In soil filling as per IS code for every 100 sqm 3 sample for core cutting test should be taken.
Electrical conduits shall not run in column
Earth work excavation for basement above 3 m should be stepped form
Any back filling shall be compacted 95% of dry density at the optimum moisture content and in layers not more than 200mm for filling above structure
and 300 mm for no structure
F soling is specified the soling stones shall be laid at 45 to 60 inclination (and not vertical) with interstices filled with sand or moorum.
A set of cube tests shall be carried out for each 30 cum of concrete / each levels of casting / each batch
of cement.
Water cement ratio for different grades of concrete shall not exceed 0.45 for M20 and above and 0.50 For M10 / M15 contractor
For concrete grades M20 and above approved admixture shall be used as per mix design requirements.
Cement shall be stored in dry places on a raised platform about 200mm above floor level and 300mm away from walls. Bags to be stacked not more than
10 bags high in such a manner that it is adequately protected from moisture and contamination.
Samples from fresh concrete shall be taken and at least a set of 6 cubes of 150mm shall be prepared and
cured. 3 Cubes each at 7 days and 28 days shall be tested for compressive strength. The test results
should be submitted to engineer for approval. If results are unsatisfactory necessary action/rectification/remedial measures has to be exercised.
Water used for both mixing and curing shall be clean and free from injurious amounts of oils, acids, alkalies, salts, sugar and organic materials or other
substances that may be deleterious to concrete or steel. The ph shall be generally between 6 and 8.
Cement shall be tested for its setting.
1. The initial setting time shall not be less than 30 minutes.
2. The final setting time shall not be more than 10 hours.
Slump IS 456
Lightly reinforced 25 75 mm
Heavily reinforced 75 100 mm
Trench fill (insitu & Tremie) 100 150 mm (For Tremie no need of vibrator)
Curing Days Required
Super Sulphate cement : 7 days
Ordinary Portland cement OPC : 10 days
Minerals and Admixture added cement : 14 days
Cube Samples
1 5 M3 : 1 No.
6 15 M3 : 2 Nos
16 30 M3 : 3 Nos
31 50 M3 : 4 Nos
Above 50 M3 : 4 + 1 No of addition sample for each 50 M3.
Things Site Engineers Must Know About Reinforcement and Steel Bars
Check out the Unit Weights and Conversion which will be required on construction site here
01-02-2015 09:48
2 of 5
http://www.engineeringcivil.com/things-site-engineers-must-know.html
We at engineeringcivil.com are thankful to Er Vikrant for submitting this construction site check list which is of great use to all civil engineers.
More Entries :
Simple Testing Of Admixtures And Surface Coating For Permeability To Water.
Concrete Mix Design M60 Grade Of Concrete (OPC 53 Grade)
Concrete Mix Design M70 Grade of Concrete (OPC 53 Grade)
Mix Design M-50 Grade
Pervious Concrete Effect of Material Proportions on Porosity
Mix Design M-40 Grade
What is the purpose of keeping tremie pipes tip immersed in freshly-placed concrete for
about 1m in underwater concreting?
What is the purpose of keeping tremie pipes tip immersed in freshly placed concrete for
about 1m in underwater concreting?
Comments
devaraj November 14, 2014 at 6:07 am
this is very useful for every civil engineers
Reply Link Quote
shahrukh khan November 16, 2014 at 1:43 pm
Very. Useful enformation
Reply Link Quote
Krishna Raj December 15, 2014 at 8:47 am
really very helpful, Thank you Sir/Mam. Try to give more important hints for us.
Reply Link Quote
kavi January 6, 2015 at 11:07 pm
This is very useful.thank you
Reply Link Quote
Post a comment
Name
Email
Website
12
Share Information
Submit Content
Ask An Expert
01-02-2015 09:48
3 of 5
http://www.engineeringcivil.com/things-site-engineers-must-know.html
Marine Engineering
Piles Engineering
Prestress Engineering
Soil Engineering
Steelworks
Surveying
Timber Engineering
Follow Us On FB
Find us on Facebook
EngineeringCivil.com
Like
Knowledge Center
Construction Equipments
Civil Engineering Disasters
Civil Engineering Events
Civil Engineering Facts
Civil Engineering Information
Civil Engineering Notes From Universities
Civil Engineering Presentations
Civil Engineering Quotes
Civil Engineering Videos
Civil Engineering Wonders
Construction Terms
Famous Civil Engineers
Interviews
Material and Site Testing
Measurement Units
Mix Design
Project Reports
Research Papers
Student Corner
Help Others
01-02-2015 09:48
4 of 5
http://www.engineeringcivil.com/things-site-engineers-must-know.html
Search
Top Contributors
You can list yourself here by submitting civil engineering related topics to us.
Er. Harpal Aujla
Er. Raj M. Khan
Er. Vikrant
Ramasesh Iyer
Er. Kaushal Kishore
Vincent T. H. CHU
Powered by groups.yahoo.com
Recently Added
AARAMBH 2015
Megalith 2015 IIT Kharagpur Fest
The GANGES CANAL
The 11th Shanghai International Energy-saving & Advanced Building Materials Exhibition
Dusting of Concrete Slab Surface
Aakaar 2015
Capping Concrete Specimens For Compression Testing
ULTRASONIC TESTING OF CONCRETE
Testing Concrete Cores
Problems of using High Grade Steel in Constructions
01-02-2015 09:48
5 of 5
http://www.engineeringcivil.com/things-site-engineers-must-know.html
Follow Us On FB
Find us on Facebook
EngineeringCivil.com
Like
01-02-2015 09:48