Вы находитесь на странице: 1из 53

Industrial Training

Presentation
Hathairat Kongsombatcharoen

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Introduction

Name

: Hathairat Kongsombatcharoen (Mook)

Education : Electronics and Telecommunication Engineering


King Mongkut's University of Technology Thonburi

Position

: RF Engineer

Supervisor : Lee Yih Pey

Company : Steadcom Sdn. Bhd.

Date Joined

: 2nd July, 2016

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Job Scope

LTE SSV Report (DTA)

Drive Test (DTE)

KPI

LTE SSV Report (DTA)

Static Test Data

Mobility Test

VoLTE Mobility Test

Drive Test (DTE)

Throughput

Volte Mobility

DL

UL

PS Setup

Ping

Volte Static

CSFB

Cell Reselection

Throughput

Volte Mobility

DL , UL

PS Setup

PS Setup Time = [ATTACH_ACCEPT ATTACH_REQUEST] [SecurityModeComplete - ULInformationTransfer]

Ping

Volte Static

CSFB

Cell Reselection

How to set the script for DL and UL

43.252.36.92
usename: ftpusr01
password: ftpusr012015*

115.164.0.134
username: allstar
password: allstar123

115.164.0.135
username: lteftp
password: lteftp

Host IP: 182.239.43.226


Username: ftptest@cs.synercel.com
Password: Tp=K+WwomSlX

43.252.36.92
usename: ftpusr01
password: ftpusr012015*

115.164.0.134
username: allstar
password: allstar123

115.164.0.135
username: lteftp
password: lteftp

Host IP: 182.239.43.226


Username: ftptest@cs.synercel.com

Password: Tp=K+WwomSlX

Remote file : /Ayam/DL/50MB


Local file

: C:\\Nemo Tools\Local Files\50MB

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Achievements

Learning how to do the report by NetNumen and Nemo Analyze

Enhancing soft skills (Communication)

Completing around 20 LTE SSV reports

Learning how to setup the devices and workspace in Nemo Outdoor

Improving the knowledge from DTA to find the logfile in DTE part

Completing around 25 Full SSV

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

ISSUES AND TROUBLESHOOTING for DTA

Low SINR

(Mod3, Pilot Pollution)

Low RSRP

(Incorrect E-tilt, Blockage from buildings


and trees)

Low DL, UL

Low SINR

Pilot Pollution

Mod 3

Swap Sector

Wrong Location

Wrong Location

ISSUES AND TROUBLESHOOTING for DTE

Tools

CSFB

Cr

Low DL, UL

Ping Test

Mobility (Throughput drop)

Mobility (HO fail)

Low DL

Low UL

Feeder Swap

No Entry

Overshooting

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Suggestion

Need DTA to support DTE

Table of Content

INTRODUCTION

JOB SCOPE

ACHIEVEMENTS

ISSUES AND TROUBLESHOOTING

SUGGESTION

FUTURE PLAN

Future Plan

Learn what is the meaning of signaling

Learn how to create the script for NemoOutdoor

Join IBC

Join more training courses

Thank you

Вам также может понравиться