-T-0003
B-C-T-0003
B-C-T-0033
B-C-T-0148
B-C-T-0174
B-C-T-0223
B-C-T-0256
B-C-T-0148
B-C-T-0174
B-C-T-0223
B-C-T-0255
B-C-T-0148
B-C-T-0174
B-C-T-0223
B-C-T-0255
B-C-T-0148
B-C-T-0174
B-C-T-0223
B-C-T-0256
B C T 0148
B-C-T-0148

14-Nov-2014
14-Nov-2014
14-Nov-2014
14-Nov-2014
14-Nov-2014
14-Nov-2014
19-Dec-2014
25-Dec-2014
5-Jan-2015
6-Jan-2015
19-Dec-2014
25-Dec-2014
5-Jan-2015
6-Jan-2015
19-Dec-2014
25-Dec-2014
5-Jan-2015
6-Jan-2015
19-Dec-2014
25-Dec-2014
5-Jan-2015
6-Jan-2015
19 D 2014
19-Dec-2014

C-P-BT-0017
C-P-BT-0017
C-P-BT-0017
C-P-BT-0017
C-P-BT-0017
C-P-BT-0017
C-P-BT-0149
C-P-BT-0177
C-P-BT-0254
C-P-BT-0256
C-P-BT-0149
C-P-BT-0177
C-P-BT-0254
C-P-BT-0256
C-P-BT-0149
C-P-BT-0177
C-P-BT-0254
C-P-BT-0256
C-P-BT-0149
C-P-BT-0177
C-P-BT-0254
C-P-BT-0256
C
C-P-BT-0149

8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22 D 2014
22-Dec-2014

C
C
C
C
C
C
C
C
A
A
C
C
A
A
C
C
A
A
C
C
A
A
C

P-C-BT-0037
P-C-BT-0037
P-C-BT-0037
P-C-BT-0037
P-C-BT-0037
P-C-BT-0037
P-C-BT-0120
P-C-BT-0173
P-C-BT-0213
P-C-BT-0234
P-C-BT-0120
P-C-BT-0173
P-C-BT-0213
P-C-BT-0234
P-C-BT-0120
P-C-BT-0173
P-C-BT-0213
P-C-BT-0234
P-C-BT-0120
P-C-BT-0173
P-C-BT-0213
P-C-BT-0234
C
P-C-BT-0120

8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
8-Dec-2014
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22-Dec-2014
29-Dec-2014
6-Jan-2015
8-Jan-2015
22 D 2014
22-Dec-2014

3
3
3
3
3
3
3
12
11
18
18
4
4
4
5
5
6
5

C
0
1
B
C
D
0
A
0
1
2
A
0
1
A
B
C
0

25-Dec-2014
30-Dec-2014
5-Jan-2015
17-Dec-2014
25-Dec-2014
6-Jan-2015
7-Jan-2015
27-Nov-2014
14-Jan-2015
2-Feb-2015
9-Feb-2015
24-Nov-2014
31-Dec-2014
4-Feb-2015
24-Nov-2014
29-Dec-2014
9-Jan-2015
22-Jan-2015

B-C-T-0174
B-C-T-0214
B-C-T-0237
B-C-T-0148
B-C-T-0174
B-C-T-0257
B-C-T-0268
B-C-T-0069
B-C-T-0321
B-C-T-0466
B-C-T-0519
B-C-T-0061
B-C-T-0218
B-C-T-0491
B-C-T-0061
B-C-T-0202
B-C-T-0287
B-C-T-0372

25-Dec-2014
31-Dec-2014
5-Jan-2015
19-Dec-2014
25-Dec-2014
6-Jan-2015
7-Jan-2015
27-Nov-2014
14-Jan-2015
3-Feb-2015
9-Feb-2015
28-Nov-2014
31-Dec-2014
6-Feb-2015
28-Nov-2014
30-Dec-2014
9-Jan-2015
22-Jan-2015

29-Dec-2014
31-Dec-2014
6-Jan-2015
22-Dec-2014
29-Dec-2014
7-Jan-2015
7-Jan-2015
25-Dec-2014
20-Jan-2015
6-Feb-2015

A
B
A
C
C
B
A
A
A
C

P-C-BT-0173
P-C-BT-0184
P-C-BT-0214
P-C-BT-0120
P-C-BT-0173
P-C-BT-0220
P-C-BT-0229
P-C-BT-0141
P-C-BT-0310
P-C-BT-0414

29-Dec-2014
31-Dec-2014
6-Jan-2015
22-Dec-2014
29-Dec-2014
7-Jan-2015
7-Jan-2015
25-Dec-2014
20-Jan-2015
6-Feb-2015

C-B-BT-0176
C-B-BT-0187
C-B-BT-0217
C-B-BT-0123
C-B-BT-0176
C-B-BT-0223
C-B-BT-0232
C-B-BT-0144

25-Dec-2014
4-Jan-2015
7-Feb-2015
25-Dec-2014
4-Jan-2015
19-Jan-2015
23-Jan-2015

B
C
A
B
A
B
A

P-C-BT-0140
P-C-BT-0200
P-C-BT-0448
P-C-BT-0140
P-C-BT-0196
P-C-BT-0301
P-C-BT-0320

25-Dec-2014
4-Jan-2015
7-Feb-2015
25-Dec-2014
4-Jan-2015
19-Jan-2015
23-Jan-2015

C-B-BT-0143
C-B-BT-0203
C-B-BT-0451
C-B-BT-0143
C-B-BT-0199
C-B-BT-0304
C-B-BT-0323

20-Nov-2014
20
Nov 2014

BB-C-T-0049
C T 0049

21-Nov-2014
21
Nov 2014

C-P-BT-0177
C-P-BT-0218
C-P-BT-0241
C-P-BT-0149
C-P-BT-0177
C-P-BT-0260
C-P-BT-0271
C-P-BT-0070
C-P-BT-0322
C-P-BT-0480
C-P-BT-0531
C-P-BT-0078
C-P-BT-0222
C-P-BT-0506
C-P-BT-0078
C-P-BT-0204
C-P-BT-0290
C-P-BT-0374
C-P-BT-0049

2
3
3
2
3
3
3
3
3
4
4
4
6
6
6
2
2
2
4
4
4

A
B
0
A
B
0
A
B
0
A
B
0
A
0
1
A
0
1
A
0
1

22-Nov-2014
30-Dec-2014
20-Jan-2015
22-Nov-2014
30-Dec-2014
20-Jan-2015
22-Nov-2014
30-Dec-2014
20-Jan-2015
22-Nov-2014
30-Dec-2014
29-Jan-2015
25-Nov-2014
2-Jan-2015
28-Jan-2015
25-Nov-2014
2-Jan-2015
21-Jan-2015
25-Nov-2014
2-Jan-2015
19-Jan-2015

B-C-T-0054
B-C-T-0207
B-C-T-0357
B-C-T-0054
B-C-T-0207
B-C-T-0357
B-C-T-0054
B-C-T-0207
B-C-T-0357
B-C-T-0054
B-C-T-0207
B-C-T-0428
B-C-T-0060
B-C-T-0219
B-C-T-0418
B-C-T-0060
B-C-T-0219
B-C-T-0363
B-C-T-0060
B-C-T-0219
B-C-T-0353

22-Nov-2014
31-Dec-2014
20-Jan-2015
22-Nov-2014
31-Dec-2014
20-Jan-2015
22-Nov-2014
31-Dec-2014
20-Jan-2015
22-Nov-2014
31-Dec-2014
29-Jan-2015
28-Nov-2014
2-Jan-2015
28-Jan-2015
28-Nov-2014
2-Jan-2015
2-Feb-2015
28-Nov-2014
2-Jan-2015
19-Jan-2015

25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
4-Feb-2015
25-Dec-2014
4-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
20-Jan-2015

A
B
A
A
B
A
A
B
A
A
B
A
B
C
C
B
C
A
B
C
A

P-C-BT-0139
P-C-BT-0198
P-C-BT-0349
P-C-BT-0139
P-C-BT-0198
P-C-BT-0349
P-C-BT-0139
P-C-BT-0198
P-C-BT-0349
P-C-BT-0139
P-C-BT-0198
P-C-BT-0441
P-C-BT-0135
P-C-BT-0187
P-C-BT-0400
P-C-BT-0135
P-C-BT-0187
P-C-BT-0442
P-C-BT-0135
P-C-BT-0187
P-C-BT-0311

25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
29-Jan-2015
25-Dec-2014
4-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
4-Feb-2015
25-Dec-2014
4-Jan-2015
6-Feb-2015
25-Dec-2014
4-Jan-2015
20-Jan-2015

C-B-BT-0142
C-B-BT-0201
C-B-BT-0352
C-B-BT-0142
C-B-BT-0201
C-B-BT-0352
C-B-BT-0142
C-B-BT-0201
C-B-BT-0352
C-B-BT-0142
C-B-BT-0201
C-B-BT-0444
C-B-BT-0138
C-B-BT-0190
C-B-BT-0403
C-B-BT-0138
C-B-BT-0190
C-B-BT-0445
C-B-BT-0138
C-B-BT-0190

Page 7 of 35

C-P-BT-0054
C-P-BT-0211
C-P-BT-0354
C-P-BT-0054
C-P-BT-0211
C-P-BT-0354
C-P-BT-0054
C-P-BT-0211
C-P-BT-0354
C-P-BT-0054
C-P-BT-0211
C-P-BT-0440
C-P-BT-0076
C-P-BT-0224
C-P-BT-0430
C-P-BT-0076
C-P-BT-0224
C-P-BT-0365
C-P-BT-0076
C-P-BT-0224
C-P-BT-0346

C-B-BT-0237
C-B-BT-0123
C-B-BT-0176
C-B-BT-0216
C-B-BT-0237
C-B-BT-0123
C-B-BT-0176
C-B-BT-0216
C-B-BT-0237
C-B-BT-0123
C-B-BT-0176
C-B-BT-0216
C-B-BT-0237
C B BT 0123
C-B-BT-0123

C-B-BT-0313
C-B-BT-0417

C-B-BT-0314
PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

23

PAL-1193-DS-PIP-024

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

Data Sheet for Extinguisher

4
4
4

A
0
1

25-Nov-2014
2-Jan-2015
21-Jan-2015

B-C-T-0060
B-C-T-0219
B-C-T-0363

28-Nov-2014
2-Jan-2015
2-Feb-2015

C-P-BT-0076
C-P-BT-0224
C-P-BT-0365

25-Dec-2014
4-Jan-2015
6-Feb-2015

B
C
A

P-C-BT-0135
P-C-BT-0187
P-C-BT-0442

25-Dec-2014
4-Jan-2015
6-Feb-2015

C-B-BT-0138
C-B-BT-0190
C-B-BT-0445

Wall Thickness Calculation Report

13
12
12
12
12

A
B
C
D
0

7-Nov-2014
24-Nov-2014
5-Jan-2015
20-Jan-2015
4-Feb-2015

B-C-T-0025
B-C-T-0059
B-C-T-0240
B-C-T-0348
B-C-T-0478

11-Nov-2014
27-Nov-2014
5-Jan-2015
20-Jan-2015
5-Feb-2015

C-P-BT-0013
C-P-BT-0068
C-P-BT-0236
C-P-BT-0361
C-P-BT-0499

15-Nov-2014
24-Dec-2014
7-Jan-2015
2-Feb-2015
6-Feb-2015

A
C
C
A
B

P-C-BT-0007
P-C-BT-0131
P-C-BT-0218
P-C-BT-0391
P-C-BT-0420

15-Nov-2014
24-Dec-2014
7-Jan-2015
2-Feb-2015
6-Feb-2015

C-B-BT-0009
C-B-BT-0134
C-B-BT-0221
C-B-BT-0394
C-B-BT-0423

131
7
27
29
29
34
34
33
5

A
A
A
0
1
A
0
1
A

10-Feb-2015
9-Feb-2015
5-Jan-2015
22-Jan-2015
3-Feb-2015
31-Oct-2014
28-Nov-2014
5-Feb-2015
6-Nov-2014

B-C-T-0543
B-C-T-0520
B-C-T-0225
B-C-T-0379
B-C-T-0484
B-C-T-0017
B-C-T-0077
B-C-T-0501
B-C-T-0023

10-Feb-2015
9-Feb-2015
5-Jan-2015
22-Jan-2015
5-Feb-2015
11-Nov-2014
29-Nov-2014
6-Feb-2015
15-Nov-2014

C-P-BT-0538
C-P-BT-0526
C-P-BT-0233
C-P-BT-0381
C-P-BT-0502
C-P-BT-0012
C-P-BT-0086
C-P-BT-0517
C-P-BT-0023

16-Jan-2015
27-Jan-2015

B
A

P-C-BT-0287
P-C-BT-0344

16-Jan-2015
27-Jan-2015

C-B-BT-0290
C-B-BT-0347

15-Nov-2014
25-Dec-2014

A
C

P-C-BT-0006
P-C-BT-0142

15-Nov-2014
25-Dec-2014

C-B-BT-0008
C-B-BT-0145

26-Dec-2014

P-C-BT-0146

26-Dec-2014

C-B-BT-0149

Plot Plan

1
1

A
0

Equipment Location Key Plan

1
1

A
B

13 N 2014
13-Nov-2014
6-Feb-2015
28-Feb-2015
4-Jan-2015
7-Feb-2015

C
B BT 0005
C-B-BT-0005
C-B-BT-0419
C-B-BT-0537
C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7 Feb 2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7 Feb 2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449
C
B BT 0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Equipment Location Plan

1
1

A
B

C
C-P-BT-0006
C-P-BT-0462
C-P-BT-0602
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437

C
P-C-BT-0003
P-C-BT-0416
P-C-BT-0534
P-C-BT-0192
P-C-BT-0446

A
B

7 N 2014
7-Nov-2014
2-Feb-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
29
Jan 2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015

A
C
C
C
B

B
C T 0006
B-C-T-0006
B-C-T-0447
B-C-T-0592
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B
C T 0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425

11 N 2014
11-Nov-2014
6-Feb-2015
28-Feb-15
4-Jan-2015
7-Feb-2015

1
1

24
O t 2014
24-Oct-2014
31-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
29
Jan 2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

Calculation (PIP)

PAL-1193-CAL-PIP-002

to JUBA

Specification
1

PAL-1193-RP-PIP-001
PAL-1193-RP-PIP-002

Stress analysis Report


Stress Critical Line List

PAL-1193-RP-PIP-011

Material Selection Modifed Report

PAL-1193-SP-PIP-001

Specification for Piping Materials

PAL-1193-SCH-PIP-001

Fire Fighting System Speciality List

to JUBA

Drawing (PIP)

10

11

12

13

14

PAL-1193-DWG-PIP-4000-01

PAL-1193-DWG-PIP-4001-1/1

PAL-1193-DWG-PIP-4002-1/1

PAL-1193-DWG-PIP-4003-1/1

PAL-1193-DWG-PIP-4004-1/1

PAL-1193-DWG-PIP-4005-1/1

PAL-1193-DWG-PIP-4006-1/1
PAL
1193 DWG PIP 4006 1/1

PAL-1193-DWG-PIP-4007-1/1

PAL-1193-DWG-PIP-4008-1/1

PAL-1193-DWG-PIP-4009-1/1

PAL-1193-DWG-PIP-4010-1/1

PAL-1193-DWG-PIP-4011-1/1

PAL-1193-DWG-PIP-4012-1/1

PAL-1193-DWG-PIP-4013-1/1

Page 8 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

15

16

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0115
B-C-T-0425
B-C-T-0582
B-C-T-0593
B-C-T-0195

15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
15-Feb-2015
29-Dec-2014

C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0117
C-P-BT-0437
C-P-BT-0593
C-P-BT-0603
C-P-BT-0196

Equipment Location Plan

1
1

A
B

PAL-1193-DWG-PIP-4015-1/1

Equipment Location Plan

1
1

A
B

PAL-1193-DWG-PIP-4100-01

TIE-IN LAYOUT PLAN

15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
11-Dec-2014
29-Jan-2015
15-Feb-2015
15-Feb-2015
27-Dec-2014

PAL-1193-DWG-PIP-4014-1/1

A- Approved; B -Accepted with Correction

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

4-Jan-2015
7-Feb-2015

C
B

P-C-BT-0192
P-C-BT-0446

4-Jan-2015
7-Feb-2015

C-B-BT-0195
C-B-BT-0449

28-Feb-15
31-Dec-2014

C
C

P-C-BT-0535
P-C-BT-0177

28-Feb-2015
31-Dec-2014

C-B-BT-0538
C-B-BT-0180

17

PAL-1193-DWG-PIP-4101-01

Underground Piping Key Plan

18

PAL-1193-DWG-PIP-4201-01

Underground Piping General Arrangement -Area 01

19

PAL-1193-DWG-PIP-4202-01

Underground Piping General Arrangement -Area 02

20

PAL-1193-DWG-PIP-4203-01

Underground Piping General Arrangement -Area 03

21

PAL-1193-DWG-PIP-4204-01

Underground Piping General Arrangement -Area 04

22

PAL-1193-DWG-PIP-4205-01

Underground Piping General Arrangement -Area 05

23

PAL-1193-DWG-PIP-4206-01

Underground Piping General Arrangement -Area 06

24

PAL-1193-DWG-PIP-4207-01

Underground Piping General Arrangement -Area 07

25

PAL-1193-DWG-PIP-4208-01

Underground
Piping
-Area 08
g
p g General Arrangement
g

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B

27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11 F b 2014
11-Feb-2014

B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B C T 0561
B-C-T-0561

29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11 F b 2015
11-Feb-2015

C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C
C-P-BT-0571

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2 M 2015
2-Mar-2015

C
C
C
B
C
B
C
B
C
B
C
B
C
B
C
B

P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
C
P-C-BT-0544

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2 M 2015
2-Mar-2015

C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C B BT 0547
C-B-BT-0547

26

PAL-1193-DWG-PIP-4209-01

Underground Piping General Arrangement -Area 09

27

PAL-1193-DWG-PIP-4210-01

Underground Piping General Arrangement -Area 10

28

PAL-1193-DWG-PIP-4211-01

Underground Piping General Arrangement -Area 11

29

PAL-1193-DWG-PIP-4212-01

Underground Piping General Arrangement -Area 12

30

PAL-1193-DWG-PIP-4213-01

Underground Piping General Arrangement -Area 13

31

PAL-1193-DWG-PIP-4214-01

Underground Piping General Arrangement -Area 14

32

PAL-1193-DWG-PIP-4215-01

Underground Piping General Arrangement -Area 15

33

PAL-1193-DWG-PIP-4216-01

Underground Piping General Arrangement -Area 16

34

PAL-1193-DWG-PIP-4217-01

Underground Piping General Arrangement -Area 17

35

PAL-1193-DWG-PIP-4218-01

Underground Piping General Arrangement -Area 18

36

PAL-1193-DWG-PIP-4219-01

Underground Piping General Arrangement -Area 19

37

PAL-1193-DWG-PIP-4220-01

Underground Piping General Arrangement -Area 20

38

PAL-1193-DWG-PIP-4221-01

Underground Piping General Arrangement -Area 21

39

PAL-1193-DWG-PIP-4222-01

Underground Piping General Arrangement -Area 22

40

PAL-1193-DWG-PIP-4223-01

Underground Piping General Arrangement -Area 23

41

PAL-1193-DWG-PIP-4224-01

Underground Piping General Arrangement -Area 24

42

PAL-1193-DWG-PIP-4225-01

Underground Piping General Arrangement -Area 25

43

PAL-1193-DWG-PIP-4226-01

Underground Piping General Arrangement -Area 26

44

PAL-1193-DWG-PIP-4227-01

Underground Piping General Arrangement -Area 27

45

PAL-1193-DWG-PIP-4228-01

Underground Piping General Arrangement -Area 28

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B

27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
27
Dec 2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014

B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B
C T 0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561

29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
29
Dec 2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015

C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
31
Dec 2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015

C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B

P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
31
Dec 2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015

C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C
B BT 0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547

Page 9 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B

27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11 F b 2014
11-Feb-2014

B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B C T 0561
B-C-T-0561

29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11 F b 2015
11-Feb-2015

C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C
C-P-BT-0571

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2 M 2015
2-Mar-2015

C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B
C
B

P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
C
P-C-BT-0544

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2 M 2015
2-Mar-2015

C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C B BT 0547
C-B-BT-0547

1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
B
A
B
A
B
A
B
A
B
A
B
A
A

27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
27-Dec-2014
11-Feb-2014
11-Feb-2014
11-Feb-2014

B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0195
B-C-T-0561
B-C-T-0561
B-C-T-0561

29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
29-Dec-2014
11-Feb-2015
11-Feb-2015
11-Feb-2015

C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0196
C-P-BT-0571
C-P-BT-0571
C-P-BT-0571

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
2-Mar-2015
2-Mar-2015

C
B
C
B
C
B
C
B
C
B
C
B
B
B

P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0177
P-C-BT-0544
P-C-BT-0544
P-C-BT-0544

31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
31-Dec-2014
2-Mar-2015
2-Mar-2015
2-Mar-2015

C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0180
C-B-BT-0547
C-B-BT-0547
C-B-BT-0547

Underground Piping Details

2
2

Valve Pit Details

20-Nov-2014
11-Feb-2015
20-Nov-2014
20
Nov 2014
30-Dec-2014
23-Jan-2015
29-Jan-2015
10-Feb-2015
3-Mar-2015
21-Nov-2014
16-Jan-2015
20-Jan-2015
23-Jan-2015
11-Feb-2015
3-Mar-2015
23-Dec-2014

B-C-T-0041
B-C-T-0566
B-C-T-0041
B
C T 0041
B-C-T-0211
B-C-T-0382
B-C-T-0435
B-C-T-0527
B-C-T-0603
B-C-T-0056
B-C-T-0332
B-C-T-0358
B-C-T-0381
B-C-T-0559
B-C-T-0603
B-C-T-0168

21-Nov-2014
12-Feb-2015
21-Nov-2014
21
Nov 2014
31-Dec-2014
23-Jan-2015
29-Jan-2015
10-Feb-2014
4-Mar-2015
22-Nov-2014
16-Jan-2015
20-Jan-2015
23-Jan-2015
11-Feb-2015
4-Mar-2015
24-Dec-2014

C-P-BT-0050
C-P-BT-0577
C-P-BT-0050
C-P-BT-0215
C-P-BT-0392
C-P-BT-0448
C-P-BT-0547
C-P-BT-0613
C-P-BT-0055
C-P-BT-0333
C-P-BT-0358
C-P-BT-0391
C-P-BT-0569
C-P-BT-0613
C-P-BT-0170

8-Dec-2014
2-Mar-2015
8-Dec-2014
8
Dec 2014
31-Dec-2014
27-Jan-2015
2-Feb-2015
28-Feb-15

A
C
A
C
C
B
C

P-C-BT-0042
P-C-BT-0541
P-C-BT-0042
P-C-BT-0178
P-C-BT-0348
P-C-BT-0392
P-C-BT-0536

8-Dec-2014
2-Mar-2015
8-Dec-2014
8
Dec 2014
31-Dec-2014
27-Jan-2015
2-Feb-2015
28-Feb-2015

C-B-BT-0045
C-B-BT-0544
C-B-BT-0045
C
B BT 0045
C-B-BT-0181
C-B-BT-0351
C-B-BT-0395
C-B-BT-0539

1
1
1
1
1
1
1

A
0
A
B
C
D
E
F
A
B
0
1
2
A
A

29-Dec-2014
19-Jan-2015
21-Jan-2015
26-Jan-2015
2-Mar-2015

C
A
B
B
A

P-C-BT-0160
P-C-BT-0305
P-C-BT-0316
P-C-BT-0338
P-C-BT-0542

29-Dec-2014
19-Jan-2015
21-Jan-2015
26-Jan-2015
2-Mar-2015

C-B-BT-0163
C-B-BT-0308
C-B-BT-0319
C-B-BT-0341
C-B-BT-0545

5-Jan-2015

P-C-BT-0208

5-Jan-2015

C-B-BT-0211

1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A

2-Feb-2014
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015

B-C-T-0436
B-C-T-0228
B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0228

3-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015

C-P-BT-0449
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237

28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015

C
C
C
C
C
C
C
C

P-C-BT-0539
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277

28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015

C-B-BT-0542
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280

PAL-1193-DWG-PIP-4229-01

Underground Piping General Arrangement -Area 29

47

PAL-1193-DWG-PIP-4230-01

Underground Piping General Arrangement -Area 30

48

PAL-1193-DWG-PIP-4231-01

Underground Piping General Arrangement -Area 31

49

PAL-1193-DWG-PIP-4232-01

Underground Piping General Arrangement -Area 32

50

PAL-1193-DWG-PIP-4233-01

Underground Piping General Arrangement -Area 33

51

PAL-1193-DWG-PIP-4234-01

Underground Piping General Arrangement -Area 34

52

PAL-1193-DWG-PIP-4235-01

Underground Piping General Arrangement -Area 35

53

PAL-1193-DWG-PIP-4236-01

Underground Piping General Arrangement -Area 36

54

PAL-1193-DWG-PIP-4237-01

Underground Piping General Arrangement -Area 37

55

PAL-1193-DWG-PIP-4238-01

Underground Piping General Arrangement -Area 38

56

PAL-1193-DWG-PIP-4239-01

Underground Piping General Arrangement -Area 39

57

PAL-1193-DWG-PIP-4240-01

Underground Piping General Arrangement -Area 40

58

PAL-1193-DWG-PIP-4241-01

Underground
Piping
-Area 41
g
p g General Arrangement
g

59

PAL-1193-DWG-PIP-4242-01

Underground Piping General Arrangement -Area 42

60

PAL-1193-DWG-PIP-4243-01

Underground Piping General Arrangement -Area 43

61

PAL-1193-DWG-PIP-4244-01

Underground Piping General Arrangement -Area 44

62

PAL-1193-DWG-PIP-4245-01

Underground Piping General Arrangement -Area 45

63

PAL-1193-DWG-PIP-4246-01

Underground Piping General Arrangement -Area 46

64

PAL-1193-DWG-PIP-4247-01

Underground Piping General Arrangement -Area 47

65
66
67
68

PAL-1193-DWG-PIP-4248-01
PAL-1193-DWG-PIP-4249-01
PAL-1193-DWG-PIP-4250-01
PAL-1193-DWG-PIP-4251-01

Underground Piping General Arrangement -Area 49


Underground Piping General Arrangement -Area 50
Underground Piping General Arrangement -Area 51
Outside Plant Open Drain Pipe Layout

69

PAL-1193-DWG-PIP-4252-01

70

PAL-1193-DWG-PIP-4253-01

72

2015/3/10

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

46

71

A- Approved; B -Accepted with Correction

PAL-1193-DWG-PIP-4254-01

Fire Fighting Equipment and Extinguisher Layout

PAL-1193-DWG-PIP-4255

Layout of Valve Pits for Fire Fighting System

PAL-1193-DWG-PIP-4102-01

Key Plan of Aboveground Piping General Arrangement

73

PAL-1193-DWG-PIP-4300-01

Aboveground Piping General Arrangement Drawing

74

PAL-1193-DWG-PIP-4301-01

Aboveground Piping General Arrangement Drawing

75

PAL-1193-DWG-PIP-4302-01

Aboveground Piping General Arrangement Drawing

76

PAL-1193-DWG-PIP-4303-01

Aboveground Piping General Arrangement Drawing

Page 10 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

76

PAL-1193-DWG-PIP-4303-01

Aboveground Piping General Arrangement Drawing

77

PAL-1193-DWG-PIP-4304-01

Aboveground Piping General Arrangement Drawing

78

PAL-1193-DWG-PIP-4305-01

Aboveground Piping General Arrangement Drawing

79

PAL-1193-DWG-PIP-4306-01
PAL 1193 DWG PIP 4306 01

Aboveground Piping General Arrangement Drawing

80

PAL-1193-DWG-PIP-4307-01

Aboveground Piping General Arrangement Drawing

81

PAL-1193-DWG-PIP-4308-01

Aboveground Piping General Arrangement Drawing

82

PAL-1193-DWG-PIP-4309-01

Aboveground Piping General Arrangement Drawing

83

PAL-1193-DWG-PIP-4310-01

Aboveground Piping General Arrangement Drawing

84

PAL-1193-DWG-PIP-4311-01

Aboveground Piping General Arrangement Drawing

85

PAL-1193-DWG-PIP-4312-01

Aboveground Piping General Arrangement Drawing

86

PAL-1193-DWG-PIP-4313-01

Aboveground Piping General Arrangement Drawing

87

PAL-1193-DWG-PIP-4314-01

Aboveground Piping General Arrangement Drawing

88

PAL-1193-DWG-PIP-4315-01

Aboveground Piping General Arrangement Drawing

89

PAL-1193-DWG-PIP-4316-01

Aboveground Piping General Arrangement Drawing

90

PAL-1193-DWG-PIP-4317-01

Aboveground Piping General Arrangement Drawing

91

PAL-1193-DWG-PIP-4318-01

Aboveground Piping General Arrangement Drawing

92

PAL-1193-DWG-PIP-4319-01

Aboveground Piping General Arrangement Drawing

93

PAL-1193-DWG-PIP-4320-01

Aboveground Piping General Arrangement Drawing

94

PAL-1193-DWG-PIP-4321-01

Aboveground Piping General Arrangement Drawing

95

PAL-1193-DWG-PIP-4322-01

Aboveground Piping General Arrangement Drawing

96

PAL-1193-DWG-PIP-4322-02

Aboveground Piping General Arrangement Drawing

97

PAL-1193-DWG-PIP-4323-01

Aboveground Piping General Arrangement Drawing

98

PAL-1193-DWG-PIP-4323-02

Aboveground Piping General Arrangement Drawing

99

PAL-1193-DWG-PIP-4324-01

Aboveground Piping General Arrangement Drawing

100

PAL-1193-DWG-PIP-4324-02

Aboveground Piping General Arrangement Drawing

101

PAL-1193-DWG-PIP-4325-01

Aboveground Piping General Arrangement Drawing

PAL-1193-DWG-PIP-4325-02

Aboveground Piping General Arrangement Drawing

102

PAL-1193-DWG-PIP-4326-01

Aboveground Piping General Arrangement Drawing

103

PAL-1193-DWG-PIP-4327-01

Aboveground Piping General Arrangement Drawing

104

PAL-1193-DWG-PIP-4328-01

Aboveground Piping General Arrangement Drawing

105

PAL-1193-DWG-PIP-4328-02

Aboveground Piping General Arrangement Drawing

106

PAL-1193-DWG-PIP-4329-01

Aboveground Piping General Arrangement Drawing

107

PAL-1193-DWG-PIP-4329-02

Aboveground Piping General Arrangement Drawing

108

PAL-1193-DWG-PIP-4330-01

Aboveground Piping General Arrangement Drawing

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A

10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15 J 2015
15-Jan-2015

B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0228
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B C T 0325
B-C-T-0325

10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15 J 2015
15-Jan-2015

C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0237
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C
C-P-BT-0326

28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20 J 2015
20-Jan-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0277
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
C
P-C-BT-0314

28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20 J 2015
20-Jan-2015

C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0280
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C B BT 0317
C-B-BT-0317

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B

10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
2
Feb 2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014

B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B
C T 0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436

10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
3
Feb 2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015

C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449

28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
28
Feb 15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539

28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
28
Feb 2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015

C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C
B BT 0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542

1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A

2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
10-Feb-2015
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015

B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325

3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015

C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326

28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314

28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015

C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317

Page 11 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

108

PAL-1193-DWG-PIP-4330-01

Aboveground Piping General Arrangement Drawing

109

PAL-1193-DWG-PIP-4330-02

Aboveground Piping General Arrangement Drawing

110

PAL-1193-DWG-PIP-4331-01

Aboveground Piping General Arrangement Drawing

111

PAL-1193-DWG-PIP-4332-01
PAL 1193 DWG PIP 4332 01

Aboveground Piping General Arrangement Drawing

112

PAL-1193-DWG-PIP-4333-01

Aboveground Piping General Arrangement Drawing

113

PAL-1193-DWG-PIP-4334-01

Aboveground Piping General Arrangement Drawing

114

PAL-1193-DWG-PIP-4335-01

Aboveground Piping General Arrangement Drawing

115

PAL-1193-DWG-PIP-4336-01

Aboveground Piping General Arrangement Drawing

116

PAL-1193-DWG-PIP-4336-02

Aboveground Piping General Arrangement Drawing

117

PAL-1193-DWG-PIP-4337-01

Aboveground Piping General Arrangement Drawing

118

PAL-1193-DWG-PIP-4337-02

Aboveground Piping General Arrangement Drawing

119

PAL-1193-DWG-PIP-4338-01

Aboveground Piping General Arrangement Drawing

120

PAL-1193-DWG-PIP-4339-01

Aboveground Piping General Arrangement Drawing

121

PAL-1193-DWG-PIP-4340-01

Aboveground Piping General Arrangement Drawing

122

PAL-1193-DWG-PIP-4340-02

Aboveground Piping General Arrangement Drawing

123

PAL-1193-DWG-PIP-4341-01

Aboveground Piping General Arrangement Drawing

124

PAL-1193-DWG-PIP-4342-01

Aboveground Piping General Arrangement Drawing

125

PAL-1193-DWG-PIP-4343-01

Aboveground Piping General Arrangement Drawing

126

PAL-1193-DWG-PIP-4344-01

Aboveground Piping General Arrangement Drawing

127

PAL-1193-DWG-PIP-4345-01

Aboveground Piping General Arrangement Drawing

128

PAL-1193-DWG-PIP-4346-01

Aboveground Piping General Arrangement Drawing

129

PAL-1193-DWG-PIP-4347-01

Aboveground Piping General Arrangement Drawing

130

PAL-1193-DWG-PIP-4348-01

Aboveground Piping General Arrangement Drawing

131

PAL-1193-DWG-PIP-4349-01

Aboveground Piping General Arrangement Drawing

132

PAL-1193-DWG-PIP-4350-01

Aboveground Piping General Arrangement Drawing

133

PAL-1193-DWG-PIP-4351-01

Aboveground Piping General Arrangement Drawing

134

PAL-1193-DWG-PIP-4352-01

Aboveground Piping General Arrangement Drawing

135

PAL-1193-DWG-PIP-4353-01

Aboveground Piping General Arrangement Drawing

136

PAL-1193-DWG-PIP-4354-01

Aboveground Piping General Arrangement Drawing

137

PAL-1193-DWG-PIP-4355-01

Aboveground Piping General Arrangement Drawing

138

PAL-1193-DWG-PIP-4356-01

Aboveground Piping General Arrangement Drawing

139

PAL-1193-DWG-PIP-4357-01

Aboveground Piping General Arrangement Drawing

140

PAL-1193-DWG-PIP-4358-01

Aboveground Piping General Arrangement Drawing

141

PAL-1193-DWG-PIP-4359-01

Aboveground Piping General Arrangement Drawing

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A

2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
2-Feb-2014
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15 J 2015
15-Jan-2015

B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0436
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B C T 0325
B-C-T-0325

3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15 J 2015
15-Jan-2015

C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0449
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C
C-P-BT-0326

28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20 J 2015
20-Jan-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0539
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
C
P-C-BT-0314

28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20 J 2015
20-Jan-2015

C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0542
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C B BT 0317
C-B-BT-0317

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A

10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
10
Feb 2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015

B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B
C T 0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249

10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
10
Feb 2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015

C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257

28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
28
Feb 15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276

28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
28
Feb 2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015

C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C
B BT 0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279

Page 12 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

141

PAL-1193-DWG-PIP-4359-01

Aboveground Piping General Arrangement Drawing

142

PAL-1193-DWG-PIP-4360-01

Aboveground Piping General Arrangement Drawing

143

PAL-1193-DWG-PIP-4361-01

Aboveground Piping General Arrangement Drawing

144

PAL-1193-DWG-PIP-4362-01
PAL 1193 DWG PIP 4362 01

Aboveground Piping General Arrangement Drawing

145

PAL-1193-DWG-PIP-4363-01

Aboveground Piping General Arrangement Drawing

146

PAL-1193-DWG-PIP-4364-01

Aboveground Piping General Arrangement Drawing

147

PAL-1193-DWG-PIP-4365-01

Aboveground Piping General Arrangement Drawing

148

PAL-1193-DWG-PIP-4366-01

Aboveground Piping General Arrangement Drawing

149

PAL-1193-DWG-PIP-4367-01

Aboveground Piping General Arrangement Drawing

150

PAL-1193-DWG-PIP-4368-01

Aboveground Piping General Arrangement Drawing

151

PAL-1193-DWG-PIP-4369-01

Aboveground Piping General Arrangement Drawing

152

PAL-1193-DWG-PIP-4370-01

Aboveground Piping General Arrangement Drawing

153

PAL-1193-DWG-PIP-4371-01

Aboveground Piping General Arrangement Drawing

154

PAL-1193-DWG-PIP-4372-01

Aboveground Piping General Arrangement Drawing

155

PAL-1193-DWG-PIP-4373-01

Aboveground Piping General Arrangement Drawing

156

PAL-1193-DWG-PIP-4374-01

Aboveground Piping General Arrangement Drawing

157

PAL-1193-DWG-PIP-4375-01

Aboveground Piping General Arrangement Drawing

158

PAL-1193-DWG-PIP-4376-01

Aboveground Piping General Arrangement Drawing

159

PAL-1193-DWG-PIP-4377-01

Aboveground Piping General Arrangement Drawing

160

PAL-1193-DWG-PIP-4378-01

Aboveground Piping General Arrangement Drawing

161

PAL-1193-DWG-PIP-4379-01

Aboveground Piping General Arrangement Drawing

162

PAL-1193-DWG-PIP-4380-01

Aboveground Piping General Arrangement Drawing

163
164
165
166

PAL-1193-DWG-PIP-4384
PAL-1193-DWG-PIP-4385
PAL-1193-DWG-PIP-4390-01
PAL-1193-DWG-PIP-4391-02
PAL-1193-DWG-PIP-4392-01

ISOmetric Drawings
ISOmetric Drawings
ISOmetric Drawings
ISOmetric Drawings
Fire Loop & Distribution Layout

167

PAL-1193-DWG-PIP-4393-01

168

PAL-1193-DWG-PIP-4394-01

Fire Protection System for Sedimentation Tank T-2302A


Arrangement
Fire Protection System for Sedimentation Tank T-2302B
Arrangement

169

PAL-1193-DWG-PIP-4395-01

Aboveground Piping General Arrangement Drawing-1

170

PAL-1193-DWG-PIP-4396-01

Aboveground Piping General Arrangement Drawing-2

171

PAL-1193-DWG-PIP-4397-01

Aboveground Piping General Arrangement Drawing-3

172

PAL-1193-DWG-PIP-4398-01

Aboveground Piping General Arrangement Drawing-4

173

PAL-1193-DWG-PIP-4399-01

Aboveground Piping General Arrangement Drawing-5

174

PAL-1193-DWG-PIP-4400-01

Aboveground Piping General Arrangement Drawing-6

175

PAL-1193-DWG-PIP-4401-01

Aboveground Piping General Arrangement Drawing-7

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A

10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
5-Jan-2015
2-Feb-2014
5-Jan-2015
2-Feb-2014
5-Jan-2015
2-Feb-2014
5-Jan-2015
2-Feb-2015
15-Jan-2015
2-Feb-2015
15-Jan-2015
2-Feb-2015
15 J 2015
15-Jan-2015

B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0250
B-C-T-0436
B-C-T-0250
B-C-T-0436
B-C-T-0250
B-C-T-0436
B-C-T-0250
B-C-T-0476
B-C-T-0325
B-C-T-0476
B-C-T-0325
B-C-T-0476
B C T 0325
B-C-T-0325

10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
5-Jan-2015
3-Feb-2015
5-Jan-2015
3-Feb-2015
5-Jan-2015
3-Feb-2015
5-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15-Jan-2015
3-Feb-2015
15 J 2015
15-Jan-2015

C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0251
C-P-BT-0449
C-P-BT-0251
C-P-BT-0449
C-P-BT-0251
C-P-BT-0449
C-P-BT-0251
C-P-BT-0484
C-P-BT-0326
C-P-BT-0484
C-P-BT-0326
C-P-BT-0484
C
C-P-BT-0326

28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
20 J 2015
20-Jan-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0278
P-C-BT-0539
P-C-BT-0278
P-C-BT-0539
P-C-BT-0278
P-C-BT-0539
P-C-BT-0278
P-C-BT-0538
P-C-BT-0314
P-C-BT-0538
P-C-BT-0314
P-C-BT-0538
C
P-C-BT-0314

28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
20 J 2015
20-Jan-2015

C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0281
C-B-BT-0542
C-B-BT-0281
C-B-BT-0542
C-B-BT-0281
C-B-BT-0542
C-B-BT-0281
C-B-BT-0541
C-B-BT-0317
C-B-BT-0541
C-B-BT-0317
C-B-BT-0541
C B BT 0317
C-B-BT-0317

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
37
118
133
95

B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
B
A
A
A
A

2-Feb-2015
15-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
11-Feb-2015
3-Feb-2015
3
Feb 2015
30-Jan-2015
3-Feb-2015

B-C-T-0476
B-C-T-0325
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0250
B-C-T-0529
B-C-T-0249
B-C-T-0529
B-C-T-0325
B-C-T-0529
B-C-T-0546
B-C-T-0469
B
C T 0469
B-C-T-0444
B-C-T-0468

3-Feb-2015
15-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
5-Jan-2015
10-Feb-2015
6-Jan-2015
10-Feb-2015
15-Jan-2015
10-Feb-2015
11-Feb-2015
4-Feb-2015
4
Feb 2015
2-Feb-2015
4-Feb-2015

C-P-BT-0484
C-P-BT-0326
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0251
C-P-BT-0549
C-P-BT-0257
C-P-BT-0549
C-P-BT-0326
C-P-BT-0549
C-P-BT-0556
C-P-BT-0489
C-P-BT-0457
C-P-BT-0488

28-Feb-15
20-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
15-Jan-2015
28-Feb-15
20-Jan-2015
28-Feb-15
26-Feb-2015
27-Feb-2015
27
Feb 2015
27-Feb-2015
26-Feb-2015

C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0538
P-C-BT-0314
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0278
P-C-BT-0540
P-C-BT-0276
P-C-BT-0540
P-C-BT-0314
P-C-BT-0540
P-C-BT-0505
P-C-BT-0509
P-C-BT-0508
P-C-BT-0506

28-Feb-2015
20-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
15-Jan-2015
28-Feb-2015
20-Jan-2015
28-Feb-2015
26-Feb-2015
27-Feb-2015
27
Feb 2015
27-Feb-2015
26-Feb-2015

C-B-BT-0541
C-B-BT-0317
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0281
C-B-BT-0543
C-B-BT-0279
C-B-BT-0543
C-B-BT-0317
C-B-BT-0543
C-B-BT-0508
C-B-BT-0512
C
B BT 0512
C-B-BT-0511
C-B-BT-0509

13-Jan-2015

B-C-T-0315

13-Jan-2015

C-P-BT-0316

17-Jan-2015

P-C-BT-0291

17-Jan-2015

C-B-BT-0294

2
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1

0
A
0
A
A
A
A
A
A
A
A
A
A
A
A
A

19-Jan-2015
13-Jan-2015
19-Jan-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015

B-C-T-0350
B-C-T-0315
B-C-T-0350
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327

19-Jan-2015
13-Jan-2015
19-Jan-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015

C-P-BT-0348

20-Jan-2015
17-Jan-2015
20-Jan-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015

A
A
A
C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0312
P-C-BT-0291
P-C-BT-0312
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295

20-Jan-2015
17-Jan-2015
20-Jan-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015

C-B-BT-0315
C-B-BT-0294

Page 13 of 35

C-P-BT-0316
C-P-BT-0348
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327

C-B-BT-0315
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

175

PAL-1193-DWG-PIP-4401-01

Aboveground Piping General Arrangement Drawing-7

176

PAL-1193-DWG-PIP-4402-01

Aboveground Piping General Arrangement Drawing-8

177

PAL-1193-DWG-PIP-4403-01

Aboveground Piping General Arrangement Drawing

178

PAL-1193-DWG-PIP-4404-01
PAL 1193 DWG PIP 4404 01

Aboveground Piping General Arrangement Drawing

179

PAL-1193-DWG-PIP-4405-01

Aboveground Piping General Arrangement Drawing

180

PAL-1193-DWG-PIP-4406-01

Aboveground Piping General Arrangement Drawing

181

PAL-1193-DWG-PIP-4600-01~53

Standard Pipe Support Drawings

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1
1
1
1
1
1
1
53
53

A
A
A
A
A
A
A
A
A
A
A
A
B

13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
24-Nov-2014
2-Feb-2015

B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0327
B-C-T-0578
B-C-T-0062
B-C-T-0437

13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
15-Jan-2015
13-Feb-2015
26-Nov-2014
3-Feb-2015

C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0327
C-P-BT-0588
C-P-BT-0064
C-P-BT-0450

27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
6-Jan-2015
26-Feb-2015

C
C
C
C
C
C
C
C
C
C
C
C
C

P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0295
P-C-BT-0507
P-C-BT-0216
P-C-BT-0503

27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
19-Jan-2015
27-Feb-2015
6-Jan-2015
26-Feb-2015

C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0298
C-B-BT-0510
C-B-BT-0219
C-B-BT-0507

26-Nov-2014

B-C-T-0071

27-Nov-2014

C-P-BT-0066

24-Dec-2014

P-C-BT-0129

24-Dec-2014

C-B-BT-0132

6-Jan-2015
28-Jan-2015
4-Feb-2015
9-Feb-2015
26-Nov-2014
31-Dec-2014

B-C-T-0254
B-C-T-0419
B-C-T-0492
B-C-T-0525
B-C-T-0067
B-C-T-0221

7-Jan-2015
28-Jan-2015
6-Feb-2015
9-Feb-2015
27-Nov-2014
4-Jan-2015

C-P-BT-0262
C-P-BT-0427
C-P-BT-0507
C-P-BT-0536
C-P-BT-0067
C-P-BT-0228

9-Jan-2015
30-Jan-2015
7-Feb-2015
26-Feb-2015
20-Dec-2014
10-Feb-2015

C
C
B
B
C
B

P-C-BT-0237
P-C-BT-0378
P-C-BT-0444
P-C-BT-0496
P-C-BT-0108
P-C-BT-0474

9-Jan-2015
30-Jan-2014
7-Feb-2015
26-Feb-2015
20-Dec-2014
10-Feb-2015

C-B-BT-0240
C-B-BT-0381
C-B-BT-0447
C-B-BT-0499
C-B-BT-0111
C-B-BT-0477

11-Feb-2015
27-Nov-2014
31-Dec-2014
11-Feb-2015
28-Oct-2014
31-Dec-2014
9-Jan-2015
30-Jan-2015
26-Nov-2014

B-C-T-0544
B-C-T-0075
B-C-T-0221
B-C-T-0544
B-C-T-0014
B-C-T-0220
B-C-T-0279
B-C-T-0438
B-C-T-0065

11-Feb-2015
27-Nov-2014
4-Jan-2015
11-Feb-2015
26-Nov-2014
31-Dec-2014
9-Jan-2015
2-Feb-2015
27-Nov-2014

C-P-BT-0560
C-P-BT-0072
C-P-BT-0228
C-P-BT-0560
C-P-BT-0063
C-P-BT-0223
C-P-BT-0282
C-P-BT-0451
C-P-BT-0067

28-Feb-15
22-Dec-2014
10-Feb-2015
28-Feb-15
23-Dec-2014
4-Jan-2015
24-Jan-2015
28-Feb-15
20-Dec-2014

B
C
B
B
C
B
B
A
C

P-C-BT-0529
P-C-BT-0122
P-C-BT-0474
P-C-BT-0529
P-C-BT-0124
P-C-BT-0186
P-C-BT-0326
P-C-BT-0528
P-C-BT-0108

28-Feb-2015
22-Dec-2014
10-Feb-2015
28-Feb-2015
23-Dec-2014
4-Jan-2015
24-Jan-2015
28-Feb-2015
20-Dec-2014

C-B-BT-0532
C-B-BT-0125
C-B-BT-0477
C-B-BT-0532
C-B-BT-0127
C-B-BT-0189

8-Jan-2015
10-Feb-2015
2-Mar-2015
26-Nov-2014

B-C-T-0273
B-C-T-0537
B-C-T-0597
B-C-T-0065

8-Jan-2015
10-Feb-2015
2-Mar-2015
27-Nov-2014

C-P-BT-0277
C-P-BT-0540
C-P-BT-0607
C-P-BT-0067

4-Feb-2015
27-Feb-2015

C
B

P-C-BT-0407
P-C-BT-0515

4-Feb-2015
27-Feb-2015

C-B-BT-0410
C-B-BT-0518

20-Dec-2014

P-C-BT-0108

20-Dec-2014

C-B-BT-0111

8-Jan-2015
10-Feb-2015
2-Mar-2015
26-Nov-2014

B-C-T-0273
B-C-T-0537
B-C-T-0597
B-C-T-0065

8-Jan-2015
10-Feb-2015
2-Mar-2015
27-Nov-2014

C-P-BT-0277
C-P-BT-0540
C-P-BT-0607
C-P-BT-0067

4-Feb-2015
27-Feb-2015

C
B

P-C-BT-0407
P-C-BT-0515

4-Feb-2015
27-Feb-2015

C-B-BT-0410
C-B-BT-0518

20-Dec-2014

P-C-BT-0108

20-Dec-2014

C-B-BT-0111

8-Jan-2015
10-Feb-2015
2-Mar-2015
26-Nov-2014

B-C-T-0273
B-C-T-0537
B-C-T-0597
B-C-T-0065

8-Jan-2015
10-Feb-2015
2-Mar-2015
27-Nov-2014

C-P-BT-0277
C-P-BT-0540
C-P-BT-0607
C-P-BT-0067

4-Feb-2015
27-Feb-2015

C
B

P-C-BT-0407
P-C-BT-0515

4-Feb-2015
27-Feb-2015

C-B-BT-0410
C-B-BT-0518

20-Dec-2014

P-C-BT-0108

20-Dec-2014

C-B-BT-0111

8-Jan-2015
10-Feb-2015
2-Mar-2015
7-Nov-2014

B-C-T-0273
B-C-T-0537
B-C-T-0597
B-C-T-0024

8-Jan-2015
10-Feb-2015
2-Mar-2015
11-Nov-2014

C-P-BT-0277
C-P-BT-0540
C-P-BT-0607
C-P-BT-0014

4-Feb-2015
27-Feb-2015

C
B

P-C-BT-0407
P-C-BT-0515

4-Feb-2015
27-Feb-2015

C-B-BT-0410
C-B-BT-0518

18-Nov-2014

P-C-BT-0011

18-Nov-2014

C-B-BT-0014

28-Nov-2014
23-Jan-2015
9-Feb-2015
29-Nov-2014

B-C-T-0078
B-C-T-0392
B-C-T-0523
B-C-T-0090

28-Nov-2014
24-Jan-2015
9-Feb-2015
1-Dec-2014

C-P-BT-0077
C-P-BT-0402
C-P-BT-0534
C-P-BT-0089

22-Dec-2014
6-Feb-2015
13-Feb-2015
24-Dec-2014

C
B
A
C

P-C-BT-0123
P-C-BT-0412
P-C-BT-0479
P-C-BT-0132

22-Dec-2014
6-Feb-2015
4-Mar-2015
24-Dec-2014

C-B-BT-0126
C-B-BT-0415
C-B-BT-0482
C-B-BT-0135

23-Jan-2015
10-Feb-2015
2-Mar-2015
28-Oct-2014
28-Nov-2014

B-C-T-0391
B-C-T-0540
B-C-T-0594

24-Jan-2015
10-Feb-2015
2-Mar-2014
15-Nov-2014
29-Nov-2014

C-P-BT-0401
C-P-BT-0543
C-P-BT-0604

4-Feb-2015
15-Feb-2015

B
B

P-C-BT-0404
P-C-BT-0490

4-Feb-2015
15-Feb-2015

C-B-BT-0407
C-B-BT-0493

C-P-BT-0019

25-Nov-2014
25-Dec-2014

B
C

P-C-BT-0014
P-C-BT-0145

25-Nov-2014
26-Dec-2014

C-B-BT-0017
C-B-BT-0148

anical(MEQ)
Sheet (MEQ)

PAL-1193-DS-MEC-001

PAL-1193-DS-MEC-002

PAL-1193-DS-MEC-003

PAL-1193-DS-MEC-004

PAL-1193-DS-MEC-005

PAL-1193-DS-MEC-006

PAL-1193-DS-MEC-007

PAL-1193-DS-MEC-008

DATA SHEET FOR SEDIMENTATION TANKS(T-

2302A/B)

DATA SHEET FOR CRUDE OIL BUFFER TANK(T-2303)

DATA SHEET FOR WATER BUFFER TANK(T-2340)

Data Sheet for Water Booster Pumps(P-2318A/B/C )

Date Sheet for Closed Drain Sump Pumps(P-2373A/B)

Data Sheet for Open Drain Sump Pumps(P-2376A/B)

Data Sheet for Sand Drain Pit Pumps(P-2374A/B)

Data Sheet for Vent Pit Oil Pumps (P-2375A/B)

4
4

0
1

6
6

C
0

6
6

C
0

6
6

C
0

C
0
A

4
4
4

B
C
0

10

11

PAL-1193-DS-MEC-009

PAL-1193-DS-MEC-010

PAL-1193-DS-MEC-011

DATA SHEET FOR GAS/LIQUID SEPARATOR SKID(A2303A/B/C/D)

Data Sheet for Anti-Foam Injection Skid(A-2357)

DATA SHEET FOR FOAM SKID(A-230)

B-C-T-0014
B-C-T-0086

Page 14 of 35

C-P-BT-0085

C-B-BT-0329
C-B-BT-0531
C-B-BT-0111

to JUBA

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

12

13

14

15

PAL-1193-DS-MEC-012

PAL-1193-DS-MEC-013

PAL-1193-DS-MEC-014

PAL-1193-DS-MEC-015

Data Sheet for Crude Oil Booster Pumps (P-2308A/B/C)

Data Sheet for Flare Knock Out Drum(V-2342)

Data Sheet for Vent Stack(FS-2344)

Data Sheet for Flare Drum Pumps(P-2342A/B)

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.

Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

B-C-T-0034
B-C-T-0092
B-C-T-0274
B-C-T-0411
B-C-T-0058
B-C-T-0104
B-C-T-0364
B-C-T-0045
B-C-T-0104
B-C-T-0364

C-P-BT-0018
C-P-BT-0088
C-P-BT-0278
C-P-BT-0423
C-P-BT-0056
C-P-BT-0107
C-P-BT-0366
C-P-BT-0046
C-P-BT-0107
C-P-BT-0366
C-P-BT-0063
C-P-BT-0223
C-P-BT-0282
C-P-BT-0451

26-Nov-2014
25-Dec-2014
19-Jan-2015
6-Feb-2015
27-Nov-2014
18-Dec-2014
4-Feb-2015
27-Nov-2014
18-Dec-2014
4-Feb-2015
23-Dec-2014
4-Jan-2015
24-Jan-2015
28-Feb-15

B
B
B
A
B
B
A
B
B
A
B
B
B
A

P-C-BT-0022
P-C-BT-0144
P-C-BT-0300
P-C-BT-0415
P-C-BT-0028
P-C-BT-0104
P-C-BT-0403
P-C-BT-0027
P-C-BT-0104
P-C-BT-0403
P-C-BT-0124
P-C-BT-0186
P-C-BT-0326
P-C-BT-0528

26-Nov-2014
25-Dec-2014
19-Jan-2015
6-Feb-2015
28-Nov-2014
19-Dec-2014
4-Feb-2015
27-Nov-2014
19-Dec-2014
4-Feb-2015
23-Dec-2014
4-Jan-2015
24-Jan-2015
28-Feb-2015

C-B-BT-0025
C-B-BT-0147
C-B-BT-0303
C-B-BT-0418
C-B-BT-0031
C-B-BT-0107
C-B-BT-0406
C-B-BT-0030
C-B-BT-0107
C-B-BT-0406
C-B-BT-0127
C-B-BT-0189

B-C-T-0279
B-C-T-0438

14-Nov-2014
1-Dec-2014
8-Jan-2015
28-Jan-2015
24-Nov-2014
8-Dec-2014
21-Jan-2015
20-Nov-2014
8-Dec-2014
21-Jan-2015
26-Nov-2014
31-Dec-2014
9-Jan-2015
2-Feb-2015

C-B-BT-0329
C-B-BT-0531

to ktm

to ktm

3
3

0
1

10-Nov-2014
29-Nov-2014
8-Jan-2015
27-Jan-2015
22-Nov-2014
3-Dec-2014
21-Jan-2015
20-Nov-2014
3-Dec-2014
21-Jan-2015
25-Nov-2014
31-Dec-2014
9-Jan-2015
30-Jan-2015

11

25-Nov-2014

B-C-T-0063

26-Nov-2014

C-P-BT-0062

24-Dec-2014

P-C-BT-0130

24-Dec-2014

C-B-BT-0133

12
12
12
12

B
C
D
0

6-Jan-2015
29-Jan-2015
2-Feb-2015
9-Feb-2015

B-C-T-0254
B-C-T-0424
B-C-T-0474
B-C-T-0525

7-Jan-2015
29-Jan-2015
3-Feb-2015
9-Feb-2015

C-P-BT-0262
C-P-BT-0436
C-P-BT-0482
C-P-BT-0536

9-Jan-2015
30-Jan-2015
6-Feb-2015
26-Feb-2015

C
C
A
A

P-C-BT-0237
P-C-BT-0375
P-C-BT-0433
P-C-BT-0496

9-Jan-2015
30-Jan-2014
6-Feb-2015
26-Feb-2015

C-B-BT-0240
C-B-BT-0378
C-B-BT-0436
C-B-BT-0499

58
58
58
45

A
B
0
A

26-Nov-2014
5-Jan-2015
10-Feb-2015
28-Oct-2014

B-C-T-0071
B-C-T-0230
B-C-T-0542
B-C-T-0014

27-Nov-2014
5-Jan-2015
10-Feb-2015
15-Nov-2014

C-P-BT-0066
C-P-BT-0239
C-P-BT-0539
C-P-BT-0020

24-Dec-2014
10-Feb-2015
28-Feb-15
24-Dec-2014

C
B
B
C

P-C-BT-0129
P-C-BT-0473
P-C-BT-0530
P-C-BT-0128

24-Dec-2014
10-Feb-2015
28-Feb-2015
24-Dec-2014

C-B-BT-0132
C-B-BT-0476
C-B-BT-0533
C-B-BT-0131

45
45
50
50
52

B
0
A
B
0

31-Dec-2014
11-Feb-2015
28-Oct-2014
31-Dec-2014
11-Feb-2015

B-C-T-0221
B-C-T-0544
B-C-T-0014
B-C-T-0221
B-C-T-0544

4-Jan-2015
11-Feb-2015
15-Nov-2014
4-Jan-2015
11-Feb-2015

C-P-BT-0228
C-P-BT-0560
C-P-BT-0020
C-P-BT-0228
C-P-BT-0560

10-Feb-2015
28-Feb-15
24-Dec-2014
10-Feb-2015
28-Feb-15

B
B
C
B
B

P-C-BT-0474
P-C-BT-0529
P-C-BT-0128
P-C-BT-0474
P-C-BT-0529

10-Feb-2015
28-Feb-2015
24-Dec-2014
10-Feb-2015
28-Feb-2015

C-B-BT-0477
C-B-BT-0532
C-B-BT-0131
C-B-BT-0477
C-B-BT-0532

B-C-T-0014
B-C-T-0220

to ktm

Specification

PAL-1193-SP-MEC-001

Specification For Sedimentation Tank Lattice Dome Roof

Calculation (MEQ)

PAL-1193-CAL-MEC-001

Calculation for Sedimentation Tank(T-2302A/B)

PAL-1193-CAL-MEC-002

CALCULATION FOR CRUDE OIL BUFFER TANK(T-2303)

PAL-1193-CAL-MEC-003

CALCULATION FOR WATER BUFFER TANK(T-2340)

/ MTO (MEQ)

PAL-1193-MR-MEC-001

PAL-1193-MR-MEC-002

PAL-1193-MR-MEC-003

PAL-1193-MR-MEC-004

PAL-1193-MR-MEC-005

PAL-1193-MR-MEC-006

PAL-1193-MR-MEC-007

MR for G-L Separator Skids

MR for Crude Oil Booster Pumps

MR for Progressive Cavity Pumps

MR for Anti-foam Injection Skids

MR for Flare Knock out Drum

MR for Foam Skids

MR for Steel Plats of Tanks

81

7-Nov-2014

B-C-T-0024

11-Nov-2014

C-P-BT-0014

18-Nov-2014

P-C-BT-0011

18-Nov-2014

C-B-BT-0014

81

28-Nov-2014

B-C-T-0078

28-Nov-2014

C-P-BT-0077

22-Dec-2014

P-C-BT-0123

22-Dec-2014

C-B-BT-0126

52

23-Jan-2015

B-C-T-0392

24-Jan-2015

C-P-BT-0402

6-Feb-2015

P-C-BT-0412

6-Feb-2015

C-B-BT-0415

82

9-Feb-2015

B-C-T-0523

9-Feb-2015

C-P-BT-0534

13-Feb-2015

P-C-BT-0479

13-Feb-2015

C-B-BT-0482

41

10-Nov-2014

B-C-T-0034

14-Nov-2014

C-P-BT-0018

26-Nov-2014

P-C-BT-0022

26-Nov-2014

C-B-BT-0025

41

29-Nov-2014

B-C-T-0092

1-Dec-2014

C-P-BT-0088

25-Dec-2014

P-C-BT-0144

25-Dec-2014

C-B-BT-0147
C-B-BT-0303

41

8-Jan-2015

B-C-T-0274

8-Jan-2015

C-P-BT-0278

19-Jan-2015

P-C-BT-0300

19-Jan-2015

47

27-Nov-2014

B-C-T-0075

27-Nov-2014

C-P-BT-0072

22-Dec-2014

P-C-BT-0122

22-Dec-2014

C-B-BT-0125

48

8-Jan-2015

B-C-T-0273

8-Jan-2015

C-P-BT-0277

4-Feb-2015

P-C-BT-0407

4-Feb-2015

C-B-BT-0410

42

10-Feb-2015

B-C-T-0537

10-Feb-2015

C-P-BT-0540

27-Feb-2015

P-C-BT-0515

27-Feb-2015

C-B-BT-0518

42

2-Mar-2015

B-C-T-0597

2-Mar-2015

C-P-BT-0607

51

29-Nov-2014

B-C-T-0090

1-Dec-2014

C-P-BT-0089

24-Dec-2014

P-C-BT-0132

24-Dec-2014

C-B-BT-0135

51

23-Jan-2915

B-C-T-0391

24-Jan-2915

C-P-BT-0401

4-Feb-2015

P-C-BT-0404

4-Feb-2015

C-B-BT-0407
C-B-BT-0497

51

10-Feb-2015

B-C-T-0539

10-Feb-2015

C-P-BT-0542

26-Feb-2015

P-C-BT-0494

26-Feb-2015

48

22-Nov-2014

B-C-T-0058

24-Nov-2014

C-P-BT-0056

27-Nov-2014

P-C-BT-0028

28-Nov-2014

C-B-BT-0031

40

3-Dec-2014

B-C-T-0104

8-Dec-2014

C-P-BT-0107

18-Dec-2014

P-C-BT-0104

19-Dec-2014

C-B-BT-0107

38

21-Jan-2015

B-C-T-0364

21-Jan-2015

C-P-BT-0366

4-Feb-2015

P-C-BT-0403

4-Feb-2015

C-B-BT-0406

45

28-Oct-2014

B-C-T-0014

15-Nov-2014

C-P-BT-0019

25-Nov-2014

P-C-BT-0014

25-Nov-2014

C-B-BT-0017

41

28-Nov-2014

B-C-T-0086

29-Nov-2014

C-P-BT-0085

25-Dec-2014

P-C-BT-0145

26-Dec-2014

C-B-BT-0148

28

6-Dec-2014

B-C-T-0106

8-Dec-2014

C-P-BT-0105

22-Dec-2014

P-C-BT-0115

22-Dec-2014

C-B-BT-0118

29

6-Jan-2015

B-C-T-0254

7-Jan-2014

C-P-BT-0262

9-Jan-2015

P-C-BT-0237

9-Jan-2015

C-B-BT-0240

25

27-Jan-2015

B-C-T-0406

28-Jan-2015

C-P-BT-0418

30-Jan-2015

P-C-BT-0381

30-Jan-2014

C-B-BT-0384

25

3-Feb-2015

B-C-T-0487

5-Feb-2015

C-P-BT-0500

6-Feb-2015

P-C-BT-0432

6-Feb-2015

C-B-BT-0435

25

9-Feb-2015

B-C-T-0525

9-Feb-2015

C-P-BT-0536

26-Feb-2015

P-C-BT-0496

26-Feb-2015

C-B-BT-0499

6-Dec-2014

B-C-T-0106

8-Dec-2014

C-P-BT-0105

22-Dec-2014

P-C-BT-0115

22-Dec-2014

C-B-BT-0118

Page 15 of 35

to JUBA

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-MTO-MEC-007

PAL-1193-MR-MEC-008

PAL-1193-MR-MEC-009

PAL-1193-MR-MEC-010

10

11

12

13

PAL-1193-MR-MEC-011

PAL-1193-MR-MEC-012

PAL-1193-MR-MEC-013

MTO for Steel Plats of Tanks

MR for Accessories of Tanks

MR for Miscellaneous Materials of Tanks

MR for Insulation of Tanks

MR for Centrifugal Pumps

MR for Vent Stack

MR for Sedimentation Tank Lattice Dome Roof

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

A- Approved; B -Accepted with Correction

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

6-Jan-2015

B-C-T-0254

7-Jan-2014

C-P-BT-0262

9-Jan-2015

P-C-BT-0237

9-Jan-2015

C-B-BT-0240

27-Jan-2015

B-C-T-0406

28-Jan-2015

C-P-BT-0418

30-Jan-2015

P-C-BT-0381

30-Jan-2014

C-B-BT-0384

3-Feb-2015

B-C-T-0487

5-Feb-2015

C-P-BT-0500

6-Feb-2015

P-C-BT-0432

6-Feb-2015

C-B-BT-0435

9-Feb-2015

B-C-T-0525

9-Feb-2015

C-P-BT-0536

26-Feb-2015

P-C-BT-0496

26-Feb-2015

C-B-BT-0499

37

9-Jan-2015

B-C-T-0278

9-Jan-2015

C-P-BT-0281

27-Jan-2015

P-C-BT-0346

27-Jan-2015

C-B-BT-0349

33

27-Jan-2015

B-C-T-0417
C

28-Jan-2015

C-P-BT-0429

30-Jan-2015

P-C-BT-0380

30-Jan-2014

C-B-BT-0383
C

37

9-Feb-2015

B-C-T-0515

9-Feb-2015

C-P-BT-0527

10-Feb-2015

P-C-BT-0464

10-Feb-2015

C-B-BT-0467

33

11-Feb-2015

B-C-T-0558

11-Feb-2015

C-P-BT-0568

28-Feb-15

P-C-BT-0522

28-Feb-15

C-B-BT-0525

30

26-Jan-2015

B-C-T-0398

26-Jan-2015

C-P-BT-0406

27-Jan-2015

P-C-BT-0345

27-Jan-2015

C-B-BT-0348

29

28-Jan-2015

B-C-T-0421

29-Jan-2015

C-P-BT-0433

30-Jan-2015

P-C-BT-0377

30-Jan-2014

C-B-BT-0380

29

5-Feb-2015

B-C-T-0498

6-Feb-2015

C-P-BT-0514

9-Feb-2015

P-C-BT-0455

9-Feb-2015

C-B-BT-0458

29

11-Feb-2015

B-C-T-0557

11-Feb-2015

C-P-BT-0567

28-Feb-15

P-C-BT-0520

28-Feb-15

C-B-BT-0523

42

25-Dec-2014

B-C-T-0181

25-Dec-2014

C-P-BT-0183

26-Dec-2014

P-C-BT-0152

26-Dec-2014

C-B-BT-0155

32

5-Jan-2015

B-C-T-0241

5-Jan-2015

C-P-BT-0243

7-Jan-2015

P-C-BT-0223

7-Jan-2015

C-B-BT-0226

29

27-Jan-2015

B-C-T-0412

28-Jan-2015

C-P-BT-0424

30-Jan-2015

P-C-BT-0379

30-Jan-2014

C-B-BT-0382
C-B-BT-0434

31

3-Feb-2015

B-C-T-0480

5-Feb-2015

C-P-BT-0501

6-Feb-2015

P-C-BT-0431

6-Feb-2015

63

28-Oct-2014

B-C-T-0014

26-Nov-2014

C-P-BT-0063

23-Dec-2014

P-C-BT-0124

23-Dec-2014

C-B-BT-0127

49

31-Dec-2014

B-C-T-0220

31-Dec-2014

C-P-BT-0223

4-Jan-2015

P-C-BT-0186

4-Jan-2015

C-B-BT-0189

49

9-Jan-2015

B-C-T-0283

9-Jan-2015

C-P-BT-0287

24-Jan-2015

P-C-BT-0325

24-Jan-2015

C-B-BT-0328

45

30-Jan-2015

B-C-T-0438

2-Feb-2015

C-P-BT-0451

28-Feb-15

P-C-BT-0528

28-Feb-2015

C-B-BT-0531

C-P-BT-0609

45

2-Mar-2015

B-C-T-0599

3-Mar-2015

44

20-Nov-2014

B-C-T-0045

20-Nov-2014

C-P-BT-0046

27-Nov-2014

P-C-BT-0027

27-Nov-2014

C-B-BT-0030

41

3-Dec-2014

B-C-T-0104

8-Dec-2014

C-P-BT-0107

18-Dec-2014

P-C-BT-0104

19-Dec-2014

C-B-BT-0107

35

21-Jan-2015

B-C-T-0364

21-Jan-2015

C-P-BT-0366

4-Feb-2015

P-C-BT-0403

4-Feb-2015

C-B-BT-0406

41

25-Nov-2014

B-C-T-0063

26-Nov-2014

C-P-BT-0062

24-Dec-2014

P-C-BT-0130

24-Dec-2014

C-B-BT-0133

41

6-Jan-2015

B-C-T-0254

7-Jan-2015

C-P-BT-0262

9-Jan-2015

P-C-BT-0237

9-Jan-2015

C-B-BT-0240

37

27-Jan-2015

B-C-T-0408

28-Jan-2015

C-P-BT-0420

30-Jan-2015

P-C-BT-0376

30-Jan-2014

C-B-BT-0379

41

4-Feb-2015

B-C-T-0492

6-Feb-2015

C-P-BT-0507

7-Feb-2015

P-C-BT-0444

7-Feb-2015

C-B-BT-0447

37

9-Feb-2015

B-C-T-0525

9-Feb-2015

C-P-BT-0536

26-Feb-2015

P-C-BT-0496

26-Feb-2015

C-B-BT-0499

10-Jan-2015

B-C-T-0296

10-Jan-2015

C-P-BT-0306

12-Jan-2015

P-C-BT-0253

12-Jan-2015

C-B-BT-0256

23-Jan-2015

B-C-T-0392

24-Jan-2015

C-P-BT-0402

6-Feb-2015

P-C-BT-0412

6-Feb-2015

C-B-BT-0415

13-Feb-2015

P-C-BT-0479

13-Feb-2015

C-B-BT-0482

TBE (MEQ)

PAL-1193-TBE-MEC-001

TBE for G-L Separator Skids

9-Feb-2015

B-C-T-0523

9-Feb-2015

C-P-BT-0534

3-Mar-2015

B-C-T-0602

4-Mar-2015

C-P-BT-0612

10

5-Jan-2015

B-C-T-0244

10-Jan-2015

C-P-BT-0295

14-Jan-2015

P-C-BT-0269

14-Jan-2015

C-B-BT-0272

PAL-1193-TBE-MEC-002

TBE for Crude Oil Booster Pumps

27-Jan-2015

B-C-T-0410

28-Jan-2015

C-P-BT-0422

6-Feb-2015

P-C-BT-0413

6-Feb-2015

C-B-BT-0416

11-Feb-2015

B-C-T-0553

12-Feb-2015

C-P-BT-0573

PAL-1193-TBE-MEC-003

TBE for Progressive Cavity Pump

37

10-Feb-2015

B-C-T-0534

10-Feb-2015

C-P-BT-0544

10-Jan-2015

B-C-T-0305

19-Jan-2015

C-P-BT-0347

26-Jan-2015

P-C-BT-0334

26-Jan-2015

C-B-BT-0337

28-Jan-2015

B-C-T-0415

28-Jan-2015

C-P-BT-0416

2-Feb-2015

P-C-BT-0395

2-Feb-2015

C-B-BT-0398

10-Feb-2015

B-C-T-0540

10-Feb-2015

C-P-BT-0543

15-Feb-2015

P-C-BT-0490

15-Feb-2015

C-B-BT-0493

3-Mar-2015

B-C-T-0602

4-Mar-2015

C-P-BT-0612

5-Jan-2015

B-C-T-0245

5-Jan-2015

C-P-BT-0246

8-Jan-2015

P-C-BT-0232

8-Jan-2015

C-B-BT-0235

22-Jan-2015

B-C-T-0375

22-Jan-2015

C-P-BT-0377

29-Jan-2015

P-C-BT-0354

29-Jan-2015

C-B-BT-0357

9-Feb-2015

B-C-T-0523

9-Feb-2015

C-P-BT-0534

13-Feb-2015

P-C-BT-0479

13-Feb-2015

C-B-BT-0482

5-Jan-2015

B-C-T-0245

5-Jan-2015

C-P-BT-0246

8-Jan-2015

P-C-BT-0232

8-Jan-2015

C-B-BT-0235

16-Jan-2015

B-C-T-0335

16-Jan-2015

C-P-BT-0337

19-Jan-2015

P-C-BT-0304

19-Jan-2015

C-B-BT-0307

23-Jan-2015

B-C-T-0390

24-Jan-2015

C-P-BT-0400

30-Jan-2015

P-C-BT-0382

30-Jan-2014

C-B-BT-0385

2-Feb-2015

B-C-T-0464

2-Feb-2015

C-P-BT-0467

10-Feb-2015

P-C-BT-0470

10-Feb-2015

C-B-BT-0473

5-Jan-2015

B-C-T-0253

5-Jan-2015

C-P-BT-0252

8-Jan-2015

P-C-BT-0232

8-Jan-2015

C-B-BT-0235

9-Feb-2015

B-C-T-0526

9-Feb-2015

C-P-BT-0537

13-Feb-2015

P-C-BT-0478

13-Feb-2015

C-B-BT-0481

4
3

A
0

4-Feb-2015
11-Feb-2015

B-C-T-0494
B-C-T-0558

6-Feb-2015
11-Feb-2015

C-P-BT-0509
C-P-BT-0568

10-Feb-2015
28-Feb-15

A
B

P-C-BT-0467
P-C-BT-0522

10-Feb-2015
28-Feb-15

C-B-BT-0470

4
3
15

A
0
A

4-Feb-2015
11-Feb-2015
29-Jan-2015

B-C-T-0495
B-C-T-0558
B-C-T-0285

6-Feb-2015
11-Feb-2015
30-Jan-2015

C-P-BT-0510
C-P-BT-0568
C-P-BT-0445

10-Feb-2015
28-Feb-15
6-Feb-2015

B
A
A

P-C-BT-0468
P-C-BT-0522
P-C-BT-0438

10-Feb-2015
28-Feb-15
6-Feb-2015

C-B-BT-0471

PAL-1193-TBE-MEC-004

PAL-1193-TBE-MEC-005

PAL-1193-TBE-MEC-006

PAL-1193-TBE-MEC-007

TBE for Anti-foam Injection Skids

TBE for Flare Knock out Skid

TBE for Foam Skids

TBE for Steel Plats of Tanks

PAL-1193-TBE-MEC-008

TBE for Accessories of Tanks

PAL-1193-TBE-MEC-009

TBE for Miscellaneous Materials of Tanks

10

PAL-1193-TBE-MEC-010

TBE for Insulation of Tanks

11

PAL-1193-TBE-MEC-011

TBE for Centrifugal Pumps

Page 16 of 35

to ktm

to ktm

C-B-BT-0525
to ktm

C-B-BT-0525
C-B-BT-0441

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

11

PAL-1193-TBE-MEC-011

TBE for Centrifugal Pumps

12

PAL-1193-TBE-MEC-012

TBE for Vent Stack

13

PAL-1193-TBE-MEC-013

TBE for Sedimentation Tank Lattice Dome Roof

A- Approved; B -Accepted with Correction

20
6
6
7
5
5
5

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

B
A
0
1
A
B
C

15-Feb-2015
26-Jan-2014
2-Feb-2015
11-Feb-2015
15-Jan-2015
2-Feb-2015
10-Feb-2015

B-C-T-0584
B-C-T-0396
B-C-T-0457
B-C-T-0554
B-C-T-0319
B-C-T-0471
B-C-T-0538

15-Feb-2015
26-Jan-2014
3-Feb-2015
11-Feb-2015
15-Jan-2015
3-Feb-2015
10-Feb-2015

C-P-BT-0595
C-P-BT-0407
C-P-BT-0469
C-P-BT-0565
C-P-BT-0320
C-P-BT-0468
C-P-BT-0541

29-Jan-2014
10-Feb-2015
15-Feb-2015
16-Jan-2015
6-Feb-2015
15-Feb-2015

B
B
B
C
C
C

P-C-BT-0352
P-C-BT-0471
P-C-BT-0500
P-C-BT-0285
P-C-BT-0411
P-C-BT-0491

29-Jan-2014
10-Feb-2015
15-Feb-2015
16-Jan-2015
6-Feb-2015
15-Feb-2015

C-B-BT-0355
C-B-BT-0474
C-B-BT-0503
C-B-BT-0288
C-B-BT-0414
C-B-BT-0494

Drawing (MEQ)
PAL-1193-DWG-MEC-3000-01

EQUIPMENT LAYOUT PLAN

PAL-1193-DWG-MEC-3001-01

Sedimentation Tank (T-2302A)General Arrangement

PAL-1193-DWG-MEC-3002-01

Sedimentation Tank (T-2302B)General Arrangement

PAL-1193-DWG-MEC-3003-01

Internal General Arrangement(T-2302A)

PAL-1193-DWG-MEC-3004-01

Internal General Arrangement(T-2302B)

PAL-1193-DWG-MEC-3005-01

Shell Accessories Orientation(T-2302A)

PAL 1193 DWG MEC 3006 01


PAL-1193-DWG-MEC-3006-01

Sh ll Accessories
A
i Orientation(T-2302B)
O i t ti (T 2302B)
Shell

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
B
A
B
A
B
0
A
B
0
A
B
0
A
B

15-Feb-2015
23-Jan-2015
9-Feb-2015
23-Jan-2015
9-Feb-2015
21-Jan-2015
5-Feb-2015
10-Feb-2015
21-Jan-2015
5-Feb-2015
10-Feb-2015
23-Jan-2015
3-Feb-2015
10-Feb-2015
23-Jan-2015
3 F b 2015
3-Feb-2015

B-C-T-0593
B-C-T-0386
B-C-T-0522
B-C-T-0386
B-C-T-0522
B-C-T-0367
B-C-T-0481
B-C-T-0545
B-C-T-0367
B-C-T-0481
B-C-T-0545
B-C-T-0385
B-C-T-0460
B-C-T-0532
B-C-T-0385
B C T 0460
B-C-T-0460

15-Feb-2015
23-Jan-2015
9-Feb-2015
23-Jan-2015
9-Feb-2015
21-Jan-2015
6-Feb-2015
10-Feb-2015
21-Jan-2015
6-Feb-2015
10-Feb-2015
23-Jan-2015
4-Feb-2015
10-Feb-2015
23-Jan-2015
4 F b 2015
4-Feb-2015

C-P-BT-0603
C-P-BT-0395
C-P-BT-0533
C-P-BT-0395
C-P-BT-0533
C-P-BT-0369
C-P-BT-0503
C-P-BT-0554
C-P-BT-0369
C-P-BT-0503
C-P-BT-0554
C-P-BT-0394
C-P-BT-0487
C-P-BT-0552
C-P-BT-0394
C
C-P-BT-0487

28-Feb-15
26-Jan-2015
26-Feb-2015
26-Jan-2015
26-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
6-Feb-2015
27-Feb-2015
29-Jan-2014
6 F b 2015
6-Feb-2015

C
C
B
C
B
C
A
B
C
A
B
C
B
A
C
B

P-C-BT-0535
P-C-BT-0343
P-C-BT-0503
P-C-BT-0343
P-C-BT-0503
P-C-BT-0357
P-C-BT-0443
P-C-BT-0498
P-C-BT-0357
P-C-BT-0443
P-C-BT-0498
P-C-BT-0356
P-C-BT-0425
P-C-BT-0513
P-C-BT-0356
C
P-C-BT-0425

28-Feb-2015
26-Jan-2015
26-Feb-2015
26-Jan-2015
26-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
6-Feb-2015
27-Feb-2015
29-Jan-2014
6 F b 2015
6-Feb-2015

C-B-BT-0538
C-B-BT-0346
C-B-BT-0506
C-B-BT-0346
C-B-BT-0506
C-B-BT-0360
C-B-BT-0446
C-B-BT-0501
C-B-BT-0360
C-B-BT-0446
C-B-BT-0501
C-B-BT-0359
C-B-BT-0428
C-B-BT-0516
C-B-BT-0359
C B BT 0428
C-B-BT-0428

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4
4
4
1
1
1
1
1
1

0
A
B
0
A
B
0
A
B
C
D
0
A
B
C
D
0
A
B
C
D
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0

10-Feb-2015
23-Jan-2015
3-Feb-2015
10-Feb-2015
23-Jan-2015
3-Feb-2015
10-Feb-2015
28-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
28-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
28-Nov-2014
15-Jan-2015
15
Jan 2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
23-Jan-2015
4-Feb-2015
11-Feb-2015
23-Jan-2015
4-Feb-2015
11-Feb-2015
16-Jan-2015
5-Feb-2015
10-Feb-2015
20-Jan-2015
5-Feb-2015
10-Feb-2015
16-Jan-2015
5-Feb-2015
10-Feb-2015
16-Jan-2015
5-Feb-2015
10-Feb-2015

B-C-T-0532
B-C-T-0386
B-C-T-0460
B-C-T-0532
B-C-T-0386
B-C-T-0460
B-C-T-0532
B-C-T-0087
B-C-T-0324
B-C-T-0352
B-C-T-0465
B-C-T-0532
B-C-T-0087
B-C-T-0324
B-C-T-0352
B-C-T-0465
B-C-T-0532
B-C-T-0087
B-C-T-0324
B
C T 0324
B-C-T-0352
B-C-T-0465
B-C-T-0532
B-C-T-0385
B-C-T-0502
B-C-T-0557
B-C-T-0385
B-C-T-0502
B-C-T-0557
B-C-T-0333
B-C-T-0481
B-C-T-0545
B-C-T-0351
B-C-T-0481
B-C-T-0545
B-C-T-0333
B-C-T-0481
B-C-T-0545
B-C-T-0333
B-C-T-0481
B-C-T-0545

10-Feb-2015
23-Jan-2015
4-Feb-2015
10-Feb-2015
23-Jan-2015
4-Feb-2015
10-Feb-2015
29-Nov-2014
15-Jan-2015
20-Jan-2015
4-Feb-2015
10-Feb-2015
29-Nov-2014
15-Jan-2015
20-Jan-2015
4-Feb-2015
10-Feb-2015
29-Nov-2014
15-Jan-2015
15
Jan 2015
20-Jan-2015
4-Feb-2015
10-Feb-2015
23-Jan-2015
6-Feb-2015
11-Feb-2015
23-Jan-2015
6-Feb-2015
11-Feb-2015
16-Jan-2015
6-Feb-2015
10-Feb-2015
20-Jan-2015
6-Feb-2015
10-Feb-2015
16-Jan-2015
6-Feb-2015
10-Feb-2015
16-Jan-2015
6-Feb-2015
10-Feb-2015

C-P-BT-0552
C-P-BT-0395
C-P-BT-0487
C-P-BT-0552
C-P-BT-0395
C-P-BT-0487
C-P-BT-0552
C-P-BT-0082
C-P-BT-0325
C-P-BT-0353
C-P-BT-0486
C-P-BT-0552
C-P-BT-0082
C-P-BT-0325
C-P-BT-0353
C-P-BT-0486
C-P-BT-0552
C-P-BT-0082
C-P-BT-0325
C-P-BT-0353
C-P-BT-0486
C-P-BT-0552
C-P-BT-0394
C-P-BT-0516
C-P-BT-0567
C-P-BT-0394
C-P-BT-0516
C-P-BT-0567
C-P-BT-0334
C-P-BT-0503
C-P-BT-0554
C-P-BT-0357
C-P-BT-0503
C-P-BT-0554
C-P-BT-0334
C-P-BT-0503
C-P-BT-0554
C-P-BT-0334
C-P-BT-0503
C-P-BT-0554

27-Feb-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
17
Jan 2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
10-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
28-Feb-15
30-Jan-2015
9-Feb-2015
15-Feb-2015
30-Jan-2015
9-Feb-2015
15-Feb-2015
30-Jan-2015
9-Feb-2015
15-Feb-2015
30-Jan-2015
9-Feb-2015
15-Feb-2015

A
C
B
A
C
B
A
C
C
C
B
A
C
C
C
B
A
C
C
C
B
A
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B

P-C-BT-0513
P-C-BT-0343
P-C-BT-0425
P-C-BT-0513
P-C-BT-0343
P-C-BT-0425
P-C-BT-0513
P-C-BT-0246
P-C-BT-0292
P-C-BT-0339
P-C-BT-0424
P-C-BT-0513
P-C-BT-0246
P-C-BT-0292
P-C-BT-0339
P-C-BT-0424
P-C-BT-0513
P-C-BT-0246
P-C-BT-0292
P-C-BT-0339
P-C-BT-0424
P-C-BT-0513
P-C-BT-0356
P-C-BT-0465
P-C-BT-0520
P-C-BT-0356
P-C-BT-0465
P-C-BT-0520
P-C-BT-0384
P-C-BT-0443
P-C-BT-0498
P-C-BT-0383
P-C-BT-0443
P-C-BT-0498
P-C-BT-0384
P-C-BT-0443
P-C-BT-0498
P-C-BT-0384
P-C-BT-0443
P-C-BT-0498

27-Feb-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
9-Jan-2015
17-Jan-2015
17
Jan 2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
10-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
28-Feb-15
30-Jan-2014
9-Feb-2015
15-Feb-2015
30-Jan-2014
9-Feb-2015
15-Feb-2015
30-Jan-2014
9-Feb-2015
15-Feb-2015
30-Jan-2014
9-Feb-2015
15-Feb-2015

C-B-BT-0516
C-B-BT-0346
C-B-BT-0428
C-B-BT-0516
C-B-BT-0346
C-B-BT-0428
C-B-BT-0516
C-B-BT-0249
C-B-BT-0295
C-B-BT-0342
C-B-BT-0427
C-B-BT-0516
C-B-BT-0249
C-B-BT-0295
C-B-BT-0342
C-B-BT-0427
C-B-BT-0516
C-B-BT-0249
C-B-BT-0295
C
B BT 0295
C-B-BT-0342
C-B-BT-0427
C-B-BT-0516
C-B-BT-0359
C-B-BT-0468

PAL-1193-DWG-MEC-3007-01

Roof Accessories Orientation(T-2302A)

PAL-1193-DWG-MEC-3008-01

Roof Accessories Orientation(T-2302B)

10

PAL-1193-DWG-MEC-3009-01

Bottom Details(T-2302A)

11

PAL-1193-DWG-MEC-3010-01

Bottom Details(T-2302B)

12

PAL-1193-DWG-MEC-3012-01

Shell Details

13

PAL-1193-DWG-MEC-3013-01

Shell Developed Surface (T-2302A)

14

PAL-1193-DWG-MEC-3014-01

Shell Developed Surface (T-2302B)

15

PAL-1193-DWG-MEC-3015-01

Oil Collector Notch Assembly and Details

16

PAL-1193-DWG-MEC-3016-01

Oil Distributor Details

17

PAL-1193-DWG-MEC-3017-01

Water Outlet Details

18

PAL-1193-DWG-MEC-3018-01

Water Collector Assembly and Details

Page 17 of 35

C-B-BT-0523
C-B-BT-0359
C-B-BT-0468
C-B-BT-0523
C-B-BT-0387
C-B-BT-0446
C-B-BT-0501
C-B-BT-0386
C-B-BT-0446
C-B-BT-0501
C-B-BT-0387
C-B-BT-0446
C-B-BT-0501
C-B-BT-0387
C-B-BT-0446
C-B-BT-0501

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

19

PAL-1193-DWG-MEC-3019-01

Central Pipe Details

20

PAL-1193-DWG-MEC-3020-01

Ladder Assembly and Details

21

PAL-1193-DWG-MEC-3021-01

Level Controller Assembly

22

PAL-1193-DWG-MEC-3022-01

Level Controller Details

23

PAL-1193-DWG-MEC-3023-01

Level Controller Details

24

PAL-1193-DWG-MEC-3024-01

Level Controller Details

25

PAL-1193-DWG-MEC-3025-01

Level Controller Details

26

PAL-1193-DWG-MEC-3026-01

Level Dontroller Details

27

PAL 1193 DWG MEC 3027 01


PAL-1193-DWG-MEC-3027-01

S
li H
l A
bl and
dD
t il
Sampling
Hole
Assembly
Details

28

PAL-1193-DWG-MEC-3028-01

24''x24'' Shell Clean-out Door Assembly

29

PAL-1193-DWG-MEC-3029-01

24''x24'' Shell Clean-out Door Details

30

31

PAL-1193-DWG-MEC-3030-01

PAL-1193-DWG-MEC-3031-01

24'' Shell Manhole Assembly

24'' Shell Manhole Details

32

PAL-1193-DWG-MEC-3032-01

20'' Roof Mamhole Assembly and Details

33

PAL-1193-DWG-MEC-3033-01

Roof Nozzle Details I

34

PAL-1193-DWG-MEC-3034-01

Roof Nozzle Details II

35

PAL-1193-DWG-MEC-3035-01

Shell Nozzle Details I

36

PAL-1193-DWG-MEC-3036-01

Shell Nozzle Details II

37

PAL-1193-DWG-MEC-3037-01

Roof Platform Assembly and Details

38

PAL-1193-DWG-MEC-3038-01

Spiral Stairway Assembly and Details

39

PAL-1193-DWG-MEC-3039-01

Nameplate & Support Bracket Details(T-2302A)

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A
B

16-Jan-2015
5-Feb-2015
10-Feb-2015
23-Jan-2015
5-Feb-2015
10-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
6-Jan-2015
31-Jan-2015
4-Feb-2015
20-Jan-2015
4 F b 2015
4-Feb-2015

B-C-T-0333
B-C-T-0481
B-C-T-0545
B-C-T-0388
B-C-T-0481
B-C-T-0545
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0259
B-C-T-0454
B-C-T-0490
B-C-T-0347
B C T 0496
B-C-T-0496

16-Jan-2015
6-Feb-2015
10-Feb-2015
23-Jan-2015
6-Feb-2015
10-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
7-Jan-2015
2-Feb-2015
6-Feb-2015
20-Jan-2015
6 F b 2015
6-Feb-2015

C-P-BT-0334
C-P-BT-0503
C-P-BT-0554
C-P-BT-0396
C-P-BT-0503
C-P-BT-0554
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0264
C-P-BT-0463
C-P-BT-0505
C-P-BT-0355
C
C-P-BT-0511

30-Jan-2015
9-Feb-2015
15-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
9 F b 2015
9-Feb-2015

C
A
B
C
A
B
C
B
A
C
A
A
C
A
A
C
A
A
C
A
A
C
A
A
C
A

P-C-BT-0384
P-C-BT-0443
P-C-BT-0498
P-C-BT-0363
P-C-BT-0443
P-C-BT-0498
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0359
P-C-BT-0402
P-C-BT-0447
P-C-BT-0358
C
P-C-BT-0454

30-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
4-Feb-2015
7-Feb-2015
29-Jan-2014
9 F b 2015
9-Feb-2015

C-B-BT-0387
C-B-BT-0446
C-B-BT-0501
C-B-BT-0366
C-B-BT-0446
C-B-BT-0501
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0362
C-B-BT-0405
C-B-BT-0450
C-B-BT-0361
C B BT 0457
C-B-BT-0457

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0
A
B
0
1
A
B
0
A
B
0
A
B
0
A
B
0
A
B
C

15-Feb-2015
12-Jan-2015
9-Feb-2015
28-Feb-15

C-B-BT-0502
C-B-BT-0261
C-B-BT-0462

1
1
1

A
B
C

P-C-BT-0258
P-C-BT-0459
P-C-BT-0523
P-C-BT-0258
P-C-BT-0459
P-C-BT-0523
P-C-BT-0258
P-C-BT-0459
P-C-BT-0523
P-C-BT-0258
P-C-BT-0425
P-C-BT-0513
P-C-BT-0260
P-C-BT-0463
P-C-BT-0492
P-C-BT-0525
P-C-BT-0260
P-C-BT-0421
P-C-BT-0513
P-C-BT-0260
P-C-BT-0421
P-C-BT-0513
P-C-BT-0260
P-C-BT-0445
P-C-BT-0513
P-C-BT-0363
P-C-BT-0443
P-C-BT-0498
P-C-BT-0256
P-C-BT-0463
P-C-BT-0492
P-C-BT-0525
P-C-BT-0248
P-C-BT-0463
P-C-BT-0492

12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
10-Feb-2015
10
Feb 2015
27-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
7-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
12-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
10-Jan-2015
10-Feb-2015
27-Feb-2015

C-B-BT-0261
C-B-BT-0462

12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
9-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
10-Feb-2015
10
Feb 2015
27-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
7-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
15-Feb-2015
12-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
10-Jan-2015
10-Feb-2015
27-Feb-2015

C
A
A
C
A
A
C
A
A
C
B
A
C
C

A
B
0
A
B
0
A
B
0
A
B
0
A
B
C

C-P-BT-0559
C-P-BT-0129
C-P-BT-0441
C-P-BT-0563
C-P-BT-0608
C-P-BT-0129
C-P-BT-0441
C-P-BT-0563
C-P-BT-0129
C-P-BT-0441
C-P-BT-0563
C-P-BT-0129
C-P-BT-0441
C-P-BT-0563
C-P-BT-0129
C-P-BT-0487
C-P-BT-0552
C-P-BT-0269
C-P-BT-0464
C-P-BT-0564
C-P-BT-0599
C-P-BT-0269
C-P-BT-0455
C-P-BT-0552
C-P-BT-0269
C-P-BT-0455
C-P-BT-0552
C-P-BT-0269
C-P-BT-0508
C-P-BT-0552
C-P-BT-0397
C-P-BT-0503
C-P-BT-0554
C-P-BT-0175
C-P-BT-0464
C-P-BT-0564
C-P-BT-0599
C-P-BT-0184
C-P-BT-0464
C-P-BT-0564

P-C-BT-0499
P-C-BT-0258
P-C-BT-0459
P-C-BT-0523

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

11-Feb-2015
15-Dec-2014
7-Feb-2015
11-Feb-2015
2-Mar-2015
15-Dec-2014
7-Feb-2015
11-Feb-2015
15-Dec-2014
7-Feb-2015
11-Feb-2015
15-Dec-2014
7-Feb-2015
11-Feb-2015
15-Dec-2014
4-Feb-2015
10-Feb-2015
7-Jan-2015
2-Feb-2015
2
Feb 2015
11-Feb-2015
15-Feb-2015
7-Jan-2015
3-Feb-2015
10-Feb-2015
7-Jan-2015
3-Feb-2015
10-Feb-2015
7-Jan-2015
6-Feb-2015
10-Feb-2015
23-Jan-2015
6-Feb-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
11-Feb-2015
15-Feb-2015
25-Dec-2014
2-Feb-2015
11-Feb-2015

A
C
B
B

B-C-T-0549
B-C-T-0128
B-C-T-0429
B-C-T-0550
B-C-T-0598
B-C-T-0128
B-C-T-0429
B-C-T-0550
B-C-T-0128
B-C-T-0429
B-C-T-0550
B-C-T-0128
B-C-T-0429
B-C-T-0550
B-C-T-0128
B-C-T-0460
B-C-T-0532
B-C-T-0267
B-C-T-0450
B
C T 0450
B-C-T-0555
B-C-T-0589
B-C-T-0267
B-C-T-0442
B-C-T-0532
B-C-T-0267
B-C-T-0442
B-C-T-0532
B-C-T-0267
B-C-T-0497
B-C-T-0532
B-C-T-0389
B-C-T-0481
B-C-T-0545
B-C-T-0172
B-C-T-0450
B-C-T-0555
B-C-T-0589
B-C-T-0182
B-C-T-0450
B-C-T-0555

15-Feb-2015
12-Jan-2015
9-Feb-2015
28-Feb-15

10-Feb-2015
12-Dec-2014
29-Jan-2015
11-Feb-2015
2-Mar-2015
12-Dec-2014
29-Jan-2015
11-Feb-2015
12-Dec-2014
29-Jan-2015
11-Feb-2015
12-Dec-2014
29-Jan-2015
11-Feb-2015
12-Dec-2014
3-Feb-2015
10-Feb-2015
7-Jan-2015
31-Jan-2015
31
Jan 2015
11-Feb-2015
15-Feb-2015
7-Jan-2015
2-Feb-2015
10-Feb-2015
7-Jan-2015
2-Feb-2015
10-Feb-2015
7-Jan-2015
4-Feb-2015
10-Feb-2015
23-Jan-2015
5-Feb-2015
10-Feb-2015
25-Dec-2014
31-Jan-2015
11-Feb-2015
15-Feb-2015
25-Dec-2014
31-Jan-2015
11-Feb-2015

Page 18 of 35

B
B
C
B
A
C
B
A
C
A
A
C
A
B
C
C
B
B
C
C
A

C-B-BT-0526

C-B-BT-0526
C-B-BT-0261
C-B-BT-0462
C-B-BT-0526
C-B-BT-0261
C-B-BT-0462
C-B-BT-0526
C-B-BT-0261
C-B-BT-0428
C-B-BT-0516
C-B-BT-0263
C-B-BT-0466
C
B BT 0466
C-B-BT-0495
C-B-BT-0528
C-B-BT-0263
C-B-BT-0424
C-B-BT-0516
C-B-BT-0263
C-B-BT-0424
C-B-BT-0516
C-B-BT-0263
C-B-BT-0448
C-B-BT-0516
C-B-BT-0366
C-B-BT-0446
C-B-BT-0501
C-B-BT-0259
C-B-BT-0466
C-B-BT-0495
C-B-BT-0528
C-B-BT-0251
C-B-BT-0466
C-B-BT-0495

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

40

41

42

43

PAL-1193-DWG-MEC-3040-01

PAL-1193-DWG-MEC-3041-01

PAL-1193-DWG-MEC-3042-01

PAL-1193-DWG-MEC-3043-01

Nameplate & Support Bracket Details(T-2302A)

Insulation Details

Hot oil coil

Anchor Chair Details

44

PAL-1193-DWG-MEC-3044-01

Collecting Container

45

PAL-1193-DWG-MEC-3051-01

Crude Oil Buffer Tank(T-2303)General Arrangement

46

PAL-1193-DWG-MEC-3052-01

Shell Accessories Orientation

47

PAL-1193-DWG-MEC-3053-01

PAL-1193-DWG-MEC-3054-01

48

PAL-1193-DWG-MEC-3055-01

49

PAL-1193-DWG-MEC-3056-01

50

51

PAL-1193-DWG-MEC-3057-01
PAL
1193 DWG MEC 3057 01

Roof Accessories Orientation

Bottom Details

Roof Details

Shell Details

Shell Developed Surface

52

PAL-1193-DWG-MEC-3058-01

24''x24'' Shell Clean-out Door Assembly

53

PAL-1193-DWG-MEC-3059-01

24''x24'' Shell Clean-out Door Details

54

55

56

57

PAL-1193-DWG-MEC-3060-01

PAL-1193-DWG-MEC-3061-01

PAL-1193-DWG-MEC-3062-01

PAL-1193-DWG-MEC-3063-01

24'' Shell Manhole Assembly

24'' Shell Manhole Details

20'' Roof Manhole Assembly and Details

Heat Coil Pipe

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

B-C-T-0589
B-C-T-0182
B-C-T-0450
B-C-T-0555
B-C-T-0589
B-C-T-0172
B-C-T-0450
B-C-T-0555
B-C-T-0589
B-C-T-0377
B-C-T-0514
B-C-T-0554
B-C-T-0595
B-C-T-0182
B-C-T-0450
B-C-T-0555
B-C-T-0589
B-C-T-0347
B-C-T-0496
B-C-T-0549
B-C-T-0380
B-C-T-0522
B-C-T-0300
B-C-T-0459
B-C-T-0533
B C T 0329
B-C-T-0329

15-Feb-2015
25-Dec-2014
2-Feb-2015
11-Feb-2015
15-Feb-2015
25-Dec-2014
2-Feb-2015
11-Feb-2015
15-Feb-2015
22-Jan-2015
6-Feb-2015
11-Feb-2015
2-Mar-2015
25-Dec-2014
2-Feb-2015
11-Feb-2015
15-Feb-2015
20-Jan-2015
6-Feb-2015
11-Feb-2015
22-Jan-2015
9-Feb-2015
10-Jan-2015
3-Feb-2015
10-Feb-2015
15 J 2015
15-Jan-2015

C-P-BT-0599
C-P-BT-0184
C-P-BT-0464
C-P-BT-0564
C-P-BT-0599
C-P-BT-0175
C-P-BT-0464
C-P-BT-0564
C-P-BT-0599
C-P-BT-0379
C-P-BT-0521
C-P-BT-0565
C-P-BT-0605
C-P-BT-0184
C-P-BT-0464
C-P-BT-0564
C-P-BT-0599
C-P-BT-0355
C-P-BT-0511
C-P-BT-0559
C-P-BT-0382
C-P-BT-0533
C-P-BT-0298
C-P-BT-0485
C-P-BT-0553
C
C-P-BT-0330

28-Feb-15
10-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
12-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
15-Feb-2015

A
C
C

P-C-BT-0525
P-C-BT-0248
P-C-BT-0463
P-C-BT-0492
P-C-BT-0525
P-C-BT-0256
P-C-BT-0463
P-C-BT-0492
P-C-BT-0525
P-C-BT-0363
P-C-BT-0466
P-C-BT-0500

28-Feb-15
10-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
12-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
15-Feb-2015

C-B-BT-0528
C-B-BT-0251
C-B-BT-0466

P-C-BT-0248
P-C-BT-0463
P-C-BT-0492
P-C-BT-0525
P-C-BT-0358
P-C-BT-0454
P-C-BT-0499
P-C-BT-0353
P-C-BT-0503
P-C-BT-0261
P-C-BT-0426
P-C-BT-0497
C
P-C-BT-0284

10-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
26-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
15 J 2015
15-Jan-2015

C-B-BT-0251
C-B-BT-0466

B-C-T-0459
B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0360
B-C-T-0500
B
C T 0500
B-C-T-0560
B-C-T-0129
B-C-T-0430
B-C-T-0531
B-C-T-0598
B-C-T-0129
B-C-T-0430
B-C-T-0531
B-C-T-0129
B-C-T-0430
B-C-T-0531
B-C-T-0129
B-C-T-0430
B-C-T-0531
B-C-T-0129
B-C-T-0451
B-C-T-0531
B-C-T-0380
B-C-T-0502
B-C-T-0560
B-C-T-0173

3-Feb-2015
10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
20-Jan-2015
6-Feb-2015
6
Feb 2015
11-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
2-Mar-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
2-Feb-2015
10-Feb-2015
22-Jan-2015
6-Feb-2015
11-Feb-2015
25-Dec-2014

C-P-BT-0485
C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0360
C-P-BT-0513
C-P-BT-0570
C-P-BT-0130
C-P-BT-0442
C-P-BT-0551
C-P-BT-0608
C-P-BT-0130
C-P-BT-0442
C-P-BT-0551
C-P-BT-0130
C-P-BT-0442
C-P-BT-0551
C-P-BT-0130
C-P-BT-0442
C-P-BT-0551
C-P-BT-0130
C-P-BT-0465
C-P-BT-0551
C-P-BT-0382
C-P-BT-0516
C-P-BT-0570
C-P-BT-0176

6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
9
Feb 2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
28-Feb-15
12-Jan-2015

1
1
1

A
B
C

1
1
1

A
B
C

1
1
1
1
1
1
1

A
B
0
1
A
B
C

1
1
1
1
1
1
1
1
1

A
B
0
A
B
A
B
0
A

15-Feb-2015
25-Dec-2014
31-Jan-2015
11-Feb-2015
15-Feb-2015
25-Dec-2014
31-Jan-2015
11-Feb-2015
15-Feb-2015
22-Jan-2015
6-Feb-2014
11-Feb-2015
2-Mar-2015
25-Dec-2014
31-Jan-2015
11-Feb-2015
15-Feb-2015
20-Jan-2015
4-Feb-2015
10-Feb-2015
22-Jan-2015
9-Feb-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
15 J 2015
15-Jan-2015

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
0
A
B
C
D
0
A
B
C
D
0
A
B
C
D
0
A
B
0
A
B
0
1
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
A

2-Feb-2015
10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Jan-2015
5-Feb-2015
5
Feb 2015
11-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
2-Mar-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
31-Jan-2015
10-Feb-2015
22-Jan-2015
4-Feb-2015
11-Feb-2015
25-Dec-2014

Page 19 of 35

10-Jan-2015
10-Feb-2015
27-Feb-2015
28-Feb-15
29-Jan-2014
9-Feb-2015
15-Feb-2015
29-Jan-2014
26-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
15 J 2015
15-Jan-2015

A
A
C
C
C
C
C
B
B
C
C
A
A
C
A
A
C
B
C
B
A
C
B

6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
9
Feb 2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15

A
C
A
A
C
A
B

P-C-BT-0426
P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0355
P-C-BT-0456
P-C-BT-0521
P-C-BT-0247
P-C-BT-0437
P-C-BT-0524

9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015
28-Feb-15
12-Jan-2015

C
A
A
C
A
A
C
A
A
C
A
A
C
A
B
C

P-C-BT-0247
P-C-BT-0437
P-C-BT-0524
P-C-BT-0247
P-C-BT-0437
P-C-BT-0524
P-C-BT-0247
P-C-BT-0437
P-C-BT-0524
P-C-BT-0247
P-C-BT-0436
P-C-BT-0524
P-C-BT-0353
P-C-BT-0465
P-C-BT-0521
P-C-BT-0259

A
C
C
C
B
A
C
C
C
B
B
C
C
C
B

C-B-BT-0495
C-B-BT-0528
C-B-BT-0259
C-B-BT-0466
C-B-BT-0495
C-B-BT-0528
C-B-BT-0366
C-B-BT-0469
C-B-BT-0503

C-B-BT-0495
C-B-BT-0528
C-B-BT-0361
C-B-BT-0457
C-B-BT-0502
C-B-BT-0356
C-B-BT-0506
C-B-BT-0264
C-B-BT-0429
C-B-BT-0500
C
C-B-BT-0287
C-B-BT-0429
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0358
C-B-BT-0459
C
B BT 0459
C-B-BT-0524
C-B-BT-0250
C-B-BT-0440
C-B-BT-0527
C-B-BT-0250
C-B-BT-0440
C-B-BT-0527
C-B-BT-0250
C-B-BT-0440
C-B-BT-0527
C-B-BT-0250
C-B-BT-0440
C-B-BT-0527
C-B-BT-0250
C-B-BT-0439
C-B-BT-0527
C-B-BT-0356
C-B-BT-0468
C-B-BT-0524
C-B-BT-0262

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

58

59

60

62

PAL-1193-DWG-MEC-3070-01

Anchor Chair Details

63

PAL-1193-DWG-MEC-3071-01

Insulation Details for Crude Oil Buffer Tank

64

PAL-1193-DWG-MEC-3101-01

Water Buffer Tank(T-2340)General Arrangement

65

PAL-1193-DWG-MEC-3102-01

Shell Accessories Orientation

PAL-1193-DWG-MEC-3105-01

PAL-1193-DWG-MEC-3106-01

PAL-1193-DWG-MEC-3107-01

70

PAL-1193-DWG-MEC-3108-01

71

72

77

PAL 1193 DWG MEC 3103 01


PAL-1193-DWG-MEC-3103-01

PAL-1193-DWG-MEC-3104-01

69

76

Spiral Stairway Assembly and Details

Nameplate & Support Bracket Details

68

75

PAL-1193-DWG-MEC-3068-01

Shell Nozzle Details I

PAL-1193-DWG-MEC-3069-01

67

74

PAL-1193-DWG-MEC-3066-01

Roof Nozzle Details I

61

66

73

PAL-1193-DWG-MEC-3064-01

R f Accessories
A
i O
i t ti
Roof
Orientation

Bottom Details

Roof Details

Shell Details

Shell Developed Surface

Oil Collector Notch Assembly and Details

PAL-1193-DWG-MEC-3109-01

24''x24'' Shell Clean-out Door Assembly

PAL-1193-DWG-MEC-3110-01

24''x24'' Shell Clean-out Door Details

PAL-1193-DWG-MEC-3111-01

PAL-1193-DWG-MEC-3112-01

PAL-1193-DWG-MEC-3113-01

PAL-1193-DWG-MEC-3114-01

24'' Shell Mamhole Assembly

24'' Shell Mamhole Details

20'' Roof Mamhole Assembly and Details

Heat Coil Pipe

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015

A
B
C
B

6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015

C-B-BT-0439

A
C
B

P-C-BT-0436
P-C-BT-0524
P-C-BT-0259
P-C-BT-0422
P-C-BT-0497
P-C-BT-0259
P-C-BT-0426
P-C-BT-0497
P-C-BT-0267
P-C-BT-0426
P-C-BT-0497

12-Jan-2015
6-Feb-2015
28-Feb-15

C
A
B

P-C-BT-0261
P-C-BT-0436
P-C-BT-0524

12-Jan-2015
6-Feb-2015
28-Feb-15

C-B-BT-0264
C-B-BT-0439

12-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
26-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
15-Jan-2015
6 F b 2015
6-Feb-2015

C
A
C
C
B
C
B

P-C-BT-0257
P-C-BT-0436
P-C-BT-0524
P-C-BT-0353
P-C-BT-0503
P-C-BT-0261
P-C-BT-0426
P-C-BT-0497
P-C-BT-0284
C
P-C-BT-0426

12-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
26-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015
15-Jan-2015
6 F b 2015
6-Feb-2015

C-B-BT-0260
C-B-BT-0439

27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
28-Feb-15
28
Feb 15
29-Jan-2014
10-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15

A
C
C
C
B

A
C
A
A
C
A
A
C
A
B

P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0265
P-C-BT-0293
P-C-BT-0337
P-C-BT-0423
P-C-BT-0497
P-C-BT-0355
P-C-BT-0456
P-C-BT-0521
P-C-BT-0353
P-C-BT-0465
P-C-BT-0521
P-C-BT-0247
P-C-BT-0434
P-C-BT-0525

27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
17-Jan-2015
26-Jan-2015
6-Feb-2015
27-Feb-2015
29-Jan-2014
9-Feb-2015
28-Feb-15
28
Feb 15
29-Jan-2014
10-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15

9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015

C
A
A
C
A
A
C
A
A
C
A
A
C
A

P-C-BT-0247
P-C-BT-0434
P-C-BT-0525
P-C-BT-0247
P-C-BT-0434
P-C-BT-0525
P-C-BT-0247
P-C-BT-0434
P-C-BT-0525
P-C-BT-0247
P-C-BT-0435
P-C-BT-0525
P-C-BT-0353
P-C-BT-0465

9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
9-Jan-2015
6-Feb-2015
28-Feb-15
29-Jan-2014
10-Feb-2015

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

B
0
A
B
0
A
B
0
A
B
0
1
A
B
0
1
A
B
0
A
B
A
B
0
A
B

31-Jan-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
2-Mar-2015
10-Jan-2015
31-Jan-2015
10-Feb-2015
2-Mar-2015
5-Jan-2015
31-Jan-2015
10-Feb-2015
22-Jan-2015
9-Feb-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
15-Jan-2015
2 F b 2015
2-Feb-2015

B-C-T-0451
B-C-T-0531
B-C-T-0173
B-C-T-0441
B-C-T-0533
B-C-T-0173
B-C-T-0459
B-C-T-0533
B-C-T-0306
B-C-T-0459
B-C-T-0533
B-C-T-0598
B-C-T-0300
B-C-T-0451
B-C-T-0531
B-C-T-0598
B-C-T-0229
B-C-T-0451
B-C-T-0531
B-C-T-0380
B-C-T-0522
B-C-T-0300
B-C-T-0459
B-C-T-0533
B-C-T-0329
B C T 0459
B-C-T-0459

2-Feb-2015
10-Feb-2015
25-Dec-2014
3-Feb-2015
10-Feb-2015
25-Dec-2014
3-Feb-2015
10-Feb-2015
10-Jan-2015
3-Feb-2015
10-Feb-2015
2-Mar-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
2-Mar-2015
5-Jan-2015
2-Feb-2015
10-Feb-2015
22-Jan-2015
9-Feb-2015
10-Jan-2015
3-Feb-2015
10-Feb-2015
15-Jan-2015
3 F b 2015
3-Feb-2015

C-P-BT-0465
C-P-BT-0551
C-P-BT-0176
C-P-BT-0454
C-P-BT-0553
C-P-BT-0176
C-P-BT-0485
C-P-BT-0553
C-P-BT-0302
C-P-BT-0485
C-P-BT-0553
C-P-BT-0608
C-P-BT-0298
C-P-BT-0465
C-P-BT-0551
C-P-BT-0608
C-P-BT-0238
C-P-BT-0465
C-P-BT-0551
C-P-BT-0382
C-P-BT-0533
C-P-BT-0298
C-P-BT-0485
C-P-BT-0553
C-P-BT-0330
C
C-P-BT-0485

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0
A
B
C
D
0
A
B
C
D
0
A
B
C
D
0
A
B
0
A
B
0
A
B
0
1
A
B
0
A
B
0
A
B
0
A
B
0
A
B

10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Nov-2014
15-Jan-2015
20-Jan-2015
2-Feb-2015
10-Feb-2015
20-Jan-2015
5-Feb-2015
11-Feb-2015
11
Feb 2015
22-Jan-2015
4-Feb-2015
11-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
2-Mar-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
29-Jan-2015
10-Feb-2015
13-Dec-2014
31-Jan-2015
10-Feb-2015
22-Jan-2015
4-Feb-2015

B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0051
B-C-T-0328
B-C-T-0354
B-C-T-0475
B-C-T-0533
B-C-T-0360
B-C-T-0500
B-C-T-0560
B
C T 0560
B-C-T-0380
B-C-T-0502
B-C-T-0560
B-C-T-0129
B-C-T-0431
B-C-T-0530
B-C-T-0598
B-C-T-0129
B-C-T-0431
B-C-T-0530
B-C-T-0129
B-C-T-0431
B-C-T-0530
B-C-T-0129
B-C-T-0431
B-C-T-0530
B-C-T-0129
B-C-T-0452
B-C-T-0530
B-C-T-0380
B-C-T-0502

10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
21-Nov-2014
15-Jan-2015
20-Jan-2015
3-Feb-2015
10-Feb-2015
20-Jan-2015
6-Feb-2015
11-Feb-2015
11
Feb 2015
22-Jan-2015
6-Feb-2015
11-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
2-Mar-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
29-Jan-2015
10-Feb-2015
15-Dec-2014
2-Feb-2015
10-Feb-2015
22-Jan-2015
6-Feb-2015

C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0047
C-P-BT-0328
C-P-BT-0356
C-P-BT-0483
C-P-BT-0553
C-P-BT-0360
C-P-BT-0513
C-P-BT-0570
C-P-BT-0382
C-P-BT-0516
C-P-BT-0570
C-P-BT-0130
C-P-BT-0443
C-P-BT-0550
C-P-BT-0608
C-P-BT-0130
C-P-BT-0443
C-P-BT-0550
C-P-BT-0130
C-P-BT-0443
C-P-BT-0550
C-P-BT-0130
C-P-BT-0443
C-P-BT-0550
C-P-BT-0130
C-P-BT-0466
C-P-BT-0550
C-P-BT-0382
C-P-BT-0516

Page 20 of 35

B
C
B

A
C
B

A
C
C
C
B
B
C
C
C
B

C-B-BT-0527
C-B-BT-0262
C-B-BT-0425
C-B-BT-0500
C-B-BT-0262
C-B-BT-0429
C-B-BT-0500
C-B-BT-0270
C-B-BT-0429
C-B-BT-0500

C-B-BT-0527

C-B-BT-0527
C-B-BT-0356
C-B-BT-0506
C-B-BT-0264
C-B-BT-0429
C-B-BT-0500
C-B-BT-0287
C B BT 0429
C-B-BT-0429
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0268
C-B-BT-0296
C-B-BT-0340
C-B-BT-0426
C-B-BT-0500
C-B-BT-0358
C-B-BT-0459
C-B-BT-0524
C-B-BT-0356
C-B-BT-0468
C-B-BT-0524
C-B-BT-0250
C-B-BT-0437
C-B-BT-0528
C-B-BT-0250
C-B-BT-0437
C-B-BT-0528
C-B-BT-0250
C-B-BT-0437
C-B-BT-0528
C-B-BT-0250
C-B-BT-0437
C-B-BT-0528
C-B-BT-0250
C-B-BT-0438
C-B-BT-0528
C-B-BT-0356
C-B-BT-0468

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-DWG-MEC-3115-01

78

PAL-1193-DWG-MEC-3117-01

79

PAL-1193-DWG-MEC-3118-01

80

PAL-1193-DWG-MEC-3119-01

81

82

83

84

PAL-1193-DWG-MEC-3120-01

Roof Nozzle Details I

Shell Nozzle Details I

Shell Nozzle Details II

Spiral Stairway Assembly and Details

Nameplate & Support Bracket Details

PAL-1193-DWG-MEC-3121-01

Anchor Chair Details

PAL-1193-DWG-MEC-3122-01

Insulation Details for Water Buffer Tank

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

B
C
A
B
C
A
A
C
A
B
C
B

28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015

C-B-BT-0524
C-B-BT-0262
C-B-BT-0438

P-C-BT-0521
P-C-BT-0259
P-C-BT-0435
P-C-BT-0525
P-C-BT-0259
P-C-BT-0435
P-C-BT-0525
P-C-BT-0259
P-C-BT-0435
P-C-BT-0525
P-C-BT-0259
P-C-BT-0426
P-C-BT-0497
P-C-BT-0267
P-C-BT-0426
P-C-BT-0497

12-Jan-2015
6-Feb-2015
28-Feb-15

C
A
B

P-C-BT-0261
P-C-BT-0435
P-C-BT-0525

12-Jan-2015
6-Feb-2015
28-Feb-15

C-B-BT-0264
C-B-BT-0438

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0
A
B
0
A
B
0
A
B
0
A
B
0
A
B
0
1
A
B
0
1
A
B
0

11-Feb-2015
25-Dec-2014
31-Jan-2015
10-Feb-2015
25-Dec-2014
31-Jan-2015
10-Feb-2015
25-Dec-2014
31-Jan-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
2-Mar-2015
10-Jan-2015
31-Jan-2015
10-Feb-2015
2-Mar-2015
5-Jan-2015
31-Jan-2015
10-Feb-2015

B-C-T-0560
B-C-T-0173
B-C-T-0452
B-C-T-0530
B-C-T-0173
B-C-T-0452
B-C-T-0530
B-C-T-0173
B-C-T-0452
B-C-T-0530
B-C-T-0173
B-C-T-0459
B-C-T-0533
B-C-T-0306
B-C-T-0459
B-C-T-0533
B-C-T-0598
B-C-T-0300
B-C-T-0452
B-C-T-0530
B-C-T-0598
B-C-T-0229
B-C-T-0452
B-C-T-0530

11-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
25-Dec-2014
2-Feb-2015
10-Feb-2015
25-Dec-2014
3-Feb-2015
10-Feb-2015
10-Jan-2015
3-Feb-2015
10-Feb-2015
2-Mar-2015
10-Jan-2015
2-Feb-2015
10-Feb-2015
2-Mar-2015
5-Jan-2015
2-Feb-2015
10-Feb-2015

C-P-BT-0570
C-P-BT-0176
C-P-BT-0466
C-P-BT-0550
C-P-BT-0176
C-P-BT-0466
C-P-BT-0550
C-P-BT-0176
C-P-BT-0466
C-P-BT-0550
C-P-BT-0176
C-P-BT-0485
C-P-BT-0553
C-P-BT-0302
C-P-BT-0485
C-P-BT-0553
C-P-BT-0608
C-P-BT-0298
C-P-BT-0466
C-P-BT-0550
C-P-BT-0608
C-P-BT-0238
C-P-BT-0466
C-P-BT-0550

28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
28-Feb-15
12-Jan-2015
6-Feb-2015
27-Feb-2015
12-Jan-2015
6-Feb-2015
27-Feb-2015

12-Jan-2015
6-Feb-2015
28-Feb-15

C
A
C

P-C-BT-0257
P-C-BT-0435
P-C-BT-0525

12-Jan-2015
6-Feb-2015
28-Feb-15

C-B-BT-0260
C-B-BT-0438

5
5
7

A
0
A

22-Oct-2014
9-Dec-2014
22-Oct-2014

B-C-T-0004
B-C-T-0108
B-C-T-0004

17-Nov-2014
10-Dec-2014
17-Nov-2014

C-P-BT-0026
C-P-BT-0113
C-P-BT-0026

8-Dec-2014
13-Dec-2014
8-Dec-2014

B
A
A

P-C-BT-0038
P-C-BT-0078
P-C-BT-0038

8-Dec-2014
13-Dec-2014
8-Dec-2014

C-B-BT-0041
C-B-BT-0081
C-B-BT-0041

7
7
7
7

0
A
0
A

9-Dec-2014
22-Oct-2014
9-Dec-2014
22-Oct-2014

B-C-T-0108
B-C-T-0004
B-C-T-0108
B-C-T-0004

10-Dec-2014
17-Nov-2014
10-Dec-2014
17-Nov-2014

C-P-BT-0113
C-P-BT-0026
C-P-BT-0113
C-P-BT-0026

13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014

A
B
A
A

P-C-BT-0078
P-C-BT-0038
P-C-BT-0078
P-C-BT-0038

13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014

C-B-BT-0081
C-B-BT-0041
C-B-BT-0081
C-B-BT-0041

7
3

0
A

9-Dec-2014
22-Oct-2014

B-C-T-0108
B-C-T-0004

10-Dec-2014
17-Nov-2014

C-P-BT-0113
C-P-BT-0026

13-Dec-2014
8-Dec-2014

A
A

P-C-BT-0078
P-C-BT-0038

13-Dec-2014
8-Dec-2014

C-B-BT-0081
C-B-BT-0041

3
6

0
A

9-Dec-2014
22-Oct-2014

B-C-T-0108
B-C-T-0004

10-Dec-2014
17-Nov-2014

C-P-BT-0113
C-P-BT-0026

13-Dec-2014
8-Dec-2014

A
A

P-C-BT-0078
P-C-BT-0038

13-Dec-2014
8-Dec-2014

C-B-BT-0081
C-B-BT-0041

6
5
5
6
6
6
6
4

0
A
0
A
0
A
0
A

9-Dec-2014
22-Oct-2014
9-Dec-2014
22-Oct-2014
9-Dec-2014
22-Oct-2014
9-Dec-2014
31-Dec-2014

B-C-T-0108
B-C-T-0004
B-C-T-0108
B-C-T-0004
B-C-T-0108
B-C-T-0004
B-C-T-0108
B-C-T-0222

10-Dec-2014
17-Nov-2014
10-Dec-2014
17-Nov-2014
10-Dec-2014
17-Nov-2014
10-Dec-2014
2-Jan-2015

C-P-BT-0113
C-P-BT-0026
C-P-BT-0113
C-P-BT-0026
C-P-BT-0113
C-P-BT-0026
C-P-BT-0113
C-P-BT-0227

13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014
13-Dec-2014
4-Jan-2015

A
B
A
B
A
A
A
B

P-C-BT-0078
P-C-BT-0038
P-C-BT-0078
P-C-BT-0038
P-C-BT-0078
P-C-BT-0038
P-C-BT-0078
P-C-BT-0189

13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014
13-Dec-2014
8-Dec-2014
13-Dec-2014
4-Jan-2015

C-B-BT-0081
C-B-BT-0041
C-B-BT-0081
C-B-BT-0041
C-B-BT-0081
C-B-BT-0041
C-B-BT-0081
C-B-BT-0192

37
47
35

A
0
A

23-Oct-2014
12-Dec-2014
21-Nov-2014

B-C-T-0005
B-C-T-0119
B-C-T-0053

17-Nov-2014
12-Dec-2014
21-Nov-2014

C-P-BT-0035
C-P-BT-0119
C-P-BT-0052

25-Nov-2014
15-Dec-2014
10-Dec-2014

C
A
B

P-C-BT-0013
P-C-BT-0089
P-C-BT-0069

25-Nov-2014
15-Dec-2014
10-Dec-2014

C-B-BT-0016
C-B-BT-0092
C-B-BT-0072

35
36
26
32

0
1
A
0

15-Dec-2014
25-Dec-2014
23-Oct-2014
12-Dec-2014

B-C-T-0134
B-C-T-0183
B-C-T-0005
B-C-T-0119

16-Dec-2014
25-Dec-2014
17-Nov-2014
12-Dec-2014

C-P-BT-0136
C-P-BT-0186
C-P-BT-0035
C-P-BT-0119

17-Dec-2014
29-Dec-2014
25-Nov-2014
15-Dec-2014

A
A
C
A

P-C-BT-0102
P-C-BT-0165
P-C-BT-0013
P-C-BT-0089

18-Dec-2014
29-Dec-2014
25-Nov-2014
15-Dec-2014

C-B-BT-0105
C-B-BT-0168
C-B-BT-0016
C-B-BT-0092

B
C
B

C-B-BT-0528
C-B-BT-0262
C-B-BT-0438
C-B-BT-0528
C-B-BT-0262
C-B-BT-0438
C-B-BT-0528
C-B-BT-0262
C-B-BT-0429
C-B-BT-0500
C-B-BT-0270
C-B-BT-0429
C-B-BT-0500

C-B-BT-0528

C-B-BT-0528

Electrical & CP
Data Sheet (ELC/CP)
1

PAL-1193-DS-ELE-001

Data Sheet for Distribution Transformer

PAL-1193-DS-ELE-002

Data Sheet for LV Switchgear and Motor Control Centre

PAL-1193-DS-ELE-003

Data Sheet for 230V AC UPS

PAL-1193-DS-ELE-004

Data Sheet for MV Power Cables and Termination Kits

PAL-1193-DS-ELE-005

Data Sheet for LV Cables and Cable Glands

PAL-1193-DS-ELE-006

Data Sheet for Electric Motors rated up to 185kW

PAL-1193-DS-ELE-007

Data Sheet for Electric Heat Tracing

PAL-1193-DS-ELE-008

Data Sheet for LV Motor Soft Starter

PAL-1193-DS-ELE-009

Data Sheet for 6.6KV Switchgear

10

PAL-1193-DS-ELE-010

Data Sheet for Ring Main Unit

MTO (ELC/CP)

PAL-1193-MR-ELE-001

MR for Distribution Transformer

PAL-1193-MR-ELE-002

MR for LV Switchgear and Motor Control Centre

PAL-1193-MR-ELE-003

MR for 230V AC UPS

Page 21 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-MR-ELE-004
PAL-1193-MR-ELE-005

MR for LV Cables and Cable Glands

PAL-1193-MR-ELE-006

MR for Lighting Poles Fixtures & Junction Boxes

PAL-1193-MR-ELE-007

MR for Electric Heat Tracing

PAL-1193-MR-ELE-008

MR for Electric Bulk Materials

PAL-1193-MR-ELE-009

MR for EICS

10

PAL-1193-MR-ELE-010

MR for Electrical Cable Tray & Accessories

11

PAL-1193-MR-ELE-011

MR for MV Switchgear (HOLD)

12

PAL-1193-MR-ELE-012

MR for Electric Heat Tracing of Underground Pipe

13

PAL-1193-MR-ELE-013

MR for Earthing Materials

14

PAL-1193-MR-ELE-014

MR for Ring Main Unit

15

PAL-1193-MTO-ELE-001

MTO for Distribution Transformer

16

PAL-1193-MTO-ELE-002

MTO for LV Switchgear and Motor Control Centre

17

PAL-1193-MTO-ELE-003
PAL-1193-MTO-ELE-004
PAL-1193-MTO-ELE-005
PAL-1193-MTO-ELE-006
PAL-1193-MTO-ELE-007
PAL-1193-MTO-ELE-008
PAL-1193-MTO-ELE-009
PAL-1193-MTO-ELE-010
PAL-1193-MTO-ELE-011
PAL-1193-MTO-ELE-012
PAL-1193-MTO-ELE-013
PAL-1193-MTO-ELE-013
PAL-1193-MTO-ELE-014

MTO for 230V AC UPS


MTO for MV Power Cables and Termination Kits
MTO for LV Cables and Cable Glands
MTO for Lighting Poles Fixtures & Junction Boxes
MTO for Electric Heat Tracing
MTO for Electric Bulk Materials
MTO for EICS
MTO for Electrical Cable Tray & Accessories
MTO for MV Switchgear (HOLD)
MTO for Electric Heat Tracing of Underground Pipe
MTO for Earthing Materials
MTO for Earthing Materials
MTO for Ring Main Unit

19
20
21
22
23
24
25
26
27
28
29

30

31

32

PAL-1193-MR-CP-001

PAL-1193-MR-CP-002

PAL-1193-MR-CP-003

MR for CP Materials for External Tank Bottom

MR for CP Materials for Buried Pipes and foundation steel


pillings

PAL-1193-MR-CP-004

MR for Painting and Coating

34

PAL-1193-MTO-CP-001

MTO for CP Materials for External Tank Bottom

36

PAL-1193-MTO-CP-002

PAL-1193-MTO-CP-003

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

18

23-Oct-2014

B-C-T-0005

17-Nov-2014

C-P-BT-0035

25-Nov-2014

P-C-BT-0013

25-Nov-2014

C-B-BT-0016

27
25
26
25

0
A
0
A

12-Dec-2014
9-Dec-2014
16-Dec-2014
27-Nov-2014

B-C-T-0119
B-C-T-0107
B-C-T-0142
B-C-T-0076

12-Dec-2014
10-Dec-2014
17-Dec-2014
27-Nov-2014

C-P-BT-0119
C-P-BT-0109
C-P-BT-0144
C-P-BT-0071

15-Dec-2014
13-Dec-2014
20-Dec-2014
10-Dec-2014

A
A
A
B

P-C-BT-0089
P-C-BT-0079
P-C-BT-0111
P-C-BT-0064

15-Dec-2014
13-Dec-2014
20-Dec-2014
10-Dec-2014

C-B-BT-0092
C-B-BT-0082
C-B-BT-0114
C-B-BT-0067

25
37
37
25
28
40
33
24

0
A
0
A
0
A
0
A

15-Dec-2014
12-Dec-2014
22-Dec-2014
9-Dec-2014
16-Dec-2014
11-Dec-2014
22-Dec-2014
28-Nov-2014

B-C-T-0134
B-C-T-0118
B-C-T-0157
B-C-T-0107
B-C-T-0142
B-C-T-0114
B-C-T-0157
B-C-T-0085

16-Dec-2014
12-Dec-2014
22-Dec-2014
10-Dec-2014
17-Dec-2014
11-Dec-2014
22-Dec-2014
28-Nov-2014

C-P-BT-0136
C-P-BT-0120
C-P-BT-0158
C-P-BT-0109
C-P-BT-0144
C-P-BT-0116
C-P-BT-0158
C-P-BT-0080

17-Dec-2014
15-Dec-2014
22-Dec-2014
13-Dec-2014
20-Dec-2014
15-Dec-2014
22-Dec-2014
10-Dec-2014

A
A
C
A
A
A
C
B

P-C-BT-0102
P-C-BT-0090
P-C-BT-0121
P-C-BT-0079
P-C-BT-0111
P-C-BT-0088
P-C-BT-0121
P-C-BT-0063

18-Dec-2014
15-Dec-2014
22-Dec-2014
13-Dec-2014
20-Dec-2014
15-Dec-2014
22-Dec-2014
10-Dec-2014

C-B-BT-0105
C-B-BT-0093
C-B-BT-0124
C-B-BT-0082
C-B-BT-0114
C-B-BT-0091
C-B-BT-0124
C-B-BT-0066

24
28
34
33

0
A
0
A

15-Dec-2014
23-Oct-2014
12-Dec-2014
19-Nov-2014

B-C-T-0134
B-C-T-0005
B-C-T-0119
B-C-T-0038

16-Dec-2014
17-Nov-2014
12-Dec-2014
19-Nov-2014

C-P-BT-0136
C-P-BT-0035
C-P-BT-0119
C-P-BT-0040

17-Dec-2014
25-Nov-2014
15-Dec-2014
9-Dec-2014

A
C
A

P-C-BT-0102
P-C-BT-0013
P-C-BT-0089
P-C-BT-0050

18-Dec-2014
25-Nov-2014
15-Dec-2014
9-Dec-2014

C-B-BT-0105
C-B-BT-0016
C-B-BT-0092
C-B-BT-0053

38
16
26
33

0
A
0
A

12-Dec-2014
19-Nov-2014
12-Dec-2014
31-Dec-2014

B-C-T-0119
B-C-T-0038
B-C-T-0119
B-C-T-0222

12-Dec-2014
20-Nov-2014
12-Dec-2014
2-Jan-2015

C-P-BT-0119
C-P-BT-0042
C-P-BT-0119
C-P-BT-0227

15-Dec-2014
9-Dec-2014
15-Dec-2014
4-Jan-2015

A
B
A
A

P-C-BT-0089
P-C-BT-0051
P-C-BT-0089
P-C-BT-0189

15-Dec-2014
9-Dec-2014
15-Dec-2014
4-Jan-2015

C-B-BT-0092
C-B-BT-0054
C-B-BT-0092
C-B-BT-0192

1
1

A
A

23-Oct-2014
21-Nov-2014

B-C-T-0005
B-C-T-0053

17-Nov-2014
21-Nov-2014

C-P-BT-0035
C-P-BT-0052

25-Nov-2014
10-Dec-2014

A
A

P-C-BT-0013
P-C-BT-0069

25-Nov-2014
10-Dec-2014

C-B-BT-0016
C-B-BT-0072

1
1
1
1
1
1
3
1
1
1
1

C
A
A
A
A
A
A
A
A
A
A

25-Dec-2014
23-Oct-2014
23-Oct-2014
9-Dec-2014
27-Nov-2014
12-Dec-2014
9-Dec-2014
11-Dec-2014
28-Nov-2014
23-Oct-2014
19-Nov-2014

B-C-T-0183
B-C-T-0005
B-C-T-0005
B-C-T-0107
B-C-T-0076
B-C-T-0118
B-C-T-0107
B-C-T-0114
B-C-T-0085
B-C-T-0005
B-C-T-0038

25-Dec-2014
17-Nov-2014
17-Nov-2014
10-Dec-2014
27-Nov-2014
12-Dec-2014
10-Dec-2014
11-Dec-2014
28-Nov-2014
17-Nov-2014
19-Nov-2014

C-P-BT-0186
C-P-BT-0035
C-P-BT-0035
C-P-BT-0109
C-P-BT-0071
C-P-BT-0120
C-P-BT-0109
C-P-BT-0116
C-P-BT-0080
C-P-BT-0035
C-P-BT-0040

29-Dec-2014
25-Nov-2014
25-Nov-2014
13-Dec-2014
10-Dec-2014
15-Dec-2014
13-Dec-2014
15-Dec-2014
10-Dec-2014
25-Nov-2014
9-Dec-2014

A
A
A
A
A
A
A
A
A
A

P-C-BT-0165
P-C-BT-0013
P-C-BT-0013
P-C-BT-0079
P-C-BT-0064
P-C-BT-0090
P-C-BT-0079
P-C-BT-0088
P-C-BT-0063
P-C-BT-0013
P-C-BT-0050

29-Dec-2014
25-Nov-2014
25-Nov-2014
13-Dec-2014
10-Dec-2014
15-Dec-2014
13-Dec-2014
15-Dec-2014
10-Dec-2014
25-Nov-2014
9-Dec-2014

C-B-BT-0168
C-B-BT-0016
C-B-BT-0016
C-B-BT-0082
C-B-BT-0067
C-B-BT-0093
C-B-BT-0082
C-B-BT-0091
C-B-BT-0066
C-B-BT-0016
C-B-BT-0053

2
1

A
A

19-Nov-2014
31-Dec-2014

B-C-T-0038
B-C-T-0222

20-Nov-2014
2-Jan-2015

C-P-BT-0042
C-P-BT-0227

9-Dec-2014
4-Jan-2015

A
A

P-C-BT-0051
P-C-BT-0189

9-Dec-2014
4-Jan-2015

C-B-BT-0054
C-B-BT-0192

31

26-Oct-2014

B-C-T-0009

15-Nov-2014

C-P-BT-0021

10-Dec-2014

P-C-BT-0068

10-Dec-2014

C-B-BT-0071

25
35
25

B
0
A

25-Dec-2014
5-Jan-2015
2-Dec-2014

B-C-T-0176
B-C-T-0238
B-C-T-0101

25-Dec-2014
5-Jan-2015
8-Dec-2014

C-P-BT-0179
C-P-BT-0235
C-P-BT-0104

29-Dec-2014
5-Jan-2015
9-Dec-2014

P-C-BT-0161
P-C-BT-0210
P-C-BT-0053

29-Dec-2014
5-Jan-2015
9-Dec-2014

C-B-BT-0164

A
B

25
35

0
A

24-Dec-2014
2-Dec-2014

B-C-T-0170
B-C-T-0102

24-Dec-2014
8-Dec-2014

C-P-BT-0173
C-P-BT-0104

29-Dec-2014
9-Dec-2014

A
B

P-C-BT-0162
P-C-BT-0053

29-Dec-2014
9-Dec-2014

C-B-BT-0165
C-B-BT-0056

35
29
30
29
1

0
A
B
0
A

25-Dec-2014
19-Dec-2014
3-Feb-2015
11-Feb-2015
26-Oct-2014

B-C-T-0175
B-C-T-0152
B-C-T-0485
B-C-T-0563
B-C-T-0009

25-Dec-2014
22-Nov-2014
4-Feb-2015
12-Feb-2015
15-Nov-2014

C-P-BT-0178
C-P-BT-0159
C-P-BT-0492
C-P-BT-0575
C-P-BT-0021

29-Dec-2014
23-Dec-2014
6-Feb-2015
13-Feb-2015
10-Dec-2014

A
C
B
A
A

P-C-BT-0163
P-C-BT-0125
P-C-BT-0430
P-C-BT-0486
P-C-BT-0068

29-Dec-2014
23-Dec-2014
6-Feb-2015
13-Feb-2015
10-Dec-2014

C-B-BT-0166

1
2
1

B
0
A

25-Dec-2014
5-Jan-2015
2-Dec-2014

B-C-T-0176
B-C-T-0238
B-C-T-0101

25-Dec-2014
5-Jan-2015
8-Dec-2014

C-P-BT-0179
C-P-BT-0235
C-P-BT-0104

29-Dec-2014
5-Jan-2015
9-Dec-2014

P-C-BT-0161
P-C-BT-0210
P-C-BT-0053

29-Dec-2014
5-Jan-2015
9-Dec-2014

C-B-BT-0164

1
1

0
A

24-Dec-2014
2-Dec-2014

B-C-T-0170
B-C-T-0102

24-Dec-2014
8-Dec-2014

C-P-BT-0173
C-P-BT-0104

29-Dec-2014
9-Dec-2014

P-C-BT-0162
P-C-BT-0053

29-Dec-2014
9-Dec-2014

C-B-BT-0165
C-B-BT-0056

C-B-BT-0213
C-B-BT-0056

MR for CP Materials For Internal Tank Surface

33

35

2015/3/10

MR for MV Power Cables and Termination Kits

18

A- Approved; B -Accepted with Correction

C-B-BT-0128
C-B-BT-0433
C-B-BT-0489
C-B-BT-0071

C-B-BT-0213
C-B-BT-0056

MTO for CP Materials For Internal Tank Surface


MTO for CP Materials for Buried Pipes and foundation
steel pillings
Page 22 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.
steel pillings

37

PAL-1193-MTO-CP-004

MTO for Painting and Coating

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

A
B
A

P-C-BT-0163
P-C-BT-0125
P-C-BT-0486

29-Dec-2014
23-Dec-2014
13-Feb-2015

C-B-BT-0166

31-Dec-2014
5-Jan-2015
6-Feb-2015
26-Feb-2015
31-Dec-2014
5-Jan-2015
9-Jan-2015

2
1
1

0
A
0

25-Dec-2014
19-Dec-2014
11-Feb-2015

B-C-T-0175
B-C-T-0152
B-C-T-0563

25-Dec-2014
22-Nov-2014
12-Feb-2015

C-P-BT-0178
C-P-BT-0159
C-P-BT-0575

29-Dec-2014
23-Dec-2014
13-Feb-2015

10
9
8
9
11
14
9

A
0
A
0
A
0
A

29-Dec-2014
5-Jan-2015
2-Feb-2015
9-Feb-2015
30-Dec-2014
5-Jan-2015
9-Jan-2015

B-C-T-0200
B-C-T-0135
B-C-T-0455
B-C-T-0587
B-C-T-0206
B-C-T-0135
B-C-T-0280

30-Dec-2014
5-Jan-2015
3-Feb-2015
15-Feb-2015
30-Dec-2014
5-Jan-2015
9-Jan-2015

C-P-BT-0202
C-P-BT-0232
C-P-BT-0475
C-P-BT-0589
C-P-BT-0209
C-P-BT-0232
C-P-BT-0283

31-Dec-2014
5-Jan-2015
6-Feb-2015
26-Feb-15
31-Dec-2014
5-Jan-2015
9-Jan-2015

A
C

P-C-BT-0180
P-C-BT-0211
P-C-BT-0417
P-C-BT-0501
P-C-BT-0181
P-C-BT-0211
P-C-BT-0241

9
5

0
A

16-Jan-2015
9-Jan-2015

B-C-T-0336
B-C-T-0281

16-Jan-2015
9-Jan-2015

C-P-BT-0338
C-P-BT-0284

19-Jan-2015
9-Jan-2015

A
C

P-C-BT-0302
P-C-BT-0243

19-Jan-2015
9-Jan-2015

C-B-BT-0305

5
4
4
4
8
7
5
6

0
A
B
0
A
0
A
0

14-Jan-2015
9-Jan-2015
20-Jan-2015
31-Jan-2015
28-Jan-2015
2-Feb-2014
9-Jan-2015
16-Jan-2015

B-C-T-0320
B-C-T-0290
B-C-T-0355
B-C-T-0445
B-C-T-0294
B-C-T-0472
B-C-T-0290
B-C-T-0336

14-Jan-2015
9-Jan-2015
27-Jan-2015
2-Feb-2015
29-Jan-2015
3-Feb-2015
9-Jan-2015
16-Jan-2015

C-P-BT-0321
C-P-BT-0293
C-P-BT-0417
C-P-BT-0460
C-P-BT-0431
C-P-BT-0474
C-P-BT-0293
C-P-BT-0338

15-Jan-2015
10-Jan-2015
29-Jan-2014
6-Feb-2015
2-Feb-2015
4-Feb-2015
10-Jan-2015
19-Jan-2015

A
C
A
A
A
A
C
A

P-C-BT-0274
P-C-BT-0252
P-C-BT-0367
P-C-BT-0427
P-C-BT-0389
P-C-BT-0405
P-C-BT-0252
P-C-BT-0302

15-Jan-2015
10-Jan-2015
29-Jan-2014
6-Feb-2015
2-Feb-2015
4-Feb-2015
10-Jan-2015
19-Jan-2015

C-B-BT-0277
C-B-BT-0255
C-B-BT-0370
C-B-BT-0430
C-B-BT-0392
C-B-BT-0408
C-B-BT-0255
C-B-BT-0305

4
4
11
11
8
7
5
5
6
5
3
2
3
5
5
4

A
0
A
0
A
0
A
0
A
A
A
B
0
A
0
A

9-Jan-2015
14-Jan-2015
31-Dec-2014
5-Jan-2015
9-Jan-2015
28-Jan-2015
9-Jan-2015
14-Jan-2015
22-Nov-2014
2-Jan-2015
10-Jan-2015
14-Jan-2015
27-Jan-2015
5-Jan-2015
27-Jan-2015
12-Feb-2015
15-Feb-2015

C-P-BT-0293
C-P-BT-0321
C-P-BT-0216
C-P-BT-0232
C-P-BT-0285
C-P-BT-0432
C-P-BT-0289
C-P-BT-0321
C-P-BT-0159
C-P-BT-0225
C-P-BT-0304
C-P-BT-0323
C-P-BT-0414
C-P-BT-0244
C-P-BT-0414
C-P-BT-0576
C-P-BT-0597

10-Jan-2015
15-Jan-2015
31-Dec-2014
5-Jan-2015
10-Jan-2015
29-Jan-2014
10-Jan-2015
15-Jan-2015
23-Dec-2014
4-Jan-2015
12-Jan-2015
15-Jan-2015
29-Jan-2014
6-Jan-2015
29-Jan-2014
13-Feb-2015
28-Feb-15

A
C
A
C
A
A
A
C
A
A
A
A
B
A

P-C-BT-0252
P-C-BT-0274
P-C-BT-0185
P-C-BT-0211
P-C-BT-0252
P-C-BT-0366
P-C-BT-0252
P-C-BT-0274
P-C-BT-0125
P-C-BT-0191
P-C-BT-0255
P-C-BT-0273
P-C-BT-0360
P-C-BT-0215
P-C-BT-0360
P-C-BT-0485
P-C-BT-0532

10-Jan-2015
15-Jan-2015
31-Dec-2014
5-Jan-2015
10-Jan-2015
29-Jan-2014
10-Jan-2015
15-Jan-2015
23-Dec-2014
4-Jan-2015
12-Jan-2015
15-Jan-2015
29-Jan-2014
6-Jan-2015
29-Jan-2014
13-Feb-2015
28-Feb-2015

C-B-BT-0255

B-C-T-0290
B-C-T-0320
B-C-T-0212
B-C-T-0135
B-C-T-0282
B-C-T-0420
B-C-T-0286
B-C-T-0320
B-C-T-0152
B-C-T-0224
B-C-T-0304
B-C-T-0322
B-C-T-0405
B-C-T-0242
B-C-T-0405
B-C-T-0565
B-C-T-0586

C
A
B

9-Jan-2015
14-Jan-2015
30-Dec-2014
5-Jan-2015
9-Jan-2015
28-Jan-2015
9-Jan-2015
14-Jan-2015
19-Dec-2014
31-Dec-2014
10-Jan-2015
14-Jan-2015
27-Jan-2015
5-Jan-2015
27-Jan-2015
11-Feb-2015
15-Feb-2015

19-Dec-2014

B-C-T-0150

19-Dec-2014

C-P-BT-0152

20-Nov-2014

B-C-T-0052

21-Nov-2014

C-P-BT-0048

9-Dec-2014

P-C-BT-0052

9-Dec-2014

C-B-BT-0055

5
18
18
5
5
15
12
23

24-Dec-2014
17-Dec-2014
23-Dec-2014
1-Dec-2014
29-Dec-2014
19-Dec-2014
23-Dec-2014
6-Dec-2014
16-Dec-2014
23-Dec-2014

B-C-T-0162
B-C-T-0147
B-C-T-0164
B-C-T-0095
B-C-T-0201
B-C-T-0146
B-C-T-0161
B-C-T-0101
B-C-T-0141
B-C-T-0161

24-Dec-2014
19-Dec-2014
24-Dec-2014
2-Dec-2014
30-Dec-2014
19-Dec-2014
24-Dec-2014
6-Dec-2014
17-Dec-2014
24-Dec-2014

26-Dec-2014
23-Dec-2014
26-Dec-2014
10-Dec-2014
31-Dec-2014
20-Dec-2014
26-Dec-2014
10-Dec-2014
20-Dec-2014
26-Dec-2014

A
A
A
A
A
B
A
A
B
A

P-C-BT-0148
P-C-BT-0126
P-C-BT-0158
P-C-BT-0067
P-C-BT-0182
P-C-BT-0113
P-C-BT-0147
P-C-BT-0062
P-C-BT-0110
P-C-BT-0147

26-Dec-2014
23-Dec-2014
26-Dec-2014
10-Dec-2014
31-Dec-2014
20-Dec-2014
26-Dec-2014
10-Dec-2014
20-Dec-2014
26-Dec-2014

C-B-BT-0129
C-B-BT-0161
C-B-BT-0070
C-B-BT-0185
C-B-BT-0116
C-B-BT-0150
C-B-BT-0065
C-B-BT-0113
C-B-BT-0150

19-Dec-2014

B-C-T-0151

19-Dec-2014

C-P-BT-0165
C-P-BT-0148
C-P-BT-0167
C-P-BT-0094
C-P-BT-0203
C-P-BT-0153
C-P-BT-0164
C-P-BT-0103
C-P-BT-0143
C-P-BT-0164
C-P-BT-0151

C-B-BT-0151

23

0
A
0
A
0
A
0
A
0
1

26-Oct-2014

B-C-T-0009

15-Nov-2014

C-P-BT-0021

10-Dec-2014

P-C-BT-0068

10-Dec-2014

C-B-BT-0071

25-Dec-2014

B-C-T-0175

25-Dec-2014

C-P-BT-0178

29-Dec-2014

P-C-BT-0163

29-Dec-2014

C-B-BT-0166

C-B-BT-0128
C-B-BT-0489

TBE (ELC/CP)

PAL-1193-TBE-ELE-001

TBE for Distribution Transformer

PAL-1193-TBE-ELE-002

TBE for LV Switchgear and Motor Control Centre

PAL-1193-TBE-ELE-003

TBE for 230V AC UPS

PAL-1193-TBE-ELE-004

PAL-1193-TBE-ELE-005

TBE for Medium Voltage Power Cables and Termination


Kits

A
C
A
A

C-B-BT-0183
C-B-BT-0214
C-B-BT-0420
C-B-BT-0504
C-B-BT-0184
C-B-BT-0214
C-B-BT-0244

C-B-BT-0246

TBE for Low Voltage Cables

PAL-1193-TBE-ELE-006

TBE For Lighting Poles Fixtures & Junction Boxes

PAL-1193-TBE-ELE-007

TBE for Electric Heat Tracing of Aboveground Pipe

PAL-1193-TBE-ELE-008

TBE for Electric Bulk Materials

PAL-1193-TBE-ELE-009

TBE for EICS

10

PAL-1193-TBE-ELE-010

TBE for Cable Tray and Accessories

11

PAL-1193-TBE-ELE-011

TBE for 6.6kv Switchgear

12

PAL-1193-TBE-ELE-012

TBE for Electric Heat Tracing of Underground Pipe

13

PAL-1193-TBE-ELE-013

TBE for Earthing Materials

14

PAL-1193-TBE-CP-001

TBE for CP Materials For External Tank Bottom

15

PAL-1193-TBE-CP-002

TBE for CP Materials For Internal Tank Surface

16

PAL-1193-TBE-CP-003

TBE for CP Materials for Steel Pilings

17

PAL-1193-TBE-CP-004

TBE for Painting and Coating

C-B-BT-0277
C-B-BT-0188
C-B-BT-0214
C-B-BT-0255
C-B-BT-0369
C-B-BT-0255
C-B-BT-0277
C-B-BT-0128
C-B-BT-0194
C-B-BT-0258
C-B-BT-0276
C-B-BT-0363
C-B-BT-0218
C-B-BT-0363
C-B-BT-0488
C-B-BT-0535

ation (ELC/CP)

PAL-1193-RP-ELE-006

Technical Proposal for 6.6KV Power Source and


Technical Proposal for 6.6KV Power Source and Route
Selection

PAL-1193-CAL-ELE-001

Calculation for Distribution Transformer Sizing

PAL-1193-CAL-ELE-002

Calculation for Short Circuit Current

PAL-1193-CAL-ELE-003

Calculation for 230V AC UPS Sizing

PAL-1193-CAL-ELE-004

Cable Size Calculation

PAL-1193-CAL-ELE-005

Calculation for Area Lighting

PAL-1193-CAL-ELE-006

Calculation for Distribution Transformer Sizing


Tag No.:PAL-PWRP-TR-01/02

PAL-1193-CAL-CP-001

Cathodic Protection Calculation for External Tank Bottom

Page 23 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-CAL-CP-002
PAL-1193-CAL-CP-003

Cathodic Protection Calculation for Internal Tank Surface


Cathodic Protection Calculationn for Buried Pipes and
foundation steel pillings

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

9
9
5

A
0
A

22-Nov-2014
5-Jan-2015
28-Nov-2014

B-C-T-0050
B-C-T-0238
B-C-T-0066

21-Nov-2014
5-Jan-2015
29-Nov-2014

C-P-BT-0053
C-P-BT-0235
C-P-BT-0083

10-Dec-2014
5-Jan-2015
11-Dec-2014

P-C-BT-0066
P-C-BT-0210
P-C-BT-0072

10-Dec-2014
5-Jan-2015
11-Dec-2014

C-B-BT-0069

A
A

25-Dec-2014

B-C-T-0175

25-Dec-2014

C-P-BT-0178

29-Dec-2014

P-C-BT-0163

29-Dec-2014

C-B-BT-0166

26-Oct-2014

B-C-T-0009

15-Nov-2014

C-P-BT-0021

10-Dec-2014

P-C-BT-0068

10-Dec-2014

C-B-BT-0071

10
11
15

B
0
A

25-Dec-2014
3-Feb-2015
26-Oct-2014

B-C-T-0176
B-C-T-0486
B-C-T-0009

25-Dec-2014
4-Feb-2015
15-Nov-2014

C-P-BT-0179
C-P-BT-0490
C-P-BT-0021

29-Dec-2014
6-Feb-2015
10-Dec-2014

B
C
A

P-C-BT-0161
P-C-BT-0429
P-C-BT-0068

29-Dec-2014
6-Feb-2015
10-Dec-2014

C-B-BT-0164
C-B-BT-0432
C-B-BT-0071

16

15

25-Dec-2014
31-Dec-2014

B-C-T-0176
B-C-T-0224

25-Dec-2014
2-Jan-2015

C-P-BT-0179
C-P-BT-0225

29-Dec-2014
4-Jan-2015

B
A

P-C-BT-0161
P-C-BT-0191

29-Dec-2014
4-Jan-2015

C-B-BT-0164
C-B-BT-0194

3
3
4
4
6
7

A
0
A
0
A
0

20-Nov-2014
24-Dec-2014
10-Jan-2015
26-Jan-2015
17-Dec-2014
23-Dec-2014

B-C-T-0052
B-C-T-0162
B-C-T-0301
B-C-T-0394
B-C-T-0145
B-C-T-0163

21-Nov-2014
24-Dec-2014
10-Jan-2015
26-Jan-2015
19-Dec-2014
24-Dec-2014

C-P-BT-0048
C-P-BT-0165
C-P-BT-0305
C-P-BT-0405
C-P-BT-0147
C P BT 0166
C-P-BT-0166

9-Dec-2014
26-Dec-2014
12-Jan-2015
29-Jan-2015
20-Dec-2014
26-Dec-2014

B
A
C
A
C
A

P-C-BT-0052
P-C-BT-0148
P-C-BT-0268
P-C-BT-0362
P-C-BT-0112
P C BT 0149
P-C-BT-0149

9-Dec-2014
26-Dec-2014
12-Jan-2015
29-Jan-2015
20-Dec-2014
26-Dec-2014

C-B-BT-0055
C-B-BT-0151
C-B-BT-0271
C-B-BT-0365
C-B-BT-0115
C-B-BT-0152

11-Feb-2015

B-C-T-0547

11-Feb-2015

P-C-BT-0476

12-Feb-2015

C-B-BT-0479

19-Dec-2014

B-C-T-0151

19-Dec-2014

C-P-BT-0557
C-P-BT-0151

12-Feb-2015

2
1
1
1
2
1
1
1
1
1
1

A
0
A
0
A
B
0
A
0
A

10-Nov-2014
15-Dec-2014
1-Nov-2014
9-Dec-2014
19-Nov-2014
26-Jan-2015
31-Jan-2015
10-Nov-2014
15-Dec-2014
10-Nov-2014

B-C-T-0030
B-C-T-0139
B-C-T-0018
B-C-T-0110
B-C-T-0039
B-C-T-0403
B-C-T-0445
B-C-T-0030
B-C-T-0139
B-C-T-0030

20-Nov-2014
16-Dec-2014
17-Nov-2014
10-Dec-2014
20-Nov-2014
26-Jan-2015
2-Feb-2015
20-Nov-2014
16-Dec-2014
20-Nov-2014

C-P-BT-0041
C-P-BT-0140
C-P-BT-0034
C-P-BT-0112
C-P-BT-0041
C-P-BT-0413
C-P-BT-0460
C-P-BT-0041
C-P-BT-0140
C-P-BT-0041

11-Dec-2014
19-Dec-2014
9-Dec-2014
13-Dec-2014
11-Dec-2014
29-Jan-2015
6-Feb-2015
11-Dec-2014
19-Dec-2014
11-Dec-2014

C
A
A
A
C
A
A
C
A
A

P-C-BT-0070
P-C-BT-0107
P-C-BT-0048
P-C-BT-0080
P-C-BT-0070
P-C-BT-0361
P-C-BT-0427
P-C-BT-0070
P-C-BT-0107
P-C-BT-0070

11-Dec-2014
19-Dec-2014
9-Dec-2014
13-Dec-2014
11-Dec-2014
29-Jan-2015
6-Feb-2015
11-Dec-2014
19-Dec-2014
11-Dec-2014

C-B-BT-0073
C-B-BT-0110
C-B-BT-0051
C-B-BT-0083
C-B-BT-0073
C-B-BT-0364
C-B-BT-0430
C-B-BT-0073
C-B-BT-0110
C-B-BT-0073

1
1

0
A

15-Dec-2014
10-Nov-2014

B-C-T-0139
B-C-T-0030

16-Dec-2014
20-Nov-2014

C-P-BT-0140
C-P-BT-0041

19-Dec-2014
11-Dec-2014

A
A

P-C-BT-0107
P-C-BT-0070

19-Dec-2014
11-Dec-2014

C-B-BT-0110
C-B-BT-0073

3
3
1
1
1
1
1
1
1
2
3
1
1
1
1

0
1
A
0
1
A
0
A
0
A
0
1
A
0
A

15-Dec-2014
13-Feb-2015
10-Nov-2014
20-Dec-2014
19-Jan-2015
19-Jan-2015
20-Jan-2015
10-Nov-2014
20-Dec-2014
6-Dec-2014
29-Dec-2014
13-Feb-2015
12-Dec-2014
20-Dec-2014
31-Dec-2014

B-C-T-0139
B-C-T-0569
B-C-T-0030
B-C-T-0156
B-C-T-0349
B-C-T-0349
B-C-T-0359
B-C-T-0030
B-C-T-0156
B-C-T-0082
B-C-T-0198
B-C-T-0569
B-C-T-0120
B-C-T-0156
B-C-T-0222

16-Dec-2014
13-Feb-2015
20-Nov-2014
20-Dec-2014
19-Jan-2015
19-Jan-2015
20-Jan-2015
20-Nov-2014
20-Dec-2014
6-Dec-2014
29-Dec-2014
13-Feb-2015
12-Dec-2014
20-Dec-2014
2-Jan-2015

C-P-BT-0140
C-P-BT-0584
C-P-BT-0041
C-P-BT-0157
C-P-BT-0350
C-P-BT-0350
C-P-BT-0359
C-P-BT-0041
C-P-BT-0157
C-P-BT-0100
C-P-BT-0199
C-P-BT-0584
C-P-BT-0121
C-P-BT-0157
C-P-BT-0227

19-Dec-2014
27-Feb-2015
11-Dec-2014
23-Dec-2014
20-Jan-2015
20-Jan-2015
21-Jan-2015
11-Dec-2014
23-Dec-2014
12-Dec-2014
30-Dec-2014
27-Feb-2015
13-Dec-2014
23-Dec-2014
4-Jan-2015

A
A
C
A
A
A
A
A
A
C
A
A
B
A
B

P-C-BT-0107
P-C-BT-0514
P-C-BT-0070
P-C-BT-0127
P-C-BT-0309
P-C-BT-0309
P-C-BT-0317
P-C-BT-0070
P-C-BT-0127
P-C-BT-0076
P-C-BT-0175
P-C-BT-0514
P-C-BT-0086
P-C-BT-0127
P-C-BT-0189

19-Dec-2014
27-Feb-2015
11-Dec-2014
23-Dec-2014
20-Jan-2015
20-Jan-2015
21-Jan-2015
11-Dec-2014
23-Dec-2014
12-Dec-2014
30-Dec-2014
27-Feb-2015
13-Dec-2014
23-Dec-2014
4-Jan-2015

C-B-BT-0110
C-B-BT-0517
C-B-BT-0073

C-B-BT-0130
C-B-BT-0192

10-Nov-2014

B-C-T-0030

20-Nov-2014

C-P-BT-0041

11-Dec-2014

P-C-BT-0070

11-Dec-2014

C-B-BT-0073

1
1

0
A

15-Dec-2014
10-Nov-2014

B-C-T-0139
B-C-T-0030

16-Dec-2014
20-Nov-2014

C-P-BT-0140
C-P-BT-0041

19-Dec-2014
11-Dec-2014

A
C

P-C-BT-0107
P-C-BT-0070

19-Dec-2014
11-Dec-2014

C-B-BT-0110
C-B-BT-0073

15-Dec-2014

B-C-T-0139

16-Dec-2014

C-P-BT-0140

19-Dec-2014

P-C-BT-0107

19-Dec-2014

C-B-BT-0110

C-B-BT-0213
C-B-BT-0075

Specification (ELC/CP)

PAL-1193-SP-CP-001

PAL-1193-SP-CP-002

Specification for Painting and Protective Coating

Specification for Cathodic Protection System for internal


Tank Surface

Drawing (ELC)
1
1

PAL-1193-SCH-ELE-001

Electrical Load Schedule

PAL-1193-SCH-ELE-002

Electrical Cable Schedule

PAL 1193 SCH ELE 003


PAL-1193-SCH-ELE-003

EICS I/O List Schedule

PAL-1193-SCH-ELE-006

Electrical Load Schedule Tag No.: PAL-PWRP-TR-01/02

PAL-1193-DWG-ELE-6000

Electrical Standard Symbols

PAL-1193-DWG-ELE-6001

Hazardous Area Classification

PAL-1193-DWG-ELE-6002

Electrical Substation Plot Plan

PAL-1193-DWG-ELE-6020

Key Single Line Diagram

PAL-1193-DWG-ELE-6021

Single Line Diagram for MV Switchgear (HOLD)

PAL-1193-DWG-ELE-6022

Single Line Diagram for 400V Switchgear & MCC

10

PAL-1193-DWG-ELE-6023-01

EICS Block Diagram

11

PAL-1193-DWG-ELE-6023-02

EICS Block Diagram

12

PAL-1193-DWG-ELE-6024

Single Line Diagram for 230V AC UPS System

13

PAL-1193-DWG-ELE-6025

Single Line Diagram for Outdoor Lighting Controlgear

14

PAL-1193-DWG-ELE-6027

15

PAL-1193-DWG-ELE-6028

Single Line Diagram For Ring Main Unit

16

PAL-1193-DWG-ELE-6050

Control Schematic (TYPE-01) (For Motors < 5.5kW)

17

PAL-1193-DWG-ELE-6051

Single Line Diagram for CP & Small Power Distribution


Board

Control Schematic (TYPE-02) (For Motors >= 5.5kW and


<30kW)

Page 24 of 35

C-B-BT-0130
C-B-BT-0312
C-B-BT-0312
C-B-BT-0320
C-B-BT-0073
C-B-BT-0130
C-B-BT-0079
C-B-BT-0178
C-B-BT-0517
C-B-BT-0089

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

18

19

20

PAL-1193-DWG-ELE-6052

PAL-1193-DWG-ELE-6053

PAL-1193-DWG-ELE-6054

Control Schematic (TYPE-03) (For Motors > 30kW and


<90kW)
Control Schematic (TYPE-04) (For Motors>= 90kW and
<150kW)

PAL-1193-DWG-ELE-6055

Control Schematic (TYPE-06) (For panel)

22

PAL-1193-DWG-ELE-6056

Control Schematic (TYPE-07) (For photocell)

23

PAL-1193-DWG-ELE-6150

Area Cable Trench and Cable Tray Layout

24

PAL-1193-DWG-ELE-6151

Area Lighting & Small Power Layout

25

PAL-1193-DWG-ELE-6152

Area Power Cable Routine Layout

PAL-1193-DWG-ELE-6152-3

Area Cable Routing Layout sheet 03

G
PAL-1193-DWG-ELE-6153

Area Earthing Installation Layout

27

28

29

30

PAL-1193-DWG-ELE-6700

PAL-1193-DWG-ELE-6701

PAL-1193-DWG-ELE-6702

PAL-1193-DWG-ELE-6703

31

PAL-1193-DWG-CP-6950-001

32

PAL-1193-DWG-CP-6951-01

33

PAL-1193-DWG-CP-6951-02

34

PAL-1193-DWG-CP-6952

35

PAL-1193-DWG-CP-6953

36

PAL-1193-DWG-CP-6954-001

37

PAL-1193-DWG-CP-6955-001

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

10-Nov-2014

B-C-T-0030

20-Nov-2014

C-P-BT-0041

11-Dec-2014

P-C-BT-0070

11-Dec-2014

C-B-BT-0073

1
1

0
A

15-Dec-2014
10-Nov-2014

B-C-T-0139
B-C-T-0030

16-Dec-2014
20-Nov-2014

C-P-BT-0140
C-P-BT-0041

19-Dec-2014
11-Dec-2014

A
C

P-C-BT-0107
P-C-BT-0070

19-Dec-2014
11-Dec-2014

C-B-BT-0110
C-B-BT-0073

1
1

0
A

15-Dec-2014
10-Nov-2014

B-C-T-0139
B-C-T-0030

16-Dec-2014
20-Nov-2014

C-P-BT-0140
C-P-BT-0041

19-Dec-2014
11-Dec-2014

A
C

P-C-BT-0107
P-C-BT-0070

19-Dec-2014
11-Dec-2014

C-B-BT-0110
C-B-BT-0073

1
1
1
1
1
1
2
2
2
2
1
1
3
2
3
1
1
1

0
A
0
A
B
0
A
0
1
A
0
1
A
0
1
0
A
0

15-Dec-2014
10-Nov-2014
15-Dec-2014
24-Jan-2015
2-Feb-2015
9-Feb-2015
6-Dec-2014
2-Feb-2015
13-Feb-2015
6-Dec-2014
29-Dec-2014
13-Feb-2015
6-Dec-2014
2-Feb-2015
13-Feb-2015
9-Feb-2015
10-Nov-2014
31 D 2014
31-Dec-2014

B-C-T-0139
B-C-T-0030
B-C-T-0139
B-C-T-0395
B-C-T-0470
B-C-T-0516
B-C-T-0083
B-C-T-0456
B-C-T-0569
B-C-T-0082
B-C-T-0198
B-C-T-0569
B-C-T-0083
B-C-T-0456
B-C-T-0569
B-C-T-0587
B-C-T-0031
B C T 0227
B-C-T-0227

16-Dec-2014
20-Nov-2014
16-Dec-2014
24-Jan-2015
3-Feb-2015
9-Feb-2015
6-Dec-2014
3-Feb-2015
13-Feb-2015
6-Dec-2014
29-Dec-2014
13-Feb-2015
6-Dec-2014
3-Feb-2015
13-Feb-2015
15-Feb-2015
19-Nov-2014
2 J 2015
2-Jan-2015

C-P-BT-0140
C-P-BT-0041
C-P-BT-0140
C-P-BT-0404
C-P-BT-0477
C-P-BT-0528
C-P-BT-0101
C-P-BT-0476
C-P-BT-0584
C-P-BT-0100
C-P-BT-0199
C-P-BT-0584
C-P-BT-0101
C-P-BT-0476
C-P-BT-0584
C-P-BT-0589
C-P-BT-0039

A
C
A
C
A
A
B
A
A
B
A
A
B
A
A
A
C
A

P-C-BT-0107
P-C-BT-0070
P-C-BT-0107
P-C-BT-0341
P-C-BT-0408
P-C-BT-0462
P-C-BT-0073
P-C-BT-0409
P-C-BT-0514
P-C-BT-0076
P-C-BT-0175
P-C-BT-0514
P-C-BT-0073
P-C-BT-0409
P-C-BT-0514
P-C-BT-0501
P-C-BT-0071

C-B-BT-0110
C-B-BT-0073
C-B-BT-0110
C-B-BT-0344
C-B-BT-0411
C-B-BT-0465
C-B-BT-0076
C-B-BT-0412
C-B-BT-0517
C-B-BT-0079
C-B-BT-0178
C-B-BT-0517
C-B-BT-0076
C-B-BT-0412
C-B-BT-0517
C-B-BT-0504
C-B-BT-0074
C B BT 0193
C-B-BT-0193

1
A

13-Feb-2015
6-Dec-2014

B-C-T-0569
B-C-T-0081

13-Feb-2015
8-Dec-2014

27-Feb-2015
11-Dec-2014

A
A

P-C-BT-0190
P-C-BT-0514
P-C-BT-0074

19-Dec-2014
11-Dec-2014
19-Dec-2014
26-Jan-2015
6-Feb-2015
10-Feb-2015
11-Dec-2014
6-Feb-2015
27-Feb-2015
12-Dec-2014
30-Dec-2014
27-Feb-2015
11-Dec-2014
6-Feb-2015
27-Feb-2015
26-Feb-2015
11-Dec-2014
4 J 2015
4-Jan-2015

2
1

C-P-BT-0226
C-P-BT-0584
C-P-BT-0099

19-Dec-2014
11-Dec-2014
19-Dec-2014
26-Jan-2015
6-Feb-2015
10-Feb-2015
11-Dec-2014
6-Feb-2015
27-Feb-2015
12-Dec-2014
30-Dec-2014
27-Feb-2015
11-Dec-2014
6-Feb-2015
27-Feb-2015
26-Feb-15
11-Dec-2014
4 J 2015
4-Jan-2015

27-Feb-2015
11-Dec-2014

C-B-BT-0517
C-B-BT-0077

1
1

0
A

15-Dec-2014
6-Dec-2014

B-C-T-0138
B-C-T-0081

16-Dec-2014
8-Dec-2014

C-P-BT-0139
C-P-BT-0099

19-Dec-2014
11-Dec-2014

A
A

P-C-BT-0106
P-C-BT-0074

19-Dec-2014
11-Dec-2014

C-B-BT-0109
C-B-BT-0077

1
3

0
A

15-Dec-2014
6-Dec-2014

B-C-T-0138
B-C-T-0081

16-Dec-2014
8-Dec-2014

C-P-BT-0139
C-P-BT-0099

19-Dec-2014
11-Dec-2014

A
A

P-C-BT-0106
P-C-BT-0074

19-Dec-2014
11-Dec-2014

C-B-BT-0109
C-B-BT-0077

3
2

0
A

15-Dec-2014
6-Dec-2014

B-C-T-0138
B-C-T-0081

16-Dec-2014
8-Dec-2014

C-P-BT-0139
C-P-BT-0099

19-Dec-2014
11-Dec-2014

A
A

P-C-BT-0106
P-C-BT-0074

19-Dec-2014
11-Dec-2014

C-B-BT-0109
C-B-BT-0077

2
1
1
1
1

0
A
B
0
A

15-Dec-2014
25-Dec-2014
26-Jan-2015
28-Jan-2015
16-Jan-2015

B-C-T-0138
B-C-T-0177
B-C-T-0400
B-C-T-0422
B-C-T-0334

16-Dec-2014
25-Dec-2014
26-Jan-2015
29-Jan-2015
16-Jan-2015

C-P-BT-0139
C-P-BT-0180
C-P-BT-0410
C-P-BT-0434
C-P-BT-0335

19-Dec-2014
29-Dec-2014
27-Jan-2015
2-Feb-2015
17-Jan-2015

A
C
A
A
C

P-C-BT-0106
P-C-BT-0166
P-C-BT-0347
P-C-BT-0390
P-C-BT-0294

19-Dec-2014
29-Dec-2014
27-Jan-2015
2-Feb-2015
17-Jan-2015

C-B-BT-0109
C-B-BT-0169
C-B-BT-0350
C-B-BT-0393
C-B-BT-0297

1
1
1

B
0
A

23-Jan-2015
27-Jan-2015
16-Jan-2015

B-C-T-0393
B-C-T-0416
B-C-T-0334

24-Jan-2015
28-Jan-2015
16-Jan-2015

C P BT 0403
C-P-BT-0403
C-P-BT-0428
C-P-BT-0335

26-Jan-2015
29-Jan-2014
17-Jan-2015

A
A
C

P C BT 0331
P-C-BT-0331
P-C-BT-0368
P-C-BT-0294

26-Jan-2015
29-Jan-2014
17-Jan-2015

C-B-BT-0334
C-B-BT-0371
C-B-BT-0297

1
1
1

B
0
A

23-Jan-2015
27-Jan-2015
16-Jan-2015

B-C-T-0393
B-C-T-0416
B-C-T-0334

24-Jan-2015
28-Jan-2015
16-Jan-2015

C-P-BT-0403
C-P-BT-0428
C-P-BT-0335

26-Jan-2015
29-Jan-2014
17-Jan-2015

A
A
C

P-C-BT-0331
P-C-BT-0368
P-C-BT-0294

26-Jan-2015
29-Jan-2014
17-Jan-2015

C-B-BT-0334
C-B-BT-0371
C-B-BT-0297

1
1
1

B
0
A

23-Jan-2015
27-Jan-2015
16-Jan-2015

B-C-T-0393
B-C-T-0416
B-C-T-0334

24-Jan-2015
28-Jan-2015
16-Jan-2015

C-P-BT-0403
C-P-BT-0428
C-P-BT-0335

26-Jan-2015
29-Jan-2014
17-Jan-2015

A
A
C

P-C-BT-0331
P-C-BT-0368
P-C-BT-0294

26-Jan-2015
29-Jan-2014
17-Jan-2015

C-B-BT-0334
C-B-BT-0371
C-B-BT-0297

1
1
1

B
0
A

23-Jan-2015
27-Jan-2015
5-Feb-2015

B-C-T-0393
B-C-T-0416
B-C-T-0503

24-Jan-2015
28-Jan-2015
6-Feb-2015

C-P-BT-0403
C-P-BT-0428
C-P-BT-0515

26-Jan-2015
29-Jan-2014
9-Feb-2015

A
A
C

P-C-BT-0331
P-C-BT-0368
P-C-BT-0460

26-Jan-2015
29-Jan-2014
9-Feb-2015

C-B-BT-0334
C-B-BT-0371
C-B-BT-0463

13-Feb-2015
15-Feb-2015
5-Feb-2015

B-C-T-0573
B-C-T-0588
B-C-T-0503

13-Feb-2015
15-Feb-2015
6-Feb-2015

C-P-BT-0583
C-P-BT-0598
C-P-BT-0515

13-Feb-2015
28-Feb-15
9-Feb-2015

A
A
C

P-C-BT-0488
P-C-BT-0531
P-C-BT-0460

14-Feb-2015
28-Feb-2015
9-Feb-2015

C-B-BT-0491
C-B-BT-0534
C-B-BT-0463

13-Feb-2015
15-Feb-2015

B-C-T-0573
B-C-T-0588

13-Feb-2015
15-Feb-2015

C-P-BT-0583
C-P-BT-0598

13-Feb-2015
28-Feb-15

A
A

P-C-BT-0488
P-C-BT-0531

14-Feb-2015
28-Feb-2015

C-B-BT-0491
C-B-BT-0534

Control Schematic (TYPE-05) (Welding Socket Feeder)

21

26

A- Approved; B -Accepted with Correction

Typical Standard Cable Tray Installation Details

Typical Standard Cable Layout Installation Details

Typical Standard Earthing Installation Details

Typical Standard Lighting Installation Details

Wiring Schematic for Impressed Current CP System

Grid Anode Installation Details For External Tank Bottom


(T-2302 A)

Grid Anode Installation Details For External Tank Bottom


(T-2302 B)

Grid Anode Installation Details For External Tank Bottom


(TK-2303)

Grid Anode Installation Details For External Tank Bottom


(TK-2340)

Cathodic Protection System Layout-1 For External Tank


Bottom

Cathodic Protection System Layout-2 For External Tank


Bottom

Page 25 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-DWG-CP-6956-01

39

PAL-1193-DWG-CP-6956-02
PAL 1193 DWG CP 6956 02

Sacrificial Anode Layout For Internal Tank Surface(TK2302 B)

40

PAL-1193-DWG-CP-6957-001

Sacrificial Anode Layout For Internal Tank Surface (T2303)

41

PAL-1193-DWG-CP-6958-001

42

PAL-1193-DWG-CP-6959

PAL-1193-DWG-CP-6961-001

44

PAL-1193-DWG-CP-6963-001

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

16-Jan-2015

B-C-T-0334

16-Jan-2015

C-P-BT-0335

17-Jan-2015

P-C-BT-0294

17-Jan-2015

C-B-BT-0297

1
1
1

B
0
A

26-Jan-2015
28-Jan-2015
16-Jan-2015

B-C-T-0400
B-C-T-0422
B-C-T-0334

26-Jan-2015
29-Jan-2015
16-Jan-2015

C-P-BT-0410
C-P-BT-0434
C-P-BT-0335

27-Jan-2015
2-Feb-2015
17-Jan-2015

A
A
C

P-C-BT-0347
P-C-BT-0390
P-C-BT-0294

27-Jan-2015
2-Feb-2015
17-Jan-2015

C-B-BT-0350
C-B-BT-0393
C-B-BT-0297

1
1
1

B
0
A

26-Jan-2015
28-Jan-2015
16-Jan-2015

B-C-T-0400
B-C-T-0422
B-C-T-0334

26-Jan-2015
29-Jan-2015
16-Jan-2015

C-P-BT-0410
C-P-BT-0434
C-P-BT-0335

27-Jan-2015
2-Feb-2015
17-Jan-2015

A
A
C

P-C-BT-0347
P-C-BT-0390
P-C-BT-0294

27-Jan-2015
2-Feb-2015
17-Jan-2015

C-B-BT-0350
C-B-BT-0393
C-B-BT-0297

1
1
1

B
0
A

26-Jan-2015
28-Jan-2015
16-Jan-2015

B-C-T-0400
B-C-T-0422
B-C-T-0334

26-Jan-2015
29-Jan-2015
16-Jan-2015

C-P-BT-0410
C-P-BT-0434
C-P-BT-0335

27-Jan-2015
2-Feb-2015
17-Jan-2015

A
A
C

P-C-BT-0347
P-C-BT-0390
P-C-BT-0294

27-Jan-2015
2-Feb-2015
17-Jan-2015

C-B-BT-0350
C-B-BT-0393
C-B-BT-0297

1
1

B
0

B-C-T-0400
B-C-T-0422
B-C-T-0583
B-C-T-0334
B-C-T-0400
B-C-T-0422
B-C-T-0334

26-Jan-2015
29-Jan-2015
15-Feb-2015
16-Jan-2015
26-Jan-2015
29-Jan-2015
16-Jan-2015

C-P-BT-0410
C-P-BT-0434
C-P-BT-0594
C-P-BT-0335
C-P-BT-0410
C-P-BT-0434
C-P-BT-0335

27-Jan-2015
2-Feb-2015
28-Feb-15
17-Jan-2015
27-Jan-2015
2-Feb-2015
17-Jan-2015

A
A
B
C
B
A
C

P-C-BT-0347
P-C-BT-0390
P-C-BT-0533
P-C-BT-0294
P-C-BT-0347
P-C-BT-0390
P-C-BT-0294

27-Jan-2015
2-Feb-2015
28-Feb-2015
17-Jan-2015
27-Jan-2015
2-Feb-2015
17-Jan-2015

C-B-BT-0350
C-B-BT-0393
C-B-BT-0536
C-B-BT-0297
C-B-BT-0350
C-B-BT-0393
C-B-BT-0297

B-C-T-0400
B-C-T-0422

26-Jan-2015
29-Jan-2015

C-P-BT-0410
C-P-BT-0434

27-Jan-2015
2-Feb-2015

B
A

P-C-BT-0347
P-C-BT-0390

27-Jan-2015
2-Feb-2015

C-B-BT-0350
C-B-BT-0393

Sacrificial Anode Layout For Internal Tank Surface(TK-

38

43

A- Approved; B -Accepted with Correction

2302 A)

Sacrificial Anode Layout For Internal Tank Surface (T2340)


CATHODIC PROTECTION SYSTEM LAYOUT FOR PILES

Internal Sacrificial Anode Installation Details

1
1
1
1

A
B
0
A

26-Jan-2015
28-Jan-2015
15-Feb-2015
16-Jan-2015
26-Jan-2015
28-Jan-2015
16-Jan-2015

1
1

B
0

26-Jan-2015
28-Jan-2015

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

25-Nov-2014

B-C-T-0064

28-Nov-2014

C-P-BT-0075

8-Dec-2014

P-C-BT-0041

8-Dec-2014

C-B-BT-0044

30-Dec-2014

B-C-T-0205

30-Dec-2014

C-P-BT-0210

5-Jan-2015

P-C-BT-0205

5-Jan-2015

C-B-BT-0208

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

25-Nov-2014

B-C-T-0064

28-Nov-2014

C-P-BT-0075

8-Dec-2014

P-C-BT-0041

8-Dec-2014

C-B-BT-0044

7-Jan-2015

B-C-T-0264

7-Jan-2015

C-P-BT-0266

7-Jan-2015

P-C-BT-0227

7-Jan-2015

C-B-BT-0230

31-Oct-2014

B-C-T-0016

17-Nov-2014

C-P-BT-0030

26-Nov-2014

P-C-BT-0015

16-Nov-2014

C-B-BT-0018

5-Jan-2015

B-C-T-0251

5-Jan-2015

C-P-BT-0253

9-Jan-2015

P-C-BT-0235

9-Jan-2015

C-B-BT-0238

9-Jan-2015

B-C-T-0284

9-Jan-2015

C-P-BT-0288

9-Jan-2015

P-C-BT-0240

9-Jan-2015

C-B-BT-0243

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

25-Nov-2014

B-C-T-0064

28-Nov-2014

C-P-BT-0075

8-Dec-2014

P-C-BT-0041

8-Dec-2014

C-B-BT-0044

30-Dec-2014

B-C-T-0204

30-Dec-2014

C-P-BT-0208

5-Jan-2015

P-C-BT-0203

5-Jan-2015

C-B-BT-0206

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

25-Nov-2014

B-C-T-0064

28-Nov-2014

C-P-BT-0075

8-Dec-2014

P-C-BT-0041

8-Dec-2014

C-B-BT-0044

23 D 2014
23-Dec-2014

B C T 0165
B-C-T-0165

24 D 2014
24-Dec-2014

C
C-P-BT-0168

26 D 2014
26-Dec-2014

P-C-BT-0150
C

26 D 2014
26-Dec-2014

C B BT 0153
C-B-BT-0153

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

30-Dec-2014

B-C-T-0205

30-Dec-2014

C-P-BT-0210

5-Jan-2015

P-C-BT-0205

5-Jan-2015

C-B-BT-0208

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

30-Dec-2014

B-C-T-0203

30-Dec-2014

C-P-BT-0207

5-Jan-2015

P-C-BT-0204

5-Jan-2015

C-B-BT-0207

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006
C-B-BT-0198

Cathodic Protection Typical Cable Termination Details for


Piles

umentation
a Sheet (INT)

PAL-1193-DS-INT-001

PAL-1193-DS-INT-002

PAL-1193-DS-INT-003

PAL-1193-DS-INT-004

PAL-1193-DS-INT-005

PAL-1193-DS-INT-006
PAL-1193-DS-INT-007
PAL-1193-DS-INT-008

DST for Differential Pressure Transmitters

DST for ESD Valves & On-Off Valves

DST for Control Valves

DST for Pressure Vacuum Relief Valves

DST for Pressure Safety Valves

DST for Pressure Transmitters


DST for Pressure Gauges
DST for Level Transmitters(Displacer Type)

PAL-1193-DS-INT-009

DST for Level Transmitters(Servo Type)

10

PAL-1193-DS-INT-010

DST for Temperature Transmitters

11

12

13

PAL-1193-DS-INT-011

PAL-1193-DS-INT-012

PAL-1193-DS-INT-013

DST for Temperature Gauges

DST for F&G Detectors & Devices

DST for Rotameters

29-Dec-2014

B-C-T-0197

29-Dec-2014

C-P-BT-0198

4-Jan-2015

P-C-BT-0195

4-Jan-2015

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

29-Dec-2014

B-C-T-0197

29-Dec-2014

C-P-BT-0198

4-Jan-2015

P-C-BT-0195

4-Jan-2015

C-B-BT-0198

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

30-Dec-2014

B-C-T-0205

30-Dec-2014

C-P-BT-0210

5-Jan-2015

P-C-BT-0205

5-Jan-2015

C-B-BT-0208

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

30-Dec-2014

B-C-T-0203

30-Dec-2014

C-P-BT-0207

5-Jan-2015

P-C-BT-0204

5-Jan-2015

C-B-BT-0207

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

C-B-BT-0006

9-Dec-2014

B-C-T-0109

10-Dec-2014

C-P-BT-0110

13-Dec-2014

P-C-BT-0081

13-Dec-2014

C-B-BT-0084

25-Dec-2014

B-C-T-0180

25-Dec-2014

C-P-BT-0182

26-Dec-2014

P-C-BT-0151

26-Dec-2014

C-B-BT-0154

31-Oct-2014

B-C-T-0016

17-Nov-2014

C-P-BT-0030

26-Nov-2014

P-C-BT-0015

16-Nov-2014

C-B-BT-0018

13-Jan-2015

B-C-T-0316

13-Jan-2015

C-P-BT-0317

15-Jan-2015

P-C-BT-0282

15-Jan-2015

C-B-BT-0285

Page 26 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-DS-INT-014

DST for Restriction Orifice Plate

15

PAL-1193-DS-INT-015

DST for Level Transmitters(Magnetostrictive Type)

16

PAL-1193-DS-TEL-001

DST for CCTV Equipment

17

PAL-1193-DS-TEL-003

DST for Fiber Optic Cable

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

14

A- Approved; B -Accepted with Correction

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.
C-B-BT-0006

27-Oct-2014

B-C-T-0012

13-Nov-2014

C-P-BT-0016

15-Nov-2014

P-C-BT-0004

15-Nov-2014

25-Nov-2014

B-C-T-0064

28-Nov-2014

C-P-BT-0075

8-Dec-2014

P-C-BT-0041

8-Dec-2014

C-B-BT-0044

23-Dec-2014

B-C-T-0165

24-Dec-2014

C-P-BT-0168

26-Dec-2014

P-C-BT-0150

26-Dec-2014

C-B-BT-0153

30-Dec-2014

B-C-T-0210

31-Dec-2014

C-P-BT-0214

4-Jan-2015

P-C-BT-0197

4-Jan-2015

C-B-BT-0200

5-Jan-2015

B-C-T-0248

5-Jan-2015

C-P-BT-0249

7-Jan-2015

P-C-BT-0224

7-Jan-2015

C-B-BT-0227

5-Dec-2014

B-C-T-0105

6-Dec-2014

C-P-BT-0102

12-Dec-2014

P-C-BT-0077

12-Dec-2014

C-B-BT-0080

24-Dec-2014

B-C-T-0171

24-Dec-2014

C-P-BT-0174

26-Dec-2014

P-C-BT-0157

26-Dec-2014

C-B-BT-0160

5-Dec-2014

B-C-T-0105

6-Dec-2014

C-P-BT-0102

12-Dec-2014

P-C-BT-0077

12-Dec-2014

C-B-BT-0080

24-Dec-2014

B-C-T-0171

24-Dec-2014

C-P-BT-0174

26-Dec-2014

P-C-BT-0157

26-Dec-2014

C-B-BT-0160

28
28
28
28
28
28

A
B
0
A
0
A

27-Oct-2014
12-Dec-2014
6-Feb-2015
31-Oct-2014
6-Feb-2015
27-Oct-2014

B-C-T-0012
B-C-T-0124
B-C-T-0508
B-C-T-0016
B-C-T-0509
B-C-T-0012

17-Nov-2014
15-Dec-2014
6-Feb-2015
17-Nov-2014
6-Feb-2015
17-Nov-2014

C-P-BT-0027
C-P-BT-0125
C-P-BT-0519
C-P-BT-0030
C-P-BT-0519
C-P-BT-0027

26-Nov-2014
17-Dec-2014
9-Feb-2015
26-Nov-2014
9-Feb-2015
26-Nov-2014

B
A
A
C
A
B

P-C-BT-0021
P-C-BT-0097
P-C-BT-0451
P-C-BT-0015
P-C-BT-0451
P-C-BT-0021

26-Nov-2014
17-Dec-2014
9-Feb-2015
16-Nov-2014
9-Feb-2015
26-Nov-2014

C-B-BT-0024
C-B-BT-0100
C-B-BT-0454
C-B-BT-0018
C-B-BT-0454
C-B-BT-0024

28
28
28
28
28
28

B
0
A
0
A
0

12-Dec-2014
7-Jan-2015
27-Oct-2014
7-Jan-2015
27-Oct-2014
10 J 2015
10-Jan-2015

B-C-T-0125
B-C-T-0269
B-C-T-0012
B-C-T-0266
B-C-T-0012
B C T 0298
B-C-T-0298

15-Dec-2014
7-Jan-2015
17-Nov-2014
7-Jan-2015
17-Nov-2014
10 J 2015
10-Jan-2015

C-P-BT-0126
C-P-BT-0272
C-P-BT-0027
C-P-BT-0268
C-P-BT-0027
C P BT 0300
C-P-BT-0300

17-Dec-2014
12-Jan-2015
26-Nov-2014
10-Jan-2015
26-Nov-2014
12 J 2015
12-Jan-2015

A
A
B
A
B
A

P-C-BT-0098
P-C-BT-0264
P-C-BT-0021
P-C-BT-0250

C-B-BT-0101
C-B-BT-0267
C-B-BT-0024
C-B-BT-0253
C-B-BT-0024
C B BT 0266
C-B-BT-0266

28
28
28
29
30
30
30

A
0
A
0
A
B
0
A
B
0
A
B
A
B
A
B
0
A

31-Oct-2014
19-Jan-2015
27-Oct-2014
7-Jan-2015
10-Nov-2014
20-Dec-2014
17-Jan-2015
27-Oct-2014
12-Dec-2014
30-Dec-2014
1-Dec-2014
4-Jan-2015
19-Nov-2014
25-Dec-2014
25-Dec-2014
16-Jan-2015
6-Feb-2015
26-Nov-2014

B-C-T-0016
B-C-T-0345
B-C-T-0012
B-C-T-0265
B-C-T-0032
B-C-T-0153
B-C-T-0344
B-C-T-0012
B-C-T-0126
B-C-T-0208
B-C-T-0097
B-C-T-0233
B-C-T-0044
B-C-T-0184
B-C-T-0178
B-C-T-0331
B-C-T-0510
B-C-T-0072

17-Nov-2014
20-Jan-2015
17-Nov-2014
7-Jan-2015
17-Nov-2014
20-Dec-2014
17-Jan-2015
17-Nov-2014
25-Dec-2014
31-Dec-2014
2-Dec-2014
4-Jan-2015
20-Nov-2014
25-Dec-2014
25-Dec-2014
16-Jan-2015
6-Feb-2015
27-Nov-2014

C-P-BT-0030
C-P-BT-0349
C-P-BT-0027
C-P-BT-0267
C-P-BT-0030
C-P-BT-0156
C-P-BT-0345
C-P-BT-0027
C-P-BT-0127
C-P-BT-0212
C-P-BT-0095
C-P-BT-0229
C-P-BT-0045
C-P-BT-0187
C-P-BT-0181
C-P-BT-0332
C-P-BT-0519
C-P-BT-0065

26-Nov-2014
21-Jan-2015
26-Nov-2014
10-Jan-2015
26-Nov-2014
24-Dec-2014
19-Jan-2015
26-Nov-2014
17-Dec-2014
5-Jan-2015
9-Dec-2014
5-Jan-2015
26-Nov-2014
29-Dec-2014
4-Jan-2015
23-Jan-2015
9-Feb-2015
9-Dec-2014

C
A
B
A
A
A
A
B
A

P-C-BT-0021
P C BT 0263
P-C-BT-0263
P-C-BT-0015
P-C-BT-0315
P-C-BT-0021
P-C-BT-0249
P-C-BT-0015
P-C-BT-0133
P-C-BT-0308
P-C-BT-0021
P-C-BT-0099
P-C-BT-0207
P-C-BT-0058
P-C-BT-0209
P-C-BT-0017
P-C-BT-0169
P-C-BT-0193
P-C-BT-0322
P-C-BT-0451
P-C-BT-0047

17-Dec-2014
12-Jan-2015
26-Nov-2014
10-Jan-2015
26-Nov-2014
12 J 2015
12-Jan-2015
16-Nov-2014
21-Jan-2015
26-Nov-2014
10-Jan-2015
16-Nov-2014
24-Dec-2014
19-Jan-2015
26-Nov-2014
17-Dec-2014
5-Jan-2015
9-Dec-2014
5-Jan-2015
26-Nov-2014
29-Dec-2014
4-Jan-2015
23-Jan-2015
9-Feb-2015
9-Dec-2014

C-B-BT-0018

32
32
32
32
3
30
30
30
30
30
10
10

B
0
A
B
0
A
B
C
0
A
A
0
A
B
0
A
0

25-Dec-2014
26-Jan-2015
27-Oct-2014
12-Dec-2014
30-Dec-2014
27-Nov-2014
5-Jan-2015
21-Jan-2015
6-Feb-2015
1-Dec-2014
24-Dec-2014
27-Jan-2015
9-Jan-2015
27-Jan-2015
3-Feb-2015
9-Jan-2015
27-Jan-2015

B-C-T-0179
B-C-T-0401
B-C-T-0012
B-C-T-0127
B-C-T-0209
B-C-T-0079
B-C-T-0247
B-C-T-0365
B-C-T-0507
B-C-T-0097
B-C-T-0171
B-C-T-0404
B-C-T-0291
B-C-T-0407
B-C-T-0473
B-C-T-0291
B-C-T-0404

25-Dec-2014
26-Jan-2015
17-Nov-2014
15-Dec-2014
31-Dec-2014
28-Nov-2014
5-Jan-2015
21-Jan-2015
6-Feb-2015
2-Dec-2014
24-Dec-2014
27-Jan-2015
9-Jan-2015
28-Jan-2015
3-Feb-2015
9-Jan-2015
27-Jan-2015

C-P-BT-0185
C-P-BT-0411
C-P-BT-0027
C-P-BT-0128
C-P-BT-0213
C-P-BT-0073
C-P-BT-0248
C-P-BT-0367
C-P-BT-0519
C-P-BT-0095
C-P-BT-0174
C-P-BT-0412
C-P-BT-0294
C-P-BT-0419
C-P-BT-0478
C-P-BT-0294
C-P-BT-0412

29-Dec-2014
29-Jan-2015
26-Nov-2014
17-Dec-2014
5-Jan-2015
2-Dec-2014
7-Jan-2015
23-Jan-2015
9-Feb-2015
9-Dec-14
26-Dec-2014
29-Jan-2015
15-Jan-2015
2-Feb-2015
4-Feb-2015
15-Jan-2015
29-Jan-2015

A
B
C
A
A
A
A
A
C
C
A
B
A

P-C-BT-0164
P-C-BT-0371
P-C-BT-0021
P-C-BT-0100
P-C-BT-0206
P-C-BT-0033
P-C-BT-0228
P-C-BT-0321
P-C-BT-0451
P-C-BT-0058
P-C-BT-0157
P-C-BT-0372
P-C-BT-0280
P-C-BT-0385
P-C-BT-0396
P-C-BT-0280
P-C-BT-0372

29-Dec-2014
29-Jan-2015
26-Nov-2014
17-Dec-2014
5-Jan-2015
2-Dec-2014
7-Jan-2015
23-Jan-2015
9-Feb-2015
9-Dec-2014
26-Dec-2014
29-Jan-2015
15-Jan-2015
2-Feb-2014
4-Feb-2015
15-Jan-2015
29-Jan-2015

6
5
5

A
A
B

10-Jan-2015
13-Jan-2015
20-Jan-2015

B-C-T-0303
B-C-T-0318
B-C-T-0346

10-Jan-2015
14-Jan-2015
20-Jan-2015

C-P-BT-0303
C-P-BT-0319
C-P-BT-0351

12-Jan-2015
16-Jan-15
26-Jan-2015

C
C
A

P-C-BT-0262
P-C-BT-0286
P-C-BT-0329

12-Jan-2015
16-Jan-2015
26-Jan-2015

MR (INT)
1

PAL-1193-MR-INT-001

MR for ESD Valves & On-Off Valves

PAL-1193-MR-INT-002

MR for Control Valves

PAL-1193-MR-INT-003

PAL-1193-MR-INT-004

MR for Electronic Transmitters

PAL-1193-MR-INT-005

MR for Level Transmitters

PAL-1193-MR-INT-006

MR for Rotameters

PAL-1193-MR-INT-007

MR for Gauges

PAL-1193-MR-INT-008

MR for Control System & ESD System

PAL-1193-MR-INT-009

MR for Fire and Gas Detectors & Devices

28
34
34
28
28
28
28
28
38

MR for Pressure Safety Valves & Pressure Vacuum Relief


Valves

10

PAL-1193-MR-INT-010

MR for Instrument Cables and Glands

11

PAL-1193-MR-INT-011

MR for Instrument Junction Boxes

12

PAL-1193-MR-INT-012

MR for Instrument Bulks Material

13

PAL-1193-MR-INT-013

14

PAL-1193-MR-INT-014

A
C
A
B
A
A
A
A
B

C-B-BT-0318
C-B-BT-0024
C-B-BT-0252
C-B-BT-0018
C-B-BT-0136
C-B-BT-0311
C-B-BT-0024
C-B-BT-0102
C-B-BT-0210
C-B-BT-0061
C-B-BT-0212
C-B-BT-0020
C-B-BT-0172
C-B-BT-0196
C-B-BT-0325
C-B-BT-0454
C-B-BT-0050

MR for Building Fire Alarm System and Cleam Agent Fire


Suppression System

38
38

MR for Restriction Orifice Plate

28

15

PAL-1193-MR-INT-015

MR for Instrument Cable Tray

16

PAL-1193-MTO-INT-010

MTO for Cables and Glands

17

PAL-1193-MR-TEL-001

Material Requisition for CCTV Equipment

18

PAL-1193-MR-TEL-002

Material Requisition for PAGA Equipment

19

PAL-1193-SP-TEL-001

Specification for PAGA System

PAL-1193-TBE-INT-001

TBE for ESD Valves & On-Off Valves

PAL-1193-TBE-INT-002

TBE for Control Valves

A
A
B
A

C-B-BT-0167
C-B-BT-0374
C-B-BT-0024
C-B-BT-0103
C-B-BT-0209
C-B-BT-0036
C-B-BT-0231
C-B-BT-0324
C-B-BT-0454
C-B-BT-0061
C-B-BT-0160
C-B-BT-0375
C-B-BT-0283
C-B-BT-0388
C-B-BT-0399
C-B-BT-0283
C-B-BT-0375

TBE(INT)

Page 27 of 35

C-B-BT-0265
C-B-BT-0289
C-B-BT-0332
PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

TBE for Pressure Safety Valves & Pressure Vacuum Relief

PAL-1193-TBE-INT-003

PAL-1193-TBE-INT-004

TBE for ElectronicTransmitters

PAL-1193-TBE-INT-005

TBE for Level Transmitters

PAL-1193-TBE-INT-006

TBE for Rotameters

PAL-1193-TBE-INT-007

TBE for Gauges

PAL-1193-TBE-INT-008

TBE for Process Control System & Safeguarding System

PAL-1193-TBE-INT-009

TBE for Fire and Gas Detectors & Devices

10
12

PAL-1193-TBE-INT-010
PAL-1193-TBE-INT-010-02
PAL-1193-TBE-INT-011

TBE for Instrument Cables


INSTRUMENT GLANDS
TBE for Instrument Junction boxes

13

PAL-1193-TBE-INT-012

TBE for Fire and Gas Detectors & Devices

14

PAL-1193-TBE-INT-012

BULKS MATERIAL

15

PAL-1193-TBE-INT-013

11

Valves

TBE for Building Fire Alarm System and Cleam Agent Fire
Suppression System

16

PAL-1193-TBE-INT-014

TBE for Restriction Orifice Plate

17

PAL-1193-TBE-INT-015

TBE for Cable Tray

18

PAL-1193TBE-TEL-001
PAL-1193TBE-TEL-002

Technical Bid Evaluation for CCTV Equipment


TBE for PAGA Equipment

19

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

5
6

0
A

6-Feb-2015
10-Jan-2015

B-C-T-0504
B-C-T-0295

6-Feb-2015
10-Jan-2015

C-P-BT-0518
C-P-BT-0297

9-Feb-2015
14-Jan-2015

A
C

P-C-BT-0458
P-C-BT-0270

9-Feb-2015
14-Jan-2015

C-B-BT-0461

7
6
6
6
6
5
4
6
6
6

0
A
A
A
B
A
0
A
0
A

9-Feb-2015
21-Jan-2015
30-Jan-2015
22-Jan-2015
29-Jan-2015
23-Jan-2015
27-Jan-2015
21-Jan-2015
30-Jan-2015
12-Jan-2015

B-C-T-0517
B-C-T-0366
B-C-T-0439
B-C-T-0373
B-C-T-0432
B-C-T-0384
B-C-T-0413
B-C-T-0356
B-C-T-0440
B-C-T-0308

9-Feb-2015
21-Jan-2015
30-Jan-2015
22-Jan-2015
30-Jan-2014
23-Jan-2015
28-Jan-2015
21-Jan-2015
30-Jan-2015
12-Jan-2015

C-P-BT-0529
C-P-BT-0368
C-P-BT-0452
C-P-BT-0375
C-P-BT-0446
C-P-BT-0393
C-P-BT-0425
C-P-BT-0362
C-P-BT-0453
C-P-BT-0309

28-Feb-15
26-Jan-2015
2-Feb-2015
26-Jan-2015
2-Feb-2015
26-Jan-2015
29-Jan-2015
24-Jan-2015
4-Feb-2015
14-Jan-2015

A
A
A
C
C
A
A
A
A
C

P-C-BT-0519
P-C-BT-0328
P-C-BT-0388
P-C-BT-0342
P-C-BT-0388
P-C-BT-0330
P-C-BT-0373
P-C-BT-0327
P-C-BT-0397
P-C-BT-0271

28-Feb-15
26-Jan-2015
2-Feb-2015
26-Jan-2015
2-Feb-2015
26-Jan-2015
29-Jan-2015
24-Jan-2015
4-Feb-2015
14-Jan-2015

C-B-BT-0522
C-B-BT-0331
C-B-BT-0391
C-B-BT-0345
C-B-BT-0390
C-B-BT-0333
C-B-BT-0376
C-B-BT-0330
C-B-BT-0400

6
6
5
3

0
B
0
A
A

B-C-T-0341
B-C-T-0346
B-C-T-0413
B-C-T-0374
B-C-T-0579

17-Jan-2015
20-Jan-2015
28-Jan-2015
22-Jan-2015
15-Feb-2015

C-P-BT-0342
C-P-BT-0351
C-P-BT-0425
C-P-BT-0376

17-Jan-2015
20-Jan-2015
27-Jan-2015
22-Jan-2015
15-Feb-2015

C-P-BT-0590

19-Jan-2015
26-Jan-2015
29-Jan-2015
26-Jan-2015
3-Mar-2015

A
A
A
A
A

P-C-BT-0303
P-C-BT-0329
P-C-BT-0373
P-C-BT-0333
P-C-BT-0546

19-Jan-2015
26-Jan-2015
29-Jan-2015
26-Jan-2015
3-Mar-2015

C-B-BT-0306
C-B-BT-0332
C-B-BT-0376
C-B-BT-0336
C-B-BT-0549

9-Jan-2015

B-C-T-0277

9-Jan-2015

C-P-BT-0280

9-Jan-15

P-C-BT-0239

9-Jan-15

C-B-BT-0242

C-P-BT-0591
C-P-BT-0616
C P BT 0493
C-P-BT-0493

3-Mar-2015

C-B-BT-0550

15-Feb-2015
4-Mar-2015
4-Feb-2015

P-C-BT-0547

B-C-T-0580
B-C-T-0608
B-C-T-0479

15-Feb-2015
4-Mar-2015
3-Feb-2015

3-Mar-2015

10-Feb-2015

P C BT 0472
P-C-BT-0472

10-Feb-2015

C-B-BT-0475

5
3
3
5
5
5
5
6

0
A
B
0
A
0
A
A

12-Feb-2015
7-Jan-2015
13-Jan-2015
6-Feb-2015
26-Jan-2015
6-Feb-2015
27-Jan-2015
13-Feb-2015

B-C-T-0564
B-C-T-0263
B-C-T-0314
B-C-T-0506
B-C-T-0399
B-C-T-0505
B-C-T-0407
B-C-T-0576

12-Feb-2015
7-Jan-2015
13-Jan-2015
6-Feb-2015
26-Jan-2015
6-Feb-2015
28-Jan-2015
13-Feb-2015

C-P-BT-0572
C-P-BT-0265
C-P-BT-0315
C-P-BT-0518
C-P-BT-0409
C-P-BT-0518
C-P-BT-0419
C-P-BT-0580

7-Jan-2015
15-Jan-2015
9-Feb-2015
29-Jan-2015
9-Feb-2015
2-Feb-2015
13-Feb-2015

C
C
A
A
A
A
C

P-C-BT-0230
P-C-BT-0281
P-C-BT-0458
P-C-BT-0374
P-C-BT-0458
P-C-BT-0385
P-C-BT-0489

7-Jan-2015
15-Jan-2015
9-Feb-2015
29-Jan-2015
9-Feb-2015
2-Feb-2014
13-Feb-2015

C-B-BT-0233
C-B-BT-0284
C-B-BT-0461
C-B-BT-0377
C-B-BT-0461
C-B-BT-0388
C-B-BT-0492

27-Oct-2014

B-C-T-0012

17-Nov-2014

C-P-BT-0029

18-Nov-14

P-C-BT-0010

18-Nov-2014

C-B-BT-0013

1-Dec-2014

B-C-T-0093

1-Dec-2014

C-P-BT-0091

6-Dec-14

P-C-BT-0035

6-Dec-2014

C-B-BT-0038

27-Oct-2014

B-C-T-0012

17-Nov-2014

C-P-BT-0029

18-Nov-14

P-C-BT-0010

18-Nov-2014

C-B-BT-0013

1-Dec-2014

B-C-T-0093

1-Dec-2014

C-P-BT-0091

6-Dec-14

P-C-BT-0035

6-Dec-2014

C-B-BT-0038

1-Nov-2014

B-C-T-0019

17-Nov-2014

C-P-BT-0031

26-Nov-14

P-C-BT-0019

26-Nov-14

C-B-BT-0022

1
1
1
15
18
2
3
3

B
0
1
A
B
A
B
0

15-Dec-2014
17-Jan-2015
6-Feb-2015
10-Nov-2014
25-Dec-2014
10-Nov-2014
23-Dec-2014
6-Feb-2015

B-C-T-0136
B-C-T-0343
B-C-T-0513
B-C-T-0029
B-C-T-0187
B-C-T-0032
B-C-T-0166
B-C-T-0512

16-Dec-2014
17-Jan-2014
6-Feb-2015
17-Nov-2014
25-Dec-2014
17-Nov-2014
24-Dec-2014
6-Feb-2015

C-P-BT-0138
C-P-BT-0344
C-P-BT-0520
C-P-BT-0031
C-P-BT-0190
C-P-BT-0031
C-P-BT-0169
C-P-BT-0520

22-Dec-2014
19-Jan-2015
9-Feb-2015
26-Nov-14
29-Dec-14
26-Nov-14
26-Dec-14
9-Feb-2015

A
B
A
C
A
C
A
A

P-C-BT-0119
P-C-BT-0306
P-C-BT-0452
P-C-BT-0019
P-C-BT-0172
P-C-BT-0019
P-C-BT-0154
P-C-BT-0452

22-Dec-2014
19-Jan-2015
9-Feb-2015
26-Nov-14
29-Dec-2014
26-Nov-14
26-Dec-14
9-Feb-2015

C-B-BT-0122
C-B-BT-0309
C-B-BT-0455
C-B-BT-0022
C-B-BT-0175
C-B-BT-0022
C-B-BT-0157
C-B-BT-0455

C-B-BT-0273

C-B-BT-0274

rev.B Change
TBE-IN-009

Specification (INT)

Calculation(INT)

PAL-1193-CAL-INT-001

PAL-1193-CAL-INT-002

Calculation for Instrument Air Consumption

Calculation for Instrument Power Consumption

Drawing (INT)

PAL-1193-DWG-INT-7000-01

Overall Instrumentation and Control System Block Diagram

PAL-1193-DWG-INT-7001-01

Instrument Cable Block Diagram

PAL-1193-DWG-INT-7002-01

F&G Cable Block Diagram

Page 28 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-DWG-INT-7003-01

5
6

PAL-1193-DWG-INT-7100-01
PAL-1193-DWG-INT-7200-01

Instrument Interconnection Drawing


Instrument Loop Drawings

PAL-1193-DWG-INT-7300-01

Instrument Hook-up Drawings

PAL-1193-DWG-INT-7400-01

DWG for Instrument Support Details

PAL-1193-DWG-INT-7500-01

Instrument Cable Tray&Trench Layout

10

PAL-1193-DWG-INT-7501-01

Details of Instrument Cable Trench

11

PAL-1193-DWG-INT-7502-01

Instrument Location Plan

12

PAL-1193-DWG-INT-7503-01

Fire & Gas Detectors & Devices Layout Drawings

13

PAL-1193-DWG-INT-7504-01

General Arrangement for Remote I/O Room

14

PAL-1193-DWG-INT-7505-01

General Arrangement for Central Control Room

15

PAL 1193 DWG INT 7506 01


PAL-1193-DWG-INT-7506-01

Building Fire Detector Layout Drawings

16

PAL-1193-DWG-INT-7507

Instrument Nameplate Drawings

PAL-1193-DWG-INT-7600-01

Logic Diagram

18

PAL-1193-DWG-INT-7700-01

System Block Diagram

Overall Instrumentation and Control System Earthing

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

19-Nov-2014

B-C-T-0043

20-Nov-2014

C-P-BT-0044

26-Nov-14

P-C-BT-0016

26-Nov-2014

C-B-BT-0019

1
1
66
133
18
19
8
8
8
7
10
1
1

B
0
A
A
A
B
A
B
0
A
B
A
0

16-Dec-2014
13-Jan-2015
10-Jan-2015
6-Jan-2015
8-Nov-2014
25-Dec-2014
17-Nov-2014
15-Dec-2014
29-Dec-2014
12-Jan-2015
11-Feb-2015
27-Nov-2014
1-Dec-2014

B-C-T-0140
B-C-T-0309
B-C-T-0297
B-C-T-0260
B-C-T-0027
B-C-T-0185
B-C-T-0036
B-C-T-0135
B-C-T-0196
B-C-T-0313
B-C-T-0567
B-C-T-0073
B-C-T-0094

16-Dec-2014
13-Jan-2015
10-Jan-2015
6-Jan-2015
17-Nov-2014
25-Dec-2014
18-Nov-2014
16-Dec-2014
29-Dec-2014
12-Jan-2015
11-Feb-2015
28-Nov-2014
1-Dec-2014

22-Dec-2014
15-Jan-2015
14-Jan-2015
9-Jan-15
2014/11/26
29-Dec-14
2014/11/26
22-Dec-2014
6-Jan-2015
16-Jan-15
13-Feb-2015
2014/11/29
2014/12/6

A
B
C
C
B
A
C
A
A
C
B
A
A

C-B-BT-0121
C-B-BT-0286
C-B-BT-0275
C-B-BT-0241
C-B-BT-0021
C-B-BT-0173
C-B-BT-0026
C-B-BT-0120
C-B-BT-0215
C-B-BT-0291
C-B-BT-0486
C-B-BT-0033
C-B-BT-0039

A
0
A

12-Jan-2015
13-Feb-2015
17-Nov-2014

B-C-T-0312
B-C-T-0574
B-C-T-0036

12-Jan-2015
13-Feb-2015
18-Nov-2014

16-Jan-15
13-Feb-15
2014/11/26

C
D
C

P-C-BT-0118
P-C-BT-0283
P-C-BT-0272
P-C-BT-0238
P-C-BT-0018
P-C-BT-0170
P-C-BT-0023
P-C-BT-0117
P-C-BT-0212
P-C-BT-0288
P-C-BT-0483
P-C-BT-0030
P-C-BT-0036
P-C-BT-0289
P-C-BT-0487
P-C-BT-0023

22-Dec-2014
15-Jan-2015
14-Jan-2015
9-Jan-15
26-Nov-2014
29-Dec-2014
26-Nov-2014
22-Dec-2014
6-Jan-2015
16-Jan-2015
13-Feb-2015
29-Nov-2014
6-Dec-2014

7
7
1

C-P-BT-0141
C-P-BT-0310
C-P-BT-0299
C-P-BT-0259
C-P-BT-0033
C-P-BT-0188
C-P-BT-0037
C-P-BT-0137
C-P-BT-0197
C-P-BT-0314
C-P-BT-0578
C-P-BT-0074
C-P-BT-0092
C-P-BT-0313
C-P-BT-0586
C-P-BT-0037

16-Jan-2015
13-Feb-2015
26-Nov-2014

C-B-BT-0292
C-B-BT-0490
C-B-BT-0026

1
1
1
1
1
1
1

B
0
A
A
0
A
B

1-Dec-2014
6-Feb-2015
11-Dec-2014
6-Jan-2015
12-Jan-2015
19-Nov-2014
16-Dec-2014

B-C-T-0099
B-C-T-0511
B-C-T-0117
B-C-T-0258
B-C-T-0310
B-C-T-0043
B-C-T-0140

2-Dec-2014
6-Feb-2015
11-Dec-2014
6-Jan-2015
12-Jan-2015
20-Nov-2014
16-Dec-2014

C-P-BT-0097
C-P-BT-0520
C-P-BT-0115
C-P-BT-0258
C-P-BT-0311
C-P-BT-0044
C P BT 0141
C-P-BT-0141

2014/12/10
9-Feb-2015
2014/12/13
8-Jan-2015
15-Jan-2015
26-Nov-14
22-Dec-2014

A
A
A
C
A
C
A

P-C-BT-0061
P-C-BT-0452
P-C-BT-0083
P-C-BT-0233
P-C-BT-0283
P-C-BT-0016
P C BT 0118
P-C-BT-0118

10-Dec-2014
9-Feb-2015
13-Dec-2014
8-Jan-2015
15-Jan-2015
26-Nov-2014
22-Dec-2014

C-B-BT-0064
C-B-BT-0455
C-B-BT-0086
C-B-BT-0236
C-B-BT-0286
C-B-BT-0019
C-B-BT-0121

1
7
7
137
112
1

0
A
0
A
B
A

13-Jan-2015
4-Jan-2015
22-Jan-2015
31-Jan-2015
12-Feb-2015
1-Dec-2014

B-C-T-0307
B-C-T-0232
B-C-T-0378
B-C-T-0453
B-C-T-0568
B-C-T-0098

13-Jan-2015
4-Jan-2015
22-Jan-2015
2-Feb-2015
12-Feb-2015
2-Dec-2014

C-P-BT-0308
C-P-BT-0230
C-P-BT-0380
C-P-BT-0458
C-P-BT-0579
C-P-BT-0096

15-Jan-2015
7-Jan-2015
26-Jan-2015
9-Feb-2015
13-Feb-2015
10-Dec-14

A
A
A
C
B
A

P-C-BT-0283
P-C-BT-0225
P-C-BT-0335
P-C-BT-0461
P-C-BT-0484
P-C-BT-0060

15-Jan-2015
7-Jan-2015
26-Jan-2015
9-Feb-2015
13-Feb-2015
10-Dec-2014

C-B-BT-0286
C-B-BT-0228
C-B-BT-0338
C-B-BT-0464
C-B-BT-0487
C-B-BT-0063

16
18
9
8
7
6
8
7
8

0
A
B
A
B
0
A
B
0
A

12-Dec-2014
1-Oct-2014
12-Jan-2015
27-Oct-2014
20-Dec-2014
17-Jan-2015
27-Oct-2014
20-Dec-2014
17-Jan-2015
20-Dec-2014

B-C-T-0123
B-C-T-0019
B-C-T-0311
B-C-T-0012
B-C-T-0154
B-C-T-0342
B-C-T-0012
B-C-T-0154
B-C-T-0342
B-C-T-0155

12-Dec-2014
17-Nov-2014
12-Jan-2015
17-Nov-2014
20-Dec-2014
17-Jan-2015
17-Nov-2014
20-Dec-2014
17-Jan-2015
20-Dec-2014

C-P-BT-0124
C-P-BT-0028
C-P-BT-0312
C-P-BT-0028
C-P-BT-0154
C-P-BT-0343
C-P-BT-0028
C-P-BT-0154
C-P-BT-0343
C-P-BT-0155

13-Dec-14
2014/11/26
19-Jan-2015
2014/11/26
26-Dec-14
19-Jan-2015
2014/11/26
26-Dec-14
19-Jan-2015
26-Dec-14

A
B
B
B
A
B
B
A
B
A

P-C-BT-0082
P-C-BT-0020
P-C-BT-0298
P-C-BT-0020
P-C-BT-0155
P-C-BT-0307
P-C-BT-0020
P-C-BT-0155
P-C-BT-0307
P-C-BT-0156

13-Dec-2014
26-Nov-2014
19-Jan-2015
26-Nov-2014
26-Dec-14
19-Jan-2015
26-Nov-2014
26-Dec-14
19-Jan-2015
26-Dec-14

C-B-BT-0085
C-B-BT-0023
C-B-BT-0301
C-B-BT-0023
C-B-BT-0158
C-B-BT-0310
C-B-BT-0023
C-B-BT-0158
C-B-BT-0310
C-B-BT-0159

12
12
3
3
3
4
4
3
3
3
3
3
2
1
0
1
0
1

A
B
A
B
a
A
B
A
B
0
A
B
0
A
A
A
A
A

26-Nov-2014
26-Dec-2014
17-Nov-2014
25-Dec-2014
5-Jan-2015
27-Nov-2014
2-Feb-2015
17-Nov-2014
2-Feb-2015
2-Mar-2015
27-Nov-2014
2-Feb-2015
10-Feb-2015
15-Dec-2014
24-Dec-2014
15-Dec-2014
24-Dec-2014
13-Feb-2015

B-C-T-0072
B-C-T-0189
B-C-T-0036
B-C-T-0186
B-C-T-0234
B-C-T-0079
B-C-T-0461
B-C-T-0036
B-C-T-0462
B-C-T-0596
B-C-T-0079
B-C-T-0463
B-C-T-0536
B-C-T-0132
B-C-T-0171
B-C-T-0132
B-C-T-0171
B-C-T-0576

27-Nov-2014
27-Dec-2014
18-Nov-2014
25-Dec-2014
4-Jan-2015
28-Nov-2014
3-Feb-2015
18-Nov-2014
3-Feb-2015
2-Mar-2015
28-Nov-2014
3-Feb-2015
10-Feb-2015
16-Dec-2014
24-Dec-2014
16-Dec-2014
24-Dec-2014
13-Feb-2015

C-P-BT-0065
C-P-BT-0192
C-P-BT-0037
C-P-BT-0189
C-P-BT-0231
C-P-BT-0073
C-P-BT-0471
C-P-BT-0037
C-P-BT-0472
C-P-BT-0606
C-P-BT-0073
C-P-BT-0473
C-P-BT-0546
C-P-BT-0135
C-P-BT-0174
C-P-BT-0135
C-P-BT-0174
C-P-BT-0580

2014/11/27
4-Jan-2015
2014/11/26
29-Dec-14
7-Jan-2015
2-Dec-14
13-Feb-2015
2014/11/26
13-Feb-2015
4-Mar-2015
2-Dec-14
4-Feb-2015
13-Feb-2015
18-Dec-2014
26-Dec-2014
18-Dec-2014
26-Dec-2014
13-Feb-2015

C
B
A
A
C
C
C
C
C
A
C
C
A
A
A
A
A
C

P-C-BT-0026
P-C-BT-0194
P-C-BT-0023
P-C-BT-0171
P-C-BT-0226
P-C-BT-0033
P-C-BT-0481
P-C-BT-0023
P-C-BT-0482
P-C-BT-0550
P-C-BT-0033
P-C-BT-0398
P-C-BT-0480
P-C-BT-0105
P-C-BT-0157
P-C-BT-0105
P-C-BT-0157
P-C-BT-0489

27-Nov-2014
4-Jan-2015
26-Nov-2014
29-Dec-2014
7-Jan-2015
2-Dec-2014
13-Feb-2015
26-Nov-2014
13-Feb-2015
4-Mar-2015
2-Dec-2014
4-Feb-2015
13-Feb-2015
19-Dec-2014
26-Dec-2014
19-Dec-2014
26-Dec-2014
13-Feb-2015

C-B-BT-0029
C-B-BT-0197
C-B-BT-0026
C-B-BT-0174
C-B-BT-0229
C-B-BT-0036
C-B-BT-0484
C-B-BT-0026
C-B-BT-0485
C-B-BT-0553
C-B-BT-0036
C-B-BT-0401
C-B-BT-0483
C-B-BT-0108
C-B-BT-0160
C-B-BT-0108
C-B-BT-0160
C-B-BT-0492

1
1
1

A
0
A

9-Jan-2015
27-Jan-2015
9-Jan-2015

B-C-T-0291
B-C-T-0404
B-C-T-0291

9-Jan-2015
27-Jan-2015
9-Jan-2015

C-P-BT-0294
C-P-BT-0412
C-P-BT-0294

15-Jan-2015
29-Jan-2015
15-Jan-2015

A
A
A

P-C-BT-0280
P-C-BT-0372
P-C-BT-0280

15-Jan-2015
29-Jan-2015
15-Jan-2015

C-B-BT-0283
C-B-BT-0375

System Diagram

19

PAL-1193-SCH-INT-001

Instrument Index

20

PAL-1193-SCH-INT-002

DCS I/O List

21

PAL-1193-SCH-INT-003

ESD System I/O List

22

PAL-1193-SCH-INT-004

Alarm and Trip Schedule

23

PAL-1193-SCH-INT-005

Instrument Cable Schedule

24

PAL-1193-SCH-INT-006

Instrument Junction Box Schedule

25

PAL-1193-SCH-INT-007

Instrument Cable Drum Schedule

26

PAL-1193-CEF-INT-001

Cause and Effect (ESD)

27

PAL-1193-CEF-INT-002

Cause and Effect (Fire & Gas)

28

PAL-1193-CEF-INT-003

Cause and Effect (DCS)

29

2015/3/10

Building Fire Alarm and Clean Agent Fire Suppression

17

A- Approved; B -Accepted with Correction

PAL-1193-DWG-TEL-8001-001
CCTV System Block Diagram

30

PAL-1193DWG-TEL-8002-001

CCTV System Layout Drawing

31

PAL-1193DWG-TEL-8003-001

CCTV steel pole and Camera Installation Drawings

32

PAL-1193DWG-TEL-8004-001

PAGA System Layout Drawing

33

PAL-1193DWG-TEL-8005-001

PAGA System Block Diagram

Page 29 of 35

C-B-BT-0283

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

33

PAL-1193DWG-TEL-8005-001

PAGA System Block Diagram

34
36

PAL-1193DWG-TEL-8006-001
PAL-1193DWG-TEL-8007-001
PAL-1193DWG-TEL-8008-001

PA/GA Cabinet Layout in Remote I/O Room


PA/GA System Wiring Diagram in Cabinet
PA/GA System Cabinet Arrangement Drawing

37

PAL-1193DWG-TEL-8009-001

PA/GA Equipment Installation Drawing on Pole

35

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

1
1
1
1
1

0
A
A
A
A

27-Jan-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015

B-C-T-0404
B-C-T-0576
B-C-T-0576
B-C-T-0576
B-C-T-0576

27-Jan-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015

C-P-BT-0412
C-P-BT-0580
C-P-BT-0580
C-P-BT-0580
C-P-BT-0580

29-Jan-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015

A
A
C
B
B

P-C-BT-0372
P-C-BT-0489
P-C-BT-0489
P-C-BT-0489
P-C-BT-0489

29-Jan-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015

C-B-BT-0375
C-B-BT-0492
C-B-BT-0492
C-B-BT-0492
C-B-BT-0492

21
24
24
21
24
28
26
26
25
20
21
21
21
20
38
38
1

A
0
1
A
0
A
0
1
A
0
A
0
A
0
A
0
A

21-Oct-2014
27-Dec-2014
17-Jan-2015
21-Oct-2014
27-Dec-2014
20-Nov-2014
6-Jan-2015
3-Feb-2015
13-Nov-2014
26-Dec-2014
4-Nov-2014
24-Dec-2014
21-Oct-2014
24-Dec-2014
4-Nov-2014
6-Jan-2015
21-Oct-2014

B-C-T-0002
B-C-T-0194
B-C-T-0340
B-C-T-0002
B-C-T-0194
B-C-T-0046
B-C-T-0261
B-C-T-0488
B-C-T-0035
B-C-T-0192
B-C-T-0021
B-C-T-0169
B-C-T-0002
B-C-T-0169
B-C-T-0021
B-C-T-0261
B-C-T-0002

15-Nov-2014
29-Dec-2014
20-Jan-2015
15-Nov-2014
29-Dec-2014
24-Nov-2014
6-Jan-2015
4-Feb-2015
20-Nov-2014
27-Dec-2014
17-Nov-2014
24-Dec-2014
15-Nov-2014
24-Dec-2014
17-Nov-2014
6-Jan-2015
15-Nov-2014

C-P-BT-0022
C-P-BT-0194
C-P-BT-0352

9-Dec-2014
31-Dec-2014
21-Jan-2015
9-Dec-2014
31-Dec-2014
9-Dec-14
7-Jan-2015
9-Feb-2015
9-Dec-14
30-Dec-2014
9-Dec-14
29-Dec-14
9-Dec-2014
29-Dec-14
9-Dec-14
7-Jan-2015
9-Dec-2014

B
A
A
B
A
B
A
A
A
A
A
A
A
A
A
A
A

P-C-BT-0046
P-C-BT-0179
P-C-BT-0319
P-C-BT-0046
P-C-BT-0179
P-C-BT-0044
P-C-BT-0217
P-C-BT-0457
P-C-BT-0049
P-C-BT-0176
P-C-BT-0055
P-C-BT-0159
P-C-BT-0046
P-C-BT-0159
P-C-BT-0055
P-C-BT-0217
P-C-BT-0046

9-Dec-2014
31-Dec-2014
21-Jan-2015
9-Dec-2014
31-Dec-2014
9-Dec-2014
7-Jan-2015
9-Feb-2015
9-Dec-2014
30-Dec-2014
9-Dec-2014
29-Dec-2014
9-Dec-2014
29-Dec-2014
9-Dec-2014
7-Jan-2015
9-Dec-2014

C-B-BT-0049
C-B-BT-0182

1
1
1
1
1
1
2
1
1
1
1
1
1

0
1
A
0
A
0
1
A
0
A
0
A
0

27-Dec-2014
17-Jan-2015
21-Oct-2014
27-Dec-2014
20-Nov-2014
6-Jan-2015
3-Feb-2015
13-Nov-2014
26-Dec-2014
4-Nov-2014
24-Dec-2014
21-Oct-2014
24-Dec-2014

B-C-T-0194
B-C-T-0340
B-C-T-0002
B-C-T-0194
B-C-T-0046
B-C-T-0261
B-C-T-0488
B-C-T-0035
B-C-T-0192
B-C-T-0021
B-C-T-0169
B-C-T-0002
B-C-T-0169

29-Dec-2014
20-Jan-2015
15-Nov-2014
29-Dec-2014
24-Nov-2014
6-Jan-2015
4-Feb-2015
20-Nov-2014
27-Dec-2014
17-Nov-2014
24-Dec-2014
15-Nov-2014
24-Dec-2014

C-P-BT-0194
C-P-BT-0352
C-P-BT-0022
C-P-BT-0194
C-P-BT-0059
C-P-BT-0261
C-P-BT-0495
C-P-BT-0043
C-P-BT-0191
C-P-BT-0025
C-P-BT-0171
C-P-BT-0022
C-P-BT-0171

31-Dec-2014
21-Jan-2015
9-Dec-2014
31-Dec-2014
9-Dec-14
7-Jan-2015
9-Feb-2015
9-Dec-14
30-Dec-2014
9-Dec-14
29-Dec-14
9-Dec-2014
29-Dec-14

A
A
A
A
A
A
A
A
A
A
A
A

P-C-BT-0179
P-C-BT-0319
P-C-BT-0046
P-C-BT-0179
P-C-BT-0044
P-C-BT-0217
P-C-BT-0457
P-C-BT-0049
P-C-BT-0176
P-C-BT-0055
P-C-BT-0159
P-C-BT-0046
P-C-BT-0159

31-Dec-2014
21-Jan-2015
9-Dec-2014
31-Dec-2014
9-Dec-2014
7-Jan-2015
9-Feb-2015
9-Dec-2014
30-Dec-2014
9-Dec-2014
29-Dec-2014
9-Dec-2014
29-Dec-2014

2
2
2
2
2
2
2
2
2
2
2
2

A
0
A
0
A
0
A
0
A
0
A
0

21-Jan-2015
27-Jan-2015
6-Jan-2015
27-Jan-2015
15 D 2014
15-Dec-2014
26-Dec-2014
10-Dec-2014
24-Dec-2014
10-Dec-2014
24-Dec-2014
9-Jan-2015
27-Jan-2015

B-C-T-0361
B-C-T-0414
B-C-T-0262
B-C-T-0414
B C T 0131
B-C-T-0131
B-C-T-0192
B-C-T-0113
B-C-T-0169
B-C-T-0113
B-C-T-0169
B-C-T-0288
B-C-T-0414

21-Jan-2015
28-Jan-2015
7-Jan-2015
28-Jan-2015
16 D 2014
16-Dec-2014
27-Dec-2014
10-Dec-2014
24-Dec-2014
10-Dec-2014
24-Dec-2014
9-Jan-2015
28-Jan-2015

C-P-BT-0363
C-P-BT-0426
C-P-BT-0263
C-P-BT-0426
C-P-BT-0134
C-P-BT-0191
C-P-BT-0114
C-P-BT-0171
C-P-BT-0114
C-P-BT-0171
C-P-BT-0291
C-P-BT-0426

21-Jan-2015
29-Jan-2015
7-Jan-2015
29-Jan-2015
17 D 14
17-Dec-14
30-Dec-2014
16-Dec-14
29-Dec-14
16-Dec-14
29-Dec-14
9-Jan-15
29-Jan-2015

A
A
A
A
A
A
A
A
A
A
A
A

P-C-BT-0318
P-C-BT-0364
P-C-BT-0221
P-C-BT-0364
P-C-BT-0101
P-C-BT-0176
P-C-BT-0096
P-C-BT-0159
P-C-BT-0096
P-C-BT-0159
P-C-BT-0242
P-C-BT-0364

21-Jan-2015
29-Jan-2015
7-Jan-2015
29-Jan-2015
17 D 2014
17-Dec-2014
30-Dec-2014
16-Dec-2014
29-Dec-2014
16-Dec-2014
29-Dec-2014
9-Jan-15
29-Jan-2015

C-B-BT-0321
C-B-BT-0367
C-B-BT-0224
C-B-BT-0367
C B BT 0104
C-B-BT-0104
C-B-BT-0179
C-B-BT-0099
C-B-BT-0162
C-B-BT-0099
C-B-BT-0162

13
13
14
13
14
13
4
4

A
0
A
0
A
0
A
0

28-Nov-2014
9-Jan-2015
24-Nov-2014
9-Jan-2015
24-Nov-2014
9-Jan-2015
13-Nov-2014
26-Dec-2014

B-C-T-0088
B-C-T-0289
B-C-T-0055
B-C-T-0289
B-C-T-0055
B-C-T-0289
B-C-T-0035
B-C-T-0192

29-Nov-2014
9-Jan-2015
24-Nov-2014
9-Jan-2015
24-Nov-2014
9-Jan-2015
20-Nov-2014
27-Dec-2014

C-P-BT-0084
C-P-BT-0292
C-P-BT-0060
C-P-BT-0292
C-P-BT-0060
C-P-BT-0292
C-P-BT-0043
C-P-BT-0191

9-Dec-14
12-Jan-2015
9-Dec-14
12-Jan-2015
9-Dec-14
12-Jan-2015
9-Dec-14
30-Dec-2014

A
A
A
A
A
A
A
A

P-C-BT-0056
P-C-BT-0266
P-C-BT-0045
P-C-BT-0266
P-C-BT-0045
P-C-BT-0266
P-C-BT-0049
P-C-BT-0176

9-Dec-2014
12-Jan-2015
9-Dec-2014
12-Jan-2015
9-Dec-2014
12-Jan-2015
9-Dec-2014
30-Dec-2014

C-B-BT-0059
C-B-BT-0269
C-B-BT-0048
C-B-BT-0269
C-B-BT-0048
C-B-BT-0269
C-B-BT-0052
C-B-BT-0179

/ Structure
MTO (CIV/STR)

PAL-1193-MR-CIV-001

MR for Rebar Materials

PAL-1193-MR-CIV-002

MR for Concrete Materials

PAL-1193-MR-CIV-003

MR for Structural Steel Materials

PAL-1193-MR-CIV-004

MR for Fencing Materials

PAL-1193-MR-CIV-005

MR for Speciality Items Materials

PAL-1193-MR-CIV-006

MR for Piling Materials

PAL-1193-MR-CIV-007

MR for Control/Switchgear/BATTERY Room Building

PAL-1193-MTO-CIV-001

MTO for Rebar Materials

PAL-1193-MTO-CIV-002

MTO for Concrete Materials

10

PAL-1193-MTO-CIV-003

MTO for Structural Steel Materials

11

PAL-1193-MTO-CIV-004

MTO for Fencing Materials

12

PAL-1193-MTO-CIV-005

MTO for Speciality Items Materials

13

PAL-1193-MTO-CIV-006

MTO for Piling Materials

C-P-BT-0022
C-P-BT-0194
C-P-BT-0059
C-P-BT-0261
C-P-BT-0495
C-P-BT-0043
C-P-BT-0191
C-P-BT-0025
C-P-BT-0171
C-P-BT-0022
C-P-BT-0171
C-P-BT-0025
C-P-BT-0261
C-P-BT-0022

C-B-BT-0322
C-B-BT-0049
C-B-BT-0182
C-B-BT-0047
C-B-BT-0220
C-B-BT-0460
C-B-BT-0052
C-B-BT-0179
C-B-BT-0058
C-B-BT-0162
C-B-BT-0049
C-B-BT-0162
C-B-BT-0058
C-B-BT-0220
C-B-BT-0049
C-B-BT-0182
C-B-BT-0322
C-B-BT-0049
C-B-BT-0182
C-B-BT-0047
C-B-BT-0220
C-B-BT-0460
C-B-BT-0052
C-B-BT-0179
C-B-BT-0058
C-B-BT-0162
C-B-BT-0049
C-B-BT-0162

TBE(CIV)

PAL-1193-TBE-CIV-001

TBE for Reinforcing bar Materials

PAL-1193-TBE-CIV-003

TBE for Structural Steel Materials

PAL-1193-TBE-CIV-004

TBE for Fencing Materials

PAL-1193-TBE-CIV-005

TBE for Speciality Materials

PAL-1193-TBE-CIV-006

TBE for Piling Materials

PAL-1193-TBE-CIV-007

TBE for Control Switchgear Battery Room

C-B-BT-0245
C-B-BT-0367

Calculation(CIV/STR)

PAL-1193-CAL-CIV-004

Calculation for Sedimentation Tank Foundation

PAL-1193-CAL-CIV-005

Calculation for Crude Oil Buffer Tank Foundation

PAL-1193-CAL-CIV-006

Calculation for Water Buffer Tank Foundation

PAL-1193-CAL-CIV-007

Calculation for Bund Wall Height

cation (CIV/STR)

Page 30 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

PAL-1193-SP-CIV-001

Specification for Geotechnical Investigation

PAL-1193-SP-CIV-002

Specification for Topographical Survey

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

16
17
14
15

A
0
A
0

10-Oct-2014
17-Dec-2014
10-Oct-2014
17-Dec-2014

B-C-T-0001
B-C-T-0144
B-C-T-0001
B-C-T-0144

17-Nov-2014
18-Dec-2014
17-Nov-2014
18-Dec-2014

C-P-BT-0036
C-P-BT-0146
C-P-BT-0036
C-P-BT-0146

9-Dec-14
22-Dec-2014
9-Dec-14
22-Dec-2014

B
A
A
A

P-C-BT-0043
P-C-BT-0116
P-C-BT-0043
P-C-BT-0116

9-Dec-2014
22-Dec-2014
9-Dec-2014
22-Dec-2014

C-B-BT-0046
C-B-BT-0119
C-B-BT-0046
C-B-BT-0119

1
1
1
1
1
1
1
1
1
1
1

A
0
IFC
A
0
A
0
IFC
A
0
IFC
A
0
A
0
A
0
A
0

10-Oct-2014
17-Dec-2014
22-Jan-2015
13-Nov-2014
15-Dec-2014
9-Dec-2014
17-Jan-2015
22-Jan-2015
23-Nov-2014
5-Jan-2015
22-Jan-2015
23-Nov-2014
31-Jan-2015
23-Nov-2014
31-Jan-2015
23-Nov-2014
31-Jan-2015
23-Nov-2014
31 J 2015
31-Jan-2015

B-C-T-0001
B-C-T-0144
B-C-IFC-T-0001
B-C-T-0042
B-C-T-0130
B-C-T-0111
B-C-T-0340
B-C-IFC-T-0001
B-C-T-0037
B-C-T-0246
B-C-IFC-T-0001
B-C-T-0037
B-C-T-0447
B-C-T-0037
B-C-T-0447
B-C-T-0037
B-C-T-0447
B-C-T-0037
B C T 0447
B-C-T-0447

17-Nov-2014
18-Dec-2014

C-P-BT-0036
C-P-BT-0146

9-Dec-14
22-Dec-2014

P-C-BT-0043
P-C-BT-0116

9-Dec-2014
22-Dec-2014

C-B-BT-0046
C-B-BT-0119

24-Nov-2014
15-Dec-2014
10-Dec-2014
20-Jan-2015

C-P-BT-0057
C-P-BT-0131
C-P-BT-0108
C-P-BT-0352

29-Nov-2014
16-Dec-2014

P-C-BT-0029
P-C-BT-0093
P-C-BT-0084
P-C-BT-0319

29-Nov-2014
16-Dec-2014
13-Dec-2014
21-Jan-2015

C-B-BT-0032
C-B-BT-0096

13-Dec-14
21-Jan-2015

A
A
A
A

24-Nov-2014
5-Jan-2015

C-P-BT-0057
C-P-BT-0247

29-Nov-2014
7-Jan-2015

A
A

P-C-BT-0029
P-C-BT-0219

29-Nov-2014
7-Jan-2015

C-B-BT-0032
C-B-BT-0222

24-Nov-2014
2-Feb-2015
24-Nov-2014
2-Feb-2015
24-Nov-2014
2-Feb-2015
24-Nov-2014
2 F b 2015
2-Feb-2015

C-P-BT-0057
C-P-BT-0461
C-P-BT-0057
C-P-BT-0461
C-P-BT-0057
C-P-BT-0461
C-P-BT-0057
C
C-P-BT-0461

29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6 F b 2015
6-Feb-2015

A
A
A
A
A
A
A
A

P-C-BT-0029
P-C-BT-0428
P-C-BT-0029
P-C-BT-0428
P-C-BT-0029
P-C-BT-0428
P-C-BT-0029
C
P-C-BT-0428

29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6 F b 2015
6-Feb-2015

C-B-BT-0032
C-B-BT-0431
C-B-BT-0032
C-B-BT-0431
C-B-BT-0032
C-B-BT-0431
C-B-BT-0032
C B BT 0431
C-B-BT-0431

A
0
A
0
A
0
A
A
A
0
IFC
A
0
IFC
A
0
IFC
A
0
IFC
A
0
A
0
A
0
A
0
A
0
IFC
A
A
A
A
A
A
A
A
A

23-Nov-2014
31-Jan-2015
23-Nov-2014
31-Jan-2015
23-Nov-2014
31-Jan-2015
23-Jan-2015
23-Jan-2015
28-Nov-2014
16-Dec-2014
22-Jan-2015
13-Nov-2014
15-Dec-2014
22-Jan-2015
28-Nov-2014
16-Dec-2014
22-Jan-2015
4-Nov-2014
24-Dec-2014
24
Dec 2014
22-Jan-2015
26-Dec-2014
10-Jan-2015
26-Dec-2014
10-Jan-2015
2-Feb-2015
9-Feb-2015
11-Feb-2015
4-Mar-2015
26-Dec-2014
10-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
14-Jan-2015

B-C-T-0037
B-C-T-0447
B-C-T-0037
B-C-T-0447
B-C-T-0037
B-C-T-0447
B-C-T-0383
B-C-T-0383
B-C-T-0089
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0042
B-C-T-0130
B-C-IFC-T-0001
B-C-T-0089
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0021
B-C-T-0169
B
C T 0169
B-C-IFC-T-0001
B-C-T-0191
B-C-T-0299
B-C-T-0191
B-C-T-0299
B-C-T-0448
B-C-T-0521
B-C-T-0551
B-C-T-0607
B-C-T-0191
B-C-T-0299
B-C-IFC-T-0001
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0338
B-C-T-0323

24-Nov-2014
2-Feb-2015
24-Nov-2014
2-Feb-2015
24-Nov-2014
2-Feb-2015
23-Jan-2015
23-Jan-2015
29-Nov-2014
17-Dec-2014

C-P-BT-0057
C-P-BT-0461
C-P-BT-0057
C-P-BT-0461
C-P-BT-0057
C-P-BT-0461
C-P-BT-0399
C-P-BT-0399
C-P-BT-0081
C-P-BT-0145

29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
30-Jan-2015
30-Jan-2015
16-Dec-2014
20-Dec-14

A
A
A
A
A
A
A
A
A
A

P-C-BT-0029
P-C-BT-0428
P-C-BT-0029
P-C-BT-0428
P-C-BT-0029
P-C-BT-0428
P-C-BT-0370
P-C-BT-0370
P-C-BT-0092
P-C-BT-0114

29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
29-Nov-2014
6-Feb-2015
30-Jan-2014
30-Jan-2014
16-Dec-2014
20-Dec-2014

C-B-BT-0032
C-B-BT-0431
C-B-BT-0032
C-B-BT-0431
C-B-BT-0032
C-B-BT-0431
C-B-BT-0373
C-B-BT-0373

24-Nov-2014
15-Dec-2014

C-P-BT-0057
C-P-BT-0131

29-Nov-2014
16-Dec-2014

A
A

P-C-BT-0029
P-C-BT-0093

29-Nov-2014
16-Dec-2014

C-B-BT-0032
C-B-BT-0096

29-Nov-2014
17-Dec-2014

C-P-BT-0081
C-P-BT-0145

16-Dec-2014
20-Dec-14

A
A

P-C-BT-0092
P-C-BT-0114

16-Dec-2014
20-Dec-2014

C-B-BT-0095
C-B-BT-0117

24-Nov-2014
24-Dec-2014
24
Dec 2014

C-P-BT-0058
C-P-BT-0171

8-Dec-2014
29-Dec-14
29
Dec 14

A
A

P-C-BT-0039
P-C-BT-0159

8-Dec-2014
29 Dec 2014
29-Dec-2014

C-B-BT-0042
C-B-BT-0162
C
B BT 0162

30-Dec-2014
10-Jan-2015
30-Dec-2014
10-Jan-2015
3-Feb-2015
9-May-2015
11-Feb-2015
4-Mar-2015
30-Dec-2014
10-Jan-2015

C-P-BT-0206
C-P-BT-0301
C-P-BT-0206
C-P-BT-0301
C-P-BT-0470
C-P-BT-0532
C-P-BT-0561
C-P-BT-0615
C-P-BT-0206
C-P-BT-0301

5-Jan-2015
10-Jan-2015
5-Jan-2015
10-Jan-2015
4-Feb-2015
12-Feb-2015
27-Feb-2015

B
A
A
A
A
A

P-C-BT-0201
P-C-BT-0251

C-B-BT-0204
C-B-BT-0254

P-C-BT-0399
P-C-BT-0477
P-C-BT-0493

5-Jan-2015
10-Jan-2015
5-Jan-2015
10-Jan-2015
4-Feb-2015
12-Feb-2015
27-Feb-2015

5-Jan-2015
10-Jan-2015

A
A

P-C-BT-0201
P-C-BT-0251

5-Jan-2015
10-Jan-2015

C-B-BT-0204
C-B-BT-0254

22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
22-Jan-2015
14-Jan-2015

C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0378
C-P-BT-0324

30-Jan-2015
30-Jan-2015
30-Jan-2015
30-Jan-2015
30-Jan-2015
30-Jan-2015
30-Jan-2015
30-Jan-2015
15-Jan-2015

A
A
A
A
A
A
A
A
B

P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0351
P-C-BT-0279

30-Jan-2014
30-Jan-2014
30-Jan-2014
30-Jan-2014
30-Jan-2014
30-Jan-2014
30-Jan-2014
30-Jan-2014
15-Jan-2015

C-B-BT-0354
C-B-BT-0354
C-B-BT-0354
C-B-BT-0354
C-B-BT-0354
C-B-BT-0354
C-B-BT-0354
C-B-BT-0354

Drawing (CIV/STR)

PAL-1193-DWG-CIV-0001-01

Boreholes and Test Pits Layout

PAL-1193-DWG-CIV-0002-01

Fencing and Gate Layout

PAL-1193-DWG-CIV-0003-01

Sign Boards Location Layout

PAL-1193-DWG-CIV-0102-01

Rough Grading Plan

PAL-1193-DWG-CIV-0104-01

Final Grading Plan Sheet 01

PAL-1193-DWG-CIV-0104-02

Final Grading Plan Sheet 02

PAL-1193-DWG-CIV-0104-03

Final Grading Plan Sheet 03

PAL-1193-DWG-CIV-0104-04

Final Grading
g Plan Sheet 04

PAL-1193-DWG-CIV-0104-05

Final Grading Plan Sheet 05

10

PAL-1193-DWG-CIV-0105-01

Grading, Drainage & Surfacing Typical Section

11

PAL-1193-DWG-CIV-0105-02

Grading, Drainage & Surfacing Typical Section

12
13

PAL-1193-DWG-CIV-0200-01
PAL-1193-DWG-CIV-0300-01~38

Pile layout Key Plan


Pile Layout Plan Sheet-01~38

14

PAL-1193-DWG-CIV-0450-01

Civil Work General Notes

15

PAL-1193-DWG-CIV-0451-01

Typical Fence and Gate Details

16

PAL-1193-DWG-CIV-0452-01

Typical Pile and Pile Cap Details and Piling General Notes

17

PAL-1193-DWG-CIV-0453-01
PAL
1193 DWG CIV 0453 01

Typical Marker Post and Sign Board

18

PAL-1193-DWG-CIV-0455-01

Tank Farm Bund Wall Sheet-01

19

PAL-1193-DWG-CIV-0455-02

Tank Farm Bund Wall Sheet-02

20

PAL-1193-DWG-CIV-0456-01

Tank Farm Area Civil Works details

21

PAL-1193-DWG-CIV-0457-01

Misc Civil Works

22

PAL-1193-DWG-CIV-0460-01

Site Work General Notes

23

PAL-1193-DWG-CIV-0601-01
PAL-1193-DWG-CIV-0601-02
PAL-1193-DWG-CIV-0602-01
PAL-1193-DWG-CIV-0602-02
PAL-1193-DWG-CIV-0603-01
PAL-1193-DWG-CIV-0603-02
PAL-1193-DWG-CIV-0604-01
PAL-1193-DWG-CIV-0605-01
PAL-1193-DWG-CIV-0606-01

T-2365 Closed Drain Sump Details


T-2365 Closed Drain Sump Details
T-2366 Open Drain Sump Details
T-2366 Open Drain Sump Details
T-2367 Sand Drain Pit Details
T-2367 Sand Drain Pit Details
T-2368 Vent Pit Details
T-2371A/B Sand Pond Details
Valve Pit 1 Details

1
1
1
1
1
38
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

24
25
26
27
28
29
30
31

Page 31 of 35

P-C-BT-0201
P-C-BT-0251

C-B-BT-0087
C-B-BT-0322

C-B-BT-0095
C-B-BT-0117

C-B-BT-0204
C-B-BT-0254
C-B-BT-0402
C-B-BT-0480
C-B-BT-0496

C-B-BT-0282

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

34

PAL-1193-DWG-CIV-0606-02
PAL-1193-DWG-CIV-0606-03
PAL-1193-DWG-CIV-0606-04

Valve Pit 2 Details


Valve Pit 3 Details
Valve Pit 4 Details

35

PAL-1193-DWG-CIV-0701-01

T-2302A/B Sedimentation Foundation Details

39

PAL-1193-DWG-CIV-0703-01

T-2340 Water Buffer Tank Foundation Details

40

PAL-1193-DWG-CIV-0703-02

T-2340 Water Buffer Tank Foundation Details

41

PAL-1193-DWG-CIV-0704-01
PAL-1193-DWG-STR-1000-01
PAL 1193 DWG STR 10 0 01
PAL-1193-DWG-STR-1050-01

FS-2344 Cold Vent Stack Foundation Details


Structural Steel Layout Key Plan
S
S
S
Structural
Steel Layout Sheet-01

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

PAL-1193-DWG-STR-1050-02
PAL-1193-DWG-STR-1050-03
PAL-1193-DWG-STR-1050-04
PAL-1193-DWG-STR-1050-05
PAL-1193-DWG-STR-1050-06
PAL-1193-DWG-STR-1050-07
PAL-1193-DWG-STR-1050-08
PAL-1193-DWG-STR-1050-09
PAL-1193-DWG-STR-1050-10
PAL-1193-DWG-STR-1050-11
PAL-1193-DWG-STR-1050-12
PAL-1193-DWG-STR-1050-13
PAL-1193-DWG-STR-1050-14
PAL-1193-DWG-STR-1050-15
PAL-1193-DWG-STR-1050-16
PAL-1193-DWG-STR-1050-17
PAL-1193-DWG-STR-1050-18
PAL-1193-DWG-STR-1050-19
PAL-1193-DWG-STR-1050-20
PAL-1193-DWG-STR-1050-21
PAL-1193-DWG-STR-1050-22
PAL-1193-DWG-STR-1050-23
PAL-1193-DWG-STR-1050-24
PAL-1193-DWG-STR-1050-25
PAL-1193-DWG-STR-1050-26
PAL-1193-DWG-STR-1050-27
PAL-1193-DWG-STR-1050-28
PAL-1193-DWG-STR-1050-29
PAL-1193-DWG-STR-1050-30
PAL-1193-DWG-STR-1050-31
PAL-1193-DWG-STR-1050-32
PAL-1193-DWG-STR-1050-33
PAL-1193-DWG-STR-1050-34
PAL-1193-DWG-STR-1050-35
PAL-1193-DWG-STR-1050-36
PAL-1193-DWG-STR-1050-37
PAL-1193-DWG-STR-1050-38
PAL-1193-DWG-STR-1050-39
PAL-1193-DWG-STR-1050-40
PAL-1193-DWG-STR-1050-41

Structural Steel Layout Sheet-02


Structural Steel Layout Sheet-03
Structural Steel Layout Sheet-04
Structural Steel Layout Sheet-05
Structural Steel Layout Sheet-06
Structural Steel Layout Sheet-07
Structural Steel Layout Sheet-08
Structural Steel Layout Sheet-09
Structural Steel Layout Sheet-10
Structural Steel Layout Sheet-11
Structural Steel Layout Sheet-12
Structural Steel Layout Sheet-13
Structural Steel Layout Sheet-14
Structural Steel Layout Sheet-15
Structural Steel Layout Sheet-16
Structural Steel Layout Sheet-17
Structural Steel Layout Sheet-18
Structural Steel Layout Sheet-19
Structural Steel Layout Sheet-20
Structural Steel Layout Sheet-21
Structural Steel Layout Sheet-22
Structural Steel Layout Sheet-23
Structural Steel Layout Sheet-24
Structural Steel Layout Sheet-25
Structural Steel Layout Sheet-26
Structural Steel Layout Sheet-27
Structural Steel Layout Sheet-28
Structural Steel Layout Sheet-29
Structural Steel Layout Sheet-30
Structural Steel Layout Sheet-31
Structural Steel Layout Sheet-32
Structural Steel Layout Sheet-33
Structural Steel Layout Sheet-34
Structural Steel Layout Sheet-35
Structural Steel Layout Sheet-36
Structural Steel Layout Sheet-37
Structural Steel Layout Sheet-38
Structural Steel Layout Sheet-39
Structural Steel Layout Sheet-40
Structural Steel Layout Sheet-41

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

32
33

36

PAL-1193-DWG-CIV-0701-02

T-2302A/B Sedimentation Foundation Details

37

PAL-1193-DWG-CIV-0702-01

T-2303 Crude Oil Buffer Tank Foundation Details

38

PAL-1193-DWG-CIV-0702-02

T-2303 Crude Oil Buffer Tank Foundation Details

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

P-C-BT-0279
P-C-BT-0279
P-C-BT-0279
P-C-BT-0202
P-C-BT-0266

15-Jan-2015
15-Jan-2015
15-Jan-2015
5-Jan-2015
12-Jan-2015

C-B-BT-0282
C-B-BT-0282
C-B-BT-0282
C-B-BT-0205
C-B-BT-0269
C-B-BT-0460

A
A
A
A
0
IFC
1
A
0
IFC
A
0
IFC
A
0
IFC
A
0
1
IFC
A
0
IFC
A
A
A

14-Jan-2015
14-Jan-2015
14-Jan-2015
30-Dec-2014
9-Jan-2015
22-Jan-2015
3-Feb-2015
30-Dec-2014
9-Jan-2015
22-Jan-2015
30-Dec-2014
9-Jan-2015
22-Jan-2015
30-Dec-2014
9-Jan-2015
22-Jan-2015
30-Dec-2014
9-Jan-2015
17-Jan-2015
22-Jan-2015
30-Dec-2014
9-Jan-2015
22-Jan-2015
30-Jan-2015
15-Jan-2015
15 J 2015
15-Jan-2015

B-C-T-0323
B-C-T-0323
B-C-T-0323
B-C-T-0215
B-C-T-0289
B-C-IFC-T-0001
B-C-T-0488
B-C-T-0215
B-C-T-0289
B-C-IFC-T-0001
B-C-T-0215
B-C-T-0289
B-C-IFC-T-0001
B-C-T-0215
B-C-T-0289
B-C-IFC-T-0001
B-C-T-0215
B-C-T-0289
B-C-T-0340
B-C-IFC-T-0001
B-C-T-0215
B-C-T-0289
B-C-IFC-T-0001
B-C-T-0443
B-C-T-0326
B C T 0326
B-C-T-0326

14-Jan-2015
14-Jan-2015
14-Jan-2015
31-Dec-2014
9-Jan-2015

C-P-BT-0324
C-P-BT-0324
C-P-BT-0324
C-P-BT-0219
C-P-BT-0292

15-Jan-2015
15-Jan-2015
15-Jan-2015
5-Jan-2015
12-Jan-2015

B
B
B

4-Feb-2015
31-Dec-2014
9-Jan-2015

C-P-BT-0495
C-P-BT-0219
C-P-BT-0292

9-Feb-2015
5-Jan-2015
12-Jan-2015

A
A
A

P-C-BT-0457
P-C-BT-0202
P-C-BT-0266

9-Feb-2015
5-Jan-2015
12-Jan-2015

C-B-BT-0205
C-B-BT-0269

31-Dec-2014
9-Jan-2015

C-P-BT-0219
C-P-BT-0292

5-Jan-2015
12-Jan-2015

A
A

P-C-BT-0202
P-C-BT-0266

5-Jan-2015
12-Jan-2015

C-B-BT-0205
C-B-BT-0269

31-Dec-2014
9-Jan-2015

C-P-BT-0219
C-P-BT-0292

5-Jan-2015
12-Jan-2015

A
A

P-C-BT-0202
P-C-BT-0266

5-Jan-2015
12-Jan-2015

C-B-BT-0205
C-B-BT-0269

31-Dec-2014
9-Jan-2015
20-Jan-2015

C-P-BT-0219
C-P-BT-0292
C-P-BT-0352

5-Jan-2015
12-Jan-2015
21-Jan-2015

A
A
A

P-C-BT-0202
P-C-BT-0266
P-C-BT-0319

5-Jan-2015
12-Jan-2015
21-Jan-2015

C-B-BT-0205
C-B-BT-0269

31-Dec-2014
9-Jan-2015

C-P-BT-0219
C-P-BT-0292

5-Jan-2015
12-Jan-2015

A
A

P-C-BT-0202
P-C-BT-0266

5-Jan-2015
12-Jan-2015

C-B-BT-0205
C-B-BT-0269

30-Jan-2015
15-Jan-2015
15 J 2015
15-Jan-2015

C-P-BT-0456
C-P-BT-0329
C P BT 0329
C-P-BT-0329

2-Feb-2015
16-Jan-15
16 J 15
16-Jan-15

A
A
A

P-C-BT-0393
P-C-BT-0290
C
P-C-BT-0290

2-Feb-2015
16-Jan-2015
16 J 2015
16-Jan-2015

C-B-BT-0396
C-B-BT-0293
C B BT 0293
C-B-BT-0293

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15
Jan 2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
13-Feb-2015
13-Feb-2015

B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B
C T 0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0326
B-C-T-0575
B-C-T-0575

15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15
Jan 2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
15-Jan-2015
13-Feb-2015
13-Feb-2015

C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C
P BT 0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329
C-P-BT-0329

16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16
Jan 15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
16-Jan-15
28-Feb-15
28-Feb-15

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0290
P-C-BT-0527
P-C-BT-0527

16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16
Jan 2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
16-Jan-2015
28-Feb-2015
28-Feb-2015

C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C
B BT 0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0293
C-B-BT-0530
C-B-BT-0530

Page 32 of 35

C-P-BT-0585
C-P-BT-0585

A
A

C-B-BT-0322

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

89

PAL-1193-DWG-STR-1050-42
PAL-1193-DWG-STR-1050-43
PAL-1193-DWG-STR-1050-44
PAL-1193-DWG-STR-1050-45
PAL-1193-DWG-STR-1050-46
PAL-1193-DWG-STR-1050-47

Structural Steel Layout Sheet-42


Structural Steel Layout Sheet-43
Structural Steel Layout Sheet-44
Structural Steel Layout Sheet-45
Structural Steel Layout Sheet-46
Structural Steel Layout Sheet-47

90

PAL-1193-DWG-STR-1250-01

Structural Steel General Notes

91

PAL-1193-DWG-STR-1251-01

Standard Ladder Elevation,Section And Details Sheet-01

92

PAL-1193-DWG-STR-1251-02

Standard Ladder Elevation,Section And Details Sheet-02

84
85
86
87
88

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.
C-B-BT-0530
C-B-BT-0530
C-B-BT-0530
C-B-BT-0530
C-B-BT-0530
C-B-BT-0530

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
A
A
A
A
A
A
0
IFC
A
0
IFC
A
0
IFC
A

13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
28-Nov-2014
16-Dec-2014
22-Jan-2015
1-Dec-2014
16-Dec-2014
22-Jan-2015
1-Dec-2014
16-Dec-2014
22-Jan-2015
1-Dec-2014

B-C-T-0575
B-C-T-0575
B-C-T-0575
B-C-T-0575
B-C-T-0575
B-C-T-0575
B-C-T-0089
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0100
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0100
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0100

13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
13-Feb-2015
29-Nov-2014
17-Dec-2014

C-P-BT-0585
C-P-BT-0585
C-P-BT-0585
C-P-BT-0585
C-P-BT-0585
C-P-BT-0585
C-P-BT-0081
C-P-BT-0145

28-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
28-Feb-15
16-Dec-2014
20-Dec-14

A
A
A
A
A
A
A
A

P-C-BT-0527
P-C-BT-0527
P-C-BT-0527
P-C-BT-0527
P-C-BT-0527
P-C-BT-0527
P-C-BT-0092
P-C-BT-0114

28-Feb-2015
28-Feb-2015
28-Feb-2015
28-Feb-2015
28-Feb-2015
28-Feb-2015
16-Dec-2014
20-Dec-2014

C-B-BT-0095
C-B-BT-0117

2-Dec-2014
17-Dec-2014

C-P-BT-0098
C-P-BT-0145

8-Dec-2014
20-Dec-14

A
A

P-C-BT-0040
P-C-BT-0114

8-Dec-2014
20-Dec-2014

C-B-BT-0043
C-B-BT-0117

2-Dec-2014
17-Dec-2014

C-P-BT-0098
C-P-BT-0145

8-Dec-2014
20-Dec-14

A
A

P-C-BT-0040
P-C-BT-0114

8-Dec-2014
20-Dec-2014

C-B-BT-0043
C-B-BT-0117

2-Dec-2014

C-P-BT-0098

8-Dec-2014

P-C-BT-0040

8-Dec-2014

C-B-BT-0043

1
1
1
1
1
1
1
1
1

0
IFC
A
0
IFC
A
0
A
0

16-Dec-2014
22-Jan-2015
1-Dec-2014
16-Dec-2014
22-Jan-2015
14-Jan-2015
23-Jan-2015
5-Jan-2015
23 J 2015
23-Jan-2015

B-C-T-0143
B-C-IFC-T-0001
B-C-T-0100
B-C-T-0143
B-C-IFC-T-0001
B-C-T-0323
B-C-T-0387
B-C-T-0253
B C T 0387
B-C-T-0387

17-Dec-2014

C-P-BT-0145

20-Dec-14

P-C-BT-0114

20-Dec-2014

C-B-BT-0117

2-Dec-2014
17-Dec-2014

C-P-BT-0098
C-P-BT-0145

8-Dec-2014
20-Dec-14

A
A

P-C-BT-0040
P-C-BT-0114

8-Dec-2014
20-Dec-2014

C-B-BT-0043
C-B-BT-0117

14-Jan-2015
23-Jan-2015
6-Jan-2015
23 J 2015
23-Jan-2015

C-P-BT-0324

15-Jan-2015
26-Jan-2015
7-Jan-2015
26 J 2015
26-Jan-2015

A
A
A
A

P-C-BT-0279
P-C-BT-0340
P-C-BT-0231

15-Jan-2015
26-Jan-2015
8-Jan-2015
26 J 2015
26-Jan-2015

C-B-BT-0282
C-B-BT-0343
C-B-BT-0234
C B BT 0343
C-B-BT-0343

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0
A
0

5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
5
Jan 2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015

B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B
C T 0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387

6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
6
Jan 2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015

7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
7
Jan 2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015

A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
8
Jan 2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015

C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C
B BT 0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343

Standard Stair Handrail & Catwalk Elevation Section And

93

PAL-1193-DWG-STR-1252-01

94

PAL-1193-DWG-STR-1252-02

95

PAL-1193-DWG-STR-1350-01

Pipe Rack Key Plan

96

PAL-1193-DWG-STR-1401-01

Pipe
p Rack-01 Plan,, Elevation and Section

97

PAL-1193-DWG-STR-1402-01

Pipe Rack-02 Plan, Elevation and Section

98

PAL-1193-DWG-STR-1403-01

Pipe Rack-03 Plan, Elevation and Section Sheet-01

99

PAL-1193-DWG-STR-1403-02

Pipe Rack-03 Plan, Elevation and Section Sheet-02

100

PAL-1193-DWG-STR-1404-01

Pipe Rack-04 Plan, Elevation and Section Sheet-01

101

PAL-1193-DWG-STR-1404-02

Pipe Rack-04 Plan, Elevation and Section Sheet-02

102

PAL-1193-DWG-STR-1405-01

Pipe Rack-05 Plan, Elevation and Section

103

PAL-1193-DWG-STR-1406-01

Pipe Rack-06 Plan, Elevation and Section Sheet-01

104

PAL-1193-DWG-STR-1406-02

Pipe Rack-06 Plan, Elevation and Section Sheet-02

105

PAL-1193-DWG-STR-1407-01

Pipe Rack-07 Plan, Elevation and Section Sheet-01

106

PAL-1193-DWG-STR-1407-02

Pipe Rack-07 Plan, Elevation and Section Sheet-02

107

PAL-1193-DWG-STR-1408-01

Pipe Rack-08 Plan, Elevation and Section Sheet-01

108

PAL-1193-DWG-STR-1408-02

Pipe Rack-08 Plan, Elevation and Section Sheet-02

109

PAL-1193-DWG-STR-1408-03

Pipe Rack-08 Plan, Elevation and Section Sheet-03

110

PAL-1193-DWG-STR-1409-01

Pipe Rack-09 Plan, Elevation and Section Sheet-01

111

PAL-1193-DWG-STR-1409-02

Pipe Rack-09 Plan, Elevation and Section Sheet-02

112

PAL-1193-DWG-STR-1409-03

Pipe Rack-09 Plan, Elevation and Section Sheet-03

113

PAL-1193-DWG-STR-1410-01

Pipe Rack-10 Plan, Elevation and Section

114

PAL-1193-DWG-STR-1411-01

Pipe Rack-11 Plan, Elevation and Section

115

PAL-1193-DWG-STR-1412-01

Pipe Rack-12 Plan, Elevation and Section Sheet-01

116

PAL-1193-DWG-STR-1412-02

Pipe Rack-12 Plan, Elevation and Section Sheet-02

Details Sheet-01
Standard Stair Handrail & Catwalk Elevation Section And
Details Sheet-02

Page 33 of 35

C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C P BT 0255
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398

P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P C BT 0231
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

Status as of:

From BEB to CPECC

Title / Description
Sheet.

117

PAL-1193-DWG-STR-1412-03

Pipe Rack-12 Plan, Elevation and Section Sheet-03

118

PAL-1193-DWG-STR-1412-04

Pipe Rack-12 Plan, Elevation and Section Sheet-04

119

PAL-1193-DWG-STR-1412-05

Pipe Rack-12 Plan, Elevation and Section Sheet-05

120

PAL-1193-DWG-STR-1412-06

Pipe Rack-12 Plan, Elevation and Section Sheet-06

121

PAL-1193-DWG-STR-1412-07

Pipe Rack-12 Plan, Elevation and Section Sheet-07

122

PAL-1193-DWG-STR-1500-01

Pipe Rack Connection Details Sheet-01

123

PAL-1193-DWG-STR-1500-02

Pipe Rack Connection Details Sheet-02

124
125

PAL-1193-DWG-STR-1500-03
PAL-1193-DWG-STR-1500-04

Pipe Rack Connection Details Sheet-03


Pipe Rack Connection Details Sheet-04

126

PAL-1193-DWG-STR-1501-01

Pipe Bridge Plan & Elevations and Section Sheet-01

127

PAL-1193-DWG-STR-1501-02

Pipe Bridge Plan & Elevations and Section Sheet-02

128

PAL-1193-DWG-STR-1501-03

Pipe Bridge Plan & Elevations and Section Sheet-03

129

PAL-1193-DWG-STR-1502-01

Pipe Bridge Connection Details Sheet-01

130

PAL-1193-DWG-STR-1502-02

Pipe
p Bridge
g Connection Details Sheet-02

131

141

PAL-1193-DWG-STR-1600-01~04
PAL-1193-DWG-STR-1600-05~09
PAL-1193-DWG-STR-1601-01~06
PAL-1193-DWG-STR-1601-07~08
PAL-1193-DWG-STR-1650-01~03
PAL-1193-DWG-STR-1650-04~06
PAL-1193-DWG-STR-1650-03~06
PAL-1193-DWG-STR-1704-01
PAL-1193-DWG-STR-1705-01
PAL-1193-DWG-STR-1706-01
PAL-1193-DWG-STR-1707-01
PAL-1193-DWG-STR-1708-01

Typical Pipe Support Details


Typical Pipe Support Details
Pipe Support Schedule
Pipe Support Schedule
Platform Structural Steel
Platform Structural Steel
Platform Structural Steel
P-2308A/B/C Crude Oil Booster Pumps Skid Details
P-2318A/B/C Water Booster Pumps Skid Details
V-2342 Flare Knock Out Drum Skid Details
P-2342A/B Flare Drum Pumps Skid Details
Transformer A/B Skid Details

142

PAL-1193-DWG-STR-1800-01~08

Walkway Structural Steel

132
133
134
135
136
137
138
139
140

143

144

145

PAL-1193-DWG-STR-1901-01

PAL-1193-DWG-STR-1901-02

PAL-1193-DWG-STR-1901-03

146

PAL-1193-DWG-STR-1902-01

147

PAL-1193-DWG-STR-1902-02

148

PAL-1193-DWG-STR-1902-03

149

PAL-1193-DWG-STR-1902-04

Control/Switchgear/Battery Room General Arrangement

Control/Switchgear/Battery Room Elevation

Control/Switchgear/Battery Room Elevation & Sections

A- Approved; B -Accepted with Correction

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
7-Jan-2015
26-Jan-2015
9-Jan-2015
26-Jan-2015
9-Jan-2015
26-Jan-2015

A
A
A
A
A
A
A
A
A
A
A
A
A
A

P-C-BT-0231

P-C-BT-0340
P-C-BT-0245
P-C-BT-0340
P-C-BT-0245
P-C-BT-0340

8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
8-Jan-2015
26-Jan-2015
9-Jan-2015
26-Jan-2015
9-Jan-2015
26-Jan-2015

C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343
C-B-BT-0234
C-B-BT-0343

20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26 J 2015
26-Jan-2015

A
A
A
A
A
A
A
A
A
A

P-C-BT-0313
P-C-BT-0340
P-C-BT-0313
P-C-BT-0340
P-C-BT-0313
P-C-BT-0340
P-C-BT-0313
P-C-BT-0340
P-C-BT-0313
C
P-C-BT-0340

20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26-Jan-2015
20-Jan-2015
26 J 2015
26-Jan-2015

C-B-BT-0316
C-B-BT-0343

29-Jan-2015
27-Feb-2015
29-Jan-2015
27-Feb-2015
9-Feb-2015
27-Feb-2015

29-Jan-2015
27-Feb-2015
29-Jan-2015
27-Feb-2015
9-Feb-2015
27-Feb-2015

C-B-BT-0368

P-C-BT-0365
P-C-BT-0495
P-C-BT-0365
P-C-BT-0495
P-C-BT-0453
P-C-BT-0493

27-Feb-2015
28-Feb-15
2-Feb-2015
28-Feb-15
9-Feb-2015
9-Feb-2015

A
A
A
A
A
A

P-C-BT-0493
P-C-BT-0527
P-C-BT-0393
P-C-BT-0527
P-C-BT-0453
P-C-BT-0453

27-Feb-2015
28-Feb-2015
2-Feb-2015
28-Feb-2015
9-Feb-2015
9-Feb-2015

C-B-BT-0496
C-B-BT-0530
C-B-BT-0396
C-B-BT-0530
C-B-BT-0456
C-B-BT-0456

8-Dec-2014
31-Dec-2014
7-Jan-2015

C
A
A

P-C-BT-0039
P-C-BT-0183

8-Dec-2014
31-Dec-2014
7-Jan-2015

C-B-BT-0042
C-B-BT-0186
C-B-BT-0220

8-Dec-2014
31-Dec-2014
7-Jan-2015

C-B-BT-0042
C-B-BT-0186
C-B-BT-0220
C-B-BT-0042
C-B-BT-0186
C-B-BT-0220

1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
0
A
0
A
0
A
0
A
0
A
0
A
0

5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
5-Jan-2015
23-Jan-2015
8-Jan-2015
23-Jan-2015
8-Jan-2015
23-Jan-2015

B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0253
B-C-T-0387
B-C-T-0276
B-C-T-0387
B-C-T-0276
B-C-T-0387

6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
6-Jan-2015
23-Jan-2015
8-Jan-2015
23-Jan-2015
8-Jan-2015
23-Jan-2015

C-P-BT-0255

1
1
1
1
1
1
1
1
1
1

A
0
A
0
A
0
A
0
A
0

16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23 J 2015
23-Jan-2015

B-C-T-0302
B-C-T-0387
B-C-T-0302
B-C-T-0387
B-C-T-0302
B-C-T-0387
B-C-T-0302
B-C-T-0387
B-C-T-0302
B C T 0387
B-C-T-0387

16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23-Jan-2015
16-Jan-2015
23 J 2015
23-Jan-2015

C-P-BT-0336

4
5
6
2
3
3
4
1
1
1
1
1
8
8
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
A
A
A
A
A
0
A
A
A
A
A
A
0
A
B
0
IFC
1
A
B
0
IFC
A
B
0
IFC
1
A

22-Jan-2015
11-Feb-2015
22-Jan-2015
11-Feb-2015
5-Feb-2015
11-Feb-2015
4-Mar-2015
11-Feb-2015
13-Feb-2015
30-Jan-2015
13-Feb-2015
5-Feb-2015
5-Feb-2015
4-Mar-2015
4-Nov-2014
23-Dec-2014
6-Jan-2015
22-Jan-2015
3-Feb-2015
3
Feb 2015
4-Nov-2014
23-Dec-2014
6-Jan-2015
22-Jan-2015
4-Nov-2014
23-Dec-2014
6-Jan-2015
22-Jan-2015
3-Feb-2015
20-Dec-2014

B-C-T-0376
B-C-T-0552
B-C-T-0376
B-C-T-0552
B-C-T-0458
B-C-T-0551
B-C-T-0607
B-C-T-0551
B-C-T-0575
B-C-T-0443
B-C-T-0575
B-C-T-0458
B-C-T-0458
B-C-T-0607
B-C-T-0021
B-C-T-0167
B-C-T-0261
B-C-IFC-T-0001
B-C-T-0488
B
C T 0488
B-C-T-0021
B-C-T-0167
B-C-T-0261
B-C-IFC-T-0001
B-C-T-0021
B-C-T-0167
B-C-T-0261
B-C-IFC-T-0001
B-C-T-0488
B-C-T-0158

27-Jan-2015
11-Feb-2015
27-Jan-2015
11-Feb-2015
5-Feb-2015
11-Feb-2015
4-Mar-2015
11-Feb-2015
13-Feb-2015
30-Jan-2015
13-Feb-2015
5-Feb-2015
5-Feb-2015
4-Mar-2015
24-Nov-2014
30-Dec-2014
6-Jan-2015

1
1
1
1
1
1
1
1
1

0
IFC
A
0
IFC
A
0
IFC
A

17-Jan-2015
22-Jan-2015
20-Dec-2014
17-Jan-2015
22-Jan-2015
20-Dec-2014
17-Jan-2015
22-Jan-2015
13-Feb-2015

B-C-T-0337
B-C-IFC-T-0001
B-C-T-0158
B-C-T-0337
B-C-IFC-T-0001
B-C-T-0158
B-C-T-0337
B-C-IFC-T-0001
B-C-T-0575

C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0255
C-P-BT-0398
C-P-BT-0279
C-P-BT-0398
C-P-BT-0279
C-P-BT-0398

C-P-BT-0398
C-P-BT-0336
C-P-BT-0398
C-P-BT-0336
C-P-BT-0398
C-P-BT-0336
C-P-BT-0398
C-P-BT-0336
C
C-P-BT-0398
C-P-BT-0415
C-P-BT-0562
C-P-BT-0415
C-P-BT-0562
C-P-BT-0498
C-P-BT-0561
C-P-BT-0615
C-P-BT-0561
C-P-BT-0585
C-P-BT-0456
C-P-BT-0585
C-P-BT-0498
C-P-BT-0498
C-P-BT-0615
C-P-BT-0058
C-P-BT-0200
C-P-BT-0261

A
A
A
A

P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231
P-C-BT-0340
P-C-BT-0231

P-C-BT-0217

C-B-BT-0248
C-B-BT-0343
C-B-BT-0248
C-B-BT-0343

C-B-BT-0316
C-B-BT-0343
C-B-BT-0316
C-B-BT-0343
C-B-BT-0316
C-B-BT-0343
C-B-BT-0316
C B BT 0343
C-B-BT-0343
C-B-BT-0498
C-B-BT-0368
C-B-BT-0498
C-B-BT-0456
C-B-BT-0496

4-Feb-2015
4
Feb 2015
24-Nov-2014
30-Dec-2014
6-Jan-2015

C-P-BT-0495
C
P BT 0495
C-P-BT-0058
C-P-BT-0200
C-P-BT-0261

8-Dec-2014
31-Dec-2014
7-Jan-2015

A
A
A

P-C-BT-0039
P-C-BT-0183

24-Nov-2014
30-Dec-2014
6-Jan-2015

C-P-BT-0058
C-P-BT-0200
C-P-BT-0261

8-Dec-2014
31-Dec-2014
7-Jan-2015

C
A
A

P-C-BT-0039
P-C-BT-0183
P-C-BT-0217

8-Dec-2014
31-Dec-2014
7-Jan-2015

4-Feb-2015
23-Dec-2014

C-P-BT-0495
C-P-BT-0161

26-Dec-2014

P-C-BT-0153

26-Dec-2014

C-B-BT-0156

17-Jan-2015

C-P-BT-0339

19-Jan-2015

P-C-BT-0299

19-Jan-2015

C-B-BT-0302

23-Dec-2014
17-Jan-2015

C-P-BT-0161
C-P-BT-0339

26-Dec-2014
19-Jan-2015

A
A

P-C-BT-0153

26-Dec-2014
19-Jan-2015

C-B-BT-0156
C-B-BT-0302

23-Dec-2014
17-Jan-2015

C-P-BT-0161
C-P-BT-0339

26-Dec-2014
19-Jan-2015

A
A

P-C-BT-0153
P-C-BT-0299

26-Dec-2014
19-Jan-2015

C-B-BT-0156
C-B-BT-0302

13-Feb-2015

C-P-BT-0585

28-Feb-15

P-C-BT-0527

28-Feb-2015

C-B-BT-0530

P-C-BT-0217

Control/Switchgear/Battery Room steel floor skid details


Sheet-01
Control/Switchgear/Battery Room steel floor skid details
Sheet-02
Control/Switchgear/Battery Room steel floor skid details
Sheet-03
Control/Switchgear/Battery Room steel floor skid details

P-C-BT-0299

Sheet-04

Page 34 of 35

PALOCH FPF TDR

Status from DPOC:

PALOCH FPF DEBOTTLENECKING PROJECT


CONTRACT No.: DPOC/23/13-1193

C- Revised as Noted & Resubmit

Technical Data Registration (TDR)


No.

Doc./Dwg. No.

A- Approved; B -Accepted with Correction

Status as of:

From BEB to CPECC

Title / Description
Sheet.

2015/3/10

From CPECC to PDOC/PMC

D- Data Accepted for Information Only

From PDOC to CPECC

CPECC to BEB
Renark

Rev.
Date

Trans.No.

Submit Date

Trans. No.

Rec'd Date

Status.

Trans. No.

Submit Date

Trans. No.

7-Jan-2015
13-Jan-2015

C-P-BT-0273
C-P-BT-0318

9-Jan-2015
15-Jan-2015

B
A

P-C-BT-0244
P-C-BT-0275

9-Jan-2015
15-Jan-2015

C-B-BT-0247
C-B-BT-0278

7-Jan-2015
13-Jan-2015

C-P-BT-0273
C-P-BT-0318

9-Jan-2015
15-Jan-2015

B
A

P-C-BT-0244
P-C-BT-0275

9-Jan-2015
15-Jan-2015

C-B-BT-0247
C-B-BT-0278

7-Jan-2015
13-Jan-2015

C-P-BT-0273
C-P-BT-0318

9-Jan-2015
15-Jan-2015

B
A

P-C-BT-0244
P-C-BT-0275

9-Jan-2015
15-Jan-2015

C-B-BT-0247
C-B-BT-0278

7-Jan-2015
13-Jan-2015

C-P-BT-0273
C-P-BT-0318

9-Jan-2015
15-Jan-2015

A
A

P-C-BT-0244
P-C-BT-0275

9-Jan-2015
15-Jan-2015

C-B-BT-0247
C-B-BT-0278

10-Dec-2014
17-Jan-2015

C-P-BT-0108
C-P-BT-0339

13-Dec-14
19-Jan-2015

A
A

P-C-BT-0084
P-C-BT-0299

13-Dec-2014
19-Jan-2015

C-B-BT-0087
C-B-BT-0302

10-Dec-2014
17-Jan-2015

C-P-BT-0108
C-P-BT-0339

13-Dec-14
19-Jan-2015

A
A

P-C-BT-0084
P-C-BT-0299

13-Dec-2014
19-Jan-2015

C-B-BT-0087
C-B-BT-0302

29-Jan-2015

C-P-BT-0435

2-Feb-2015

P-C-BT-0386

2-Feb-2014

C-B-BT-0389

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

A
0
IFC
A
0
IFC
A
0
IFC
A
0
IFC
A
0
IFC
A
0
IFC
A

7-Jan-2015
13-Jan-2015
22-Jan-2015
7-Jan-2015
13-Jan-2015
22-Jan-2015
7-Jan-2015
13-Jan-2015
22-Jan-2015
7-Jan-2015
13-Jan-2015
22-Jan-2015
9-Dec-2014
17-Jan-2015
22-Jan-2015
9-Dec-2014
17-Jan-2015
22-Jan-2015
29-Jan-2015

B-C-T-0270
B-C-T-0317
B-C-IFC-T-0001
B-C-T-0270
B-C-T-0317
B-C-IFC-T-0001
B-C-T-0270
B-C-T-0317
B-C-IFC-T-0001
B-C-T-0270
B-C-T-0317
B-C-IFC-T-0001
B-C-T-0111
B-C-T-0337
B-C-IFC-T-0001
B-C-T-0111
B-C-T-0337
B-C-IFC-T-0001
B-C-T-0423

Transformer Shelter Plan and Details

29-Jan-2015

B-C-T-0423

29-Jan-2015

C-P-BT-0435

2-Feb-2015

P-C-BT-0386

2-Feb-2014

C-B-BT-0389

PAL-1193-DWG-STR-1908-01

Anti-Foam Skid Shed Sheet-01

B-C-T-0446
B-C-T-0607
B-C-T-0446
B C T 0607
B-C-T-0607

3-Feb-2015
4-Mar-2015
3-Feb-2015
4 M 2015
4-Mar-2015

C-P-BT-0479
C-P-BT-0615
C-P-BT-0479
C
C-P-BT-0615

P-C-BT-0406

4-Feb-2015

C-B-BT-0409

Anti-Foam Skid Shed Sheet-02

2-Feb-2015
4-Mar-2015
2-Feb-2015
4 M 2015
4-Mar-2015

PAL-1193-DWG-STR-1908-02

A
0
A
0

4-Feb-2015

159

1
1
1
1

4-Feb-2015

P-C-BT-0406

4-Feb-2015

C-B-BT-0409

160

PAL-1193-DWG-STR-1908-03

Anti-Foam Skid Shed Sheet-03

1
1

A
0

2-Feb-2015
4-Mar-2015

B-C-T-0446
B-C-T-0607

3-Feb-2015
4-Mar-2015

C-P-BT-0479
C-P-BT-0615

4-Feb-2015

P-C-BT-0406

4-Feb-2015

C-B-BT-0409

32
34
34
34

A
B
C
0

23-Dec-2014
30-Dec-2014
5-Jan-2015
7-Jan-2015

C-P-BT-0162
C-P-BT-0205
C-P-BT-0250
C-P-BT-0270

25-Dec-2014
4-Jan-2015
7-Jan-2015
8-Jan-2015

C
C
A
A

Approved
Approved
Approved
Approved

13
13
10
54

A
0

9-Jan-2015
10-Jan-2015
10-Jan-2015
24-Dec-2014

C-P-BT-0286
C-P-BT-0296
C-P-BT-0307
C-P-BT-0172

10-Jan-2015

Approved

25-Dec-2014

Approved

SAFETY & SECURITY POLICY


SAFETY MANUAL&PLAN
SAFETY TRAINING
EMERGENCY RESPONSE PLAN
ACCIDENT/INCIDENT INVESTIGATION
RADIOGRAPHY GUIDELINES
PRESSURE TESTING GUIDELINES
DRIVING GUIDELINES

3
39
41
8
11
9
8
7

A
A
A
A
A
A
A
A

23-Jan-2015
23
J 2015
23-Jan-2015
23-Jan-2015
23-Jan-2015
23-Jan-2015
23-Jan-2015
23-Jan-2015
23-Jan-2015

C P BT 0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383
C-P-BT-0383

GENERAL PROVISION OF INSPECTION AND TEST


PLAN
TIE-IN PROCEDURE

17

23-Jan-2015

C-P-BT-0384

23-Jan-2015

C-P-BT-0384

Control/Switchgear/Battery Room Access Stair AS-1 Plan

150

PAL-1193-DWG-STR-1902-05

151

PAL-1193-DWG-STR-1902-06

152

PAL-1193-DWG-STR-1902-07

153

PAL-1193-DWG-STR-1902-08

Control/Switchgear/Battery Room Access Stair Details

154

PAL-1193-DWG-STR-1904-01

Under The Building Fencing and Gate Layout Plan

155

PAL-1193-DWG-STR-1904-02

Under The Building Fencing and Gate Layout Plan

156

PAL-1193-DWG-STR-1905-01

Transformer Shelter Plan and Details

157

PAL-1193-DWG-STR-1905-02

158

& Section
Control/Switchgear/Battery Room Access Stair AS-2 Plan
& Section
Control/Switchgear/Battery Room Access Stair AS-3 Plan
& Section

GENERAL
1

PAL-1193-PRO-QA-01

Project Quality Plan

GPOC-1193-PRO-GEN-001

Project Quality Plan

DPOC-1193-PR-GEN-003

Document and Data Control Procedure

DPOC/23/13-1193/GEO-001

Sand Sample Test Report


Geotechnical Engineering Investigation Report

3
4
5
6
7
8

PROCEDURE SUBMITTION

1
2
3
4
5
6
7
8

1
2

I SAFETY (SAF)
DPOC-1193-PR-SAF-001
DPOC
1193 PR SAF 001
DPOC-1193-PR-SAF-002
DPOC-1193-PR-SAF-003
DPOC-1193-PR-SAF-004
DPOC-1193-PR-SAF-005
DPOC-1193-PR-SAF-006
DPOC-1193-PR-SAF-007
DPOC-1193-PR-SAF-008
GENERAL/PROJECT (GEN)
DPOC-1193-PR-GEN-002
DPOC-1193-PR-GEN-004

Page 35 of 35

PALOCH FPF TDR

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


Provision of EPCC of Paloch FPF De-Bottlenecking Project Sedimentation Process System, Project Contract No. : DPOC/23/13-1193

Procurement
DEL- Delivery;

ETD-Estimate Departure;

ATD-Actual Departure;

ETA-Estimate Arrive;

Status

Report

ATA-Actual Arrive

Description

Tag No/Qty

Vendor

Delivery
Location

Price
Terms

P.O.
Award

DEL
Terms

PO
DEL'Y

ETD/
ATD

ETA/
ATA
Sudan

ETA/
ATA
Site

Buyer

1 P/ PAL-1193-PIP-001

Bulk Valves

689 sets

CNNC Sufa Technology Industry Co., Ltd.

Tianjin
Xingang

FCA

02/13/15

FCA

06/19/15

06/24/15

07/24/15

08/24/15

Liyaqiang

2 P/PAL-1193-PIP-002-A

Underground Bulk Pipes & Fittings

390 m

Shanghai Zhongyou TIPO Steel Pipe


Co.,Ltd

Tianjin
Xingang

FCA

01/23/15

FCA

03/29/15

04/01/15

05/01/15

06/01/15

Gao rong

3 P/PAL-1193-PIP-002-B

Underground SMLS Pipes

one lot

INTER EQUIPMENT CO., LTD.

Jeblel Ali

EXW

02/02/15

EXW

05/03/15

05/06/15

06/06/15

07/06/15

Gao rong

4 P/PAL-1193-PIP-002-C

Underground Bulk Pipes & Fittings

one lot

FUSHUN PETROLEUM MACHINE WORKS METAL


STRUCTURE COMPANY FITTINGS WORKS

Tianjin
Xingang

FCA

01/26/15

FCA

03/13/15

03/18/15

04/18/15

05/18/15

Gao rong

5 P/PAL-1193-PIP-003-A

Aboveground Bulk Pipes & Fittings

one lot

Zhejiang Jiuli Hi-Tech Metals Co.,Ltd

Tianjin
Xingang

FCA

02/05/15

FCA

04/13/15

04/15/15

05/15/15

06/15/15

Gao rong

6 P/PAL-1193-PIP-003-B

Aboveground Bulk Pipes & Fittings

one lot

Shanghai Zhongyou TIPO Steel Pipe


Co.,Ltd

Tianjin
Xingang

FCA

01/29/15

FCA

03/29/15

04/01/15

05/01/15

06/01/15

Gao rong

7 P/PAL-1193-PIP-003-C

Aboveground Bulk Pipes & Fittings

one lot

FUSHUN PETROLEUM MACHINE WORKS METAL


STRUCTURE COMPANY FITTINGS WORKS

Tianjin
Xingang

FCA

01/29/15

FCA

03/22/15

03/25/15

04/25/15

05/25/15

Gao rong

8 P/PAL-1193-PIP-003-D

Aboveground Bulk Pipes & Fittings

one lot

Hebei Yongsheng Petri-Chemical Machinery


Manufacturing CO., Ltd.

Tianjin
Xingang

FCA

01/26/15

FCA

03/30/15

04/01/15

05/01/15

06/01/15

Gao rong

9 P/PAL-1193-PIP-003-E

Aboveground Bulk Pipes & Fittings

one lot

Hebei Yongsheng Petri-Chemical Machinery


Manufacturing CO., Ltd.

Tianjin
Xingang

FCA

01/29/15

FCA

04/14/15

04/15/15

05/15/15

06/15/15

Gao rong

10 P/PAL-1193-PIP-003-F

Gasket

one lot

INTER EQUIPMENT CO., LTD.

Jebel Ali

EXW

02/02/15

EXW

03/01/15

03/11/15

03/24/15

04/24/15

Gao rong

11 P/PAL-1193 -PIP-003-G

Aboveground SMLS Pipes

one lot

INTER EQUIPMENT CO., LTD.

Jebel Ali

EXW

02/11/15

EXW

05/11/15

05/13/15

06/13/15

07/13/15

Gao rong

12 P/PAL-1193-PIP-005-B

Special items

one lot

Nantong Sanlian Petrochemical Equipment


Manufacture Co., LTD

Tianjin
Xingang

FCA

02/09/15

FCA

05/01/15

05/06/15

06/06/15

07/06/15

Gao rong

13 R-PAL-1193-PIP-005-C

Special items

one lot

FUSHUN YITONG PETROCHEMICAL


EQUIPMENT PLANT

Tianjin
Xingang

FCA

02/13/15

FCA

04/22/15

04/24/15

05/24/15

06/24/15

Gao rong

14 P/PAL-1193-PIP-015

Galvanized Pipe and Fitting for Fire


Fighting System

one lot

Fushun Petroleum Machine Works Metal Structure


Company Fittings Works

Tianjin
Xingang

FCA

01/29/15

FCA

04/11/15

04/15/15

05/15/15

06/15/15

Gao rong

15 P/PAL-1193-INT-001

ESDV

9 sets

Hong Kong New Century Control Equipment Co.Ltd.

ITALIA

FCA

02/10/15

FCA

08/11/15

08/12/15

09/12/15

10/12/15

Cao di

16 P/PAL-1193-INT-002

Control Valves

4 sets

Silicon-Valley Energy Hong Kong Co., Ltd

INDIA

FCA

02/09/15

FCA

08/27/15

17 P/PAL-1193-INT-003A

PRESSURE SAFTY VALVE

4 sets

Oakwell Distribution(s) Pte. Led.

Germany

EXW

02/10/15

EXW

05/11/15

05/13/15

06/13/15

07/13/15

Cao di

18 P/PAL-1193-INT-003B

pressure vaccume relief valves

8 sets

Silicon-Valley Energy Hong Kong Co., Ltd

ENGLAND

FCA

02/10/15

FCA

08/27/15

08/28/15

09/28/15

10/28/15

Cao di

19 P/PAL-1193-INT-004

Electronic Transmitters

PT :24 Nos.
TT:13 Nos.
DPT:6 Nos.

GOLDEN STAR TECHNOLOGY CO LTD.

KAOSHIUNG
AIRPORT
TAIWAN

FCA

02/16/15

FCA

06/08/15

20 P/PAL-1193-INT-005

LEVEL TRANSMITTERS

one lot

OAKWELL DISTRIBUTION (S) PTE LTD

SINGAPORE

FCA

02/13/15

FCA

06/08/15

No

PO NO

1193 PAL PCU weekly report 150306(PO)

1 of 4

Cao di

Li jie

06/10/15

07/10/15

08/10/15

Li jie

Status

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


Provision of EPCC of Paloch FPF De-Bottlenecking Project Sedimentation Process System, Project Contract No. : DPOC/23/13-1193

Procurement
DEL- Delivery;

ETD-Estimate Departure;

ATD-Actual Departure;

ETA-Estimate Arrive;

Status

Report

ATA-Actual Arrive

Description

Tag No/Qty

Vendor

Delivery
Location

Price
Terms

P.O.
Award

DEL
Terms

PO
DEL'Y

ETD/
ATD

ETA/
ATA
Sudan

ETA/
ATA
Site

Buyer

21 P/PAL-1193-INT-006

Rotameters

6 Nos.

Hong Kong New Century Control Equipment Co.Ltd.

GERMANY

EXW

02/27/15

EXW

05/30/15

06/03/15

07/03/15

08/03/15

Zhou feng

22 P/PAL-1193-INT-007

Gauges

PG :40 Nos.
TG:20 Nos.

FOB

02/27/15

FOB

05/30/15

06/03/15

07/03/15

08/03/15

Zhou feng

23 P/PAL-1193-INT-008

Electric Bulk Materials

one lot

BEIJING ZHONGCHENHUITONG TECHNICAL &


TECHNOLOGY CO.,LTD

Tianjin
Xingang

FCA

01/29/15

FCA

05/30/15

06/03/15

07/03/15

08/03/15

Quan Jianglin

24 P/PAL-1193-INT-009

Fire and Gas Detectors & Devices

one lot

WUXI General Monitors Co., Ltd

HongKong

FCA

03/04/15

FCA

07/20/15

07/22/15

08/22/15

09/22/15

Cao di

25 P/PAL-1193-INT-010

Instrument Cable

one lot

ANHUI SIAIT CABLES GROUP CO., LTD.

Tianjin
Xingang

FCA

02/03/15

FCA

03/10/15

03/11/15

04/11/15

05/11/15

Li yaqiang

26 P/PAL-1193-INT-014

RESTRICTION ORIFICE PLATE

one lot

GOLDEN STAR TECHNOLOGY CO LTD.

KAOSHIUNG
AIRPORT

FCA

02/03/15

FCA

03/13/15

03/14/15

03/17/15

04/17/15

Li jie

27 P/PAL-1193-INT-015

Instrument Cable Tray

one lot

Tianjin
Xingang

FCA

02/15/15

FCA

04/30/15

28 P/PAL-1193-ELE-001

DISTRIBUTION TRANSFORMER

one lot

SHENYANG SEALED TRANSFORMER LTD.,


COMPANY

Tianjin
Xingang

FCA

01/16/15

FCA

03/20/15

03/25/15

04/25/15

05/25/15

Wu zengke

29 P/PAL-1193-ELE-003

UPS

1 set

BEIJING DZ-TITAN E & E CO., LTD.

Tianjin
Xingang

FCA

01/19/15

FCA

04/10/15

04/15/15

05/15/15

06/15/15

Zhou feng

30 P/ PAL-1193-ELE-004

MV Cable

1900 m

PRYSMIAN TIANJIN CABLES CO., LTD.

Tianjin
Xingang

FCA

01/26/15

FCA

03/03/15

03/04/15

04/04/15

05/04/15

Li yaqiang

31 P/ PAL-1193-ELE-004A

Cable Termination

4 sets

Beijing Summer Technologies Co., Ltd.

Tianjin
Xingang

FCA

02/06/15

FCA

03/24/15

03/25/15

04/25/15

05/25/15

Li yaqiang

32 P/ PAL-1193-ELE-005

LV Cable

one lot

ANHUI SIAIT CABLES GROUP CO., LTD.

Tianjin
Xingang

FCA

01/19/15

FCA

02/13/15

02/15/15A

03/22/15

04/22/15

Li yaqiang

33 P/PAL-1193-ELE-006

LIGHTING POLES FIXTURES &


JUNCTION BOXES

FEDERAL HARDWARE ENGINEERING CO.PTE

SINGAPORE

EXW

02/25/15

EXW

06/19/15

06/24/15

07/24/15

08/24/15

Wu zengke

34 P/PAL-1193-ELE-008

ELECTRICAL BULK MATERIALS

one lot

FEDERAL HARDWARE ENGINEERING CO.,PTE


LTD

SINGAPORE

EXW

02/10/15

EXW

04/20/15

04/22/15

05/22/15

06/22/15

Li jie

35 P/ PAL-1193-ELE-010

Electrical Cable Tray & Accessories

one lot

ZHENJIANG GUANGHUA INSTRUMENT AND


ELECTRIC EQUIPMENT FACTORY

Tianjin
Xingang

FCA

01/29/15

FCA

04/30/15

05/06/15

06/06/15

07/06/15

Quan Jianglin

36 P/ PAL-1193-ELE-013

Earthing Materials

one lot

WUXI GREEN ELECTRICIAN EQUIPMENT CO.,


LTD

Tianjin
Xingang

FCA

02/04/15

FCA

04/30/15

05/06/15

06/06/15

07/06/15

Quanjianglin

37 P/PAL
P/PAL-1193-TEL-001
1193 TEL 001

CCTV Equipment

one lot

Tianjin
Xingang

FCA

02/13/15

FCA

07/01/15

No

PO NO

1193 PAL PCU weekly report 150306(PO)

Hong Kong New Century Control Equipment Co.Ltd. Beijing Airport

Zhenjiang City GuangHua Electric


Appliance Equipment General Factory

BEIJING OPTRANS TECHNOLOGY


DEVELOPMENT CO., LTD.

2 of 4

Quanjianglin

Quan Jianglin

Status

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


Provision of EPCC of Paloch FPF De-Bottlenecking Project Sedimentation Process System, Project Contract No. : DPOC/23/13-1193

Procurement
DEL- Delivery;
No

ETD-Estimate Departure;
PO NO

ATD-Actual Departure;
Description

ETA-Estimate Arrive;
Tag No/Qty

Status

Report

ATA-Actual Arrive
Vendor

Delivery
Location

Price
Terms

P.O.
Award

DEL
Terms

PO
DEL'Y

ETD/
ATD

ETA/
ATA
Sudan

ETA/
ATA
Site

Buyer

FCA

01/07/15

FCA

02/16/15

02/18/15

03/18/15

04/18/15

Quan Jianglin

04/07/15

04/08/15

05/08/15

06/08/15

Quan Jianglin

04/01/15

04/03/15

05/03/15

06/03/15

38 P/PAL-1193-CP-001

CP Materials for External Tank Bottom

one lot

Sunrui Marine Environment Engineering Co.,Ltd

BEIJING
AIRPORT,
Tianjin
Xingang

39 P/PAL-1193-CP-002

CP MATERIALS FOR INTERNAL TANK


SURFACE

one lot

HUBEI XING CHENG ANTI-CORROSION


TECHNOLOGY CO.,LTD

Tianjin
Xingang

FCA

01/26/15

FCA

40 P/PAL-1193-CP-003

CP MATERIALS FOR STEEL PILINGS

one lot

SUNRUI MARINE ENVIRONMENT ENGINEERING


CO.,LTD

Tianjin
Xingang

FCA

01/26/15

FCA

Quan Jianglin

41 P/PAL-1193-CP-003-01

CP MATERIALS FOR STEEL PILINGS

Q'TY decreased

SUNRUI MARINE ENVIRONMENT ENGINEERING


CO.,LTD

Tianjin
Xingang

FCA

02/12/15

FCA

42 P/PAL-1193-MEC-001

G-L Separator Skids

4 sets

LANPEC TECHNOLOGIES LIMITED

Tianjin
Xingang

FCA

01/26/15

FCA

06/01/15

06/03/15

07/03/15

08/03/15

Fanyubin

43 P/PAL-1193-MEC-002

Crude Oil Booster Pumps

3 sets

Tianjin Red Screw Pumps Manufacture &


Technology Co., Ltd.

Tianjin
Xingang

FCA

02/10/15

FCA

07/15/15

07/21/15

08/21/15

09/21/15

Qin jianlin

44 P/PAL
1193 MEC 003
P/PAL-1193-MEC-003

PROGRESSIVE CAVITY PUMPS

5 sets

Tianjin Pumps & Machinery Group Co., Ltd.

Tianjin
Xingang
Xi

FCA

02/15/15

FCA

06/30/15

45 P/PAL-1193-MEC-004

Anti-foam Injection Skids

1 set

BENXI LAUREL PETROLEUM CHEMICAL


EQUIPMENT SETS CO., LTD.

Tianjin
Xingang

FCA

01/29/15

FCA

04/15/15

04/17/15

05/17/15

06/17/15

Qin jianlin

46 P/PAL-1193-MEC-005

Flare Knock out drum

1 set

CHINAPETROLEUM7THCONSTRUCTION
COMPANY Equipment Manufacturing Company

Tianjin
Xingang

FCA

01/27/15

FCA

05/16/15

05/20/15

06/20/15

07/20/15

Wangxin

47 P/PAL-1193-MEC-006

Foam Skids

1 set

Nanjing Fire Protection Technology Co .,Ltd

Tianjin
Xingang

FCA

02/04/15

FCA

06/10/15

06/12/15

07/12/15

08/12/15

Fanyubin

Accessories of Tanks

one lot

FUSHUN PETROLEUM MACHINE WORKS METAL


STRUCTURE COMPANY FITTINGS WORKS

Tianjin
Xingang

FCA

02/15/15

FCA

04/10/15

Insulation of Tanks

one lot

Tianjin
Xingang

FCA

03/04/15

FCA

03/25/15

03/27/15

04/27/15

05/27/15

Gao rong

Tianjin
Xingang

FCA

02/10/15

FCA

07/30/15

08/11/15

09/11/15

10/11/15

Qin jianlin

48 P/ PAL-1193-MEC-008
P/ PAL-1193-MEC-010

Dalian Deep Blue Pump Co., Ltd

Quan Jianglin

Qin jianlin

Wangxin

49 P/ PAL-1193-MEC-011

Centrifugal Pumps

5 sets

50 P/ PAL-1193-MEC-012

Vent Stack

1 set

Xuzhou Luyuan Combustion Control


Equipment Co., Ltd

Tianjin
Xingang

FCA

02/10/15

FCA

04/18/15

04/22/15

05/22/15

06/22/15

Wangxin

51 P/ PAL-1193-MEC-013

Sedimentation Tank Lattice Dome Roof

2 sets

SHANGHAI BAOSHAN PETROLEUM MACHINERY


FACTORY

Tianjin
Xingang

FCA

02/09/15

FCA

03/31/15

04/01/15

05/01/15

06/01/15

Chu Xiaofei

52 P/PAL-1193-CIV-001

REINFORCING BAR MATERIALS

one lot

WESTERN CORPORATION LTD FZE

JEBEL ALI

FCA

02/15/15

FCA

02/18/15

02/26/15A

03/18/15

04/18/15

Li jie

53 P/PAL-1193-CIV-004

Fencing Materials

one lot

BEIJING OPTRANS TECHNOLOGY


DEVELOPMENT CO., LTD.

Tianjin
Xingang

FCA

12/31/14

FCA

03/21/15

03/25/15

04/25/15

05/25/15

Gao rong

54 P/PAL-1193-CIV-005

SPECIALITY ITEMS MATERIALS

one lot

AUM INTERNATIONAL FZE

UAE

FCA

02/02/15

FCA

02/23/15

03/11/15

03/24/15

04/24/15

Cao di

1193 PAL PCU weekly report 150306(PO)

3 of 4

Status

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


Provision of EPCC of Paloch FPF De-Bottlenecking Project Sedimentation Process System, Project Contract No. : DPOC/23/13-1193

Procurement
DEL- Delivery;
No

ETD-Estimate Departure;
PO NO

55 P/PAL-1193-CIV-006

P/PAL-1193-CIV-006-01
56 P/ GPOC-C0672012BCIV-0010A
57 P/PAL-1193-CIV-007

ATD-Actual Departure;

ETA-Estimate Arrive;

Status

Report

ATA-Actual Arrive

Description

Tag No/Qty

Vendor

Delivery
Location

Price
Terms

P.O.
Award

DEL
Terms

PO
DEL'Y

ETD/
ATD

ETA/
ATA
Sudan

ETA/
ATA
Site

Buyer

Piling Materials

one lot

JIANGXI METALLURGY INDUSTRY CO., LTD

Tianjin
Xingang

FCA

01/07/15

FCA

03/18/15

03/10/15
03/10/15

04/10/15
04/10/15

05/10/15
05/10/15

Gao rong

Piling Pipes

one lot

JIANGXI METALLURGY INDUSTRY CO., LTD

Tianjin
Xingang

FCA

FCA

12/24/13

03/10/15

04/10/15

05/10/15

Li yaqiang

Tianjin
Xingang

FCA

FCA

04/30/15

05/01/15

06/01/15

07/01/15

Wu zengke

Control/Switchgear/BATTERY Room
Building

1193 PAL PCU weekly report 150306(PO)

one lot

TIANJIN ZHONGJUYUAN COLOR


STEEL&STEEL STRUCTURES CO., LTD.

4 of 4

02/10/15