A project has been defined to contain the following list of activities, along with their required
times for completion,
ACTIVITY
TIME
IMMEDIATE PREDECESSORS
A
B
C
D
E
F
G
H
I
1
4
3
7
6
2
7
9
4
A
A
A
B
C,D
E,F
D
G,H
Requirement:
a. Draw the critical path diagram (Node).
b. Show the early start and early finish times.c. Show the critical path.
d. What would happen if activity F was revised to take four days instead of two?
EXPECTED TIME
ET=
a+ 4 m+b
6
ACTIVITY VARIANCE
ba 2
2=
6
( )
4.00
5.50
25
36
4.17
1
4
11.33
16
9
6.50
9
4
9.00
25
9
4.50
25
36
b.
F(2)
B(4)
G(7)
A(1)
C(3)
D(7)
E(6)
c. Shown on diagram
d. Shown on diagram
e. We know that,
Transformation formula Z
Problem 3
A project consists of 9 activities. For each activity, the preceding activity is given and a
deterministic estimate of the length of time required to complete it.
ACTIVITY
TIME
IMMEDIATE PREDECESSORS
A
B
C
D
E
F
G
H
I
6
9
8
12
11
7
12
14
9
A
A
A
B
C,D
E,F
D
G,H
Requirement:
a. Draw a node diagram.
b. Calculate the slack time for each paths.
c. Determine critical path.